HomeMy WebLinkAboutM-88-0943M TT
* Pub Mfg. Co ,Inc..
55 N.E. 24th Street
Miami, Florida 33137
(305) 573-3610
Florida Watt t (its 330-Q.
` 5-� 1.
. 9= 43
A rur nee4 m Woad J'raucu.
September 260 1968
Mr Aurelio Perez-Lugones
Office of the Commission
City of Miami
3500 Pan American Dr
Miami, FL 33133
Dear Sir:
We respectfully request that the following three matters be
placed on the Agenda of the Commissioners Meeting scheduled for
October 1988.
1. Claim for amount due for Oreenheart piles supplied for
Slip 3, Bicentennial Park. (See documents marked Al and
A2 enclosed.)
2. Similar claim for Bayfront Park Redevelopment Phase III -
Amphitheater Project B3205-F. (See document marked 91
enclosed.)
3. Discussion on Bid tH788-096: Tot Lot and Leisure Products
for Parks and Recreation.
Thanks in anticipation for your kind cooperation.
Sincerely:,--'.-"1
Hassan Rahaman, President
1
C,"3
w
� k+5
.r
s'
F;
ft^%#WMTW% QUO.. WC 4A 0UAUMD ANNW? ' C01VAWa1Ja W 06NWr0000" at
* PurpGe� Mfg. Coq Inc,
Miami, Florida 33137
I"
(305) 573-3610 * Al
Fonda wan t (OW) 330-9063
AQ your nails in WWd rftducts.
July 14, 1988
City Commissioners,
Office of the Commission,
City of Miami,
3500 Pan American Drive,
Miami, FL 33133.
Dear Commissioners,
Respectfully, ray Company entreats your attention and kind
consideration relative to P.O. No. 90054 pertaining to 58 pieces
of Greenheart.piles for Bicentennial Park.
In the instant rtiatter, I proposed to the City of Miami Public
Works Department to deliver 58 pieces of Greenheart piles 57 ft.
long in 30 days. (It should be mentioned that a normal delivery
of th1:3 naturr takes 90 - 120 days.) I roade this gesture because
I was aware that 58 piles were ready for immediate shipment from
Guyana and would have been here, under normal circumstances,
within 30 days.
However, since one can never be certait-i About the ex.3ottird15 lit
thr tufting of t,e.a tr.ansportat ion, I took the precaution to advise
the City (see attached letter dated Jan. 28, 1988) that my
Company should "not be held responsible for any unforseen delays
such as bad weather or'engine failure enroute to Miami or any
other factors beyond our control."
As is well known its the hardwood lumber buslrres., Greenheart
piles must be barlled up -river, a distance of some 150 miles to
the point of international shipping. During one Stormy night one
of the bargee broke the tow and was unable to make the vessel. As
a result, I received only a part of Lhe original cargo on time -
only 25 piles of 57 ft length arrived in Miami.
At this point, we (the City and I) had one of two options. Either
(a) we wait for an additional thirty or so days for the
original pilings, or
(b) we utilize 35 piles of a longer length which were
i«unediately available from a previous cargo in
Jacksonville.
The decision hinged upon the urgency of the impending Grand Prix
show for the VIP ship to moor alongside. That decision was; made
Jointly between me: and the City Public Works Department. We
►iecidtd to use, the longer piles which were immediately available
but which would cost more. r
* Pwpk can Mfg. Cool Inc.*
55 N.E. 24th Street
Miami, Florida 33137 * *'
(305) 573-3610
Florida wets 1 XM 330.9063
AU your needs in Wood Products.
Gentlemen, I hope you do agree with me that my Company should not
suffer any further loss financially from this transaction. I made
every effort to assist all the way. Even at the last moment i
proposed to supplement other pilings to meet the grand event, an
offer which the City accepted to the extent that the piles were
utilized. And Gentlemen, in order to show good faith on my part
and with the hope of further business with the City, I did not
apply the 15% mark-up as is usual in transactions of this kind.
Believe me, Gentlemen, I sold the piles for exactly the same
price for which I bought them. .( See attached invoice from the
suppliers, Messrs Greenheart Associates.)
Sirs, my Company pleads for your kind consideration at this
particular time in its life. Should the difference not be met, my
Company's financial position would be debilitating, if not fatal.
