HomeMy WebLinkAboutR-89-08069/y/89 RESOLUTION No A RESOLUTION, WITH ATTACHMENT, APPROVING, IN PRINCIPLE, THE 1989-1995 CAPITAL IMPROVEMENT PROGRAM AS A GUIDE TO CITY AGENCIES, HOARDS AND DEPARTMENTS. WHEREAS? the Miami City Code requires the development of a Capital Improvement Program; and WHEREAS, a Capital programming process to support the Comprehensive Plan is required by the Local Government Comprehensive Planning Act of 1975, as amended in 1986, more particularly Section 163.3177 of the Florida Statutes; and WHEREAS, the Miami Capital Improvement Program 1989-1995 has been prepared to partially satisfy the aforementioned state requirement; and WHEREAS, a capital improvement program is a desirable policy and management tool to plan municipal borrowing and indebtedness over a period of time, to establish annual expenditures within a framework of long-range fiscal requirements and to serve as an official statement of the City's development plans; and WHEREAS, the Miami Planning Advisory Board, at its meeting of September 6, 1989, Item No. 6, following an advertised hearing, adopted Resolution No. PAB 46-89, by a 6 to 0 vote, RECOMMENDING APPROVAL, in principle, of the 1989-1995 Capital Improvement Program as a guide to City agencies, boards and departments, as hereinafter set forth; and WHEREAS, the subject Program is consistent with the adopted Miami Comprehensive Neighborhood Plan 1989-2000; NOW THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: ATT �� u C 0 YN14 T A I I CITY CODOUSSIO 14 MEETING OF SEP 14 1989 ,RESOLUTION No. 89" 11 G �y �i�iC1Y aVVCa+j i!il'C .. ':.irti/�i.�i. 4 40 .. attacy�hog f� .a6 d i1CL� Wt yty f �;w�y, � LL I LV•� G prLast '_ y ii ti Y14th day of D embWORD VIER L. tlA E ► l x ; PREPARED AND APPROVED BYt t r JoRIENNE L. FRIESNER ASSISTANT CITY ATTORNEY�;". APPROVED AS TO FORM AND CORRECTNESSs { F AjO E F NDEZ CItY ATTORNEY �a { t i ALF/dot/M1180 r r y d {G pl— TO RyyS* PROGRAM 1989-95 { CAPITAL IMPRORT � e�clified in a separate folder with the backup page P*l CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM j To: Honorable Mayor and Members of the City Commission DATE : Ste' p 1 1989 FILE SUWECT: Resolution Approving the 1989-1995 City of Miami Capital Improvement Program REFERENCES: FROM : Cesar H. Odi City Manager ENCLOSURES: RECOMMENDATION: ( It is respectfully recommended that the City Commission adopt the attached the 1989-1995 City of Miami Capital � Resolution approving, in principle, 9 Improvement rovement Program. BACKGROUND: During the past year, the City Manager's Coordinating Unit has worked with City to develop tie City of Miami Capital Improvement agencies and departments Program 1989-1995. The 1989-1995 Capital Improvement Program (CIP) is the thirteenth program capital improvement programming process. prepared as part of Miami's ongoing The CIP serves as a source of information about the City's development and capital expenditures. The proposed 1989-1995 CIP includes over 221 projects valued at over $463 is on Transportation and Physical Environment million. Major emphasis placed programmed throughout the six year plan. These two program areas together = receive over 47.9% of the total proposed funding allocation. r The 1989-1995 CIP is funded from five major sources. City bonds provide 69.2% funding requirements for the six -year capital program; the City's of the total Capital Improvement Fund provides 15.1% of the funding required; federal and future funds account for 6.0%; _ State Grants account for 7.5%; undertermined and private funds account for 2.2%. = In a companion item to this resolution, the City Commission will be requested to adopt the,FY'90 Capital Appropriations Ordinance. CNO/ER Attachment: CIP (3 Volumes) � l 4 *lI#:I=IIII# d @. . t •_'x.`` 1+T'r-T,`.if ram- -,��„ �„r �._ .y.i 'f1 ri - .. --� .��-. rrrlm il t P The 1989-1996 Miami Capital Improvement prograw THE CITY OF MIAMI-COMNISSI and 1990 Capital Budget was prepared by the Xavier L. Suarez, Mayor City Manager's Coordinating office: Victor Be Yurre, Vice -Mayor Eduardo Rodriguez, Capital Improvements Manager Miller J. Dawkins Athalie Range Mori Vega, Administrative Aid I J. L. Plummer, Jr. Gladys Cajina, Computer Department Cesar H. Odio, City Manager Olga Garcia, Planning Department Fernando Paiva, Public Works Department Jorge L. Fernandez, City Attorney Jeff Berliner, Computer Department Matty Hirai, City Clerk The y-of Miami Qoera ino Denim THE CITY OF MIAMi PLANNING ADVISORY BOARD and the City of Miami Print Shop. Raymond G. Asmar, Chairman Pedro Lopez, Vice -Chairman Carlos Arboleya, Jr. Eladio Armesto-Garcia Donald F Benjamin' Wilfredo Gort. Doreen LoCicero. Herbert Lee Simon Ofelia.Tabares-Fernandez (Alternate)' F Y J a r Jt� e^ 11 i . r a . . — '�i i r ill i�i r YrU 4�IrMwigrY�YWrwTri �II14 TABLE OF CONTENTS M -kkl THE CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM 1989-1995 Page PART I: INTRODUCTION AND OVERVIEW............................................"....«............... PARTII: PROJECTS COMPLETED DURING FY'89...........................................................f PARTIII: FUNDING SOURCES ............................................ .....:.«....................69 PARTIV: FY'90 CAPITAL BUDGET...............•.......................................................18 PART V: HISTORICAL COMPARISON AND TRENDS.:....................................................... 30 PART VI: PROGRAM SUMMARIES BY FUNCTIONAL CATEGORY: GeneralGovernment......................................:......................................4b Police.......................................................................................... 53 Fire Rescue .....................................................................................58 Housing........................................................................................63 CommunityDevelopment..........................................................................is, EconomicDevelopment...........................................................................C9 Parks and Recreation...........................................................................1' Stadiums.......................................................................................80 Auditoriums.................................... 85 Marinas........................................................................................9 Streets..........................................................................►.............96 Mass Transit..................................................................................lot Parking................................................................................:.........1 06 Sanitary Sewers ...................................................... .....................s..,30$ StormSewers..................................................................................113 " Solid Waste...................................................................................11 LIST OF TABLES Table 1 2 3 4 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1989-1995 Cost Summary by Major Program and Functional Category ..............................3 FY'89 Completed Projects.....................................................................8 1989-1995 Funding by Major Funding Source...................................................9 1989-1995 Funding by Funding Source. ...............................................11 FY'90 Capital Budget, Funding by Majoh Funding Source.......................................19 FY'90 Capital Budget, Cost Schedule by Major Program........................................19 FY'90 Capital Budget, Appropriation of Funds by Capital Projects ............................20 History of Appropriations ......................................... 0....... 0.................30 1989-1995 Detailed Cost and Funding by Functional Category - General Government ............47 1989-1995 Detailed Cost and Funding by Functional Category - Police ........................54 1989-1995 Detailed Cost and Funding by Functional Category - Fire Rescue ...................59 1989-1995 Detailed Cost and Funding by Functional Category - Housing ........................64 1989-1995 Detailed Cost and Funding by Functional Category - Community Development .........66 1989-1995 Detailed Cost and Funding by Functional Category - Economic Development ..........70 1989-1995 Detailed Cost and Funding by Functional Category - Parks and Recreation ..........74 1989-1995 Detailed Cost and Funding by Functional Category - Stadiums ......................81 1989-1995 Detailed Cost and Funding by Functional Category - Auditoriums ...................86 1989-1995 Detailed Cost and Funding by Functional Category - Marinas .......................91 1989-1995 Detailed Cost and Funding by Functional Category - Streets .......................96 1989-1995 Detailed Cost and Funding by Functional Category - Mass Transit .................102 1989-1995 Detailed Cost and Funding by Functional Category - Parking ......................107 1989-1995 Detailed Cost and Funding by Functional Category - Sanitary Sewers ..............109 1989-1995 Detailed Cost and Funding by Functional Category - Storm Servers .................114 1989-1995 Detailed Cost and Funding by Functional Category - Solid haste ...................119t 4i''I TIIV� 'H "" 7� LIST OF FIGURES Figure �y IProgrammed Expenditures by Major Program 1989 - 1995........a.a••....••••••..-••••««««-«w.a.!► sa wa a aawaa«••.r••wf wa/� 2 Completed Projects During FY'89......................sss•sss•ww••••••a w 3 Program Funding by Major Funding Source FY'90 - FY'95 .................swa.saa.awa««..«•.«.wwi1� * 9. 4 Programmed Expenditures by Funding Source FY'90 - FY'95......•••-••«•••••••"`•'•««`••`••«.a 5 Cost Schedule by Major Program FY'90 ............................w.........«..-w..•...••«•.E4 6 General Government Appropriations FY'83 - FY'90 •••••••••••••••••-••••• " ••" «" ««`•" +� 7 Police Appropriations FY'83 - FY'90...........................•.....0..............as.w.waaa.747 34 " « " " . 8 Fire and Rescue Appropriations FY'83 - FY'90......-•-••••••••••••••••-••••••••• " 9 Housing Appropriations FY'83 - FY'90... ••............ •..•.•... ..........«'..«-.a.a.a««.a.w' Appropriations FY'83 - FY'90 •••••••••••••«-••••www.««`*.�•�`F 10 Community and Economic Development 11 Parks and Recreation Appropriations FY'83 - FY'90 ••••••••••••••ss•s•s•sssrwaswssaas•awawa►s.7N-. Auditoriums and Convention Center App priations FY'83 - FY'90 ••••••••«•«•«.«..•• 12 Stadiums, ••..-w••.•-..www.« 13 Marinas Appropriations FY'83 - FY'90 •.•••••••••••••••••••••••••••••••••-• ...s..sw«-•«..•..«' 14 Streets Appropriations FY'83 - FY'90..................... ........... 0.... «........ a.s•a.«� 15 Mass Transit Appropriations FY'83 - FY'90.................................. 16 Parking Appropriations FY'83 - FY'90 . " ".`... " " 17 Sanitary Sewers Appropriations FY'83 - FY'90...... ..........•-••••••••'•'^••" 18 Storm Sewers Appropriations FY'83 - FY'90...............................•.•.....•..a.aawaa« �s 19 Solid Waste Appropriations FY'83 - FY'90 ..............w.-.•.••••••••••-•«•««.««saaas•.s.•s.4ra W P r # s> , a1 w ' III III i LIST OF MAPS Map rap 1 Capital Projects Completed During FY189 2 ................................r....ww.„ w,,www1 City of Miami Genera Government Offices and Facilities 3 ...................................47 Proposed General Government Improvements 1989 - 1995 a ...................... too ... ........w.st Cit of Miami Police Facilities y ............................................................56 Proposed Police Improvements 1989 - 1995 `5 City of Miami Fire Stations and Facilities 1 Proposed Fire Rescue Improvements 1989 - 1995 8 .............................................6t Proposed Community Development Improvements 1989 - 1995 9 10 ...............................,,.,6, Proposed Economic Development Improvements 1989 - 1995 ���`��`~�����`... City of Miami and Parks and Recreation Facilities " ....... .......... 71 11 ..........................................16. Proposed Park and Recreation Improvements 1989 - 1995 12 ...r................................. City of Miami Stadiums y 13 ......................... ...........................................82` Proposed Stadiums Improvements 1989 - 1995 14 ..................r......s..rr..r.wrwrrr..wrw.ww City of Miami Auditoriu83 msand Convention Center 15 .............................................Si Proposed Auditoriums Improvements 1989 - 1995 16 .............................................87 City of Miami Marinas............................................r...r.wr.r..r.er.wwww..rw77G 11 Proposed Marinas Improvements 1989 - 1995 18 ............................................,.,,,gc City of Miami Street System...........................................................w.w.9�y 9 Proposed Street Improvements 19$9 • 1995 20 ...........................................r.ss«.,,99� City of Miami Mass Transit 21 ........................................................w.......IO Proposed Mass Transit Improvements 1989-1995 22 ...............................................1{ City of Miami Sanitary Sewer System..................................................w,..i 23 Proposed Sanitary Sewer Improvements 1989 - 1995 ., .24 ............................ City of Miami Storm Sewer System 25 .............................................w........w..tt Proposed Storm Sewer Improvements 1989 - 1995 26 ..............................,,,,,,.,,..,w.ifb Proposed Solid Waste Improvements 1989 - 1995 .......................... ..........„�.,....1 20 INTRODUCTION AND OVERVIEW PURPOSE OF THE CAPITAL IMPROVEMENT PROGRAM The Capital Improvement Program (CIP) is an .official statement of public policy regarding ., long-range physical development in the City of Miami. A capital improvement is defined as a capital or "in kind" expenditure of $5,000 or more, resulting in the acquisition, improvement or addition to fixed assets in the form of land, buildings or improvements, more or less permanent in character, and durable equipment with a life expectancy of at least three years. The Capital Improvement Program is a proposed funding schedule for six years, updated annually to add new projects, to reevaluate program and project priorities and to revise recommendations to take account of new requirements and new sources of funding. The annual capital programming process provides the following benefits: 1. The CIP serves as a source of information about the City's physical development and capital expenditures. 2. The CIP process provides a mechanism for coordination among projects with respect to funding, location and timing and ensures that the most crucial projects are developed first. 3. The CIP is a tool for implementing Miami's Comprehensive Plan and other special area plans. LEGAL AUTHORITY Legal requirements for preparing Miami's Capital Improvement Program are set forth in the City of Miami Code, the Metropolitan Dade County Code and the Florida Statutes, respectively. Specifically, the Miami City codes requires the development of a capital improvement program. A capital programing process is required by the Local Government Comprehensive Planning Act of 1975, as amended in 1986. incorporated as Chapter 163.316 of the Florida Statues. THE CAPITAL BUDGET The Capital Budget represents a legal authorization to spend, during the first year of the program, funds from Federal, State and City sources and is adopted separately from the six year program by means of an Appropriations. Ordinance. Miami's Capital Budget is distinct from the Operating Budget. The Capital Budget authorizes capital expenditures, while the Operating Budget authorizes the expenditure of funds for employee salaries and the purchase of supplies and minor equipment. Part IV of this volume contains a detailed description of the FY'90 Capital Budget. Nii�N iN i ii i ►� _ II _ _ I N N a' IL I L I _ N I I I I _I I _ L _ _ _ _ .__ _.. . OVERVIEW The 1989-1995 Capital Improvement Program is the thirteenth Program prepared as part. of Miami's ongoing capital improvement programming process. This year's Capital Improvement Program has a total of 221 projects valued at $463.2 million. "•Actual funding totals for these sixteen functional areas are summarized for each year of the six -year program in Table I. It should be noted that the program includes only those projects with identified available funds. Anticipated projects with undetermined funding are, with rare exception, not part of the Capital Improvement Program. Table I shows approximately 59.3%, or $274,860,900 of the entire six year program cost has been appropriated to projects prior to September 30, 1989, as indicated by the total in the Prior Appropriations column. An additional $22,405,200 of the total program's cost is being allocated to this budget year - FY 90. is signifies that 64.2% of the I �s funding unding requirements are available, appropriated, those projects underway. A 19.2% of the 1989-1995 CIP cost is Iroximately ocated to the following two years of the program, FY191 and FY'92. 16.6% of the remaining of the scheduled is prorm for the last three Y Figure 1 PROGRAMMED APPROPRIATIONS BY MAJOR PROGRAM 1989-1995 W sl8 o"ME"T GENERAL GrGO 11AENT i $463.2 MILLION TRANSPOii TT 7 25.% 7-.2' SOCUL AWE t"V11l0lMtlii 4 b PUBLIC 4I5OCILITiE$ 10.47ePARKS AND RECREMION 0 3!* $47.5 ITTTTT 116, TABLE 1 1909-1995 CAPI' IMPROVEMENT PROGRAM COST SUMMARY BY MAJOR Pft--RAM AND FUNCTIONAL CATEGORY PROGRAM TOTAL COST PRIOR APPROP. - - - - - - - - FUTUf1E COST ESTIMATES - FUNCTIONAL CATEGORY ESTIMATE APPROP. 1969-90 1990-91 1991-92 1992-93 i993-94 1994-95 ------------- ------------------------------------------------------------------------------------------------------------------------ 1 • x 1000 1 GENERAL GOVERNMENT GENERAL GOVERNMENT 661691.2 40,216.4 479.4 4.S77.9 12,758.5 7,56S.5 11023.5 21047.0 SUBTOTAL 66,691.2 40 216.4 479:4 1 577.9 12,756.5 7,568.5 1,0?3.s ?:047.0 PUBLIC SAFETY POLICE 15,406.3 15,092.6 323.7 0.0 0.0 0.0 0.0 0.0 FIRE RESCUE 17,916.1 161015.4 237.3 932.0 $31.4 0.0 0.0 0.0 ----- ----- - SUBTOTAL 33.322.4 31.09i.0 561.0 632.0 681.4 0.0 0.0 0.0 SOCIAL AND ECON. ENVIRONMENT HOUSING 181916.6 16,397.6 2,519.0 0.0 0.0 0.0 0.0 0.0 COMMUNITY DEVELOPIM HT 21,079.7 26,347.7 5.266.0- 0.0 0.0 0.0 0.0 0-.0 ECONOMIC DEVELOPMENT 4.011.2 3.764.9 27.7- 114.0 90.0 60.0 0.0 - 0.0 k----------------------------------------------•---------•�- •-- ----- SUBTOTAL 44,•007.-7 46:510:1 2.776.7- 114.0 i0.0 60.0 0.0 0.0 PARKS AND RECREATION PARKS AND RECREATION 47,505.7 37,747.9 3,497.6 61260.2 0.0 0.0 0.0 0.0 •-•------ -- SUBTOTAL 47,505.7 37,747.9 3,497.E 6,260.2 0.0 .0.0 9--•---0- -0.0 I PUBLIC FACILITIES ` STADILMS 17,102.1 3,102.1 14.000.0 0.0 0.0 0.0 0.0 0.0 AUDITORIUMS 8,116.0 5:116.0 0.0 0.0 0.0 0.0 0.0 0'.0 MARINAS 22,734.0 19.360.2 -- --0.0--3_374-� ----- 0.0 ----- 0.0 ----- O.0 -•--- �.0 ---- SUBTOTAL-if.ssi.! 30.574.3 14.000.0 3.374.6 •0.0 -0.0 0.0 0 O TRANSPORTATION STREET$ 89,880.7 24,007.6 2.201.0 21.761.1 12,116.2 9,950.0 101410.5 0.400.0 MASS TRANSIT 7,239.3 2,000.0 10767.7- 19600.0 2.603.s 21608.0 0.0 0.0 { PARKING 21.7S7.0 21,757.0 0.0 0.0 0.0 0.0 0.0 ------ ------ ---- ------------------ ----- - -------•------- ----- SUBTOTAL 119,477.•0 47.764.E 434.1 231S61.1 14,719.7 12►967.0 10,410.0 91400.6 PHYSICAL ENVIRONMENT SANITARY SEWERS 30.116.0 24,618.0 2,600.0 2,100.0 150.0 IW O 1s0.0 Ls0.0 STORM SEWERS 69,075.6 13.967.0 3.275.E 10,133.0 5,400.0 10,000.0 9,100.0 14,?00.0 SOLID WASTE 30601.7 2,160.3 334.2 3.103.4 11.0 0.0 0.0' 0.0' ------------- ------ --------- --------- --------- SUBTOTAL 102,iO3.3 40,945.3 6,209.E 13.334.4 S.S61.6 101190.0 902$0.0 14,390.0' -- --- ------------------ - ......... TOTAL COST 463,160.2 274,860.9 22,405.2 52,Os6.2 3609s1 4 30,40s.s� 201604.0 +2S,797.0 �,a 1 � W nn4 }z-` visit av �•,c aS•.K+.ni'LYkd 'FA'S'k a:wk o '+ ,._;.'Lr •r I s _ . .,,: �: .A-.; .,. .., .:i „ ..:s ,x::. -,:-"„�...;.,z...... ,w ;i+,r.. `i+:� +,a�,f�P4:a£� „,...,:5 ;:" ids*-o:F,�r ,w ,a .e.n.�-�w.,� '•a M dc>� e.'�h+"s4'-f+"+.�'+t+�r ik +A i°t. s?•r� a OKRA 4o A - c .ems F r c F 3 z� ...t+• Np• _ + _ '�;i - t°-I� s't t �-, �` _ W MIT - �' i. ,Y +i. � rriirt;..; 5., b...' 'F �Y�( a • Rd ` }�gt` '�; ' +� }-.; s r'�„ r 3 �ry •� t Mal m " s y �'ik -,a2 rsl�-a�.t..;� 'aacty-'::S'' •�.��.d '°-�U r.•�.. i' r ..7" ,,. � r. �:f,: t '�t.-'`= 1 ... ,.'«. '4"+r C'.-r� ,. ,.Y Yw��'. .^^r 4+ Fle `� P .,2" � �':.; •'i. '�C Sk'� � rfi � �t. i.,. r'h_` _•..ti��• � f-. ro `R� �2f., ..r � %'. '�'.' "� t �� ,r'd"; .:.� tows ... _.. ,.. .. .. ..r ... y"`i'.... A"i,.. y F.._,..x .Y£a' - .n. r, t"- ..; '.. � '-x ....�if ,...: _ �.. '-s : ^- ` .. '.:� .-�f X i.. .} •5. _ A �Y. r • ,.-- b,r•.. s.,. ::�`n-i a:_.: i..,- '-'.: ., a. o s r , :. ¢. ':r t , < T _ ..�4 e a, k 4. ,-'bw `i ;.e...�pr," �- 'fi �is.'rS..'a. ..:., zv: .. .. x7+ ..jiCF s. �..�_. .,�. .�: w�, .T,»��/>:,..v .4.�, � ,.."w=',- _ -.;_: �.br� ,Fi: : �,•-.Y^.��a J t :..: : 3. �.,...,, ce.:.aC> _ ...,.. R. . n.,.. at .- f.,b.:. <.. Spa• `� ,.: tw. . a%c:. , �. �rt si `+ 3 E t r` .t+..r ,v{ r 3. '+-w. 'm. 'ncp•, "' ,, -' : , ' : t � a �• xc?','; '�'�' _ t c. , ra..'_ t"'$3 �, a;;;:.r,+�5 s+� ..- ,::..' _:,: c . ,": � ..�- r- t ,{ r=r' �%^y' r•. ,:R> Y�.zt�" `'7rc . .i»b�i�>r r,#t. +n+ '4,: ��. 1 r ' z k-^'tt. •� �.,. tt� R. y+rF ,' ,1 ,� . '?.1 C.#' _.gam.• . ,-. C' ('°„'�'r f� k „ r �'`p�`. ,� '� %, �: ld- e C� a� tt•`• '� + , is 3: ,,;,, i•_.. {. ; �''�}f+'a `:':; e:«. „ ti. �7'^r,q _ a .... f. �, �` },�. _...;p ..}.:.. ��...a. 4'^ rk r��',�a'.i a.�-`��'x' �44� ;.� Y $` r,;; �^Y 'Y x,; .•CY2 fi - �t �: '1,'- ��`�: ,,.. .�: `�:.. .rr . �-'r ?2.u- r- '�yaM. }act � �.� r. Ma•�;.R, �� �� i ���:.ei.aT sgx.- �.=,.' '�"t� i¢" ,A `�tni r .;F_ y �:y .> z;� ,s `�.. �.y: - _S:: :h �;�:, i,^!''rY •s f �.�•.4..4 {'� �^s '::r iu. d,. ���r 's�'r .4� '�5�a�:"a: �' ��� '` t1 � r.. +',':� '�'rsu „ v� _ �� �2' rn � ,v .��� ... "'ank �`Si.� •j� i . �� ",�,y � a.'..� � �`G '' :F'� '�`'�=w 'y ` m' - a�'�'+�"a yw� .:.t ;�� r�'a^+�: , .,,*s �' �. f� r .:s. P -' c'. ;.� •,q Yr f �.-H' -i 5;�w`Y � rr� qa %.�. �.; i ��,�„sue, '�a" � - Y r �.r�.. �t �.'� '.. � �J:�'. � °,� �`.��x'"'°"�•`"• 'f�}4 "iP=.�"�{�.,� ;f�'._ �`���,`. `':, 4: .°!� n.m ks^'.. a.r 3, `.�'Y`8'� ,.-7�.'..,f �,�• ,ah: 1•. '.Y,- S .. Y 'Y ?. Wvow. - ^,. �., �'��3��k ,�! h"�': pp � �i'2,-wf:��d: f.i'.tilx� r tii`��? e •� s�, �.�. tc. �'. S a� ni`T r�',s Y+ �. �. K n.�'<,•�T'w ry�s«,,::i Ft+rt -a v, -Pf � ;it C �:: ORGANIZING THE CAPITAL IMPROVEMENT PROGRAM The Capital Improvement Program is divided into seven major program areas. Each program area is further broken down into functional categories, sixteen in total. Capital projects are classified according to the sixteen functional categories. The complete schedule of program areas and functional categories is presented • below. A Public Safety Police Fire Rescue Social and Economic Environment Housing Community Development Economic Development Public Facilities Stadiums Auditoriums Marinas Transportation Streets Parking Mass Transit Physical Environment Sanitary Sewers Storm Sewers .Solid Waste • CAPITAL IMPROVEMENT PROGRAMMING PROCESS .: The City's capital programing proc�sprogramingbegan in March when operating departments were asked; to supply information about each of the capital projects to be included in the 1989-1995 Capital Improvement Program. Project Managers were asked to explain how the projects satisfied the following criteria: 1. Improves the City's financial condition. 2. Is consistent with City plans and policies. 3. Represents the Department's top priority. 4. Coordinates with public and private actions. 5. Is needed to maintain City service leviels. In March, CIP update materials were distributed to the operating departments. In April, proposed project requests, status reports and budget forms were returned by the Operating Departments. In June, the Capital Improvement • Manager conducted a preliminary review of the department project requests. In July, the Manager's Coordinating Office and the Strategic Planning Unit evaluated project proposals. In August the City Manager review the 1989-1995 CIP and Appropriations Ordinance, and a preliminary 1989-1995 CIP and Capital Appropriation Ordinance was formulated In August, a workshop was held with the P.A.B. On September 6, 1989 the 1989-1994 CIP was presented to the P.A.B. for its consideration and recommendation to the City Cow-ission. In September, the CIP and the Capital 89"80(;, Appropriations Ordinance were presented to the P.A.B. and City Commission. (14 1 . ,.'� - '•.; vpr Ly: a"!. .,: -... _ ,:.b .r� h'a'.e tic +.-.vL, ,t: .. _ _ • ' mod„ -. Sfii" 4'. -77 i, ::•q •:i?'''S'r:R a.f ;t,y 4 ,,av $, THE��CAPTTAL PROGRAM IN MIAMI' S NEIGHBORHOODS Voivawa :Il:of the CIP - the Neighborhood Program, pro vides a listing of projects by the neighborhood in which the project is located ort; tfie pproject serves. This section includes1 • location maps and a listing of projects and funding ..schedules b Planning Districts, by y' Neighborhoods' and by Community Development z Tar get Areas . f 3 r READING THE PROGRAM TABLES 't • ( Shi V yy t�d Ft Detailed --project information is provided in t a # r k Volume'III of the CIP - Project Description141 Sheets._ Each project sheet contains a project description, a project summary by cost category and •funding schedules for each funding source. The funding schedules are based on the funding needed to begin design, land acquisition and/or gr; tM, y 4. construction of a project. The capital; �,�� irov�ent program is not an expenditure or cash flow plan. Although the funding for a }f_, particular project may be shown in one fiscal �i }' ` �'``°� `' dit year, expenures may continue for several h ` • �� F ¢" ` ..years depending on the development time table. zv When a project's funding schedule lists funding only in the Prior Years column, all fun necessary_ for the project have been " :{ a "ro rfiated, but the project has not beenQi c; feted. An explanation of the or t es of :_ . yp aouxkes., s; found 'inn. Part - III of this k 'fii�ldi c sx ..'.'• .. '` lfo u e u6 n� P d 5ot�rces �►���I 1� I II I I ► �11T7 in I i!�111 I r PROJECTS COMPLETED DURING FY'89 The following table and map show the location and total cost of these projects. For more Introduction detailed information on specific projects, see Volume III of the CIP. During the past fiscal year, twenty five capital improvement projects representing " $39,666,600 in improvements were completed. Accomplish -cents include, in order of total cost: The Citywide Microwave 800 MHz Figure 2 Communication System ($7.4 million Winona Sanitary Sewers ($7.1 millions, PNVSrut"ROMME'N>'aos: West Little Havana Street Improvements tty's ($2.6 million), Fla ami Sanitary Sewers FY187 ($2.6 million) Edgewater Street ,Improvements ($2.4 million), Allapattah - -' Street Improvements - Phase I ($2.3 P 4 million), Fairlawn South Sanitary Sewer %///,i�j�./% /fl�/C an" f." ;, .. � Ixs Improvement - FY' 87 ($2.0 million) , TRANSPORTATION 29.9 ,«aunts Citywide Sanitary Sewer Extension FY' 86 ="•9%%�� PAWS AND cacAnoN « ($1.9 million), Florida East Cost irs Railroad Settlement - Land Acquisition ($1.7 million). Citywide Street GMR&OOVCRlMICNT Is.ts Improvements - FY'87 ($1.7 million), iT's Citywide Sanitary Sewer Extension ($1.6 COMPLETED PROJECTS million), Buena' Vista Street :39.7 MILLION i Improvements - Phase II ($1.5 million), N.N. 8 Street Road Highway Improvements J$0.8 million), Shenandoah Storm Sewers �$0.7 million), Wynwood Street Improvements - Phase II ($0.7 million), Miami Stadium - Press Box Repairs ($0.6 million), Miami Stadium - Roof Repairs (f0.6 million). Renovation of Fire MAP 1 CAPITAL PROJECTS COMPLETED TIP DURING RY' 88 rw t PUSUC SAFETY 2 SOCIAL AND ECONOMIC ENVIRONMENT w 3 PARKS AND RECREATION ... 4-9 PUBM FACKJM /0-U TRANSPORTATION t U-20 PHYSICAL ENVIRONMENT • • r. w Lm'-i C7 rr ! wrw o r moo ���` � v. �n y5b� bra � .pe'• •sn. 'tq r�- a. z. i nri�'�' .n.:: �.. .,� Table 2 FY'89 COMPLETED PROJECTS TOTAL PROJECT COST TOTAL. PRditaET Wit. IVERIWNT ivernment HZ Network Support - 011) aide Microwave 800 MHZ iunications System 1021) ETY a 1. Renovation of Fire t. Admin. Office Space (3130201 S 178,900 7,402.300 $7,581,200 1496, $496,700 SOCIAL AND ECONOMIC ENVIRONMENT Housin 2. Golden Arm - Property Acquisition (321036) 350, $350,000 PARKS AND RECREATION i Parks • and Recreation Florida East Coast Railroad Settlement (Land Acq.) (3312") $1.738,600 3. Triangle Park Renovations (331345) _ 23.000 $1.761.600 PUBLIC FACILITIES Stadiums ` 4. Miami Stadium - Roof Repairs (332236) S 575,000 S. Miami Stadium - Press Box Repairs (403004) 600.000 Auditoriums $1,175,000 6. Coconut Grove Exhibition Center, Additional Tables 'Snd Chairs (333236) S 34.600 7. Miami Convention Center - Contrib. t, Fire Alarm Replacement (420010) 162.500 8. Miami Convention Center - Refurb. !i Equipment FY'88 (420011) 262, $459.600 Marinas 9. Pier Five Marine Facility - Preliainary Expenses (413006) IsM 190,000 TRANSPORTATION Streets 10. Edgewater Street Improvements - Phase 1 (3410%) S 2.3i10.000' 11. Buena Vista Street Improvements - Phase 11 (341108) 1.475.000 12. West Little Havana Street Improvements (341109) 2.625.000 13. N.V. 8 Street Road*ofgbmy Improvements (341111) 750,000 14. Mynwood Street Improvements Phase 1 (341113) 700.000 15. Allapattah Street Improvements - Phase 11 (341118) 2.290.000 • Citywide Street improvements - FY'87 (341152) I-7wom $1118801000 PHYSICAL ENVIRONMENT Y Sanitary 16. Sewer Winona Sanitary Sewers (351159) ' # 7.0501000 ' Citywide Sanitary Sewer Extension - Prior to FY'88 (351170) I.SBa,500 17. Flagami Sanitary Sewer - FY'87 (351173) 2,600,000 18. Fairlawn South Sanitary Sewer Improvement - FY'87 (351176) 2.000,000 ' Citywide Sanitary Sewer Extensions - FY'86 (35i118) I-gn_000P Storm Sewers fI5,164,500 19. Shenandoah Storm Sewers ' ;~+ (352176) TOTAL FY'89 COMPLETED PROJECTS S39.M.600 -Not Mapped .,.._..,: ......._J.....-. �cw_.::-4.0 _r�rc r-aa«s'ams.�,c-a..i,a:µ✓• .� _......... -----" ._.._<: - a 44 is Y».rp . pp 'AS*P' , '�Y - 4" b - YR� } K Si. :.�ik d'�' '�r4 t�GRi ',,Y f 'x� -*yj+ a 31 "'S.2'•�i"A3:: �S N 1 f ,. _ t y... . t i�' � •.. [ r <:t 1. h u#N �: , :' �' 9 � {�' 1 `i ! nM • .y s �- 9 ,; ., f �::; `,:` x _ . .>, e '1 ,,,� 9 ` : „ ... .,, :.,..: ».. -:>.. ,t,= e ,.-. �., `.:', i'�•._r.,••r._t �i% iA .3 ��Jr�. _3+ az i �a-,`�.. _,.s•F ,- s{.,�,.r , x„ - =�'P•s � -..T ,� ".a1rF : �„L , ::L C J 'L . ��'.•S' ;�.' 't, 1 ^�y - A -':\ {..h. e.§.. L r_.. �T �' `�'� ,"4 �- ti9,. £nv•. 'S�. 4, G ? :<... ;s,.,,Kv c c . ., .. � +< `> > ,�.:.r;. ..a, ..J: � �er;�, ,r. ...�a:1 �. 6i�._ z9h�•e'k�e. �,.�,....,.n,. �.` . f z=!�. �.• -. 'v a. *•�5.' �... so.. .F• .,, t.. ,n'a-.�...>x<�. ,ss,.. <:3'. '; >,,.- •:';, Y 4.. �' :.y: �4 ,...:v. t 'yri _. -. yw. ;z; ,, ,.. , . ,:-, ,,. <;>t ,k<;, .•�� -� �F � .. ,., .v .....5 r 2.. • w.r. , .s�::, x •,?r.. �'� �y . �s:y� r�'v{r„�:d,.v '� � +3. S�„�+w.�"4=� � 1 -s, ��`�. >.::.. ,:3 '' Y :: -.." ..i*.:. �'ti:�.. ., e. � 4e ':'n , �,:: �F"Y'�'t'.Fy � ��:. >Y R•a�> fr {�� .3 �1 4, rL{''... ,.. ... '::.� ;:,. ...'i _ P ...•y,-.. �... .. .0 ;,' ,. .� � ! h. 3 �:.•.� � •..i ,[ .. _�. L § � ,S, >, A &t� :i r, ��:{+R �'4i§' .*{�. � {: �� ut,z$' �I 3'tfi -` §.: „ v .:;r �r 't ;;?' {«'°.'. a• :.... 5 t cl: •, n r2 ", . - x;tX r�< y r '2". -a r, n L n y S •. ,. ..... e...:...-r _,:_. t,� . � , ._ .,a. .,r � i it ld� ri A FUNDING SOURCES The 1989-1995 Capital Improvement Program, with a dollar value of $463,160,200 is funded from five major sources: " 1. Federal Grants: Federal grants may be used only for the purposes specified in Federal laws, such as community development. The amount of funding available from Federal grants is dictated by Federal priorities. 2. State Grants: State grants may be used only for purposes defined by State laws. 3. City Bonds: Two types of bonds may be used for capital improvements: (1) Revenue Bonds and (2) General Obligation Bonds. Revenue bonds are issued to finance revenue -producing facilities. The Iand interest payments on these loans are paid from the revenues of the facilities. General Obligation Bonds, which must be approved by City voters before the bonds can be issued, finance specific capital improvement programs presented to the electorate, such as public safety, highways or storm sewers. The City pledges its full faith and credit and financial resources to pay the principal and interest on these bonds. The largest source of funds for general obligation debt is the property tax. The City Charter limits the amount of Miami's general obligation debt to 15% of the City's assessed property valuation.- t 4. Capital IsorovementFundss: These funds are collected from current revenues produced by miscellaneous county or city taxes, fees, or from the operation of City of Miami facilities. S. Priiate Funds: This funding source includes any private funds as well as the dedication or sale of land for City capital facilities. Table 3, on page 12, along with Table 4, on page 13, shows that city bonds provide the lion's share of CIP funding overall (69.2%). while the federal government provides a modest (6.50 , but significant, level of CIP funding, the state funding level is minimal, only $4.3 million of a $463.2 million program. Capital improvement funds, have been a significant source of funding for the program, accounting for 15.1% overall funding. Private funds and contributions account for 2.2% of the program. Undetermined funds account for 6.0% of overall funding. A detailed list of all funding sources is shown in Table g. TABLE 3 ;_ FIINDING BY MAJOR FINOIN& SOURCE ( i x 1000 ) Net Future Total Prior Additional Funding Cost APProp• FY'91-FY'95 Federal Grants $30,211.9 $29,938.2 (j66.3) 7 $340.0 0 State Grants CityBonds f4,334.2 ,111.0 E,947.5 S1 ,034.9 Si4g8s6b f24,509.1 $106,173.0 ,899.2 Catal imp. Funds r07:974:0 Pnvate Funds 1239 $48,140.3 15,800.0 $2,533.2) �8 9 to $24,292.1 y�,315.0 $9:874.0 Wdeterarined $0.0 Totals w,160.2 $274,86o.9 $22,405.2 $166,04.1 09 III I I I I I �I I�IIIIIII�III 310M 110M ONM 230RF0 slow �.0000 �70" �500W „u0 VAX* f0000 "M 30000 FED STATE BONDS CITY BaNQS 69.I V_ $320.7 a� y � , h,. i If � I III -able 4 1989-1995 CAPIT :MPROVEMENT PROGRAM FUNDING Bl .UNDING SOURCE ---s FUNDING ------►----------------------r-r------- FUND FUND TOTAL PRIOR APPROP. �------------------- FUTURE FtOi01N9-rir-r-r----rrrrrrrrt NO CODE SOURCE TITLE FUNDING APPROP. I989-90 1990-91 1991-92 1992-93 1"S_94 L4i1-9S ------------------------------------------------------------------------------------------------------------------------------------ ( • x 1000 ) i i FEDERAL GRANTS 15 159 CDBG--FUTURE YEARS 240.0 0.0 0.0 80.0 80.0 80.0 0.0 0.0 25 159 US. HISTRC PRESRV GRHT - ANT 100.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 44 119 URBAN MASS TRANSP. ADM. -SPA 719.7 0.0 719.7 0.0 0.0 0.0 0.0 0.0 142 119 US COMMERCE EDA FUND 2,000.0 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 200 119 NATL ENDOW. FOR THE ARTS ORA 50.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0 482 119 CBOG - L. MATCH FOR UMTA ORA 0.0 1,438.6 1,438.6- 0.0 0.0 0.0 0.0 0.0 703 119 CDBG--3RD YR 57.5 57.5 0.0 0.0 0.0 0.0 0.0 0.0 704 119 CDBG--4TN YR 189.7 407.6 217.9- 0.0 0.0 0.0 0.0 0.0 705 119 CDBG--STH YR I1050.0 19100.0 50.0- 0.0 0.0 0.0' 0'.0 0.0 706 119 CDBG--6TH YR 1,422.9 1,493.8 70.9- 0.0 0.0 0.0 0.0 II' 707 119 CDBG--7TH YR 434.0 626.7 192.7- 0.0 0.0 0.0 0.0 0�.0 I' 708 119 CDBG---BTH YR 0.0 225.0 225.0- 0.0 0.0 0.0 0.0 (3«0 709 119 CDBG--9TH YR 495.0 720.0 225.0- 0.0 0.0 0.0 0.0 710 119 CDBG--IOTH YR 1,300.0 1,54S.9 245.9- 0.0 0.0 0.0 0.0.-0t;' 712 119 CDBG--I2TH YR 239.8 369.4 129.6- 0.0 0.0 6.0 0.0 0*0 713 119 CDBG--I3TH YR 0.0 143.0 143.0- 0.0 0.0 0.0 0.0 0.0 715 119 CQBO-- 15TH YR 2,400.0 0.0 2,400.0 0.0 0.0 0.0' 0.0 11Gpu 716 119 CDBG--IITH YR 1,030.0 1,266.1 236.1- 0.0 0.0 0.0 0.0 0:0? �. 731 119 US DEPT. OF HUD, SEC 108 LOA 5,958.4 5,956.4 0.0 0.0 0.0 0.0 0.0 735 119 US INTERIOR UPARR FUND 700.0 700.0 0.0 0.0 0.0 0«0 0.0 0.0 740 119 US INTER. LAND 8 WTR CONS. G $17.9 629.2 11.3- 0.0 0.0 0.0 0.0 0.0 758 119 1tS DEPARTMENT OF HUD, WAG 11,007.0 11,007.0 0.0 0.0 0.0 000 0.0 010 SUBTOTAL 30,211.9 29,938.2 - 66.3- `--- 180.0 80.0 -rr- $rOq r ..Q .O --r + 0�0 r. • ••yl 1695 CAPI1 LWROVMMT PROGRAM A* Amex- FUNDING d :U DINQ 8UUMM& -------------------- •�__ y _ _ FUNp--------------9f4-la ------ <- ------ Z!!A-9 FUTURE Alma-94 _--- -------TOTAL •----PRIOR 19e9-90 1990-91 -------------------------------- FUN � SOUJR�CEITITLE--------------- FUNDING APPROP. - 1--- ------------------------- 0.0 0.0 0.0 STATE GRANTS 0.0 0.0 150.0 lao.o o.a 0.0 0.0 26 259 nA• O+TO- STATE GRANT - ANY 0.0 0.0 200.0 0.0 BEACH MIGMT• - ANTIC Z00.0 0.0 0•a a.0 36 259 FLA. OAR 200.0 0.0 0.0 39 219 FLA CULTURAL FACILITIES GRAN 200.0 0.p a.a 0.0 0.0 250.0 Z50.0 0.0 0•0 40 259 REIMBuRaMHT FROM PORT OF MIA 0.0 400.0 0.0 400.0 0.0 O.a 0.0 41 2a9 FLA. 0.0•T• - ANTICIPATED 0.0 0.0 0.0 65.0 65.0 0.0 0.0 203 219 FLA 16£ALTH a REHAB SERV• BRA 0.0 0.0 0.0 Z4.0 24.0 0.0 0.0 446 210 FLA DEPT OF TRANSPORT• GRANT 0.0 0.0 o.o $oo.o 0.0 _FY aoo.o o.a 0.0 563 219 FLA STATE DIRECT APPROP- 400.0 0.0 150.0 550.0 a.0 0.0 0.0 770 219 FLA RED DEV ASSIST. PROW OR 13.3- 0.0 e6.7 l00.0 o.b 0,b 0.0 709 219 FLA. OPTO. COMM. AFFAIRS ORA 0.0 0.0 FY 1,050.0 i3Oso.o 0.0 0,0 0.0 650 219 FLA STATE DIRECT APPROP - 0.0 0.0 -ORA 59.5 56-a 0.0 0.0 0-0 9e6 219 FLA DAY RESTOR-/ENHANC. 0.0 0.0 FY e00.0------0.0 t0o.o ______ FLA. STATE DIRECT APPROP - --- xe7 Z19 ------------------ 0.0 0.0 -- 4e6.7 900.0 SUBTOTAL 4,334.Z 2,947.5 CITY BONDS 136 all 241 311 249 311 250 951 564 all it? all SP.. ASSE88. COLLECTIONS - IN 60.0 CONVENTION CNTR REVENUE DOiD 10,294.0 CONY. CENTER REV- BONDS -INT 666.0 LONG TERM DEBT INSTRUMENT 7,007.0 GUARANTEE ENTL REV. RHOS -FY 5-100.0 70 POLLUT GO BONDS 70 SL, BA 752.0 0.0 0.0 0.0 60.0 0.0 o.o 0.0 0'.0 100294.0 0.0 0.0 0.0 0.0 0.0 ' 668.0 0.0 0.0 0.0 2,f08.5 0.0 0.0 1,800.0 2,603.5 0.0 0.0 0.0 0.0 2,10o•O 3,000.0 0.0 0. a,,:.,___ 0.0 0.0 0.0 _sW 762.0 Jil 't iaaiaHl 1939-1995 CAPIl awROVEMEw PROGRAM FINDING So : UNDING SOURCE -----------------------------------------------------------------------------------------------------------���------------------- FUND FUND FUNDINIG TOTAL PRIOR APPROP. �------------------- 1990-91 FUTURE FUNDING 1991-92 1992-93 -------------------' 11f8-l4 1994-95 NO CODE SOURCE TITLE FUNDING APPROP. 1989-90 -------------------------------------------------------------------------------------------- 1 • X 1000 ) STATE GRANTS 26 259 'FLA. OPTO. STATE GRANT - ANT 150.0 0.0 0.0 150.0 0.0 0.0 0.0 a.0 36 259 FLA. DHR BEACH MGMT. - ANTIC 200.0 0.0 0.0 200.0 0.0 0.0 0.0 0.0 S9 219 FLA CULTURAL FACILITIES GRAN 200.0 200.0 0.0 0.0 0.0 0.0 0.0 0.0 40 259 REIMBURSMNT FROM PORT OF MIA 250.0 250.0 0.0 0.0 0.0 0.0 0.0 0.0 41 259 FLA. D.O.T. - ANTICIPATED 400.0 0.0 0.0 400.6 0.0 0.0 0.0 6.0 203 219 FLA HEALTH i REHAB SERV. BRA 65.0 65.0 0.0 0.6 0.0 6.0 0.0 9.0 441 219 FLA DEPT OF TRANSPORT. GRANT 24.0 24.0 0.0 0.0 0.0 0.0 - 0.0 0.0 568 219 FLA STATE DIRECT APPROP. -FY 500.0 0.0 S00.0 0.0 0.0 0..0 0.0 0.0 770 219 FLA REG DEV ASSIST- PROW OR 550.0 400.0 0.0 150.0 0.0 9.0 0.0 0.0 769 219 FLA. DPTO. COMM. AFFAIRS ORA 56.7 100.0 1S.$- 0.0 0.0 0.0 0.0 0.0 •50 219 FLA STATE DIRECT APPROP - FY 1,050.0 11050.0 0.0 0.0 0.0 0.0' 0.0 0.0 986 219 FLA SAY RESTOR./EHHANC. -GRA 58.5 58.5 0.0 0.0 0.0 0.0 0.0 0.0 937 219 FLA. STATE DIRECT APPROP -FY $00.0 $00.0 0.0 0.0 0.0 0.0 0.0 0..0 SUBTOTAL 4,SS4.2 2,947.5 48i.7 900.0 0.0 ----- 0.0 --------- 0.0 --------- 00 CITY BONDS 186 811 OP. ASSESS. COLLECTIONS - IN 60.0 60.0 0.0 0.0 0.0 0.0 0.0 6.0 241 311 CONVENTION! CNTR REVENUE BOND 10,294.0 10,294.0 0.0 0.0 0.0 0.0 0.0 0.0 249 811 CONV. CENTER REV. BONDS -INT 668.0 666.0 0.0 0.0 0.0 0.0 0.0 0.0 250 851 LONG TERM DEBT INSTRUMENT 7,007.0 0.0 0.0 10600.0 2,603.5 21608.6 -0.0 0.0 564 $11 GUARANTEE ENTL REV. SNOB -FY 51100.0 2,100.0 31000.0 0.0 0.0 0.0 0.Q Owl 787 311 70 POLLUT 60 BONDS 70 SL, SA 752.0 752.0 0,.0 0.0 0.0 0' .. ;r ,, dix..... �':..,,:., .. ,:.,:..-..-. ..,.".:,...:,.....-_ _.. .�. ,:,d a;.. +- � r . „„tt !I�,,��,, 1 TRk s;., `=l r>, ...,,. s,a y„>.+,.t, s•:ex:.-S7twr .c. �.$(9j� 6asf��ii° ro.i ie^n°ji Y �iA'�f �7 1989-1995 CAPIZ IMPROVEMENT PROGRAM t FUMING B, : UNDING SOURCE , ---- ------------------- ----- - - - ------ ------------------------ --------------------- FUN FUND FUNDING TOTAL PRIOR APPROP. <--------------...-..- FUTtSiE Fmr*--------------•----s NO CODE SOURCE TITLE FUNDING APPROP. 1989-90 1990-91 1991-92 1lfT-!N 1!l3-li 11i4-15 ------------------------------------------------------------------------------------------------------------------------------------ ( * X 1000 ) 791 all 1984 POLICE 0.0.8, 87 SL - I 50.0 $0.0 0.0 0.0 0.0 0.0 0.0 0.0 I 792 311, 1970 HGWAY G.O. BONDS -87 SL 1,851.3 1,826.3 25.0 0.0 0.0 0.0 0.0 0.0 794 311 1984 STORM 0.0 BONDS - 87 SL 300.0 400.0 200.0 200.0 0.0 0.0 0.0 0.0 798 311 SIDEWALK G.O. BONDS 25.4 25.4 0.0 0.0 0.0 0.0 0.0 0.0 799 311 FY'89 SUNSHINE ST. BON PROC 6,555.2 5,631.2 924.0 0.0 0.0 0.0 0.0 0.0 636 311 1964 POLICE G.O. BONDS - 68 1,268.3 0.0* 1,288.3 0.0 0.0 0.0 0.0 0.0 837 311 1984 STORM G.Q. BONDS -88 SL 775.3 0.0 775.3 0.0 0.0 0.0 0.0 0.0 I$38 311 1930 SANITARY G.O. S. - 88 S 1,425.0 $50.0 11075.0 0.0 0.0 0.0 0.0 0.0 640 $11 1981 FIRE G.O. BONDS - 88 SL 3,680.6 5,265.0 1,584.2- 0.0 0.0 0.0 0.0 0.0 843 311 FLA LEAGUE OF CITIES BOND PO 15,948.8 0.0 15,940.8 0.0 0.0 0.0 0.0 0.0 $49 all 1970 POLLUT. 0.0 B. 86 SL -I 685.0 85.0 0.0 100.0 100.0 100.0 100.0 200.0 $57 311 SP. OBLO. BONDS SR. 66A - IN $09.0 0.0 509.0 0.0 0.0 0.0 0.0 0.0 $60 311 1970 POLLUT. 0.0 BONDS - 86 3,017.7 11568.3 334.2 11103.4 11.0 0.0 0.0 0.0 $62 311 1970 HIGHWAY 0. 0 BONDS -70 20.0 20.0 0.0 0.0 0.0 0.0 0.0 6..0 863 311 1980 HIGHWAY G.0 BONGS 7,230.0 5,907.0 1,323.0 0.0 0.01 0.0 0.0 0.0 864 311 1980 HIGHWAY O.O.B. 80 SL -I 200.0 200.0 0.0 0.0 0.0 0.0 0.0 0..0 $66 all 1976 FIRE G.O. BONDS 6,245.0 61511.0 266.0- 0.0 0.0 0.0 0.0 0.0 867 311 1981, FIRE G.O. BONS 81601.1 6,361.4 2,087.5 152.2 0.0 0.0 0.0 0.6 $66 $51 1960 HIGHWAY G.O. BONS -37 2,817.0 2,817.0 0.0 0.0 0.0 0.0 0.0 0.-0 470 311 1975 8 76 SAN SEW G.O. BONS 7,748.0 6,248.0 11500.0 0.0 0.0 0.0 0.0 0«0 $71 311 1980 SANITARY SEWER G.O. BON 12,695.0 12,403.0 292.0 0.0 0.0 0.0 0.0 $72 all 1980 SANITARY SW G.O.B. -07 2,600.0 2,600.0 0.0 0.0 0.0 0.0 0.0 0.0 873 $11 1980 SANT. 0.0 B., 87 SL - I 161.0 161.0 0.0 0.0 0.0 0.0 0.0 0.0 874 all 476 6 1978 STORM SEWER G.O. 4,490.0 4*790.0 900.0- 600.0 0.0 0.0 0.0 0.0 1989-1995 CAPZ: IMPROVEMENT PROGRAM FUNDING B, 'UNDING SOURCE FUND FUND FUNDING -------TOTAL -----PRIOR------APPROP--------------1991-92 t99FZ ! 1993-94----1994_95 NO CODE SOURCE TITLE FUNDING APPROP. 1969-90 1990-91---------------------- -_ ------ 1----------- 875 311 1984 STORM SEWER O.O. BONDS 11,020.0 10,610.0 2,323.0- 1,933.0 900.0 0.0 0.0 0.0 876 351 HIGHWAY G.O. BONDS-UNAUT. 36.550.0 0.0 0.0 10,600.0 6,600.0 4,450.0 6,450.0 6,450.0 878 311 1972 PARKS 6 REC G.O. BONDS 571.9 S71.9 0.0 0.0 0.0 0.0 0.0 0.0 880 all 1970 POLICE G.O. BONDS 2,386.1 2,673.9 285.8- 0.0 0.0 o.o a.o a.o Sol all 1984 POLICE G.O. BONDS 3,726.0 3,784.2 58.2- 0.0 0.0 0.0 0.0 0.0 882 all 1984 POLICE GO. BONDS - 87 S 747.2 1,248.3 653.3- 152.2 0.0 0`0 0'a a.0 664 311 1976 HOUSING G.O. BONDS 17,844.2 17,844.2 0.0 0.0 0.0 o.o a.a a.a 885 311 1976 HOUSING G.O. BONDS - IN 6,715.8 5,705.6 11010.0 0.0 0.0 0.•0 0.0 886 311 1980 NOWAY 8.0 BONDS - 86 SA 2,025.0 2,025.0 0.0 0.0 0.0 0.0 0.0 887 311 1980 HIGHWAY 8.0.6.,86 SL -I 91.0 91.0 0.0 0.0 0.0 0.0 0.0 0.0�,,, 890 311 1984 STORM O.O BONDS - 86 SA 2,162.0 0.0 1,162.0 1,000.0 0.0 0.0 0'0 0.114;. }1', 691 all 84 STORM G0. BONDS, 86 SL -I 252.0 252.0 0.0 0.0 0.0 0. 