RESOLUTION NO.
A RESOLUTION ACCEPTING THE RID OF MIRI
CONSTRUCTION, INC. IN THE PROPOSED AMOUNT
OF $578,440.00, RASE BID OF THE PROPOSAL,
FOR COCONUT GROVE STORM SEWER PROJECT,
WITH MONIES THEREFOR ALLOCATED FROM THE
1988 CAPITAL IMPROVEMENT ORDINANCE NO.
10347, PROJECT NO. 352187 IN THE AMOUNT OF
$578,440.00 TO COVER THE CONTRACT COST;
AUTHORIZING THE CITY MANAGER TO
EXECUTE A CONTRACT WITH SAID FIRM.
WHEREAS, sealed bids were received September 20, 1988 for
Coconut Grove Storm Sewer Project; and
WHEREAS, the City Manager and the Director of Public Works
recommend that the bid received from Miri Construction, Inc. be
accepted as the lowest responsible and responsive bid; and
WHEREAS, the 1988 Capital Improvement Ordinance No. 10347,
was adopted on November 19, 1987, and monies are available for
the proposed amount of the contract, project expense, and
incidentals under Project #352187 of said ordinance;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The September 20, 1988, bid of Miri
Construction, Inc. in the proposed amount of $578,440.00, for the
project entitled Coconut Grove Storm Sewer Project, for the base
bid of the proposal based on lump sum prices, is hereby accepted
at the price stated therein.
Section 2. The amount of $578,440.00 is hereby allocated
from the 1988 Capital Improvement Ordinance No. 10347, Project
No. 352187 to cover the cost of said contract.
CITY C014MISSION
MEETING (DF
NOV 3 Qp19C
KSOLUTION No. Sy'�1oa
1AMARKS:
i
i
i
i
11
Section 3. The City Manager is hereby authorized to enter
into a contract on behalf of the City of Miami with Miri
Construction, Inc., for Coconut Grove Storm Sewer Project, base
bid of the proposal.
PASSED AND ADOPTED this 3rd day of November , 1988.
ATTFRT!
PREPARED AND APPROVED BY:
CAL
CHIEF DEPUTY CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
,0 4P
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO Honorable Mayor and Members
of the City Commission
®FROM Cesar H. Odio
City Manager
RECOMMENDATION
34
DATE FILE B_5525
OCT � 4 1988
SUI&JECT Resolution Awarding Contract
COCONUT GROVE STORM
SEWER PROJECT
REFERENCES
ENCLOSURES.
It is respectfully recommended that the City Commission adopt the
attached resolution accepting the low bid of Miri Construction, Inc.
f or COCONUT GROVE STORM SEWER PROJECT, received September 20, 1988
in the amount of $ 578,440.00, Base Bid authorizing the City Manager
to enter into a contract on behalf of the City.
BACKGROUND
Amount of Bid: $ 578,440.00 % of Cost Estimate: 91.8%
Bid Cost Estimate/Total Appropriation: $630,000/$600,000
Source of Funds: 1988 C.I.P. Ord. 10347, as amended
Minority Representation: 193 invitations mailed
16 contractors picked up plans & specs
(6 Hispanic, 2 Black, 0 Female)
8 contractors submitted bids
(2 Hispanic, 1 Black, 0 Female)
Public Hearings/Notices: No Public Hearing/Bid notice published.
Assessable Project: No
Discussion: The Project Coordinator and the Department of Public
Works have evaluated the bids received on September 20, 1988 and
determined that the lowest responsible and responsive bid, in the
amount of $578,440.00, is from Miri Construction, Inc., a hispanic
minority controlled corporation. Funds are available to cover the
contract cost, and for such incidental items as postage,
blueprinting, advertising, and reproduction costs.
Resolution attached
S9-1Q32
P
COCONUT GROVE STORM SEWER PROJECT
JOB NO. B-5525
CONTRACTOR'S FACT SHEET
1. Miri Construction, Inc.
7340 S.W. 121 Street
Miami, Florida 33156 Tel: (305) 233-5266
2. Principals:
Dionisio Suarez, President
Dion Suarez, Vice President
3. Contractor is properly licensed and insured.
4. Subcontractors: None required at this time.
5. Experience: Corporation established in 1978.
6. A hispanic minority contractor.
7. Project and Scope:
Coconut Grove Storm Sewer Project
The project consists of constructing French drain and storm
sewer additions with necessary catch basins, manholes and
grading.
One hundred twenty (120) working days construction time.
