HomeMy WebLinkAboutR-89-00082 zNIA ; 's
i
J-89-57
1z✓�✓ss
RESOLUTION NO.
A RESOLUTION ACCEPTING - THE COMPLETED WORK OF
MIRI CONSTRUCTION CO., INC. AT A TOTAL COST
OF S49,800.00 FOR LOCAL DRAINAGE PROJECT
FLAGLER STREET REPAIR E-58 (SECOND 8I9DIM
CIP PROJECT NO. 352232 AND AUTHORIZING A
FINAL PAYMENT OF $4,980.00.
WHEREAS, there exists a contract dated September 19,
1988 between the City of Miami and Miri Construction Co., Inc.;
and
WHEREAS, the work has been satisfactorily completed
by Miri Construction Co., Inc. and they have furnished the
k—
required documents certifying that all bills for labor and -
materials have been paid in full in connection with the }
aforesaid contract; and
WHEREAS, the City Manager and the Director of the
Department of Public Works recommend that the completed work be
accepted and final payment made to the contractor;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF
THE CITY OF MIAMI, FLORIDA: 5
Section 1. The completed work performed by Miri -
Construction Co., Inc. for LOCAL DRAINAGE PROJECT FLAGLER _1
STREET REPAIR E-58 (SECOND BIDDING) C.I.P. Project No. 352232
at a total cost of $49,800.00 is hereby approved.
Section 2. The proper officials of the City of Miami
are hereby authorized to pay $4,980.00 to Miri Construction
Co., Inc. as full and final payment for all work performed and
all materials furnished in connection with LOCAL DRAINAGE
-
PROJECT FLAGLER STREET REPAIR E-58 (SECOND BIDDING) C.I.P.
Project No. 352232.
CITY CONIISSION
MEETING OF
JAN 112 19899
=
RESOLUTION No. C3w77
AND A00pTEbth l 1 dA , b ►� a V
VY •.:
t
t
Y
;? sw
ATTES
ES a,
MEW
-HL
ITY
PREPARED AND APPROVED BY:
A'Q'BFRT' F . ULARK
CHIEF DEPUTY CITY ATTORNEY. u
f 1 ,
t s
�s. � E.. T !'Y_^+�.L'.. )1 'i i. ���� �• 3e1= f'ii4 'F" ���tb�E 'k
,APPROVED AS TO FORM AND CORRECTNESS"'.:,yn w{mot
. 3. t ., t ,tt o-iyt _: �.$ J• iT ���r 1 s�, ��t�A�
i .. 1 } (` } 71, A d�%t�Ht�2�{]4•,' R1' ': ��'��Mgy'�t�y�+t"{r��`'�s�
{ 41T
' �5 • ATTORNEY
t % §
APP.ROYED ITURE:
1w ,
• FINANC DEPARTMENT
-� BUDGETARY REVIEW:
•,jC z �r y y��s a. f tll a 1 5
� a
ULKLUIUK
:4 DEPARTMENT 0 BUDGET
CAPITAL PROJECT:
�keiJs.ii
i C 1 "Z y`� L ry�M�$ly t1-i
PLANNING DEPARTMENT
exs qq +tr ! s;yl�r�
-s. .. �. ,.,., ,_ • ..:u s ,., .. ,. x�1�r,: a.Y.�t�a. xr,.1 �. ;. r_3 erb-,13'-.-.L.a'e4`�.'„�e;.�ti�'v:.. - - .-
d
r
+7 .•+Wkwi^ r•slNrw4�:�i -
-
M
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
-o Honorable Mayor and Members DATE JA►N - 3 1989 FILE B-5552
of the City Commission '
SUBJECT LOCAL DRAINAGE PROJECT FLAGLE
ST. REPAIR E-58 (2ND BIDDING,
C.I.P. PROJECT NO. 352232.
=qOM r REFERENCES: Resolution for Final Payment ,4.
Cesar H. Odio
City Manager ENCLOSURES:
,a
.RECOMMENDATION:
.It 1s'-respectfully recommended that the •City Commission-adopt.the
attached resolution accepting the completed work performed by Mirir
Construction Co., Inc. at a total cost of $49,800.00 for LOCAL ;
..DRAINAGE PROJECT FLAGLER STREET REPAIR E-58 (SECOND BIDDING),
.C.I.P. Project No. 352232 and authorizing a final payment''of
$4,-980.00.
E
l
BACKGROUND:
The Department of Public Works has determined that it is now. -fin
order for the Commission to accept the completed work acid
authorize final
payment, after all conditions are met for LoCAI
Drainage Project Flagler Street Repair E-58 (Second Bidding
C.I.P. Project No. 352232.
Miri Construction Co., Inc. has completed the project consistiing 1
of installing protective slab over existing storm sewer bax
culvert and replacing concrete and asphalt pavement in East
Flagler Street between Miami Avenue and East 1 Avenue.
The total payment to the contractor will be $7,300.00 less th-i0
r: tFie on gi nal contract amount of $57,100.00 because not all 'of
C
'ash. -Allowance was used.
4 �
k
� AtA tisen t
ChtS i' _ '1 r rir tryl.k
proposed Resolution
i
—n
is i d a i.:, t t f '�,.R'�'tt L W�5`x. F'�✓� j.5�1.��11t"'Sn�S`"y �.+s�w i",� �.
"
L
,
n
ZW
f t i`l r 7,yv Y." imlf,.,
FM
t• t' Aux °sit yP ';?,. `& R,ar�.J r ht n `j 1'+c 3� d i_ 'yh1 {3 t" i a iU4a"`e'Xi d}`, i
h 11
,, - _ - k fy�.:: r,t � �:K . , � f,�° ,�' 4 . ; X;• d 7 �?�.� 3 3� ,3' r `a i t"�3 � rf'� X �1b � .;
s X
a _
FINAL .CONSTRUCTION _FACT _SHEET
JOB NAME LOCAL DRAINAGE PROJECT FLAGLER STREET REPAIR E•58
iSEC4ND BIDDING) - B-5552
k:
CONTRACTOR Miri Construction Co., Inc.
JOB SCOPE Install protective slab over existing storm sewer, box. r
6." culvert and replacing concrete and asphalt pavement in
:r
East Flagler Street between Miami Avenue and East
Avenue.
REASON Repairs made to sanitary sewer laterals`
FOR WORK
—- 80URCE.. 1988 Capital Improvement Ordinance No., 10347P,rnject ftk >
No. 352232
OF FUNDS
PROJECT Bids Received: 7/12/88'{
,4
ILI
e .°.
HISTORY Contract Awarded: :7/ /
Preconstructi on Meeting: 9/28/88 dr
SL
CONTRACT
TIME,
STARTED 10/12/88
. ��� s f' 9` '�A +"'vk..�fsar 9iTr°f5'..�f" `4 L.° wn .,5•.` 4 :,�'�-_
-, CONTRACT
TIME 10 Working days;
SCHEDULED,, ,_L:��v �u. s'xXWE
1-: COMPLETION
3
10/25/88- � � �
DATE �km
—
FY
ACTUAL
COMPLETION
DATE ' 10/25/88 a ��'�;�'rsMAx
'; fi
raxx� s , d
v.
BID 'AMOUNT $
th
CONTRACT'
FINAL CAST .�$49,800.00 t �
-
CURRENT
ITEM FOR `Resol uti:ono .accept compl
CONSIthe contractor.i`Y¢ r