0 0.0 0.0 0�0 $92 all 1984 POLICE G.O. BONDS - 86 10,450.0 10,800.0 370.0- 0.0 0.0 0.0 0.0 0.0 893 311 64 POLICE GO. BOND, 86 SL -I 546.0 546.0 0.0 0.0 0.0 0.0 0.0 0.0 894 351 1970*POLICE GO. BONDS - INT 14.2 14.2 0.0 0.0 0.0 0.0 0.0 989 311 1980 SAN SEMI GO BNDS-UNISSU 2,700.0 0.0 0.0 2PI00.0 150.0 150.0 150.0 150.6 SEVER. G.O. BONDS -UNA 54,050.0 0.0 0.0 91600.0 6,250.0 10,600.0 10,400.0 151000.0 993 996 351 319 STORM SUNSHINE STATE REV. BONDS PO 20,596.5 20,777.0 180.5- 0.0 0.0 0.0 0.0 0.0 997 311 SPI OSLO. BONDS SERIES 1986A 3.997.8 3,997.8 0.0 0.0 0.0 0.0 0.0 0.0 998 311 RENTAL REVENUE BONDS, SR 198 29,676.0 30,000.0 324.0- 0.0 0.0 0.0 0.0 0.0 999 351 FIRE 0.0. BONDS - UNAUTHORIZ 1,313.4 0.0 0.0 462.0 931.4 0.0 0.0 0.0 r-r�rrrr- -r--rr.--r --------- a20,i1i.0 109,034.9 24,509.1 29,722.9 --------,- 19,446.7 20,108-0 17,100.0 2104".0 SUBTOTAL lilllilllllll��l��l!Ili 1969-1995 CAPI IMPROVEMENT PROGRAM FUNDING B. rUHDIN4 SOURCE ------------------------ ---- --rr- -r ..--rr----r..--------..-rr -----------------•...r--r--sr- FUND FUNO FUNDING TOTAL PRZOR APPROP.-----••---•-------- FU7URE FUNDIMO--------------•----> i NO CODE SOURCE TITLE FUNDING APPROP. 1909-90 1990-91 1991-92 1992-99 1999-94 1994-93 ------------------------------- -----------------------------( i ---)----------------------------------------------------- ---- X I CAPITAL IMPROVEMENT FUNDS 30 451" OMNI TAX INCREMENT TRUST 31 451 FEC RAILROAD REIMBURSEMENT 35 451 RENT FROM ARENA 45 411 DADE COUNTY SCHOOL BOARD CON 70 451 PROPERTY RENT 94 411 INTEREST ON INVESTMENT- FND 143 411 MISCELLAN. OTHER REVENUE FUN 148 411 CONTRIB M. SPORTS 6 EXHIS. A 164 411 LUMMUS DOCKAGE REVENUE 193 451 CONTRIB FR GENERAL FUND 253 411 CERTF. OF PARTICIP. - INTERE 342 411 CAPITAL IMP. FUNDS - FUND BA 378 459 METRO-DADE COUNTY RESORT TAX 369 411 REVOLVING FUND 430 451 BAYFRNT PK BANDSHELL PKG REV 446 451 .CONTRIB FR DEBT SERVICE FUND 539 411 911 SYSTEM SERVICE FEE 558 459 SURFACE WATER IMP. 8 MANG. F $84 411 CONTRIB FR FY84 GENERAL FUND 585 411 CONTRIB FR FY85 GENERAL FUND $86 411 CONTRIB FR FY46 GENERAL FUND $87 411 CONTRIB FR FY07 GENERAL FUND 100.0 0.0 0.0 100.0 0.0 0.0 0.0 0.0 58.0 100.0 42.0- 0.0 0.0 0.0 0.0 0.0 0.0 300.0 300.0- 0.0 0.0 0.0 0.0 .. 0.0 26.6 0.0 26.8 0.0 0.0 0.0 0.0 0.0 150.0 150.0 0.0 0.0 0.0 0.0 0.0 0.0 150.0 150.0 0.0 0.0 0.0 0.0 0.6 0.0 66.8 $7.2 20.4- 0.0 0.0 0.0 0.0 0.0 51500.0 5,500.0 0.0 0.9 0.0 0.0 0.0 0.0 19.5 19.5 0.0 0.0 0.0 0.0 0.0 6.0 51738.3 197.3 0.0 923.5 $23.5 923.5 923.5 1,147.0 250.0 250.0 0.0 0.0 0.0 0.0 0.0 6.0 11057.5 11057.5 0.0 0.0 0.0 0.0 0.0 0.0 . 799.3 2,298.1 1.498.5- 0.0 0.0 0.0 0.0 0.,0 266.9 266.9 0.0 0.0 0.0 0.0 0.0 0.0 78.5 73.5 0.0 0.0 0.0 0.0 0.0 0.0 765.0 765.0 0.0 0.0 0.0 0.0 0.0 346.0 0.0 346.0 0.0 0.0 9.0 0.01 0.0 2,003.3 1,190.0 613.$ 0.0 0.0 0.0 0.0 0« 973.0 973.0 0.0 0.0 0.0 0.0 0.0 f1t.0 490.0 466.0 0.0 0.0 0.0 0.0 0.0 488.0 408.0 0.0 0.0 0.0 0.0. 0.0 16.0 638.0 636.0 0.6 0.0 0.0 0.0 0.0 0.0 1 � I I II I I II I I Ilk II II III IIII11� JIII11I11III� �. 16 C1989-1995 CAPI1 IMPROVEMENT PROGRAM � FUNDING B, FUNDING SOURCE - ---------------------------------------------------------------------------- FUlNO FUND FUNDING TOTAL PRIOR APPROP. 4--- ------------991- FUTURE FUNDING --- -1904--9-a NO CODE SOURCE TITLE FUMING APPROP. 1969-90 1990-91 1991-l2-------4------ ----- -------------------------------------------------------------- --- ----------- ` • 1) $88 411 CONTRIS FR FY86 GENERAL FUND 712.1 11066.1 354.0- 0.0 0.0 0.0 0.0 0.0 589 411 CONTRIa FR FY89 GENERAL FUND 488.0 486.0 0.0 0.0 0.0 0.0 0.0 0.0 590 411 n CONTRIB FR FY90 GENERAL FUND 33.4 0.0 $3.4 0.0 0.0 0.0 0.0 0.0 601 411 FY81 FPSL FRANCHISE REVENUES 1,190.0 11190.0 0.0 0.0 0.0 0.0 0.0 0.0 602 411 FY82 FPSL FRANCHISE REVENUES 250.0 250.0 0.0 0.0 0.0 0.0 0.0 0.0 ' 611 411 CAP. IMP. FUND -INTEREST INC 150.0 150.0 0.0 0.0 0.0 0.0 0.0 0.0 612 411 FY80 FPSL FRANCHISE REVENUES 325.0 325.0 0.0 0.0 0.0 0.0 0.0 0.0 635 451 LAND SALES 3,210.0 0.0 500.0 2,710.0 0.0 0.0 0.0 6.0 670 411 OINR KEY MARINA RET EARNINGS 4,359.5 4,679.0 319.$- 0.0 0.0 0.0 0.0 0.0 684 411 PROP. S LEASE MANG. ENT. FUN 544.0 544.0 34.0- 34.0 0.0 0.0 0.0 0.0F 635 411 ORANGE BOWL ENTERPRISE FUND 0.0 450.0 450.0- 0.0 0.0 0.0 0.0 691 451 SEOPW TAX INCREMENT TRUST 5,802.1 2,194.2 2,049.2- 1,446.9 2,616.2 588.5 1,010.5 0.0 695 411 CERTIFIC. OF PARTICIPATION - 1,123.0 2,890.7 1,767.7- 0.0 0.0 0.0 0.0 0.0 775 411 VIRGINIA KEY LANDFILL SALE 375.0 375.0 0.0 0.0 0.0 0.0 0.0 0.0 782 411 SEOPW DEVELOPER DEPOSIT 0.0 45.0 45.0- 0.0 0.0 0.0 0.0 0.0 783 411 SEOPW RENTAL PROPERTIES 26.3 129.7 103.4- 0.0 0.0 0.0 R•0 0.0 784 411 LOAN FR GENERAL FUND BALANCE 0.0 1,288.7 1,288.7- 0.0 0.0 0.0 0.0 0.0 648 411 NEW PORT BRIDGE LAND SL - IN 110.6 110.6 0.0 0.0 0.0 0.0 0.0 0.0 555 411 DAVE SAVINGS S LOAN ESCROW 4,854.0 4,654.0 0.0 0.0 0.0 0.0 6.0 0.0 $58 411 D. COUNTY SEAPORT LAND SETTL 1,020.0 1,020.0 0.0 0.0 0.0 0.0 0.0 0.0 $59 411 PRO. NEW PORT BRIDGE LAND SA 5,850.0 5,850.0 0.0 0.0 0.0 0.0 0.0 0.0 865 411 STORMWATER UTILITY TRUST FUN 15,748.0 1.600.0 4,148.0 2.000.0 21000.0 2,000.0 1,500.0 21000.0 $97 419 MUNICIPAL FUEL TAX 1,146.3 398.3 0.0 150.0 150.0 150.0 150.0 Iso.0 944 459 M%D. WTR 6 SWR AUTH. REIMBSM 3,000.0 31150.0 150.0- 0.0 0.0 0.0 0.0 0.0 m • - - 3 !4l-1 FFfEKHT PROGRAM �INNG 9-t - y SOURCE -_---------•.-_.._---rr_r-_-_:-__--------- FUTURE -FUND ----------------- -.p. ...__«----------- -------------------------- TOTAL ----_-PRIOR FUND FUND !'�� FUNDING AppRgp- 19�f+D s-1llo=fl----_llfl-!Z 3992-94 1993-94 1l�""�' NO CODE ------ TITLE ___________________FUN--N-----------•---r-•-----_---------0---_----r_---------------------------------------- -------------------.._.. { • X 1000 ) 962 451 MWWAS,RETAINED EARHtNOE • 5U0TOTAL h PRIMATE FUNDS 42 559 PRIMATE DEVELOPER CONTRIOU" 42 559 PRIVATEIDEVELPR CONTRIG-ANTI 44 559 TAOOLCY COD. DEVL- CORP. ORA 124 $5f FCC RAILROAD LOAN 746 55! RIOON CORPORATION - OONTRISI 7#4 $to NEW WORLD ACTION COM. - CONT 435 559 FED RAILROAD GRANT $41 559 ROUSE-MIAMI• INC. CONTRIGUTI 912 559 LEE 4 TV" HILLS FUND 942 559 J. L. NCNTGNT FOUNDATION CONT SUOTOTAL UNDETERMINED 4!! ail UNDETERMINED SUBTOTAL TOTAL FUNOO R 100.0 100.0 0.0 0.0 �44.140.#-2.5aa.Z- - 7•ia4.4 0.0 0.0 --5•a4l.7 - 4ri57.0 #,004.0 -#R!l7.0 . 50.0 $0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4•a15.o 0.0 0.0` 0.0 0.0 4.a15.o 0.0 0.0 0.0 0.0 0.0 $4.9 54.9 0.0 0'.0 0.0 0.0 1.700.0 1.700.0 0.0 0.0 0.0 0.0 836.1 886.1 0.0 0.0 0.0 O.S.0.0 lsa.0 159.0 0.0 0.0 0.0 0.0 0.0 0.0 1.700.0 1.700.0 0.0 0.0 0.0 0.0 6.0 a.a 1.000.0 1.000.0 0.0 0.0 0.0 0.0 0.0 0.0 lia.7 3Z7.4 N.! 0.0 0.0 0.0 0.0 *1, 674.2 474.2 0.0 0.0 0.0 0.0 0.0 -----_--- 0+0 _ r-__"_� --e;ioo:a -! - a.S1s.0 ______0.0 - ----------------- 0.0 0.0 0,0p 0.0 9•574.0 11r 7a5.0 6•545.0 Z7.474.0 0.0 ------.f.... ------o.o '---__----____---- 0.0 -�ti►��i4;o 0.a l.574.0 13.7a5.o a•5a5.0 •----------------"-----------------------------r+r-w -----_i- -- + 466•140.2274.O0422,406.2 s2.054.2 a4.i51.4 30.400-5 Z0•N4.0 ZO.TO . r" I I IIIIIIII�II■___,,,_�,-„ mounni � i---�-•--------- - -- , S e f: sr. .:..m5is. o- ju a�� CAPITAL BUDGET The FY'90 Capital Budget, presented in Table 7 on page 21 through 29, includes 160 projects in fifteen functional categories. Included in this ca this .fiscal year's budges are decrease thoseon nvgieln0il g as those projects receiving " receiving an increase in appropriations over the prior years' van°prantiaPProP aationSe forPithe projects recei 9 capital projects first time. All other ongoing riation for that require no additional app P Fy190 appear with a zero in the FY'90 appropriations column. Table 5, shows the manner in which funds have This been appropriated to the CIP for FY'90. fiscal year monies are being deappropriated as well as being appropriated. Deappropriation is the act of taking money out of the Capital The deappropriated funds are then Budget. t and FWtNs IT pan ta�N N Sma (S x �orl Additional mom Approp• A•WXV9vap. VT F�1 Gana '947.5 0 � tCIF3 Stab &W" 03 1,1g4.I Ci Bonn S '9 .5 ;�122.7 tal Grp. Furls IS ,140.0 91' .9Avow Fads ' .Q ,0 .0 w dmininw , Total $274,W-9 yN1-97Z.2 .�S1a•�.0� �• y rescheduled for projects in the cu, Deappropriations of $18.57 future years. million occurred in the four major funding - stte sources: federal grants $0.013 millioncit3.19Y bondson� $6a95 grants - , funds - $8.42 million, and capital improvement These deappropriations were offset by, ` pillion. appropriations of $40.97 million from the gross aPProP federal grants - 53.12 five major sources: million, state g rants - $0.5 million, city capital improvement bonds - $31.45 million, millionand private funds $0.009 _ mi , funds S5•89 million. After accounting for both gross appropriations and deaPpropriations, a net results. - ap ro riation figure of s22.40 million Pfigure represents the additional Y This provided to the CIP in FY 90. .. . ....—._. . i 'sits v. •I'l 111 i(I IP"r dorr, (Wt 4A f f VIto 3 vto"tf w N, t * figure 3 COT ' WEDULE BY MAJOR PROGRAM iY 90 Metes►► r .r3 TA61* to co"mw 0:::;6w posswo of OWN sow fsws Now- frog fsr me 0slwl *00220,0 s.WA- 4m" M 06,ltf.4 f. IfrMl.s l.Mi-! t �� _ Z0.2 em "on S Sol" • K� 2t,! i,isl.i �. }. Ipll/NMf Ww i.�M•i� i,1 - -- �0 l 64,510.4 SWIA& me M o. MNfomf !.M.$ N.!- 9.40.4 �t,1i1.f ""Iva 3,103.6 •.ai.igo.*- � w s s _ ian+ia��rr ��.�•! � hill.• ....•--- fMN.tQ fi016tl1/� u.+».! 3.300.9 , 9.0lie us l.iil.i i.i 0.0 y.i1l.M l.&N•l 4 y,lle.i IWIVAV son"1IVA � 1.til.i 1N•s i iou� �N N.iis.! ...... ..---'! f.mv.i s $*"If" wvllM i 114000•9 ii. •1' ll.tM•i-. 32.4W.r LZ4:' l; i��ii�i I �u✓ri I �+��� li� ILA iii li � Mai 1� N� iii ii III � CITY Tpbe.ZAMI 1989-199C 'ITAL BUDGET PROGRAM/FUNCTION PROJECT PROJECT TITLE NUMBER GENERAL GOVERNMENT GENERAL GOVERNMENT - •479,400 311001 CITY ADMINISTRATION SLOG - PH II 315231 ACQUISITION OF COMPUTERS 6 ASSOCIATED PERIPHERALS 314232 GEOGRAPHIC INFORMATION SYSTEM 311015 UPGRADE MAINFRAME COMPUTERS 6 PERIPHERALS 311012 TREASURY MANAGEMENT FURNITURE 311017 CLERK OFFICE LEKTRIEVER REPLACEMENT 311018 RELOCATION OF MUNICIPAL SHOP OPERATIONS 311019 ARCHITECTURAL/ENGINEERING COMPUTER SYSTEM 311014 FEDERAL LAW ENFORCEMENT BUILDING TOTALS k PREVIOUS TOTAL FY 1989-1990 FUND APPROPRIATION APPROPRIATION NUMBER SOURCE OF FUNDING $23,000 so 386 94 REVOLVVS FUNa INTEREST ON INVESTMENT- FND 8L S150.000 $60.000 so s0 136 SP. ASSESS. COLLECTIONS - INT. 0973,000 s0 S84 S6s CoMTRIS FR FY84 GENERAL FUND CONTRIB FR FY85 GENERAL FUND 0486,000 $486,000 s0 so SSG CONTRID FR FY86 GENERAL FUND s388,000 s0 Sa7 568 CONTRIB FR FYS7 GENERAL FUND CONTRIB FR FYAS GENERAL FUND 847S,400 0466,000 so 4210,600- Sag CONTRIS FR FY89 GENERAL FUND CAP. IMP. FUND -INTEREST IWAN- $150,000 $50,000 s0 $0 611 791 1984 POLICE G•0.8, 87 SL - INT $00,000 so 849 860 NT 1970 POLLUT. a-O 6- 66 SL ISL - 86 1970 POLLUT- G.O stoo.000 $1,800,000 s0 866 ,BONDS 1976 FIRE G•0. 80NDS s s367.0soo- 667 870 1981 BONDS 1973 6 76 SANRE -SEW GG-0- BONDS 033,000 s33.000 $413,000 s0 aa0 1970 POLICE G.O. BONDS 02.360,000 s0 $$1 882 1984 POLICE G.O. BONDS 1994 POLICE G0. BONDS - 87 SL 4595,000 0595,000- 40 587 CONTRIS FR FY87 GENERAL FUND 02SO,000 $60,000 s0 860 1970 POLLUT. G.o BONDS - 8G SL $100,000 so 40 867 Sol 1981 FIRE G.0- BONDS 1964 POLICE G-0. BONDS s1S0,000 $50,000 s0 Gas 1976 HOUSING G.0- BONDS FUND so $210,600 569 CONTRIB FR FY89 GENERAL $0 0367,000 0595,000 867 882 1981 FIRE S-O- BONDS 1984 POLICE GO. BONDS - 87 SL. s0 s2s.000 s0 446 849 CONTRIB FR DEBT SERVICE FUND 1970 POLLUT. G.0 8. 86 SL -INT $2s,000 $25,000 s0 s0 873 1980 $ANT. 0.0 8., 87 SL - INT 06 SL -INT 025,000 s0 453,400 891 590 84 STORM GO. BONDS, CONTRIS FR FY90 GENERAL FUND s0 s0 $500,000 s2S,000 635 792 LAND SALES 1970 NOWAY G.O. BONDS -87 SL !0 s0 07S.000 $37 1984 STORM G.Q. BONDS -66 SL to 075,000 $38 66S 1980 SANITARY G.o- S- STORMWATER UTILITY TRUST FUNDS oo $30,000.000 $75,000 s324,000- 996 RENTAL REVENUE BONDS, SR 198E $40,216,400 4479,400 • PROGRAM/FUNCTION PROJECT PROJECT TITLE NUMBER PUBLIC SAFETY C I T Y c M I A M I 1989-199C 'ITAL BUDGET PREVIOUS TOTAL FY 1989-1990 FUND APPROPRIATION APPROPRIATION NUMBER r i SOURCE OF FUNDING POLICE - $323,700 312006 " POLICE SUPPORT SERVICES FACILITY $50,000 s0 S60 1970 POLICE A.O. BONDS 312007 NORTH DISTRICT POLICE SUBSTATION $5,000,000 s0 $92 1984 POLICE A.O. BONDS - 66 SL 312008 SOUTH DISTRICT POLICE SUBSTATION $5,000,000 so 492 1984 POLICE G.O. BONDS - 86 SL 312010 POLICE MOBIL DIGITAL TERMINAL REFINEMENT $913,900 s0 Boo 1970 POLICE A.O. BONDS $492,000 5180,000- $92 1964 POLICE A.O. BONDS - 86 SL 312012 POLICE PROPERTY o AUTO POUND FACILITY RENOVATION $185,000 5185,000- $62 1994 POLICE GO. BONDS - 87 SL $308,000 $190,000- $92 1964 POLICE G.O. BONDS - 86 SL 312014 POLICE MICRO -COMPUTER 6 I.D. SYSTEM ENHANCEMENTS $100,000 $13,300- 789 FLA. DPTO. COW. AFFAIRS GRANT $129,000 so 080 1970 POLICE A.O. BONGS $896,000 $300,000 Sol 1984 POLICE G.O. BONGS 312015 CENTRAL POLICE FACILITY EXPANSION AND REMODELING $1,085,000 s265,800- Boo 1970 POLICE G.O. BONDS '312019 MPD FIREARMS RANGE RENOVATION $83,000 40 88o 1970 POLICE A-0. BONDS 312018 POLICE EQUIPMENT ACQUISITION - FY'89-FY'90 s0 $1,235,500 $36 1984 POLICE G.O. BONDS - 88 SL $358,200 $356,200- eel 1964 POLICE G.O. BONDS $468,300 4468,300- $82 1964 POLICE GO. BONDS - 87 SL $14,200 s0 694 1970'POLICE GO. BONGS - INT 312020 911 EMERGENCY BACKUP SITE s0 $346,000 539 911 SYSTEM SERVICE FEE s0 $52,800 836 1964 POLICE G.O. BONGS - 88 SL 312021 LEGION PARK POLICE MINI -STATION s0 $70,000 799 FY189 SUNGHINE ST. BOND PROCOS TOTALS $15,082,600 $323,700 89-Mr-. FIRE RESCUE - s237,300 313016 FIRE TRAINING FACILITY $100,000 s0 601 FY81 FPSL FRANCNISE REVENUES $2,140,000 s0 866 1976 FIRE A.O. BONDS S1,235,600 s0 $67 1961 FIRE G.O. BONDS 313018 RENOVATION OF FIRE STATIONS 6 OLD DRILL TOWER $32,000 s0 $66 1976 FIRE G.O. BONDS $965,500 $914,800 867 1981 FIRE G.O. BONDS 313019 FIRE STATION 83 GARAGE MODIFICATION 6 EXPANSION $3,173,300 s0 867 1981 FIRE A.O. BONDS 313221 EXPANSION AND RENOVATION OF FIRE STATION 812 $500,000 S500,000- 867 1981 FIRE A.O. BONDS 313234 FIRE RESCUE NEW APPARATUS ACQUISITION FY'90 s0 $821,000 867 1961 FIRE A.O. BONDS 313220 EXPANSION AND MODIFICATION OF FIRE STATION 810 01,234,000 S1,234,000- 866 1976 FIRE A.O. BONDS 313223 FIRE RESCUE NEW APPARATUS ACQUISITION - FY'8S $1,200.000 s0 866 1976 FIRE A.O. BONDS 313229 FIRE RESCUE NEW APPARATUS ACQUISITION - FY'89 $65,000 40 203 FLA HEALTH 6 REHAB SERV. GRANT $4,140,000 $2,040,000- $40 1981 FIRE G-0. BONDS - 88 8L 313222 FIRE APPARATUS REPLACEMENT AND MODIFICAT. - FY'SS $105,000 s0 866 1976 FIRE G.O. BONDS 313224 FIRE APPARATUS REFURS. 6 MODIFICATION - FY'69 $487,000 so 840 1981 FIRE G.O. BONDS - 68 SL 313232 FIRE DEPARTMENT COMPUTER ENHANCEMENT - FY'S9 $400,000 $280,700 840 1961 FIRE A.O. BONDS - 88 SL 313230 FIRE RESCUE SPECIAL EQUIPMENT - FY'89 $115,000 $0 840 1981 FIRE A-O. BONDS - 86 SL 313228 VIDEO PRODUCTION AND TRAINING ASSISTANCE $123,000 $175,100 $40 19SI FIRE G.Q. BONDS - 88 SL 313231 MIAMI FIRE MUSEUM so $30,000 867 1981 FIRE A.O. BONGS Nkiomrl d,sk8� �F4�1�, 1�Nli�p 'IliliUl�, �f� lilll u��` f irrT" I 'I Li C I T Y M I A M I _ 1999-1990 ITAL BUDGET PROGRAM/FUNCTION PREVIOUS TOTAL FY 1999-1990 FUND SOURCE OF F1 PROJECT PROJECT TITLE APPROPRIATION APPROPRIATION NUMBER NUMBER, $13235 FIRE APPARATUS REPLACEMENT 6 MODIFICATION FY90 f0 fo $535,000 f750000 •67 ail 1951 FIRE G.O. BOHM 1991 TIRE G.O. BONDS 313236 318237 FIRE DEPARTMENT MASTER PLAN FIRE RESCUE SPECIAL SUPPORT EQUIPMENT FY'90 f0 $211,700 067 1951 FIRE CO. BONDS k S13239 NEW FIRE STATION • 12 40 $9641000 off 1976 FIRE $.O. BOH M TOTALS $16,019,400 $287,300 SOOIAL AND ECON. ENVIRONMENT USING - f 2, 519, 000 221024 AFFORDABLE HOUSING PROGRAM $6,044,200 $2,556,000 f0 $210,000 S84 ass 1976 HOUSINM Q.O. BOH M 1976 NOUBINO M.O. BONDS - IN7'. 321026 321025 HOUSING LAND ACQUISITION PROGRAM MODEL CITY/L. HAVANA HOUSING DEMONSTRATION PROGRAM 41,0009000 $1,000,000 f0 40 .716 716 COW-11TN YR COBG--IOT" YR INV. 321035 321034 HOUSING PROGRAM ADMINISTRATION SCATTERED SITE AFFORDABLE HOUSING OVLPMT. PROGRAM 4500/000 so 4100,006 $309,000 Say 857 1976 HOUSING G.O. BONW - SP. OSLA. BONDS SO. If& - INT. 02,997,a00 f0 997 W. OBLG. BONDS sEaiES 1964A 321037 SECOND MORTGAGE NODE LOAN POOL 9105000000 f0 •0 •500,000 as$ 715 1976 HOUSING 0.0. BONOB - INT. CO0G-- iSTN YR 321038 LITTLE HAVANA LAND ACQUISITION so $500,000 715 00w- 1ST" YQ 321049 MODEL CITY LAND ACQUISITION TOTALS 416,397,500 020619,000 COMMUNITY DEVELOPMENT - 05,268,000- • aZZOZ9 SE oVERtowNiaARK WEST REOEVELOPYENT-PHASE i 080o,o00 $20,400 fa00r000- $20,400- as 143 RENT FROM ARENA MISCELLAN. OTHER REVENUE FUND $1,436,000 f1,436,400- 442 009 - L. MATON FOR UNTA GRANT $2,194,200 621049,200- i91 SEOPW TAX INCREMENT TRUST $217,100 f217,900- 704 O0B0--4TN YR $50,000 $50,000- 700 COBG--STN YR •70,900 470,100- 704 COB$--6TN YR 81991000 4199.000- 707 00W-7TN YR $225,000 f225,000- 706 CDOG--STN YR 8225,000 f225r000- 709 000$--97N YR $245,900 4245,940- 710 COB$--10TM YR •269,900 f129,600- 712 008$-4 2TH YR $1480000 4148,000- 716 COBG--IaTN YR $2860100 $5195#0400 f226,100- f0 716 731 COW-11TN YR US DEPT. OF HUD, SEC IDS LOAK f45,000 045,000- 702 SEOPO DEVELOPER DEPOSIT f129►700 $1,288,700 6103,400- 81,298,700- 763 764 SEOPM RENTAL PROPERTIES LOAN FR GENERAL FUND BALANCE *120000,000 so 994 1976 HOUBINO 9.O. BONDS 41,100,000 60 SSS 1976 HOUSING 0.0. so"" Im• j' ' CITY _ MIAYI , ""'• 1989-1990 ITAL BUDGET PROGRAM/FUNCTION PREVIOUS TOTAL FY 1989-1990 FUND SOURCE or Fti1�IC PROJECT PROJECT TITLE APPROPRIATION APPROPRIATION NUMBER NUMBER 322056 CAMILLUS HOUSE LAND ACQUISITION f0 $1,000,000 715 C050" 157H YR 322057 SE OVERTOWN/PARK WEST PHASE II 00 $719,700 44 URBAN MASS TRAMP. AD*. -GRANT TOTALS 026,347,700 05,268,000- ECONOMIC DEVELOPMENT - 027,700- 322025 GARMENT CENTER/FASHION DISTRICT EXPANSION 41891300 f0 704 CD9G--4TH'YR • $1,050,000 00 70S CDSG--STH YR $1,175,000 f0 706 COBQ--6TH YR' *427*700 $6,300 707 CDBG--7TI4 YR 0450,000 f0 709 CDBG__9T" YR 0300,000 40 710 COSG--IOTH YR 322054 EDISON CENTER GATEWAY IMPROVEMENTS 054,900 4o 43 TACOLCY ECO. DEVL. CORP. GRANT $24,000 40 448 FLA DEPT OF TRANSPORT. GRANT *30,000 40 712 COBG--I2TH YR $30,000 f0 716 COBG--IITH YR t19002 NORTHWEST RIVER DRIVE ACQUISITION - KREIOT PROP. 634,000 034,000- 684 PROP. 6 LEASE MANG. ENT. FUND TOTALS 03,764,900 027,700- i PARKS AND RECREATION PARKS AND RECREATION - 03,497,600 F 331311 HADLEY PARK IMPROVEMENTS/RESTROOM FACILITIES 075,000 f0 996 SUNSHINE STATE REV. BONDS POOL. 331304 SEWELL PARK/RIVER SHORELINE STABILIZATION 458,500 40 588 CONTRZB FR FY88 GENERAL FUND $56,500 f0 946 FLA SAY RESTOR./ENHANC. -GRANT`-„ 331231 SAYFRONT PARK REDEV. NORTH END 6 AMPHITH. - PH. I 034,700 4o 342 CAPITAL IMP. FUNDS - FUND SAL.'' 06,013,000 f0 758 US DEPARTMENT OF HUD, UDAG 0103,000 to 858 D. COUNTY SEAPORT LAND SETTLM.' 881038 LEMON CITY PARK IMPROVEMENTS O45,000 00 709 C08A--9TH YR $31089 MOORE PARK REDEVELOPMENT 0490,000 f0 446 CONTRIS FR DEBT SERVICE FUND $700,000 f0 735 US INTERIOR UPARR FUND 331143 ANTONIO MACEO PARK DEVELOPMENT 0150,000 40 70 PROPERTY RENT 025,000 f0 193 CONTRIS FR GENERAL FUND $450,000 40 601 FY61 FPSL FRANCHISE REVENUES $402,000 f11,300- 740 US INTER. LAND 6 WTR CONS. GRT $175,000 40 775 VIRGINIA KEY LANDFILL SALE 016,000 f0 858 D. COUNTY -SEAPORT LAND SETTLM. 0452,000 60 $78 1972 PARKS S REC Q.O. BONDS $31042 LUMMUS PARK REDEVELOPMENT $19,500 4o 164 LUMMUS DOCKAGE REVENUE 057,500 f0 703 CDBG--3RD YR $400 f0 704 COSG.--4TH YR $147,900 f0 706 CDBQ--GTH'YR 0791500 f0 712 CDBG--I27H YR rrrn IIII r I I 1 ri I I i �: 1 I I IIII d ��� I., II I IIII I I I I I I I I I III C I T Y M I A M I 1989-1990 ITAL BUDGET PREVIOUS TOTAL FY 1989-1990 FUND SOURCE OF FUNOV4 PROGRAM/FUNCTION PROJECT PROJECT TITLE APPROPRIATION APPROPRIATION NUMBER NUMBER $75,000 60 996 SUNSHINE STATE REV. BONDS POOL 331044 VIRGINIA KEY PARK DEVELOPMENT - PHASE I 80 602 E� FUND FY82FPSLFRA14CHISEOTHER VRE REVENUE $2S0,000 826a, RVASSIST. NT 100 80 878 1972PARKS5 RECG.O. BONDS $225,000 60 40 996 $59 SUNSHINE STATE REV. BONDS POOL PRO. NEW PORT BRIDGE LAND SALE 331309 ALLAPATTAH-COMSTOCK PARK RENOVATION $150,000 81101000 t0 996 SUNSHINE STATE REV. BONDS POOL 331053 AFRICAN SQUARE PARK RENOVATIONS $300,000 60 80 859 987 PRO. NEW PORT BRIDGE LAND SALE FLA. STATE DIRECT APPROP -FY89 $200,000 $100,000 60 996 SUNSHINE STATE REV. BONDS POOL 331232 BAYFRONT PARK REDEVELOPMENT - PLAY SCULPTURES 8127,800 88,900 60 912 858 LEE 6 TINA HILLS FUND 0. COUNTY SEAPORT LAND SETTLM. 331056 ROBERTO CLEMENTE PARK REHABILITATION $300,000 $1,000,000 80 859 PRO. NEW PORT BRIDGE LAND SALE $68,000 60 $73 1980 SANT. G.0 B., 67 SL - INT $45,500 60 $87 1940 HIGHWAY A.O.B.,86 8L -INT $113,500 60 $91 64 STORM GO. BOHDB, 86 SL -INT $273,000 60 693 84 POLICE GO. BOND, 86 SL -INT $100,000 80 967 FLA. STATE DIRECT APPROP -FY89 331070 ATHALIE RANGE PARK REHABILITATION $100,000 60 80 859 996 PRO. NEW PORT BRIDGE LAND SALE SUNSHINE STATE REV. BONDS POOL 331308 CITYWIDE VITA COURSE RENOVATIONS $25,000 $150,000 60 80 996 996 SUNSHINE STATE REV. BONDS POOL SUNSHINE STATE REV. BONDS POOL 831312 LEGION PARK RENOVATIONS $100,000 $250,000 80 446 CONTRIB FR DEBT SERVICE FUND 331099 SWIMMING POOL RENOVATIONS $440,000 60 601 FYSI FPSL FRANCHISE REVENUES $1,200,000 80 996 SUNSHINE STATE REV. BONDS POOL 331228 BAYFT. PK. REDVMT. - WALKWAYS S LNOSCPINA - AREA A •272,600 60 SO 342 a88 CAPITAL IMP. FUNDS - FUND SAL. REVOLVING FUND $238,900 $427,200 60 740 US INTER. LAND 6 WTR CONS. GRT 33123C BAYFRONT PARK REDEVELOPMENT - LIGHT TOWER $1,000,000 60 40 $41 932 ROUSE-MIAMI, INC. CONTRIBUTION J. L. KNIGHT FOUNDATION CONTRB $678,200 $152,000 60 996 SUNSHINE STATE REV. BONDS POOL 331229 BAYFRNT PARK REDVLPMT - WKWAYS S LAND8CPG - AREA B 6100,000 80 60 706 770 CDBG--67H YR FLA REC DEV ASSIST. PROAM GRNT 331227 SAYFRONT PARK REDEV. DESIGN AND DEVELOP.- $200,000 PHASE I $50,000 60 60 200 430 HATL ENDOW. FOR THE ARTS GRANT BAYFRNT PK BANDSHELL PKG REV $73,500 $200,000 80 601 FYS1 FPBL FRANCHISE REVENUES $325,000 60 612 FY60 FPSL FRANCHISE REVENUES $200,000 60 775 VIRGINIA KEY LANDFILL SALE 6183,000 60 a58 0. COUNTY SEAPORT LAND SETTLM. $55,000 60 60 878 859 1972 PARKS S REC A.O. BONDS PRO. NEW PORT BRIDGE LAND SALE $31310 GRAPELAND PARK IMPROVEMENTS $150,000 $100,000 60 996 SUNSHINE STATE REV. BONDS POOL 331318 CITYWIDE PARK PLAYING COURT RENOVATIONS $500,000 80 60 996 588 SUNSHINE STATE REV. BONDS POOL CONTRIB FR FY88 GENERAL FUND 331317 JAPANESE GARDEN RENOVATION $178,200 $336,100 60 786 RICOH CORPORATION - CONTRIBIT. 021,600 60 878 1972 PARKS 6 REC A.A. BONDS W000NTYBRIDGE 331a03 CITYWIDE NEIGHBORHOOD PARK RENOVATIONS 8,000 66, 000 $6 sp 858 0.SEAPORTAL AAND SETTLM. $700,000 649,200- 859 PRO. NEW PORT BRIDGE LAND SALE IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIINIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII I I II I II I �� I I I .., C I T Y M I A M I 1989-1990 ITAL BUDGET PROGRAM/FUNCTION PROJECT PROJECT TITLE NUMBER 331307 CITYWIDE BALLFIELD RENOVATIONS 331302 SAYFRONT PARK REDEV. NORTH END 6 AMPHITH. - PH II 331313 �MORNINGSIDE PARK RENOVATIONS 331353 CITY OF MIAMI YOUTH CENTER 331315 ROBERT KING HIGH PARK BRIDGE RENOVATION 331316 VIRRICK PARK RENOVATIONS 331305 BAYFRONT PARK REDEVEL. - SOUTH END 6 CHOPIN PLAZA 331329 WAINWRIGHT PARK RENOVATION - PHASE II 331347 DUPONT PLAZA BAY/RIVERWALK IMPROVEMENTS 331306 BAYFRONT PARK REDEVELOPMENT - PEPPER FOUNTAIN $31338 CITYWIDE IRRIOATION PROJECTS 331339 CITYWIDE PARK EQUIPMENT REPLACEMENT 381340 DOUGLAS PARK RENOVATIONS 331341 GIBSON PARK RECREATION BUILDING IMPROVEMENTS 331342 GRAND AVENUE PARK RENOVATIONS 331343 KIRK MONROE PARK/ADDITIONAL TENNIS FACILITIES 331344 REEVES PARK BUILDING RENOVATION 331346 SIMPSON PARK RENOVATIONS 331351 WILLIAMS PARK RENOVATION 331350 -TALCOLCY PARK ROOF REPLACEMENT 331348 ATHALIE RANGE PARK POOL REPLACEMENT 331349 HADLEY PARK POOL REPLACEMENT PUBLIC FACILITIES PREVIOUS TOTAL FY 1989-1990 FUND APPROPRIATION APPROPRIATION NUMBER 0162,000 $200,000 047,500 0224,000 02,900,000 $68,000 •45,500 $113,500 $273,000 $1.285,000 $250,000 0200,000 so so $75,000 4100,000 0100,000 $55,500 0750,000 0500,000 $213,000 $73,000 so $100,000 $50,000 $2,700,000 0400,000 $50,000 s130,000 $100,000 $100,000 0100,000 $50,000 $100,000 $65,000 $50,000 0100,000 $35,000 s0 $10.000 085,000 $2,100,000 02,100,000 TOTALS 037,747,900 t0 s0 $0 $0 f0 s0 so s0 s0 00 so s0 $100,000 03,000,000 so so so so 00 so t0 so 027,000 t0 !0 so so s0 so s0 s0 $0 $22,200 $0 s0 s0 so !0 $400,000 so !0 so !0 $3,497,600 996 996 788 858 859 873 $67 891 893 996 659 996 563 564 996 $59 996 788 $so 987 996 $58 659 962 788 996 996 $58 996 996 859 996 859 996 656 859 996 878 563 684 $48 799 564 2 SOURCE OF FUNDING SUNSHINE STATE REV. BONDS POOL SUNSHINE STATE REV. BONDS POOL NEW WORLD ACTION COM. - CONTR. D. COUNTY SEAPORT LAND SETTLM. PRO. NEW PORT BRIDGE LAND SALE 1980 SANT. G.0 S.. 87 SL - INT 1960 HIGHWAY G.0.5.,86 SL -INT 84 STORM GO. BONDS, 86 SL -INT 84 POLICE GO. BOND, 86 SL -INT SUNSHINE STATE REV. BONDS POOL PRO. NEW PORT BRIDGE LAND SALE SUNSHINE STATE REV. BONDS POOL FLA STATE DIRECT APPROP. -FY90 GUARANTEE ENTL REV. ENDS -FY89 SUNSHINE STATE REV. BONDS POOL PRO. NEW PORT BRIDGE LAND SALE SUNSHINE STATE REV. BONDS POOL NEW WORLD ACTION COM. - CONTR. FLA STATE DIRECT APPROP - FY88 FLA. STATE DIRECT APPROP -FY89 SUNSHINE STATE REV. BONDS POOL D. COUNTY SEAPORT LAND SETTLM. PRO.. NEW PORT BRIDGE LAND SALE MARINAS RETAINED EARNINGS NEW WORLD ACTION COM. - CONTR. SUNSHINE STATE REV. BONDS POOL SUNSHINE STATE REV. BONDS POOL D. COUNTY SEAPORT LAND SETTLM. SUNSHINE STATE REV. BONDS POOL SUNSHINE STATE REV. BONDS POOL PRO. NEW PORT BRIDGE LAND SALE SUNSHINE STATE REV. BONDS POOL PRO. NEW PORT BRIDGE LAND SALE SUNSHINE STATE REV. BONDS POOL 0. COUNTY SEAPORT LAND SETTLM. PRO. NEW PORT BRIDGE LAND SALE SUNSHINE STATE REV. BONDS POOL 1972 PARKS 6 REC G.O. BONDS FLA STATE DIRECT APPROP. -FY90 PROP. 6 LEASE MANS. ENT. FUND NEW PORT BRIDGE LAND SL - INT. FY'89 SUNSHINE ST. BOND PROCDS GUARANTEE ENTL REV. BNOS -FY89 I& PROJECT ­ PROJECT TITLE NUMBER d CITY MIAMI 1989-199C 'ITAL BUDGET ' PREVIOUS TOTAL FY 1969-1990 FUND SOURCE OF FINDING APPROPRIATION APPROPRIATION NUMBER STADIUMS - $14,000,000 404231 ORANGE BOWL STADIUM - ADDIT. PRESS BOX FACILITIES *974,100 4716,800- 378 METRO-OAOE COUNTY RESORT TAX 40 *716,800 S43 FLA LEAGUE OF CITIES SONG POOL 332232 ORANGE BOWL. STADIUM - PRO -CLUB RECONSTRUCTION $540,000 40 378 METRO-DADE COUNTY RESORT TAX 402002 MARINE STADIUM RENOVATIONS $354,000 4354,000- 588 CONTRIS FR FY66 GENERAL FUND 40 $354,000 799 FY'89 SUNSHINE 8T. BOND PROCDS 404237 ORANGE BOWL MODERNIZATION - PHASE I $780,000 4780,000- 37S METRO-DADE COUNTY RESORT TAX $450,000 4450,000- 685 ORANGE BOWL ENTERPRISE FUND 40 01,230,000 $43 FLA LEAGUE OF CITIES BOND POOL 404238 ORANGE BOWL MODERNIZATION - PHASE II 40 $14,000,000 $43 FLA LEAGUE OF CITIES BOND POOL TOTALS $3,102,100 $14,000,000 AUDITORIUMS - 40 333083 RENOVATION OF MANUEL ARTIME COMMUNITY CENTER 0200,000 40 39 FLA CULTURAL FACILITIES GRANT 0300,000 4o $50 FLA STATE DIRECT APPROP - FY66 415002 COCONUT GROVE EXHIBITION CENTER - REN. 6 EXPANSION 05,500,000 40 148 CONTRIB N. SPORTS S CXHIB. AUT $2,000,000 40 799 FY'89 SUNSHINE ST. BOND PROCOS 420012 MIAMI CONVENTION CENTER - REFURB. 8 EQUIPMT. FY'89 $116,000 40 241 CONVENTION CNTR REVENUE BONDS TOTALS 48,116,000 40 MARINAS - 40 413004 LUMMUS PARK MARINA 050,000 40 32 PRIVATE DEVELOPER CONTRIBUTION 414005 DINNER KEY MARINA - RENOVATION/EXPANSION $762,000 4319,500- 670 DINR KEY MARINA RET EARNIN100 40 0500,000 799 FY'89 SUNSHINE ST. BOND PROODS• 412,100,000 4180,500- 996 SUNSHINE STATE REV. BONDS POOL 413007 MIAMARINA RENOVATION - PHASE I $3,917,000 40 670 DIM KEY MARINA RET EARNINGS1 354009 BAYVISTA MARINA $250,000 40 253 CERTF. OF PARTICIP. - INTERIXT 0750,000 40 342 CAPITAL IMP. FUNDS - FUND BAL. 413013 141AMARINA - FISHERMEN'S PIER 5 $1,531,200 40 799 FY'69 SUNSHINE W. BOND PROWS TOTALS $19,360,200 4o TRANSPORTATION STREETS - 42,201,800 341105 BE OVERTOWH/PARK WEST STREET IMPROVEMENTS -PHASE I $250,000 40 40 RCIMBU6?SMNT FROlf PORT OF WAMS 4117000000 40 724 FCC RAILROAD LOAN 01,700,000 $0 635 FCC RAILROAD GRANT A I1111I IIilI[ jullilI C I T Y c M I A M I 1989-1991 3ITAL BUDGET PROGRAM/FUNCTION PROJECT PROJECT TITLE NUMBER 341086 LATIN QUARTER STREET IMPROVEMENTS 341090 MANOR STREET IMPROVEMENTS - PHASE III 341094 SW 16TH STREET IMPROVEMENT 341103 NORTH RIVER DRIVE STREET IMPROVEMENTS 341115 ^•DOWNTOWN STREET IMPROVEMENTS - PHASE II 341116 MORNINGSIDE STREET IMPROVEMENTS 341119 MANOR STREET IMPROVEMENTS - PHASE IV 341121 SILVER BLUFF STREET IMPROVEMENTS 341122 BUENA VISTA STREET IMPROVEMENTS - PHASE III 341123 SHENANDOAH STREET IMPROVEMENTS - PHASE II 341124 EAST LITTLE HAVANA STREET IMPROVEMENTS - PHASE II $41126 MODEL CITY STREET IMPROVEMENTS -PHASE I 341127 WEST LITTLE HAVANA STREET IMPROVEMENTS -PHASE II 341128 EAST ALLAPATTAH STREET IMPROVEMENTS -PHASE II 341129 BELLE MEADE STREET IMPROVEMENTS 341159 RENOVATION OF SIDEWALKS AND STREETS - FY'88-FY'89 341160 LAWRENCE WATERWAY STREET IMPROVEMENT 341176 -SOUTH E. OVERTOWN/PARK WEST 7TH 9 9TH STREET MALLS 341175 CITYWIDE STREET IMPROVEMENTS - FY'89/90 341177 CITYWIDE C.D. PAVING PROJECT TOTALS - 01,767,700- PREVIOUS TOTAL FY 1909-1990 FUND APPROPRIATION APPROPRIATION NUMBER 01,724,000 $200,000 $2,000,000 $731,000 $419,000 0961,000 $474,000 0500,000 01,200,000 0330,000 01,237,000 $1380000 0400,000 $225,000 $1,400,000 $1,000,000 *900,000 t1,8o0,000 050,000 $50,000 $33,000 $50,000 417,000 $50,000 *190,000 $1,400,000 0910,000 $30,000 •20,000 $50,000 $50,000 450,000 $76,300 025,400 •15,600 00 $398,300 so 0250,000 0376,000 $O $627,000 to 80 •24,007,600 s0 s0 to s0 so •0 s0 s0 s0 s0 s0 so so so so so to s0 •0 s0 •0 so to s0 $0 so so s0 so s0 •0 80 •0 s0 s0 0750,000 •0 0250,000 s0 s0 *28,$00 4573,000 *400,000 1200,000 42,201,8O0 r 863 $64 142 863 874 863 874 684 863 874 792 863 875 886 868 87S 875 886 792 863 792 863 868 863 533 ass 875 792 $62 792 792 792 792 798 $48 863 $97 553 792 863 45 863 7I5 794 '271 SOURCE OF FUNDING 1980 1416MAY G.0 BONS 1960 HIGHWAY G.O.B. 80 SL -INT US COMMERCE EDA FUND 1960 HIGHWAY 0.0 BONGS 1976 9 1973 STORM SEWER G.O.B. 1980 HIGHWAY 0.0 BONDS 1976 6 1978 STORM SEWER G.O.B. PROP. 9 LEASE MANG. ENT. FUND 1980 HIGHWAY G.O BONS 1976 9 1970 STORM SEWER B.O.B. 1970 NOWAY G.O. BONDS -87 SL 1980 HIGHWAY G.0 BONGS 1984 STORM SEWER G.O. BONDS 1980 NOWAY 9.0 BONDS - 86 SALE 1980 HIGHWAY G.O. BONDS -97 SL 1984 STORM SEWER G.O. BONDS 1984 STORM SEWER G.O. BONS 1980 NOWAY 0.0 BONDS - 66 SALE 1970 NOWAY G.O. BONS -87 SL 1980 HIGHWAY 0.0 BONDS 1970 NOWAY G.O. BONDS -87 SL 1990 HIGHWAY G.0 BONDS 1980 HIGHWAY G.O. BONDS -87 SL 1960 HIGHWAY 0.0 BONDS SURFACE WATER IMP. 9 MANG. FND 1960 HIGHWAY G.O. BONDS -87 SL 1984 STORM SEWER G.O. BONDS 1970 NOWAY G.O. BONDS -87 SL 1970 HIGHWAY G. 0 BONDS -70 SL 1970 NOWAY Q.O. BONDS -87 SL 1970 NOWAY G.O. BONDS -87 SL 1970 NOWAY G.O. BONDS -87 SL 1970 NOWAY G.O. BONDS -87 SL SIDEWALK G.O. BONDS NEW PORT BRIDGE LAND SL - INT. 2980 HIGHWAY 0.0 BONDS MUNICIPAL FUEL TAX SURFACE WATER IMP. 9 MANG. FND 1970 NOWAY G.O. BONDS -87 SL 1980 HIGHWAY G.0 BONDS DADE COUNTY SCHOOL BOARD CONTR 1980 HIGHWAY G.0 BONS CDBG-- 15TH YR 1984 STORM O.0 BONDS - 87 SL , . , q .. -1 1 v P:, ...� .,.; Ji , i,:, , ff ern ', u fill I III► CITY �.` MIAMI 1949-1990 ITAL BUDGET PROGRAM/FUNCTION PREVIOUS TOTAL FY 1949-1990 FUND PROJECT PROJECT TITLE APPROPRIATION APPROPRIATION NUMBER HUMIBER 343229 DOWNTOWN COMPONENT OF METRORAIL ST-II - CONTRIBUT. 0172,300 so 193 •1,427,700 01,767,700- 695 TOTALS 02,000,000 01,767,709- PARKING - •0 420002 MIAMI CONVENTION CENTER PARKING GARAGE TOTALS PHYSICAL ENVIRONMENT SANITARY SEWERS - •2,600,000 351247 CITYWIDE SANITARY SEWER EXTENSIONS - FY'49 4 FY490 351166 SOUTH FLAGLER SANITARY SEWERS 351174 SOUTH GROVE SANITARY SEWERS 951273 NORTH FLAGLER SANITARY SEWERS 351274 CITYWIDE SANITARY SEWER EXTENSIONS - FY'47 $51275 CITYWIDE SANITARY SERER REPLACEMENTS - FY'47 351276 N.W. 36 STREET SANITARY SEWER IMPROVEMENT 351279 THE LAST SANITARY SEWERS 351240 SE OVERTOWN/PARK WEST SANITARY SEWERS 351241 DOWNTOWN SANITARY SEWER REPLACEMENTS - PHASE III 351262 BUENA VISTA/LITTLE HAITI SAN. SEWER REPL -PHASE I 351245 SHENANDOAH SANITARY SEWER REPLACEMENT - PHASE I STORM SEWERS i - 08,275,600 TOTALS 01011741000 •6441000 41,063,000 •4,9949000 •4,854,000 021,757,000 •350,000 f4.500,000 •6000,000 •1:715,000 02,965,000 •150,000 055,000 •1,600,000 •1.263,000 •0 •1,400,000 •2,600,000 •100,000 •400,000 •400,000 050,000 0750,000 •30,000 •270,000 •70,000 $130,000 024,616,000 $0 •0 so so to •0 •o 01,5000000 40 •0 •0 •0 40 •0 s0 •1,000,000 so to •42,000- •292,000 •150,000- •0 00 so •0 $0 t0 •2,600*000 SOURCE OF frL mom CONTRID FR GENERAL Ft4R0'' CERTIFIC. OF PARTICIPATION CONVENTION CNTR REVENUE BONOS 249 CONY. COMO REV. SONDE -INT 695 CERTIFIC. OF PARTICIPATION -44 759 uS DEPARTMENT OF NW, UQAR 4s$ DADE SAVINGS S LOAN ESCROW 434 470 $70 071 471 $71 944 $71 •s$ 871 472 $1 071 944 471 944 $71 944 471 944 1980 SANITARY G.O. B. - 44 SL 1975 S 76 SAN SEW G.O. BONDS 1960 SANITARY SERER Q.O. BONDS 197% 6 76 SAN SEW G.O. BONDS 1940 SANITARY SEWER G.O. BONGS 1940 SANITARY SEWER G.O. BONDS 1940 SANITARY SEWER G.O. BOHM M.O. WTR 4 SWR AUTH. REIMBSMHT 19S0 SANITARY SEWER G.O. BONDS 1960 SANITARY G.O. B. - 44 SL 1900 SANITARY SEWER G.O. BONDS 1940 SANITARY SW G.O.B. -47 SL FEC RAILROAD REIMBURSEMENT 1940 SANITARY SEWER G.O. BONDS M.D. WTR 6 SWR AUTH. REIMSSMHT 1940 SANITARY SEWER G.O. BONGS M.D. WTR 4 SWR AUTH. REIMBSMNT I940 SANITARY SEWER Q.O. BONDS M.D. WTR 6 SWR AUTH. REIMSSMNT 1940 SANITARY SEWER G.O. BONDS M.D. WTR 4 SWR AUTH. REIMBSMRNT w ' l IINNI�N II I I I II I I I I I I I II I� 1 CITY M I A M I ' 1989-1990 ITAL BUDGET PROGRAM/FUNCTION PROJECT PROJECT TITLE PREVIOUS TOTAL FY 1989-1990 FUND SOURCE OF FUNDING NUMBER APPROPRIATION APPROPRIATION NUMBER 352250 CITYWIDE STORM DRAINAGE MASTER PLAN 4100,000 t0 865 STORMWATER UTILITY TRUST FUNDS 352179 ORANGE BOWL PUMP STATION MODIFICATIONS $350,000 $100,000 f0 t0 875 874 1964 STORM SEWER G.O. BONDS 1976 6 1975 STORM SEWER G.O.S. 352182 FLAGAMI STORM SEWERS - PHASE I $0 0770,000 865 STORMWATER UTILITY TRUST FUNDS 352184 LAWRENCE PUMP STATION - MODIFICATIONS $1,600,000 t0 •770,000- 0250,000 875 5S3 1984 STORM SEWER Q.O. BONDS SURFACE WATER IMP. 9 MANG. FHO t0 0550,000 865 STORMWATER UTILITY TRUST FUNDS $450,000 0450,000- 875 1904 STORM SEWER Q.O. BONDS 352187 COCONUT GROVE STORM SEWERS $0 0750,000 $450,000 t0 890 875 1984 STORM 0.0 BONGS - 86 SALE 1964 STORM SEWER A.O. BONDS 352190 JAMIAMI STORM SEWERS - PHASE II t0 $500,000 865 STORMWATER UTILITY TRUST FUNDS 352194 LAWRENCE WATERWAY DREDGING 9 BULKHEADING $1,600,000 $1,500,000 $500,000- t0 875 874 1964 STORM SEWER G.O. BONDS 1976 9 1978 STORM SEWER G.O.B. 352195 ENGLEWOOD STORM SEWERS 0600,000 $600,000- 875 1984 STORM SEWER G.O. BONDS 352230 WAGNER CREEK RENOVATION - PHASE III t0 t0 $600,000 0900,000 $90 865 1964 STORM G.0 BONDS - 86 SALE STORMWATER UTILITY TRUST FUNDS 352251 CITYWIDE LOCAL DRAINAGE PROJECTS - FY'88 01,800,000 01,200,000 0900,000- $0 874 87S 1976 9 1978 STORM SEWER G.O.B. 1984 STORM SEWER G.O. BONDS 352252 352254 S.W. 6 STREET STORM SEWERS PUMP STATION RENOVATIONS - FY'88 00 $550,000 0600,000 0550,000- 865 875 STORMWATER UTILITY TRUST FUNDS 352256 LEJEUNE STORM SEWERS - PHASE I 0400,000 t0 794 I984 STORM SEWER Q.O. BONDS 1984 STORM 6.0 BONGS - 87 SL 3$2257 LEJEUNE STORM SEWERS - PHASE II $167,000 t0 874 1976 6 1979 STORM SEWER G.O.B. 352267 CITYWIDE LOCAL DRAINAGE PROJECTS - FY'89-FY'90 0730,000 0623,000 865 STORMWATER UTILITY TRUST FUNDS 352271 LITTLE RIVER STORM SEWER RETROFITTING t0 0100,000 $647,000 t0 875 $53 1984 STORM SEWER G.O. BONDS SURFACE WATER IMP. 9 MANG. FNO $100,000 t100,000- 675 1964 STORM SEWER G.O. BONDS 852272 CIVIC CENTER STORM SEWER RETROFITTING t0 $390,000 $112,000 t0 890 553 1944 STORM G.0 BONS - 86 SALE SURFACE WATER IMP. 9 MANG. FND► 352273 RIVERSIDE STORM SEWER RETROFITTING $260,000 0510,000 $130,000 t0 865 553 STORMWATER UTILITY TRUST FUNS SURFACE WATER IMP. 6 MANG. FND 852274 HEAVY EQUIPMENT FACILITY STORM SEWER RETROFITTING $510,000 t0 t0 $313,300 66S 553 STORMWATER UTILITY TRUST FUNS SURFACE WATER IMP. 9 MANG. FND t0 0700,300 $37 1984 STORM G.O. BONS -88 SL TOTALS $13,967,000 03,275,600 SOLID WASTE - 0334,200 t' 353009 SOLID WASTE EXPANDED FACILITIES $25,000 tQ 860 1970 POLLUT. 0.0 BONDS - 86 SL 353001 SOLID WASTE COLLECTION EQUIPMENT ACQUISITION 0752,000 t0 787 70 POLLUT GO BONDS 70 SL, BALC 353002 INCINERATOR PROPERTY - FEASIB. AND STRUCT. STUDY $60,000 $60,000- $60 1970 POLLUT. 0.0 BONGS - 86 SL 353003 SOLID WASTE COLLECTION MINI -SITE -NW. 20TH STREET #363,000 4354,600- 860 1970 POLLUT. 6.0 BONDS - 86 SL 353005 STREET AND SIDEWALK SWEEPING EQUIPMENT PURCHASE 4714,500 t0 660 1970 POLLUT. 0.0 BONDS - 66 SL 353007 LITTER CONTAINERS REPLACEMENT PROGRAM 0245,800 011,800 860 1970 POLLUT. G.0 BONDS - 86 SL 353010 SOLID WASTE COLLECTION EQUIPMENT t0 0737,000 $60 1970 POLLUT. 0.0 BONDS - 86 SL TOTALS $2,160,800 $334,200 TOTAL CAPITAL BUDGET $274,860,900 022,405,200 I IpIpgIl IIIIry 1 !: , i HISTORY OF CAPITAL APPROPRIATIONS The 1989-1995 Capital Improvement Program is the thirteenth program prepared as part of Miami's ongoing capital programming process. The FY'90 CIP Budget has a total of 161 projects and allocates a net additional $22,405,200. TABLE 8: HISTORY OF APPROPRIATIONS ($ MILLIONS) CIP y"r FY'82 FY'83 FY'84 FY'85 FY'86 FY'87 FY'88 FY'89 FY'90 Appropriations Net Gross 65.9 95.4 47.2 82.1 106.7 9.2 15.0 40.7 21.7 37.4 22.4 41.0 25.7 15.7 18.6 General Goverment receive a moderate appropriation of $479,400 in FY'90. Police and Fire receive respectively a moderate appropriation of $323,700 and $237,300. Housing rebounded from no appropriations in FY'89 to $2,519,000 in FY'90. Community Development experienced deappropriations of $5,987,700 due to the reclarification of some revenue sources for proper accountability, while Economic Development had a net deappropriation of $27,.700 in FY'90, Parks and Recreation experienced an additional appropriation of $3,497,600. The Stadiums, Auditoriums, Convention Center and Marinas Categories rebounded from a moderate combined appropriation of $0.7 million for FY'89, to $14,000,000 in FY'90- Streets received $2.2 million in FY'90. Mass Transit received a deappropriation of $1,767,700 in FY'90. Parking received no funding for FY'90. (Department of Off -Street Parking projects are excluded from the CIP Program). Sanitary Sewers received $2.6 million in FY'90!. Storm Sewers received an appropriation of $3.3 million, and Solid Waste a modest $334,200. 30 a, iiii Ti 1 *;,«::6.'.u-�c�mxR�RtXt»,Si,'3rYrr, . .....� � ..I•. rxr:�#..u,o.,,:xm.r,::.3:sn:. . ,.. ; IIIIIIIIL III IIIIJIIIL L L . _ f�.,'. ?'w"m'fR�� N, Figure r {a CITY OF MIAMI k&PJ�L R V E T pRR : . �MPpE�Rp�GEAOVERNMENT A P 0 t _� a WN —90 6500 W V V WR 4500 4000 4 3500 w h 1500 1000 nr 500 k ! t� 01 19.83 1984 - 1985 1986 1987 1988 080 �5cr#s POLICE < - — — — -- — —POLICE —_._—...�..�.�,.�:_ 4 AND FIRE>.. ....................... Figure CITY OF MIAMI Vil", A CAPITAL IMPROVEMENT PROGRAM POLICE APPROPRIATIONS FY '83-90 VWK0) I 2OW - i low 1 00 0ow 9000 I. 7000 -tow_ 'o -2000 1985 1986 1983 .1984 <POUCE AND FIK> R 4- .,Y Figure 9 CITY OFMIAMt CAPITAL IMPROVEMENTPROtAt HOUSING APPROPRIATION ,y FY83 0 w x 3����yyyy�� M - YF i WOW { '•> 25000 . W LW000 x t • Ism _ C 10owsow !�• —ioocx� �' • i —25000 W35^ ti WVVV�V/ 1.983 ,:> r 1984 t485 1988 ` �98�T t9Q& l989 �99f�r t15 E e 9 _ � S.i� 'T 1� •� ,��y 4 ��. 1 � a a _ -. 1983 1984 fi986 4 4 _,.. s.- p Fig:r4 Ml CITY OF IAMI M CAPITAL IMPROVEMENT PROM 'MARI NAS::APPROPRIATIO sr', 'FY'83 —90 opm a6w 7000 6000 40 a " _31 r s . Figure 1 4 t CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM STREETS APPROPRIATION'S FY'83-90 (xs�o00 j` 28000 t �� � � 6'JI 3. J 'w'ti e, x r t° � u •r y cytir .�� � ,r -w4 A�2 QQ�M t 0001: r 1 yy. 7 -4000 1984 1.985. 1986 198 199E�. 1983 � fr r rry �»�37',� r .�t Fig u re 1 5- CITY OF MIAMI y CAPITAL IMPROVEMENT PROGRM MASS TRANSIT APP_ROPRIA'CIC1N►� 83 9a �. - 3100 � eta •� �' Y 2500 2100 '. 1900 ti 1700 ' 1600 1100 900 77000. 300 100 _-ma0 500 '� 1100 _ 11500 -1700 A�' •+�• 4c '�S `.SiN i � 1 � YS 4�' ¢ °wiXk '`''A, y + .(���n i � hF:�} 1.�'cl� pf j �'�+*Y'���,�k�f`� y�+K �}..�`'ii kw✓, i'.:4 �Y k T 'ns$ ��r �{�,R.'��k.:. yFe iVool Baca ri77� _ r. Fig u re 16 CITY OF MIAM1 z CAPITAL IMPROVEMENT PROGRAM,= r: f aa� z �5 PARKING APPROPRIATIONS z y 4 r e FY'83-90 "` t X T t't ,. v .� r WW Yal�z 4 �•'o fr a q r }v t { 2600 4. f ti q r t����yyy r ,;t :'+ .:$ E. ♦ x ti t "+ s° ae,'; 2�►W fi r ��_ i r.. :.; ;�_ M K h 6w tr I y &4 ZW ...s i�c'x4 ? P e.� - P k '7 t + ra 4Fz�' i F .•4ia.... ���G ��YX. f •` 20000 { . � �,.: a�''S° � � �, F � 3.4� :.�xp�'q w.. � � `zs Zt �t �r.,i � � r' �� „�a+z� "�:t• ♦� 140 al l W/fff W. 9y, "+' ,n"' ,'^�,cr;,�- RT`• " f 7'� -rrii Syr+. "4:'. r 'HOOV" F�'" .. ,d`Y �,�Q�rrr.•n„x j? rd �z� tlxxrp� rr .. . �`� r A 8$ , �'' '{� mat `�.,`..4,�•y13 '�-`2 ,"}z r yr` 1k�3�"- 2 Y f } 0 3 1983 1984. t . 1985 t 986 1987" 198 3 M f 389� i99o�`` ; -y e' F. �,� •� to ` �y�� i r!Ah1.R.sac•!_�'--�o-&"@3e}i1NS ;'``:�iri:'��xPlk���m. 3nS`t. - u • EFROW/M A Poro Ilillll IIIIII I II ilr on A Q! How .................... "0. 4kx'............. —too dl� j "s<W YOl l Nfix,l =.a VQ q_ phiOWN . 044­�'T �-yxs V-04MAT 'A"-�:L%QWY 0� And W .......... .............. ST In SO Avis ................................ 1 h 17 A. t y;� r s E 1 C ` +i AM—,� ri A ,� r ,, sMTV QW +' 4. _ rb - +..x r a, 1 f ¢� S ..+F { a" 4 `a `k li" J v ' _ t >.Y �{ r �` WAS— w .etc 1. n.t 4s..1` h �d tYi52 i'. ,7 -s rr3 $ a k E�s j�a =r ss'E s`jF r ..x -w::.. 4.' r"'� t' �i s FwYi < 6.. �e r•4 W .' � ��"$ .s ark... ��, r i - i . t t' t ��>� i :^��' " � � „( t._} 4 ,.� .� i t �es Mz w �: �''� �` �.M TtxE t..x',a, _}'�.� �,. �s e�j.3•,: .` � t #t ° a YE n...-, >✓sP.. �t t 7,W ":''�: ;� . k , h*:;at � J.e -�' � a Exf7 .�. W,,srt t a � s s.� *- eU :. 1 � a������� 7%�xY :,:. i i a ixit +a�F ' s'rw Xv via r 4f i�il sE r °fii. Kam" 9 fi+M[,,,: ��R 'd",."'.bjs. }0. � �� ?S. Y " t ♦ � � tt �` �r t�ctaWu-� `z,F�ti. , - .. ...aii� t i e s,.v..,«,�.:,...... _.� ;, c:•: :,,.�. �..,"i�_:'r...,._ ,._.,. _.�,%',' .. '" ..'-_!^ ...�. _..�''.- "�.�' :�.-.s.�.�xe�'�_ _'N_>s,si;,:s. _. � ,. .,a, r � .i n" n-I, lulll II I I j III I� Table 9 1989-1995 CAPIT MPROVEMENT PROGRAM DETAILED COST AND FUND, -..a BY FUNCTIONAL CATEGORY PROGRAM : GENERAL GOVERNMENT CATEGORY : GENERAL GOVERNMENT a ------------------------------------------------------------------------------------------------------------------------------------- COST TOTAL COST PRIOR APPROP. <----------------- FUTURE COST ESTIMATES ---•---------- r CATEGORY ESTIMATE APPROP. 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 --------- ---------------------------------------------------------------------------- ---------------------------------------------• ( 0 X-1000 ) LAND ACQUISITION 0.0 0.0 0.0 0.0 0.0 0.0 0_0 0.0 DESIGN 1,250.0 0.0 0.0 1,250.0 0.0 0.0 0.0 0.0 CONSTRUCTION 49,876.0 30,000.0 176.0 1,700.0 11,435.0 61565.0 0.0 0.0 EQUIPMENT 16,488.2 9.439.4 303.4 1,327.9 1,323.5 1,023.3 11020.5 2,&47.0 ADMINISTRATION 179.0 179.0 0.0 0.0 0.0 0.0 0.0 0.0 OTHER 898.0 598.0 0.0 300.0 0.0 0.0 0.0 0.0 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL COSTS ---------- 68,691.2 ---------- 40,216.4 ---------- 479.4 ^ --.----- 4,577.9 ------I --- ---------- 12.758.5 ---------- 7,568.5 ----._---- 1,023.5 2 047.0 ------------------------------------------------------------------------------------------------------------------------------------ FUND SUMMARY OF TOTAL PRIOR APPROP. ---------- ------ FUTURE FUNDING ------------------•- NO. FUNDING SOURCES FUNDING APPROP. 1989-90 1990-91 1991-92 1992-93 1993-94 1994-9S ------------------------------------------------------------------------------------------------------------------------------------ t • X 1000 ) AVAILABLE 094 INTEREST ON INVESTMENT- FNO SL 150.0 150.0 0.0 0.0 0.0 0.0 0.0 0.0 136 SP. ASSESS. COLLECTIONS - INT. 60.0 60.0 0.0 0.0 0.0 0.0 0.0 010 368 REVOLVING FUND 28.0 28.0 0.0 0.0 0.0 0.0 0.0 0«0 446 CONTRIB FR DEBT SERVICE FUND 25.0 25.0 0.0 0.0 0.0 0.0 0.0 OOr 564 CONTRIS FR FY84 GENERAL FUND 973.0 973.0 0.0 0.0 0.0 0.0 0.0 0,.w '. S65 CONTRIS FR FY85 GENERAL FUND 488.0 488.0 0.0 0.0 0.0 0.0 0.0 0..0 586 CONTRIB FR FY86 GENERAL FUND 488.0 488.0 0.0 0.0 0.0 0.0 0.0 0.0 587 CONTRIB FR FY87 GENERAL FUND 638.0 638.0 0.0 0.0 0.0 0.0 0.0 0..0 ; 568 CONTRIS FR FY88 GENERAL FUND 475.4 475.4 0.0 0.0 0.0 0.0 0.0 S89 CONTRIS FR FY69 GENERAL FUND 488.0 488.0 0.0 0.0 0.0 0.0 0.0 0.0 590 CONTRIB FR FY90 GENERAL FUND 53.4 0.0 S3.4 0.0 0.0 0.0 0.0 611 CAP. IMP. FUND -INTEREST INCM. 150.0 150.0 0.0 0.0 0.0 0.0 0.0 &W 635 LAND SALES 500.0 0.0 500.0 0.0 0.0 6.0 9.0 0,It, , 791 1984 POLICE G.O.B, 87 SL - INT 50.0 50.0 0.0 0.0 0.0 0.0 0.0 & 792 1970 HGWAY G.O. BONDS -87 SL 2S.0 0.0 2S.0 0.0 0.0 0.0 0.6 Ww $37 1984 STORM G.O. BONDS -88 SL 75.0 0.0 75.0 0.0 0.0 0.0 0.0 0 0... 