Pl( :.i6C, airs, do coii5ider that my Company's future rests in your
hands - this very morning.
For your kind consideration please accept our best wishes.
Sincerely,
Hassan Rahaman, President
HR/GR/dt)
-2-
S
NNMrp�M►Ma. 00.. Mlt:. N A Q1M��MrEO MwO�M►ICOMIMMrttila�t/M�xrAaI�1MOMA1t
l
PURPLE HEART MANUFACTURING CO., INC. w
7rt * Z�C 66 N.E. 24th Street • Miami, Florida 33137
.� TNaphone: 1306) 673-3610
.r
SOLD TO City of Miami Accounting Div. �
Dept of Finame
P.O. Box 330708
L !lia d Fla 33133
Attn: Mr. Donald W. Car}wr
SHIPPIED To
Bernath Mull
Wpmmm
�lll�.
mmm
mm
I
mm
mom
Ref: To your,P.O. 090054
��lARIA�!
o�ucTeo ar
N
t:
0
s
mrrAk Woo* for Larri"s Snrefrra
SAL4S CONFIRMATION
Greenheart Associates, Inc.
A J.N. MONIEAM COKVANV. Est i &%
guyef- Danville-Findorff
..._+ Ee 1:
3152 Border W x le
P.O. am 757
South Arf+DaV. KI 068 79
(201) 721-7"1
TewK 652994
7331 Coral Way, Ste. 210 P.O. Box 140938 Dale: October 26. lydl
Coral Gables, FL 33114 E / No: P 720
Attention; Chris Hayward Your Reference: Dayf ront Park
Redevelopment Phase Ill
Dear Sirs: Aq)hltM&tre
We take pleasure In confirming our sale to you as follows and shall be much obliged If you will Immediately return one copy
signed to evoid delay in execution of order.
Grade and Species
FAS
Pau Lop* TM
d
Cluentity and specifications
D4S,
E4E as per specifications by Fuller 6
Sadao
bundled, end
sealed
LFT
BFT
2" x 8" 04S
to:
16" x 716" 192/141. 150/121, 170/191
6188
$249
2" x 6" DO
to:
M" x 5X" 264/14', 264/12'. 532/10'
10384
10384
12" x 12" 04S
to'
111 i" x I I S" 4 / 16'
64
768
16636 LFT 19401 BFT
Price: $2.25/BFT Total: $43,652.25
Prices Stated Are: tug trucKs Per.
For Dellvery / Shipment to: —lobs 141. M1M In / By: as soon As 09Ss ible
Freight: —
Insurance:
Wharfage:
Duty If Any:
Commission / Discount: n a _ -
Marks: _
Payment: 110,000-00 wlth order, balance t_D_D_
Remarks: We rc+auire drawings showing aasad edge^ Yitt`on ;u_rrant_ans fro. PuCpl •rt„ Ani
CMADX_ Inc
This sales confirmation *hail not be deemed accepted unless countersigned by UNtee offic ars or rewesentsthres In the S
New Jersey. Plosse sign and return this original and the yeUow oopy for final execution.
DANV I LLE-F INUORFF Yours thy.
Accepted by Buyer: al`EtNM wstOCtAtnS. 01C.
how tw. half M. , Itissltflsllt
The terms and conditions on the reverse side of this Contract are an Integral part of the COnlrsllt. tend am" betel 611 ow
before seceptsnce d this contract.
PURPLE HEART MANUFACTURING CO-, INC.
65 N.E. 24th Strut • Miami, Florida 33137
TMaphow (306) $73-3410
1� t
ylt � �Ar ; 8—
1610mer nANVTLLF FiNMRF'i_ _ ___Dille 1/213/87
idre" 201 Biscayne Byd__ _ Tune _
ly Miami . F1 on tin '13131_._ _ _P O R
,yer MA_ . �0_HN_DANVI LE _ PNM _3Z2_347_j __ 7041*1417e�rv
This ►s a • Ordef • Quote • Pickup
bYy
YM
vYw
Y MIAY �Y
•�
��•
MMY/tMO
M•
MY110Y
wall
Me"
'
�wYw
MM"
120
01 11
'
126
2" x 6"
x 10'
106
2"x 6"
x I '
57
2 It x 6
14'
54
2" x 6"
x 14'
69
2" x 6 "
x 14'
E4E with
rounded. Delivered in good order,.
Received