RESOLUTION NO. 88 --101 r?
A RESOLUTION ACCEPTING THE BID OF
CAMPANELLA CONSTRUCTION CORPORATION IN THE
PROPOSED AMOUNT OF $77,775.00, BASE BID OF
THE PROPOSAL, FOR N.W. 1 AVENUE SANITARY
SEWER REPLACEMENT PROJECT; WITH MONIES
THEREFOR ALLOCATED FROM CAPITAL
IMPROVEMENT ORDINANCE NO. 10347, PROJECT
NO. 351280 IN THE AMOUNT OF $77,775.00 TO
COVER THE CONTRACT COST; AND AUTHORIZING
THE CITY MANAGER TO EXECUTE A CONTRACT
WITH SAID FIRM.
WHEREAS, sealed bids were received August 16, 1988, for N.W.
1 Avenue Sanitary Sewer Replacement Project; and
WHEREAS, the City Manager and the Director of the Department
of Public Works recommend that the bid received from Campanella
Construction Corporation be accepted as the lowest responsible
and responsive bid; and
WHEREAS, Capital Improvement Ordinance No. 10347,
was adopted on November 19, 1987, and monies are available for
the proposed amount of the contract, project expense, and
Incidentals under Project #351280 of said ordinance;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The August 16, 1988 bid of Campanella
Construction Corporation In the proposed amount of $77,775.00,
for the project entitled N.W. 1 Avenue Sanitary Sewer Replacement
Project, for the base bid of the proposal based on lump sum
prices, is hereby accepted at the price stated therein.
Section 2. The amount of $77,775.00 Is hereby allocated
from Capital Improvement Ordinance No. 10347, Project
No. 351280 to cover the cost of said contract.
CITY CON CMON
BQEEET= OF
NOV 4 ISU
:SOLUTION No. 8A-1 n
Section 3. The City Manager is hereby authorized to enter
Into a contract on behalf of the City of Miami with Campanella
Construction Corporation, for N.W. 1 Avenue Sanitary Sewer
Replacement Project, base bid of the proposal.
PASSED AND ADOPTED this 3rd day of November 1988.
XAVIER L. S AR MAYOR
ATTEST:
PREPARED AND APPROVED BY:
le &.ng� - - / "e.,lr
ROBERT F. CLARK
CHIEF DEPUTY CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
t
JO GE 1.0. FE A DEZ
CITY ATTORN
- 2
il
4
5«`
{z
1
{ff
r
j
SSE E►iPl RECE�vEP,,,,,T„�.u`-3u�� ]�^� °R� 11:0(1 am
Atecciv@4 >i*c above do(wikci tlwck• thl Vey o1 ILA
1wt r1Ct0YMTIMG DIVISION
9
s
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO Honorable Mayor and Members
of the City Commission
p
1l)
FR M Cesar H. Od I o I
City Manager
RECOMMENDATION
12
DATE OCT z 4 1988 FILE B-5553
SUBJECT Resolution Awarding Contract
N.W. 1 AVENUE SANITARY
SEWER REPLACEMENT PROJECT
REFERENCES
ENCLOSURES.
It is respectfully recommended that the City Commission adopt the
attached resolution accepting the low bid of Campanella Construction
Corporation, for N.W. 1 AVENUE SANITARY SEWER REPLACEMENT PROJECT,
received August 16, 1988 In the amount of $77,775.00, Base Bid;
authorizing the City Manager to enter Into a contract on behalf of
the City.
BACKGROUND
Amount of Bid: $ 77,775.00 % of Cost Estimate: 102.3%
Cost Estimate/Budgeted Amount: $78,000/$95,000
Source of Funds: 1988 C.I.P. Ordinance No. 10347 as amended
Minority Representation: 194 Invitations mailed
8 contractors picked up plans & specs
(3 Hispanic, 2 Black, 0 Female)
3 contractors submitted bids
(2 Hispanic, 0 Black, 0 Female)
Public Hearings/Notices: No public hearing/Bid notice published
Assessable Project: No.
DIscussIon: The Department of Public Works has evaluated the bids
received on August 16 and determined that the lowest responsible and
responsive bid. In the amount of $77,775.00, Is from Campanella
Construction Corporation, a hispanic controlled corporation. Funds
are available to cover the contract cost, and for such incidental
items as postage, blueprinting, advertising, and reproduction costs.