838 1980 SANITARY O.O. B. - 88 SL 75.0 0.0 75.0 0.0 0.0 0.0 0.0 0>., 849 1970 POLLUT. G.0 B. 66 SL -INT 685.0 85.0 0.0 100.0 100.0 100.0 106.0 200.0 860 1970 POLLUT. G-0 BONDS - 86 SL 160.0 160.0 0.0 0.0 0.0 0.0 0.0 0.0 865 STORUWATER UTILITY TRUST FUNDS 75.0 0.0 75.0 0.0 0.0 0.01 0.0 O..Oe 066 1976 FIRE G.O. BONDS 1.800.0 1,800.0 0.0 0.0 0.0 0.0 0.0 O.dI 867 1981 FIRE G.O. BONDS 639.2 437.0 0.0 152.2 0.0 0.0 0.0 0.0 , 870 1975 t 76 SAN SEW G.O. BONDS 33.0 33.0 0.0 0.0 0.0 0.0 0.0 0.0 873 1980 *ANT. G-0 B., 87 SL - ZNT 25.0 25.0 0.0 0.0 0.0 0.0 0.0 0.0 t74JQ - 17 14 P I i PROGRAM i GENERAL GOVERNMENT CATEGORY t `rtw raw wril al aaiwl-rrwwraww arrr-----rrrr--rrrrrrrr-------rrrr--rrrr-rrrr--------rrrr-------r---------err----------------------r.r-ri.. TOTALPRIOR APPROP. rr--- r------ -r---- FUTUlK FUNIINO ----r rrrr---rr-rrrr No, FUNDING GOUROLI FUNDING APPROP• 1901-00 11f0-11 1091-02 1!f!•!0 1"6-" 1!l**fly r wi w r � a f •1l wait a awl al i l rl • w ll w wa-rr rr rr r r r --. rr r ra rrrr -r r rra--------------- ----------------------------------------------- rrwrr ar--------rrrr l 0 X 1000 ) 1s0 010 POLUC 0.0, GONG: 414.0 418.0 0.0 0.0 0.0 0.0 0.0, 0.0 M 104 POLICE 0,0, 00N0! 206/0.0 2,e40.0 0.0 0..0 0.0 G.'0 0*0 01.0 S#2 1984 POLICE 00. 0010409 - 17 •L 747.2 595.0 .0.0 152.2 0.0 0.0 0.0 O.Ib M 1076 NOUlING 0.o. DOW$ - INI. 90.0 $0.0 0.0 0.0 *.0 0.* *«* 0F.0 Sol 94 !loom Go, sON00 of !L -INT 25.0 25.0 0.0 0.0 0.0 Go'* 040, 0*0 991 MORTAL RLVENIIE 00NS, 80 1911 20#076.0 80,000.0 424.0- 0:0 0.0 0#0 Ole 0k*dt 0U0 TOTAL$ 410000.2 40,216.4 479.4 404.4 66.0 idol* 1o0.0 2i0r« 1!f CONTRI ," QENERAL FUND 5.641.0 000 0.0 923.5 920.6 stols l20.0 low* 685 -LAW 0ALX0 2,000.0 %0.0 0.0 2000010 0,00 000 u�ad�rarlNEo M ►OTAI. 7, d41. 0 , o. o 0.0 2,928.5 928..5 "S.-S ftsa% 1,i47b.0r !!! UNDETER112NED 100650.0 0.0 0.0 11250.0 11,785.* Mas.* *.* 0.0 !ND fEKALO 11i0S0:0 0.0 0.0 1,2d0.O 11,7116.0 #aW.a --: - ,. IDTAL OPUMDO rrwrwr rrrr 61491.2 ' rrrwrr rs-- 40416.4 ---------- 479.4 ------r--- 4,677.9 ----------- 12,791.5 rr•rf.,rrMrr _7,10m��` r/rif.i+li.r+Yaia1F ir*20•!1' rri .fa►.►i►r 1"„d+02'�1 - wr►..I www.rwlrlwwww wl iwwwlwwrraa�+rrrrrrw-rrrr---r---rrrr--r---r----------r-------------r----- -------r-- _g q f TIP, s jrs vimIK1'B�1T � 'J ■ a M a a CITY OF MIAMI GENERAL GOVERNMENT OFFICES AND FACILITIES 1. Miami City Hall 3500 Pan American Drive Mayor a Commission Offices City Manager's Office City Clerk's Office 2. Coconut Grove Exhibition Center 3360 Pan American Drive Pension Office 3. Office of Marinas 3400 Pan American Drive 4. Coast Guard Building 2600 S. Bayshore Drive Comammications Department Parks, Recreation and Public Facilities Department 5. Department of Computers 2850 Tigertail Ave. 6. Orange Bowl Stadium 1501 NW 3 St. Office of Stadiums 7. James L. Knight Center 400 S.E. 2nd Ave. Conferences b Conventions 8. City Administration Building 275 NW 2nd St. Fire, Rescue a Inspection Services Department Planning Department Public Works Department Building and Zoning Department 9. Police Department Building 400 NW 2nd Ave. 11. AMerifirst Building i S.E. 3rd Ave. Law Department 12. Municipal Justice Building 1145 NW 11 St. Community Development Department Personnel Department Civil Service Office Purchasing and Stock Room 13. Solid Waste Administration Building 1290 NW 20 St. Solid Waste Department City Federal Credit onion 14. Motor Pool Division 1901 NW 12 Avenue Property Maintenance Division 15. General Services Administration 1390 NW 20 St. Print Shop Property and Lease Management OMC& 16. Fern Isle 2400 MW 14 St. Public Works Storage Area 17. Dupont Plaza Office Building 300 Biscayne Blvd., Dupont Plaza, Suite 400 Development Department Housing Conservation' and Development Agency 18. Coconut Grove Bank Building: 2701 S. Bayshore Drive Office of Labor Relations 19. Aviation Building 3006 Aviation Ave. Finance Department. Industrial Er4iM@ri1* and Internal Audits 8 Reviews. MAP EKE`If o =0140molomlop so too I hub — N � ate Y c�. �� rr., as t N!Aar,,_.:r�s�tize .err Noma x .. � a .���� .." �. - -� _z. a_v.. ..�„-�. ,,,t,_ i_..,,_r .3,...,....�..�i.�,.y�.,_..�.,..."-_.. ,; ,_�....—� � it 'y.;�:r �>o �+,.,1PL'•yi tqY wE.& c, �t _ _}ii � • _._ r �.. _s',.,��s�:�v�t6�.,r3�v�'V���® ..�1���1i'�i III���II��'I��,iifli4 ��I����„ ��I��il�• I��illi�l�il� �., .��i,l II_li�ii..:i3� A �<. F": �,T C; f,•'E:te � .. III � ',, qm.'. �C. ' �I.,. 'f .I ng • 1. City Administration Building Phase II Feasibility Study (311001) 2. Acquisition of Computers and Associated Peripherals (315231) 3, Treasu Management Furniture (31101 Law Enforcement Building 4, Federal (311014) ,w 5, Upgrade Mainframe Computers periph eral s. : and (311015) Lektriever Replacement; b. Clerk Office (311017)� w Relocation of Municipal . Shop.0perations (311618) Architectural/Engineering k Sy5ten z i Computer (311019) "or I i i •fiS�t t 1 k d 1 1-e {sy $c information System ograph i f 5 r �f� `+, c� 9 � t r: i POLICE _ The 'Policefunctional category$ one of two .,categories under the Public Safety major PrPolice area. is presented in this section. 'projects include the �toi po�1Ce°operation sub- stations and improvements in facilities. There eleven �°cP°�ts 95 Capital improvement ntProgram. the 1989-19 ro ects is total cost orof these 3.3� of the cig89a1995 CIP. Table $15,406,300 10 summarizes athe police nd funding functional nub .nal category y cost category p 4 shows the location of Miami's Police " Jacilities- . o..nnnc�+d Pol i ce I Nine of the Police projects in Capital Improvement Program are projects are 5 awe ltehde tlocatgin ion Shown on Map jects y t .. . u 9 1995 the ongoing. Two } during FY'909 of the Police r f� improvement pro Capita Project Description Sheets,.! to the Cap' for Refer basis individual project an are provided on data. These project she detai led project in volume III for these`eleven:PrOJ efts?',are Y-, % r All funds required- <- -avail able,, v Table 10 1989-1905 CAPIT MPROVEYENT PROGRAM DETAILED COST AND FUNG...G BY FUNCTIONAL CATEGORY PROGRAM a PUBLIC SAFETY CATEGORY i POLICE m • • - . - • . - .. • • ... • ................ - .. • .... .... a ... .......................... .. .. .. is . -ia ......... 0 *... COST TOTAL COST PRIOR APPROP. ............••••• FUTURE OOST E1112MATIS ............rr.w CATEGORY ESTIMATE APPROP. 1989-90 1990-91 1991-92 1992-96 1998r94 Mel." ..........r.. ..r.......rr...............................................a.................-----a.aa...-...-..-..a...-.aaa.a.--. 4 • X 1000 1 LAND ACQUISITION 2,200.0 2,200.0 0.0 0.0 0.0 0.0 0.0 0.0, DESIGN 470.8 944.4 78.8- 0.0 0.0 0.0 0.0 a. op CONSTRUCTION 71117.8 70627.7 510.4- 0.0 0.0 0.0 0.0 6.0 EQUIPMENT 4,568.4 8.789.E 029.9 0.0 0.0 0.0 0.01 0.0 ADMINISTRATION $41.8 $44.4 8.6- 0.0 0.0 0.6 0.0 0.0 OTHER _ 818.5 226.0 67.6 0.0 0.0 0.0 9.0 0.0 . TOTAL COSTS 16,40E 8 - - - - - • - -- -- - a - - - - - - --- - - - - - - -- - - - - - - - -- - - - - - - - - - - - •..•-•a-.r- •.r.•.•a.- 15.OS2 i 828.7 - - - - - - - - - - - - - - - - - - - - - - - -- .•.aara-.- 0.0 0.0 - - -- - ----- -- - - --- ---r ------------ -•ra.-..a. ..ar...r.r... 0.0 0.0 O.Ofa - - - - -- - - - - - - - - - -- -- - - - - - - - - - - - - - - a - - - FUND SUMMARY:OF -TOTAL - - - - - - - . ----rrrs.Yrssa/rwa1r+11-------- PRIOR APPQOP. ---- - ---r--r..-. s.11.k.rrdtrrl.-r.Yrs- ♦.rr 1 FuTm F1N UM " NO. FUNDING SOURCES FUNDING APPROP. 1999-90 1990-91 1991-92 1992-96 19l►0.94 .• 1994w-9S _ ----------r---------------------------•---a-------------aa--------------------------------------a-.--arr-f-..-rrs-rwr.�r.r..r--r-r. 1 0 x 1000 1 AVAILABLE $89 911 SYSTEM SERVICE FEE 846.0 0.0 $46.0 0.0 0.0 0.0 0.0 0.0 789 FLA. OPTO COMM. AFFAIRS GRANT -$6.7 100.0 18.8- 0.0 0.0 0.0 10..0 040 799 FY-89 SUNSHINE ST. BOND PROCOS 70.0 0.0 70.0 0.0 0.0 0.0 0«0 040 886 1994 POLICE G.O. BONS - SI AL 1,280.3 0.0 1,288.3 0.0 0.0 0.0 0.0 0.0 SBO 1970'POLICE 0.0. BONDS, 11975.1 2.260.9 265.5- 0.0 0.0 0.0 0.0 0.0 $81 1984 POLICE G.O. BONDS 11196.0 1,254.2 58.2- 0.0 0.0 0.0 0.0 040 $82 1984 POLICE 00. BONS - 67 SL 0.0 658.8 658.8- 0.0 0.0 0.0 0.0 0.0 $92 1984 POLICE G.O. BONDS - 86 SL 10,430.0 10,800.0 870.0- 0.0 0.0 4.0 0.0 0:0 $94 1970 POLICE 00. BONDS - INT 14.2 14.2 0.0 0.0 0.0 0.0 0.0 0.0 SUB TOTALS 15,406.1 16,082.E 828.7 0.0 9.0 0.0 0.0 O.0 TOTAL FUNDS 15,406.8 15.082.E 821.7 - - - - - - - -. 0.0 - - - -- - r 0.0 - --- - .--- a 0.0 ---------- .... 0.0 0.0 - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- -- -- -- - - -------------- --------r-.rr..r.r--r.r.rrrrr.c �,, ,.'�. g_ .: , g�l $� II . ` IL � � IiE � I,IR� ,�� I V , ,.l,I �� 4, i ,o �li!,l,,iV MAP 4 poucE FACILITIES www t OVERTOVM YIN-STATM 2. MARva PATROL UNIT & POLICE M"a GARAGE 4, POLICE DEPARTmENT HEADGUARTERS • mi i 9AP 5 "Me"' f'W AOM 0 bar O d ld d11�tt r,+ wr6 '� ate BEd rep i py Im AWNpy 40 W r«� NA gas ov I I W ,}A ,!P.'�►���'�' �I �� I� � III `' Aj . a ,qfy- i, y� Proposed Police Projects 1989-1995 ` o..�;tee orniectc That Are Police Equipuent Acquisitiom Tn tiAted Pnrina rf' 19�FY189 (312018) SAW- l4i ' kt,' t'+a�F't. � aaw..•ky a+�ul- 'E 'hy r4c S'°y ; I' Ikl M .tn ,.+ F ^,` .,..a ''- 'e,r _"'^,; u } Zt;, •'"w-` 1?., ,.,.? ' r, FIRE _RESCUE The Fi Rescue functioval category, one of twa: categories under the Public Safety major prograa :'• There are i :... .� area, is presented`in the section. seventeen Fire Rescue projects 9 of sthe 1989-1995 =17 . 916 , 100, representing X x& #- CIP, Table 11 summarizes the Fire Rescue �£ rt Junctional category by cost category and funding, x F source. { .; Map 6 shows *the location of the City's fire #} and operation facilities. H r stations V�s. x4iMa Rv-fray a: -" Pro os d 1989-1995 _ 1989-1995 projects in the Sixteen Fire Rescue p •} I rovement Programit are either ongoing. r Capital mp FY 90 The F s or4. scheduled to begin during ect is scheduled for future years.' z 444 regaining proj ,fi , ...�� ; ects are shown on Map 7. "" These prof g F � V t .. Description Sheets, Refer to the Capital Project Descri for provided on an individual project basis, N^ project sheets are _ A data. These ��` detailed project { i Volume III vol k� Dawn The availability of funds for the Fire projects , ie chart. 9a7�c i s, shown i n the accompanying p " for these rojEwCts are 'r ' _ ' xs of Funds required Fire General from authorized available is r : while the remaining ��' Bonds < tr Obligation >, anticipated. mk 14 4 k YY ,y . ,_.T[, ,+ _, .. `�. .. .'.'.. ,. ' • ,. �': � � � .._..._...�,. �,.,,. �WPlIP_ r�fi•YiYiif Ifirr "..�� Table 11 1990-1995 CAPIS IMPROVEMENT PROGRAM DETAILED COST AND FUN6-.40 BY FUNCTIONAL CATEGORY PROGRAM s PUBLIC SAFETY CATEGORY t FIRE RESCVE 4' -------------------- -TOTAL ---- ---rr•r-•rr•••rr••-..-rr•r-•- ------ FUTURE-CasT --sr--..-rr-♦---r--►.a--r-..- E>FTIMIrTtB------------- - ------------•-------- --------. ---- COSTrt COST PRIOR- ------ ---- 1989-90 .--1990---- -- 19l1-9Z 1!!Z+!! t!l3-94 1994-OS CATEGORYESTIMATE APPROP------------------19 --91- --- -•-••--------•-r-r ------------ ----------- ---------------- -----•------------------------------- c • X 1000-) 19.0 131.0 112.0- 0.0 0.0 0.0 0.0 0.0 0.0 LAND ACQUISITION 462.2 469.1 46.9- 20.0 $30.0 0.0 0.0 0.0 0.0 DEBION CONSTRUCTION 6,767.5 9,092.4 6,020.7 60141.6 417.1 342.6- 4TJ.0 i1i.4 0.0 0.0 6.0 0.0 0.0 0.6 EOUIPMENT ADMINISTRATION 725.0 467.6 237.4 i4.3 7.0 0.0 13.0 0.0 0.0 a.0 a.04 $49.7 765.4 ------- -•---,...... .rrrrr-a OTHER-- COSTS-"'-•----•-------------------------------------•------------------------------------------------------- ---- 17,91611 ------ ---- 14,015.4 - - ---- 237 3' - - 002.0 ---------- e11.4 a.a o.a 0 TOTAL ---------------------------- ,. .--- - - ---- - ----r- r-------------------------------•--PRIOR ' - - TOTAL -•---APPROP --------------------------------.-�.'�-./-�-----...rrr-sr---- ------r-------- •-- FUTUiK FUNOINOF 1991-92 1!!Z'-!! - rrrrrr-rrrrrrrr - r-r t!!8-!! I!l4-10 FUND SUMMARY OF FUNDING APPROP. 1969-90 1990-91 ND. FUNDING SOURCE8 ----------------------- --- ---------- ----------------------------------------•----------------------------------------------- s X l0oo ) AVAILABLE 65.0 65.0 0.0 0.0 a.0 0.0 0-a Of.A 0*1 0.0 Otrl 203 FLA HEALTH 6 REHAB SERV- GRANT 601 FY81 FPIL.FRANCHISE REVENUES 100.0 100.0 0.0 1,266.0• 0.0 a.a e40 19e1 FIRE o.a. BONDS - ee SL 4,44S.0 41711.0 0.0 0.0 0•0 0.0 0.0 �•� 0k. 866 1976 FIRE Q.O. SONOS 71961.9 5,474.4 2,057.5 0.0 0.0 061 1981 FIRE 0.0. BONDS 0'.0 0"0 f1.lt SUB TOTALS 16,252.7 16,015.4 237.3 0.0 ANTICIPATED 0 025 US. HISTRC PTASSV ORNT 100.0 0.0 0.0 150.0 0.0 0.0 0.0 a.4 0.0 0' 026 FLA. DPTO- S - ANTIC 030 OMNI TAX INCREMENT TRUST 100.0 0.0 0.0 0.0 100.0 831.4 0.0, 0.0 0 999 FIRE O.O. BONDS - UNAUTHORIZED 11313.4 0.0 0.6 0 SUB TOTALS 1.663.4 0.0 e32.0 ---------- 831.4 -------- - 0.0 ---------- --...,.r-..... ....-..-r..+. TOTAL FUNDS -- 17,916.1 --1 6.015 ; ---O-O ---- 237. 3 e32.0 831.4 ---------- -... &.a �..-......-0.a •..-r..�....�.+ F gy � 1e I ,. - � : � � „ "5n��s'-;. 3ki.:.> •.,,.� S'� ``�ii iII Li �,nl �� i � 1, iS li Ili ,�i �i�,.. y... UII� �. il, I6.� ', S ' ''�I a i��ilii G.. �� i. I� � • I y.. ,,;. �:. ,:.x,.. ..�. .. ., ,..:... _.. .,..... T, .�.,_ T�i�T•_,Y �..,_:� -.a-•' ,r�'<.. ��� ��J. II {li.i•�� III i, ln. .S-.:.} _.c:�,.., 7r-,, •._ ,.....r..c a:n-:. ,:. ,,, .v'i' �7.� .J •�,., .j 7 '4?t jl I 'q' I�In �i�. �pl MAP 6.. �„ Aft FIRE PROJECT! THAT AR! ONGOINGONGOG ED SE INITIATED 0 ON SCHEDULED TO "04 FY 1990 PROJECTS SCHEDULED FOR FY loll "0" IN 199E % T "a 0 -mom to asaw moo roposad �Ftr'e'R� rs s Dser�Ie Praia Onaoina ar Srhed led-S ?�i is e� Durina FY 1990 1, New Fire Station 1 12 (313239) . 2. Renovation ojirerStations and old (313018)D rill 3. Fire Station #E3 Garage Modification 8 Expansion (313019) 4. Miami Fire Museum (313231) 5. Video Production and Training Assistance (313228) /�I� eCtS I989 _'" I995�. , .� :� z.� , �-� ��.V �'�-�`� t� �s� � aat• Fire Departent CO,f Enhancement - FY" (313232) aratus Refurblis Fire Rescue New ApP S Modification - FY'89 (313229) Fire Rescue Special Equipoent FY'89 (313230) Fire Apparatus Refurbishment.and Modification - FY'89 (313224) - Fire Rescue New Apparatus Acquisftiorn . FY'90 (313234) _ Fire Apparatus Refurbishment and i Mod 7 F e- d h ;w HOUSING' Refer to the Capital projects eor The Housing functional category one of three provided on an individual prof detailed project data. These sheets are i categories under the Social iand esented in Environment major program area, P volume III - this section. It includes projects dedicated to F the preservation of Miami's existing housing t e develo Pent of additional Funding resources and th P u housing opportunities for the City's low and P raw, moderate income citizensued There ere;18r916e800t All funding for projects in the�Housing n s ocN Housing projects valued are available from Community 4.1� of the 1989-1995 Capital Housing 6.0. Bonds, and Nousan Spiel representing Grants, Improvement Program. Table 12 summaribzes cost Obligation Bonds. Housing Program functional category y category and funding source. .,,use na The 1989-1995 Capital IPprovementam ro9r that are includes seven housing projects. ongoing: The Affordable Housing Program (321024); The Model City/Little Havana Housing Demonstration Program (321025); The Housing Land Acquisition Program ._ (321026) ; :. The Scattered Site Affordable Housing Development Program (321034); Housing Program Administration (321035) ; Second Mortgage Home Loan Pool (321037) ; Little Havana Land -Acquisition (321038); and Model City Land Acquisition1` p (321039). 64 Table 12 1969-1995 CAPII IMPROVEMENT PROGRAM DETAILED COST AND FUN6-r1G BY FUNCTIONAL CATEGORY PROGRAM : SOCIAL AND ECON. ENVIRONMENT CATEGORY a HOUSING ---------- L--COST--------------------- ---------------- ------ CATEGORY -- ---------------------------------------------------------------------------t ESTIMATE APPROP. 1989-90 1990-91 1991-92 1992-93 1993-94- 1994-SS - f --- )---------------------------------------- 3 LAND ACQUISITION 10,653.0 9,853.0 11000.0 0.0 0.0 0.0 0.0 0.0 DESIGN 150.0 150.0 0.0 0.0 0.0 0.0 0.0 0.0 CONSTRUCTION 31547.8 31547.8 0.0 0.0 0.0 0.0 0.0 0.0 EQUIPMENT 0.0 0.0 0.0 0.0 0_0 0.0 0.0 0.0 ADMINISTRATION 2,761.0 11347.0 1,414.0 0.0 0.0 0.0 0.0 0.0 OTHER 10605.0 1,500.0 105.0 0.0 0.0 0.0 0.0 0.0 TOTAL COSTS ---- --- -- 18,916.8 ----- - 16,397.8 -- -- - - 2,519.0 ------ -0.0 ------ -----•----- 0.0 ------ 0.0 ------ -0.0 0.0 --------w---------_-----w-----------------------------------------------------w-----------------------------------------. ----------- ---- w wrwr---------------------- FUND SUMMARY OF TOTALr----------- P--RIO--------------------••-------------------------------ww•-►..---w--w..wrw---..-• R APPQOP. ---- FUTURE itNrOilM3 •-----«------•----- NO. FUNDING SOURCES FUNDING APPROP. 1969-90 1990-91 1991-92 1992-93 1992-10 1994-95 ----------- -- --------- ------------------------------------------ --- - -------------------------------------•---- AVAILABLE 710 COBG--IOTH YR 11000.0 11000.0 0.0 0.0 0.0 0.0 0.0 0.0 715 CDBO-- 1STH YR 11000.0 0.0 1,000.0 0.0 0.0 0.0 0.0 0.6 716 CDBG--11TH YR 11000.0 11000.0 0.0 0.0 0.0 0.0 0.0 0.0 857 SP. OSLO: BONDS SR. 86A - INT. 509.0 0.0 509.0 0.0 0.0 0.0 0.0 0.0 884 1976 HOUSING A.O. BONDS 5,844.2 5,844.2 0.0 0.0 0.0 010 'O.* 0.0 SOS 1976'HOUSING 0.0. BONDS - INT. 5,565.6 4,555.8 11010.0 0.0 0.0 0.0 0.0 0.0 997 SP- OSLO. BONDS SERIES 3986A 31997.8 3,997.3 0.0 0.0 0.0 0.0 0.0 0.0 SUB TOTALS 18,916.6 16,397.8 2,519.0 0.0 0.0 0.0 0.0 0.0 TOTAL FUNDS ---------------------------------------------------------------------------------------•---------------------•---------------------- - -- - -- 18,916 8 --- 16,397 8 ------ - 2,519 0 ------ - 0 0 -------•-- 0.0 ------ - - 0.0 ------ - 0.0 -w---- - 0.0 Sg-8�01f' L 4. aNOW r + ects in the Comnity 111.�: funding _ for pro3 vafiio�us Development program are available frog revenue sours s 41 .i kL. ua ...��g i` �:iqk r�i ,�+ 3 yy� O' A, ,G. .. R'�'b' 4Yiv Mom"+@ .s ,' '.i• W,a+: h ..h..+n.r{M .iFc3M ..y..1!}.P:'.c" ,.: �T,+h.�.; OO �' 5 5 i S 4 J� !� xi" y..e t .0 Syt �R 9i h' +y..nf;' .FY9"t �R�' "t` - �.y`i `L'i3"p�+ .F4 k Sfi�z�•i'." YOU . Table 13 1969-1995 CAPIT MPROVEMENT PROGRAM DETAILED COST AND FUNb_.d BY FUNCTIONAL CATEGORY PROGRAM : SOCIAL AND ECON. ENVIRONMENT CATEGORY : COMMUNITY DEVELOPMENT Y ------------------------------------------------------------------------------------------------------------------------------------ COST TOTAL COST PRIOR APPROP.----------------- FUTURE COST ESTIMATES--------------v CATEGORY ESTIMATE APPROP. 1969-90 1990-91 1991-92 1992-93 1993-94 1094-93 --------------------------------------------------------------------------------------- ------_-------------------?--------------- • X 1000 ) LAND ACQUISITION 17,864.3 22,386.1 4,521.6- 0.0 0.0 0.0 0.0 0.0 DESIGN 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CONSTRUCTION 0.0 0.0 0.0 0.0 0.0 0.0 01.0 0.0 EQUIPMENT 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 AOMINISTRATION 2',465.4 3,231.6 746.2- 0.0 0.0 0.0 0.0 0.0 OTHER 730.0 730.0 0.0 0.0 0.0 0.0 0.0 0.9 TOTAL COSTS ------------------------------------------------------------------------------------------------------------------------------------ ------ ---- 21,079.7 ---------- 26,347.7 -------------------- 5,268.0- ---------- 0.0 ---------- 0.0 ---------- 0.0 ---------- 0.0 0.0 Fl6VD ---- -+.-rrr-r---------r-r-------rrrrrOTALr-r--r-r-rr__--r---rr-r-r-r-r__r-rrrrrrrrrrrrrrrrrr-rrrrrrrrrrr--- SUMMARY OF T PRIM APPROP. ------------------ FUTURE FUND2N<1' rrr---rrr-rrrr-rrrr -------------------- NO. FUMING SOURCES FUNDING APPROP. 1969-90 1990-91 1991-92 1992-93 1993-94 --------------------------------------------------------------------------------- - - --------------------------------------- c • X 1000 AVAILABLE 035 RENT FROM ARENA 0.0 $00.0 300.0- 0.0 0.0 0.0 0.0 0. 044 URBAN MASS TRANSP. ADM. -GRANT 719.7 0.0 719.7 0.0 0.0 0.0 0.01 Q. 143 MISCELLAN. OTHER REVENUE FUND 0.0 20.4 20.4- 0.0 0.0 0.0 0.0 0. 146 CONTRIB M. SPORTS 6 EXHIB. AUT 0.0 0.0 0.0 0.0 0.0 0.0 0.0' O. 462 CBDG - L. MATCH FOR (PATR GRANT 0.0 11438.6 11436.6- 0.0 0.0 0.0 0.0 0.0 691 SEOPW TAX INCREMENT TRUST 145.0 2,194.2 2,049.2- 0.0 0.0 0.0 0.0 0.0 704 CDBG--4TH YR 0.0 217.9 217.9- 0.0 0.0 0.0 0.0 0.0 705 C09G--5TH YR 0.0 50.0 50.0- 0.0 0.0 0.0 0.0 0.0 706 CDBQ--GTH YR 0.0 70.9 70.9- 0.0 0.0 0.0 0.0 0.0 707 CD9G--7TH YR 0.0 199.0 199.0- 0.0 0.0 0.0 0.0 0.0 700 COBG--STH YR 0.0 225.0 223.0- 0.0 0.0 0.0 C.0 0.0 709 CDBG--9TH YR 0.0 225.0 225.0- 0.0 0.0 0.0 0.0 0.0 710 COBG--IOTH YR 0.0 245.9 245.9- 0.0 0.0 0.0 0.01 mw 0.0 712 CDBG--I2TH YR 130.3 259.9 129.6- 0.0 0.0 0.0 0.0 0.0 1 713 CDBG--l3TH YR 0.0 143.0 143.0- 0.0 0.0 0.0 0.0 0.0 715 CDBG-- 15TH YR 11000.0 0.0 11000.0 0.0 0.0 0.0 0.0 1 0.0 716 CDBG--l1TH YR 0.0 236.1 236.1- 0.0 0.0 0.0 0.0 23 0.0 731 US DEPT. OF HUD, SEC 106 LOAN 5,956.4 5,956.4 0.0 0.0 0.0 0.0 0.0 0.0 762 SEOPW DEVELOPER DEPOSIT 0.0 45.0 45.0- 0.0 0.0 0.0 0.0 cc 0.0 763 SEOPW RENTAL PROPERTIES 26.3 129.7 103.4- 0.0 0.0 0.0 0.0 0.0 764 LOAN FR GENERAL FUND BALANCE 0.0 1,266.7 1,266.7- 0.0 0.0 0.0' 0. 0L 0.0 684 1976 HOUSING G.O. BONGS 12,000.0 12,000.0 0.0 0.0 0.0 0.0 0.0 0.0 665 1976 HOUSING G.O. BONDS - INT. 11100.0 11100.0 0.0 0.0 0.0 0.0 0.0 0.6 ------.---------"-----r-----------rr----r----------- -- TOTAL FUNDS -------- 21.079.7 ---------- 26.547.7 ---------- 3 266.0- ------- --- O.O ------- --- O.O ------- --- 0.0 --- ------- 0.0 --------r- 0.da -r--r--------- ir.,rs.r e'iY`:5 u�;t{ f'up{ M1�` tyry% THIS, Joi' _.....I ...._... sses:!.rs uu��rururnr,MINI r.�iurrier�.nnr���n�imo p� gg IMMUNITY DEVELOPMENT PROPOSEDIMPROVEMENTS OoROJECTS THAT ARE ONGOING OR SCHEDULED TO BE MRIATED DURING Fr Im . PROJECTS SCHEDULED FOR i FY 199I THROUGH FY 1996 s MwP Hwy �. .r t at C i s •.� _ a• •- 3La Z .� • 4 ' I OK ; _ELM --rtDjjn/pairk West Redevelopment = Phase I (322020) SE i/Park West Oveirtow ftide4eiloPlIent Phase Cami 1,lus House Lan d ACQOJ Si ti M i 3. R . kA., �� UO Vq! I op eat; �'�. y n - , w : 'rrys a u .� ;m�5.�e £ ;., `,.� j '�� ,. � �;> ,. N Ma �*' .er .a a. ____. �._����� ���al��wAK/rWY _ .. .. .tli ra -�Sn _ �y��. ,nin •. i I�I�.I ICI IIIII II IIIII I11111 IIII Ill, 11ll. lkill lllll 1 IIIII Itl IIIII IIIII .1111111 L1 { El are ss fohlRAft iol4 n�m�j raa� fH►Rl:rl9 Ifol Rtl�+�� MRQ@�AM = §@6 A6 IlMM €6M= 9MYIR INY �AiE4�� r ��AN9A�4M AEA _ •r• 10104 --=-=__=_:_,_-_sr-s_�;��c:;zrt��_•___s=�-_-_•_•___—___�_fi___$____31;..__ _- _ce__..___- _• •• �•• grim sSsSx?it9aS:7:?aSsSsSsSaS:4a?sl:Rtasr=sarzas9xra4tll" i_®}99929}l99 MANY sa asassalxazssaaattaxaai�r►of 9 �_#+ logoof > # r II t 4 r r ! r off Af no r r r r r � r r r rsarazsssz +ssaszsaasyr �� szasas►s=- aszsasssaa azz:aassaz �r9 fftfAh Owf 4xA}}r� _ 9rii4t9 9�t�= - �___;xs�lkasr:srS.sSsi�eaaaresss-asFzsszaLss_=arssszsaszza=s--assaaaaszzmssarsaslsazasxssaasssa�ra=llax�rf:seas*ssssseilerrrss*;:a:n► ---====FFssrsr�ts=��esrsrssesraasesa#tr��tssraaassast:_asrrsssssssaar:saA���¢asasssssslsasfssf:ssssfsffss:es�f:ie� res ��i� * asa■*,s,trur .,:-a� FLAW- : � � � __•_ - F;�drL•Frl►:s•syrs=rzFitiErmaaaas�zt=tx:msatzzsaz.zzxe:sssasssaa=z===a=sazaasa:a�a;xs� a� }sssfar=ss���sfa*+rfsytr+rrasarsfel+rr*e:f+rrer:ss t ,u 44 014 0*1 I W• Ire 4,(t i,9� bil , Co •e 99i►tt s li�i,ea is €-€1€ �€e ote 6t� n=- _ sz3ca_ Ss ===:ease a=sasrfaas asssssas** data `�i� fsffs*itfa* **f**va*t '�i� of Ar����pp � Fpnp§ � _,_ =e____e_e_.=___ LL3.—.S—. SSC SSS S3'SSS =a.asasaaaffiaf+ma�sxsfaffiasssr�esilal*dtt**srafrsatfs '- •::, ., ,:,:. ..- -. -.?;_-_ - .., ,;`. ..,,; - a.�g1r.x ire y'k <)'� ,u :. �•1�117� ,�-it�c+x^II?T� i I I was �� *6� �/1t o �or on , PMOAIM SPOOMMD MR moo ow ow SOMPAN ov of" • • s 1 j r f O �M r M Opp • A r '`� �,H .r�`''�,k9 N+.'� Yr ih3' i�fi%s,Tr'3 i^'•r —T • s l } Garment` Center/Fashion 1 . DI strict Expansion y (322025) • - y rhat gre Rot mold proEdison -Center Gateway Improvements M1'as (322054) �. Protec ts 40, ���da••1 d for FY' 1991 P River Drive Acquisition - 1. Northwest a Kreidt property k ` $ t � .• (.419002) .4 6r,;; ya e v Nil r 5 � z? d- JIM�e�v . w, -�:� -w-� _�:__» ieble 15 1969-1995 CAPI' IMPROVEMENT PROGRAM DETAILED COST AND FUNL-AG BY FUNCTIONAL CATEGORY PROGRAM : PARKS AND RECREATION CATEGORY : PARKS AND RECREATION --------------------------------------------------------- COST CATEGORY --------------------------------------------------------------------------------------------------r TOTAL COST ESTIMATE --------------------------------------------------------------------------- PRIOR APPROP. APPROP. 1999-90 c----------------- FUTURE 1990-91 1991-92 COST ESTIMATES r---rr........ 1992-93 1993-94 r.! 1,994-93 -------------- ! X 1000 1 LAND ACQUISITION DESIGN 2,385.5 1,504.0 $81.5 0.0 0.0 0.0 0.0 0.0 CONSTRUCTION 3,673.0 37,472.9 3062.8 31,060.0 175.6 1,241.0 434.6 51171.9 0.0 0.0 9.0 0.0 0.0 0.0 EQUIPMENT ADMINISTRATION 993.3 747.6 171.9 73.9 0.0 0.0 0.0 0.0 0.0 0.0 OTHER 2,149.6 $31.4 1,040.0 333.5 776.6 251.0 333.0 246.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 --- --------------------------------------------------------------------------------------------------------0.O---------O-O-------- TOTAL COSTS 47,505 7 37 747.9 ---3,497.6 ---6,260.2 -------0 - ------ ------------- ---------- 0-- FUND NO. ------SUMMARY OF---------------------TOTAL-------PRIOR------APPROP FUNDING SOURCES ------------------------------------------------------------------------------------------------------------------------ FUNDING APPROP. • 1989-90 ------------------ 1990-91 ------FUTURE FUNOIN9 --- 1991-92 1992-93 -----------------�- ----------- 1993-94 -.------- 1914-98 t • X 1000 AVAILABLE i. 070 PROPERTY RENT 150.0 150.0 0.0 0.0 0.0 0.0 0.0 00 143 MISCELLAN. OTHER REVENUE FUND 66.8 66.6 0.0 0.0 0.0 0.0 0.0 eke 164 LUMMUS DOCKAGE REVENUE 19.5 19.5 0.0 0.0 0.0 0.0 0.0 0 193 CONTRIB FR GENERAL FUND 25.0 25.0 0.0 0.0 0.0 0.0' 0.0 0. 200 NATL ENDOW. FOR THE ARTS GRANT 50.0 50.0 0.0 0.0 0.0 �0.0 0.0 0. 342 CAPITAL IMP. FUNDS - FUND BAL. 307.5 307.5 0.0 0.0 0.0 01.0 0.0 0. 388 REVOLVING FUND 238.9 239.9 0.0 0.0 0.0 0.0 0.0 0. 430 BAYFRNT PK BANDSHELL PKG REV 73.5 73.5 0.0 0.0 0.0 0.0 0.0 0.0 446 CONTRIB FR DEBT SERVICE FUND 740.0 740.0 0.0 0.0 0.0 0.0 0.0 O.G 563 FLA STATE DIRECT APPROP. -FY90 500.0 0.0 500.0 0.0 0.0 0.0 0.0 0.1 564 GUARANTEE ENTL REV. ENDS -FY89 5,100.0 2,100.0 30000.0 0.0 0.0 0.0 0.0 0.4 588 CONTRIB FR FY88 GENERAL FUND 236.7 236.7 0.0 0.0 0.0 0.0 0.0 0.1 601 FY81 FPBL FRANCHISE REVENUES 11090.0 11090.0 0.0 0.0 0.0 0.0 0.3 *0 602 FY82 FPBL FRANCHISE REVENUES 250.0 250.0 0.0 0.0 0.0 0.0 01, 0.1 612 FY80 FPSL FRANCHISE REVENUES 325.0 325.0 0.0 0.0 0.0 0.0 0r0 0.1 684 PROP. 8 LEASE MANG. ENT. FUND 10.0 10.0 0.0 0.0 0.0' 0.0 0.0 0.. 703 CDBG--3RD YR 57.S 57.5 0.0 0.0 0.0 0.0 0.0 0. 704 CDBG--4TN YR 0.4 0.4 0.0 0.0 0.0 0.0 &.0 0. 706 CDBG--GTH YR 247.9 247.9 0.0 0.0 0.0 0.0 0.0 0, 709 CDBG--9TN YR 45.0 45.0 0.0 0.0 0.0 0.0 0.0 0. 712 CD9G--I2TN YR 79.5 79.5 0.0 0.0 0.0 0.0 0.0 0. 735 US INTERIOR UPARR FUND 700.0 700.0 0.0 0.0 0.0 0.0 0.0 0. 740 US INTER. LAND 8 IITR CONS. ORT $17.9 929.2 11.3- 0.0 0.0 0.0 6.0 t1, 759 US DEPARTMENT OF NUD, WAG 6,OI3.0 61013.0 0.0 0.0 0.0 0.0 0.0 0. 7777 ow_7 _R 4 DETA PROGRAM, PARKS AND RECREATION CATEGORY t PARKS AND fKCWATXW ------ i;;; iliWARY-OF -------------------------------------------------------------------------------------- TOTAL PRIOR APPROP. ------------------ FUTURE NO. FUNDING SOURCES ------------------------------------------------------------------------------------------------------------------------------ FUNDZNQ APPROP. 1969-90 1990-91 1991-92 1992-98 1"t- 0 x 1000 770 FLA RED DEV ASSIST. PROGM QRNT 550.0 400.0 0.0 150.0 0.0 0.0 0.0 9.1 775 VIRGINIA KEY LANDFILL SALE 375.0 375.0 0.0 0.0 0.0 9.0 DID 0.4 786 RICOH CORPORATION - CONTRIOXT. 836.1 836.1 0.0 0.0 0.0 0.0 0.0 0.4 768 NEW WORLD ACTION COM. - CONTR. 153.0 153.0 0.0 0.0 0.0 0.0 0.0 0.4 799 FY'69 SUNSHINE ST. BOND PROODS 2,100.0 21100.0 0.0 0.0 0.0 0.0 DID 0.4 $41 ROUSE-MIAMI, INC. CONTRIBUTION 19000.0 11000.0 0.0 0.0 0.0 0.0 9.0 0.0 848 NEW PORT BRIDGE LAND SL - INT. 95.0 95.0 0.0 0.0 0.0 0.0 0.0 0.4 050 FLA STATE DIRECT APPROP - FY66 750.0 750.0 0.0 0.0 0.01 0.0 9.0 0.0 $56 D. COUNTY SEAPORT LAND SETTLM. 1,020.0 1,020.0 0.0 0.0 0.0 0.0 0.01 0.0 359 PRO. NEW PORT BRIDGE LAND SALE 51850.0 59$50.0 0.0 0.0 0.0 0.0 0.6 0.0 673 1980 SANT. 0.0 8.# 97 SL - INT 136.0 136.0 0.0 0.0 0.0 0.0 0.0 0.6 879 1972 PARKS 6 RED G.O. BONDS 571.9 $71.9 0.0 0.0 0.0 0.0 0.0 0.0 $67 1980 HIGHWAY G.O.B.,66 SL -INT 91.0 91.0 0.0 0.0 0.0 0.0 0.0 0.0 889 1980 SANITARY 0.0.9,86 SL -INT 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 $91 84 STORM 90. BONDS, 86 SL -INT 227.0 227.0 0.0 0.0 0.0 0.0 0.0 0.0 $93 94 POLICE 00. BOND, 86 SL -INT 546.0 $46.0 0.0 0.0 0.0 0.0 0.0 0.0 912 LEE 9 TINA HILLS FUND 136.7 127.8 S-9 0-0 0.0 0.0 0.0 0.0 932 J. L. KNIGHT FOUNDATION COHTRS 678.2 678.2 0.0 0.0- 0.0 0.0 0.0 DID 962 MARINAS RETAINED EARNINGS 100.0 100.0 0.0 0.0 0.0 9.0 0.0 0.0 986 FLA DAY RESTOR./ENHANC. -GRANT 58.5 56.5 0.0 0.0 0.0 0.0 0.0 0.6 967 FLA. STATE DIRECT APPROP -FY89 000.0 800.0, 0.0 0.0 0.0 0.0 0.0 0.0 996 SUNSHINE STATE REV. BONDS POOL 8,677.0 9,677.0 0.0 0.0 0.0 0.0 0.0 0.0 SUB TOTALS 41,395.5 $7,747.9 9,497.6 150.0 0.0 0.0* 0.0 0.0 ANTICIPATED 036 041 FLA. DNR BEACH MGMT. - ANTICIP FLA. O.C.T. - ANTICIPATED 200.0 400.0 0.0 0.0 200.0 0.0 0.0 01.0 0.0 0.0 400.0 0.0 0.9 0.0 042 PRIVATE/DEVELPR OONTRIB-ANTI 4,315.0 0.0 0.0 4,915.0 0.0 0.0 0.0 440 635 LAND SALES 710.0 0.0 0.0 710.0 0.0 0.9 9.0 0o0 SUB TOTALS 5,625.0 0.0 0.0 5,625.0 0.0 0.0 0.0 0.0 UNDETERMINED $99 UNDETERMINED 485.2 0.0 0.0 405.2 0.0 0.0 0.0 0.0 SUB TOTALS 485.2 0.0 0.0 485.2 0.0 0.0 0.0 0.0 TOTAL FUNDS ---------- 47,505.7 ---------- ---------- 379747.9 ---------- 3,497.6 ---------- 61260.2 ---------- 0.0 ---------- 0.0 ------ sw"W� 0.0 060 --- -------------------------------------------------- ------ ------------------ -------------------------------------------------- Wrm "villft, .,F Jw i 1 111111111fill[l 777-7- MAP 10 PARM Sk PARK* FACIUTMS ss JIF rww P .0 416. swis, '� Irr�'llf. 19 AN I 01 t • r CITY OF MIAMI PARKS AND RECREATION FACILITIES 1. African Square Park 2. Allapattah Constock Park 3. Allapattah Mini Park 4. Bayfront Park of the Americas 5. Belafonte (Tacolcy) Park 6. Belle Meade Park 7. Bicentennial Park (New World Center) 8. Biscayne Heights Park 9. Biscayne Park 10. Blanche Park 11. Blue Lagoon Park 12. Brickell Park 13. Brickell Plaza Mini Park (AMCO) 14. Broward Circle Mini Park 15. Bryan Park 16. Buena Vista Park 17. Central Mini Park 18. Christmas (Merrie) Park 19. Clemente (Roberto) Park 20. Coconut Grove Mini Park 21. Coconut Grove Tennis Court 22. Coral Gate Park 23. Creswood Park 24. Cuban Memorial Plaza 25. Curtis (Gerry) Park 26. Dinner Key (Seminole Boat Ramp) 27. Dinner Key - Picnic Islands (4) 28. Dorsey (B.A.) Park 29. Douglas Park 30. East Bay Vista Mini Park 31. Eaton Park 32. Fern Isle (South Fork) Park 33. Fifty-fourth Street Mini Park 34. Flagami Parr 35. Flagler Mini Park 36. Fort Dallas Park 37. Gibson (Theodore R.) Park 38. Glen Royal Park 39. Grand Avenue Park 40. Grapeland Heights Park 41. Grove Mini Park 42. Hadley (Charles) Park 43. Henderson Park 44. High (Robert King) Park 45. Highland Circle Mini Park 46. Kennedy (David T.) Park 47. Kinloch Park 48. Lecuona (Ernesto) Park 49. Lee (Robert E-) Park 50. Legion Park 51. Legion Park Picnic islands (2) 52. Lemon City Park 53. Lincoln Park 54. Little River Commerce Park 55. Lummus Park 56. Maceo (Antonio) Mini Park (Domino) 57. Marti (Jose) Riverfront Park 58. Magnolia Park 59. Martell (Elizabeth) Park 60. Melrose Park 61. Melreese Golf Course 62. Miami Design Plaza (Woodson) Park 63. Miami Riverwalk 64. Miami Springs Golf Course (Outside City) 65. Moore Park 66. Morningside Park 67. Morningside Picnic Islands (3) 68. Munroe (Kirk) Park 69. Myers (Kenneth M.) Park 70. North Bay Vista Mini Park 71. Oakland Grove Mini Park 72. Orange Bowl Playground 73. Pace (Margaret) Park 74. Pace Park Picnic Island (1) 75. Paradise Point Parke ,. r 76. Peacock Park 77. Pine Heights Mini Parks 78. Pullman Mini Park. 79. Rainbow Village Park 80. Athalie Range Park (Edison) 81. Range No. 1 82. Range No. 2 83. Reeves (Henry E.S.) Park 84. Riverside Park 85. Second Avenue Mini Park 86. Sewell (E.G.) Park 87. Shenandoah Park 88. Silver Bluff Park 89. Simpson (Charles Torrey) Park 90. South Bay Vista Park 91. Southside Park 92. Stearns Park 93. Steele (Elizabeth) Park 94. Town Mini Park 95. Triangle Mini Park 96. Virginia Key Park 97. Virrick (Elizabeth) Park 98. Virrick (Elizabeth) Boat Ramp b Boxing Gym ) park 99. Wainwright (Alice C. 100. Walker (Paul S.) Mini Park 101. Watson Island b Japanesev Garden Park 102. West End Park 103. West Buena Vista Mini Park 104. Williams Park µ;p ' MAP 11 �+ OAVIKs A RECREATION t . IMPROVEMENTS PROPOSED ww� TMT ME o CM SCMEOMO 10 BE U,,.ED b T "NO Mae PRQIECn SCHEDULED FDA ' FY im Twot M Fr ios "OtM { A, _ ■ a ' � w�I M v .. In 7 mom s • yl . T i .,, A y 1k' •` i � '. j' S•� i ^M TY. � N Parks and Recreation s that are Ongoing pr,� hed,tlesi to � vitiated Ouri�fttN 1. Aliapattah-Comstock Park Renovation (331309) 2. Miami River Shoreline Stabilitation (331304) 3. Malrwi ' t Park Renovation - Phase Ii (331329) 4. Rayfroat Park Redevelopment - ((South End a Chapin Plata) (33130S) S. �s2Park Redevelopment - 33104) 6. Lemon City Park Improvements (331039) 7. Rioore Park Redevelopment - Phase 1 (331039) 8. (a wso Garden Ne11"Ation 13, 0. Antonio Macao Park Development (331143) 10. Virrgginia Key Park Development - Phase'I (331044) 11. Grapeland Part Renovatiats (331310) t2. Athalie R��qqee Park Rehabilitation nslnmt 13. Bayfroot Park., includes: Bayfroat Park Redevelopment - t Desiggnn and Development - Phase I (331227) Bayfront Park Redevelopment Malkwarrs and landscaping - Area A (33122i1) Bayiroat Park Redevelupment - ? Walkways and landscaping - Area 6 (331229) Baylront Park Redevelopment ligqht tower : 0 12301 �` Batit�r�i Valk Mralra•L.,awent. ilurth Ind and Amphitheatre Phre 1 (111?i11 Bayfront Park Redevelopment - Play Sculptures (331232) Bayfront Park Redevelopment, North End a Amphitheatre - Phase 11 (331302) Bayfront Park Redevelopment - South End a Chopin MAN (33130S) Bayfront Park Redevelopment - Pepper Fountain (331306) 14. Nadlerr Park Improvements (331311) IS. Legion Park Renovations (331312) 16. Morni�..ggside Park Renovations (331313) 17. Robert King High Park Renovations (33131S) 18. Yirrick Park Renovations (331316) 19. Douglas Park Renovations (331340) 20. Gibson Park Improvements (331341) 21. Grand Avenue Park Renovations (331342) 22. Kirk Munroe Park Renovations (331343) 23. Reeves Park Renovations (131344) 24. Dupont Pia:a/Rivernalk Improvements (331347) 2S. Simpson Park Renovations 1331346) 26. African 1quare Park Renovations 0110S3) 27. ReAwrto ( Irr•nle Part 28. Mntlidms Patk Reauvation'. (3111st ) 1 29. Athalie Range Park Poor Replacement 1311348) 30. Hadley Park Pool Replacamoot (331349) 31. Talcolc Park Roof Replacement (331350T Protect% That Are mot tlaoned. Citywide Balifield Renovations (331301) - Citywide Park Vita Coupe Renovations (331308) swiemi Pool Renovations - Phew t (33109l1 City of Miami Youth Cooler (331353) Citywide Neighborhood Park Renovations (331303) • Citywide Park Playing Court Renovations (331318) Citywide Park Irrigation Improvements (331338) Citywide Park Equipment (331339) Parks and Recresiio0 I-rov Scheduled for FY'1991 Iwrnunh 11.19% 1. Brickell Point Park Relocation' and Redevelopment (03 U52) 2. Helreese Golf Course Improvements (416047) �I III II t":;: i��IIIIAI��. �"' , �,ar..n.■ � u:� Table 16 1969-1995 CAPI' IMPROVEMENT PROGRAM • DETAILED COST AND FUNL,.AG BY FUNCTIONAL CATEGORY ! PROGRAM PUBLIC FACILITIES CATEGORY : STADIUMS -r r----r--r----- ,;. -------- - OOBT7 1 TOTAL COST PRIOR APPROP. ------------------- t----------------- FUTURE COST ESTIMATiO =- rrr--rrr....r 2992-93 1993-94 39li-9S CATEGmY ESTIMATE APPROP. 1989-90 - - - - - - 1990-91 - - - - - - - - - - - 1991-92 -- - - - - - - - ---- - - - -- --- --- -----------r--r-- -------------------------------------------------------------- t • X loon ) LAND ACQUISITION 0.0 0.0 0.0 970.e 0.0 0.0 0.0 0.0 0.0 0'•0 O.A 0.0 0.0 0.0 DESIGN CONSTRUCTION 1.169.E 1S.326.I 219.0 2,421.1 12,905.0 0.0 0.0 0.0 0..0 0.0 0.0 0.0 0.0 0-0 i EQUIPMENT 166.0 166.7 426.0 30.0 242.0- 156.7 0.0 0.0 0.0 0.0 0.0 9.0 ADMINISTRATION 213.5 4.0 209.5 0.0 0.0 0.0 0.0 0.0 OTHER ---------- -------------------- ------ --- ----- ----- TOTAL COSTS --------- 17,102.1 ---------- 3.102..1 14.000.0---------0.0---------0-0-------- Q-------rr-ararr-r--- 0.0 --- rr--r -------------- -- ---------------------------------------------- ---------- ---- -- -r-rrrr-r--r-rr ----------------rrrrr• ' ------------------------------------------------------- FIND SUMMARY OF TOTAL r - - r-- PRIOR -------- APPROP. ------- - FUTURE 92-91 k I991=92--------------- - ---_----------4-- -NO-----FUNDING-SOURCES---------------- -FUNDING-----APPROP------1989_90-r---1990_91-- - t • X 1000 ) AVAILABLE 376 METRO-DADE COUNTY RESORT TAX 799.3 2,298.1 1.498.6- 354.0- 0.0 0.0 0.0 0.0 0.0 0.0 0.0. 0.0 586 CONTRIB FR FY88 GENERAL FUND 0.0 0.0 354.0 450.0 450.0- 0.0 0.0 0.0 0.0 665 799 ORANGE BOWL ENTERPRISE FIND tN FY'89 SUNSHINE ST. BOND PROCOS 354.0 0.0 354.0 0.0 0.0 0.0 0.0 0.0 O.0 0.0 643 FLA LEAGUE OF CITIES BOND POOL 15,948.8 0.0 15,946.8 0.0 SUB TOTALS 17002.1 3,102.1 14,000.0 0.0 ---------- 0.0 ---------- 0.0 ---------- 0.0 ----- - - - - - TOTALFUNDS -- - -- -- - -- - r rr r r r r r-- r r - - -r-r r rr r --17.102.1 r-- -- - r - - -rr ---9.102.1 rr rr - rr r -rr r ---------- 14.000.0------a-a-r-r---- - r r -r- - -- -+ -- 0.Or-r..rr---a-a..-r--r---a-q --- ------- pw• o , i �t p M =i=.w.r s do n • J'I x 11 MAP 13 s STADIUMS ...... ' ,., J PROPOSED IMPROVEMENTS, OPROJECTS THAT ARE OHGOJHG d OR SCHEDULED TO BE PKMTEO "NO FY f9*0 • PROJECTS SCHEDULED FOR a« FY root THROUGH FY t"S 1 0 rww r, �y i0. a so 1 rw r- -: V Proposed Stadiums Projects 1989-1995 f �_'�i;®,5.:,;irarov -,.That S nuo i `FYi ' 194Q 0 ., jibedched na rang Bowl Moderns iati on Phase Y� % (404237) , �;` " ernization - 2t- Orange��Bov+1� �` Phase 1I {404238) r 3` Orange Bowl 'Stadium - Pro-Clubtr .—Reconstruction (332232) Orange Bow Stadium: -. Additional Press Facilities . (404231)'� Marine Stadium Concrete Pilar Repair 5.. 1402 ?' r Rom-, fi - , , � �,.k '�$ ,Ky �sL. +T�''y�.. �, Ai i�''�t! "f$��.� �� bE `Kd�x��. M{ :.yk r..1'Y"•- i � - i. . ,, _. ...*... _.a . ,. ,., _. t.,�r, .:i.—.�:!^,. w -., ._.. _t r. ,-_ -,. e. .. .., <.-- ,, .. �. _.,, .. _7T <"y•C s�,�,: - ,ws r'«-`.�:"v ,. 'Y..,.. - _F ... a{..%� . :..�...w�—� ?>w eet\ h, AUbIT08I" The Auditoriurs� 'f�nctiona `category, one of -three categories, under °the` Public` Facilitieszr major program area, is presented in this- section. It includes improvements to Miami's k auditoriums and the Miami Convention Center. There are three Auditorium projects in the y: 1+989-1995 Capital. Improvement Program. These ,; t r Ottjects total $8,116,000 and represent L8% of =the'1989-1995 CIP. Table, 17 summarizes the s� s' Auditoriums functional category by cost category. td funding 'source. a< J +. i'-` is ih9 facilities The location of Miami's auditoriums is shown on:!,;; Map 14. "y�.R7n 'ems ie Ifr'a�lY���'11,�dit�r L S., I=roveiiits 1989-1995 + :ergs -,taw ^uri s ^ three projects are ongoing _or. scheduIed_.to Yt r ..w " s ' begin during FY'90 " Refer to the Capital Project Description Sheets,* z- v 3 provided on an individual,, basin, ° for fr j,=- ,#, m ham. detailed project data. These'. sheets art in Ftindi rig `L'-• , . %y '1P:i x The- total+ funding required is available row i� s � r various sources as shown in Table 170 'I 41 ��y%�'.°�� ,. xe i� .�- ��� � � t ° t: ,.o- .F-... -aa .`; - .. �Sa.�,-r� �s�.�:f�i; i,f`°'�F��S�� "�?,r .y�'r•.�. i�..i8¢iA.. ... - Table 17 1969-199S CAPI! LMPROVEMENT PROGRAM DETAILED COST AND FtAfq.-.49 BY FUNCTIONAL CATEGORY PROGRAM PUBLIC FACILITIES CATEGORY : AUDITORIUMS --------- ------ --- ---- --i•-------------------_---------------------------------------- -------a-------r---------°-----------------.- FUTURE COST ESTIMATES-----------.,..�r i COST CATEGORY TOTAL COST PRIOR ESTIMATE APPROP. APPROP. 1969-90 4----------------- 1990-91 1991-92 1992-99 1"S-94 1"4-09' ,n aa - as a---- - -- a a ai.-C- ---- - - - -- - - ---► - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ► - - - - - - -- - - - - -- - - - - - - --- - -- - ---- ---- ---- ---Y--�Y---a-�1----+i-- t 0 X 1000 LAND ACQUISITION 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 DESIGN CONSTRUCTION- 695.0 695.0 6,828.0 6,828.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 EQUIPMENT 96.0 96.0 46.0 46.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 ADMINISTRATION OTHER 451.0 451.0 0.0 0.0 0.0 0.0 --- ------- -------0.0 9.0 --- -�- ------•0.0 TOTAL C05T$ ---a.116-0---5.116.0-------o.p -------0.0 --- ---- 0.0 0.0 i --------.-------------------------------------------------------------------------------------------------------- --,aa .�.ar------.L------ - --.. a a -- as - a as a a - - --- - - - - - -- - -- - - - - - - - -- - - - - - - - -- - - - - - - - - - -- - -- - -----------------------------•a ----a -- FUNOa -a - a a a-SU-MM---ARY OF TOTAL PRIOR APPROP.------------------ FUTURE FtN0IN0--------- --------•- NO. FUNDING SOURCES FUNDING APPROP. 1989-90 1990-91 1991-92 1992-95 1993-!4 191i-915 ---------------------------------------------------•-------------------------------- -------------------- t • X 11 AVAILABLE 039 FLA CULTURAL FACILITIES GRANT 200.0 200.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 148 241 CONTRIS M. SPORTS 8 EXHIS. AUT CONVENTION CHTR REVENUE BONDS 5,500.0 116.0 5,500.0 116.0 0.0 0.0 0.0 0.0 0.0 0.9 799 FY'89 SUNSHINE ST. BOND PROCOS 2,000.0 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0, 650 FLA STATE DIRECT APPROP - FY88 300.0 300.0 0.0 SUB TOTALS 81116.0 81116.0 0.0 0.0 0.0 ------ 0.0 ---------- 0.0 0 -------- TOTAL FUNDS---,116.0 d d,116.0 -- 0.0 -- 0.0 ----- - 0.0 0.0 d - - - - -- - - - - ---- -- ---------------- ------- ----- ---------------------------- - - -_0.0 - ----------------- -` --------------~-------- ml V--tJ- fJ M" 14 AUDn*RMMS AUDI: 4 CONVENTIMCINTuR near— j. so eat mo so 10 ona Jk It NwwmxMOAAN% lifillwurairk F.. _ r f At�DITORIUMS PROPOSED IMPROVEMENTS •• Nr VROAC" THAT ARE OWMX4 • f O OR SMOMED TO 8E NT1ATEO ` OUlIMrO Fr 1990 FRDJECT! SCHEDULED FOR KKr . Fr 1991 THROUGH FV 199S f r �t.! .. Koko f f QVnSTl18t n t L J. y !" Ca►conut 6rore Exhibition Centet� =°�FA ^t� 1novation h Expansion t k 9 ,.itenovation of Manuel Artie.. Comunity Center 3330P) �: x�M13aa�i Convention -Center � _� b : r ' Ni�fi�urbIi�siaient and Equip�ent Flf'89 :ors (420 12) ! trn t x £ ti ri u w Lt i :k 11= .yP Table 18 1989-1995 CAPI1 IMPROVEMENT PROGRAM DETAILED COST AND FUNS.-4 BY FUNCTIONAL CATEGORY :- PROGRAM s PUBLIC FACILITIES CAtEGORt MARINAS ------------i�irsr�irs-w�.i►r----r----------------------------------------- _-------_-�--------__- -----z COST TOTAL COST PRIOR APPROP. t----------------- FUTURE COST BSTIMAIRS....... CATEGORY ESTIMATE APPROP. 1969-90 1990-9I 1991-92 1992-93 1993-94 I994- --------------- _ ---_------..----------------r---.