8. Funds allocated:
- Contract:
$ 578,440.00
Project Expense
80,982.00
_ Blueprint:
500.00
Advertising:
750.00
Testing:
3,000.00
Postage:
110.00
SUB -TOTAL
$ 663,782.00
Indirect Cost
79368.00
TOTAL
$ 671.150.00
Prepared by: G.E. Picard
21 Sep 88
W 11"
BID NO. 87-88-149
CITY OF MIAMI
DEPARTMENT OF PUBLIC WORKS
ASSESSMENTS,SPECIFICATIONS AND CONTRACTS SECTION
PROJECT REQUEST
DATE: August 18, 1988 CIP Project: Coconut Grove Storm
Sewer Project
C..�-.�. PROJECT NO.: 352187 INDEX NO.: 319201
SOURCE OF FUNDS: CIP Ordinance No. 10347
BIDS TO BE SECURED FOR: COCONUT GROVE STORM SEWER PROJECT
Located at various locations in Coconut Grove
South of Bird Avenue and West Mary Street
The project consists of the construction of
French Drains and other storm sewer additions '
necessary catch basins and pavement restoration
PLANS b SPECS PREPARED BY: Public Works
FOR THE DEPARTMENT/699'- OF: Public Works
ADVERTISE ON: September 1, 1988 RECEIVE BIDS: September 20, 1988`
ESTIMATED COST Total Bid $600,000
NOTE: Plans b specs must accompany this form, together
with rough copy of advertisement, at least TWO weeks prior
to the proposed date of advertising. Minimum bidding time
is 15 days (Code Sec. 18-52.1(d)).
Form PW #121R
Rev 7/13/97
To File
FROM
Dona
Dire
W. Cather
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
DATE August 18, 1988 WILE: B-5525
SUBJECT Request to Coordinate
Bids 6 Specifications
REFERENCES-
WoX S ENCLOSURES
Attached is PW form #E121R for the job entitled COCONUT GROVE
STORM SEWER PROJECT, as per Project No. 352187.
We have verified with the Department of Finance that funding
will be available for this project; indicated below are monies
required to cover the cost of this contract based on the
preliminary engineer's/architect's estimate of $600,000, /and
lus
additional amounts for project expe�rs�;�----�ncid� s,
indirect cost. ( �s
aoity - de (Y) N)
Adrienne Macbeth
Minority Procurement
Approved Expenditure
ano ar urana--
Director Of Budget
GEP:au .0 J06 IN �
cc: Contract B-1525
4
fBuge Zd7".rll r o j .
Sergio Rodriguez
Director of Planning
$ will be
available to cover the
cost of this contract
1A.t We-- - C',
Carlos arc
Director of Fina ce
i I fl I111I§Ih01111111 I I I II I
TABULATION
OF BIDS FOR
COCONUT
GROVE STORM
SEWER PROJECT B-5525
Cl
it: go A.M.
MIRI CONST. INC.
W L AMS PAV O.INC.
OCEAN BAY CONST.
ALFRED LLOYD&SONS INC.
lleMud M bmw-td M Mr Cltj Csds • Metro Ord.
5x
5x
5%
H8 VOUCHER
Nd good ANWAt
B
A
lrlt!«
IrreguA
YES
NO
NO
YES
"ifteriky COW
TOTAL BASE BID: THE TOTAL
578 440.00
634 638.00
697,116.05
726,849.32
OF ITEMS i THRU 32
(120) WORKING DAYS
M VILA G ASSOC. INC.
LANZO CONSTRUCTION
ROCCO FERRERA&CO.
INC.
MAN -CON INC.
�1
usawd s snwrsd M rr city cods s metre are.
5%
5 %
5%
old �ww was
5X
A.B
A 8,H
irrNulrltlM
YES
YES
NO
NO
Mlnrlt owned
TOTAL BASE BID: THE TOTAL
859. 550.00
890. 698.00
995. 750.00
1, 298, 886.55
OF ITEMS i THRU 32
(120 WORKING DAYS
IRREGULARITIES LEGEND
A - Ns ftm-+t-atwn r
THE DEPARTMENT OF
PUBLIC WORKS HAS DETERMINED
8-0 AtNdWit M t. CRltsl E @wswr Of WW"I cssvw+r that the lowest Responsible
and Respons ve
bidder is
C — owreatsd EagwwIwo
D-w%psssl 1w sped or IM am ly !loved or He CrMvt- 90-2
E —tns mms Estwrlswe
F — o w-rompowivs bid
I 6 — Up ow Bid MwM
r
BID
87-ee-laq
H—am I mum nd
w — fiw•.t ammo mrins amol1Mw-- s<-tw0
--Ir �a.srttr Onpllrw ustemot
Ni swig"" US MgMss
8-5525