HomeMy WebLinkAboutR-88-1064J-88-1009 9/22/P8 fy-'1nFi�� PESOLIITION NO. A RESOLUTION AUTHORIZING AN INCREASE IN THE CONTRACT AMOUNT OF $3,767.72 IN THE CONTRACT BETWEEN THE CITY OF MIAMI, FLORIDA AND DELGADO PAVING, INC. DATED JUNE 18, 1087 FOR THE CONSTRUCTION OF CITYWIDE HIGHWAY IMPROVEMENT PHASE IV CIP PROJECT NO. 3411521 SAID FUNDS TO BE PROVIDED FROM THE CAPITAL IMPROVEMENTS ORDINANCE NO. 10347, AS AMENDED WITH FUNDS ALREADY ALLOCATED TO THE PROJECT; FURTHER ACCEPTING THE COMPLETED WORK OF DELGADO PAVING, INC. AT A TOTAL COST OF $671,802.40; AND AUTHORIZING A FINAL PAYMENT OF $52,600.84 WHEREAS, there exists a contract dated June 18, 1987 between the City of Miami, Florida and Delgado Paving, Inc. for CITYWIDE HIGHWAY IMPROVEMENT PHASE IV, CIP Project No. 341152; and WHEREAS, an increase in contract of $3,767.72 is required to cover the cost of additional work requested by the City; and WHEREAS, the Director of the Department of Public Works recommends the increase in contract to cover the additional costs; and WHEREAS, funds to cover the increase are available from money already allocated to the project; and WHEREAS, all of the work included in the contract and the proposed increase in contract has been satisfactorily completed by Delgado Paving, Inc. and they have furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend acceptance of the completed work and authorization of final payment to the contractor. NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The contract between the City of Miami, Florida and Delgado Paving, Inc. for the construction of Citywide Highway Improvement CIP Project No. 341152 dated June 18, 1987 is CITY COMMISSION MEETING OF NOV 3 1988 hereby increased by $3,767.72 with funds for the increase to be provided from monies already allocated to the project. Section 2. The completed work performed by Delgado Paving, Inc. for CITYWIDE HIGHWAY IMPROVEMENT C.I.P. Project No. 341152 is hereby accepted at a total cost of S671,RO2.40. Section 3. The proper officials of the City of Miami are hereby authorized to pay Delgado Paving, Inc. a balance of $52,600.84 as full and final payment for all work performed and all materials furnished in connection with the aforesaid contract. ATTEST; PASSED AND ADOPTED this3rdday of November CITY CLZRr PREPARED AND APPROVED BY: 11 _, CHIEF DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: CITY ATTORNEY APPROVED EXPENDITURE: FINANCARLODEPARTMENT BUDGETARY REVIE n' BUDGET DEPARTM NT CAPITAL PROJECT: PLANNINGvDRRTMENT , 1088. CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM TO. Honorable Mayor and Members of the City Commission FROM Cesar H. 0 a City Manage RECOMMENDATION: 73 DATE- CT 2 4 1988 FILE'B-4526 CITYWIDE HIGHWAY IMP. PHASE IV SUBJECT: CIP project No. 341152 Resolution for Increase in Contract and Final Payment REFERENCES: ENCLOSURES: It is respectfully recommended that the City Commission adopt the attached resolution authorizing an increase in contract in the amount of $3,767.72 in the contract between the City of Miami, Florida and Delgado Paving, Inc. for the construction of CITYWIDE HIGHWAY IMPROVEMENT PHASE IV - CIP Project No. 341152; said funds to be provided from the Capital Improvements Ordinance No. 10347, as amended, with funds already allocated to the project; further accepting the completed work of Delgado Paving, Inc., at a total cost of $671,802.40; and authorizing a final payment of $52,600.84. BACKGROUND: The Department of Public Works has determined that it is now in order for the Commission to authorize an increase in contract amount, accept the completed work and authorize final payment, after all conditions are met for Citywide Highway Improvement Phase IV - CIP Project No. 341152. The Citywide Highway Improvement Phase IV has been completed by Delgado Paving, Inc. The project consisted of constructing 0.8 miles of streets including clearing and grading, construction of asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm sewers and landscaping. Attachments: Proposed Resolution •, M FINAL CONSTRUCTIOM FACT SHEET JOB NAME CITYWIDE HIGHWAY IMPROVEMENT PHASE IV - B-4526 CONTRACTOR Delgado Paving, Inc. JOB SCOPE Construct 0.8 miles of streets including clearing and grading, construction of asphaltic pavement, concrete curbs and/or gutters, concrete sidewalk, storm sewers and landscaping. The work is located on N.W. 12 Street Drive (42-45 Avenues), N.W. 45 Avenue (Comfort Canal - N.W. 12 Street Drive), N.W. 27 Court (Flagler Street - N.W. 3 Street) and S.W. 12 Street (1-3 Avenues). REASON Eliminate drainage problems and deteriorated side FOR WORK parkways. SOURCE Capital Improvements Ordinance No. 10187 OF FUNDS Project No. 341152 PROJECT Bids Received: 5/14/87 HISTORY Contract Awarded: 6/11/87 Preconstruction Meeting: 6/10/g7 CONTRACT TIME STARTED 9/21/87 CONTRACT TIME 120 Working days plus 5 days rain and 3 days for extra work SCHEDULED COMPLETION DATE 3/25/88 ACTUAL COMPLETION DATE 3/25/88 BID AMOUNT $668,034.68 CONTRACT FINAL COST $671,802.40 CURRENT ITEM FOR Resolution to accept completed work increase contract CONSIDERATION amount $3,767.72 and authorize final payment to the contractor. i 7� Apa`