-------- LAND ACQUISITION 1,000.0 1,000.0 0.0 0.0 375.9 0.0 0.0 0.0' 0.0 0:0 Q.0 0«0 0.0 DESIGN CONSTRUCTION 1,260.7 181518.0 $84.0 15,578.0 0.0 0.0 2,940.0 0.0 0.0 0.0 0.0 0.9 0«0 0.0 EQUIPMENT 11150.0 526.0 1.150.0 521.0 0.0 0.0 0.0 5.0 0.0 0.0 0.9 0.0 ADMINISTRATION' 226.4 0.0 53.7 9.0 .01 OTHER 280.1 --------•0 - ---------- ._ ---------- -- TOTAL COSTS' 22,734.8 ---------- 19,360.2 ----•--------------- 0.0 31374.6 ---------0 0.0 ----------------------------------------- 0.0 0.0 0.0 ----------------- r-r---------r------------------------------------- ---------------------- .. -----•---------------------------------------------------------------------------- FUND SUMMARY OF TOTAL FUNDING PRZOR APPROP. APPROP. 1989-90 •---- ------------------ 1990-91 --- - -- ------------------------ ------------ FUTURE FUNDING -------------------- 1------ 1------ 1------ 1------ No. FUNDING SOURCES --------------------------------------------------------------------------------( f X 1000-----------------•---------------------.. AVAILABLE 032 PRIVATE DEVELOPER CONTRIBUTION 50.0 50.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0�+ Or.. 253 CERTF. OF PARTICIP. - INTEREST 250.0 250.0 750.0 0.0 0.0 0.0 0.0 0.0 0.0 O«' 342 670 CAPITAL IMP. FUNDS - FUND BAL• DINR KEY MARINA RET EARNINGS 750.0 4,359.5 4,679.0 319.5- 0.0 0.0 0.0 0.0 0.0 6.0 0.0 ao 799 FY'89 SUNSHINE St. BOND PROWS 1,531.2 500.0 IdQ.S- 0.0 0.0 0.0 0.0 0.0 996 SUNSHINE STATE REV. BONDS POOL 11,919.5 12,100.0 SUB TOTALS 19,360.2 19,360.2 0.0 0.0 0.0 0.0 0.0- UNDETERMINED $99 UNDETERMINED 3,374.6 0.0 0.0 3,374.E SUB TOTALS 3,371.E 0.0 0.0 3,374.6 0.0 0.0 ------- -•«--•----.- - - - - - - . TOTAL FUNDS --- - ------ - - -- - - -- ------ -- -- -- 22,734.9 - - - - --- -- - ----- - 19.360.2 - -- - - -- - --- - - - - -- - -- - 0.0 - ----- - - ------- - -- ---- - - --- 3,374.E ----- -----------------------------------s_-.i - ------ 0«0 0.0 0.0+ -------- yn,.r�.-+-�.M� a•..-iY/ .r-...1/ -�+rJ rur w.. r� i ..a`•' 1/oni i .., ; .. 'Awl., li I !l , ARM"' `t II r 1 � 1 PFA)W Doom I+ i I y v - k � �"" £' n � wry r�f$� "'�rt���?S'.�; �.,.3'F�� m-5�.,Gz'an x»� ii o ui S5 r • t :rr • r. . +sit /{.y■� C R� funeti.o6al category.; one of !three Wee�s� Fynd no `�tde e�the . Tr'ans oAation major.prograe areal is r RZ -969 projects ;26,400 or 34.0� of ttie toter linil figs presented in th3 s section. The capital r wired is available, $5�,45r100' or ,6•i1 � � ,•>� °iih ,this ;category"provide reconstruction, major antict ated, while $4,464r,M or - is �u 4:w, ntenance and beautification `to Miami s street faurty-four street undetec�rined. em There are rdveent' projects in the 1989-1995 Capital` N;aC • Mprovement' Program valued at $890880y00, rr presenting 19." of the total ,I989-1995 ,CIP. p the S treets functional ' , Table 19 summarizes ' `� cetegory,by cost category and funding sources. r it+ino Facilities There are 756 miles of streets within the City Road --limits as follows: (1) State and County 662 miles 2 Cit Street system - systems.- 88 , O Y �`Yiles'�'(3) Private streets - 6 miles. It_. The City of Miami street system is shown on Map 18. Proposed Imurove�ents 1�9-1995 Street The Streets projects proposed for the 1989-1995 19. fr- 'Capital improvement Program are shown on Map at $50,280,700 are , `-Twenty-one projects valued ongoing or scheduled to begin during FY'90. The y. a a.: ' remaining twenty-three projects valued at s $390600,000 are scheduled for the last five i years of the 1989-1995 CIP..- i Refer to the Capital Project Description -Sheets, provided on an individual esheets ct pare for detailed project data. These - Volume III. I - Y I1I III Il�il II h I IIII I All I I I I u �N Table 19 1989-1995 CAPI! IMPROVEMENT PROGRAM DETAILED COST AND FUN6-.40 BY FUNCTIONAL CATEGORY PROGRAM : TRANSPORTATION CATEGORY STREETS --------------------------------------RIOR------APPROP COST TOTAL COST P 1989-90 4----------------- FUTURE 1990-91 1991-92 COST ESTIMATES ^ --------- -V' 1992-93 1993-94 19949S CATEGORY ESTIMATE APPROP. - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- -- -- - - - - - - --r ..- - - - - -- - --- - - - - - - - - - - - - - - a- 4. --- - - - •• - - - - - - - - - -.. - - - - - - - - - -- - - - - - - - ( f X 1000 ) LAND ACQUISITION 31164.0 4,650.3 31184.0 1,791.9 0.0 269.5 0.0 996.3 0.0 421.2 0.0 446.4 0.0 303.0 0.0 381.0 DESIGN CONSTRUCTION 74,330.1 17,211.1 1,774.1 19,019.1 10,538.8 0.0 80602.1 0.0 91051.3 0.0 01133.0 0.0 EQUIPMENT ADMINISTRATION 0.0 1,267.6 0.0 402.6 0.0 24.9 0.0 255.7 307.2 849.0 95.0 $40.0 187.2 $39.0 45.0' 841.0' OTHER 6,410.7 1,418.0 133.7 1,490.0 -------------------- ---------- ---------- -------TOTAL-COSTS------------------ 891660 7 ------------------------------------------------------------------ ---------- 24,007.6 ---------- 2,20176 ---------- 21,761.1 12,116.2 91993.5 ------------------------------ 10,410.5 9`.400.0 --------- ----------------------------•------------------------------------------------------------------------------------------- FUND SUMMARY OF TOTAL FUNDING PRIOR APPROP. APPROP. 1989-90 ------------------ 1990-91 FUTURE FUNDING 1991-92 1992-93 -'---'-----"--'----- 1993-94 - 1994-95 NO. FUNDING SOURCES --- - ----------------------------------------------------------------------------------A--- )---------- AVAILABLE 040 REIMBURSMNT FROM PORT OF MIAMI 250.0 250.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 045 DADE COUNTY SCHOOL BOARD CONTR. 26.8 0.0 2,000.0 28.8 0.0 0.0 0.0 0.0 0.0 142 553 US COMMERCE EDA FUND SURFACE WATER IMP. 8 MANG. FNO 2,000.0 440.0 190.0 250.0 0.0 0.0 0.0 0.0 0.J 0.0 0.0 684 PROP. 6 LEASE MANG. ENT. FUND 500.0 500.0 0.0 0.0 400.0 0.0 0.0 0.0 0.0 0'•0 715 724 COBO-- 35TH YR FEC RAILROAD LOAN 400.0 1,7000 1,700.0 0.0 0.0 0.0 0.0 0.0 O.0 0.0 0.0 792 1970 HGWAY G.O. BONDS -57 SL 1,826:3 1,826.3 0.0 0.0 200.0 0.0 0.0 0.0 0.0 0.0 794 1984 STORM 0.0 BONDS - 67 SL 200.0 25.4 25.4 0.0 0.0 0.0 0.0 0.0 798 835 SIDEWALK G.O. BONDS FEC RAILROAD GRANT 1,700.0 1.700.0 0.0 0.0 0.0 0.0 0.0 0.0 Q.0 0.0 848 NEW PORT BRIDGE LAND SL - INT. 15.6 15.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 862 $63 1970 HIGHWAY G. O BONDS -70 SL 1960 HIGHWAY 0.0 BONDS 200 7,230:0 20.0 51907.0 1,323.0 0.0 0.0 0.0 0.0 0.0 0.0 $64 1980 HIGHWAY O.O.B. 80 SL -INT 200.0 200.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 868 1980 HIGHWAY G.O. BONDS -57 SL 2,817.0 2,517.0 0.0 0.0 0.0 0.0 0.0 O.0 674 1976 6 1976 STORM SEWER O.O.B. 1,223.0 1,223.0 0.0 0.0 0.0 0.0 0.0' 675 1954 STORM SEWER 0.0. BONDS 3,210.0 3,210.0 0.0 0.0 0.0 0.0 0.0 886 1980 NOWAY 0.0 BONDS - 86 SALE 2,025.0 2,025.0 398.3 0.0 150.0 150.0 150.0 150.0' 897 MUNICIPAL FUEL TAX 1,148.3 SUB TOTALS 26,959.4 24,007.6 2,201.8 150.0 150.0 150.0 150.0 89-806 0.0 0.0 0.0 150.0 150.0 196!-1995 CAPi' DVMMffpWWAM DETAILED COST AMD FUNI-A SY FUNCTIONAL OATLOORT sTREETR TRANSPORTATION oATEaa�x_� .- .I I I �i I Ililnl i l �111 II II I IIII III II II III II IIII II I III III I Iaid z � R zAl .tS j, 3 STRK T. SYSTEM �- goes STREETS MAMTARIEO SY THE 'STATE OF FL.ORM ww STREETS MAMTAMED Sr WOE COUNTY rr e.1 = on v i T � s � 1 Mww 0-0 Z .,**** III .�......,...,..�,,....,,...,.,...+..r.+r..�r,....u.awr.roinrn�r�uil�Y�nul7�uduililiYdiYIIrWIOIYIu�iPhllllllllll111111 III II I III I or Scheduled To Be tg Ming jpitiat d During FV11990 1. Belle Meade Street Improvements (341129) x 2. SE Overtowe/Park West Street Improvements. Phase 1 (341105) 3. Sheannioah Street Improvements - Phase 11 (341123) 4. Southeast Overtown/Park West 7th & 9th Street Malts (341176) S. East Allapattsh Street Improvements - Phase 11 (341128) 6. Borth River Drive Street improvements (341103) 7. Nornlnnygside Street Improvements (341116) f S. Manor Street Improvements - Phase III (341090) 9. SW 16th Street Improvement (3410") 10. Downtown Street Improvements - PI I I (341115) 11. Silver Bluff Street Improvements (341121) 12. Nodel City Street Improvements. Phase 13. West Little Navarra Street improvements- Phase 11 (341127) 14. Lawrence Waterway Nighway Improvement (341160) IS. Buena Vista Street improvements - Phase III (341122) 16. Manor Street Improvements - Phase lY (341119) 17. fast Little Havana Street Improvements - Phase 11 (341124) 18. Latin Quarter Street Improvements (341086) Projects that Are Not Mooned Renovation Sidewalks and Streets - FY'8B-FY'90 (341159) Citywide Street Improvements - FT'90 (34117S) - Citywide C.O. Paving Project (141177) 1. 6rapeland Street Improvements (041156) 2. Design Plaza Street Improvements - Phase It (041157) 3. Coral Gardens Street Improvements (041165) 4. Allapattah Street Improvements - Phase III (04114S) 5. Overtown Street Improvements - Phase 11 (041144) 6. Edgewater Street Improvements - Phase III (041166) 7. Buena vista Street Improvements - Phase Iv (041146) 8. Wvnwood Street Improvements - Phase II (04use) 9. East Little Havana Street Improvements - Phase III (041147) 10. Edison Street Improvements - Phase ill (041167) 19 It. Manor Street It9rovw Its - 11►asi tT (041168) 12. West tittle Nmwrim MONODY TmPt- Phase I11 (04110) 13. East AllalattaR Street Improvements Phase III (04115S) 14. tittle River Street Improvements - (aaII 1143) is. Edison Street Improvements - Phase 11 (041131) 16. Edgewater Street Improvements - Phase 1t (041132) 11. Sewell Park Street Improvements (041133) Is. Nanor Street improvements - Phase V 1041134) 19. Downtown Street improvements - Phase ill (041135) 20. Nodal City Street Improvements - Phase II (0411S4) 21. erickell Transit Stations Are& Street Improvements (041101) - Citywide Street Improvements FY'1990-94 (041170) - Rouild sidewalks and Streets FY'1990-94 (041111) Iiiiii1ow'"T LUIT 100 Y�l Y. �t MASS TRANSIT The Mass Transit functional category, one of Refer to the Capital Project f escriptionlifteets, three categories under the Transportation major provided on an indiv#dual project basisfor program.. area$ is presented in this section. It detailed project data. These sheets are ifr includes capital improvements to Miami's public Volute III. trihtpbitation system. Public transportation 'Within -the City is provided by Metropolitan Dade Funding County. Projects within this category include cometitents made by the City to support major $232,300 or 3.2% of the total funds required area Public"',, transportation projects. One project available. $7,007,000 or 96.8% of they funds art _ costing $7,239,300 and representing 1.6% of the anticipated. 1989-1995 Capital Improvement Program is this category. . Table 20 summaries - scheduled in eg y . b cost t:+ `:the Mass Transit functional category y category and funding source. EYistin Filities �9 ac 20 shows the portion of the :Metropolitan ;.. ........ Dade County rapid transit system, Metrorail, that lies within the City of Miami. The rapid transit line, with its ten City stations will connect with the Downtown. } Component of Metrorail (DCM) also shown on Map 20. The DCM will facilitate the movement of pedestrians from transit stations to their` � destinations. proposed Transit System Improvements e , tin K_'4.5; The City of Miami is committed to assist in the � financing of the DCM. This single transit project's funding will cover the City's.share of the estimated cost of the Downtown Component of Metrorail - Phase IL The Downtown Component of Metrorail - Phase II is shown on Map 21. Will nt,. i. �.;�,.P,. n,vr 'lip¢,5 Table 20 1909-1995 CAPI IMPROVEMENT PROGRAM DETAILED COST AND FUNu-dOG BY FUNCTIONAL. CATEGORY PROGRAM TRANSPORTATION CATEGORY t MASS TRANSIT ------- • » �....�.. ..._ .. _..-. ------------------ COST-TOTAL COST ---- PRIOR -----------------------FUTURE-LAST------ APPROP. TEO ...-.._,.-_.--...- r----------------- ------------- 119S-S* 191+1-�95: CATEGORY ESTIMATE APPROP. 1989-90 1990-91 1991-92 1992-93 _ ._-.. �. _..-.............. -. _ ..........._ _--.--...-----------------------------------------------------------------------.. • t ! X 1000 T LAND ACQUISITION`- 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.0 0.0 0.0 DESIGN CONSTRUCTION 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 EOUIPKNT 0.0 0.0 0.0 0.0 0.0 0.0 0.0 O.O .0 0.0 0.0 0.0 ADMINISTRATION 70239.3 2,000.0 1.767.7- 1.600-0 3 2r603-S O.0 0.0 --- OTHER ---2_603_5 -- ------ ------ TOTAL COSTS -----------------------------------------------------------------------------------------------------.. 7r239.3 2r000.0 1r767.T- i►S00.0 2.603 - -..._ ..._.....- ----- - ...._ ..........,......,»-. --- --- . -.. - FtlND -----SUMMARY-bF------- --+----_-_-TOTAL-------PRIOR FUNDING '_--_APPROP ----------------------FUTURE+FtSiDING-_-----------------w_- ---------------------.. APPROP. 1939-90 1990-91 1991-92 1992-93 1993-94 -.. - - 191�1-95 N0. FUNDING SOURCES ----------------------- --------------------------------------------------------------------------------: s x 0 1000 AVAILABLE 193 CONTRIB FR GENERAL FUND 172.3 $0.0 172.3 1,927.7 0.0 1.767.7- 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Ow OF* $95 CERTIFIC- OF PARTICIPATION -96 SUB TOTALS 232.3 2,000.0 1,767.7- 0.0 0.0 0.0 0.01 a, ANTICIPATED - 250 LONG TERM DEBT INSTRUMENT 71007.0 0.0 0.0 10800.0 2.603.5 2.403.S 0.0 Lif+ SUB TOTALS 7,007.0 0.0 0.0 10800.0 -- ------------- Q.Q ei TOTAL F- --------------------------__-----_+--------------------`---- 723s- 2OOOO I 0 --6 2r0R _------------------------ Oy rrrr ------- MNTA Ma -i nr��+�niiii inum�nN�m�q��mionsn.i, nlliuuui wii i i iu iipnul���ir,ii _ i it t L.. � 3 } . MAP.221 t .MASS TRAUM ww nN *' AROPOSED'`IMYEMENTS FMACTS THAT ARE ONWWiG E . O cn SCNEoutf u THs sE 11immto ` OLNU 3 FY m" . PROJECTS SCHEDULED FOR . • FY »tf TMOM FY fit! _• 7 1. Mt ki l `- .Phase:" I r - a � a s r M � t; 1989-1995 CAPI! IMPROVEMENT PROGRAM DETAILED COST AND FUH6.40 BY FUNCTIONAL CATEGORY PROGRAM : TRANSPORTATION CATEGORY : PARKING ---r--r__-►r-rr..r--r--r.. r..rr.-rrrrrrrrrrwr r---------------r.Y.-r -r.------------r---------r-------------.._---r--------------r-------�. TOTAL COST PRIOR APPROP. <----------------- FUTURE COST ESTIMATES---r--wr-------r COST CATEGORY ESTIMATE APPROP. 1989-90 1990-91 1991-92 1992-93 1995-94 199#-9"� .i----------------------------------------------------------------------------------------------------------------- t ! X 1000 ) LAND ACQUISITION 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.,0 0.0 0.0 0.0 DESIGN CONSTRUCTION 2.0 20,269.0 2.0 20,269.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 EQUIPMENT 905.0 905.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ADMINISTRATION 581.0 0.0 581.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.0 01.0 OTHER -------0.0 _ -------0.0 ---------- -------0.0 TOTAL `.COSTS --------------rrrrrr--rr-rr..r---------------------------r----------------------------------------------------------------.r--r-. _ --21.757 0 ___ 21.7S7-o -------0.0-------o-o -^-----O.Q .r -- - r- - r - -- -- - - - - - - r r - - r _ -- - rrr•-rr-rrrr-rrr♦-rrr ---- ----r rfrr- -rrrr -r-r--- - -r - -- ..--- - r - - r - r _ -- - r - - - -- - - - - --- - - - - -♦ - - - r -r r-rr rrr FUND SUMMARY OF TOTAL PRIOR APPROP----- NO.FUTURE FUNDING -------------------- NO. FUNDING SOURCES FUNDING APPROP. 1989-90 1990-91 1991-92 1292-93 1993-94 1994-95 ----------- ! ! X 1000 ) AVAILABLE 241 CONVENTION CNTR REVENUE BONDS 10,176.0 10,178.0 0.0 0.0 0.0 0.0 0.0 0.0 0.01 . 0 249 CONY. CENTER REV. BONDS -INT 2 695 CERTIFiC. OF PARTICIPATION -86ME 668.0 11063.0 668.0 11063.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0+ 7S8 US DEPARTMENT OF HUO,. WAG 4,994.0 4,994.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0.0 + 0 65S DADE SAVINGS 8 LOAN ESCROW 4,654.0 4,8S4.0 0.0 SUB TOTALS 21,757.0 21►7S7.0 0.0 0.0 0.0' 0.0 0.0 0 TOTAL FUNDS _____ _____ _ 7-0 ----- ------ ----rrrr rrrrr-rry --- d« ---------- -0--------- -------------------------- rrrrrrrrrrrrr rr-iii.i r------ - ------------------- -a----21_757 V IIIN�NIN N � �� I I, I J y ill III II IIIIIIIII.IiliiYll I.MYYYYi.11ilYMiYi II IIYI'YOY.IiYIIIIIIYIiIYYYYIilr.11lllllllllll llll ll��l!MYIII IIIiIIIli1111111111 Y1111111 III II IIII II II IIIIIIilll111llllll111 I II,II III I III.I I,. _ I I _. ,... ..,, ., .. SANITARY SEWERS The Sanitary Sewers: functional category, one of three categories` under`the Physical Environment major 'program area, is presented in this section. It=:includes.projects that will improve, _:.Miami's ,existing sanitary sewer system and. provide sanitary sewers in areas of the City that do not have them. The 1989-1995 Capital A provement Program includes fourteen sanitary sewer_ projects estimated to cost $30,118,000. .;These projects represent 6.5% of the total Capital Program. A summary of the Sanitary Sewers functional category by cost category and °r funding -source is presented in.Table 22. Existing Facilities -The City of Miami sanitary sewer system is displayed on Map 22. ` Proposed Sanitary Sewer 1Mprovements_198 -1995 Sanitary Sewer projects are shown on map 23. �s --Twelve of these projects, valued at +.. { {k y6 $27,418,000, are ongoing or scheduled to begin.w, during FY'90. The remaining two projects, valued at $2,700,000, are scheduled for the last five years of the Capital Program. Refer to the Capital Project Description Sheets, - - • provided on an individual project basis, for detailed project data. These sheets are in Volume 111. Fins Al of the total funding required is available from various sources. I ... - •I`il' e, I� iiS". 'T '�IO'��(�MII °I -'V11� 1 ��;° r_i mill ii i _ IIIII x _' Table 22 1989-1995 CAPIT MPROVEMENT PROGRAM a,. DETAILED COST AND FUNL_..3 BY FUNCTIONAL CATEGORY PROGRAM PHYSICAL ENVIRONMENT CATEGORY SANITARY SEVERS --------------"- -.. .� ------------- COST TOTAL COST PRIOR APPROP. c----------------- FUTURE COST ESTIMATES-----------�--r 1993-94 1994-99; CATEGORY, ESTIMATE APPROP. 1989-90 1990-91 - 1991-92 --- ---------------------------------------- 1992-93 ------------------------------------------------------------------------------t ! 1 LAND ACQUISITION 0.0 11339.0 0.0 11060.0 0.0 166.0 0.0 $9.0 0.0 6.0 0.0 6.0 0".0 9.0 0-0 6.0 DESIGN CONSTRUCTION 25,630.0 21,154.0 2,173.0 11791.0 129.0 128.0 120.0 0.0 120.0 0.0 EQUIPMENT ADMINISTRATION 0.0 386.0 9.0 331.0 9.0- 26.0 0.0 23.0 0.0 2.0 0.0 2.0 2.0 2.0 OTHER 2,761.0 2,264.0 244.0 197.0 14.0 14.0 -------------------- 14.0 ---------- 14.0 TOTAL COSTS ------------------------------------------------------ ---------- 30,118.0 ---------- 24,816.0 ---------------- ---------- 2,600.0 -------------------------------------------------------------- ---------- 2,100.0 ---------- 150.0 150.0 150.0 1S*.0 ------------------------------------ FUND SUMMARY OF ----------------------------------------------------------------------------------------------- TOTAL FUNDING PRIOR APPROP. APPROP. 1989-90 ------------------ 1990-91 FUTURE FUNDING 1991-92 1992-93 -------------------- 1993-94 1994-OS NO. FLING SOURCES - --- --------------------------------------------------------------------------------t f )---------------- I AVAILABLE 031 F'EC RAILROAD REIMBUIRSEMENT 58.0 100.0 42.0- 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.0 0.0+ 838 870 1980 SANITARY O.O. 8. - 88 SL 1975 6 76 SAN SEW G.O. BONDS 1,350.0 7,715.0 350.0 6,21S.0 1,000.0 I,SOO.O 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 $71 1980 SANITARY SEWER G.O. BONDS 12,695.0 12,403.0 292.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 872 944 1960 SANITARY SW G.O.B. -87 SL M.D. U(TR 6 SWR AUTH. REIMBSMNT 2,600.0 3,000.0 2,600.0 3,150.0 0.0 1S0.0- 0.0 0.0 0.0 0.0 0.0' 150.0 989 1980 SAN SEW 00 BNDS -UNISSUED 2,700.0 0.0 0.0 2,100.0 150.0 150.0 150.0 SUB TOTALS 30,119.0 24,816.0 2,600.0 2,100.0 150.0 150.0 150.0 190.0 TOTAL FUNDS ---------- 30.116.0 -------------------- 24,818.0 ---------- 2,600.0 ---------- 2,100.0 150.0 ---------- 150.0 ----------r I50.0 _--..-----------------------►---_-----___-_--_--------_-_----_---_-------_-------_---_----------------------------------1---------_-- tom:' ,' .R " eftr J Proposed Sanitary Sewer Projects 1989-1995 nito Are : d Sewers IMRrovestnts That Ongoi n chgd41]-Be During FY'1990 Proiects That Are tiot l - Citywide Sanitary Sewers Initiated Replacements - FY`87 '} 1. N.W. 36 Street Sanitary Sewer (351275) i Irrovement (351276) - Citywide Sanitary Sewers Extensions - FY'87 2. Downtown Sanitary Sewer Replacement - (351274) Phase III {351281) Citywide Sanitary Sewer Extensions 3. North Flagler Sanitary Sewers (351287) (351273) Sanitary Sewers Improvements: 4. Buena Vista Sanitary Sewer Scheduled for FY'1991 FY'1995 Replacement - Phase I Through (351282) 1. Watson Island Sanitary Sewers 5. Shenandoah Sanitary Sewer (051283) Replacement - Phase I (351285) p�iects ThatAreNot NORedThat Are Not NOR 6. South Flagler Sanitary Sewers Citywide Sanitary Sewer $ (351168) Improvements - FY'90-94 7. South Grove Sanitary.Sewers (051284} • (351174) 8. SE Overtown/Parkwest Sanitary Sewers` (351280) 9. The Last Sanitary Sewers t (351279)� �s to p f y �} 3 Y s ✓ t7 w- �yk S r n • T�K } �'��` t f, I4 t - ,,IL. YMIrAiM1/I✓ YYiM .I 1 II I 1 I111111 IrI�1 1 p .a0u''�,�I� II fi' S '. a k � f �. .. � r'��� �.y �J'y{� {a„f � S ..:. i •.' `Ir' � � � Jvt•i+' 5, , 1 y_ IN ' C STORM SE MIERs' :,. Refer, the Capital project Oescr ptior� Sheets, one ofbasis The Story Sewers functional category, provided an indiv.i uai pray 1 ec k for ht-e±e categories" under='the Physica-Envirorn�ent detailed project data. These sheets are i or' proq ram area, is presented _.an this Volume III. a section. It includes storm sewer improvements T= h„ toh;the City of Miami. ,There are forty-twoFunding rojects valued at $69�0751600 in the 1989-1995 P s ro ec t :red These funds Th 3 l 4 Capital I�rovement Program. P 31,275.600 or 45.O�c of the total i . represent 14.9% of the total Capital improvement are available. S7.SO.tO•;ar 5 this proge'am. Table 23 summarizes the. Storm Sewers funds are anticipated. ;a3k tun�tional- category; by' cost category and funding t� a � :, # , - source.. .. ;, • ;. ,.• �µ� �,- Facilities-:° . - . , ,, I ... �: There are two types of storm water collection systems in operation in the City: (1) areawide or positive stoma sewers that drain directly +, rota the ocean or the -river, and (2) local w which drain into underground "N �i�ai Wage Systems, .. . holding basins in the surface limestone. The-City's positive drainage system is shown on �;.w Map 24. ;F a , ewnn�e �aRQ-1995 • � ..nnneori is c�S:2T' ImQrO --- - The six year storm sewer improvement program is x L g ry shown on Map 25. Eighteen projects valued at T $20,275,600 are either ongoing or scheduled to 9 I begin during fiscal year 1989-1990. Twenty-four.iA "• _ ,, Y valued at -,of the storm sewer projects $49,300,000 are scheduled for later years of the 1989-1995 CIP. ; ..; ..1. i ;l a t* Table 23 1989-1995 CAPI7 MPROVEMENT PROGRAM DETAILED COST AND FUN6-4 BY FUNCTIONAL CATEGORY PROGRAM : PHYSICAL ENVIRONMENT CATEGORY : STORM SEVERS - - - -- - - - - - -- - - -- - r'1.- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - COST TOTAL - - - - - - - - - - - - - - -- - - - - - - - - -- ---- -----r rrr CATEGORYt COST ESTIMATE PRIOR APPROP. APPROP. 1969-90 ----------------- 1990-91 FUTURE 1991-92 COST ESTIMATES 1992-93 ---r--------rs 1993-94 1994-OS ----------- -r.. ------------------------------------------------------------------------------------------------r--------------- t x 1000 LAND ACQUISITION 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 DESIGN , 3.356.4 1,048.0 140.4 399.0 359.0 427.0 388.0 605.0 CONSTRUCTION 50,490.0 11,377.0 2,779.0 0,783.0 7.162.0 $1529.0 7,750.0 12,106.0 EQUIPMENT 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ADMINISTRATION $04.1 211.0 35.1 103.0 91.0 109.0 99.0 1SO.0 OTHER 6,425.1 11331.0 322.1 $59.0 766.0 939.0 955.0 11331.0 TOTAL COSTS -----------------•-----------------------------------------------------------------------------------------------------------------r -69,075 6 131967.0 3,275 6 10,133 0 81400.0 10.000.0 - 91100.0 14,T00.0 ------- --------------------- ---------- - - -------------------------------- --------------------- FUNO SUMMARY OF TOTAL PRIOR-APPROP. ----------- -- - FUTURE -FUNDING --------------------- NO.- -- - FUNDING SOURCES FUNDING APPROP. 1989-90 1990-91 1991-92 1992-93 1993-94 1994-99 ------------------------------------------------------------------------------------------------------------------------- c t x 1000- AVAILABLE 553 SURFACE HATER IMP. 6 MANG. FRO 1,563.3 1,000.0 S63.3 0.0 0.0 0.0 0.0 0. 794 1984 STORM 9.0 BONDS - 67 SL 600.0 400.0 0.0 200.0 0.0 0.0 0.0 0. $37 1984 STORM G.O. BONDS -68 SL 700.3 0.0 700.3 0.0 0.0 0.0 0.0 0. 865 STORYWATER UTILITY TRUST FUNDS 15,673.0 11600.0 4,073.0 2,000.0 2,000.0 21000.0 10300.0 2.000. $74 1976 6 1978 STORM SEVER G.O.B. 3,267.0 3,567.0 900.0- $00.0 0.0 0.0 0.0' 0. 875 1964 STORM SEWER G.O. BONDS 7,810.0 7,400.0 2,323.0- 1.098.0 900.0 0.0 0.0 0. 490 1984 STORM 0.0 BONDS - 86 SALE 2,162.0 0.0 1,162.0 11000.0 0.0 0.0 0.0 0. SUB TOTALS 31,775.6 13,967.0 3,275.6 5,633.0 2,900.0 2,000.0 11300.0 2,000. ANTICIPATED 993 STORM SEVER. G.O. BONS -UNAUT 37,800.0 0.0 0.0 41500.0 S9500.0 6.000.0 7,600..0 12.200. SUB TOTALS- 37,800.0 0.0 0.0 4,300.0 5,500.0 8,000.0 71400.0 12.200. TOTAL FUNS ---------- 69,275.E - -- ---- - -- ------ 13,967.0 - --- '� 3,275.E --- --- - - - -- 10.133.Q - --- ---- 8.400.0 - ---- - -- -- 10.000.0 rr ----r--- 90100.0 - - .srrrrrr 1M.200. - --- - - - -- - - --- - - - ------ --- - - ----------- - - - - - ---- -- --- - - - - ---- -- - - - - --- - - - - ---------- - ---- ------------------------r- rrr--r---ar--rs.� • s' I --A ---j -j __j -j ---j -j --j ---) --) ---j --j -j --.j --j -A -j LA!" �� �r I i 4 n ■ i ��r7 �ww�.ri.wrr.Mw.rr.�!wr'�rrr��rr. yyryyy�y y��p�M �n Yr IYM4ili _ Il I Illlirl��l I �I I Ill ullll 111 I I 7 i!, «qr, `g� Al III .MAP 24 sroAM $swans a rww a ® FOWM ORAMAOE IMEMi • 7 0 � %vo. rww _ ,•` t rs iK i H �w aw ;y i� 4 I,; i I ICJ•eUnbus!l�locfllusEeeI�IJC!!!lW1611'�161611.1a�II;�IIJII.d�lIIIIIIIIILIIVIIII 11.6„,.I�.I �IV�� b II Celli MAP ! ZS a STORM $awaits PROPOSEDIMPRWW Q PROJECTS THAT ME 0110(" n O OR SCHEDULED TO BE "WED $ , "No FY logo PROJECTS SCHEDULED FOR OWN { : FY MI THROUGH FY 1995 3. r wow 2 Y�. I ® T r .M: J. LeJeune Storm Sewers - Phase"( (352256) 4. Civic Center Store Sewers Retrofitting (352272) S. Coconut Grove Store Sewers (3S2187) ��� �+w+ �� w ��r r rr r� � � ��,...r.+rr.r. �: �•-..� � Ir:ur� � ,.rur,�rrrr �n�� rr.w..ws� i Pro3ects that Are Not Manned - Cit ide Local Drainage Project - FY' (352267) - Citywide Local Drainage Projects - FY'88 (3S22S1) i Heavy Eqa peen& Facility Store Sewer Retofilling (3S227/) - Citywide Storm Drainage Master Plan (3S2250) 6. Lawrence Waterway Dredging i Store Sewers laravements, Scheduled for FY'1991 Iwlkheading thERM FT-lggs (3S2194) 1. Pinehurst Store Sewers I. Vapor Creek Renovation - (OS2191) Phase III (352230) 2. Reid Acres Store Sewers (OS2258) 8. Flagami Store Sewers - Phase 1 3. Ourham Store Sewers (3S2182) (OS2193) 9. Lawrence Pump Station - +. Wagner Renovations - Bar Screen Installation "� lCreek (352184) ' (052259) 10. Tamiami Store Sewers - Phase 11 (3S2190) 11. Englewood Storm Sewers (3S219S) 12. LeJeune Storm Sewers - Phase It (3S22S7) 13. Riverside Stone Sewer Retrofitting (3S2273) 14. Little River Store Sewer Retrofitting (352271J S. Belle Meade Store Sewers - Phase 1 (OS2260) 6. Northwest Store Sewers (OS2196) 7. Liberty Store Sewers (052197) 8. West End Store Sewers - Phase 11 (OS21") 9. Auburn Store Sewers (OS2200) 10. Glenroyal Store Sewers (052201) It. Lawrence Store Sewers - Phase 11 (OS2202) 12. N.W. 71 Street Oki* Trunk- (OSMI) 13. Kinloch Store Sewers (OS2262) 14. Maaggnneer Creek Renovations - Pthtse M' (052263I 1S. Lawoview Store Sewers (OS2209) 16. Belle Meade Stone Sewers - PlteW It (05M) 17. Avalon Store Sewers (05220d) 18. Flagamt Store Sewers - Phase 11 (052211) 19. Belle Meade Store Sewer - Phase t (0am) 20. Fairway Store Sewers - (052198) 21. Fairlawn Store Sewers (OS226S) 22. Grapeland Storm Sewers - Phase 11 (052266) 23. Grapeland Store Sewers - PNew I (052188) ejects That Are Not now Pump Station Renovations - • FY'90-94 (OS22S3) - Local Drainage "Oct - FY'90-93 (OS2231) s Y?fn� J �f i Pr i g i s Ao r# �-��/1`�:.�irJfi-vr•� _' �� $.. �irll3a�i'�+2' r t t n� i k ` 70r , ��4 4 T q' s � oL-lb.-ASTE id Waste 1 unctional' category,'' oiie` o$ � r under `the, Physical Environr .categories r' x Oajor area, is presented in this �r ,'program l section. " , There are -six projects valued ,at { Y' 3;09700 in the 1989-95 CiP.: These projects *� r ti 4 represent 0.8% of the :total. Capital I rovemen A t prograe. Table 24 summarizes the Solid waste . ` .-,,functional category by cost category and funding y` —1995 r.,.. the, -six-year solid waste improvement program is shown on Map`26 Re#er to the Capital Project.Description Sheets, tovided on an individual project basis, for -> -.Aetailed project data. These sheets are in r.. volume III. All funding for these projects is available. , rtr t• Cfi � 1 ; Y ai ,.,gyp'+" f MV wag 1 x� NMI ~r � � l - Table 24: 1909-1995 CAPIt MPROVEMENT PROGRAM DETAILED COST AND FUHL-..G BY FUNCTIONAL CATEGORY PROGRAM a PHYSICAL ENVIRONMENT CATEGORY i SOLID WASTE --------r-^I.iirrarr-r.�-----r----r----------------------------r--r--------------►------------ - - - - I� - - COOT TOTAL COST PRIOR APPROP. ------------r .------- -------- FUTURE-COST-ESTIMATES-•----��� CATEGORY ESTIMATE APPROP. 1909-90 1990-91 1991-92 t992-93 1993-94 1"4-9s ---------------------- .:----- - ------------------------------------------------ ----- ------------------••-------------r------ ! • x-1000-) LAND ACQUISITION 0.0 0.0 0.0 0.0 0.0 0.0 i O.a 0.0 DESIGN 31.0 31.0 30.0- 30.0 0.0 0.0 0.0 0.0 j CONSTRUCTION 320.0 320.0 291.6- 291.6 0.0 0.0 0.0 0.0 EOUIPMENT, 2,951.7 11576.0 661.3 662.3 11.3 0.0 0.0 0Or ADMINISTRATION 0.0 50.0 50.0- 0.0 0.0 0.9 0.0 0:0 OTHER 307.0 102•5 24.5 99.5 0.5 0.0 0.0 0.0 TOTAL COSTS --------------------- -- --- ---- ---- 30609.7 ------------------------------------------------------------------------------------------------------- - --- 2,160.3 ---------- 334.2 ----- ------------------- -------- 1,103.4 11.6 0.0 - ------ --- 0.0 0.0` ----- - ---r-------------r---------------r---------r---r-------------------------r-r-----r--------------------------------- FUNDSUMMARY OF TOTAL PRIOR APPROP. ------------------ FUTURE FUNDING -------------------- NO• FUNDING SOURCES FUNDING APPROP. 1999-90 1990-91 1991-92 1992-92 19"-94 1994-" ------------------ -------------------------------------------------------------- ----- ------------------------------------------ i 0 x 1000 AVAILABLE 707 70 POLLUT GO BONDS 70 OL, BALC 752.0 752.0 0.0 0.0 0.0 0.0 0.0 0. $60 1970 POLLUT. G.0 BONGS - 06 SL 2,857.7 1,408.3 334.2 1,103.4 11.6 0.0 0.0 0. SUB TOTALS 3,609.7 2,160.3 334.2 1,103.4 11.0 0.0 0.0 i%• TOTAL FUNDS 3,609.7 2.160.3 334.2 1,103.1 1'1.8 0.0 0.0 Ot -----------------------•---------------------------------------------------------------------------------------------------------- . v J MAP, 26 AMAOLOXAM: PROPOSED NPROVEIMENTS PMQUEM THINT ARE ONGIONG O OR SCHEMAND 10 K Pal DURING PY Im PROJECTS SCHEMXEO FOR PY 991 THROUGH FY 1"S woo so I Xt C a 1 0 0 ft 1 / II1131101I I'Illll � x TABLE OF CONTENTS CAPITAL IMPROVEMENT PROJECTS IN MIAMI'S NEIGHBORHOODS. The Capital Improvement Program in Miami's Neighborhoods.................................................. Planning District A........................................................................r.......... 0...6 PlanningDistrict B................................................................. ...................IS PlanningDistrict C........................................................................................2q5 Planning District D......................................................................r.......r«r....r3EI. Planning District E......................................................................................3 Planning District F.......................................................................................' Planning District G.................................................................«.... ««.«..«.« ««.5C,�; Citywide Projects...................................................................................r....561 LIST OF TABLES PLANNING DISTRICT A: 1 Planning District Funding Summary by Major Program and Functional Category .......................i/l�, 2 Project Funding Summary by Neighborhood..................................................e..r...s.. 3 Project Funding Summary by Target Area...........................................«..............�' PLANNING DISTRICT B: 4 Planning District Funding Summary by Major Program and Functional Category ....................... 17' 5 Project Funding Summary by Neighborhood..........................................................IIi�By 6 Project Funding Summary by Target Area........................................►.......ww..wsw. PLANNING DISTRICT C: 7 Planning District Funding Summary by Major Program and Functional Category ..................�....2 8 Project Funding Summary by Neighborhood ................. ..................«....... .«............ . 9` Project Funding Summary by Target Area......:...................«..........w«w......w««.«.«.««.«. Table No. "f Pa►go PLANNING DISTRICT D: 10 Planning District Funding Summary by Major Program and Functional Category .....................J4 11 Project Funding Summary by Neighborhood ................................................. ►.....rw*33 12 Project Funding Summary by Target Area..................................................ww...►.. PLANNING DISTRICT E: 13 Planning District Funding Summary by Major Program and Functional Category ...................... 40, 14 Project Funding Summary by Neighborhood ................................... ......... «...... «•ar•r«.4 15 Project Funding Summary by Target Area..........................••....•.....rr..r.r.M.wwr....e««" PLANNING DISTRICT F: 16 Planning District Funding Summary by Major Program and Functional Category ...................... 46 17 Project Funding Summary by Neighborhood.....................•.•....rr.......rrrrr«rr«.r.i.«�«1.M.M�4�!�/y 18 Project Funding Summary by Target Area.................................r...r.rs...rr..r.««r.ww«.7 PLANNING DISTRICT G: 19 Planning District Funding Summary by Major Program and Functional Category...•.. .. 54 20 Project Funding Summary by Neighborhood.......................................................r. 21 Project Funding Summary by Target Area......................................r.....r.............56 22 23 24 LIST OF FIGURES AII&jitiowof TuNdt by Planning -Districts, 1989 - LIST OF MAPS 0 0 0 00 City of Miami Planning Districts.... 2 City of Miami Neighborhoods. 3 City of Miami Community Devdlopment Target Areas.. •4 Planning District A.......................................... 5 •Planning District 8 ................................................... 6 Planning District C .................................................. 7 Planning District D ...................................... Planning District E ............................. 9 Planning District F ..................................................... 10 Planning District ra -e 4, aqp yi J t f a il R p W P4 QV CAPITAL IMPROVEMENT PROJECTS IN MIAMI'S NEIGHBORHOODS The 1989-1995 Capital Improvement Program for each of Miami's Planning Districts, Neighborhoods, and Community Development Target Areas is presented in this volume. The information provided for each Planning District includes *a map of neighborhood and target area boundaries, a summary of the 1989-1995 Capital Improvement Program by major program area and functional category, and a list of capital projects located within the City's neighborhoods and target areas that includes funding schedules for project implementation. The tables and maps provided herein are intended to be used in conjunction with detailed project descriptions and maps included in Volume III. In addition to the information provided for each Planning District, proposed project funding schedules are included for Citywide projects. Each of the Planning District sections includes a map depicting geographic boundaries of the district's neighborhoods and target areas. A funding summary by program and functional category accompanies the map. Only those categories that have capital projects proposed for the district are included. The first set of maps show the City of Miami and all Planning District, Neighborhood, and Community Development Target Area boundaries. The City is divided into seven Planning Districts as shown on Map 1. These districts are further divided into smaller neighborhoods - 63 in all, as shown on Map 2. Community Development Target Area boundaries are overlaid onto a map of the City's neighborhoods, Map 3. Generally, target areas consist of groups of neighborhoods, which are characterized by a concentration of socio- economic needs and physical blighting influences. For purposes of Community Development program expenditures, these sections of the City constitute target or priority areas for funded activities and projects. The table that follows the summary material includes a list of capital projects proposed for the 1989-1995 program by neighborhood. the use of the term "multi" or "single" bt the column headed "Project Location" sfgnffies that the projects listed within that category are located in more than one neighborhood (multi) or are physically located within the boundaries of only that neighborhood (single). It is important to note that since projects overlap neighborhood boundaries in some cases,. a total of all proposed capital project costs would not be a true comparative figure to use with respect to other neighborhoods. The project cost figures are intended for informational use only. Community Development Target Areas are located in Planning Districts A, B, C, D, and F. These five district sections additionally include a list of capital projects by target area along with funding schedules for the six -year program. In addition to the projects located within a particular Planning District, some projects by their nature, e.g. communications projects, cannot be assigned a location but, in fact, benefit the entire City. These projects are presented in the Citywide Section following District G. The allocation of funds required to implement the 1989-1995 Capital Improvement Program is shown by Planning District in the pie chart, in Figure 1. Also shown is the percentage of funds required to implement capital projects' for proposed Citywide programs and those that do not have a determined location. 6 OF • Q - ..r• - -- so UAW Y dk •. - i 1 !'• � _ � S � �� ��y,�i.�f �l't�f'�+1�k'�� '� �� y 3 'Y � f -'fi^ire."��.� u�' t � ;p �i a. f I III Allillill I I loy F7igure 1 l Or T i A� IA r) njpov kAr'MT PROGRAM PLANNING DIST RICT- ALL TIO'OF QCN'. FUNDS BY 1989-1995 (MILLION$). CITYWIDE 38.9% Olt, $182.0 Tl nPUPir G DISTRICT 13"22.9 DISTRtCT D 6% $28.4 DISTRICT E 5.9% {STRICT C 6.9% -P, 'l DISTRICT,-A.,1 1 .7% $33.4 $567 DISTRICT F 7.5% $35.5 Ra' all M��'i 2 n•rI LE GM OF M1AM1 .. ,... -- 11 — Y , . CODE MEMOO CITY ,�1 lO�ORH ' _ - Q Iit ltTTIE �� E ... Ob 112 VISTA Y[ST Q 113 Y15TA EA6T t21 An— 114MA 119 rum SWA 193 12T 22 NIII U2 BI rM 1223 1111, I ItI n tlfT NpATM rtgtC tSLAM05 133 t t� t 1�, 241 242 - i • t� 2" ,..as es.. 2ST��... 252 •• • •, _•_ __ -- - -- _ _ _ w264 263 PNt1F wt«ELF PEST E133 E131 — T wIdIE14 I10AT11 M1A11t AYEIM3 I EAItlIELI SOUTM' t1t5 . ' 22" W . PORT Or NIM1t •• • .... ,...... rw.. V 361 GNOME Nt ii3 S3S r �n 0�51AtIK T� StFYE1t <IIItPP ,;�- n,r �Z S =M ♦ rGip�IIC ISlAlbS N r N3 � wEss CITNIIS 6Nt1� TT2 TT3 ' HEST NIMIT NiGM South TJIST LIrnE 1NYAM 4Tt 7Ti - �... • 4T3 E ..-_. �' 472 778 T77 1" T7li =q CMi6IMpgPI= t r 3 I10A0 p ACIMt 1Mt : :: 4T: ; 201 ,r1 YEST 692 vAtacAlMr t � KIIILocN r�� ! 4" _ I % 6j1 CgISTiOCK I 632 MELIIOSE 3 CLMITIS Pwi ; 63 64 civic d11TEN .. n .• ' 3 ............ 6:4 TN e4lGMT 391 pt 69 6!2 NONTM SENELL PAN �3 03 tSEYEGLL PMIe 04 Sm" GNAPEUIIt1 NEIGNTS EAST CI GNOME ... .. — — 111 mS 172 ONANG6 ►!n 3N . 113' MPTN *"ITT •' iE11 �/ 1is SOM iIOA VJwITT OE LATI*RIVERWaTot � 3EIE1 ��� 7 EAST M INGIt � YIM61MtA MEY r , r 3. ", }#!3'_ >;.�.., rfi dr,•� r ci Pit Y' T r r. �I �, � .�.:` .. . ..-.�:r .. ..�}i:., _ .... >� ..... ::.-. .. _. ....,._ .... .. ..,. . :�.: .:. :.:..� ...:..: �.... . �. .. .� ...r. _... ...... .�:: .. ...a � .�^ ._t H�^:`rig+ �....:.t'-+S ` yW� p t � e � Y kW 4 }� �!C 7[ ��5"�i.. .-...r. a .. _ ._ _. .r '� ,.�`�. ,.. _ �': �.�atS,.� � . i yy t _ 1k 3 ':: �* F f f q ^,��ktTi-L¢�'-2�`ii.�'„ nd F''s' iM m � � r_ t r i ir� f�-yLx 4.4"p �� K � r # l �. �r�c`d^��� far „r t h "��7 "�;,� 4 ,y�y �a �n J�kw�,. z r $` � r�' - �t^ �`� � �� i � F �x ��r.i i{' � ..r ' F .. . ` � .:' :. �IIIIIIIIIIIIIIIIIII... .,. .� ... I _ .. PLANNING DISTRICT A SSIoc'X Planning District A comprises the northernmost portion of the City north of 36th Street. The proposed 1989-1995 Capital Improvement Program for District A includes projects in nine functional cat oriel that Iota of 56 668,900, substation, a new Fire Station: #12i* Demonstration a a9 ��r Acquisition Cevf erf,an� for Improvements Marina. District -wide functional category summaries, detailed project listings acid fundingi schedules by the h following tables. get Areas are presented amount to a total va u • approximately 12.2% of the capital program. Planning District A is comprised of eleven neighborhoods and two Community DevCommunity elopment Target Areas as shown on the map• Development Target Areas located within Planning Distri ct A include Edison -Little River and Model City. Major program emphasis is placed on Street Improvement projects ongoing or proposed in the Little Haiti, Buena Vista West, Buena Vista East, Brentwood, Liberty Square, King Heights, Manor Park, Belle Meade, and Baypoint neighborhoods.Proposed street improvements total $21,250 ,O00. Storm Sewers improvements are ongoing or proposed in Belle Meade and Morningside/ awnnint_ These projects total $14,512,000. n Ia��n..—. fr�.••�l ttf�•�':��� !d!`slaia �W1�1�� IllPffl sun A'AmI - : SONS �w.11i.� aq�111 11111�1 :m �.�........ee.aw! . .�.__ ,�;•;•a. itamw t,.e. .■ w w . ISO.am � ,..,.�ewsq.■.�..�s � � m13�" ��B■�iw.iasei! ■1 Iw.arw.wie�■■.■�.w'll��'Sul__l1 r tom +.rrw n,a. �-_ r q Al Ila.w.l� q� q���w gggll•■ IQ+1��/i1C'A ��1'e w..s.�■■tee gggqM R w� ew■s�w�■ !� ■w ■u r lel lr lam. ws. s rrA SIGN G k IN NI ■ . r_ � s Iwgtll/l�foL�n�iA.�i■.-i �M sllai�i' ./i .r.,swwws®.ws� .s■unIga1�N�7..w....w �nawu.pu■ ■am• nw�,�. == wa wr .�,I..w..4aw..101..■� "i xra.e�+a■. WENSam■"ei .w.rswsowws�w .�n..a1 1 •��¢a�.Iww.o worts A Tz;ble 1 PLANNING DISTRICT A 1969-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY -- r-rr----------- • -- - - ---- --- ----- -- -- - - - - - -- - - - - - - -- - - - - - - - - - - - - -- - - - - - - - - - - --- - ---------- TOTAL PRIOR APDROP--------r-•---- --- ------------------------------------ FUTURE FUNDING --------------- - PROGRAM FUNCTIONAL CATEGORY FUNDING APPROP 1989-90 1990-91 ------------------ 1991-92 1992-93 ------ 1993-94 1994-95 ---------------------------------------------------------------------------------------- 1000) PUBLIC SAFETY POLICE S.070.0 5,000.0 70.0 0.0 0.0 0.0 0.0 0.0 0. OL 0.0 0.0 0.0 0.0 FIRE RESCUE 968.0 500.0 468.0 ---------------------------------- -------- ---------------- -------- PROGRAM TOTAL 6,038.0 5.S00.0 538.0 0.0 0.0 0.a 0.0 0.0 SOCIAL AND ECON. ENVIRONM HOUSING ECONOMIC DEVELOPMENT I PROGRAM TOTAL I PARKS AND RECREATION PARKS AND RECREATION PUBLIC FACILITIES TRANSPORTATION PROGRAM TOTAL MARINAS PROGRAM TOTAL STREETS PROGRAM TOTAL PHYSICAL ENVIRONMENT SANITARY SEWERS STORM SEWERS PROGRAM TOTAL DISTRICT TOTAL 1,500.0 376.9 ------------------ 1r000.0 136.9 -------- 500.0 0.0 0.0 $0.0 -------- 0.0 80.0 -------- 0.0 00.0 -------- 0.0 0.9 -------- 0-•0 0.0 -------- 11876.9 10134.9 300.0 80.0 SO.0 00.01 0.0 0.0 5,690.0 ------------------ %,690.0 -------- 0.0 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0_0 ------ 5.690.0 5.690.0 0.0 0.0 0.0 0.0 0.0 0.0 10000.0 11060.0 60.0- 0.0 0.0 0.0 0.0 0.0 ------------------ -------- -------- -------- -------- -------- --r-'�-. 1,000.0 11060.0 60.0- 0.0 0.0 0.0 0.0 0.0 27,250.0 --------- 6,450.0 --------- 600.0 -------- 5,900.0 -------- 4,200.0 -------- 5,600.0 -------- 3.000.0 -------- RW"*.