Loading...
HomeMy WebLinkAboutR-88-1032J-88-1027 9/21/88 RESOLUTION NO. A RESOLUTION ACCEPTING THE RID OF MIRI CONSTRUCTION, INC. IN THE PROPOSED AMOUNT OF $578,440.00, RASE BID OF THE PROPOSAL, FOR COCONUT GROVE STORM SEWER PROJECT, WITH MONIES THEREFOR ALLOCATED FROM THE 1988 CAPITAL IMPROVEMENT ORDINANCE NO. 10347, PROJECT NO. 352187 IN THE AMOUNT OF $578,440.00 TO COVER THE CONTRACT COST; AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH SAID FIRM. WHEREAS, sealed bids were received September 20, 1988 for Coconut Grove Storm Sewer Project; and WHEREAS, the City Manager and the Director of Public Works recommend that the bid received from Miri Construction, Inc. be accepted as the lowest responsible and responsive bid; and WHEREAS, the 1988 Capital Improvement Ordinance No. 10347, was adopted on November 19, 1987, and monies are available for the proposed amount of the contract, project expense, and incidentals under Project #352187 of said ordinance; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The September 20, 1988, bid of Miri Construction, Inc. in the proposed amount of $578,440.00, for the project entitled Coconut Grove Storm Sewer Project, for the base bid of the proposal based on lump sum prices, is hereby accepted at the price stated therein. Section 2. The amount of $578,440.00 is hereby allocated from the 1988 Capital Improvement Ordinance No. 10347, Project No. 352187 to cover the cost of said contract. CITY C014MISSION MEETING (DF NOV 3 Qp19C KSOLUTION No. Sy'�1oa 1AMARKS: i i i i 11 Section 3. The City Manager is hereby authorized to enter into a contract on behalf of the City of Miami with Miri Construction, Inc., for Coconut Grove Storm Sewer Project, base bid of the proposal. PASSED AND ADOPTED this 3rd day of November , 1988. ATTFRT! PREPARED AND APPROVED BY: CAL CHIEF DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: ,0 4P CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO Honorable Mayor and Members of the City Commission ®FROM Cesar H. Odio City Manager RECOMMENDATION 34 DATE FILE B_5525 OCT � 4 1988 SUI&JECT Resolution Awarding Contract COCONUT GROVE STORM SEWER PROJECT REFERENCES ENCLOSURES. It is respectfully recommended that the City Commission adopt the attached resolution accepting the low bid of Miri Construction, Inc. f or COCONUT GROVE STORM SEWER PROJECT, received September 20, 1988 in the amount of $ 578,440.00, Base Bid authorizing the City Manager to enter into a contract on behalf of the City. BACKGROUND Amount of Bid: $ 578,440.00 % of Cost Estimate: 91.8% Bid Cost Estimate/Total Appropriation: $630,000/$600,000 Source of Funds: 1988 C.I.P. Ord. 10347, as amended Minority Representation: 193 invitations mailed 16 contractors picked up plans & specs (6 Hispanic, 2 Black, 0 Female) 8 contractors submitted bids (2 Hispanic, 1 Black, 0 Female) Public Hearings/Notices: No Public Hearing/Bid notice published. Assessable Project: No Discussion: The Project Coordinator and the Department of Public Works have evaluated the bids received on September 20, 1988 and determined that the lowest responsible and responsive bid, in the amount of $578,440.00, is from Miri Construction, Inc., a hispanic minority controlled corporation. Funds are available to cover the contract cost, and for such incidental items as postage, blueprinting, advertising, and reproduction costs. Resolution attached S9-1Q32 P COCONUT GROVE STORM SEWER PROJECT JOB NO. B-5525 CONTRACTOR'S FACT SHEET 1. Miri Construction, Inc. 7340 S.W. 121 Street Miami, Florida 33156 Tel: (305) 233-5266 2. Principals: Dionisio Suarez, President Dion Suarez, Vice President 3. Contractor is properly licensed and insured. 