Resolution attached
88--i01S
i
N.W. 1 AVENUE SANITARY SEWER REPLACEMENT PROJECT
JOB NO. B-5553
CONTRACTOR'S FACT SHEET
1. Campanella Construction Corporation
1901 N.W. 18th Street, Bldg. F-1
Pompano Beach, Florida 33069 Tel: (305) 960-0116
2. Principals:
Santl Campanella, President
Oscar Bustamante, Vice -President
Carlos Martin, Secretary
3. Contractor is properly licensed and Insured.
4. Subcontractors:
None required at this time
5. Experience: Corporation established In 1931.
6. A hispanic minority contractor
7. Project and Scope:
N.W. 1 Avenue Sanitary Sewer Replacement Project
N.W. 1 Avenue between N.W. 1 Street and N.W. 4 Street
The project consists of the replacement of approximately
850 linear feet of various sizes of sanitary sewer along
with manholes and sidewalk/pavement In the construction
area.
Thirty (30) working days construction time
S. Funds allocated:
Contract: $ 77,775.00
Project Expense 10,888.00
Blueprint: 200.00
Advertising: 800.00
Testing: 500.00
Postage: 75.00
SUB -TOTAL S 89,938.00
lndlrect" Cost 998.00
TOTAL $ 90,936.00
Prepared by:
C.E. Picard
17 Aug 88
5 015
BID NO. 87-88-131
CITY OF MIAMI
DEPARTMENT OF PUBLIC WORKS
ASSESSMENT89SPECIFICATIONS AND CONTRACTS SECTION
PROJECT REQUEST
DATE: July 14, 1988 CIP Project: N.W. 1 Avenue Sanitar.,
Sewer Replacement
Project B-5553
9 1 R. PROJECT NO.: 351280 INDEX NO.: 301,201
SOURCE OF FUNDS: CIP Ordinance No. 10347
BIDS TO BE SECURED FOR: N.W. 1 AVENUE SANITARY SEWER REPLACEMENT
PROJECT, B-5553
Located at N.W. 1 Avenue between N.W. 1 Street
and N.W. 4 Street.
The project consists of installing sewer and
laterals along with necessary sidewalk and
pavement replacement.
PLANS & SPECS PREPARED BY: Public Works
FOR THE DEPARTMENT/ePPIGE OF: Public Works
ADVERTISE ON: July 28, 1988 RECEIVE BIDS: August 16, 1988
ESTIMATED COST Total Bid $76,000
NOTE: Plans & specs must accompany this form, together
with rough copy of advertisement, at least TWO weeks prior
to the proposed date of advertising. Minimum bidding time
is 15 days (Code Sec. 18-52.1(d)).
Form PW #121R
Rev 7/13/87 80-1015
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
To Fi le DATE July 14, 1988 FILE B-5553
SUBJECT Request to Coordinate
Bids b Specifications
a
FROM
Do W. Cath
D i V e c ta rAf-�
orks
REFERENCES
ENCLOSURES
Attached is PW form #121R for the job entitled N.N. 1 AVENUE
SANITARY SEWER REPLACEMENT PROJECT, B-5553, as per Project No.
351280.
We have verified with the Department of Finance that funding
will be available for this project; indicated below are monies
required to cover the cost of this contract based on the
preliminary engineer's/architect's estimate of $76,000, plus
additional amounts for project expense, incidentals, and
indirect cost.
in r, rity et -Aside (Y) (N) Budgeted Capital Proj.
r enne ac a5 eXglguez
Minority Procurement Diof Planning
Approved Expenditure $ will be
ava a e to F&ver the
cost of this contract
*Nonqana
Direcof B dget
GEP:au
cc: Sewers
Contract B-5553
6��-
NarluGarcia
Director of Finance
Ef
TABULATION OF BIDS FOR �
N.W. 1 AVENUE SANITARY SEWER REPLACEMENT PROJECT B-5553
City Meneder..414.o.-- 11: 00 A.M. AUGUST 16. 1988
bidder CAMPANELLA CONST. MAN -CON INC. MIRI COW. INC.
Licensed A Insured so per City Code a no" Ord.
Bid Bond Amount
98 VOUCHER
Irresularitim
lawlty
YES
NO
YES
TOTAL OAK 011k THE TOTAL OF ITEMS i THRU 23 p0) MOWING DAYs
$ 7. 775.00
eo4 Ma.00
•M, 071.00
IRREGULARITIES LEGEND
A — Me PoMar-of-Attonry
8 —ir Affidevit as to Capital a S"lw of aandiM CoMWI IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC MONKS
C am mated Dttewiew THAT THE LOWEST BIDDER IS CAMPANELLA CONSTRUCTION INCORPORATED
D—Nvpseel I4alp" w improperly Bland or No Corporate anal IN THE AMOUNT OF $77, 775. 00
E -
F -
6 — Improper aid Bond
M ow"std ad BID 67-88-131
I-
J-
or LE e-5553