* �rrsarrr 27,250.0 6,4S0.0 600.0 S,800.0 4,200.0 8,400.0 3►000.0 9,400.4 300.0 300.0 0.0 14,512.0 ------------------ 200.0 -------- 12.0 14r012.0 500.0 32.0 $6,666.9 20,336 9 11590.0 0.0 0.0 0.0 1� a 0.0 0.0 -------- 31140.0 -------- 11000. 0 -------- 2. 000�': 0 7,500,00 0.0 31800.0 11000.0 2,000.0 71"0.,* rr-rrrrr rrrrr+rr rrrrr rJirrr -..- rrr ---rrrrr -SYe6o_0 8.080.0 4,000.0 9.000.0 11/100.0 i 14694 1�.AMN13J40 0T0ffPx�'1 4 IM�9M� f111� O+fiNMMAIi� f4iR iM.Aawt,MO OZ3YIRl6T3 OVr �SaMO�Ni� , "rrzrrcrrza.^'z rrss,�rarxrarraasasarsarr:sr+rsaraJasa:+.rr+r+rr+:...r+�+�.++++..s+..�+++++++....+++.+•.•••�..:���..,..�.......���.....y.....•�..�,.�....��• OPMOP IaIdw fru f fEv" 31,E + � l0�+01 j f!)+ !!Z 100j •-Od 1004-00 ------------------------------ I It CLffi I 0 A► o ff 041140 kff,OV,0f,i101004: is 1,000,0 0.0 O,o 0.0 0.0 too".* O.'O 0.0 o90fo1 w f1 0f, fowl 0*10 0,000,0 0.0 O.o O.O 0.0 O.O 0.0 90900.0 0lf"f M, not, 68L0, 0,000.0 0000010 0,o O.0 0.• 0.0 O.0 0.0 So46o! OAfVfOfA MAOi4ilF 1,o00,O i,000.0 0.0 O.s 010 0.0 010 0.0 f f 0 Cfff * WTff Mftt 041101 mom of Im OM:Tf 2010010 0,o O.o o.• 20100.0 0.0 010 0:0 041tof 9m, 01, 11W, FN=211 #4004 0.0 0.0 0.0 0.0 #1* O.i 1.M%a offl#0 IAINN' SiMM KwMO 1,o",0 0.0 0.0 0.0 0.0 1,o".0 O.0 0.0 001000 L94 M 0, PAN s 1M4 I 4910 49,0 O.0 *If 0.0 0.0 0.0 •.0 4010f0 A, 0A$W PAW N!'ZNAS, 1n,0 In'# 0.0 0.0 O.♦ #Is 0.0 0.0 001040 ATM NNG 00 /L M9/4a 2,100,0 2010010 0.0 0.0 0.0 O.0 O.O 0.0 04113i OTND 0,0, IAVOMo PNJ 00010 0.0 0o0.0 0.0 0.0 0.0 0.0 0.4 MEAfI O l4! W,MV,of,IV, ONI %1 1010810 010 O,0 0.0 0.0 1,of0.0 0.0 0,4 00 M KID AOM $ slow Kw 1,400,0 a. o 0.0 0.0 1040000 0.0 O.s "lids MN it Sf, fmx' MAZ" 0, 00o. o 0.0 0.0 0.0 0.6 11.0 0.0 S. #11r001': N, OUT, POLO, IWST MOM $0000.0 0.0 0.0 0.0 04 0.0 "0000 1ATVIIIA MAMNA 10000.0 10000.0 0.0 0.0 0.0 0.0 0.0 HAWC 0#1202 IMA, VISTA SAW ►-_ M 4 140.0 0.0 0.0 0.0 fit; 04110# A VISTA 01, 10. ►mZV 1rIOM 0.0 0.0 0.0 0.0 EMa.a 0.0 0 0l000f M, 0201, IO1.0, $Ugly 4000640 !, 000. 0 0.0 0. 0 0.0 0. 0 #41111 11110MA VISTA if P-ZZZ 20100.0 184.0 O.O :6000.0 0.0 0.0 O.Om tl PLANNING DISTRICT A,' 1969-9S CAPITAL IMPROVEMENT PROGRAM NG SUMMARY FOR NEIGNBORNOQOS PROJECT Ft�il PLANNING DISTRICTS BY _ _ _ ____..-•__•---------a"_ -------- -TOTAL---- PRIOR -APPROP--- - ---1r------FUTLAiE'*�3� -------------- O----- IC-pRO PROJECT ------------� - APPROP---1969-90 1990-9 1991-92 1---___------------ NEIGliEIGFiB CECGVERA1C NUMBER PROJECT TITLE FUNDING ---------------------- ODE NAME_„___.___._______________.._---_---------------_------------______ tf X 1000) 1993-94! +1994_9S ------------------ 114 BUENA VISTA EAST MULTI. 041146 B VISTA ST. IN- P-IV 041157 DSN PLZ ST IMP PH II 312007 N. DIST. POLC. SUBST $41122 BUENA VISTA ST P-III 1.600.0 g00.0 5.000.0 2,100.0 0.0 0.0 5r000.0 100.0 0.0 0'0 0•Q a.Q 0.0 0.0 0.0 2.000.a O.Q 0.0 0.0 0.0 1.300.0 0.0 0.0 0.0 0.0 900.0 0.0 0.0 0.0 0.0 0.0 0.0 115 BRENTWOOD MULTI 041146 B YISTA ST. IM. P-IY 041157 DSN PLZ ST IMP PH IZ 341122 BUENA VISTA ST P-III 1,d0a.0 900.0 2,100.0 0.0 0,0 100,0 0.0 Q.0 0.0 0•0 0.0 2,00Q.0 0.0 0.0 a.0 1.600.0 0.0 0.0 0.0 O0d.0 0.0 0.0 O•Q 0.0 121 LIBERTY SQUARE SINGLE OS2196 N.W. STORM SEWERS 052197 LIBERTY STRM. SEWRS. MULTI 041154 MDL CY ST IMAM PH ZI 052261 NW 71 ST. TRUK. MAIN 313219 NEW F. STATION ! 12 321025 MODEL CITYILTT. HAY. 321039 M. CITY LAND ACO. 322054 EDISON CENTER GATEWY 341126 MODEL C-ST IMPRY P-1 122 KING HEIGHTS SINGLE 331053 AFR. SO. PARK REHOV• 331950 TALCLCY PK ROOF REPO MULTI 041154 VOL CY ST.IMpM PH 11 11000.0 1,400.0 2.100.0 S.S00.0 966.0 11000.0 500.0 375.9 2,1a0.0 600,o 95.0 21100.0 0.0 0.0 0,0 0.0 0,Q 21000.0 0.0 136.9 30.0 600.0 95.a Q. a 0.0 0.0 0.0 Q.0 96a.0 0.0 500.0 0.0 O,. o 0.0 0.0 Q,o 0.0 0.0 0.0 0.0 0.0 0.0 0,0 00.9 2050.0 0.0 0.0 a.a 1,000.0 1.400.0 0.0 0.0 0.0 0.0 Q.0 90.0 0.0 Q.a 0.0 o.a 0.0 0.a 0.0 0.0 0.0 0.0 0.0 •Q.a 0.0 Q,Q a,a QsQ 0.0 0.0 2,100.0 0.0' 0.0 0.0 0.0 0- , 0.0 Q.a a;a ����Q0.0 0.0 0.0' 0.0 $400,0 0.0 0.0 0.0 0.0�° 0,0 O,d� Q.0 0.0 III I I � l i II I I I I I I __" I._ I I I II II a Ilhll PLANNING DISTRICT A 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY NEIGHBORHOODS ' -------------------------------------------------------------------------------------------------------------------------------- NEIGHBORHOOD GEOGRAPHIC PROJECT TOTAL PRIOR APPROP - - - - - - - - FUTURE FUNfliNfi - - - - - - CODE NAME COVERAGE NUMBER PROJECT TITLE FUNDING APPROP 1939-90 1990-91 1991-92 1992-93 1993-94 1994-9M --------------------------------------------------------------------------------------- -(! X --- ---------------------------------- 1000) 122 KING HEIGHTS MULTI 313239 NEW F. STATION 0 12 968.0 0.0 968.0 0.0 0.0 0.0 0.0 0.0 321025 MODEL CITY/LTT. HAV. 1,000.0 1,000.0 0.0 0.0 0.0 0.0 0.0 0.0 321039 M. CITY LAND ACO. 500.0 0.0 500.0 0.0 0.0 0.0 0.0 0.0 322054 EDISON CENTER GATEWY 378.9 138.9• 0.0 80.0 80.0 60.0 0.01 0.0 341126 MODEL C-ST IMPRV P-I 2,100.0 50.0 0.0 2,050.0 0.0 0.0 0.0 0.0 123 MANOR PARK SINGLE 041134 MANOR ST IMP PH-V 2,100.0 0.0 0.0 0.0 21100.0 0.0 " 0.0 041168 MANR. ST. IMV- PH -VI 1,800.0 0.0 0.0 0.0 0.0 0.0 0.0 313221 EXP. i REN. OF FR ST 0.0 500.0 500.0- 0.0 0.0 0.0 0.0 331311 HADLEY PK. IMP/REST. 75.0 75.0 0.0 0.0 0.0 0.0 0.0 341090 MANOR ST.IMPR. P-in 1,150.0 1,150.0 0.0 0.0 .0.0 0.0' 0.0 341119 MANOR ST IMP. PH -IV 2,700.0 2,760.0 0.0 0.0 0.0 0.0 0.0 MULTI 313239 NEW F. STATION • 12 968.0 0.0 966.0 0.0 0.0 0.0 0.9 321025 MODEL CITY/LTT. HAV. 1,000.0 1,000.0 0.0 0.0 0.0 0.0 0.0 321039 M. CITY LAND ACC. $00.0 0.0 $00.0 0.0 0.0 0.0 0.0 331349 HOLY PK PL REPLC 2,100.0 2,100.0 0.0 0.0 0.0 0..0 0.0 191 BELLE MEADE SINGLE 052210 BELLE MEASE STRM SEW 0.0 0.0 0.0 0.0 0.0 0.0 0.0 052260 BEL. MED. STM. SEM.P 2,000.0 0.0 0.0 0.0 0.0 0.0 21000.0 052264 BEL. MEAD. STOM. SEW 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 312021 LEGION P- POLCE M-ST 70.0. 0.0• 70.0 0.0 01.0 0.0! 0.0' 331312 LEGION PK. RENOVAT. 100.0. 100.0 0.0 0.0 0.0 0.0 0.0 PLANNING DISTRICT A 1909-95 CAPITAL IMPROVEMENT PROGRAM FOR PLANNING DISTRICTS BY NEIGHBORHOODS PROJECT FUNDING SUMMARY - _---------- ------ GEOGRAPHIC PROJECT ----- TOTAL ---A-----R--- PRIOR ----------wrw-_--_RYs\/wo - 19s9-90 �.,�y_err_�rra�+_��ryr��wr_rr►_r.ar.r....+r_.r r{Nifi.avr' - - - - - - 1990--- 1------ i--------------------rr-r.«r IGNSORHOOD CODE NAME ' COVERAGE NUMBER PROJECT TITLE FINDING APPROP ----------------------------------------------------------------------------------------to X 10001------- 191 BELLE MEADS 0.0 1.ts0.0 0.0 0.0' 0«0 � SINGLE 341129 BELLE MEADE ST IMPRV 1.d00.0 50.0 0'. 0 0.0' �`• �' $52271 LTT. RIV. STR. SEWER 212.0 200.0 12.0 0.0 0.0 0« 0+0 MULTI 052258 REIO ACRES STOM SEWR 1,400.0 0.0 0.0 0.0' 1►400'.0 0«Q' l41116 MORNINGSIDE ST IMPR. 21400.0 2,400.0 0.0 0.0 0.0 354009 BAYVISTA MARINA 1,000.0 11000.0 0.0 0`'0 0.0 192 MORNINGSIDE/BAYPOINT 0«0 0' 0.0 0.0 SINGLE 052204 HE SS ST. STORM SEW. 0.0 0.0 0.0 9.0 o.a 0.0 331313 MORNINGSIDE PK RENV. 450.0 450.0 0.0 0.0 �•0v a Q«'� MULTI $84094 MARINA BTRP. IMPROV. 0.0 $0.0 60.0- 0«0 0.0 0.0 Q..a 0Or 341116 MORNINGSIDE ST IMPR. 2,400.0 2r400.0 0.0 0«0 0.0 0«0 0.0 Y BAYVISTA MARINA 11000.0 10000.0 0.0 0.0 0.0 a.0 0.0SA40b9 r� x a- Table 3 -13 PLANNING DISTRICT A 1939-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AND TARGET AREAS ----------- ------ - -- ---- --- ---- - ----------------- ------------------- PROJECT TOTAL PRIOR APPROP - - FUTURE FUNDINW - - TARGET AREA NUMBER PROJECT TITLE FUNDING APPROP 1939-90 1990-91 1991-92 1992-93 1908-94 19'90-9S --- ---------------------------------------------------------------------------------- -- - -----------------------.--------.--- (4 X 1000) EDISON-LITTLE RIVER 41131 41143 41146 41157 41167 32198 $2233 $2261 312007 331033 331070 33134• 341122 341177 SS1282 MODEL CITY EDISON ST IMP PH -II 2,100.0 0.0 0.0 0.0 21100.0 0.0 0.0 LTT.RV.ST.IMP.PH. II 1,600.0 0.0 0.0 0.0 0.0 11600.0 0.0 B VISTA ST. IM. P-IV 11800.0 0.0 0.0 0.0 0.0 1.800.0 0.0 DSN PLZ ST IMP PH I= 900.0 0.0 0.0 0.0 0.0 0.0 900.0 EDS. ST. IMV. PH -III 11800.0 0.0 0.0 0.0 0.0 0.0 0.0 FAIRW. STRM SEWERS 1,000.0 0.0 0.0 0.0 0.0 11000.0 0.0 REID ACRES STOM SEWR 1,400.0 0.0 0.0. 0.0 1,400.0 0.0 0.0 NW 71 ST. TRUK. MAIN 5,500.0 0.0 0.0 0.0 0.0 0.0 0.0 N. DIST. POLO. SUBST 56000.0 $0000.0 0.0 0.0 0.0 0.0 0..0 LEMON C. PARK - PH I 45.0 4S.0 0.0 0.0 0.0 0.0 0.0 A. RANGE PARK REHAB. 125.0 125.0 0.0 0.0 0.0 0.0 0.0 ATH RNG PK PL RJEPLC 2,100.0 2,100.0 0.0 0.0 0.0 0.0 0.0 BUENA VISTA ST P-III 2,100.0 100.0 0.0 2,000.0 0.0 0.9 0.9 CTWD C.D. PAVING PRJ $00.0 0.0 600.0 0.0 0.0 0.0 0.0 DNA. VISTA SANIT P-I 300.0 300.0 0.0 0.0 0.0 0.0 0.0 TOTALS 26,570.0 7,670.0 600.0 21000.0 31500.0 41600.0 900.0 41134 MANOR ST IMP PH-V 2,100.0 0.0 0.0 0.0 21100.0 0.01 0.0 41134 MDL CY ST IMPM PH II 2,100.0 0.0 0.0 0.0 0.0 0.0 2.100.0 41163 MAHR. ST. IMV. PH -VI 1,A00.0 0.0 0.0 0.0 0.0 0.0 0.0 S2196 N.N. STORM SEWERS 10000.0 0.0 0.0 0.0 1,000.0 0.0 0.0 S2197 LIBERTY STRM. SEWRS. 11400.0 0.0 0.0 0.0 1,400.0 0.0 0.0 0.0 0.0 0.0 0.0 1,900.0 0.0 0.0 51'di00.0 0.0 0.6 •, S & is gas w w s s sws ,s'_w- I I PLANNING DISTRICT A 1969-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AND TARGET AREAS --------------- --------------------------------------------------------------------- - ------ - ---- --------------- --------------------- PROJECT TOTAL PRIOR APPROP - - - - -- - FUTURE FUNDING - - - TARGET AREA NUMBER PROJECT TITLE FUNDING APPROP 1969-90 1990-911991-92 1992-93 1993-94 1994-9'I -------------------------------------------------------------------------------------------------------------------------------- t• x 1000) MODEL CITY $2261 NW 71 ST. TRUK. MAIN S,S00.0 0.0 0.0 0.0 0.0 0.0 0.0 91500.0 313221 EXP, 5 REN. OF FR ST 0.0 $00.0 500.0- 0.0 0.0 0.0 0.0 0.0 313239 NEW F. STATION t 12 966.0 0.0 966.0 0.0 0.0 0.0 0.0 0.0 321030 M. CITY LAND ACO. 500.0 0.0 soo.0 0.0 0.0 0.0 0.0 0.0 3220S4 EDISON CENTER GATEWY 376.9 139.9 0.0 $0.0 00.0 60.0 0.0 0.0 931053 AFR. $0. PARK RENOV. 600.0 600.0 0.0 0.0 0.0 0.0 0.0 0.0 331311 HADLEY PK. IMP/REST. 75.0 75.0 0.0 0.0 0.0 0.0 0.0 0.0 331949 HOLY PK PL REPLC 2,100.0 2,100.0 0.0 0.0 0.0 0.0 0.0 0.0 331350 TALCLCY PK ROOF REPC 95.0 95.0 0.0 0.0 0.0 0.0 0.0 0.0 341090 MANOR ST.IMPR. P-III 11150.0 1,150.0 0.0 0.0 0.0 0.0 0.0 0.0 341119 MANOR ST IMP. PH -IV 2,700.0 2,700.0 0.0 0.0 0.0 0.0 0.0 0.0 341126 MODEL C.ST IMPRV P-I 2,100.0 50.0 0.0 21050.0 0.0 0.0 0.0 0.0 TOTALS 24,566.9 7,408.9 966.0 21130.0 40580.0 $0.0 2,100.0 7,300.0 NON -CO TARGET AREA 52259 52260 52264 312021 331312 331313 341116 341129 352271 3S4009 REID ACRES $TOM SEWR BEL. MED. STM. SEW.P BEL. MEAD. STOM. SEW LEGION P. POLCE M-ST LEGION PK. RENOVAT. MORHINGSIDE PK RENV. MORNINGSIDE ST IMPR. BELLE MEADE ST IMPRV LTT. RIV. STR. SEWER BAYVISTA MARINA TOTALS 11400.0 0.0 0.0 0.0 11400.0 0.0 0.0 0.0 2,000.0 0.0 0.0 0.0 0.0 0.0 2,000.0 0.t 2,000.0 0.0 0.0 0.0 0.0 0.0 70.0 0.0 70.0 0.0 0.0 0.0 0.0 O.d 100.0 100.0 0.0 0.0 0.0 0.0 0.0 450.0 450.0 0.0 0.0 0.0 0.0 0.0 6.0 2,400.0 2,400.0 0.0 0.0 0.0 0.0 0.01 0.0 1,600.0 50.0 0.0 1,750.0 0.0 0.0 0.0 0.0 212.0 200.0 12.0 0.0 0.0 0.0 O.0 0.0 1.000.0 1,000.0 0.0 0.0 0.0 0.0 0.0 0.0 11,432.0 4,200.0 62.0 1,750.0 1,400.0 0.0 2,600.0 21000.0 14 w µ 88 WC THIS ION7i►I.L ;� ..=P!►GB 77 � .'..6.} L �•�,.. �N 1 ,'.,.FCC'.- t^'+w4 .`< ' �`' , 7 71 1 1 I�V] 1_1 � 1�� I -V At 1- % 11-1[11101J�l ��111 I III �1 I I PLANNING DISTRICT B Planning District B is defined as the area east of I-95 between the Airport Expressway and the Rickenbacker Causeway and west of I-95 between SR 836 and the Miami River. It encompasses Miami's Central Business District, the Brickell area, the Port of Miami, Watson Island, and the neighborhoods immediately north and west of Downtown. The district is divided into fourteen neighborhoods and includes the three Community Development Target Areas of Wynwood, Overtown and Downtown, as shown on the map. The proposed 1989-1995 Capital Improvement Program for District B includes projects classified in ten functional categories. The total value of projects, both ongoing and proposed, for the six year program is $110,458,500. Since this is the core area of the City, major emphasis is placed on funding capital projects in Planning District B. The total value of projects represents 23.8% of the proposed 1989-1995 Capital Improvement Program. Community Development errojects valued at $21,079,700 include Southeast%vtown Park West Redevelopment project, the major capital improvement project ongoing in Planning District B. The remaining component of the Miami Convention Center project yet to be completed is the 1,450 space Parking Garage valued at $21,757,000. Parks and Recreation projects valued at $15,126,100 are either ongoing or scheduled in the 1989-1995 Capital Improvement Program. Included in this category is the redevelopment of Bayfront Park in Central Downtown. Other Major Parks and Recreation projects are programmed for Roberto Clemente Park, Lummus Park • and the Japanese Garden Renovation on Watson Island. Economic Development projects for Planning District B are valued at $3,632,300 and include the expansion of the Garment Center in Wynwood. Streets projects valued at $27,401,300 are ongoing or programmed in Wynwood, Boulevard, Edgewater, Overtown, Spring Gardens, Central Downtown, Lummus Park, Brickell West and North and Omni/Islands. The Transit project included in the 1989- 1995 Capital Improvement Program is in District B. The City of Miami is committed to financing a portion, $7,239,300, of the second phase of the Downtown Component of Metrorail (People Mover) that will link with Metrorail. Other capital improvement projects in Planning District B include improvements to Marinas as well as Sanitary and Storm Sewers improvements. District -wide funding summaries by functional category for District B and a listing of proposed capital projects with accompanying funding schedules by neighborhoods and target areas are presented in the following tables. 15 :2[1:: joIMM limmos�a"�is omm VOVsm� ~ s lil lie M an i � IN I• ll ■u.a.u..►.u:.A .tea®wnr^•• Qttwt � 1EW$ NNW = 1 11111-o Mm..IC' ■1.■■■rMou we mop F 1; :1 �■II a!t ell A ■ ►__ Z . wnto V 1�' 11010M.. lopsa.m MUIR �!•� map, Table 4 PLANNING DISTRICT B ' 1969-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY -------------------------------------------------------- ---------------------------------------------------------------------------- TOTAL PRIOR APPROP------- - ---- FUTURE FUNDING -- PROGRAM FUNCTIONAL CATEGORY FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1993-941994-OS -----------------------------------------------------------------------------------------------------^------------------------------ t• X 1000) SOCIAL AND ECON. ENVIRONM COMMUNITY DEVELOPMENT 21,079.7 26,347.7 5.268.0- 0.0 0.0 0.0 0.0 0.0: ECONOMIC DEVELOPMENT 3,632.3 3,626.0 27.7- 34.0 0.0 0.0 0.0 0.0 ------------------------------------------------------------------ PROGRAM TOTAL 24,712.0 29,973.7 S,295-7- 34.0 0.0 0.0 0.0 0.0 PARKS AND RECREATION PARKS AND RECREATION 1S,126.1 12,705.9 220.0 2,200.2 0.0 0.0 0.0 0.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - --------- 0- --- --- -- -------- PROGRAM TOTAL 15,126.1 12,705.9 220.0 2,200.2 0.0 0.9 0.01 0.0 PUBLIC FACILITIES MARINAS 8,672.4 5,558.2 60.0- 3,314.6 0.0 0.0 0.0 0.0 --------------------------------------------------------------- PROGRAM TOTAL 6,872.6 5,558.2 60.0- 31374.6 0.0 0.0 0.0 01.0 TRANSPORTATION STREETS 27,401.3 10,660.0 700.0- 6,611.1 5,116.2 10793.5 2,210-S 1,S00.0 MASS TRANSIT 7,239.3 2,000.0 1,767.7- 1,800.0 2,603-S 2,903.5 0.0 0.0 PARKING 21,757.0 21,757.0 0.0 0.0 0.0 0.0 0.0 O.6 ----------------------------------------------- -------- PROGRAM TOTAL $6,397.6 34,437.0 2,467.7- 9,611.1 7,719.7 4,367.0 2►210.3 1.500.0 PHYSICAL ENVIRONMENT SANITARY SEWERS 3,750.0 1,850.0 50.0- 1,950.0 0.0 0.0 0.0 0.0 STORM SEWERS 2.600.0 0.0 600.0 0.0 0.0 0.0 0.0 2.000.0 -------------------------- ------------ ---- -------- -------- -------- PROGRAM TOTAL 6,330.0 1,850.0 550.0 1,950.0 0.0 0.0 0.0 2,000.,Oq -------- DISTRICT TOTAL 111,458.5 84,524.9 7,053.4- 16,169.5 7,719.7 4,367.0 2410.5 1N.Sf10a0 ---------------------------------------------------------------..-.- ,���►►N N I IIII I I III Idl III IIII _ Table 5 PLANNING DISTRICT B 1939-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY NEIGNBORNOODS i ----------------------------------------------------=-=-=-=-=-=-=-----r-rrrr--rr-r-rrr-rrrrrrrrrr....rr NEIGFWlORH000 GEOGRAPHIC PROJECT CODE NAME COVERAGE NUMBER PROJECT TITLE TOTAL FUNDING PRIOR APPROP APPROP 1939-90 - FUTURE FiN1D'INa 1990-91 1991-92 1992-93 -------------------- 1l93rl4 - 1994+99 -------------------------------------------------------------------------------------------- i 241 WYNW000 SINGLE 041158 WYNWD ST IMPRV PH II 1,200.0 0.0 0.0 0.0 0.0 9.0 1,200.9 0.0 052203 BUENA VST. STRM SEW. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 322025 GRM. CT./FSN. OT-EX. 3,598.3 3,992.0 9.3 0.0 0.0 0.9 0.0 0.0 331056 R. CLEMENTE PARK REH 1,900.0 1,900.0 0.0 0.0 0.0 0.0 0.0 0'.0 242 BOULEVARD 243 EDGEWATER 251 OVERTOWN MULTI 041132 EDGEWTER ST IMP P II 1,500.0 0.0 0.0 041166 EQW. ST. IMV. PH -III 1,500.0 0.0 0.0 SINGLE 052192 MIRAMAR STORM SEWERS 0.0 0.0 0.0 MULTI 041132 EDGEWTER ST IMP P II 1,500.0 0.0 0.0 041166 EQW. ST. IMV. PH -III 1,500.0 0.0 0.0 SINGLE 331341 GIBSON PK BLDG IMPRV 200.0 200.0 0.0 331344 REEVES PARK REHOVAT. 150.0 150.0 0.0 331351 WILLIAMS PK RENOVAT. 400.0 0.0 400.0 MULTI 041144 OVTN. ST. IMP. PH.II 1,200.0 0.0 0.0 322029 SE OVERT. P.W R. P-1 19,360.0 26,347.7 6,957.7- 322067 SEOPW PHASE 12 719.7 0.0 719.7 341105 SE OVERT/P W ST. IMP 10,038.2 $,S74.0 0.0 341176 SEOPW 7 6 9 ST MALLS 6,033.1 376.0 0.0 351230 BE OVTN/PKW. SANT. S 1,000.0 900.0 100.0 0.0 1,900.0 0.0 0.0 0.0 0.0 0.0 0.0. 0.0 1,$Go.0i 0.0 0.0 0.0 0.0 0.ft 0.0 10500.0 0.0 0.0 d�.m 0.0 0.0 9.0 0.0 l}500.0 0.0 0.0 0.0 0.0 IM«' 0.0 0.0 0.0 0.0 .6P 0.0 0.0 0.0 0.0 r. 0.0 0.0 1,200.0 0.0«I 0.0 0.0 0.0 0.0 (.!' 0.0 0.0 0.0 0.0.=.,rr.1 4,444.2 0.0 0.0 v 0.0 1,444.9 2,016.2 S48.5 1,.0E0.S � 6► 0.0 0.0 0.0 m s % v �1. �11N N � I �� I i7l n V1 �l I I � I PLANNING DISTRICT B ' 1969-95 CAPITAL IMPROVEMENT PROGRAM s PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY HEIGHBORNOOOS ------------------ -r-r r---r..--------------------------- NEIGHBORN000 GEOGRAPHIC PROJECT ---RIO------A--PPROP..---------- ------- - - - F---:r..----;UTr-r-UREr--iirINrQID-r-l�IGrr��..r�-r •rr..-rrr.... --L -------PR--I-OR- T-TAR CODE NAME COVERAGE ------------------------------------------------------------------------------------------------------------------------------------ NUMBER PROJECT TITLE FUNDING APPROP 1969-90 1990-91 I991-92 1992-93 1993-" I994-9S (• X 1000) 2S2 SPRING GARDENS SINGLE 052205 S. GARDEN STRM EWERS 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.01 MULTI 041144 OVTN. ST. IMP. PH.II 1,200.0 0.0 0.0 0.0 0.0 1,200.0 0.0' 0.01 052263 WONR. CRK. RNV. PH-V 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 2,000.0 263 CENTRAL DOWNTOWN SINGLE 031301 BICENT. PARK STABILZ 0.0 0.0 041135 DOWNT ST IMP PH -III 1,000.0 0.0 041161 NW 1 ST AVE. ST IMPV 0.0 0.0 313011 MIAMA. REDVLOP. PNII 3,114.6 0.0 322056 CAMILLUS HOUSE LAND 11000.0 0.0 I 331302 BYFT. PK. RED. PH.II 4,956.5 4,956.S j 331305 BAYFR. P. R. S. END 1,513.S 1,518.5 331306 BAYF. P. RED. PEPPER 2,7S0.0 2,750.0 331347 D. PLAZA BAY/RVRWALK 100.0 100.0 341115 OWNT ST. IMP. PH -II 2,000.0 2,000.0 N 3S1164 BICENT PARK SANT SEW 0.0 IS0.0 351231 DWTN. SLATY. SEW. III $00.0 300.0 413007 MIAMAR. RENOVA. PH-1 3,917.0 3,917.0 413013 MIAMARINA - PIER 5 1,531.2 1,531.2 420002 M. CONV. C. PKG GARG 21,757.0 21,7S7.0 MULTI 0313S2 BRIKL PT PK RELOC 1,715.0 0.0 0512$3 WTSN. ISLD. SLATY. SE 1,950.0 0.0 322029 SE OVERT. P.W R. P-I 19,360.0 26,347.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 11000.0 0. a 0.0 0.0 0.0 0.0 0.0 0.0 0.0 31114.6 0.0 0.0 0.0 11000.0 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0'.0 0.0 0.0 0.0 - 0.0 0.a. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 150.0- 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1171S.0 0.0 0.0 0.0 0.0 11950.0 0.0 0.0 0.9 6,957.7- 0.0 0.0 0.a 0.0 0.0 0.0 d. d o. a. a d. �r 0.OI 0.� BTQV� 19 PLANNING DISTRICT B 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUMING SUMMARY FOR PLAITING DISTRICTS BY NEIGHBORH0009 - - NEIGHBORH000 GEOGRAPHIC PRO.>ECT ----------------------- ---- TOTAL ---- PRIOR - ADPROP ------------------ - - - FUTURE FUNDINii ---------------•- - CODE NAME COVERAGE NUMBER PROJECT TITLE FUMING APPROP 1989-90 1990-91 1991-92 1992-93 1993-94- 1994-99 ------------------------ ------------------------------------------------------------------ (• X - -------------------- 10an) ------------- 263 CENTRAL DOWNTOWN MULTI 322057 SEOPW PHASE II 719.7 0.0 719.7 0.0 0.0 0.0 0.0 0.0 341103 SE OVERT/P W ST. IMP 10,038.2 5,574.0 0.0 4,464.2 0.0 0.0 0.0 0.0 341176 SEOPW 7 6 9 ST MALLS 6,033.1 $76.0 0.0 1,446.9 2,616.2 503.5 1,010.S 0'.0 343229 METRORAIL STAGE II 7,239.3 2,000.0 1,767.7- 11800.0 2,503.5 2,603.5 0.0 0.0 351260 SE OVTN/PKW. SANT. 8 11000.0 900.0 100.0 0.0 0.0 0.0 0.0 0.0 264 LUMMU8 PARK SINGLE 332034 LUMMUS P.AREA BEAUT. 0.0 180.0 180.0- 0.0 0.0 0.0 0.0 331042 LUMMUS PARK - PH I $65.0 $79.8 0.0 465.2 0.0 0.0 0.0 341103 N. RIVER DR. ST. IM. 2,030.0 2,030.0 0.0 0.0 0.0 0.0 0.0 413004 LUMMUS PARK MARINA 310.0 $0.0 0.0 260.0 0.0 0.0 0.0 419002 KREIDT PROPERTY 34.0 34.0 34.0- 34.0 0.0 0.0 0.0 291 BRICKELL WEST MULTI 031352 BRXKL PT PK RELOC 11715.0 0.0 0.0 11715.0 0.0 0.0 0.0 041101 BRICKELL T. S. ST. 900.0 0.0 0.0 900.0 0.0 0.0 0.0 $43229 METRORAIL STAGE II 7,289.3 2400.0 11767.7- 10800.0 2,608.5 2960a.5 0.0 i 352232 SW 6.ST STORM SEWERS 600.0 0.0 600.0 0.0 0.0 0.6 0.0 292 BRICKELL NORTH SINGLE 341099 BRICK. PLAZA ST. IMP 0.0 100.0 100.0- 0.0 0.0 0.0 0.0 MULTI 031352 BRILL PT PK RELOC ..•1,715.0 0.0 0.0 1,715.0 0.0' 0.0 .0.0 041101 BRICKELL T. S. ST. 900.0 0.0 0.0 960.0 0.0 0.0 0.0 343229 METRORAIL STAGE II' 7,239.3 2400.0 1,767.7- 1,800.0 2,609.5 2,60$.5 0.0 PLANNING DISTRICT e 1989-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICTS BY HEIGHBORN00D$ PROJECT FUNDING SUMMARY FOR -----+ s-s r..--•••• , _ ___ ---------------------TOTAL GEOGRAPHIC PROJECT ----- ---- PRIOR APPROP _•�r,�ryrr�• -rrrr APPROP - 1959-90------r---1 FNTtM�E. i1M4'f>INO 1990•!1 1lf1-l2 1!!'t•!3 r - r.. r 1!!S-!A 3!' HEIGW CODE NAME COVERAGE ---- --------------------------- NUMBER PROJECT TITLE --------------------------------------- FUNDING ---1991------------r----rrrr-------•rrrr �• X 10001 - ---- 293 MIAMI AVENUE 35•0 0.0 0.0 0.0 0.0 0.0Or. SINGLE 331346 SIMPSON PARK RENOVAT 35.0 0.0 MULTI 341100 BRCK. AV. S-R- IMPVM 0.0 600.0 600.0- 0.0 294 SRICKELL SOUTH ioa.o- a•� 0.P_ 0.0 0�0 a'07 MULTI $41100 ORCK. AV. S.R. IMPVM O.0 ioo.o , 295 OMNI/ISLAND8 0.0 G,.O i.S00.0 0•Q 0.a 0.0+ MULTI 041132 EDOEMTER ST IMP P II 1.S00.0 0.0 0.•0 Ot-a O.a 3iS00.0G 041166 EQW. STe IMV- PN-III 11500.0 0.0 0.0 0.0 11800.0 21603.5 2iso*.$ a.a ; a.0 343229 METRORAIL STAGE II 7,239.3 2,000.0 117i7.7- 296 WATSON ISLAND 536.1 0.0 0.0 SINGLE 331317 JAPNES. GARON- RENV- 536.I 1.9so.o o•o 0.0 r MULTI 051233 MTSN- ISLD. SLATY- SE 1t95O.o 0.0 o.G 0.0 0.0 0« 0 0 334034 MARINA OTRP. IMPROV. 0.0 io.0 i0.0- 0.0 : WA­ kL -`.'s d d�,f`.s i Table 6 PLANNING DISTRICT B 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FINDING SUMMARY FOR PLANNING DISTRICTS AND TARGET AREAS ---------------- ------------------------------------------------- - - --------------------------------------. PROJECT TOTAL PRIOR APPROP - - - FUTUREFUNO2N0 - .. TARGET AREA NUMBER PROJECT TITLE FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1913-94 191t-lS ----------------------------------------------------------------------------------------------- ------------------------------------ NYNI400D (• X 1000) OVERTOWN DOWNTOWN 41132 EDGEIITER ST IMP P II 1,500.0 0.0 0.0 0.0 1,500.0 0.0 0.0 0.9 41156 WYNMD ST IMPRV PH II 1,200.0 0.0 0.0 0.0 0.0 0.0 1.200.0 0.0 41166 EO11. ST. IMV. PH -III 1,500.0 0.0 0.0 0.0 0.0 0.0 0.0 1150010 113231 MIAMI FIRE MUSEUM 300.0 0.0 30.0 $50.0 0.0 0.0 0.0 0.0 922025 ORR. CT./FSN. OT-EX. 31S9e.3 3,S92.0 6.3 0.0 0.0 0.0 9.0 0.0 331056 R. CLEMENTE PARK REH 1,900.0 1,900.0 0.0 0.0 0.0 0.0 0.0 0.0 TOTALS 10,076.3 5,492.0 $6.3 SSO.0 1,500.0 0.0 1,200.0 1,S00.0 41144 OVTN. ST. IMP. PH.II 1,200.0 0.0 0.0 0.0 0.0 1,209.0 0.0 0.0 52263 MONK. CRK. RNV. PH-V 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 2,000.0 322029 SE OVERT. P.11 R. P-I 19,360.0 26,347.7 61987.7- 0.0 0.0 0.9 0.0 0..0 322057 SEOPM PHASE II 719.7 0.0 719.7 0.0 0.0 0.0 0.0 0.0 331341 GIBSON PK BLDG IMPRV 200.0 200.0 0.0 0.0 0.0 0.0 0.0 0.0 4,1, 331344 REEVES PARK RENOVAT. 150.0 150.0 0.0 0.0 0.0 0.0 0.0 331351 WILLIAMS PK RENOVAT. 400.0 0.0 400.0 0.0 0.0 0.0 0.0 0.�0 341105 SE OVERT/P M ST. IMP 10,038.2 5,574.0 0.0 4,464.2 0.0 0.0 0.0 341176 SEOPM 7 6 9 ST MALLS 61033.1 376.0 0.0 1,446.9 2,615.2 503.S 11010.S co 351280 SE OVTN/PKM- GANT. S 11000.0 900.0 100.0 0.0 0.0 0.0 0.0 *.0 TOTALS 41,101.0 33,S47.7 5,768.0- 5,911.1 2,916.2 11753.5 11010.5 2,Dlill 0 41135 DONNT ST IMP PH -III 10000.0 0.0 0.0 0.0 11000.0 0.0 0.0 0`fl 311001 CITY ADM. BLDG PH II 19,575.0 28.0 0.0 1,250.0 11,735.0` 6,545.0 0.0 "+ qw mw t PLANNING DISTRICT B 1999-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AND TARGET AREAS ------------------------------------------------------------------------------------------------------------------------------------ PROJECT TOTAL PRIOR APPROP - - - - - _ FUTURE FUNDING - •• .. TARGET AREA NUMBER ------------------------------------------------------------------------------------------------------------------------------------ PROJECT TITLE FUNDING APPROP 1969-90 1990-91 1991-92 1992-93 3993-94 1994-95 (4 X 1000) DOMNTOWN 311014 FED. LAW ENFRC BLOO 29,676.0 30,000.0 324.0- 0.0 0.0 0.9 0.0 6.0 311015 UPGRO MNFRM COMP/PER 71636.0 0.0 1,192.6 1,321.9 1,023.5 1,028.9 3,023.S 2,04F.0 311019 P.W. COMPUTER SYST. 250.0 0.0 250.0 0.0 0.0 0.9 0.0 0.0 312010 POL. MOB. DOT. TERM. 1,225.9 1,403.0 180.0- 0.0 0.0 0.0 0.0 0.0 312012 POLICE PRO. UNIT REN 118.0 493.0 375.0- 0.0 0.0 0.0 0.0 0.0 312014 POLC. MICROCOMP 8 ID 1,411.7 1,125.0 296.7 0.0 0.0 0.0 0.0 0.0 312015 POL. PAC. EXP./REMO. 799.2 1,085.0 28S.8- 0.0 0.0 0.0 0.0 0.0 312018 PLC EQUIP. FY-89, 90 1,249.7 840.7 409.0 0.0 0.0 0.0 0.0 0.0 312019 I MPO FIREARMS RANGE 83.0 $3.0 0.0 0.0 0.0 0.0 0'.0 0.0 318011 MIAMA. REOVLOP. PHZZ 3,114.6 0.0 0.0 $0114.6 0.0 0.0 0.0 0.0 $1i232 FIRE DEPT. COMP. ENN 680.7 400.0 280.7 0.0 0.0 0.0 0.0 0.0 314232 GEOGR. INFORM. SYST. 610.0 610.0 0.0 0.0 0.0 0.0 0.0 0.0 322029 SE OVERT. P.11 R. P-1 19,360.0 26,347.7 61967.7- 0.0 0.0 0.0 0.0 0.6 322056 CAMILLUS HOUSE LAND 1,000.0 0.0 1,000.0 0.0 0.0 0.0 0.0 0..0 322057 SEOPN PHASE II 719.7 0.0 719.7 0.0 0.0 0.0 0.0 0*0' 331042 LUMMUS PARK - PH I $65.0 379.8 0.0 465.2 0.0 0.0 0.0 olke 331227 BAYFRONT PARK PH. 1 11086.5 11086.5 0.0 0.0 0.0 0.9 0..0 e"A - 381226 BAYFT. P. ROV. AR. B 938.9 936.9 0.0 0.0 0.0 0.0 0.0 10,14 j 331229 BAYFT. P. RDV. AR.'A 300.0 300.0 0.0 0.0 0.0 0.0 0.0 -CW", $31230 BFRT PK ROV LGHT TOM 1,630.2 1,630.2 0.0 0.0 0.0 0.9 0.0 0.0 331231 BYFT. PK. N. END P I 6.iS0.7 61150.7 0.0 0.0 0.0 0.0 0.01 0.0 331232 BAYFT. PARK REDEVPMT 136.7 127.6 $69 0.0 0..0 0.0 0.0 0.0 6.a+r7 PLANNING DISTRICT B 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AND TARGET AREAS --------------- --------------------------------- ----- -- - -------------------------------r-r-.irrrrr PROJECT TOTAL PRIOR APPROP - - - - - - FUTURE FUI1DINB TARGET AREA NUMBER PROJECT TITLE FUNDING APPROP 1989-90 1990-91 1991-92 1992 99 199344 1994-" ----------------------------------------------------------------------------------------- - --------------r---.------r----r.--- (0 X 1000) DOWNTOWN 331805 331306 331347 341109 341105 341115 341176 351280 351281 413004 413007 413013 419002 420012 NON -CD TARGET AREA 41132 41166 331317 331846 343229 BAYFR. P. R. S. END 1,518.5 1,513.5 0.0 0.0 0.0 0.0 0.0 0.0 BAYF. P. RED. PEPPER 2,750.0 2,750.0 0.0 0.0 0.0 0.0 0.0 0.0 0. PLAZA BAY/RVRWALK 100.0 100.0 0.0 0.0 0.0 0.0 0.0 0.0 N. RIVER DR. ST. IM. 2,030.0 2,030.0 0.0 0.0 0.0 0.0 0.0 a.0 SE OVERTIP W ST. IMP 10,038.2 5,574.0 0.0 4,464.2 0.0 0.0 0.0 0.0 DWHT ST. IMP. PH -II 2,000.0 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 SEOPW 7 8 9 ST MALLS 61033.1 376.0 0.0 1,446.9 2,616.2 542.9 11010.9 0.0 SE OVTN/PKW. SANT. S 11000.0 900.0 100.0 0.0 0.0 0.0 0.0 0.0 OWTH. SNTY. SEW. III 800.0 800.0 0.0 0.0 0.0 0.0 0.0 0.0 LUMMUS PARK MARINA 310.0 50.0 0.0 260.0 0.0 0.0 0.0 0.0 MIAMAR. RENOVA. PH-1 3,917.0 3,917.0 0.0 0.0 0.0 0.0 0.0 0.0 MIAMARINA - PIER 5 1,531.2 1,531.2 0.0 0.0 0.0 0.0 0.0 0.0 KREIDT PROPERTY 34.0 34.0 34.0- 34.0 0.0 0.0 0.0 MIA. CONV. CEN. FY89 116.0 116.0 0.0 0.0 0.0 0.0 0.0 0.a. TOTALS 132,000.5 94.928.9 3,938.9- 12,362.0 16,374.7 8,I72.0 2,034.0 2,047.0 EDGEWTER ST IMP P II 1,500.0 0.0 0.0 0.0 11500.0 0.0 0.0 0`.0 EGW. ST. IMV. PH -III 1,500.0 0.0 0.0 0.0 0.0 0.0 0.0 11"10.0 JAPNES. GARON. RENV. 536.1 536.1 0.0 0.0 0.0 0.0 0.0 4.0 SIMPSON PARK RENOVAT 35.0 35.0 0.0 0.0 0.0 0.0 0.0 0.0E METRORAIL STAGE II 7,239.3 2,000.0 1,767.7- 11800.0 2,609.5 2,603.l1 0.0 0 0. TOTALS 10,610.4 2,S71.1 1,767.7- 11400.0 41103.9 21400.9 0.0' I,$00.* i�� 1 I �l Gl n n �'1 C1 ;`1.. �`1 �. FL E� El. �1. F . PLANNING DISTRICT C Planning District C is the southern portion of the City south of Coral Way -and east to Biscayne Bay. The proposed 1989-1995 Capital Improvement Program for District C includes projects in seven functional categories with a total value of $33,395,300. Th s represents approximately 7.2% of the capital program. Planning District C is comprised of seven neighborhoods including the off -shore picnic islands in Biscayne Bay. The Coconut Grove Community Development Target Area lies within the district as shown on the map. 'Sanitary Sewers valued $11,000,000 are ongoing in South Grove. t. Storm Sewers valued at $5,750,000 are ongoing or scheduled for Douglas Park and East Grove. Street Improvements valued at $2,100,000 2910 programed in 'Silver Bluff. Park* and Recreation projects valued at $637,200 are ongoing in West Grove, Douglas Park and North Grove. listings with accompanying fundingscheW all neighborhoods and the Coconut #A Area are included in the following tables. Fire Rescue projects valued at $298,100 are ongoing in District C. Specifically the video production and training assistance project. ''lunding 'di 41de: A summary by d detailed 'project functional category an IT Ikulp NO Sit L CM cool wommon"OOD su "m stmuw 30 N wermMon wio`I1�I�Y1i �IinYwii9�f Table 7 PLANNING DISTRICT C 1989-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY - - - --- - -------------------------------- ------------------ - ------ ------------- ------------TOTAL--- PRIOR APPROP ----- ------------ -- -- FUTURE F1N�ZNQ ----- -- -- PROGRAM FUNCTIONAL CATEGORY FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1993-94 1;;Z '.1 ------------------------------------------------------------------------------------------ - ---------------------------------- 10001 PUBLIC SAFETY POLICE 51000.0 51000.0 0.0 0.0 0.0 0.0 0.0 0.0 FIRE RESCUE 298.1 123.0 175.1 ---------------------------------- 0.0 0.0 ---------------- 0.0 -------- 0.0- 0.0 -------- PROGRAM TOTAL 5,298.1 5,123.0 175.1 0.0 0.0 0.0 0.0 9.0 SOCIAL AND ECON. ENVIRONM HOUSING PARKS AND RECREATION PUBLIC FACILITIES TRANSPORTATION PHYSICAL ENVIRONMENT PROGRAM TOTAL PARKS AND RECREATION PROGRAM TOTAL MARINAS PROGRAM TOTAL STREETS PROGRAM TOTAL SANITARY SEWERS STORM SEWERS PROGRAM TOTAL 6,610.0 51400.0 210.0 0.0 0.0 0.0 0.0 0.0 ------------------------------------------------------------------ 6.610.0 8.400.0 210.0 0.0 0.0 0.0 0.0 0.0 637.2 588.0 49.2 V.0 0.0 0.0 0.0 0.0 ------------------------------------------------------------------ 637.2 568.0 49.2 0.0 0.0 0.0' 0.0 0.0 0.0 60.0 so.0'- 0.0 0.0 0.0 0.0 0.O --------------------------------- - -------- ---------------- -------Wbr 0.0 $0.0 60.0- 0.0 0.0 0.0 0.0 0.0 2,100.0 1,700.0 1,600.0- 2,000.0' 0.0 01.0 0.0 0.0. ----------------------------------------------------------------- 2,100.0 1v700,0 1,600.0- 2,000.0 0.0 0.0 0.0 0.0 11,000.0 10,000.0 11000.0 5,750.0 750.0 0.0 - - - - - - - - - - - - - - - - - - - - - - - - - - 16,750.0 10,750.0 1,000.0 0.0 9.0 0.9 0. 0 0., 0+ 51000.0 -------- -------- 0.0 -------- 0.0 -------- 0,0 0.0 ------ir14,. 5,000.0 0.0 0.0 0.0 0.0 --------------- 7.000.0 ---- 0.0 ---- o a o.o ---- -G - -o.o Table 8 PLANNING DISTRICT C 1989-95 CAPITAL IMPROVEMENT PROGRAM FOR PLANNING DISTRICTS BY NEIGHBORHO00$ PROJECT FUNDING SUMMARY ________-_-.._________________.._---- -____---_..-__-___ WItiHBORH000 GEOGRAPHIC PROJECT ------------------------------------ ----------- TOTAL PRIOR APPROP APPROP - 1989-90 ------ - - - - - - -FUTURE FUNGI Q 1990-91 1991-92 1992-93 - - _ .. ;998-94 _ _ _ 1994=95 CODE NAME COVERAGE NUMBER PROJECT TITLE FUNDING _______________TELL-________-- _--_---------------_.._--_-_____-_--- -(i - ------------------------------ TITLE-------_FU X 1000) 361 WEST GROVE I7S.1 O.O 0.0 0.0 . 00 0.0 SINGLE 313226 VIDEO PROD 8 TRAINIG 298.1 123.0 0.0 0.,0 331316 VIRRICK PK. RENOVAN. 200.0 200.0 0.0 0.0 0�0' a'.a 0.0 0.0 331342 GRAND AVE PARK RENOV 172.2 150.0 22.2O.0 0.0 0.0. 0.0 O.p $31343 KIRK MONROE PK/TEH 65.0 65.0 0.0 0.0 0.0 0.0 0.0 341110 C. GROVE ST. IMPROV. 0.0 1,600.0 1.600.0- 0.0 0.0 0.0 0.0 0.0 MULTI 312008 S. DISTR. POLO. SUBS S.o00.0 S,000.0 0.0 0.0 0.0 0.0 p•p' 0.0 0.0 321024 AFFOR. LASING PROGRAM 8*610.0 8,400.0 210.0 0.0 0.0 0.0 391 DOUGLAS PARK SINGLE 052208 AVALON STORM SEWERS 5,000.0 0.0 B31340 DOUGLAS PARK RENOVAT 100.0 100.0 MULTI 312008 S. DISTR. POLO. SUBS 5#000.0 5.000.0 392 SILVER BLUFF SINGLE 341121 SILVER BLUFF ST IMP. 2#100.0 100.0 MULTI A12008 S. DISTR. POLO. SUBS 5,000.0 511000.0 393 NORTH GROVE SINGLE 331329 WAINWRIGHT PRK -P II 100.0 73.0 MULTI $12008 S. DISTR. POLC. SUBS 5,000.0 5#000.0 344 EAST GROVE SINGLE 3S2187 COCONUT GROVE STORM MULTI 334064 MARINA GTRP- IMPROV. $95 SOUTH GROVE SINGLE 351174 S. GROVE SANIT. SEW. SINGLE BS1279 THE LAST $ANY- SEWR. 750.0 750.0 p.0 60.0 0.0 5.000.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 D.C. 0.0 0.0 0.0 0.0 0.0 0..0. 0.0 2,000.0 0.0 0.,0 0•4 0.0 0.0 0.0 0.0 0.0 27.0 0.0 0.0 0.0 0.0 0.0 60.0- 0.0 6,000.0 6,000.0 0.0 0.0 6,000.0 4,000.0 1,000.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 p.0 0.0 89-f; .: "I Table 9 PLANNING DISTRICT C 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AND TARKT AREA$ ---------------- --------------'---..--------------- ------ -- ----------------------- -----------------------------" -----..- - -- - ---- ------ PROJECT TOTAL PRIOR APPROP - - - - - - - FUTURE FUNDIFq - TARGET AREA NUMBER PROJECT TITLE FUNDING APPROP 1939-90 1990-91 1991-92 1992-93 MS-t* 290A'-9$ ------------------------------------------------------------------------------------------ - - ---------------------------------- _ COCONUT GROVE to X 1000) 313016 FIRE TRAIN. FACILITY 3,475.6 3,475.6 0.0 0.0 0.0 0.0 0.0 0.0 331916 VIRRICK PK- REHOVAN. 200.0 200.0 0.0 0.0 0.0 0.0 0.0 0.0 331342 GRAND AVE PARK RENOV 172.2 150.0 22.2 0.0 0.0 0.0 0.0 0.0 331341 KIRK MONROE PK/TEN 65.0 65.0 0.0 0.0 0.0 0.01 0.0 0.0 TOTALS 3,912.E 3,090.6 22.2 0.0 0.0 0.0 0.01 0.0 NON -CO TARGET AREA 52208 AVALON STORM SEWERS 311012 TREASURY MAGMT. FUR. 311017 CLK OFC LEKTVR REPLC 331329 WAINWRIGHT PRK -P II $31840 DOUGLAS PARK RENOVAT 341121 SILVER BLUFF ST IMP. $51174 S. DROVE SANIT. SEW. 351279 THE LAST SANY. SEWR- 352197 COCONUT GROVE STORM 414005 DM. KEY MAR. REN/EX 415002 C.G. EXH. CEN. RENV- TOTALS 51000.0 0.0 0.0 51000.0 0.0 0.0 9.0 100.0 100.0 0.0 0.0 0.0 0.0 0.0 S3.4 0.0 $3.4 0.0 0.0 0.0 9.0 100.0 73.0 27.0 0.0 0.0 0.0 0.0 100.0 100.0 0.0 0.0 0.0 0.0 0.0 2,100.0 100.0 0.0 2,000.0 0.0 6.0 6.6 6,000.0 6,000.0 0.0 0.0 0.0 0.6 0.0' $0000.0 41000.0 11000.0 0.0 0.0 6.0 0.0 750.0 750.0 0.0 0.0 0.0 6.0 0.0 12,862.0 12,862.0 0.0 0.0 0.0 0.0 0.0 71500.0 71500.0 0.0 0.0 0.0 0.0 0.0' 39,565.4 311465.0 1,080.4 71000.0 0.0 0.0 0.0 �► w 0.0 0.6 0.0 0.0 Owl` 0.0 OOr V, ,VHT PAGE 2 k, PLANNING DISTRICT D The area west of I-95 from Coral Way north to NW 7th Street defines Planning District D. The proposed 1989-1995 Capital Improvement Program for this district includes projects in eight functional categories. The total value of improvements, $28,405,000, represents approx- imately 6.1% of the six year program. Planning District D is comprised of fifteen neighborhoods. The Little Havana Community Development Target Area lies within the District as shown on the map. Emphasis is placed on street improvements proposed throughout District D. Projects, totaling .$15,235,000 are ongoing or scheduled to begin during the six years of the program with emphasis in West Citrus Grove, West Miami, Coral Gate, Shenandoah, East Citrus Grove Orange Bowl and Riverside. Storm sewer improvements totaling $10,970,000 are ongoing or scheduled for seven neighborhoods: Auburndale, Coral Gate, East Citrus Grove, Henderson Park, South Ada Merritt, Riverside, and East. Miami High. One project in the Auditoriums functions ! category is in Riverside. This project, is modernization of the Manuel Artime Community # Center, is valued at $500,000. Police projects include construction of a a full service police substation in the little Havana- Target Area. Other projects include the a Housing Demonstration Program Land A,i3it:�idn and improvements to marinas in the Lummus Park neighborhood. A district -wide funding summry by functional category follows. In addition, a listing of projects with their accompanying funding schareasduiss for all presented in gtherhf owing oods and torg tables. x�.t. i III 1 In Wiwi mim k �piIny�J�7�y��®®Y.>pYn�+i_':L.i 8�6t9 OW AEl id �6�ya �P�II@I:yS.7l�D Whip }JP. '��y��q, PR - mom a � a° � �•� Im im w m i14'JN11 Tlaa1R m W# E"ift p:Y�Y'.M �yq�•y .per lx �q l i�7 R�3I°.AM IAM I�MI"sFdk'z'ltt'^.f a 3 "° $ M. (4 „� qe nssl l P,!9i mV5,k 1i4 y�q Pry11F4,4. ""1 F-1 t I ary#�y1 IN"ray! I, � y�x� Aoae �x. a =•.�* ....T+y a.'� :;?tassrs-a ca s�+a MUM -M 31! ro,4L,i� 1 91"vsw cseaeesw,� 8����� �I W M IR IS 11116 1 6 1 . oblP 10 PLANNING DISTRICT 0 1969-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY ------------------r --r----r---------------- PROGRAM FUNCTIONAL CATEGORY TOTAL PRIOR FUNDING APPROP APPROP 1989-90 --------------- 1990-91 FUTURE FUNDING-------.---.r-- 1991-92 1992-PI 1999-94 1994-9S - -- -------------- ---------- ----------------------'-------�--- ----------------------------------------------------------------------- (• x 1000) SOCIAL AND ECON. ENVIRONM HOUSING 1,500.0 1,000.0 ------------------ 500.0 -------- 0.0 -------- 0.0 -------- 0.0 ---------------- 0.0 0..01 -------- PROGRAM TOTAL 1,500.0 1,000.0 500.0 0.0 0.0 0.0 0.0 0.0 PUBLIC FACILITIES AUDITORIUMS 500.0 500.0 ------------------ 0.0 -------- 0.0 -------- 0.0 -------- 0.0 ---------------- 0.0 0.0 -------- PROGRAM TOTAL 500.0 500.0 0.0 0.0 0.0 6.0 0.0 9.0 TRANSPORTATION STREETS 13,235.0 7,235.0 - - - - - - - - - - - - - - - - - - 1,200.0- - - - - - - - - 4,100.0 -- - - - -- - 0.0 --- - - --- 1,900«0 ---- - --- ----- 6.0 --- $1300.0 -------- PROGRAM TOTAL 15,235.0 7,235.0 1,200.0- 4,100.0 0.0 1.000.0 0.0 $1300.0 PHYSICAL ENVIRONMENT SANITARY SEVERS 200.0 200.0 10,970.0 2,070.0 0.0 1,400.0 0.0 11000.0 0.0 21000.0 0.0 9.0 0.0 4,900.0 0.0 0.0 STORM SEWERS ------------------ -------- -------- -------- ---------------- --------° PROGRAM TOTAL 11,170.0 2,270.0 1,400.0 1,000.0 2,000.0 0.0 4.500.0 0.0 DISTRICT TOTAL _ _ 26,40S.0 11,0050 _ _ _ 700.0 _ 5,100.0 _ 2,000.0 11900.0 4_900�0 -.-.� ------------------ -------- -------- -------- -------- - -3_300t. ---,. I - Table 11 PLANNING DISTRICT 0 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY NEIGHBORHOOM NEIOHdORH00D GEOGRAPHIC PROJECT APPROP - - - - - - - - FUTURE FUNDING, - - - - - - -------------------------- TOTAL ------PRIOR---- --- - -- - - - - - - - -- •------------------------------ COVE NAME COVERAGE NUMBER PROJECT TITLE FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 19"-94- - t9g4-9s ------------------------------------------------------------------------------------------------------------------------------------ 471 WEST CITRUS GROVE to X 10001 MULTI 041169 W LTT. HAV. NOW. IMP 1,800.0 0.0 0.0 0-0 0.0 0.0 0.01 11869-0 341127 W.L.H. ST IMP PH -II 2,100.0 50.0 0.0 21050.0 0.0 0.0 0.0 0.0 472 WEST MIAMI MULTI 041169 W LTT. HAV. HQW. IMP 1,800.0 0.0 0.0 0.0 0.0 0.0 0.0 11,600.0, 341127 W.L.H. ST IMP PH-11 2,100.0 50.0 0.0 20050.0 0.0 0.0 9.0 0.0 473 S.E LITTLE HAVANA MULTI 021029 LTH. CRT. MIX UPE PJ 0.0 0.0 0.0 0.0 01.0 0.0 0.0 9-0 022034 LIN. QRT. HOTEL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ft.0 491 AUBURNDALE SINGLE 052200 AUBRN. STORM SEWERS 2,000.0 0.0 0.0 0.0 2,000.0 0.0 0.0 1.01 492 CORAL GATE SINGLE 041165 CORAL GADNIS. ST. IMP 1,500.0 0.0 0.0 0.0 0.0 0.0 0.0 1.,Vmn Of 352195 ENGLEWOOD 8TRU. SEW. 10600.0 600.0 0.0 11000.0 0.0 0.0 0.0; W, MULTI 341094 SW 16TH ST. IMPROVM. 1,435.0 1,435.0 0.0 0.0 0.0 Goo 0.0 ow. 493 SHENANDOAH SINGLE 321038 L. HAVANA LAND ACQ. 500.0 0.0 $00.0 0.0 0.0 0.0 01.0 341123 SHENANDOAH ST. PH -II 2,100.0 50.0 0.0 21050.0 0.0 0.0 0.01 351285 SHNAH. SAM. SEW. RPL 200.0 200.0 0.0 0.0 0.0 0.0 0.0 0.0 MULTI 021029 LTH. ORT. MIX UPE PJ 0.0 0.0 0.0 0.0 0.0 0.9 • 022034 LTH. ORT. HOTEL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Aof 041169 W LTT. HAV. NOW. IMP 1,600.0 0.0 0.0 0.0 0.9 0.0 0.0 1 09P. C 341094 SW 16TH ST. IMIPROVM. 1,4A5.0 1,435.0 0.0 0.0 0.0 0.0 0.0 0.0 mm� PLANNING DISTRICT D ' 1969-95 CAPITAL IMPROVEMENT PROGRAM r,tia_ PROJECT FUNDING SUMMARY FOR PLANNING OISTRICTS BY NEXCHBORH000S -- -- -- rrr•rrrrr••rrrrrrr•r•..•---------------- -------..----•rr•..,r •rr-- r-rrrrrrrrrrrrrrrrrrrrrr rr NEIGHBORHOOD GEOGRAPHIC -PROJECT TOTAL PRIOR APPROP - - - - - iUTURE FUMING - - CODE NAME COVERAGE NUMBER PROJECT TITLE FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 ---------------------------------------------------------------------------------------------1000>---------------------------------- 493 SHENANDOAH MULTI 341127 M.L.H. ST IMP PH -II 21100.0 50.0 0.0 2,0l0.0 0.0 0.0 0.0 0.0 494 ROADS SINGLE 341112 RDS. AR. ST. IMPRMT. 0.0 1,200.0 1,200.0- 0.0 0.0 0.0 0.0 0.0 771 EAST CITRUS GROVE SINGLE 052201 GLENRYL. STORM SEMR. 2,000.0 0.0 0.0 0.0 0.0 0.0 21000.0 0.0 MULTI 021029 LTN. ORT. MIX UPE PJ 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 022034 LTH. CRT. HOTEL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 041169 M LTT. HAV. HOW. IMP 11600.0 0.0 0.0 0.0 0.0 0.0 0.0 11900.0 321025 MODEL CITY/LTT. HAV. 11000.0 11000.0 0.0 0.0 0.9 0.0 0.0 0.0 341127 M.L.H. ST IMP PH -II 2,100.0 50.0 0.0 2,050.0 0.0 0.0' 0.0 0.0 772 ORANGE BOWL SINGLE 432224 ORO. BWL. CHARSK. ST 0.0 0.0 0.0 0.0 0.0 0.0 0.01 0. MULTI 021029 LTN. CRT. MIX UPC PJ 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 022034 LTN. ORT. HOTEL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0. 041147 E.L.HVN.ST.IMP.P-III 1,800.0 0.0 0.0 0.0 0.0 11600.0 0.0 . 773 HENDERSON PARK SINGLE 352273 RVSO. STR. SEW. RTF. 1,020.0 1,020.0 0.0 0.0 0.0 0.0 6.0 (. MULTI 041147 E-L-HVN-ST.IMP-P-III 1,800.0 0.0 0.0 0.0 0.0 1,600.0 �0.0 0 774 NORTH ADA MERRITT MULTI 021026 E. LTT. HVA. HODS. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 01! 022035 MIA. RIFRT. RETZATH. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 4.0 041147 E.L-HVN.ST.IMP.P-III 1,600.0 0.0 0.0 0.0 0.0 1ei000 0.034 00 I Y � .Y�6¢�AA�AI�*��IR � r�i�ii��SIY'I�il%Y�...I��iYli1OII1�i1III II�Iill Ydll�ll III III II �I III II II.II II II 1111 I � � i PLANNING DISTRICT O A: 14, 1959-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY HEIGFBORfi00DS jj ---.r..--....------------------r-------------------------------------------r ---------r---------------w-----rrrr.+iri+aw.rr �r.r.rrNr.rrlrsria►wb GEOGRAPHIC PROJECT ' TOTAL PRIOR APPROP - - - -- - - - - Fun= FUNUM CODE NAME COVERAGE NUMBER PROJECT TITLE FUNDING APPROP 1969-90 1990-91 1991-92 199Z-lg- 1905:l4; 1094-00, j-------------------------- ---------------------- -------------------- ------------------------------------------------ ..-..,.--......---....-.. t• x 1000) 775 SOUTH ADA MERRITT SINGLE $52184 LAWRENCE PUMP STATN. 