Loading...
HomeMy WebLinkAboutR-88-1025s 6 J-88-1062 10/12/88 RESOLUTION NO. —10`"i A RESOLUTION ACCEPTING THE COMPLETED WORK OF SOLO CONSTRUCTION CORP. AT A TOTAL COST OF $454,507.5R FOR SHENANDOAH STORM SEWER PROJECT C I P PROJECT NO. 352.176 AND AUTHORIZING A FINAL PAYMENT OF $9,127.09. WHEREAS, there exists a contract dated April 30, 1987 between the City of Miami and Solo Construction Corp.; and WHEREAS, the work has been satisfactorily completed by Solo Construction Corp. and they have furnished the required documents certifying that all bills for labor and materials have been paid in full in connection with the aforesaid contract; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend that the completed work be accepted and final payment made to the contractor; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section I. The completed work performed by Solo Construction Corp. for SHENANDOAH STORM SEWER PROJECT C.I.P. Project No. 352176 at a total cost of $454,507.5P is hereby approved. Section 2. The proper officials of the City of Miami are hereby authorized to pay $9,127.09 to Solo Construction Corp. as full and final payment for all work performed and all materials furnished in connection with SHENANDOAH STORM SEWER PROJECT C.I.P. Project No. 352176. a' CITY COMMISSION 9 MEETING OF NOVppR 1988 ,A:: SOLUTION NdJs-10 5 �ILMARKS: 1988. ATTEST: PASSED AND ADOPTED this 3rd day of November , L1 Lj-1 rtKK -,/"/ PREPARED AND APPROVED BY: -/. A"Ic- IT CHIEF DEPUTY CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: r 4CITATTOR Y APPROVED EXPENDITURE: Kff,jv� FINAN DEPARTMENT BUDGETARY REVIEW: DEPAR r ENT OF BUDGET CAPITAL PR ECT: P DEPARTMENT ;i i i 11 a CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO Honorable Mayor and Members of the City Commission FROM ®Cesar H. Odio " City Manager .� RECOMMENDATION: DATE SUBJECT REFERENCES: ENCLOSURES: 23 FILE B-5507 T 2 4 1988 SHENANDOAH STORM SEWER PROJECT C.I.P. PROJECT NO. 352176 Resolution for Final Payment It is respectfully recommended that the City Commission adopt the attached resolution accepting the completed work performed by Solo Construction Corp. at a total cost of $454,507.58 for SHENANDOAH STORM SEWER PROJECT, C.I.P. Project No. 352176 and authorizing a final payment of $9,127.09. BACKGROUND: The Department of Public Works has determined that it is now in order for the Commission to accept the completed work and authorize final payment, after all conditions are met for Shenandoah Storm Sewer Project C.I.P. Project No. 352176. Solo Construction Corp. has completed the project consisting of constructing 1427' of 24", 30" and 36" French Drain; 1760' of 3' and 5' wide covered ditch; 1811' of 12"-24" pipe, manholes, catch basins and pavement restoration in area bounded by S.W. 8-21 Streets between S.W. 12-19 Avenues. The total payment to the contractor will be less than the original contract amount of $507,580.00 because not all of the Proposal Items were used. Attachments: Proposed Resolution .. FINAL CONSTRUCTION FACT SHEET JOB NAME SHENANDOAH STORM SEWER PROJECT B-5507 CONTRACTOR Solo Construction Corp. JOB SCOPE Construct 1427' of 24", 30" and 36" French Drain; 1760' of 3' and 5' wide covered ditch; 1811' of 12"-24" pipe, manholes, catch basins and pavement restoration in area bounded by SW 8-21 Streets between S.W. 12-19 Avenues. REASON Provide drainage structures at locations of greatest FOR WORK need. SOURCE Capital Improvements Ordinance No. 10347 OF FUNDS Proj.ect No. 352176 PROJECT Bids Received: 4/21/87 HISTORY Contract Awarded: 4/30/87 Preconstruction Meeting: 6/8/87 CONTRACT TIME STARTED 6/26/87 CONTRACT TIME 155 Working days plus 10 days delay from rain and 4 days delay for extra work. SCHEDULED COMPLETION DATE 3/2/88 ACTUAL COMPLETION DATE 3/2/88 BID AMOUNT $507,580.00 CONTRACT FINAL COST $454,507.58 CURRENT ITEM FOR Resolution to accept completed work, and authorize CONSIDERATION final payment to the contractor.