4. Subcontractors: None required at this time. 5. Experience: Corporation established in 1978. 6. A hispanic minority contractor. 7. Project and Scope: Coconut Grove Storm Sewer Project The project consists of constructing French drain and storm sewer additions with necessary catch basins, manholes and grading. One hundred twenty (120) working days construction time. 8. Funds allocated: - Contract: $ 578,440.00 Project Expense 80,982.00 _ Blueprint: 500.00 Advertising: 750.00 Testing: 3,000.00 Postage: 110.00 SUB -TOTAL $ 663,782.00 Indirect Cost 79368.00 TOTAL $ 671.150.00 Prepared by: G.E. Picard 21 Sep 88 W 11" BID NO. 87-88-149 CITY OF MIAMI DEPARTMENT OF PUBLIC WORKS ASSESSMENTS,SPECIFICATIONS AND CONTRACTS SECTION PROJECT REQUEST DATE: August 18, 1988 CIP Project: Coconut Grove Storm Sewer Project C..�-.�. PROJECT NO.: 352187 INDEX NO.: 319201 SOURCE OF FUNDS: CIP Ordinance No. 10347 BIDS TO BE SECURED FOR: COCONUT GROVE STORM SEWER PROJECT Located at various locations in Coconut Grove South of Bird Avenue and West Mary Street The project consists of the construction of French Drains and other storm sewer additions ' necessary catch basins and pavement restoration PLANS b SPECS PREPARED BY: Public Works FOR THE DEPARTMENT/699'- OF: Public Works ADVERTISE ON: September 1, 1988 RECEIVE BIDS: September 20, 1988` ESTIMATED COST Total Bid $600,000 NOTE: Plans b specs must accompany this form, together with rough copy of advertisement, at least TWO weeks prior to the proposed date of advertising. Minimum bidding time is 15 days (Code Sec. 18-52.1(d)). Form PW #121R Rev 7/13/97 To File FROM Dona Dire W. Cather CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM DATE August 18, 1988 WILE: B-5525 SUBJECT Request to Coordinate Bids 6 Specifications REFERENCES- WoX S ENCLOSURES Attached is PW form #E121R for the job entitled COCONUT GROVE STORM SEWER PROJECT, as per Project No. 352187. We have verified with the Department of Finance that funding will be available for this project; indicated below are monies required to cover the cost of this contract based on the preliminary engineer's/architect's estimate of $600,000, /and lus additional amounts for project expe�rs�;�----�ncid� s, indirect cost. ( �s aoity - de (Y) N) Adrienne Macbeth Minority Procurement Approved Expenditure ano ar urana-- Director Of Budget GEP:au .0 J06 IN � cc: Contract B-1525 4 fBuge Zd7".rll r o j . Sergio Rodriguez Director of Planning $ will be available to cover the cost of this contract 1A.t We-- - C', Carlos arc Director of Fina ce i I fl I111I§Ih01111111 I I I II I TABULATION OF BIDS FOR COCONUT GROVE STORM SEWER PROJECT B-5525 Cl it: go A.M. MIRI CONST. INC. W L AMS PAV O.INC. OCEAN BAY CONST. ALFRED LLOYD&SONS INC. lleMud M bmw-td M Mr Cltj Csds • Metro Ord. 5x 5x 5% H8 VOUCHER Nd good ANWAt B A lrlt!« IrreguA YES NO NO YES "ifteriky COW TOTAL BASE BID: THE TOTAL 578 440.00 634 638.00 697,116.05 726,849.32 OF ITEMS i THRU 32 (120) WORKING DAYS M VILA G ASSOC. INC. LANZO CONSTRUCTION ROCCO FERRERA&CO. INC. MAN -CON INC. �1 usawd s snwrsd M rr city cods s metre are. 5% 5 % 5% old �ww was 5X A.B A 8,H irrNulrltlM YES YES NO NO Mlnrlt owned TOTAL BASE BID: THE TOTAL 859. 550.00 890. 698.00 995. 750.00 1, 298, 886.55 OF ITEMS i THRU 32 (120 WORKING DAYS IRREGULARITIES LEGEND A - Ns ftm-+t-atwn r THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED 8-0 AtNdWit M t. CRltsl E @wswr Of WW"I cssvw+r that the lowest Responsible and Respons ve bidder is C — owreatsd EagwwIwo D-w%psssl 1w sped or IM am ly !loved or He CrMvt- 90-2 E —tns mms Estwrlswe F — o w-rompowivs bid I 6 — Up ow Bid MwM r BID 87-ee-laq H—am I mum nd w — fiw•.t ammo mrins amol1Mw-- s<-tw0 --Ir �a.srttr Onpllrw ustemot Ni swig"" US MgMss 8-5525