1,250.0 450.0 a00.0 0.0 0.0 0.0 0.0 0.0- MULTI 021026 E. LTT- HVA. HOUS. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 022035 MIA. RIFRT. RETZATN. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 041147 E.L.HVN.ST.IMP.P-III 1,800.0 0.0 0.0 0.0 0.0 1,000.0 0.0 0.o 352252 SW 6 ST STORM SEWERS 600.0 0.0 600.0 0.0 0.0 0.0 0.0 0.0 776 RIVERSIOE SINGLE 052202 LAWRENCE STRM 8 P'II 1,500.0 0.0 0.0 0.0 0.0 0.0 1wS00«0 333088 RNVT. OF MU. AR. COM $00.0 500.0 0.0 0.0 0.0 0.0 0.6 0«d I' 541124 EAST L. HAV ST. P-II 2,500.0 2,500.0 0.0 0.0 0.0 9.0 0.0 0«{ 777 "TIN QUARTER SINGLE $41086 LATH. OUR. ST. IMPR. 2,000.0 2,000.0 0.0 0.0 0.0. 0.01 778 EAST MIAMI HIGH SINGLE 052209 LAWNVIEW STRM SEWERS 1,000.0 0.0 0.0 0.0 0.0 0.0 1.000.0 . o if � � � �► llll Ilr � II I �-�'l1.. � 11i III 1i I It i_ a� �' � � , Table 12 PLANNING DISTRICT 0 1969-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AND TARGET AREAS --------------- -- PROJECT --------------------------------------- --------- TOTAL PRIOR --------------------- APPROP - - - - - - FUTUREFUNDING- ------------------- TARGET AREA NUMBER PROJECT TITLE FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1993-94 1994-93 ------------------------------------------------------------------------------------------------------------------------------------ (s x 1000) CITYWIDE 31352 BRIKL PT PK RELOC 1,715.0 0.0 0.0 1,71S.0 0.0 0.0 0.0 0.0 41101 BRICKELL T. S. ST. 900.0 0.0 0.0 900.0 0.0 0.0 0.0 0.0 $2I86 GRAPELANO ST SW PH I 1,100.0 0.0 0.0 11100.0 0.0 0.0 0.0 6.0 313226 VIDEO PROJ 6 TRAINIG 296.1 123.0 175.1 0.0 0.0 0.0 0.0 0.0 352252 SW 6 ST STORM SEWERS 600.0 0.0 600.0 0.0 0.0 0.0 0.0 0.0 TOTALS 4,613.1 123.0 77S.1 3,715.0 0.0 0.0 0.0 0.0 LITTLE HAVAHA 41147 E.L.HVN.ST.7CMP.P-III 1,800.0 0.0 0.0 0.0 0.0 1,900.9 0.0 0.0 41169 •W LTT. HAV. HOW. IMP 11600.0 0.0 0.0 0.0 0.0 0.0 0.0 1,800.0 52201 GLENRYL. STORM SEWR. 21000.0 0.0 0.0 0.0 0.0 0.0 21000.0 0.6 52202 LAWRENCE STRM S P II 1,s0O.0 0.0 0.0 0.0 0.0 0.0 I,s00.0 0.0 52209 LAWHVIEW STRM SEWERS 1,000.0 0.0 0.0 0.0 0.0 0.0 11000.0 0.0 312006 S. DISTR. POLC. SUBS 51000.0 51000.0 0.0 0.0 0.0 0.0 0.0 0.0 332232 ORNO SWL STA. PRO-CL 540.0 540.0 0.0 0.0 0.0 0.0 0.0 0:0 333083 RNVT. OF MU. AR. COM 500.0 SO0.0 0.0 0.0 0.0 0.0 0.0 0.0 341066 LATH. OUR. ST. IMPR. 2,000.0 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 341124 EAST L. HAV ST. P-II 2,500.0 2,500.0 0.0 0.0 0.0 0.0 341127 W.L.H. ST IMP PH -II 2,100.0 50.0 0.0 21050.0 0.0 352154 LAWRENCE PUMP STAIN. 1,250.0 450.0 800.0 0.0 0.0 0.0 0.0 352273 RVSD. STR. SEW. RTF. 1,020.0 1,020.0 0.0 0.0 0.0 0.0 0.0 04 404231 GANG SM. ADOIT PRESS 978.1 978.1 0.0 0.0 0.0 0.0 0.0 0.0 404237 ORANGE B. MOD. -PH I .. 1,230.0 1,230.0 0.0 0.0 0.0, 040 0.0 0.01 PLAlMING DISTRICT 0 CAPITAL IMPROVBLM£N'L' PROGRAM 19e9-95 pROJEOT F IFIG V.M ARY FOR PLAWUNG DISTRICTS AND TARGET AREAS rr r.«+...►«►A1w.rr+.1 ....+...ri..+..rrr....rrr+ ' .. - -- -- ----- TOTAL - ---- PRIOR ----------------- APPROP - 1!d!-!0 - 1l10-91 - -92 1"s-9O 1!lS�► 1!fl6�►l0 1!l1-lS-••rrr PROJECT.TZTL.E--------------------------FUNDING APPR--------------------(4 ----------------rrrrrr+.jrs..rr1_rrrr'+" TA1:6ET AREA-___.,,, - x 1000) .ram-_- .:.- LITTLE NAVAMA 0.0 14, 000.0 0.0 0.0 0.0 0.0 .0� 404238 0. QOWL IMOOERN. P II 14,000.0 0.0 1,•00.0 4,Soo.0 1r500�«4 - TOTALS 89.21e.1 14,26e.1 14.e00.0 2,050.0 NON -CO TARGET AREA 0.0 0.0 0.0 6.0 41165 CORAL GADH9. ST. IMP 1,500.0 0.0 0.0 0.0 0.0 14".0 4 41199 W LTT. HAV. HGW. IMP 1,800.0 0.0 0.0 0.0 0.0 Z,000.0 0.0 0.0 0.0p j 52200 AtMM. STORM SEWERS 2.000.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0' .. 32103e L. HAVANA LAND ACC. 500.0 0.0 500.0 0.0 0.0 0.6 0.0 341094 SW 16TH ST. IMPROVM. 1,435.0 1,435.0 0.0 0.0 0.0 0.0 0.0 O.OE 341123 SHENANDO AH ST. PH -II 2,100.0 50.0 0.0 2.050.0 0.0 0.0 0.0 0.0 141127 W.L.H. ST IMP PH -II 2,100.0 a0.0 0.0 2,060.0 2,608.9 2.60ffi.S 0.0 0.0 343229 METRORAIL STAGE II 7,239.3 2,000.0 1,767.7- 1,300.0 0.0 0.0 0.0 0.0r 351265 SWAN. SAW SEW. RPL 200.0 200.0 0.0 0.0 0-� 0.0 $52195 ENGLEWOOD STRM. SEW. 10600.0 soo.0 0.0 1.000.0 4,603.5 2040S.5 0. 0:i S TOTALS Z0,474.3 4,33S.o 1.267.7- 6,900-0 Table 13 s PLANNING DISTRICT E 1989-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY ----- -- -----r---------------------r---------------------------------------------------------------------rr------------------ TOTAL PRIOR APPROP ------ FUTURE FINIDYNf -r rr-sr.. PROGRAM FUNCTIONAL CATEGORY FUMING APPROP 1989-90 1990-91 1991-92 1992-03 3993-9461904-l6 -----.. -----r-r-r----r---------------------------------------------------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - tt X luuo) PUBLIC SAFETY FIRE RESCUE 0.0 1,234.0 1,234.0- 0.0 0.0 6.0 0.0 G.0 --------- --------------------------------- ---------------- ------- PROGRAM TOTAL 0.0 1,234.0 1,234.0- 0.0 0.0 0.0 0.0 0.0 PARKS AND RECREATION PHYSICAL ENVIRONMENT PARKS AND RECREATION 1,963.7 --------- 1.99S.0 --------- 11.3- -------- 0'•0 ---------------- 0.0 0.0 ----s--- 0.0 --------- 0.6 -------- PROGRAM TOTAL 10983.7 11995.0 11.3- 0.0 0.0 0.0 0.0 0.0 SANITARY SEWERS 10,680.0 91180.0 11300.0 0.0 0.0 0.•0 G.G STORM SEWERS 16,100.0 - - -- - - -- - 12,0S0.0 - - - - - - - -- 8,091.0- - - - -- - - - 2,033.0 ---------------- 0.0 OF500.0 -- - ----- 1,600.0 -------- 2.000.0 -------- PROGRAM TOTAL 26,760.0 21,236.0 6,S91.0- 2,033.0 0.0 6.600.0 1.600:* 2.000.0 DISTRICT TOTAL 26 763.7 - 24,467.0 7,636.3- -------- 2,083.0 0.0 61500.0 1:1600.0 20, - - - - -- - -- - -- - -- - - - - - ----- - ----- --- ---- -- - - -------- -------- d,-r-.►err 'Cable 14 PLANNING DISTRICT E 1969-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY NEIGHSORHOOOG -.i----------------------------------------------------------------------------------------------- NEIGNdORi1000 GEOGRAPHIC PROJECT TOTAL PRIOR APPROP - - - - - - - - PUTUQE FUNDIM - - - - r - CODE NAME COVERAGE NUMBER PROJECT TITLE FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 199S.." 1094-1S ------------------------------------------ ------------------------------------------------------------------------------------------ 591 WEST FLAQAMI (• X 1000) SINGLE 052211 FLOAMI STRM SWR P II 1,600.0 0.0 0.0 0.0 0.0 0.0 11600.0 0.0 MULTI $52102 FLAGAMI STORM S. P-I 1,600.0 1,000.0 0.0 0.0 0.0 0.0 1 9.0 0.0 592 FAIRLAWN SINGLE 052199 W. END ST. SEW.PH.II 8,000.0 0.0 0.0 0.0 0.0 81000.0 0.0 0.0 052206 REST END PUMPO. STA. 0.0 0.0 0.0 0.0 0.0 9.0 0.0 0.0 331215 RST. KG. MI. Pt. REN 75.0 75.0 0.0 8.0 0.0 0.0 0.0 0.0 MULTI 352192 FLAGAMI STORM S. P-I 1,600.0 1,600.0 0.0 0.0 0.0 0.0 0.0 0.0 352190 TAMIAMI STORM -PH II 1,800.0 1,000.0 0.0 0.0 0.0 0.0 0.0 0.0 $93 KINLOCH PARK SINGLE 052207 GRANADA STORM SEWERS 05226E FAIRLAWN ST. SEWERS $52177 LEJ. ST. SEW. PM.ST. 352181 LEJEUNE STORM SEWERS 352186 FAIRL ST SEWRS ENGNR 352256 LEJEUNE STR. S. PH I MULTI 052262 KINLOCH STORM SEWERS 551168 S. FLAGLER SANT. SE 551273 N. FLAGLER SANT. SWR 552190 TAMIAMI STORM -PH II 852257 LJUE 8TRM SEW. PH -II 594 LEJEUNE GARDENS SINGLE 052198 OURNAM STORM SEWERS 0.0 0.0 0.0 0.0 0.0 0.0 3,000.0 0.0 0.0 0.0 0.0 81000.0 0.0 2,500.0 2,500.0- 0.0 0.0 0.6 0.0 5,500.0 5,500.0- 6.0 0.0 0.0 0.0 91.0 91.0- 0.0 0.0 0.0 600.0 400.0 0.0 200.0 0.0 0.0 2,000.0 0.0 0.0 0.0 0.0 0..0 6,000.0 4,500.0 11500.0 0.0 0.0 0.0 4,6S0.0 4,660.0 0.0 0.0 0.0 0.0 11800.0 11e00.0 0.0 0.0 0.0 0.0 2000.0 167.0 0.0 1.688.0 0.0 0.0 $00.0 0.0 0.0 0.0 0.0 $00.0 O.c► o.o o.e a.o 0.0 O+fb a.0 0.0 O.o 2.00�►. 0.0 0.0 O.o a�a 0.0 0. PLANNING DISTRICT E 1999-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS SY HE! lie .. " --r-------------------- .«-----r-------------- --------------------i--r------------ ---.« - — ------------- GEOGRAPHIC PROJECT -- -- -- - - — — — — -- - — — --- -- --------- TOTAL PRIOR APPROP - - - FUTURE FMRDI#N1 - - - - 1991-92 1992--96 1193-94 - - - - idl NEIGHBORHOOD CODE NAME COVERAGE NUMBER- PROJECT TITLE FUNDING APPROP 1989-90 1990-91 a —----r---------- —-------------------------------------------------------------------------------------------�«--------i----ri—i (4 x 10001 E94 LEJEUME GARDENS 0.0 0.0 0.0 SINGLE 313220 EXP. • MOD. OF FR ST 0.0 1,234.0 1.234.0— 0.0 0.0 331143 ANTONIO NCO PK DEVPM 1,656.7 1,670.0 11.3- 0.0 0.0 d.0 331310 GRAPELAND PK. IMPROV 250.0 250.0 0.0 0.0 MULTI 052262 KINLOCH STORM SEWERS 2#000.0 0.0 0.0 0.0 0«0 0.0 0.0 2►OdQ.O S. FLAD.ER SANT 351168 . SE 6,000.0 4,500.0 1,500.0 0.0 0«t0 ,0.0 Q«0 0.0 $31273 N. FLAOLER SANT. SWR 4,680.0 4,690.0 0.0 0.0 0•0 252257 LJUE STRM SEW. PH -II 2,000.0 167.0 0.0 1,839. 0.0 „ hi'. '-.0 n,K _.ew..:, r.•k .. # ���Y•«: .ei?:'= a �. � 3a s i di,.<�. '4 � '� a.: €fi '. ..a kt a: a- s w9•.=. ..�� } = n } ''Z, 7 spi :i � %� 1t! !R tt.IR #. • ,�k �_ny. {, M �l�;filF F. � F -.:1'_i' T a3 � �, JCS. �' 6y� �+i` �'1EY` WiT.idd^E K ^���" • 's# � � �+Y' ✓:"� 47 Y -. h' ai r Wrb �."K' °,�'.�� �w .�w :. .. d.+ . , .:. +, of w 4 e .� ki✓x<xw )k-r+'•l.—Ni ".lu N:y'r. ;+Y i .«..pTri-.t rvi-'+ '' '&,. '� `�- F '~4.r �:�'� �•M> ^'ls 3. :r�u y, yetr�,� .4rq.. 'tDj�.'7t y Table 15 II II V II II,III IIII,IIIq,iJ 11 il111111 lllllll,ll l II,IIIII! 16 Illllllllll111l l 11 dl 1111 1 I II 1 Il I PLANNING DISTRICT E 1939-95 CAPITAL IMPROVEMENT PROGRAIM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AM TARGET AMC" 1 --------- m ------------------------------------------------- PROJECT TARGET AREA NUMBER PROJECT TITLE TOTAL FUNDING PRIOR APPROP APPROP 1999-90 - - 1990-91 - FUTURE 1991-92 FUND1100 I992-90 199E-94f It"-" ----- ------------ - --------- -- - ----- ------ - ------ ------------------------rrrrrrrrrrrrr ------------------------------------- ei x 10001 HOM-CO TARGET AREA $2193 OURHAM STORM SEWERS S00.0 0.0 0.0 0.0 0.0 9010 0.6 0.0 52199 W. EN) ST. SEW.PH-11 3,000.0 0.0 0.0 0.0 0.0 31000.0 0.0 0.0' $2211 FLGAMI STRM SWR P II 11600.0 0.0 0.0 0.0 0.0 0.0 11600.0 0.0 52262 KINLOCH STORM SEWERS 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 21000.0 314220 EXP. 3 MOD. OF FR ST 0.0 1,234.0 1,234.0- 0.0 0.0 0.0 0.0 0.9 331143 ANTONIO MOO PK DEVPM 1,658.7 1,970.0 11.3- 0.0 0.0 0.0 0.0 0.0 431310 ORAPELAND PK. XMPROV 250.0 2SO.0 0.0 0.0 0.0 0.0 0.9 6.0 341315 ROT. KG. NG. PK- REM 7S.0 75.0 0.0 0.0 0.0 0.0 0.0 0.0 351163 S. FLAGLER $ART. BE 61000.0 41300.0 11500.0 0.0 0.0 9.0 0.9 9.0 $51273 N. FLAGLER BART. SWR 41680.0 41680.0 0.0 0.0 0.0 0.0 0.0 6.0' 352132 FLAGAMI STORM S. P-I 11600.0 1,600.0 0.0 0.0 0.0 0.0 0.0 9.0 352166 FAIRL ST SEWRS ENGHR 0.0 91.0 91.0- 0.0 0.0 0.0 0.0 0.0 352190 TAMIAMI STORM -PH II 1,800.0 1,600.0 0.0 0.0 0.0 0.0 0.0 0.0' 452256 LEJEUNE STR. S- PH I 600.0 400.0 0.0 200.0 0.0 0.0 0.0 0.01 352257 LJUE STRM SEW. PH-11 2,000.0 167.0 0.0 111$*.* 0.0 0.0 0.0 0a6 416047 MELREESE 9- C- IMPRV 710.0 0.0 0.0 710.0 0.0 0.0 0.0 0.01 TOTALS 26,473.7 16,467.0 163.7 2,743.0 0.0 3,500.0 1,600.0 2r000"..Oil PLANNING DISTRICT F of projects with their accompar- schedules for all neighborhoods and target areas are presented in the following. tables. Planning District F comprises the area of the City north of NM 7th Street to the Airport Expressway and east of I-95 to the western City limits, The Proposed 1989-1995 Capital Improvement Program for District F includes projects in nine functional categories Tthat his amount to a total of $35,466,600. represents an approximate 7.7% share of the proposed capital program. Planning District F is comprised of eleven neighborhoods and the Allapattah Community Development Target Area as shown on the map. The majority of funding for District F is programmed for Storm Sewers Improvements. These projects valued $13,093,600 are programmed for Santa Clara, Civic Center, Jackson, North Grapeland Heights, North and South Sewell Park. Street improvements valued at $10,400,000 are scheduled for the 1989-1995 Capital Improvement Program in most neighborhoods. Parks and Recreation projects are valued at $1,717,000 and are ongoing or scheduled for the six year program in Santa Clara, Comstock and North Sewell Park. _ x s s 7a 'glib 11 6 11, i 1..4 11111 I1. I T -A 1 _ I' 1 F: ,11. f PLANNING DISTRICT F 1989-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY ---------------- - - -- - - ---- - - ----- ----------------------------------------------------------------------------•t-------------------- PROGRAM FUNCTIONAL CATEGORY TOTAL FUNDING PRIOR APPROP APPROP-- 1969-90 ------ ------- 1990-91 FUTURE R{NIDINM----------.---.. 1991-92 1992-98 1990-94 19 -1 ------------- -------------------------------•-----------------------------►------------------------------------------------rr---rr-- to X 1000) SOCIAL AND ECON. ENVXRONM HOUSING 8,610.0 91400.0 210.0 0.0 0.0 0.0 0. Or 0.0 0.9 0.0 0.0 6.0 9.0 ECONOMIC DEVELOPMENT 0.0 --------- 2,800.0 ----------------- 2,800.0- -------- -------- -------- -------- --------- PROGRAM TOTAL 8,610.0 11,200.0 2,S90.0- 0.0 0.0 0.0 0.0, 0.0 I PARKS AND RECREATION PARKS AND RECREATION 1,717.0 --------- 10567.0 --------- 0.0 ---------------- IS0.0 0.0• -------- 0.0 -------- 0.0 -------- i 9.0 -------- .PROGRAM TOTAL 1,717.0 1,567.0 0.0 1S0.0 0.0 6.0 V.0" 0.04 TRANSPORTATION PHYSICAL ENVIRONMENT STREETS PROGRAM TOTAL SANITARY KWERS STORM SEWERS SOLID WASTE PROGRAM TOTAL DISTRICT TOTAL 10,400.0 300.0 2S0.0 2,050.0 1,800.0 10800.0 4,200.0 0.0' -------------------------- ---------------- ---------------- -------- 10,400.0 300.0 2S0.0 2,OS0.0 1,400.0 1,100.0 4,200.0' 0.0 1,283.0 1,283.0 0.0 13,093.6 4,163.0 1,030.6 $63.0 --------- 363.0 --------- 354.6- -------- 14,739.6 5,809.0 676.0 35;44;.6 18,87i:O -------------------------- 0.0 0.0 0..0 1,100.0 11600.0 1480.9 354.6 0.0 0.0 0.0 0.9 -------- - - - - - - - - - - - - - - - - - - - - - - - - 6 -•-..6-.: 10454.6 1,600.0 I,300.9 0.0 0070Q.0 ;,iii:; 8,400.0 -i,800.0 4,200.0 -Sr700.d � # Table 17 PLANNING DISTRICT F 1909-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY --------------------------T..OTA__ .. NEIB#030RFlOOO GfOBRAPNIC PROJECT CODE NAME COVERAGE NUMBER PROJECT TITLE ------ FINDING P--_RIOR,._.._-__/tPP__ APPROP ROP,..... --_-----_..----..... 1909-90 - 1990-91 - ..IK---VU-N..--------------------- -it1TLMM! 1991-92 FtMMQINO 1992-93 _ - .. ,. 1999S-94-1990-95 ----------------------------------------------------------------------------------------M;-- 1000)------------------------_ 431 SANTA CLARA SINGLE 052191 PINEMURST STRM. SEW. 1400.0 0.0 0.0 0.0 0.0 1,500.0 0.0 0•' 322032 ALLPN. SNOPNQ CENTER 0.0 2,400.0 2.000.0- 0.0 0.0 0.0 0.0 O.Op 331039 MOORE PARK REDEVEL 11190.0 11190.0 0.0 0.0 0.9 0.0 0.0 0'.0 MULTI 022040 MERCADO IN ALLAPATAN 0.0 0.0 0.0 0.0 0.9 0.0 041155 E ALLP ST IMP PH In 2,100.0 0.0 0.0 8.0 9.0 0.0 20100.0 0.0 $41126 E. ALLAP ST IMP P II 2,100.0 $0.0 0.0 2,090.0 0.0 0.0 0.0 O.O 333003 WASTE COLL. NW 20 ST 363.0 363.0 SS4.6- 994.6 0.0 0.0 0.0 0.0 632 COMSTOCK SINGLE $31309 ALLP. COMSK. PK. REN 410.0 260.0 0.0 150.0 0.0 0.0 0.0 9.0 MULTI 022046 MERCADO IN ALLAPATAN 0.0 0.0 0.0 0.0 0.01 0.0 0.0 0.0 041145 ALLP. ST. IMP.PN.III 1.000.0 0.0 0.0 0.0 0.0 1.800.0 0.0 $53003 WASTE COLL. NW 20 ST 363.0 363.0 354.6- $94.6 0.0 0.0 0.0 4.10 633 MELROSE SINGLE 3$1276 NW 36 ST SAN SEW IMP 1,263.0 11293.0 0.0 0.0 0.0 0.0 0.0 • MULTI 022043 MERCADO IN ALLAPATAN 0.0 0.0 0.0 0.0 0.0 0.0 0.9 b ` 041145 ALLP. ST. IMP -PH -III 1,600.0 0.0 0.0 0.0 0.0 1►SOQ'.* 0.0 10.pr 353003 WASTE COLL. NW 20 ST 363.0 363.0 354.6- $54.6 0.0 0.0 0.0 0.f9 $54 CURTIS PARK MULTI 041145 ALLP. ST. IMP.PN.III 1,900.0 0.0 0.0 000 0«0 I.SQO«Q y0.0 i0f0 353003 WASTE COLL. NW 20 ST $43.0 343.0 $54.6- 354.6 0.0 0.0 0.0 0`Gr 635 CIVIC CENTER SINGLE 052259 WGNR. CRK. RNV. P-IV 11600.0 0.0 0.0 0.0 1r6Q0«0 00 0'.O b•d t PLANNING DISTRICT F 1969-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY NEIGHBORHOODS ---r---------•-r--r------rrr-r------r------r----r-r--r----r----r--r---r-r--rr-rr--rrr-rrrr-rrrrs-rs---r--r..-r-rr--- ---r--- rrr----rr- NEIGHBORHOOD GEOGRAPHIC PROJECT TOTAL PRIOR APPROP - - - - FUTURE FUNDING - - - - -1994-95 CODE NAME COVERAGE !UMBER PROJECT TITLE FUNDING APPROP 1939-90 1990-91 1991-92 1992-93 1993-94 ----------r------------------------------------------------------------------------------- (• X --- --------------------------------- 1000)- 635 CIVIC CENTER SINGLE 352230 WAGNER C. REN. P III 1,600.0 11800.0 0.0 0.0 0.0 0.9 0.0 0.0, 352272 CIV. CNT. STR. SEWER 760.0 650.0 130.0 0.0 0.0 0.0 0.0 0.0 $52274 HVY EO FAC STM SW RE 1,013.6 0.0 1,013.6 0.0 0.0 0.0 0.0 01.0 MULTI 041155 E ALLP ST IMP PH III 2,100.0 0.0 0.0 0.0 0.0 0.0 21300.0 0.0 341123 E. ALLAP ST IMP P II 2,100.0 $0.0 0.0 2,090.0 0.0 0.0 6.0 0.0 636 JACKSON SINGLE 311003 M. POOL B.S. AD P II MULTI 041155 E ALLP ST IMP PH III 052263 WGNR. CRK. RNV. PH-V 341128 E. ALLAP ST IMP P II 691 N. GRAPELAND HEIGHTS SINGLE 09213E GRAPELAND ST SW PH I 052266 GRAPELAND ST SW P-II $52162 GPLAD. PMPG. STATION MULTI 041156 GRAPELAND ST IMPRVMT 692 WORTH SEWELL PARK SINGLE 331304 SWEL.RVR. SHRL. STA. MULTI 041133 SEWEL PARK ST IMPROV 321024 AFFOR. HSINO PROGRAM 341160 LAWR. WAWY. ST. IMP. 352194 LAR. WTWY. DRG./BKH. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2,100.0 0.0 0.0 0.0 0.0 0.0 2,100.0 0.0 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 2,600-.0 2,100.0 $0.0 0.0 2,050.0 0.0 0.0 0.0 0. 11100.0 0.0 0.0 11100.0 0.0 0.0 .0.0 0.. 11700.0 0.0 0.0 0.0 0.0 0.0 0.0 1,700. 0.0 113.0 113.0- 0.0 0.0 0.0 0.0 0. 2,100.0 0.0 0.0 0.0 0.0 0.0 21100.0 0 117.0 117.0 0.0 6.0 0.0 0.0 .0.0 1!� 1,800.0 .0.0 0.0 0.0 1.1100.0 0.0 0.0w 51610.0 $1400.0 210.0 0.0 0.0 0.0 0.0 500.0 2SO.0 250.0 0.0 0.0 6.0 0.0 0.0 1,500.0 1,300.0 0.0 0.0 6.0 0.0 0.0 0i0 I ';�f 7P PFP h`i i�p,Tililii•nlyd.`S'J, rr r'P :4'ts a,. f" II-IIIIIIIIIII�IIIII�IIIIIIII Will llllllluilllllllunn ...■• t - PLANlIZNA DISTRICT F .. OGRAM ZWWANB*W OIS FUNDING9d8lWARY9-95 �OR PLANNING DISTRZITAL by NEIG ORMOODi' - PROJECT • +n- rr '■i.�li'Ii�.W.WW .,. .-_ .. - -------------------- - �• .....■ .■� �■ . ,.. +---------------------------------------------- =------------------ NEIGHBORHOOD GEOGRAPHIC PROJECT ;- TOTAL PRIOR APPROP - APPROP 19d9-90 -- - - - - - Ft::uR� 1990-9 1941-12 CODE NAME COVERAGE NUMBER PROJECT TITLE FNNp� -- ----- - ------------------------------------------- ------------------------------------------ to x 10001- 694 SOUTH SERELL PARK 0.0 0. SINGLE 852179 ORANGE BM PUMP 8TA 100.0 100.0 0.0 0.0 0.0 0.0 0.0 1.400.0 1 MULTI 041188 BEVEL PARK 8T IMPROV 1•800.0 821024 AFFOR. HSINB PROGRAM 8,610.0 8,400.0 Z10.0 a•b 0'• 341160 LAWIR. WAMY. ST. IMP. 500.0 250.0 250.0 0•t! 0'O dP�Ok ORB./BKH. 1.500.0 1,500.0 0.0 b•b ' • ` � 852194 LAR. MTWY.. 695 S. GRAPELAND HEIGHTS MULTI 0 41156 N2APELAtND 8T IIPRVMT 2.100.0 0.0 0.0 , : s , j�. 3 . � �. _ � 3 �• ~y s'L r �".kr Y .i a i ;'l �. 5 3=' f,Y' , e u .v _ a : 1h " {4' • " t • ,.t,f. a F p4 M • >: r y t • +p "t r L'#§'t.• k , i .. i'S. ;� Yt M,r.. :N i2 { _ ....'vi r Y _.i'. -y .��[,:i r' _ 2i}�^� :.Y'Kf q .g, 4Y 'tWRt• � ;�'..��; Sx` 14 a � � � ;h .t q t_ v. R :,y d ^� «t.C,Sr .). 4 fj, �« f �16�a�. y �-Yr l• n , al LI L. .� '{ •A'-t`,,. t "T, F t w' Fs. 4 # i yJ. �� kyK¢# x p{ �tS � ,�• 7% Table 18 PLANNING DISTRICT F 1989-9S CAPITAL SUMMARY FOR IMPROVEMENT PROGRAM PLANNING DISTRICTS AND TARGET AREAS PROJECT FUNDING ----- ------------------------------------------------------------------------------ -------------- ;;765ECt TOTAL PRIOR APPROP -------------------------- - - - 1990-91 - - FUTURE FUNDING 2491�92---I992�43 - - - - - 1193-94 - - - - 299<-9 TARGET AREA NLS,iIiER PROJECT TITLE FUNDING APPROP 19a9-90 _- - -- ----------------_------ _-___------.-------___.-----------------..._._ AI.LAPATTAH 0.0 0.0 0.0 I,i00.0 0.0 0.0 41145 ALLP. St. II�,PH,III 1.300.0 0.0 O.0 0.0 2,100.0 O.a 4115E E ALLP ST IMP PH III 2,100.0 0.0 0,0 0.0 0.0 1.500.0 0.0 0.0 $2191 pINEHURST STRM. SEW. 11500.0 0.0 0.0 0.0 0.0 0.Q 0.0 . 00 522S9 WGNR. CRK. RNV. P-IV 11600.0 0.0 0.0 0.0 1.iQ0.0 O.Q. 2,QQ. 52263 WGNR. CRK. RNV. PH-V 2,000.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 331d39 MOORE PARK REDEVEL I,190.0 1,190.0 0.0 0.0 0.0 0.0 0.0 0.0 331309 ALLP. COMSK. PK. PEN 410.0 260.0 0.0 ISO-0 0.0 o.o 0.0 o.Q a-o 341126 E. ALLAP ST IMP P II 2,100.0 $0.0 a.o 2,a5o.o Q-a 0.0 0.0 351276 NW 36 St SAN SEW IMP 1,233.0 1,263.a Q«a Q.d 0«0 0.0 0.0 0.0 352230 WAGNER C. REM. P III I,3a0,0 1.ioa.0 0.0 0.0 0.0 0.0 0.0 0.0 352272 CZV. CNT. STR. SEWER 7a0.0 6SO.0 130.0 0.0 0.0 0.0 Q.Q 0.0 952274 HVY EG FAC STU SW RE 1,013.6 0.0 11013.6 0.0 0.0 0.0 0.0` 3S3003 WASTE COLL. NW 20 ST 363.0 363.0 SS4.6- . SS46 0.0 0.0 0.0 9.0 353009 SOLID WASTE EXP FCLT 2S.0 2S.0 0.0 0.0 o«o 3,600.0 3,800.0 20100.0 21,r00+0.0 . TOTALS 17,964.6 S,621.0 769.0 2,SS4.6 NON -CD TARGET AREA a.o o.o I.sao.o o.Q 0.0 00� 41133 SEWEL PARK ST IMPROV l,eaa.o o.o 0.0 0.0 2,100.0 0`a1� `1. 41156 GRAPELAND ST IMPRVMT 2,100.0 0.0 0.0 0.0 0.0 0.0 1�7�* 52266 GRAPELAND ST SW P-II 11700.0 0.0 0.0 0.0 0.0 o.o a.Q 0.0 313019 FIRE STAT. 03 GARAGE 3,113.3 3.173.3 0.0 0.0 0.0 0.0 0.0 0.0 321024 AFFOR- HSING PROGRAM $1610.0 a0400.0 210.0 0.0 0.0 0.0 331304 SWEL.RVR. SHRL. STA. 117.0 117.0 0.0 0.0 0.0 0.0' 0.0 0.0 0.0 341160 LAWR. WAWY. ST. IMP- 500.0 2SO.Q 250.0 0«0 0.0 0.0 0.0 0.0 352179 ORANGE BOWL PUMP STA 100.0 100.0 0.0 O.0 0•0 0«0' Q,Q. 0.9. 352194 LAR. 11TIflf. DRG.15KH. 1.500.0 10500.0 0.0 O,o 1 i0ti. i! 0.0 2,100.0 1.700F'. TOTALS 19,600.8 13.540.3t 460.0 0.0 • 819`Wf ; WIN 1111111/ 11 0 1 I 1 P i W 1 a I W -V W -I W -1I �. —1 W, '-11 lit llMF PLANNING DISTRICT G Summarx Virginia Keyy, the 1,500 acre barrier . island off the Rickenbacker Causeway in Biscayne Bay, defines Planning District G. The smallest � of the planning districts in land area, District G is comprised of -one neighborhood - Virginian' , Key Two projects valued at $1,3030900 are ongoing or programmed for this district in the 1989-1995 Capital -Improvement Program. This represents 0.3% of the proposed capital program. p� f The ongoing project is Phase I o the Virginia' , • ,,{ Key Park Development Project, and the Marine Stadium Concrete Pillar Repair is a project'tolip rt start during FY'90. a: The following tables include a funding summa b functional categoryfor District G as y well as a project listing with the proposed z r"t funding schedule. �. s _ b i 4 C 1 7 31ITV. : rapt �',' .... .,.t-`" .'1...., .✓...: ....., r! .,:' .,. ;. .: :c.r t ::,.• �,:.. k ..:: 6� ... ,_. _ �. 1 ,ni i, t4' 3'h"ii4-. f epl "."; ,e;, r Y.`.. `lsa,�f4'-t°+'' fc.: rt::kaYi=. ,. ..- ,...fr., r..:. ,.e ...: ::r _...... _:... 7,.��'Yti@{ic. .1`�fR...._... ... .., .,.tr.:.. ,-. _.. :,.1 .. _ ✓.. .... _. .. - .. s'b= .... _ .. .. ,...:+.Jii�'�,.�«u��..!a-�:Y?�:ah.,. .'a i :.. t.e ...:.. ..-..........:. �L� ...- ,..J. a. ..-�-..�.z.+c�c+sn rs.�ac< vrs,:w-x...n-:-,_s�..re.+Lv.•~-m1�-..,.,n.....ww.r•+.......... _ _ _ — _ _........�..........�..._......h.. .�......r...�.. .. j MAP 10 PLANNING DISTRICT G CAPITAL IMPROVEMENT PROGRAM h m c x RICKENBACKER CSWY VIRGINIA KEY • Fi I 'y Y�� *. 891 cy �I s- p k 1 v.. i X""A'u. a ya4• t• 'w — ]INS 1111111 711111GIB 11 6 '1 If '1 A 7 L19 -11 Is 'III U 11 0 111 if . ..v 1 6N 0 —+al!... 11 wr_ —JilRlipl�"._' 3 f PLANN'j'��jING tfSMCT 1969-95 CAPITAL IMPROVEMENT PROGRAM' PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONML CATEGORY r.rrrrraGrs�rrr�itrY.Mr�r W cif _ _ _ rrr-rwr rrrrrrrr rrrrrrrrrrari ----- ----- -----------------------------------------TOTAL PRIOR APPROP ----- --- — fululm r �..r----sr.r+.� FUNCTIONAL CATEGORY FUNDING - APPROP 19A9_90----1990_91---1!!1_!YM ILL ----� ` PROGRAM _ rrrrrrrrrrrr,rrr..�irrrrrrri.iri; -------------------rrr-------------------------------------------------------- (4 X 1000) PARKS AND RECREATION PUBLIC FACILITIES PARKS AND RECREATION PROGRAM TOTAL STADIUMS PROGRAM TOTAL DISTRICT TOTAL 949.9 749.9 0.0 200.0 0.0 0.0 -------------------------------r-- ---- -- -r—rrrrr rrrisrrr. rrrr.�+iWIM.. 949.9 749.9 0.0 200.0 0.0 0#9 0a0 -.0'0 354.0 3S4.0 rr—r 0.0 0.0 0.0 6--- r—rrrrrr rrrrrrrr rrwrw.iur: rrr...rrrr rrrrrr.rr. ------------------ 354.0 394.0 0.0 0.0 --------- rr—rr--r rrrrrrr— rw rrrrrr •rrrirrr' rr�rrr.Yr �• rr�r.�rs+ 0•R —----�--- 1.303.9 1.103.9 0.0 200.0 0.0 r-rrrrrr 0«0 riwr.►rrr rrrrrrrr rrrrrr.r.n ... .. --------r ------r r--rrrr+ wrrrrrrr r 1 j•iP f e - � m�'1 ��}; :tii'Ni 1f�[yiRWRR,{�..%rt�+'• f"i.�!�,,�y 3!i wi �� �-r"� � .�... �y¢� ,4,� r,�yfi�.e. 4Y.{, .. 1 4. .v� )) }ry��v C;�i .�Yw ��d q�� . t +W d^'w'+- +✓r a+'i '�""+9 vJ +�ly�F'.+- M♦....'=4 i. -., h.a�rh.Nrt wx� .. .. .r t ..�� vRkaW9+t :, •-�: ul As, 4r v5".>. .,y6 _ r�Yi+!�t+af �I%1,iYY,. Y ' :.. . k� : :.: �'4.:11f i!Y r';.. s ��M1ib" 11 •x t5:'M1,'y.Efs � �+f-dam, r 1'' }y �.. ' S '"} rSR ..j�l'.# :�.', `�e' ' `•.� •�q., _ ?X,7E'. 1 . .�3^�- t uy'�/,� g�y�t ,. '.'-.��1�. �-Mti"� '..'4T4a.�i1���5D lA±�:'��iF "'P•. �:�:�i W� Rt'7.i�'��..� Yw4'4��X'�i�xQ:SiR � 'R�t'e:�$ d31Vw' M' «rq Y j!?� "F ,14t . • .". •. ��:" � � 4":,: '•'.k'i!1 !A' J. stl'"U•�s FF.. j+:w.r. - f YMv:?.h�2�r✓{aF��!hiM?tR-`1#Y+'t1 �6.JR^.}&h;&'X.S t�nY!4'rM'HWAIFYIIW �&MnT i9r #,"� A "tWMY� 'M 413, M .4rw •...+� .,,.uM :. 2i w:x;.t �+A :e 1+. a».io-.:w WF $'iµ mx:n t4c ... s',N .H. dp ^P:Fr�-h ,Y riF ii :�. i�a� F.�fi5rWf+1�':�,8¢',q@:Tv..,AxT tii#�?{�'�:."�dib�Y hl nJ'!K#taro- >.;RlkigY'YM�Vj y�-:t;1�C' �-�F •-'?�' §+�}'{ Y�. spy '�..+ wyy ,.}^�+q�s:la��yy��4��%znnR.tt: i'.'�ry��.:1�'Yn ow JA - ��` i;:�.Y '6' SSY�•°G.��+�'N ibRl �a4 YF #•$, � �`_ ). `-�''S iedx . � it "`�� lib � �'. �Y � {l�,/ Y''i §b MA i9iI�jlVlt •Ps 1 { �'. Table 20 PLANNING DISTRICT 0" 1969-95 CAPITAL =WMMDWW� rump N0 WAMARY FOR PLAWUM NEZr�ORNb�! s, PROJECT ------------------iN.�rr.•�r�.1•�•I: 1 NNNrir•U...Y•r,•r•irrr•ri••••••i••r •r•••i i••••r-rr-•r•---TOTAL---------- • PRIOR APPf10P PRIOR r. • r • r • • ►Y�Yw=�� aEOaRAPNIC PROJECT FtNAIIp 1!P!-!O PROJECT TITLE-----------------------------------. 1!l0-11 . . : '_ TER_ ---r•r•rrrrrrr•r•r••rrrrrrrrrrrr+� _.---------- - - ... ir•rrrr•-rsYar i.►+ri-••ir�.�:. ; _ :. _. ft0 E• x 1 y Sl1 VIR92NIA KEY °, Z0o'o a«� 0«0� f«5 SIN9LE 331044 V. KEY PARK oEv PH I !4!.9 74l•! 0.0 Ir.IM 354.0 •54.0 0.o 0.S a.a 40Z002 MRNE MOM RENOtl *e , �y f j � , - n F , 'f Y L � Q• tl 5 X "� - - %.�Ri� t flf# y4A�3* NU,""+ u '+K#-.1`t. W'�My','. .,. - F r F'x ♦ -v i E ` X rrM �� aeq+i r j yryd It Streets projects that are scheduled throughout the City are valued at $7,W,QW,. They include rebuilding local street'si piii»q improvements, and the beautification of streets.. Solid waste projects that are scheduled throughout the City are valued at $3;Z46r700-. They include the acquisition of eoltection, sweeping equipment, and the Litter Containers Replacement program. The following tables present the 19894995 Capital Improvement Program by functional category and a detailed listing of all citywide projects including the proposed funding schedules. i CITYWIDE PROJECTS SuMary The 1989-1995 Capital Improvement Program projects found in this Citywide portion include those projects that cannot be attributed to a specific location. These capital projects benefit all of the City of Miami's 63 neighborhoods and are listed separately from the projects presented by district, neighborhood, and target area. Citywide projects are classified within twelve functional categories and are valued at $182,008,300, approximately 39.3% of the capital program. General Government projects valued at $68,691.200. Major projects in this category include the Federal Law Enforcement Building, the City Administration Building - Phase II, the Upgrade of the Mainframe Computer and Peripherals and the Relocation of the Municipal Shop Fire Rescue projects that are to be implemented citywide are valued at $16,650,000 Citywide Police projects total $6,336,300. These projects include improvement of the police computer system, operating facilities, and the acquisition of special equipment. Storm Sewer projects, valued at $8,650,000 are scheduled citywide. Sanitary Sewer projects scheduled citywide are valued at $2,905,000 and include ,codifications to the existing sewer system where required. Table 22 CITYWIDE 1989-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY ------------------------------------------------------------- --------- TOTAL ---------- ------------------- PRIOR APPROP--------------- -- FUTURE FUNDING ------- --------------- --- PROGRAM FUNCTIONAL CATEGORY FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1993-94 1994-9S ------------------------------------------------------------------------------------------------------------------------------- (• X 1000) ---- GENERAL GOVERNMENT GENERAL GOVERNMENT 68,691.2 --------- 40,216.4 479.4 ------------------------- 4,577.9 12,758.5 7,568.5 ------------------------ 1,023.5 2,047.8 -------- PROGRAM TOTAL 68,691.2 40,216.4 479.4 4,577.9 12,756.5 7,566.5 1.023.5 2,047.0 PUBLIC SAFETY POLICE 5,336.3 5,062.6 2S3.7 0.0 0.0 0.0 0.0 0.0 FIRE RESCUE 16,650.0 --------- 14,178.4 --------- 806.2 -------- 832.0 -------- $31.4 -------- 0.0 -------- 0.0 -----:---------- 0.0 PROGRAM TOTAL 21.986.3 19,261.0 11061.9 832.0 831.4 0.0 0.0 0.0 SOCIAL AND ECON. ENVIRONM HOUSING 8,306.8 --------- 39,497.8 --------- 31,191.0- -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- PROGRAM TOTAL 8,306.8 39,497.8 31,191.0- 0.0 0.0 0.01 0.0 0.0 PARKS AND RECREATION PARKS AND RECREATION 23,501.8 --------- 16,732.1 --------- 31059.7 -------- 3,710.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- PROGRAM TOTAL 23,501.E 16,732.1 3,059.7 3.710.0 0.0 0.0 0.0 0..0' PUBLIC FACILITIES STADIUMS 16,748.1 2,748.1 14,000.0 0.0 0.0 0.0 0.0 0.0' AUDITORIUMS 7,616.0 7,616.0 0.0 0.0 0.0 0.0 0.0 0.9 MARINAS 12,862.0 --------- 12,862.0 --------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- PROGRAM TOTAL 37,226.1 23,226.1 14,000.0 0.0 0.0 0.0 0.0 0.0 TRANSPORTATION STREETS 7,494.4 --------- 1,142.6 --------- 1,351.8 -------- 11000.0 -------- 11000.0 -------- 1.000.0 -------- 1,000.0 -------- 1,000.0 ------� PROGRAM TOTAL 7,494.4 1,142.6 1,351.8 1,000.0 1,000.0 1,000.0 1.000.0 110GM4 PHYSICAL ENVIRONMENT SANITARY SEWERS 2,905.0 2,605.0 450.0- 150.0 150.0 150.0 150.0 150 ,>, STORM SEWERS 8,650.0 2.930.0 720.0 1,000.0 1,000.0 1,000.0 1.000.0 11000.0" SOLID WASTE 3,246.7 --------- 1,879.3 --------- 606.8 -------- 748.8 -------- 11.8 -------- 0.0 -------- 0.0 -------- 0.0 -------- PROGRAM TOTAL 14,601.7 7,414.3 876.8 1,898.8 11161-f 1.110.0 1.150.0 1.150.0 --------- --- DISTRICT TOTAL 182,009.3 --------- 147,490.3 -------- 10,361.4- ---- 12.018.7 1S.}51.} -9.}88.5 .....- -8s.1}S.'3 ' 40 M M 1111 I II �I III II I L � III MIL .. _ L _ `-`-".`..._h I•---i. ,........,-h,,. _ Table 22 CITYWIDE 1989-95 CAPITAL IMPROVEMENT PROGRAM PLANNING DISTRICT FUNDING SUMMARY BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY s ------------------------------------------------------------------------------------------------------------------------------------ TOTAL PRIOR APPROP ---- - - --- -- FUTURE FUNDING - PROGRAM FUNCTIONAL CATEGORY FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1993-94 1994-93 ------------------------------------------------------------------------------------------------------------------------------- (9 X 1000) ---- GENERAL GOVERNMENT GENERAL GOVERNMENT 68,691.2 --------- 40,216.4 --------- 479.4 -------- 4,577.9 -------- 12,7S8.S -------- 7,S88.S ---------------- lo023.3 2,047.0 -------- PROGRAM TOTAL 68,691.2 40,216.4 479.4 4,577.9 12,756.5 7,586.5 1.023.5 2,047.0 PUBLIC SAFETY POLICE 5,336.3 5,082.6 2S3.7 0.0 0.0 0.0 0.0 9.0 FIRE RESCUE 16,650.0 --------- 14,178.4 --------- $08.2 -------- 832.0 -------- 831.4 -------- 0.0 -------------:-- 0.0 0.0 -------- PROGRAM TOTAL 21,986.3 19,261.0 1,061.9 832.0 $31.4 0.0 0.0 0.0 SOCIAL AND ECON. ENVIRDNM HOUSING PARKS AND RECREATION PUBLIC FACILITIES TRANSPORTATION PHYSICAL ENVIRONMENT PROGRAM TOTAL PARKS AND RECREATION PROGRAM TOTAL STADIUMS AUDITORIUMS MARINAS PROGRAM TOTAL STREETS PROGRAM TOTAL SANITARY SEWERS STORM SEWERS SOLID WASTE PROGRAM TOTAL DISTRICT TOTAL 8,306.8 --------- 39,497.8 --------- 31,191.0- -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 8,306.8 39,497.6 31,191.0- 0.0 0.0 0.0 0.0 0.0 23,501.8 --------- 16,732.1 --------- 3,059.7 -------- 3,710.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 23,501.8 16,732.1 3,059.7 3,710.0 0.0 0.0 0.0 0.0._, 16,748.1 2,748.1 14,000.0 0.0 0.0 0.0 0.0 0.0 7,616.0 7,616.0 0.0 0.0 0.0 0.0 0.0 0.0 12,862.0 --------- 12,862.0 --------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -------- 0.0 -----'�•-' 37,226.1 23,226.1 14,000.0 0.0 0.0 0.0 0.0 0.0 7,494.4 1,142.6 1,351.8 11000.0 11000.0 1,000.0 1,000.0 1,004.0 --------- --------- -------- -------- -------- -------- -------- ------r_s 7,494.4 1,142.6 1,351.8 11000.0 11000.0 1,000.0 1,000.0 1.000*0'' 2,905.0 2,605.0 450.0- 150.0 150.0 130.0 130.0 150�0, 8,650.0 2,930.0 720.0 1.000.0 1.000.0 1,000.0 1,000.0 1,000.1- 3,246.7 --------- 1,879.3 --------- 606.8 -------- 748.6 -------- 11.0 -------- 0.0 ----- --- *.0 -------- 0.0 -------- 14,801.7 7,414.3 $76.8 1,898.8 11161.5 ills*.* Ills&.* 11150.0 --------- 182.008.3 --------- -------- 147,490.3 --------- -------- 10,361.4- -------- -------- 12,OI8.7 -------- - - 1S,Ts1�.7 -------- 9,736 s -r------ ---r -3,17S.s -------- rr-..- -4,19i.0 -------- 1NI1116 1� I[� 7 I� I Nl �I 111 I� �l 116 -. Table 23 CITYWIDE 1969-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY NEIGHBORHOODS -- - - - - -- --------------------- -------------------------------------------------------------------------- ---- -- ------ -- - ---- -- - --- --- NEIGiBZORHOOO GEOGRAPHIC PROJECT +' TOTAL PRIOR APPROP - - - - FUTURC FUNDINM - CODE NAME COVERAGE NUMBER PROJECT TITLE FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1993-94 1994-99 ---------------------------------------------------------------------------------------------------------------------------------- 900 CITYWIDE to x 1000) SINGLE 013233 FR APR REP/MOO 91-92 1.313.4 0.0 041170 CYWO. ST. IMV. 1989- 2,500.0 0.0 041171 REB. SDW. 8 ST.91-95 2,500.0 0.0 051284 CTWO. SANT. SW 90-94 750.0 0.0 052231 LC. OR. PRJ. FY89 4,000.0 0.0 052253 PUMP STATH - FY91-93 11000.0 0.0 $11001 CITY ADM. SLOG PH II 19,578.0 29.0 311012 TREASURY MAGMT. FUR. 100.0 100.0 $11014 FED. LAW EHFRC BLDG 29,676.0 30,000.0 311015 UPGRO MHFRM COMP/PER 7.638.0 0.0 $11017 CLK OFC LEKTVR REPLC S3.4 0.0 311015 REL. MUNICIPAL SHOP 2,500.0 0.0 311019 P.W. COMPUTER SYST. 250.0 0.0 312005 PUCH. OF POL. HELCOP 0.0 0.0 312006 POLICE SUP. SER. FA. 50.0 50.0 312010 POL. MOB. DOT. TERM. 1,225.9 1,405.9 312012 POLICE PRO. UNIT REN 118.0 493.0 312014 POLC. MICROCOMP 8 IO 1,411.7 1,125.0 312015 POL. FAC. EXP./REMD. 799.2 1,085.0 312018 PLC EQUIP. FY-89, 90 1,249.7 840.7 312019 MPO FIREARMS RANGE 83.0 83.0 312020 911 EMER SKUP SITE 398.6 0.0 0.0 482.0 831.4 0.0 500.0 500.0 0.0 $00.0 $00.0 0.0 150.0 150.0 0.0 $00.0 800.0 0.0 200.0 200.0 0.0 1,2SO.0 11,73S.0 0.0 0.0 0.0 324.0- 0.0 0.0 1,192.6 1,327.9 1,023.5 $3.4 0.0 0.0 500.0 2,000.0 0.0 2SO.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 180.0- 0.0 0.0 375.0- 0.0 0.0 286.7 0.0 0.0 265.6- 0.0 0.0 409.0 0.0 0.0 0.0 0.0 0.0 396.8 0.0 0.0 0.0 0.0 0.0 500.0 500.0 500.0 see-* so*.* 900.a 190.0 150.0 1SO.0' 400.0 600.a so0.a 200.0 200.0 200.01 61865.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3,023.S 1,023.5 2,041.6' •0.0 0.0 0.0 0.0 0.160 0.0 0.0 li-e 0.0 0.0+ 0.0 a 0 t►' 0.0 0.0 0.a 0.0 0.0" ; . 0.OR 0.OR oil0_' .vo 6 a� 0 ; *mW • � A i CITYWIDE 1969-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY NEIGHBORHOODS ------------,----------------------- ------- - - r - - - - ---------------- ------ -- NEIGHBORHOOD GEOGRAPHIC PROJECT TOTAL PRIOR -----------------------------------rrr...�rw...rrr.r.rrr rMrr.r.W Ma►� APPROP - - - FUTURE FiNDZIM - - - - - - - 000E NAME COVERAGE NUMBER PROJECT TITLE FUNDING APPROP 1969-90 1990-91 1991-92 19O -98 1998r►94 1904691 ------------------------------------------------------------------------r-------------- ------------r----------------- -- to X 1000) 900 CITYWIDE SINGLE $13016 FIRE TRAIN. FACILITY 3,475.6 8,47S.6 0.0 0.0 0.0 0.0 0.0 0.0 $13016 REN. FIRE ST. 8 DRLL 1,912.3 997.5 914.6 0.0 0.0 0.0 0.0 0.0 313019 FIRE $TAT. 83 GARAGE 3,173.3 8,173.3 0.0 0.0 0.0 0.0 0.01 0.0 $13215 ADV. FIRE PROS. EYES 0.0 20.0 20.0- 0.0 0.0 0.0 0.0 0.0 313222 FIRE APP. RPLM. MOD. 105.0 105.0 0.0 0.0 0.0 0.0 0.0 0.0 $13223 FIRE RES. APP. FY'66 1,200.0 1,200.0 0.0 0.0 0.0 0.0 0.0 0.0 $13224 FIRE APP. RFS -FY'89 467.0 487.0 0.0 0.0 0.0 0.0 0.0 D.C. 313229 NEW FIRE APP. 89 2*165.0 4,205.0 2,040.0- 0.0 0.0 0.0 0.0 0.0 $13230 FIRE R. EQUIP. FY'89 115.0 115.0 0.0 0.0 0.0 0.0 0.9 0.0 313231 MIAMI FIRE MUSEUM 380.0 0.0 30.0 330.0 0.0 0.0 0.6 0.0 313232 FIRE DEPT. COMP. ENH 690.7 400.0 280.7 0.0 0.0 0.0 0.0 0.0 313234 FR RES APP. ACO FY90 021.0 0.0 $21.0 0.0 0.0 0.0 0.0 0'.09"' 313235 FR APP REPL/MOD FY90 535.0 0.0 $35.0 0.0 0.0 0.0 0.0 0.0 313236 FIRE DEPT MASTER PLN 75.0 0.0 75.0 0.0 0.0 0.0 0.0 0.6 313237 FR RE SP SUP EO FY90 211.7 0.0 211.7 0.0 0.0 0.0 0.4 art* 314232 GEOGR. INFORM. SYST. 610.0 610.0 0.0 0.0 0.0 0.01 0.0 0.0 $15231 ACO. COMP. 8 PERIPH. 8,295.6 9,478.4 1,192.6- 0.0 0.0 6.0 0.0 0.0 321026 HOUSG LO. ACO. PROD 1,000.0 10000.0 0.0 0.0 0.0 0.0 0.0 0.0 321027 AF. RT. HOU. D. PRO. 0.0 32,500.0 32,500.0- 0.0 0.0 0.0 .0.0 :9.0 321034 SCATT. STE. AFF. HSG 4,506.8 31997.5 509.0 0.0 0.0 0.0 0.0 .QF __. 321035 NOUSG. PROD. ADMINS.. 1,300.0 500.0 800.0 0.0 0.0 0.0 0►0 0.0 321037 SECOND MRTG LOAN PL 11500.0 11500.0 0.0 0.0 0.0 0.0 0.0 0r.0 l a i i � Ltd=»�ssr,��ara�rar� CITYWIDE 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUMING SUMMARY FOR PLANNING DISTRICTS BY NEIGHBORHOODS ------------------------------------------------------^----------------------------------------------------------------------------- NEIGHBORHOOD GEOGRAPHIC PROJECT TOTAL PRIOR APPROP - - FUTURE FUNOINO CODE NAME COVERAGE NUMBER PROJECT TITLE FUNDING APPROP 1969-90 1990-91 1991-92 1992-93 1993-94 1994-9% ----------- ------------------------------------------------------------------------------------------------------------------------- 1000) 900 CITYWIDE SINGLE 331099 SWMNG. POOL REN. 331227 BAYFRONT PARK PH. I 331223 BAYFT. P. RDV. AR. B 331229 BAYFT. P. RDV. AR. A 331230 BFRT PK RDV LGHT TOW 331231 BYFT. PK. N. END P I 331232 BAYFT. PARK REDEVPMT 331303 NEIGH. PARK RENOVAT. $31307 CITYWO. BALLF. RENV. 331308 CYWO. VITA COURS REN 331318 PARK COURT R£NOVAT. 331336 CITY IRRIGAT. PROJTS 331339 CITY PARK EQUIP. REP 331353 CTY OF MIA YOUTH CTR 332232 ORNG BWL STA. PRO-CL 341159 REB SOWKS 8 ST FY'88 34117S CTWO. ST. IMPRV. 89 351171 CTYW SANT LATER MOOF 331180 CW. SN. SEW. LT. MD. 351274 CTWO. SAN. SEW. FY67 10890.0 11890.0 1,086.5 10086.3 938.9 938.9 300.0 300.0 1,630.2 1,830.2 6,150.7 6,150.7 136.7 127.8 828.9 $78.0 200.0 200.0 150.0 150.0 500.0 500.0 400.0 400.0 180.0 180.0 6,100.0 0.0 $40.0 540.0 1,26S.6 s1s.6 1,228.8 627.0 0.0 7s.0 0.0 25.0 150.0 150.0 351275 CITYWO SANT. REP. 87 1,655.0 1,6Ss.0 SS1286 CTW. SAN. SEW. FY'88 0.0 350.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.9 0.0 49.2- 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 3,100.0 3,000.0 0.0 0.0 750.0 0.0 601.9 0.0 75.0- 0.0 25.0- 0.0 0.0 4.0 0.0 0.0 as0.0- 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 9.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0�0 Lft&zlzl'� . 0.0 0.0 0.0 0.0 0.0 0.0 9.0 0.0 0.0 0.0' 8.6 0.0 0.0 0.0 9.0 0.0 0 0' 0.0 0.0 0.0 0.0 0.0 ... .j'..u:..19•I�L 14lSJ YIE...:Y:...+._...�....•�..:...a..... _....... ........ �....... .._............... .�...a..ram,...n..._...•+w.rr..unl..-- �.i- :. .. 'C} CITYWIDE . 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS BY NEXOMORHOODS ------------- -..-•-r�---�..�Ip-�.«.-..r�r�rr�.Ys.-ram NEIGHBORHOOD GEOGRAPHIC PROJECT CODE NAME COVERAGE NUMBER PROJECT TITLE TOTAL FUNDING PRIOR APPROP 1989-90 1990-91 1991-92 199?-IBI 1993.6.94 ---- -- -- -- - -- -------- - - ------------- ---------- --�------ ------------.�ai��r.�rri.r -- --- --- - ----- - - - - -- -- - - - -- - - - - - - -- - - - - - - - - -- - - ---- --- (• x 1000) 900 CITYWIDE SINGLE 351237 CTWD. SANT. SEW. EXT 350.0 350.0 0.0 0.0 0.0 0.0 0.0 Q.0 352250 STORM DRG. MASTER PL 450.0 450.0 0.0 0.0 0.0 0.0 Ot0 0•( 352251 DRAIN. PROD. FY87-88 1,200.0 lv200.O 0.0 0.0 0.0 0.0 0«0 0.l 852254 PUMP ST. RENOV. FY88 0.0 550.0 550.0- 0.0 0.0 0.0, 9.0 0.4 352267 CTW. DRNG PRJ 89-90 2,000.0 730.0 1,270.0 0.0 0.0 0.0 0.0.E 353001 SOLID W. EQUIP ACQ. 752.0 752.0 0.0 0.0 0.0 0.0 0.0 353002 IHCNRT. PRO. FEASIBL 0.0 60.0 60.0- 0.0 0.0 0.0 353005 ST 6 SIDEWALK EQUIP. 714.5 714.5 0.0 0.0 0.0 0.0 0.0 0.4 353006 SLO. WST. COM. EQPM. 0.0 32.0 32.0- 0.0 0.0 0.0 0.0 0«E 353007 LTTR. CONT. RPLM. PR 281.2 245.8 11.8 11.6 11.8 0.0 0.6 6.4 353008 REN. INCINERT PROPTY 0.0 50.0 50.0- 0.0 0.0 0.0 0.0 (�«� 353009 SOLID WASTE EXP FCLT 25.0 25.0 0.0 0.0 0.0 0.0 0.0 353010 SLD W COL EQUIPMENT 1,474.0 0.0 737.0 737.0 0.0 0.0 0.0 404231 ORNG BWL ADDIT PRESS 978.1 978.1 0.0 0.0 0.0 0.0 0.0 01 404237 ORANGE B. MOD. -PH•I 1,230.0 1,230.0 0.0 0.0 0.0 0.0 0.0� 404238 O. BOWL MODERN. P II 14,000.0 0.0 14,000.0 0.0 0.0 0.0 414005 ONN. KEY MAR. RMEX 12,862.0 12,862.0 0.0 0.0 0.0 0.0 415002 C.O. EXH. CEN. RENV- 7,500.0 7,500.0 0.0 0.0 0.0 0.0 0.0 0 � 416047 MELREESE G. C. IMPRV 710.0 0.0 0.0 710.0 0.0 0.0 «0«0 0-c 420012 MIA. CONV. CEN. FY89 116.0 116.0 0.0 0.0 0.0 0.0 0. 0� MULTI 331349 NDLY PK PL REPLC 2,100.0 2,100.0 0.0 0.0 0.0 0.0> 17, Table 24 CITYWIDE ,4 1989-9S CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AND TARGET AREAS ------------------------------------------------------------------------------------------------------------------------------------ PROJECT TOTAL PRIOR APPROP - - - - - - FUTURE FUNDING TARGET AREA NUMBER PROJECT TITLE FUNDING APPROP 1989-90 1990-91 1991-92 1992-93 1993-94 1994-9'3 ---------------------------------------------------------------------------------------- - ---------------------------------- I (• x 1000) CITYWIDE 13233 FR APR REP/MOO 91-92 11313.4 0.0 0.0 482.0 831.4 0.0 0.9 6.0 41170 CYWO. ST. IMV. 1989- 2,500.0 0.0 0.0 500.0 300.0 300.0 500.0 $00.0 41171 RED. SOW. 6 ST.91-9S 2,500.0 0.0 0.0 500.0 500.0 300.0 500.0 500.0 51284 CTWD. SANT. SW 90-94 750.0 0.0 0.0 IS0.0 150.0 190.0 130.0 190.0 52231 LC. DR. PRJ. FY09 4,000.0 0.0 0.0 800.0 800.0 000.0 000.0 800.0 52253 PUMP STATN - FY91-95 1,000.0 0.0 0.0 200.0 200.0 200.0 200.0 200.0 312020 911 EWER BKUP SITE 396.8 0.0 398.0 0.0 0.0 0.0 0.0 0.0 313018 OEM. FIRE ST. 6 DOLL 1,912.3 997.S 914.9 0.0 0.0 0.0 0.0 0.0 313222 FIRE APP. RPLM. MOD. 105.0 105.0 0.0 0.0 0.0 0.0 0.0 0.0 319223 FIRE RES. APP. FY'89 1,200.0 1,200.0 0.0 0.0 0.0 0.0 0.0 0.0 A13224 FIRE APP. RFD -FY'89 487.0 497.0 0.0 0.0 0.0 0.0 0.0 0..0 313229 NEW FIRE APP.'89 2,165.0 4,205.0 2.040.0- 0.0 0.0 0.0 0.0 0.0 313230 FIRE R. EQUIP. FY'89 115.0 115.0 0.0 0.0 0.0 0.0 0.0 .0.0 313234 FR RES APP. ACO FY90 $21.0 0.0 $21.0 0.0 0.0 0.0 0..0 0.0 313235 FR APP REPL/MOD FY90 535.0 0.0 535.0 0.0 0.0 0.0 0.0 6.0' 313236 FIRE DEPT MASTER PLN 75.0 0.0 75.0 0.0 0.0 0.0 0.0 O.0 313237 FR RE SP SUP EO FY90 211.7 0.0 211.7 0.0 9.0 0.0 0.0 d•Di 321026 HOUSG LO. ACO. PROD 1,000.0 11000.0 0.0 0.0 0.0 0.0 0.0 .0.0 321034 SCATT. STE. AFF. HSG' 4,506.8 3,997.8 509.0 0.0 0.0 0.0 0.0 0.0 32.1035 HOUSG. PROD. ADMINS. 1,300.0 500.0 800.0 0.0 0.0 0.0 0.0 0.0 321037 SECOND MRTG LOAN PL 1,500.0 1,500.0 0.0 0.0 0.0 0.0 0.0 0.0 331099 SWMNG. POOL REN. 1,890.0 1,090.0 0.0 0.0 0.0 0f.0 0.0 .. Ari it '.. -,-Yrr . ,�•irw'r�ro fi' ^o. ?,� p CITYWIDE _ j `.. 1989-95 CAPITAL IMPROVEMENT PROGRAM PROJECT FUNDING SUMMARY FOR PLANNING DISTRICTS AND TARGET AREAS y i -------------------r- ---------------------------------TOTAL PROJECT ----PRIO------APPROP TOTAL FUNDING PRIOR APPROP ---------- 1969-90 ------ 1990-91 -F PJK 1991-92 ------- - - F1 ..., - -& .. - 1992-9S TARGET AREA NUMBER PROJECT TITLE ----------------------------r----r------r----r---r----------rrarrr-sr+. -------------------------------------------------------------- 10 X 1000) CITYWIDE 331303 NEIGH. PARK RENOVAT. 826.8 $76.0 49.2- 0.0 0.0 0.0 331307 CITYWO. SALLF. RENV. 200.0 200.0 0:0 0.0 0.0 0.& O.0 0.6 831300 CYWD. VITA COURS REM 150.0 150.0 0.0 0.0 0.0 0.0' 0.0. 0.11 331318 PARK COURT RENOVAT. 500.0 500.0 0.0 0.0 0.0 0.0 0.0 0.0 331338 CITY IRRIGAT. PROJTS 400.0 400.0 0.0 0.0 0.O 0.0 0.0 O.0 331339 CITY PARK EQUIP. REP 180.0 180.0 0.0 0.0 0.0 0.0 0.0 0.0 341159 RES SDWKS 8 ST FY'88 1,265.6 515.6 750.0 0.0 0.0 0.0 0.0 0r.0 341175 CTWD. ST. IMPRV. 89 1,228.6 627.0 601.6 0.9 0.0 0.0 0`.0' O«0 351274 CTWO. SAN. SEW. FY67 150.0 150.0 0.0 0.0 0.0 0.0 0.0 0.0 351275 CITYWD SANT. REP. 87 1,655.0 11655.0 0.0 0.0 0.0 0.0 0.0 0.0 352250 STORM DRG. MASTER PL 450.0 450.0 0.0 0.0 0.0 0.0 O.O 0.0. 352251 DRAIN. PROD. FY87-88 1,200.0 1,200.0 0.0 0.0 0.0 0.0 352254 PUMP ST. RENOV. FY88 0.0 550.0 550.0- 0.0 0.0 0.0'' 352267 CTW. DRNG PRJ 89-90 2,000.0 730.0 1,270.0 0.0 0.0 0.0 $53002 INCNRT. PRO. FEASIBL 0.0 60.0 60.0- 0.0 0.0 0.0 $53010 SLD W COL EQUIPMENT 1,474.0 0.0 737.0 797.0 0.0 000 0.0 O.Ot TOTALS 41,968.2 24,242.9 4,924.9 3,399.0 2,981.4 'K Ju niuiin CITY OF MUM CAPITAL IMPROWME1gT' P ; . 1999 - 1995 Volume 3 Project Description Sheets �I This volume contains 251 CIP projects organized as follows: a by Major Program area and Functional ti Category as in Volume I) i b) by Project Status 1. Projects Deleted During FY'89; 2. Projects Completed During FY'89; Ti, 3. Ongoing Projects with Prior Appropriations; 4. Previously Scheduled projects with FY'90 Appropriations; , S. New Projects with FY`90 Appropriations; ; 6. Previously Scheduled Projects for Future Years; and 7. New Projects Scheduled for 4,R Future Years }7.�A I� Y. �'lfil'dyyry�ryif r ... ,k� }' h:3 ?` i S• `�� �,"L 4,L'N p � " ra -. ,t Y,: �•, St,r�rn,;i/��N. �T,e,.�-v`-va «.w�W..w.:+C ew--.�^ i ..:. �� _„''y ..., ..., .. , n«.' r I - ILI I 1. j TJ J 1 1 1 1 1 11 -A -.1 » GENERAL GOVERNMENT COMPLETED PROJECTS DURING FY'89: 311011 800 MHZ NETWORK SUPPORT ..................... SYSTEM............6-0 .r••... 314021 CITYWIDE MICROWAVE 800 MHZ COMMUNICATIONS ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: CITY ADMINISTRATION BUILDING -PHASE II FEA SIBILITY STU 311001 311012 TREASURY MANAGEMENT FURNITURE ...................... ..... ................... ...••-•-••• 311014 FEDERAL LAW ENFORCEMENT BUILDING .............................. SYSTEM ......«.r......«««.«..««..«... 314232 GEOGRAPHIC INFORMATION ........................... OF COMPUTERS a ASSOCIATED PERIPHERALS .........'r.rr..•••.••w......w...ws.w 315231 ACQUISITION NEW PROJECTS WITH FY'90 APPROPRIATIONS: r 311015 UPGRADE MAINFRAMECOMPUTERS a PERIPHERALS........................•....••-.w-.•..w•-•..8' `"""`"`..�.'...ww.j��/��, 311017 CLERK OFFICE LEKTRIEYER REPLACEMENT..................-•.rw.`..`.`.. 311018 RELOCATION OF MUNICIPAL SHOP OPERATIONS.. •..........sserwrw.w.w...w..w.«.s..w..w«.:««a{f'.. $ ««wr.«••.s. i } 311019 ARCHITECTURAL/ENGINEERING COMPUTER SYSTEM .......... ' } PUBLIC SAFETY t r. POLICE PRIOR APPROPRIATIONS: R IATIONS: ONGOII� PROJECTS WITH P _ 312006 POLICE SUPPORT SERVICES FACILITY .......•.............���`«.•"`:`M•rr«•�«""««`«""««.«•_@ 312007 ......i..II....i.r.....'...«.y.t«.i-ili«Fil�'!If'EiF««A-i««« NORTH DISTRICT POLICE SUBSTATION. . 312008 SOUTH DISTRICT POLICE SUBSTATION........••..•.••••••«•••«�•••"""i`w`r""•«�«.r.r+««« CATEGORY/ PROJECT NUMBER 312010 312012 312014 312015 312018 312019 �INNiIINlllll II , PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY Page POLICE MOBIL DIGITAL TERMINAL REFINEMENT............................................w15 POLICE PROPERTY UNIT & AUTO POUND FACILITY RENOVATION................................16 POLICE MICRO -COMPUTER & I.D. SYSTEM ENHANCEMENTS.....................................17 CENTRAL POLICE FACILITY EXPANSION AND REMODELING......................................19 POLICE EQUIPMENT ACQUISITION - FY'89 - FY'90.........................................19r MPO FIREARMS RANGE RENOVATION .............................................. .......... 20 NEW PROJECTS WITH FY'90 APPROPRIATIONS: 312020 911 EMERGENCY BACKUP SITE ......................... w.... w...... ..........r........www.21 312021 LEGION PARK POLICE MINI-STATION.......................................................22 t FIRE RESCUE DELETED PROJECTS DURING FY'89 313220 EXPANSION AND MODIFICATION OF FIRE STATION # 10......................................23 313221 EXPANSION AND RENOVATION OF FIRE STATION i 12.............r.rw.r.r..w................24 PROJECTS COMPLETED DURING FY'89: 313020 RENOVATION OF FIRE DEPARTMENT ADMINISTRATION BUILDING OFFICE SPACE...................25 ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: 313016 313018 313019 313222 313223 313224 313228 313229 #' 1 FIRE TRAINING FACILITY...............................................................26 RENOVATION OF FIRE STATIONS AND OLD DRILL TONER......................................2x FIRE STATION #3 GARAGE MODIFICATION AND EXPANSION...w................................28� FIRE APPARATUS REPLACEMENT AND MODIFICATIONS - FY'88.................................29 FIRE RESCUE NEW APPARATUS ACQUISITION - FY'88.........................................3U FIRE APPARATUS REFURBISHMENT AND MODIFICATION - FY'89................................31 VIDEO PRODUCTION AND TRAINING ASSISTANCE.............................................32 FIRE RESCUE NEW APPARATUS ACQUISITION - FY'89.........................................33 PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL'CATEGORY` CATEGORY/ PROJECT DER PROJECT NAME p 313230 FIRE RESCUE SPECIAL EQUIPMENT - FY'89....'..•••••••••••••....`•............�tsssw.i.� ~ 313232 FIRE DEPARTMENT COMPUTER ENHANCEMENT - FY 89.......•••••••••• PREVIOUSLY SCHEDULED PROJECTS WITH FY'90 APPROPRIATIONS: 313231 MIAMI FIRE MUSEUM............................................r.:..rw.ww.r.wsw•wwswwwr«« NEW PROJECTS WITH FY'90 APPROPRIATIONS: tr t3 313234 FIRE RESCUE NEW APPARATUS ACQUISITION FY'90... ••••....r.r.41` 313235 FIRE APPARATUS REPLACEMENT & MODIFICATION FY'90................•••••••" 313236 FIRE DEPARTMENT MASTER PLAN.....................................•••►••••............ 0 "`"`""` RESCUE SPECIAL SUPPORT EQUIPMENT FY' 9............................... T 313237 313239 FIRE NEW N ......r..r...r.r....r.rr..r. FIRE STATION 12.................................... NEW PROJECTS SCHEDULED FOR FUTURE YEARS: FIRE APPARATUS REPLACEMENT & MODIFICATION FY'91 - FY'92........... 013233 SOCIAL AND ECONOMIC ENVIRONMENT S r ' 9 HOUSING r 4 PROJECTS COMPLETED DURING FY'89: 321036 GOLDEN ARM PROPERTY ACQUISITION. ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: 321024 AFFORDABLE HOUSING PROGRAM.......................:..r.r..r......�i.•iw.««�.�«Iw«i>Mi«« HOUSING DEMONSTRATION PROGRAM .«.rsr.w«. �:•...i s.a. r.«ir.,i i. «.«.+«i __ 321025 321026. MODEL CITY/LITTLE HAVANA lMi.4 HOUSING LAND ACQUISITION PROGRAM......................••rY..«.«1�••«•�•�.,.��r««� il.frq, PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL CATEWRY CATEGORY/ PROJECT Pao PROJECT NAME 321034 SCATTERED SITE AFFORDABLE HOUSING DEVELOPMENT PROGRAM ......................... .... 35 HOUSING PROGRAM ADMINISTRATION.......••.••••.•.••...•....•.....................«.«. n 32103SECOND MORTGAGE HOME LOAN POOL........•••• NEW PROJECTS WITH FY'90 APPROPRIATIONS: C� ° 321038 LITTLE HAVANA LAND ACQUISITION....................•...«........srr..w.r......w..r.rr.:A� 321039 MODEL CITY LAND ACQUISITION., COMMUNITY DEVELOPMENT ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: f PARK WEST REDEVELOPMENT — PHASE I...•••••"••••`• " " " ` """` �� 322029 SOUTHEAST OVERTOWN / NEW PROJECTS WITH FY'90 APPROPRIATIONS: 322056 CAMILLUS HOUSE LAND ACQU ISITION ................................. r.....s.....,.....rr,r.� 322057 SOUTHEAS T OVERTOWN/PARK WEST REDEVELOPMENT — PHASE II..•••••••""`"•"`"`"" "'""•��• ECONOMIC DEVELOPMENT *0 & 0.*. O-OW-0018 PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY CATEGORY/ PROJECT NUMBER PAP PARKS AND RECREATION PARKS AND RECREATION COMPLETED PROJECTS DURING FY'89: 031335 BAYFRONT PARK REDEVELOPMENT CORPS. OF ENGINEERS. 331299 FLORIDA EAST COAST RAILROAD SETTLEMENT (LAND 331345 TRAINGLE PARK RENOVATIONS..........' ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: 331038 LEMON CITY PARK IMPROVEMENTS .......................... 331039 MOORE PARK REDEVELOPMENT .............................. **62 331042 LUMMUS PARK REDEVELOPMENT ............................................................63 331044 VIRGINIA KEY PARK DEVELOPMENT - PHASE I .............................. 0-6 ... 331053 AFRICAN SQUARE PARK RENOVATIONS ...................................................... 6S 331056 ROBERTO CLEMENTE PARK REHABILITATION ................................................. 66 331070 ATHALIE RANGE PARK REHABILITATION .......................................... **vw*e*wwfi7 331099 SWIMMING POOL RENOVATIONS ............................................................ 68 331143 ANTONIO 14ACEO PARK DEVELOPMENT .......................................................69 331227 BAYFRONT PARK REDEVELOPMENT, DESIGN AND DEVELOPMENT - PHASE I ........................ 70 331228 BAYFRONT PARK REDEVELOPMENT, WALKWAYS & LANDSCAPING - AREA A ... 331229 BAYFRONT PARK REDEVELOPMENT, WALKWAYS & LANDSCAPING - AREA B.........................72. 331230 -BAYFRONT PARK REDEVELOPMENT, LIGHT TOWER .............................................7 331231 BAYFRONT PARK REDEVELOPMENT, NORTH END AND AMPHITHEATRE - PHASE I ....................74, 331232 BAYFRONT PARK REDEVELOPMENT, PLAY SCULPTURES ........................................ -75 331302 BAYFRONT PARK REDEVELOPMENT, DESIGN AND DEVELOPMENT - PHASE 11 .......................76 331303 CITYWIDE NEIGHBORHOOD PARK RENOVATIONS ................................................ n L 331304 MTAMT OVER C.14nRFITUF qTARAITZATION & ...................... 331305 BAYFRONT PARK REDEVELOPMENT SOUTH END AND CHOPIN 331306 BAYFRONT PARK REDEVELOPMENT PEPPER FOUNTAIN ........................................ so 331307 CITYWIDE BALLFIELD RENOVATIONS .................... k i CATEGORY/ PROJECT NUMBER PROJECT NAME Page 331308 CITYWIDE PARK VITA COURSE RENOVATION..................................................82 331309 ALLAPATTAH-COMSTOCK PARK RENOVATION..................................................83 331310 GRAPELAND PARK RENOVATION .................................... ........................ 84 331311 HADLEY PARK IMPROVEMENTS/RESTROOM FACILITIES.........................................85 331312 LEGION PARK RENOVATIONS..............................................................86 331313 MORNINGSIDE PARK RENOVATIONS.........................................................87 331315 ROBERT KING HIGH PARK BRIDGE RENOVATION..............................................88 331316 VIRRICK PARK RENOVATIONS.............................................................89 331317 JAPANESE GARDENS RENOVATION..........................................................90 91 33131E CITYWIDE PARK PLAYING COURT RENOVATIONS ........................ ...................... 331329 WAINWRIGHT PARK RENOVATION - PHASE II................................................92 331338 CITYWIDE IRRIGATION PROJECTS 331339 .........................................................93 CITYWIDE PARK EQUIPMENT REPLACEMENT..................................................94 331340 .................. DOUGLAS PARK RENOVATIONS...........................................9�5 331341 GIBSON PARK RECREATION BUILDING IMPROVEMENTS.........................................96, 331342 GRAND AVENUE PARK RENOVATIONS .................... .................................... 9T 331343 KIRK MUNROE PARK/ADDITIONAL TENNIS FACILITIES.......................................098 331344 REEVES PARK BUILDING RENOVATIONS....................................................,.99 331346 SIMPSON PARK RENOVATIONS................................................ ............too 331347 DUPONT PLAZA BAY/RIVERWALKIMPROVEMENTS.............................................101 331348 ATHALIE RANGE PARK POOL REPLACEMENT ................................... ..........102' 331349 HADLEY PARK POOL REPLACEMENT........................................................103 331350 TALCOLCY PARK ROOF REPLACEMENT......................................................104 NEW PROJECTS WITH FY'90 APPROPRIATIONS: 331351 WILLIAMS PARK RENOVATION ............ ........................... ......,.............. 105- 331353 CITY OF MIAMI YOUTH CENTER ..........................................................106 PREVIOUSLY SCHEDULED PROJECTS FOR FUTURE YEARS: M —80C 416047 MELREESEGOLF COURSE IMPROVEMENTS.........................................,..�.....•l0' { _ PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY CATEGORY/ !� PROJECT NUMBER PROJECT NAME s NEW PROJECTS SCHEDULED FOR FUTURE YEARS: n , 031352 BRICKELL POINT PARK RELOCATION AND REDEVELOP!SENT......... i.....i.i+....««`«.i«..a.. a a� PUBLIC FACILITIES STADIUMS; COMPLETED PROJECTS DURING FY'89: 332236 MIAMI STADIUM — ROOF REPAIRS .........................Mi.. 403004 MIAMI STADIUM - PRESS BOX REPAIRS..*'.....•.•..*...••.••.►.•t..r.�..ws.1►.�ww«.www�; ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: ; ORANGE BOWL STADIUM - PRO —CLUB RECONSTRUCTION............................«.««....«««3i' ,332232 402002 .««....ilk MARINE STADIUM - CONCRETE PILLAR REPAIR ....... ...... ...................W....13 404231 ORANGE BOWL STADIUM — ADDITIONAL PRESS BOX FACILITIES .....................l.....i... 404237 ORANGE BOWL MODERNIZATION — PHASE I .................................... y„r NEW PROJECTS WITH FY'90-APPROPRIATIONS:.= 404238., ORANGE BOWL -MODERNIZATION — PHASE II.............................�«....«««...«�.....1�5 ry AUDITORIUM5 F COMPLETED PROJECTS DURING FY'89: r y ":333236::" COCONUT GROVE EXHIBITION CENTER = ADDITYOirAt 420010 MIAMI CONVENTION CENTER - FIRE ALARM REPLACEMENT........ ...� ..i.i�...w �«.,„.«••�.►�l 420011 MIA NI:CONVENTION CENTER. - REFURBISHMENT-,AND.EQUIPI T- FY098'.�• ««... ««. . w««�«�.� Y 8� PROJECTS BY MAJOR PROGRAM ANC FUNCTiML 'CATVE CATEGORY/ PROJECT NUMBER PROJECT ftw r ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: 333083 RENOVATION OF MANUEL ARTIME COMMUNITY CENTER...................••.....F....w.w.wwFF««%1I3� RENOVATION AND EXPANSION •..............a....w«wwiwii�f�il:' 415002 COCONUT GROVE EXHIBITION CENTER — CONVENTION CENTER — REFURBISHMENT AND EQUIPMENT FY'`89...... «.•w". w«we••••!awiw - 420012 MIAMI MARINA _,.. COMPLETED PROJECTS DURING FY'89: 413006 PIER FIVE MARINA FACILITY - PRELIMINARY EXPENSES ............ ..w.w♦f.w1►w.FMs-.ii«."*0dh*122 s ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: ., [ 354009 BAYVISTA MARINA..................................►.....►.....;..i•...i.w,.riF.wM•+ire � 413004 LUMMUS PARK MARINA...........................................F...w..wiw.F y 413007 MIAMARINA RENOVATION PHASE I............................ww►►www....:..w..F.wsw..a..Wi� .w....r.w..«..,11 413013 MIAMARINA - FISHERMEN'S PIER 5....................................... e 414005 DINNER KEY MARINA — RENOVATION/EXPANSION.......••.•••••'•'••••••••'•�•F.i«F..iiwwFiiw« j - ... NEW PROJECTS SCHEDULED FOR FUTURE YEARS: i.wwFiww.z } 31301E MIAMARINA RENOVATION — PHASE II..................w............F. a...wFwF... TRANSPQRTATION STREETS COMPLETED PROJECTS DURING FY'89 ;. :. a 341096 EDGEWATER STREET IMPROVEMENTS - PHASE I.........wiFFF.F.«..i..«.ii.i�«..�•�•««••«•« .,w :,arty PROJECTS BY MAJOR PROGRAM AND F�JNCTIONAL CATEGMY - y .... CATEGORY/ PROJECTEalRma - PHASE II..e..... ...... ..'132 T IMPROVEMENTS ••....•.•• TA STREET ROVEMENTS - PHASE Ir••-••• ...• T IMP ..«« BUENA VISTA STREE AY ENTS.• ..•...•. " «...`..• 341108 LITTLE HAVANA IMPROVEM ...... {{ WEST HIGHWAY «srrr«Y • T _ ROAD ........ 341109 N.W. 8 STREET VEMENTS - PHASE I•••••" " - " 341111 T IMPRO - PHASE 11..........`...... `••...••• 341113 WYNWOOD STREET IMPROVEMENTS 341118 ALLAPATfAH STREET 152 CITYWIDE STREET IMPROVEMENT � 341 TIONS: """• i37 PROPRIA ••••• " " PROJECTS WITH PRIOR AP •••• " •... ONGOING .....r• 139, ET IMPROVEMENTS............ .•.. .... III........... •........«.. NTS - PHASE .....3 14AM R QUARTER IMPROVEMENTS ..•...•.•• 34108fi MANOR STREET IM ...... ••....... •...«1 . ENTS............ ,.... I ...«r 4R3 341090 STREET IMPROVEM PROVEMENTS• ..••.'PHASE .•..••••`. " •••- SW 16TH '••j�EMENT5 DRIVE STREET IM T IMPRO i 341094 NORTH RIVER PARK WEST STREE .............. TOWN ...«......«««..««« � 341103 OVER PHASE 11........••- SOUTHEAST • •j/...•..• `.ice STREET IMPROVEMENTS................. ««1444 341105 DOWNTOWN STRNTS........ ,,.. E STREET IMPROVEME ......... ••'' 341115 MORNINGSID - PHASE IV....... ••• " '••e••r• ENTS .......... ,,...•....14 341116 IMPROVEM..............•,..1 '' MANOR STREET STREET IMPROVEMENTS•..... •,••... 341119 III............«..•• .147 �:. BLUFF ENTS - PHA. SILVER 8LU IMPROVEM •••••" '•••r• ,.`..• � 341121 STREET - PHASE 11.••••••• .......•....`..`• .«rim BUENA VISTA IMPROVEMENTS VEM _ PHASE II.••••••• .•••.`.• 341122 STREET IMPRO ENTS ....... " • SHENANDOAH IMPROVEMENT ....... •rr....«.i44 341123 HAVANA STREET - PHASE I•••••.......... ...r.r...• EAST LITTLE IMPROVEMENTS I I ... • " " • • , • "' i - PHASE ..••.•• •...- 341124 MODEL CITY STREET IMPROVEMENTS ••i53 STREET - PHASE II...........e. ....r.•V •152 341126 HAVANA ENTS .........•......`....•.•. WEST ALLppptTAH STREET IMPROVEM .•••••••,....«... 341127 ..1 VEMENTS•• ...•r 341128 ET IMPRQ - .. *'-FY%89•..•• .1..•••• " EADE SIRE STREETS «•• SEIZE M ON OF SIDEWALKS AND .••••••` .««.........• 341129 yATI IMPROVEMENT.......... 341159 REND FY'89 - F`t'90••............... LAWRENCE STREET IMP IMPROVEMENTS - r.r.r.r.r..r.rr,,rr.,.r,rsarr•«• 34116q CITYWIDE STREET N PARK WEST 7TH AND 9TH STREET MALL . 34i115 SOUTHEAST OVERTOW % 341176 +56 APPROPRIATIONS: ..+«..«rr�rr� NEW PROJECTS WITH FY 90 AF.................. � _ CTs..•r.......r..•,.a..r...r.rrrr..rrs.r.r«..xr 31177 CITYWIDE C.C. PAVING pROJE """"� PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY CATEGORY/ PROJECT NUMBER PREVIOUSLY SCHEDULED PROJECTS SCHEDULED FOR FUTURE YEARS: 041101 BRICKELL TRANSIT STATION AREA STREET IMPROVEMENTS ................................... 57 041131 EDISON STREET IMPROVEMENTS - PHASE II .....................«......«..«......«........ 041132 EDGEWATER STREET IMPROVEMENTS — PHASE 1I............................................159 041133 S€WELL PARK STREET IMPROVEMENTS.....................................................160 041134 MANOR STREET IMPROVEMENTS — PHASE V.................................................161 041135 DOWNTOWN STREET IMPROVEMENTS - PHASE III...........................................6162 041143 LITTLE RIVER STREET IMPROVEMENTS — PHASE II.........................................163 041144 OVERTOWN STREET IMPROVEMENTS — PHASE II.............................................164 041145 ALLAPATTAH STREET IMPROVEMENTS — PHASE III..........................................166 041146 BUENA VISTA STREET IMPROVEMENTS - PHASE IV..........................................166, 041147 EAST LITTLE HAVANA STREET IMPROVEMENTS — PHASE III..................................167 041154 MODEL CITY STREET IMPROVEMENTS — PHASE II...........................................168 041155 EAST ALLAPATTAH STREET IMPROVEMENTS — PHASE III......................................169 041156 GRAPELAND STREET IMPROVEMENTS...........................................I............170 041157 DESIGN PLAZA STREET IMPROVEMENTS — PHASE II.........................................171 041158 WYNWOOD STREET IMPROVEMENTS — PHASE II..............................................17T 041165 CORAL GARDENS STREET IMPROVEMENTS....................................................173 041166 EDGEWATER STREET IMPROVEMENTS — PHASE III...........................................174 041167 EDISON STREET IMPROVEMENTS — PHASE III .................................... ..... o.o.o175r 041168 MANOR STREET IMPROVEMENTS - PHASE VI................................................176 041169 WEST LITTLE HAVANA STREET IMPROVEMENTS - PHASE III..................................177 041170 CITYWIDE STREET IMPROVEMENTS - FY'91 - FY'95........................................178 041171 REBUILD SIDEWALKS AND STREETS — FY'91 - FY'95.......................................179 MASS TRANSIT 99-80'( PREVIOUSLY SCHEDULED PROJECTS WITH PRIOR APPROPRIATIONS: 343229 DOWNTOWN COMPONENT OF METRORAIL (PEOPLE -MOVER) STAGE 11 - C011TRIBUT1Ot4...............184 6. PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY CATEGORY/ PROJECT NUMBER PROJECT NAME PARKING ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: 420002 MIAMI CONVENTION CENTER PARKING GARAGE....•...••....•....••....es.wwwwwww.w.wr►w.wr18 PHYSICAL ENVIRONMENT SANITARY SEWERS COMPLETED PROJECTS DURING FY'89 351169 WINONA SANITARY SEWERS..............................................................182 351170 CITYWIDE SANITARY SEWER EXTENSIONS - PRIOR TO FY'88.................................1,83 351173 FLAGAMI SANITARY SEWERS - FY'87.....................................................184 351176 FAIRLAWN SOUTH SANITARY SEWER IMPROVEMENTS - FY'87..................................185 351178 CITYWIDE SANITARY SEWER EXTENSIONS - FY'86...................0........................186 ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: 351168 351174 351273 351274 351275 351276 351279 351280 351281 351282 351285 351287 SOUTH FLAGLER SANITARY SEWERS.......................................................187 SOUTH GROVE SANITARY SEWERS.........................................................188 NORTH FLAGLER SANITARY SEWERS........................................................189 CITYWIDE SANITARY SEWER EXTENSIONS - FY'87..........................................19 CITYWIDESANITARY SEWER REPLACEMENTS - FY'87.......................................r.191 N.W. 36 STREET SANITARY SEWER IMPROVEMENT .................................. 0....... *192- THE LAST SANITARY SEWERS.............................................................. 193 SOUTHEAST OVERTOWN/PARKWEST SANITARY SEWERS.........................................194 DOWNTOWN SANITARY SEWER REPLACEMENTS - PHASE III.................................w..195 BUENA VISTA/LITTLE HAITI SANITARY SEWER REPLACEMENTS - PHASE I......................196 SHENANDOAH SANITARY SEWER REPLACEMENTS - PHASE I.....................................197` CITYWIDE SANITARY SEWER EXTENSIONS - FY'89 - FY'90 ..................................190, r s i v PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY CATEGORY/ PROJECT NUMBER PROJECT NAME t: PREVIOUSLY SCHEDULED PROJECTS FOR FUTURE YEARS: i 051283 WATSON ISLAND SANITARY SEWERS..................................s• r.wsr.w.ww•wwrw.s•l�7Qy' ;. 051284 CITYWIDE SANITARY SEWER IMPROVEMENTS - FY'91—FY'95....•....r......rrrt.r..c.wwww.s.i�Y�/ STORM SEWERS DELETED PROJECTS DURING FY'89: 352254 PUMP STATION RENOVATIONS — FY'88 ...................................... COMPLETED PROJECTS DURING FY'89: 352176 SHENANDOAH STORM SEWERS.................................................•...........2"' ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: 352179 ORANGE BOWL PUMP STATION MODIFICATION...............................................2M, 182 FLAGAMI STORM SEWERS — PHASE I....................................................•w2ti4 352184 LAWRENCE PUMP STATION — MODIFICATIONS 352187 ........................................F..•.*205 COCONUT GROVE STORM SEWERS.................................................... ► 352190 TAMIAMI STORM SEWERS — PHASE II ................ :................. .......... .....206r ............207 352194 LAWRENCE WATERWAY DREDGING & BULKHEADING............................................209 352195 ENGLEWOOD STORM SEWERS...................... .......................................209 352230 WAGNER CREEK DRAINAGE RENOVATION — PHASE III........................................210 352250 CITYWIDE STORM DRAINAGE MASTER PLAN.................................................211 352251 CITYWIDE LOCAL DRAINAGE PROJECTS — FY'88............................................212 352256 LEJEUNE STORM SEWERS - PHASE I......................................................213 352257 LEJEUNE STORM SEWERS — PHASE II.....................................................214 352267 CITYWIDE LOCAL DRAINAGE PROJECTS — FY'89 - FY'90....................................215 352271 LITTLE RIVER STORM SEWER RETROFITTING.................................................216 ' 352272 CIVIC CENTER STORM SEWER RETROFITTING...............................................217 352273 RIVERSIDE STORM SEWER RETROFITTING..................................................218 S Alt PROJECTS BY MAJOR PROGRAM AND FUNCTIONAL CATEGORY CATEGORY/ PROJECT NUMBS PROJECT NAME Page. . PREVIOUSLY SCHEDULED PROJECTS WITH FY'90 APPROPRIATIONS: n 352252 S.W. 6 STREET STORM SEWERS..........................................................219 352274 HEAVY EQUIPMENT FACILITY STORM SEWER RETROFITTING....................................220 PREVIOUSLY SCHEDULED PROJECTS FOR FUTURE YEARS: 052188 GRAPELAND STORM SEWERS - PHASE I......................................................221. 052191 PINEHURST STORM SEWERS 052193 ..............................................................222 DURHAM STORM SEWERS.................................................................223 OS2196 NORTHWEST STORM SEWERS..............................................................224 052197 LIBERTY STORM SEWERS ................................ 225 052198 .................. ....,......... FAIRWAY STORM SEWERS................................................................226 052199 WEST END STORM SEWERS - PHASE 11....................................................227 052200 AUBURN STORM SEWERS.................................................................228 052201 GLENROYAL STORM SEWERS..............................................................229 052202 LAWRENCE STORM SEWERS - PHASE I1....................................................230 052208 AVALON STORM SEWERS.................................................................231 052209 LAWNVIEW STORM SEWERS...............................................................232 052211 FLAGAMI STORM SEWERS - PHASE II.....................................................233 052231 LOCAL DRAINAGE PROJECTS - FY'91 - FY'95.............................................234 052253 PUMP STATION RENOVATIONS - FY'91 - FY'95............................................235 052258 REID ACRES STORM SEWERS........... .................................................236 052259 WAGNER CREEK RENOVATIONS - PHASE IV.................................................237 052260 BELLE MEADE STORM SEWERS - PHASE I..................................................238 052261 N.W. 71 STREET MAIN TRUNK STORM SEWER...............................................239 052262 KINLOCH STORM SEWERS..................................................................240 052263 WAGNER CREEK RENOVATIONS - PHASE V..................................................241 052264 BELLE MEADE STORM SEWERS - PHASE 11.................................................242 052265 FAIRLAWN STORM SEWERS...............................................................243 052266 GRAPELAND STORM SEWERS - PHASE I1...................................................244 i ;PROJECTS•BY MAJOR PROGRAM AND -FUNCTIONAL ATEO CATEGORY PROJECT. PROJECT` NAME SOLID -WASTE DELETED PROJECTS DURING FY'89 INCINERATOR PROPERTY - FEASIBILITY AND STRUCTURAL S�7{JfY..«`..w«...•.�.««.•.«.«.«.. 353002 ONGOING PROJECTS WITH PRIOR APPROPRIATIONS: 353001 SOLID WASTE COLLECTION EQUIPMENT ACQUISITION ................... ` 353003 SOLID WASTE COLLECTION MINI -SITE, N.W. 20TH STREET .......... 353005 STREET AND SIDEWALK SWEEPING EQUIPMENT PURCHASE ............................ ••••-••«« 353007 LITTER CONTAINERS REPLACEMENT PROGRAM.....................t.«••••••-«••*•••••••..•«.290 353009 SOLID WASTE EXPANDED FACILITIES .......................• ............... NEW PROJECTS WITH FY'90 APPROPRIATIONS: r . i 353010 SOLID WASTE COLLECTION EQUIPMENT.... j' t r� 3 ,� 7 I% Kr 01� ^+rifth ;f K ti4 t C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 As OF 09129/89 PROJECTNO. s 311011 -----rr------------- ----- ----- -rr--------------r-rrr---rrr—r PROJECT NAME : 800 MHZ NETWORK SUPPORT 1 PROJECT DESCRIPTIONS ! ! ADDRESS : CITYWIDE NBRHD LOCATION : ! ! This project will provide certain equipment to Support ! NBRHD SERVICE s 900 1 the $00 Mhz communication systsA for use bS Firs. ! 1 Police and local government departments., ! .PROGRAM : 001 GENERAL GOVERNMENT ! ! CATEGORY' s 011 GENERAL GOVERNMENT ! ! DEPARTMENT : 042 GENERAL SERVICES ADMINISTRAT. ! PROJECT MANAGER: 421 RON WILLIAMS ! FIRST YEAR IN CAPITAL PROGRAM : FY88 ! !' ! FIRST YEAR OF APPROPRIATIONS : FY86 1 PROJECT SCHEDULE = !. !' INITIAL REVISED ! ! COMMENCE DESIGN 10/87 ! ! AWARD CONTRACT ! ! BEGIN CONSTRUCTION ! ! BENEFICIAL USE 06/88 ! PROJECT COMPLETE 09/88 ------------------ ------------ ----------------�....r-..�r..-..- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS --------------- FUTLWE COST ESTIMATES ------- -------� COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-98 1" -94 1994-99 ------------------ ----- ---------- --- ------------------------ --- --------- --------- --- ------ t t X 1000 LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT 178.9 178.9 ADMINISTRATION OTHER -- --------- ------ - ---------------------------------- TOTAL COST 178.9 --------- 178.9 --------- 0.0 --------- ------------------ 0.0 0.0 0.0 PRIOR APPRO- TOTAL FUNDING SOURCES FUNDING APPRO- PRIATIONS PRIATIONS 1989-90 <------------------ FUTLIK FtNOMNO --- ------"----•---' 1990-91 1991-92 1912-93 1"8-94 1"4-99 ------------------ -- --------- ------ ------------ t t X 1000 1 867 1981 FIRE G.O. BONDS 35.0 35.6 $81"1984 POLICE G.O. BONDS 143.1 143.1 _ --- ------------------ - TOTAL FUNDZNG 178.9 ---- 178.9 --------- 0.0 ----r --- --------- ----r 0.0 0.0 0.0 0.0 0.0 COMPLETION DATE 09/30/59 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION ryto AS OF 08/29/S! PROJECTNO. : 314021 ------------------------------------------------------------ PROJECT NAME : CITYWIDE MICROWAVE $00 MHZ COMMUNICATIONS SYSTEM t PROJECT OESCRIPTION: t ADDRESS : CITYWTnE ! F HBRHD LOCATION : t This project involves the implementation of a C1tVW1d0 ! NBRHD SERVICE : 900 1 microwave S00 Mhz communication system for ues by firs • ! Polies and other local goverment dopartamsnts. ! PROGRAM : 001 GENERAL GOVERNMENT ! ! CATEGORY" : 011 GENERAL GOVERNMENT ! ! DEPARTMENT s 042 GENERAL SERVICES ADMINISTRAT. ! The microwave network is used in lieu of teiepphsns !' PROJECT MANAGER: 421 RON WILLIAMS ! lines to support the 20-channel. 800 MHz trunked city- t ! wide radio systems and data lines from the Burroughs t FIRST YEAR IN CAPITAL PROGRAM : FY84 ! 7900 computer System. t FIRST YEAR OF APPROPRIATIONS : FY84 ! PROJECT SCHEDULE : ! ! INITIAL REVISED ! t. COMMENCE DESIGN 08/64 ! M AWARD CONTRACT 08/34 ! f BEGIN CONSTRUCTION 09/84 ! BENEFICIAL USE 09/85 ! f PROJECTCOMPLETE 06166 TOD ------------------------------------------------------------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONS --------------- FUTURE COST ESTIMATES ---------------> COST CATEGORIES ESTIMATE PRIATIONS 19So-90 logo-91 1991-92 1992-98 19911-94 1914-" ----------------------- ------------------------ -- --- -- -- - ------- - --------- ---- - ---- ( 4X1000) LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMMEHT 7254.2 7254.2 ADMINISTRATION 140.1 146.1 OTHER -------------- -- ------------------ TOTAL COST 7402.3 -- ----- ------- ---- 7402.3 0.0 ----- ------ - ----- -------------• ---- - - ---- ---- 0.0 0.0 0.0 0.0 file FUNDING SOURCES 235 CONTRIB. OFF-STREET PARKG. RE 605 FY85 FPSL FRANCHISE REVENUES 860 1970 POLLUT. 6.0 BONDS - 66 8 866 1976 FIRE G.O. BONDS $67 1981 FIRE G.O. BONDS 877 1935 GVMNT CNT SPCL OSLO BONDS 881 1984 POLICE G-0. BONDS ------------------------- TOTAL FUNDING IM'; .■ V L PRIOR APPRO- TOTAL FUNDING APPRD- PRIATIONS PRIATIONS 1989-90 ------------------ FUTURE ------------------- 1990-91 1991-92 1992-92 1993-94 1994- -----------------°+ --------- --------- --------- --- - - ------------- ( 4 X 1000 ) 56.3 56.3 52.0 52.0 120.0 120.0 1293.0 1233.0 *. 1267.0 1267.0 730.0 730.0 3944.0 3944.0 ---7402.3 -- 7402.3 ----- -0.0 _-'-------- ----- ------------------ 0.0 0.0 0.0 0.6 COMPLETION DATE 09/30/S9 ff C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 09/29/99 ti PROJECTN0. t 311001 PROJECT NAME t CITY ADMINISTRATION BLDG - PH II -----------------------------------------------------------}. ! PROJECT DESCRIPTION: ! ADDRESS : 275 NW 2ND ST NBRHO LOCATION : 263 ! ! this pro ect includes the design and construction, o3 a ! 30,000 NBRHO SERVICE t 900 ! * or - sq. it. City Administration Building ! ! located on City -owned property in the government t PROGRAM : 001 GENERAL GOVERNMENT ! Center. This building will consolidate all City ! Administrative Offices and provide offices for the CltV It CATEGORY O11 DEPARTMENT : 046 GENERAL GOVERNMENT DEVELOPMENT ! Commissioner* as well as Commission Chambers. Funding t ! PROJECT MANAGER: 971 HERBERT J. BAILEY ! for this facility is anticipated to be generated from ! the rental cost savings of approximately •1,763,707 FIRST YEAR IN CAPITAL PROGRAM : FY82 ! (based on 1989). ! FIRST YEAR OF APPROPRIATIONS : FY82 ! ! The addition of two levels on the adjacent parking. E PROJECT SCHEDULE : ! garage may be carried out coincident y with this ! ! an additional cost of approximately INITIAL REVISED project at COMMENCE DESIGN 09/89 TOO ! 02. million. ! AWARD CONTRACT 02/90 ! f BEGIN CONSTRUCTION 04/90 ! ! BENEFICIAL USE 10191 ! ,._--- PROJECT COMPLETE 12/91 ------------------------------------------------------ TOTALCOST PRIOR APPRO- APPRO- PRIATIONS <--------- "` ' 1991-92 1992-93 1998-94 1994-99 COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 ---- -------------------------�--�-- LAND ACQUISITION DESIGN 1250.0 1250.0 CONSTRUCTION 18000.0 11435.0 656S.0 300.0 EQUIPMENT 300.0 ADMINISTRATION OTTER 28.0 28.0 - -- --- -- - ----- ----- --- -- -- ---- ---- - ------------------------- TOTAL 008T --------- 19578.0 --------- 28.0 ------------------ - 0.0 •1250.0 11735.0 6565.0 0.0 0.0 TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------ '-99&_94 ` "-9 1991-92F i9-----1------ FUNDING SOURCES FUMING PRIATIONS 1989-90 1990-91 ------- ---- ---------------------- ------------------------- --------- --------- --------- ( • X 1000 ) 388 REVOLVING FUND 899 UNDETERMINED 28.0 19550.0 29.0 1250.0 11735.0 6565•0 ------.� ------------------------- TOTAL FINDING --------- 19578.0 --------- 28.0 ----..------�•-----------��-�. 0.0 1250.0 11735.0 6S6S.0 0.0 0.0' REVISION DATE 06/01/60 PROJECT NO. 1 $11012 PROJECT NAME: 1 TREASURY MANAGEMENT FURNITURE ADDRESS 1 3006 AVIATION AVE. HBRND LuuATION 1 $98 HBRND SERVICE 1 900 PROGRAM : 001 GENERAL GOVERNMENT CATEGORY ^ 1 011 GENERAL GOVERNMENT DEPARTMENT : 026 FINANCE PROJECT MANAGERS 262 CARLOS GARCIA FIRST YEAR IN CAPITAL PROGRAM 1 FYS9 FIRST YEAR OF APPROPRIATIONS 1 FY59 PROJECT SCHEDULE : I COMMENCE DESIGN NITIAL REVISED AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 09/59 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION 100.0 OTHER TOTAL COST 100.0 TOTAL FUNDING SOURCES FUNDING 446 CONTRIS FR DEBT SERVICE FUND 25.0 549 1970 POLLUT. 0.0 B. 56 SL -INT 25.0 073 1980 SANT. G.O B., 57 SL - INT 25.0 691 84 STORM GO. BONDS, 56 SL -INT 25.0 TOTAL FUNDING 100.0 R C I T Y O F M I A M I CAPITAL IMPROVEMENT FRMAM PROJECT OESCRIPTION FY96 PRIOR APPRO- PRIATIONS 100.0 100.0 PRIOR APPRO- PRIATIONS 25.0 25.0 25.0 25.0 100.0 AS OF 40.420, S0 ----------------------------------------------------- I PROJECT OESCRIPTIONI t f t f Dilapidated furniture bein used by Treasury ! ! Management stiff way result in workers oewpenssiSoo t f cases due to their poor condition. f Additionally, the *file* is visitsdoby the pubue t f to ills applications for various 11consesr Ampirsp - t I about accounts status, and wake related'paWmals. F t B f t f t t : t ! r f t -----------------------------------i.�--rss--.►-rrss.uw-r.r-.., APPRO- PRIATIONS <- --- FUTURE COST CSTIMAUS--------------•►r 1999-90 1990-91 1991-92 1992-99 1998-" 39"►991 --------- ---- ------------- ------- 1 x 10- ----- ----- ----- --- ----- " 0.0 0.0 -0.0 0.0 -0.0 0.01 APPRO- PRIATIONS <- -- - --- ---- FUTURE FtRD2N0--i---------- •••--.tk 1959-90 1990-911991-92 1992-95 IM-94 19944-So --------- --- --- - - ------------------------------- • X 1000 -- ----- --- ------ ----- o.o o. o o. o 0.0 -0.0 REVISION DATE 10/12/55 Rff A ' ' s"' I PROJECT NO. : 311014 PROJECT NAME : FEDERAL LAM ENFORCEMENT BUILDING ADDRESS : N.E. 1 AVE. 8 N.M. 4 ST. NBRHD LOCATION : 263 NBRH O SERVICE : 900 PROGRAM : 001 GENERAL GOVERNMENT CATEGORY' : 011 GENERAL GOVERNMENT DEPARTMENT : 046 DEVELOPMENT PROJECT MANAGER: 902 ARLEEN WEINTRAUB FIRST YEAR IN CAPITAL PROGRAM : FY09 FIRST YEAR OF APPROPRIATIONS : FY89 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 09/89 AWARD CONTRACT 03189 BEGIN CONSTRUCTION 05169 BENEFICIAL USE 12/90 PROJECT COMPLETE 03/91 -fIII�INH�HN�� C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 04/29109 ---------- -------------------------------------------------- ! PROJECT DESCRIPTIONS ! ! This ppro sct entails construction of a 2S0,000 square ! ! toot buiding to be occupied by Federal Law Enforcement t ! agencies under a 30-year lease agreement with the U.S. ! ! General Services Administration. The City, as faaili- ! ! tator for the Federal Government, will acquire the ! ! specified property adjacent to the Federal Courthouse, i ! desig9n and construct the building for subsequent leas* ! ! to the U.S. General Services Administration, through t ! lease rental pa ments, is responsible for total pre set ! ! cost. This pro act is being accomplished at no cosi ! ! to the CitV. ! f --------- ------ --------------------- --------------------- PRIOR - _ FUTURE COST ESTIMATES TOTAL COST APPRO- PRIATZONS <------------- --rr+--+rrrrr-ref' COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-93 1993-94 1994-90 ----------rrr------------ ---- ------------- - ------------------ -----------r-------------------- • x I000 ) LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER 'DOTAL COST FUNDING SOURCES 994 RENTAL REVENUE BONDS, SR 1988 -------- I--"-- TOTAL FUNDINf:- 29676.0 30000.0 824.0- 29676.0 30000.0 324.0- - r 0.0 0.0 -------------------------- 0.0 0.0' 0.0 PRIOR APPRO- TOTALAPPRO- PRIATIONS 1969-90 <------------------ FUTURE 1990-91 1991-92 FANG -'---------- -r-----' 1992-98 i990-9+i jt"-10 FUNDING PRIATIONS --------- --------- ------ --------- --------- --------- --------- c 0 x 1000 29676.0 30000.0 824.0- _ _ rrr..r -arr.. rr.r rrrr 29676.0 ___ __ 30000.0 _ __ ___ - 324.0- --------- ------ - 0.0 0.0 ----- _ 0.0 0.0 0.0 REVISION DATE 04/18/99 PROJECT NO. : 314232 PROJECT NAME : GEOGRAPHIC INFORMATION SYSTEM ADDRESS : CXTYWXDE NBRHD LOCATION : 253 NSRHD SERVICE : 900 PROGRAM : 001 GENERAL GOVERNMENT CATEGORY" : 011 GENERAL GOVERNMENT DEPARTMENT : 038 PLANNING PROJECT MANAGER: 386 ALAN RODDY FIRST YEAR IN CAPITAL PROGRAM : FY86 FIRST YEAR OF APPROPRIATIONS : FY87 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 10/87 AWARD CONTRACT 03/68 04/89 BEGIN CONSTRUCTION BENEFICIAL USE 10/88 10/89 PROJECT COMPLETE 12/89 10/90 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 0612914* -----------------------------------------------------------[ ! PROJECT DESCRIPTION: ! t ! The Geographic Information System (GIB) is a c00pr6ft*0- t ! sive property and neighborhood computer information t ! system involving: Task I - Compilation of database and ! ! cross-index of all buildings, parcels and blocks in ! ! the City; Task II - Digitizing (entering into computer ! ! by scanning machinery or manual tracing) of Csty's ! ! Metropolitan Map Series parcel maps; and Task III ! ! Acquisition of an automated mapping system and display ! ! devices, including terminals, plotters, and digitisers. ! ! Task I builds on a complete survey of all buildings in ! ! the City to allow immediate computer access to all t ! existing property information for Solid waste route ! planning, for Police and Fire emergency response and t ! for auditing of property tax assessment information. t ! Task II and III add automated mapping capabilities to ! ! the property database. 1----------------------------------------------------------! PRIOR APPRO- -- FUTURE COST ESTIMATES TOTAL COST APPRO- PRIATION8 <----------------------------> COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-93 1993-94 1994-95 -- -------------------------------- ------------------------------ ---- --------- ------ - ----- ---- ( • X 1000 ) LAND ACQUISITION DESIGN E QUIPPMENTION ET ADMINISTRATION OTHER TOTAL COST 360.0 360.0 250.0 250.0 _ ----- ----- --------- ----610.0----610.0------0.0------0.0------0.0 0.0 -0.0 0*0 TOTAL FUNDING SOURCES FUNDING 557 CONTRIB'FR FY67 GENERAL FUND 250.0 860 1970 POLLUT. 0.0 BONDS - 86 SL 60.0 667 1981 FIRE G.O. BONDS 100.0 $81 1984 POLICE G.O. BONDS 150.0 g85 1976 HOUSING G.O. BONDS - INT. 50.0 TOTAL FUNDING 610.0 a PRIOR A ----- FUTURE FUNDING APPRO- PRIATIONTIONS <-------------------"----"'------> PRIATIONS 1969-90 1990-91 1991-92 1992-93 1993-94 1994- ------------------ ----- --- - -- -- ---- -.. t e X 1000 ) 250.0 60.0 100.0 150.0 50.0 610.0 ------ 0.0------a.0------0.0------0.0------WO -- - tt.0, ,, r ; .. w C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 315231 PROJECT NAME : ACQUISITION OF COMPUTERS i ASSOCIATED PERIPHERALS ADORES$ : 2850 TIGERTAIL AVE NORM LOCATION : NBRHO SERVICE : 900 PROGRAM : 001 GENERAL GOVERNMENT CATEGORY : 011 GENERAL GOVERNMENT DEPARTMENT : 046 COMPUTERS PROJECT MANAGER: 461 PABLO ESQUIJAROSA FIRST YEAR IN CAPITAL PROGRAM : FY84 FIRST YEAR OF APPROPRIATIONS : FY84 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE 11183 PROJECT COMPLETE 10189 INITIAL REVISED o9/s3 02/90 A8 OF 06/29/49 ------------------------------------------------------------ ! PROJECT DESCRIPTION: t ! This project Involves the purchase of U14ZSYf t ! computer equips* nt bythe Oapartwant of Computer*. ! ! Equipment purchased includes two 8-7900's and aen- ! ! version support. terminals, cork stations and ! ! supporting equipment used for support of Poiias. ! ! Fire and other ganaral governmental appiteatlon. ! The 1•as•/purohas• of ts his equipment will be completed ! ------------------------------------------------------------ I at the and of FY'85-8l. ! NOTE: In addition, the purchase of the now financial t ! •yt.w was added to tl:la project, estimated completion ! ! during FY•89-90. ! i ! ! ! ! t PRIOR APPRO- TOTAL COST APPRO- PRIATIONS --------------- FUTURE FUTURE COST ESTIMATES -•-_-----------t 1991-92 i!!?•!! I!!%!! I994•99 C08T CATEGORIES ESTIMATE PRIATIONS I949-90 1990-91 LAND AGQUISITION DESIGN CONSTRUCTION EQUIPMENT 7786.8 0979.1 1192.6- AOMINISTRATION 179.0 179.0 OTHER 520.0 320.0 - -- '--- •0-0 -- TOTA1. COST-------------- ---eZeS.O 9478.4 1192.6- -- 0.0 -- 000.0 .0 .0 APPRO- ' FUNDINti SOURCES TOTAL FUNDING .PRIOR APPRO- PRIATIONS PRIATIONS 19e9-90 ------------------- FUTURE FUTURE FUNDING ---•-'-------------' 1990-91 1991-92 1992-!! 1993-94 I994-99 I a x 1000 ) 94 INTEREST ON INVESTMENT- FM BL I50.0---------------------- 150.0 136 SP. A$SESS. COLLECTIONS - INT. 60.0 Sit CONTR B FR fY84 GENERAL FUND 973.0 5e5 CONTRIB FR FYBS GENERAL FUND 4ee.0 546 CONTAIB FR FYe6 GENERAL FUND 4ee.0 5e7 CONTRIB FR FYe7 GENERAL FUND eee.0 See CONTRIB FR FYee GENERAL FUND 475.4 5e9 CONTRIB FR Fr89 GENERAL FUND 277.e ill CAP. IMP. FUND -INTEREST INCY. I50.0 791 1941 POLICE G.O.B. 87 SL - INT $0.0 649 I970 POLLUT. G.0 B. ei $L -INT 60.0 t60 1970 POI.LUT. 6.0 BONDS - 86 8L 100.0 eii 1976+FIRE G.O. BONDS 1e00.0 007 19e1 FIRE G.O. BONDS 870 1975 i 76 $AN sew G.O. soNos 33.0 ie0 I970 POLICE G.O. BONDS 413.0 eil 1901 POLICE G.O. eoNos 2380.0 e82 19e4 POLICE G0. BONDS - e7 SL TDTAL FUNDING 82e5.e 60.0 973.0 188.0 468.0 3ee.o 475.4 4e8.0 210.6- 150.0 50.0 60.0 100.0 It00.0 ee7.0 367.0- 33.0 413.0 2340.0 595.0 595.0- ---947e-4 ------o: a;o------o ------ o-a a o o•o 07 :s N CNeEREPLACEMENT OLL11KPROXC-T HAVE 3500V&AMERIAOR. OCATIO14 = 394 HBRND SERVICE 900 1 001 GENERAL GOVERNMENT PROGRAM Y : O11 GENERAL GOVERfN1ENT CATEGORY s 022 CLERK OFFICE PROJECT MANAGER' tI17 MALTER FOEMAN FIRST YEAR IN CAPITAL PROGRAM s FYS9 FIRST YEAR OF APPROPRIATIONS s pROjgCT SCHEDULE s INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN FITION o USE PROJECT COMPLETE PRIOR TOTAL COST ESTIMATE i COST CATEGORIES --------- -r---•------------------- LAND ACQUISITION CONSTRUCTIONg§UxPMV 58.4 ADMINISTRATION OTHER rrrr-- ----rrrr58.4 - - - - - - - - - Fj TOTAL COST TOTAL FUNDING FUona SOURCES --------- rrrr------"--rrrr-- rrrr-- 53.4 coNTaIs FR FYSO OENffRA1-. Fut� ___ -- 5g0 rrr_-•._sr.a-----------rrrr-. TOTAL FUNDING. _ 53.4 APPRO- PRIATIONB ------0.0 PRIOR APPRO- PRIATIONS • • - _ rrrr--------rrrr--rr ------------ rrrrrr�irrrrrr APPRO- p�; OM _r-r rrr-- SS.4 ;--PROJECT OESCRIPTIONs file coftivelt t qs reeerds ! The Kardox Loktirsaeqi $Srths " efsfl.OeThvp� ktrlever !' t into the d ul y Socha* In, ) t aaeoss and unsieateheu s!e L:Sa8 istipreal flile¢ !, ! Series S0 provides up t ! just 34 square feet of deer of Beer spoof. ! ! t ! r t r ! F ! ) t r 1 ! �_rrrr_rr-rrrrrrrrrr r-- ----------------rrrrrrrr---rrrr- •'-- , �-•rrrr--•rrrr-- FUTURE (>�� s�e��lATtilss=s4 r- r�-� i ll0-�1 1------ r-rrrrr-- rrrrrrrrr - rrrrr-r rr ----�-� >< 1000 ) rrrr •- $8.4 pRIAT OM 53.4 --- ----- ;Z4 0.0 _ rrrr rrrrr�il�-'- rrrrrrrrr rr • �M� r _rrrrrr- o.a �•�/ rrrrrr0.0 0.0 1"S-94 {rrr•---•rrrr-1!!1-9 992-to .........r-rr-IflliaY- -- - rr_ rrr -•-••rrr - -j ( • x 1000 __-_ram ------ Ot.O! ---- - --- O.Q ------o.0 0.8 0.0 REVISION OATS 01/28/69 -.v ,rir.r .:.rat ; tt C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 06/29/69 PROJECT N0. : 811015 PROJECT NAME : UPGRADE MAINFRAME COMPUTERS 8 PERIPHERALS ------------------------------------------------------------ PROJECT DESCRIPTION% f ADDRESS : 400 NW 2ND AVE i s This project involves the upgrade to (2) UNISYS A-17 t NSRHD LOCATION : 263 ! mainframe computers and associated peripherals the ! NBRHO SERVICE : 900 ! A-17's will be able to handle the City's demands for ! PROGRAM : 001 GENERAL GOVERNMENT ! the next eight years. Furthermore, the 1.2 million ! payment for previous 0-7900 mainframe was cancelled, t ! CATEGORY' : 011 GENERAL GOVERNMENT ! and its appropriations carried into this project. The ! DEPARTMENT s 046 COMPUTERS PROJECT MANAGER: 461 PABLO ESQUIJAROSA ! total funding for the A-17's (including interest, and the carried over 1.2 million t ! FIRST YEAR IN CAPITAL PROGRAM : FY90 ! indirect allocation ! from the previous project) is $7,625.000.00: ! ! FIRST YEAR OF APPROPRIATIONS t FY90 ! PROJECT SCHEDULE s ! ! INITIAL REVISED ! ! COMMENCE DESIGN 10/68 ! ! AWARD CONTRACT 10/88 ! ! BEGIN CONSTRUCTION ! ! BENEFICIAL USE 04/89 PROJECTCOMPLETE 04/89 ----------------------------------------------------------- TOTAL COST PRIOR APPRO- APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES--------------- � 1992-93 1993-94 1994-95 COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 ----------1000---------------- ---------------------------------- ------------------ [ f X ) LAND ACQUISITION DESIGN CONSTRUCTION 1192.6 1327.9 1023.5 1023.5 1023.5 204 . EQUIPMENT 7636.0 ADMINISTRATION OTHER------ --------- -- --------------- ------ -- - - TOTAL COST 7688.0 ------------------ 0.0 1192.E --- ia27.9 1023.5 1023.5 1023.5 204 7.0 TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTURE FUNDING -------------------• 1992-93 1993-94 1994-95 FUNDING SOURCES FUNDING PRIATIONS 1989-90 --------- 1990-91 1991-92 ---- ----- ---------------------------------- --------- ( f X 1000 ) 928.5 928.5 923.5 923.5 1847.0 193 CONTRIB'FR GENERAL FUND 5541.0 p S89 CONTRIB FR FY89 GENERAL FUND 210.6 210.6 1 00.0 100.0 100.0 100.0 200.0 $49 1970 POLLUT. 0.0 B. 86 SL -INT 600.0 539.2 887.0 100.2 867 1941 FIRE-G.O. BONDS $62 1964 POLICE Go. BONDS - 87 SL 747.2 59S.0 152.2 - __ _ __ _ _ `-- TOTAL Ft1NDIN9-------------7638.0 --- 0.0---1192.6 1327.9 1023.5 1023.51023.5 2047.0 4. REVISION DATE 08/14/89 • •` . 0 Y T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION At OF OS<29I8!6 PROJECTNO. s 811018 --rr-------r----------•------------------------------------- PROJECT'NAME r RELOCATION OF MUNICIPAL SHOP OPERATIONS ! PROJECT DESCRXPTIONs ` ADORESB : N.W. 12 AVENUE AND 20 ST. ! 1 i NSRNO LuuATION : N NSRHD SERVICE s 900 f t PROGRAM s 001 GENERAL GOVERNMENT I k ) CATEGORY s 011 GENERAL GOVERNMENT 1 t DEPARTMENT s 042 GENERAL SERVICES ADMINISTRAT. I PROJECT MANAGERs 992 ARISTIOES FERNANDEZ I FIRST YEAR IN CAPITAL PROGRAM : FY90 I FIRST YEAR OF APPROPRIATIONS : FY90 ! I ( • ) PROJECT SCHEDULE s ! F INITIAL REVISED I P COMMENCE DESIGN 09/89 I f AWARD CONTRACT 11189 1 ( I" BEGIN CONSTRUCTION ! DENEFICIAL USE ! 1' PROJECTCOMPLETE 07/90 ------------------------------ --------.....------------ ------- PRIOR APPRO— TOTAL COST APPRO— PRIATIONS COST CATEGORIES ESTIMATE PRIATIONS 1909-90 •--------------- FUTURE COST ESTIMATES--------•------•-s 1990-91 1991-92 1992-to 1998—" 1998-90 ------------- rr---------------- r -- ---------------------------- - --rrr--- r--------- --- ( •X1000) �'l LAND ACQUISITION DESIGN CONSTRUCTION EGUIPMENT AA�RNISTRATION TOTAL COST - ------ ----- FUNDING SOURCES 685 LAND SAES ------------------------- 'TOTAL FUNDING t. 2200.0 500.0 300.0 --------- 2500.0 --------- 0.0 --------- 500.0 PRIOR APPRO— TOTAL APPRO— PRIATIONS FUNDING PRIATIONS 1989-90 2500.0 500.0 --------- 2500.0 --------- 0.0 --------- 500.0 1700.0 300.0 _ _ _ -- ----- ----- ----- ----- —�— z000.0 0.0 r0.0 0.0 a!( <------------------ FUTURE FUNDING-------------------3w 1990-91 1991-92 1992-95 199si-•94 -------- ------ --------------- ( • X 1000 >• 2000.0 -r --r r---- r rrr-r r-rrr rrrrr rim' 2000.0 0.0 0.0 0.0 REVISION DATE 08/18/89 BMMIII Amm89 Amom A X-4 C I T Y OF M I A M I AS OF0i129/'09 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. t 311019 PROJECT NAME t ARCHITECTURAL/ENQINRERINO COMPUTER SYSTEM ADDRESS t 275 N.N. 2ND ST NBRHD LOCATION t 263 NSRHD SERVICE t 900 PROGRAM : 001 GENERAL GOVERNMENT CATEGORY t 011 GENERAL GOVERNMENT DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERt 995 DR. LUIS A. PRIETO-PORTAR FIRST YEAR IN CAPITAL PROGRAM t FY90 FIRST YEAR OF APPROPRIATIONS t FY90 PROJECT SCHEDULE t COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED TBD I'll P 1', 1 -------------------------------------- ---.----�---. t PROJECT DESCQZPTiON: f ! This proj*ct is intended to enhance the dosing of ! I construction projects bV allowing the designfrs e th!' I opportunity to lxplorf alternative* designs and: the N I corrfspondingq ispact, thus providingthe boot possible, t I dosing, and to do so in a such shortened time fram9, f I conssquentlV reducing the cost of dosing. !' t t t C ! t r ! t ! t ! t ! r t t !' ----------------------------------------------r------------r PRIOR APPRO- TOTAL COST APPRO- PRIATIONS --------------- FiRZRE COST ESTIMATES---------------r COST CATEGORIES ESTIMATE PRIATIONS 1909-90 1990-91 19l1-92 199Z-93 1"26.94 1914-9E ----- -------------------- --------- ---- ----- --------- -- ---- ----------------------------- i-i x 1000 i- LAND ACOU28ITION DESIGN CONSTRUCTION EOUIPMENT 250.0 250.0 ADMINISTRATION OTHER --------------- TOTAL COST --- 250.0 ---- - -- 0.0 --r 250.0 ----r - -------------- ----r --------- 0.0 0.0 0.0 0.0 W.0 TOTAL FUNDING SOURCES FUNDING 792 1970 HGWAY Q.O. BONDS -37 SL 25.0 $87 1984 STORM Q-O. BONS -88 SL 75.0 aid 1950 SANITARY A.O. B. - 85 SL 75.0 $65 STORMWATER UTILITY TRUST FUNDS 75.0 TOTAL FLING 250.0 PRIOR APPRO- APPRO- PRIATIONS------------------ FUTtm F'eNWHIS------------------, PRIATIOHS 1939-90 1990-91 1991-92 1992-90 1990-90 1904.95 ------------------ ---- ----------------- --- ------------ i0 x 1000.E . 25.0 75.0 75.0 75.0 ----- ---- ----- ----- ----- --------.�-..... 0.0 250.0 0.0 0.0 0.0 �0.0 �r.o REVISION DATE 09101/09 s�! • ■ z P]!GB �pti.7 ��. CITY OP M I A M I AO OF 08129/09 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 812006 PROJECT NAME s POLICE SUPPORT SERVICES FACILITY ------••--___r-r-_-rr--- ! PROJECT DESCRIPTIONS ! ! ADDRESS : TO BE DETERMINED ! i NBRMD LOCATION t $91 NBRHO SERVICE s 900 ! ! This project involves the construction et & taeility ! ! PROGRAM S 002 PUBLIC SAFETY ! to house and train the horses and do* used':bV ! Police Department Special Polito Unit. The the proposed ! 2 CATEGORY S 02POLICE ! facility will house approximately 2A here** dogs used by the by the K-9 t 029 POLICE DEPARTMENT s 022 1 Mounted Patrol Detail and Several used ! PROJECT MANAGERS POE I.ONGUEIRA ! Detail. ! FIRST YEAR IN CAPITAL PROGRAM s FY85 ! FIRST YEAR OF APPROPRIATIONS S FY88 R � PROJECT SCHEDULE : INITIAL REVISED ' ! ! ! COMMENCE DESIGN TBQ ! ! ! AWARD CONTRACT TBD BEGIN CONSTRUCTION TBD ! BENEFICIAL USE TOD -'----__ PROJECT COMPLETE TBD TOTAL COST PRIOR APPRO- APB- PRIATIONS _ FUTURE COST ESTIMATES ,„,,, ,-_-r-------- s <------------ -" 1991-92 1992-98 i198-9d COST CATEGORIES ESTIMATE RRIATIONS 1989-90 --------- 1990-91 ____ _-___ _+�__- _-Zl9t_r. ------------------------- --------- --------- S v 0A 10� w !i Y t LAND ACQUISITION DESIGN CONSTRUCTION 49.5 49.5 EQUIPMENT 5 .5 ADMINISTRATION OTHER_ _______________ -- -COST - _ -----50:0 ---_- - -0.0 -_---_ ----r r------------------ 0.0 _0.0 0.0 0.0 --------- 0.0 TOTAL 0.0 PRIOR APPRO- FUTURE Ft1M0I!#R------------------- r TOTAL APPRO- PRZATIONS 1989-90 <------------------ 1990-91 1991-92 1992-93 FUNDING SOURCES--- FUNDING PRIATIONS _—_ --_ - -r _ ---- ...r rrrrrr r-------- r-1!!4-lS — ------ -- t e X 1000 i $90 1970 POLICE G.O. BONDS ____ - 50.0 ____ ------- 50.0 -- __-50.0 --_ M — -_ ro.o _____ ___ __--- ------------------ — -0.o ro.o o.a o:o --------- TOTALFUNDING-50.0 06 REVISION DATE 06/28/69 • Al A 1-1,411 MQ C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. 312007 PROJECT NAME : NORTH DISTRICT POLICE SUBSTATION ADDRESS a 1060 NW 62NO STREET NBRHD LOCATION : 111 NBRHD SERVICE s 111, 112, 113, 114, 115, 121, 122, 123, 191, 192, • 631, 632, 633, 634, 635, 636 PROGRAM : 002 PUBLIC SAFETY CATEGORY s 022 POLICE DEPARTMENT s 029 POLICE PROJECT MANAGERt 293 JOE LONGUEIRA FIRST YEAR IN CAPITAL PROGRAM : FY85 FIRST YEAR OF APPROPRIATIONS : FY85 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 09/86 AWARD CONTRACT 09136 07187 BEGIN CONSTRUCTION 10/86 08187 BENEFICIAL USE 10/87 01/89 PROJECT COMPLETE 12/87 03/89 A0 OF 00/2tt/S! ------------------------------------------------------ i---M! 1 PROJECT--DE8C----RIPTIONs ! ! 1 ! Construction of a full service police subststieft is bey t t located in the Liberty City Area. The station 0122 ! have approximately 22,000 sq•ft. of building space and! ) ! parking space for approximately 100 vehiclss. ! ! ! I Facility will provide basic police services which in E ! chide Report Writing, Community Relations Unit, Coa- 1 plaint Reporting and Case Follow-up. Patrol Officers, ! t Walking Beats, Vice Intelligent@ and Narcotics, I General Investigations Unit and a Crime Analysts ! .. ! Unit will be housed in this facility. up to 160 t ! personnel may be operating from this facility. t t t t r ------------------------------------------------------------ TOTAL COST PRIOR APPRO- APPRO- PRIATIONS ------ FUTURE COST ESTIMATES �-----------'---`-""`-`-' 1991-92 1992-98 1l1S-94 1914-15 COST CATEGORIES ESTIMATE PRIATIONS 1909-90 1990-91 ---- ------------- --------- --------- -- --------- LAND ACQUISITION DESIGN 324.0 324.0 CONSTRUCTION 4299.0 4299.0 Eptapmin 150.0 150.0 ADMINISTRATION 131.0 131.0 OTHER 96.0 96.0 ----- ---- _---_ ---- _-_-_ --- - ------------------------- TOTAL COST --------- 5000.0 --------- 5000.0 --------- --------- --------- 0.0 0•a TOTAL PRIOR APPRO- APPRO- PRIATIONS <--------- --------- FUTURE FUNDING 2!!2-l8 y '-""- 94 1904-9 1!!8-l4 FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-9I 1991-92 ------- --------- --------- --------- ------------- ..�..----. ------------------------- --------- --------- t 0 X 1000 ) 892 1984 POLICE G.O. BONGS - 86 SL 5000.0 5000.0 -----__ __-_____ _-----0.0 TOTAL FUNDING ---5000.0 _-- ------ ------0.0 -_---- 0.0 16 REVISION DATE 06/23/89 89-80ft ■7 ��, �l 1. ill �1161_61_{�1 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 312008 PROJECT NAME s SOUTH DISTRICT POLICE SUBSTATION ADDRESS s BEACOM BLVD a W. FLAGLER NBRHD LOCATION s 779 NBRHD SERVICE : 3e1, 391, 392, 393, 471, 472, 473, 491, 492, 493, 494, S91, 592, S93, 594, 691, 692, 693, 694, 77e PROGRAM s 002 PUBLIC SAFETY CATEGORY s 022 POLICE DEPARTMENT s 029 POLICE PROJECT MANAGER% 293 JOE LONBUEIRA FIRST YEAR IN CAPITAL PROGRAM : FYSS FIRST YEAR OF APPROPRIATIONS s FY85 PROJECT SCHEDULE _ INITIAL REVISED COMMENCE DESIGN Ogles AWARD CONTRACT 12/87 07/8e BEGIN CONSTRUCTION 02147 ogres BENEFICIAL USE 06/ee 08/e9 PROJECT COMPLETE 06/e6 10/e9 A: OF 00/29/89 -r-r--rrrrr-rr-rrr-rrrr---- r-r---rr-r-rrrr----r----------r ! PROJECT OESCRiPTZON: € ! € 1 Construction of a full sarvice Police, substation to be I 1 located in the, Little, Havana area. The, elation will 1 have approximately 17,000 square foot of buildingq € ! space and parking spats for apprexlm04019 100 vshlolss. ! The facility will provide basic police services which € 1 include Report Writing Community Relations Unit- ! Complaint Reporting and Case Follow-up Patrol Officers € 1 WalkingBeats. Vice Intelligqence and Narcotics General € ! Investigqations Unit and a Criss Analysis unit will be € 1 housed in this facility. Up to 221 personnel maybe 1 1 operating from this facility. 1 The commencement of contract far the construction € 1 of the substation is on hold pending the water tonta- f ! mination issue. Public Works has appplled for relm- ► 1 buressent from the "Super Act" for the actual cost of 1 the cleanup. S-------------------------------------------------------r--r PRIOR APPRO--„----s TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES ----N--- 95 COST CATEGORIES ESTIMATE PRIATIONS 19$9-90 1990-91 1991-92 1992-98 1993-94--1994--- ---------------------------------------------------- ------------ ----- - ' ( is X 1000 ) LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST 2200.0 2200.0 336.0 336.0 2134.0 2134.0 150.0 150.0 148.0 146.0 30.0 30.0 5000.0 5000.0 TOTAL FUNDING SOURCES FUNDING --------------------r----------- -- e92 1984 POLICE 0.0.. SOWS - e6 SL 5000.0 TOTAL FUJNDING 5000.0 A r-r- ------r--------r-- rr--r-N --r N-r ------c:0 o.o o.o o�.o a.o a PRIOR APPRO- _------- FuTU K Ft ------- r APPRO- PRIATIONS 4---------- - ..rrr PRIATIONS 19e9-90 1990-91 1991-92 1"2-98 1998-94 1994-1s9 -------- - --------- ----- - - ------ ---------'--------- --------- 6 x 1000 ) ---5000.0 ---------------------- 5000.0 0.0 0.0 REVISIOIN DATE 09/28/S9 - - - - - - - - - ------o-o• ------a.Q < N .. _ I�1111111111 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO- s 312010 PROJECT NAME s POLICE MOBIL DIGITAL TERMINAL REFINEMENT ADDRESS s M.P.O. - 400 UW 2ND AVE NSRHD LOCATION s 263 HBRHD SERVICE s 900 PROGRAM - s 002 PUBLIC SAFETY CATEGORY" s 022 POLICE DEPARTMENT s 029 POLICE PROJECT MANAGER: 297 MAJOR DEJONG FIRST YEAR IN CAPITAL PROGRAM s FY34 FIRST YEAR OF APPROPRIATIONS s FY37 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 01/67 AWARD CONTRACT 01/90 BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 01/90 COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION TTRRATION OTHER ------------------------- TOTAL COST ---PR—rOJEC------------r--rr------ r—rrrrrrrrrrrrrrrrrrrr..r-rrrrrrr } ! T �8CRIPTZDN: i ! ! Acquisition of now MDT terminals and the expansion f ! of available funattons to tit to with tht Prsssnt ! Computer Assisted Report Entry (CAM) and 0em�utsr ! Assisted Dispetah (CAD) systoms. To, inoluds such host ! as Autosatio Call Direct, Call Check Raaords and ! ! Logging Tape Recorders. ! ! ! f ) ! ! t t ! M: --------------------------------------------- --------rrr-rr PRIOR Ate- ------ FUTURE 006T ESTIMATES rrr------- ---- I TOTAL COST APPRO- PRIATZONS <`-------- ESTIMATE PRIATIONS 194940 1990-91 1991-92 1!!Z-98 199S-94 E!!4-!S -------r----r ---rrrrr-- ----rrrrr -rrr-rr-- ---•--rrr—rr--------r------ ----- •X1000) 1212.3 1390.5 13.6 15.4 ------- -- --- ------ 1225.91405.9 TOTAL APPROO-- FUNDING SOURCES FUNDING PRIATIONS ------ ----rrr-------- --------- --------- ii0 1970 POLICE 0.o. BoNDS 913.9 492 1904 POLICE 0.0. SONDS 96 SL $12.0 - _----------- --- --- — TOTAL FUNDING 1225.9 a 175.2- • S ----rr..+r _---rrrrr r+rrr.e++rrh ----`` 1M�0.0-------0----- .0 0.0 APPRO— PRIATIONS rrYi PRIATIONS <------------------ FUTURE a rr.►rrrrrrrrr..rrYr puma 19$9-90 1990-91 1991-92 1992-93 1990-" "94-00 — — — — — — — -----rrr— rrrrr.rrrr rrrr+rra*riG ( 0 x 1000 ) 913.9 492.0 130.0- -- rrr--rrr— rrrrrrrrr - rrrrrYfi.t► 1405.9 130.0- 0.0 0.0 0.0 0.0 KKR 991twa-Z an C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 312012 PROJECT NAME t POLICE PROPERTY 8 AUTO POUND FACILITY RENOVATION ADDRESS : 400 NW 2ND AVE. HBRHD LOCATION t 263 NBRHD SERVICE : 900 PROGRAM t 002 PUBLIC SAFETY CATEGORY : 022 POLICE DEPARTMENT t 029 POLICE PROJECT MANAGER: 293 JOE LONGUEIRA FIRST YEAR IN CAPITAL PROGRAM t FY85 FIRST YEAR OF APPROPRIATIONS : FYaa PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 10/87 10/89 AWARD CONTRACT 03/83 03/90 BEGIN CONSTRUCTION 04/BB 04/90 BENEFICIAL USE 09/88 09/90 PROJECT COMPLETE 09/66 09190 COST CATEGORIES LAND ACQUISITION DESIGN CEONSOUION pR T ADMINISTRATION OTHER TOTAL COST AS OF 08/29/09 -----------------------------------------------------------t t PROJECT DESCRIPTIONc t t ! This Project involves expansion, renovation and securi- t I ty of the Property Unit and Auto Pound Faculty, to t Include first floor expansion, redeel n and construes- !' t tionienclosure of K-9 bays !or Pro ortyy stors"I and t t security enhancemonts to the Auto OUR N PRIOR APPRO- ---- FUTURE COST 56MATEi TOTAL COST APPRO- PRIATIONS----------- "- ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-99 1994-94 1994-" --------------------------- --- - ------------- --------------- ( e X 1000 ) 8.8 82.6 $5.5 400.0 5.0 5.0 1.2 5.4 17.5 ------------------ 13B.o 49a.o PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS 73.6- 314.5- 4.2- 17.5 375.0- APPRO- PRIATIONS 1989-90 882 1984 POLICE GO. BONDS - 67 SL 185.0 185.0- 892 1964 POLICE O.O. BONDS a6 SL 1ia.o 808.0 190.0- TOTAL FUNDING 118.0 493.0 375.0- 46 ------o.o------p.o------a.o------o-�------o.a t------------------ FUTURE FUNDING-------------------s 1990-93 1991-92 1992-98 399s-94 3994-9E --- ------------------------------- -t e X 1000 )` o.o a.o a.o �o=� o•a REVISION DATE 06/23/19 , I C I T Y O F MI A 92 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s $12014 PROJECT NAME j POLICE MICRO -COMPUTER •4 L D. SYSTEM ENHANCEMENTS ADDRESS M.P.D - 400 HW 2ND AVE NBRHD LOCATION t 263 NW" SERVICE : 900 PROGRAM s 002 PUBLIC SAFETY CATEGORY s 022 POLICE DEPARTMENT : 029 POLICE PROJECT MAHAGERs 301 SOT. HELMS FIRST YEAR IN CAPITAL PROGRAM s FY65 FIRST YEAR OF APPROPRIATIONS s FY45 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN TOO 10/49 AWARD CONTRACT 03/90 BEGIN CONSTRUCTION 03/90 BENEFICIAL USE PROJECT COMPLETE 09/90 AD OF 0012*10" ------------------- ---- ----r-r-r rr---- t PROJECT DESCRIPTION$ t 1 1 This project involves the upgrading of tho promo** t I Police computer *Veto* and the purehaaw of 4"A41e002 t I computer terminals and printer* to expand itm uwm. t 1 Pending a review of the new securityy •yysstef fee thm: t 1 Pollee Department..moniow will be utiii•ad for t I automated fingerprint I.O. eytew, Micro-Coaputer t' 1 Expansion, and Re -write of C.A.R.E eyetem. ! t : t t ! t ! t t t t t ! t : t ---------------------------------------r--..rr—r------------ PRIOR APPRO- TOTAL COST APPRO- PRIATIOHS <--------------- FUTURE COST ESTIMATES---•---------�--� COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1"2-" 1918-9A :91i-911 ------------------------------------------- -------- • --- ---------- --------------rrrrrrr rrrrrrrrr *x1000) LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES --------------------- 7S9 FLA. DPTO• COMM. AFFAIRS GRANT 840'1970 POLICE G.O. BOND$ 091 1984 POLICE G.O. BONDS ------------------------- TOTAL FUMING R 1249.2 1002.5 22.5 22.5 100.0 100.0 -1411.7 1125.0 299.7 --• -- •----•--- ----- --------rr-----rr-.n0.11k. 286.7 0.0 0.0 �0.0 0.0 �t TOTAL PRIOR APPRO- APPRO- TIONS PRIATIONS ------ FUTURE FUNDING __ _ <------------ -r-.. --..rr 1990-91 1991-92 19"-93 1999-94 1994 9 FUNDING PRIATIONS 1969-90 ---------------------------------•_-...,. --------- --------- --------- --- 4 i x 1000 I 46.7 100.0 1a.8- 129.0 129.0 1196.0 996.0 $00.0 r----r. --- 1411 7 ------- 1125.0 ----2si.7 --------- ------ — ----- -- 0.0 0.- 0•Q a•Q REVISION DATE 06/26/99 ■`�d`Ill6l6��l�l�ln�ll�il�l��'l�" C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 312015 PROJECT NAME : CENTRAL POLICE FACILITY EXPANSION AND ADDRESS s M.P.D. - 400 NW 2ND AVE NBRFD LOCATION s 263 NBRHD SERVICE s 900 . PROGRAM s 002 PUBLIC SAFETY CATEGORY" s 022 POLICE DEPARTMENT : 029 POLICE PROJECT MANAGERS 293 JOE LONGUEIRA FIRST YEAR IN CAPITAL PROGRAM s FY64 FIRST YEAR OF APPROPRIATIONS s FY87 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 08/46 10/29 AWARD CONTRACT 02/67 01/90 BEGIN CONSTRUCTION 03187 04/90 BENEFICIAL USE 12/87 09190 PROJECT COMPLETE 12167 09/90 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST As of Q8/"/is —-----------------M..�--.Y--.r------�—�- ---------------------- t PROJECT DESCRIPTION: !' ! E ! Esspaneion and remodeling consist of s F ! 1. 5th floor core area, 1 ! 2. Police Compound enhancoments f ! a. Redesign of front lobby/socuritq sgsto�r• on 2sd 91~ r ! 4. Implementation of socurSIV agetoss orAWMessonts, for E ! wain Police facilltV. ! t ! 1 ! 1 ! M ! ,1 --------------------------------�....-......,-� .....�-,..........�-..,... PRIOR APPRO- TOTAL COST APPRD- PRIATIONS <--------------- FUTURE COST ESTIMATEM---------------i ESTIMATE PRIATIONS 1989-90 1990-93 1991-92 1992-98 199e-9i 1994w-99 --------------------------- --- -----------------..--r.ur -------� -( t X 1000 ) 200.0 200.0 489.4 735.1 240.7- 100.0 135.0 35.0- 9.8 11.9 2.1- --------- --------- 799.2 10e5.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS d80'1970 POLICE G.O.- BONDS 799.2 1085.0 TOTAL FUNDING 799.2 1085.0 —-------- 255.5- --------- --------- 0.0 0.0 --------- --------- 0.0 0.0 --------- 0.0 APPRO- PRIATIONS 1969-90 <------------------FUTM 1990-911991-92 - FUNDING ------------ 1992-991998-" It"-9R --------- ---- ----- 4 • X 1000 ) ------ ----.Y----i.1- 2es.e- --- - 295.5- - ----- - ----- 0.0.0 0 _ ----- ----- ------ .0 0.0 _...._---_- 0.0 N ■i�iiii iiii _ _ --.._I_ I _ III II _� I_ ILIIIII��I C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N0. PROJECT NAME s 312013 : POLICE EQUIPMENT ACQUISITION - FY'89-FY'90 ADDRESS : MPD 400 14W 2 AVENUE NSRHO LOCATION : 263 NBRHD SERVICE s 900 PROGRAM s 002 PUBLIC SAFETY CATEGORY" s 022 POLICE DEPARTMENT : 029 POLICE PROJECT MANAGER: 291 SANDRA LATEY FIRST YEAR IN CAPITAL PROGRAM s FY89 FIRST YEAR OF APPROPRIATIONS s FY89 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 09/89 09/90 IKI AS OF 04129180 � _ -•----------------------------------------- ------�. 1 PROJECT �SCRIPTIONs ! 1 Acquisition of a now Too 9 Storage and Notrlevol P 1 Subsystem for the Automated Fingerprint Identification f 1 System (AFIS) which interfaces with the Video Laser ! Oisc INaqq• and Retrieval System- This syystese ws11 ! enable tf►e Department to photograph !ndlvlduals, bi ! capturing images on a video disc with retrieval bg a 1 computer. ! Other equipment to be purchase include radios. riot ! 1 gear. and State of the Art Video Equipment- ! ' ( t ! f 1 f ! 1 !-----------------------------r------..rrr-r..rr--r- -sw� PRIOR APPRO- --r----------- f. TOTAL COST APPRO- PRIATIONS <--------------- COST ESTIMATE* -r COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-98 lots--- 1994-9lf ------------------------------------ ( • x 1000 ) LAN ACQUISITION DESIGN CONSTRUCTION EQUIPMENTADMIN OTHER TOTAL COST FUNDING SOURCES 836 1984 POLICE G-O- BONS - 88 $81 1984 POLICE G.0- BONDS $82 1984 POLICE GO. BONS - 87 SL $94 1970 POLICE GO- BONDS - INT TOTAL FUNDING 46 1235.9 8L $31.5 404.4 13.8 9.2 4.6 1249.7 $40.7 409.0 ------------------ 0.0 0.0 ----------------�----------� 0.0 TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTURE 1991-92 FUNOM r--------�„, 1992-93 199s--- 1994-91� FUNDING PRIATIONS 1989-90 1990-91 --------- --------------------..--rr-.�, --------- --------- --------- --------- ( e x loco ) 1235-S 1235.S 358.2 358.2- 466.3 468.3- 14.2 14.2 •-----�---�r..-----"~� --------- 1249.7 --------- 840.7 --------- 409.0 ------------------ 0.0 0.0 •---- 0.0 o.a o.It REVISION DATE 06/30/89 �iiflllllililCl{IiI'il� ilI(1 ilfl si �i. .r PROJECT NO. s.312019 PROJECT NAME t MPD FIREARMS RANGE RENOVATION ADDRESS s M.P.D. 400 NM 2ND AVENUE; NBRHO LOCATION s 263 NBRFD SERVICE s 900 PROGRAM s 002 PUBLIC SAFETY CATEGORY : 022 POLICE DEPARTMENT s 029 POLICE PROJECT MANAGER: 293 JOE LONGUEIRA FIRST YEAR IN CAPITAL PROGRAM : FY39 FIRST YEAR OF APPROPRIATIONS s FY39 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION DESIGN CONSTRUCTION 7.1 EQUIPMENT 75.0 ADMINISTRATION .9 OTHER -------------------- TOTAL COST —_—a----- 3e.0 TOTAL FINDING SOURCES FUNDING Se0.1970 POLICE G-O,..BMt e3.0 76 TOTAL .FUNDING 33.0 CITY OF MIAMI AR OFGol"It! CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR APPRO- PRIATIONS ----------------------------r-.r..r.... ! PROJECT D[SCRIPTION2 ! Funds will be utilized for the upgrade: and msd!lYestlen 1 1 of the existinq Miami Police Department pistol raatenger ! to meet State Certification requirements. Medsllsatsmss t ! to include all phyelaal improvemento to the range 9ast t ! city and upyradinss of the operating tar90t eystoe., t 1 Possible modificstion• ma be necessary in the ve"S- I ! lation system to west OSHA standards. t ! t 1 t ! t t t ! t t ! t ! ------------------ -----------_r-r-rrrr+err.fNlNr�ir.r.�rrrr.rr—..raY�r.. APPRO- PRIATIONS --------------- FUTIMiE CO" EBTtMjMs-----------•---� • --19e9-90 1990-91 1991-92 1l92-9i 19993 3!!-! -------------- ------------------ t 4 x 1000 I-;, 7.1 75.0 .9 -- ----- — ee—.o ------ --- _---- ------ --- ---- -------------r ---- r—r—r-rrs PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 19SO-90 <------------------ FO 1990-91 - 1991-92 MiE FUMDrIQ --- 1992-99 199-94" "r"- i9lfAb-9tr — — — — — — — — — — — — — - — — — — — — — —— -i-� - x 10" ) $3.0 -r.rNr—r•; — — — — — — 03.0 ----- -- — 0.0 ----- ----- 0.0 0.0- ----- ---rrai—r 0.0 0.0 6.:.0- CITY OF MIAMI AS or00,120169r CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION' F.+ FY90 PROJECT NO. : $12019 PROJECT NAME : UPC FIREARMS RANGE RENOVATION ADDRESS : M.P.D. 400 NW 2ND AVENUE' .> NBRHO LOCATION : 263 NBRHD SERVICE : 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY : 022 POLICE DEPARTMENT s 029 POLICE PROJECT MANAGER: 293 JOE LONGUEIRA FIRST YEAR IN CAPITAL PROGRAM : FY89 FIRST YEAR OF APPROPRIATIONS : FY89 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------- LAW'--- ACQUISITION DESIGN CONSTRUCTION AATIO!! OTHER TOTAL COST INITIAL REVISED PRIOR APPRO- TOTAL COST APPRO- PRIATIONS ESTIMATE PRIATIONS 1969-90 7.1 7.1 75.0 75.0 .9 .9 ----------------------------r-----------------r-r--rr-r-wwr.►. I PROJECT DESCRIPTIONi 1 ! Funds will be utilized for the upgrade and modlfleatlen f of the existing Miami Police Department pistol rany� to most State Certification requlressnts. Medidtsattlonsbl I to include all physical Improvemonta to the rang* faal-w F ! lity and upgrading of the operating targat •ystss.. 1' I Po*elbIs modifications may bs necessarg low thev*wtl-- ! ! lotion *Votes to west. OSFIA standards. ! C 1 E I M ! !r ! E i t I 1 ! 1 --------------------------------------.+rrrsr----ww.r.rrr-r.rr:.. <- --- FLE17 E COST ESTMTES---------------�s -------- --- - 1990-91 1991-92 1992-9s 199 -> 4 -- 1!1lal --------------------------rr— r--.rr--raw. . t t x 1000 i ----- ----- ----- ------------'i--------- .o �. ea.o-----eao.o' o.o 0.0 -0.0 0.0 0.4 TOTAL FUNDING.SOURCES FUNDING no 1970 POLICEG.O. BOWS 83.0 .. s. .. ., TOTAL fUNDI181 63.0 PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTUFAL FUNDIM PRIATIONS 1969-90 1990-91 1991-92 lost -to jos#;.4 1996_M ------------------ --- ----------w- l • x 1000 )� 63.0 rr.rtwr-w.+- siir.rr.Yr+ar - --- -- --- ------- -- ----- --- - ----- ---- ----- ---- $3.0 0.0 0.0 0.0 0.0 0.0 0+0 a s ��� N�IIIII I IIII I I C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT OE8CilIPTION FY90 PAOJECt,Hib.. 2 312020 PROJECT NAME- t 911 EMERGENCY BACKUP SITE ADDRESS : `1060 N.M. 62HMO STREET~ NBRHD LOCATION s 900 NNW, SERVICE : 900 PROGRAM, : 002 PUBLIC SAFETY CATEGORY : 022 POLICE 'DEPARTMENT s 029 POLICE PROJECT MANAGERS 291 SANDRA LATEY FIRST YEAR IN CAPITAL PROGRAM s FY90 FIRST YEAR OF APPROPRIATIONS : FY90 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN to/69 AWARD CONTRACT 12/89 BEGIN! CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE PRIOR APPRO— TOTAL COST APPRO— PRZATIONS COST CATEGORIES ESTIMATE PRIATIOH8 1989-90 ---------------------------------------------------- LAND ACQUISITION Maio" CONSTRUCTION EGUZPMENT ADMINISTRATION OTHER ------------ ------------ TOTAL COST 52.8 846.0 PRIOR TOTAL APPRO- FUNDING SOURCE$ FUNDING PRIATIONS --------------------------- 52.8 446.0 ----i9e:e APPRO- PRIATIONS S89 911 SYSTEM SERVICE FEE 346.0 344.0 336 1954 POLICE-Q.O. BOOM = 198 SL $2.6 $2.8 --------�----------- ------------------ TOTAL-FUNDING- a94.8 0.0 398.6 a .--------------r---------+rrr+..rr.w-s ! PROJECT DESCRIPTION: 1 ! This project involves the acquisition at equipment ter f ! the purpose of providing a backup to the •�e3st#no 911. M ! Ewsrgsnc Systoo ! This pro eat wilt enhance the, Pollss Departaw4wo M ! ability o deliver cantinueous E911 seraics'AM time_ !� ! event of an evacuation from the Polls* an# VIP ! buildings. f ! 1 � 1 ! ! 1 ! 1 ! 1 --------------r--------,-r-_-_-__-N--ih..i,YYiNi�..r-�IJri.i�r���.IF (--------------- FUTURE COST EST MTEO----••----r....... s 1990-91 1991-92 19f2-93 1"86-94 19"-ft --- - ---- ( • x 1000 ) ---- — - — — N-----ar.. rr..-srr11�11R 0.0 0.0 0.0 0.0 0. (------------------ FUTm. ►U�yWAt------------- 1990-91 1991-92 1912-90 199M)-90 3504-5 ---------------- - ---- -..--- .—,�;. c 0--- x 1000 ----------------------- --------- 0.0 • — _— ---fir 0.0 0.0 0.0 ftis11�1t' i1J' �lililil�l�1`1 °1'1Pl F C I T Y O F Y I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 00/"/t# PROJECTNO. : 812021 _-__-----r_-_rrr_---rrrr-rr_rrrr_r-rrrr-r-rrrrr-r-rrrrr..r.r.rr. PROJECT NAME s LEGION PARK POLICE MINI -STATION ! PROJECT DE80RIPTION: ADDRESS s 6447 N.E. 7 AVEWIE NBRHD LOCATION 1 191 ! ! This project involves the construction of a 1200 e NBRHD SERVICE s 191 ! square toot police mini -station located tie teg*a, • ! Park. This Mini -Station will service the Northeloot e PROGRAM : 002 PUBLIC SAFETY ! Biscayne Boulevard corridor and'20 factor. The Oros F CATEGORY" : C22 POLICE ! is ct sill be funded through a rant to two Grantor This ChaMibrr ! p DEPARTMENT : 029 POLICE ! iseayne Boulevard Chamber of Commerce. PROJECT MANAGERs 298 JOE LONGUEIRA ! of Commerce is responsible for the complete project t ! including design and construction and wU1 aoordinats 1 FIRST YEAR IN CAPITAL PROGRAM : FY90 ! with the Department's of Police. Parks, and Rscreetlen e FIRST YEAR OF APPROPRIATIONS s FY90 ! and Public Works. !, PROJECT SCHEDULE s 1 �` INITIAL REVISED ! COMMENCE LESION 10/69 ! e AWARD CONTRACT ! E BEGIN CONSTRUCTION ! BENEFICIAL USE ! !` PROJECTCOMPLETE -------------------------------- ----•-----r-.Nrr......��.r..r... TOTAL COST PRIOR APPRO- APPRO- PRIATIONS -------------- FUTURE 009T ESTIMATBI 1901�l COST CATEGORIES ESTIVATE PRIATIONB 1989-90 1990_ !1 1991-92 1!l2-08 19lSrl4 ---------- --------------- -------- --------- --------- -----i-------rr--- ------rrr Y, t e X 1000 l t LAND ACGUI8ITiON DESIGNCONSTRUCTION w E4UIPYENT ADMINISTRATION. f j OTHER 70.0 70.0 --- - ---- TOTAL COST ---- ---- 70.0 ----- 0.0 ---- 70.0 ----- ------------ -----rrr- -rrrrN rrrrrrrrr. 0.0 0.0 0.0 0.0 0.0 z PRIOR APPRO- TOTAL FUNDING SOURCES FUNDING APPRO- PRIATIONS PRIATION8 1989-90 ------------ -- FUTelriE FU UM rrr--rr------------ 1990-91 1991-92 9S j ---- --19l2 - -rsr-.rrrrrrrr-rr-rrrrw ---------------------------------- - -------- --------_ 1 g )I 1000) 799 FY' 99 StiSHINE ST: BOND PROCD8 70.0 - 70.0 _ _rrrr_r-.► N_rrrrrr. s ___ _ -----70.0 --- ------ 0.0 -----70.0 --------- ------0.0 r - r-0.6 0.0 0«9 .xx! j REVISION ` ii* dR/di/RR M , - d -.'Es�*i}i4777,+�+k" �� ��^ �,,<; ^4�kWM*2+w".x�M` ' .8. Est'^ i3�y �s THIS PAGE INTBNTIOl1.tiYj`. ��^ Fu r � �.4� �$r.�-� i Y+�,S*d' �.S ti .. gam,.✓ Olt w ,}'N'mf iMFY� Y- 'ir fl t wh +' �A s ' +t J is Y P+-t.F;..+=x: C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. 313220 PROJECT NAME : EXPANSION AND MODIFICATION OF FIRE STATION 810 ADDRESS i 4101 N.M. 7TH STREET NBRHD LOCATION : 594 NORNO SERVICE s 594 PROGRAM. : 002 PUBLIC SAFETY CATEGORY" a 023 FIRE RESCUE DEPARTMENT t 026 FIRE RESCUE PROJECT MANAGER: 231 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM t FY87 FIRST YEAR OF APPROPRIATIONS : FY87 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 12/88 06189 AWARD CONTRACT 03/38 09/89 BEGIN CONSTRUCTION 04/88 10/89 BENEFICIAL USE 02/39 09/90 PROJECT COMPLETE 03/89 10/90 AS OF 09/29/29 ------------------------------------------------------------ ! PROJECT DESCRIPTIONi t ! t t This proect involves the expansion and rofurbishment f ! of Fij re tation 810. It includes the acquisition of t t two residential properties to accommodate a two story t t addition of approxlsately 8000 square foot. The t t second floor will provide additional office and t ! dorultorspace plus rest roes facilities for sale t ! and tamaly e firefighters. ! The Around floor will Include an apparatus roes and t ! additional storeys space. The driveway at the roar ! ! of the station will be expanded to allow firs apparatus ! t ogress on N.N. 41 Avenue. ! PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES ---------------> ` COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-98 1992-94 1994-96 ------------------------- -- ------ — ----- - --- ---- ----- --- -t • X ---- 1000 ) --------- --------- --------- LAND ACQUISITION 112.0 112.0- DESIGN 100.0 100.0- CONSTRUCTION $00.0 300.0- EDUIPMENT 200.0 200.0- ADMINISTRATION 12.0 12.0- OTHER 10.0 10.0- --------------- -------- -- TOTAL COST ----- - - - - 0.0 ----- -- -- 1234.0 -- ------- 1234.0- ------ --- 0.0 --------- 0.0 --------- 0.0 ---- ---- ----- ----- 6.0 0.6 PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------------ FUTURE FI1NDZH0 ------- -------------► • FUNDING SOURCES FUNDING PRIATIONS 1909-90 1990-91 1991-92 1992-98 1993-94 1994-991 --------- ---------------------- --- ------- -- --------- --------- --------- 1 • X - - ----- 1000 ) --------- --�------- $66 1976 FIRE G.O. BONDS 1234.0 1234.0- _r— TOTAL F_U_N_DING 0.0 -1234.0 1234.0- 0.0 0.0 0.0 0.0 0 0' 99-896 DELETION DATE 09/30/S9 y •,.,.r_� r+i+e ..trv...: .i•' Ja-, ...: ..k.`]s....vi.+.t';ki+t 4r..,::5... ^�.. Ke.:....;n'✓Ji"1M anian.r ;a ..ri r. :, ..;, -._e. r o-. n,...-. ..,... z ..-:... -. ._:.. .-.... ._.,. ..... ......... ... .. .. .,. .. . ,... .. ., k.re...t+:...,.,�+_...�.+.:�.iw_.._....w+ti:::''•` �rS"..E'u:W�"La.S.".;1...:.u...-'.7� r.,i!••B"!, ! ..- .v. _ .. ,:. ..:...... .. °�f.w....-wvu+. .. .... '.':'. :. - .. _.. ..... —. ram+. ....i..,.. .�, .. .. ..., _....: ._,....�_; .� CITY OF MIAMI AS OF001291*9 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 • ,PROJECT 'NO. & 318221 PROJECT NAME : EXPANSION AND RENOVATION OF FIRE STATION 812 -------------------------------------------------------..�rr 1 PROJECT DEBCRZPTIONs t 'ADDRESS;` : 1458 N.W. 46 STRFET 1 This prolset involves the expansion and refurb1sh0@n4 N HdRHD LOCATION : 128 NBRFtD SERVICE : 12a 1 of Firs tstion 8129 a 36 year old building. PROGRAM,. : 002 PUBLIC SAFETY 1 1 It will include the addition of an apparatus bay plus 1 and storage fer an additional roeewe unit. t t CATEGORIC : 028 FIRE RESCUE 028 DEPARTMENT s 023 FIRE RESCUE quarters 1 The single story addition of approxiately 2,500 sprit bay, office and dormitoryy t t° PROJECT MANAGER: TOY YCLEAN 1 will include an apparatus 1 space, rest roase facilities and oterags for an addl- t FIRST YEAR IN CAPITAL PROGRAM : FY87 1 tional rescue unit and crew. Additienai fundin i includes provision for nesting South Florida SulidAft t t FIRST YEAR OF APPROPRIATIONS : FY87 1 Cods Handicapped requirements and possible asbestos PROJECT SCHEDULE : t abatement procedures. tt t INITIAL REVISED t t COMMENCE DESIGN 10/67 12/88 = t AWARD CONTRACT 03/86 t BEGIN CONSTRUCTION 04/83 ! t BENEFICIAL USE 02/89 ! PROJECTCOMPLETE TOD 03/89 ------------------------------------------------------------ TOTAL COST PRIOR APPRO- APPRO- PRZATIONS <---+----- rrrrrrrrrrr+r++} ------ FUTURE COST ESTIMATEi 1991-92 1992-98 1998-94 1996-90 COST CATEGORIES ESTIMATE PRIATIONS 1989-90 -- 1990-91 ---- ------------------------------.... ACQUISITION .LAND DESIGN 28.2 28.2- CONSTRUCTION 404.6 40.0 404.6- 40.0- EQUIPMENT ADMINISTRATION 14.2 14.2- OTHER 13.0 13.0- ----- ---- ---- r---- ---- —r—rr - rrrrr+irr ------- ----- —--------------------- TOTAL COST 0.0 ---- ----- $00.0 --------- 500.0- -- —--- ---0.0 0.0 0.0 0.0 0.9 t TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTUREFUNEWS ------------------`0 1991-92 1992-98 1998-94 1994-96 FUNDS SOURCES FUNDING PRIATIONS 1989-90 1990-91 -- -------------------------------- 867 1981 FIRE G.O. BONS $00.0 500.0- r++rr++rr --rrrr+r+ rrrrr—r+r TOTAL FUNING----------- ----- 0.0 500.0 500.0- r- —r -- 0.0 0.0 0.0 0.0 0.0 a DELETION DATE 09/30/69 CITY OF MIAMI CAPITAL XMPROVEMENT PROGRAM PROJECTOoIPTION c.v..ry a_..w. • vsvv-v PROJECT NAME i RENOVATION OF FIRE DEPT. ADMINISTRAT. OFFICE SPACE ADDRESS : 275 NM 2ND ST NBRHD LOCATION s 263 NBRHD SERVICE : 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY : 023 FIRE RESCUE DEPARTMENT : 028 FIRE RESCUE PROJECT MANAGER: 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM s FY82 FIRST YEAR OF APPROPRIATIONS s FY88 PROJECT SCHEDULE s INITIAL REVISED ' COMMENCE DESIGN 03/83 09/88 AWARD CONTRACT 11/83 02/89 BEGIN CONSTRUCTION 12/83 03/69 BENEFICIAL USE 09/89 PROJECT COMPLETE 10189 COST CATEGORIES LAND ACOUISmON DESIGN aEa MTI°N ADMINISTRATION TOTAL COST FUNDING SOBS 667 1981 FIRE G.O. BONDS';`. -i6- ----------------ar.u- ... TOTAL'FUNDING' PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS 10.0 10.0 285.2 285.2 160.0 160.0 9.0 3.0 38.5 $8.5 --- 496.7 --- 496.7 PRIOR TOTAL APPRO- FUNOING PRIATIOrS 496.7 496.7 -------------- 496.7 496.7 AM OF 06/29/09 -----r--r-------------r-------------------rrr..r ! PROJECT DESCRIPTION: ! t t ! This project involves expansion of tho Firer Dispatch t ! Center lecatod in the Citg Admialstration ftliding to t ! secommodate an uP9radinq of radio and communleatidno R ! sgotewe from 450 Miz to 800 MHz. 6Xpantlon will ! regTo the relocation of some offlees purchase of P ! additional furniture and the relocation of existing ! space for other purposes and the installation et now: k ! carpetin in the ofiles of the, Chief. This project t t also ineyudes the construction of a now Emergoneg C ! Operation Center. ----------------------------------- APPRO- PRXATIONS f--------------- FUTURE COS' nTXMAM rrrrrrrr.�rrrrr►� lost-90 1990-91 1901-92 19t2-" 1999-94 1999-9% --------- --- ---- --------- --------- --------ter • X 1000 )- r--..-- r-------- - --- - 0.0 ----- 0.0 r--r--rrr 0.0 -rrrrrr-r -rr APPRO- PRIATIONS 1989-90 <- --- ---- FUTURE 1990-91 1991-92 FU OM 1992-99 --rrr-.►..-----------� tots:-" 1994-99 --------- ryi.rr.-rr�r i -------- - --- - 0 X -....-r 1000 )' rrrr--- a: 1 ----- 0.0 ---- 0.0 -- --- -0.0 --------- - 0.0 ------.err; 0.0 --r------ 0.9 _. PROJECT NO. : 318016 PROJECT HAVE : FIRE TRAINING FACILITY ADDRESS : NA25'JEFFERSON ST., NBRFO LOCATION : 661 NBRHD SERVICE : 900 PROGRAM : 002 PUK.IC SAFETY CATEMY^ : 023 FIRE RESCUE DEPARTMENT : 026 FIRE RESCUE PROJECT MANAGER: 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM : FY76 FIRST YEAR OF APPROPRIATIONS : FY80 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 07/80 AWARD CONTRACT 04/81 BEGIN CONSTRUCTION 07/81 BENEFICIAL USE 05163 PROJECT COMPLETE TBD TOTAL COST COST CATEGORIES ------------------------- ESTIMATE ------- - LAND ACQUISITION DESIGN 85.9 CONSTRUCTION 2276.3 ENIPMENT412.6 ADMINISTRATION 64.6 OTHER 634.2 TOTAL COST 3475.6 TOTAL FUNDING 100.0 2140.0 1235.6 8475.E CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DEGORIPTION FY90 AS OF 00/'ftfw �I --------------------------------- ---------------- ---------- ! PROJECT OEBCRIPTION= ! The Coconut Grove Incinerator has been rodifisd for ue! ) ! as the Fire Training Fsailityy. The now facilit ) ! replaced the training faaillfV on NM 7 Avr. at a8tlt St. F ! that was inadequst0 in size and Obsolete, to design ter t ! training needs. Tho project resains open in as 80061 ) ! as litigation was involved and the, City how not r ! forsally aaaepted the completed work. The, Public Works ) ! Department has boon requested to, sxpodhto closure on ) ! acceptance of the work. ! ) ----------------- -..r-------rr---r--r-r-------r---------.Il�r-rr PRIOR APPRO- ----- FUTURE COST ESTIM I APPRO- PRIATIONS �---------- 14 1"i-!M PRIATIONS 1989-90 1990-91 1991-92 1992-93 10- 99 ------------------ --------------------------------rr.rrr-r (-• x 1000 ) $5.9 2274.3 412.6 64.6 634.2 3475.6 PRIOR APPRO- PRIATIONS 100.0 2140.0 1235.6 8475.6 r--rrrrr rrrrrrrrr rrrrr-rr-. rrrrrr+sr.. . APPRO---------- FUTURE RIR�� PRIATIDNG<--------- rrrr-rrrrr-rrrrrrrr.w@ 1939-90 1990-91 1991-921992-98 I"S-14 3094-W --------- ---- ---------- r---------------r-...r.Y, ( • X 1000 ) 4. REVISION DATE 04/09/68 .■ C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 313010 PROJECT NAME : RENOVATION OF FIRE STATIONS t OLD DRILL TOWER ADDRESS : CITYWIDE NdRFiD LOCATION : 900 NOW SERVICE : 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY" s 028 FIRE RESCUE DEPARTMENT : 028 FIRE RESCUE PROJECT MANAGERt 201 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM t FY63 FIRST YEAR OF APPROPRIATIONS : FY&A PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 04/02 AWARD CONTRACT 03/32 BEGIN CONSTRUCTION 03/13 BENEFICIAL USE PROJECT COMPLETE TOO COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EGUZPMEHT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------- off 1976 FIRE G.O. !BONDS - 067 1901 FIRE G.O. BOMB ------------------------ TOTAL FUMING AS OF 00/29109 -••-----------------------------------------f i PROJECT DESCRIPTION: t ! This project involves the renovation of existlnS Firs t ! Stations and the Old Drill Tower. Improvements wfil t ! include the redooiyn of dorms to provide privadG for t ! study and rest, restroom modifications to aoeemmodats f ! non and women, installation of hardware smeks detectors F ! and security oystems, replacement and modifieatien of ! t major appliances in Fire Stations, the addition of An ! ! apparatus roes to Sta. 82 and $to. •s, roplaaament of ! ! s apparatus doors at $to. 11, and provision of an error- t ! ency apparatus pull -off lane and ramp modifications at t ! fit.. •a. t ! t !, t -------- ----------------------------------- --..-------- TOTAL COST PRIOR APPRO- APPRO- PRIATIONS t--------•------Fiffm COST ESTZMATEi--N-----N----> i!l2-10 1!!S-!1� Y!!4:•!O ESTIMATE PRIATIONS 1909-90 1990-91 1911-9z -------�.s �J;;. --------- --------- --------- --------• -�•-----N i s X 1000 l !' 19.0 19.0 22.0 3.0 19.0 1465.0 576.5 S89.s 360.0 060.0 ' 15.5 9.0 6.6 30.0 30.0 --------- ---1912.3 997 . S 914. S 0.0 0.0 0`• 0 S'• O O' O TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------ F 1991-92 IT%= Ftljfj Im 1992-98 -------------------> its --Si FUNDZNG PRIATIONS 1909-90 1990-91 ---- --------- -------'� ---- ----- ---- ------- --------- --- l • X 1000 ? $2.0 92.0 1000.3 965.E 914.0 --------- --------- --------- 1912.3 997.5 0.0 --- - C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 313019 PROJECT NAME : FIRE STATION 83 GARAGE MODIFICATION 9 EXPANSION ADDKSB s 1103 8 1151 NW 7TH ST NBRM LOCATION s 698 NBRHD SERVICE : 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY" : 023 FIRE RESCUE DEPARTMENT s 028 FIRE RESCUE PROJECT MANAGER: 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM : FY83 FIRST YEAR OF APPROPRIATIONS : FY83 PROJECT SCHEDULE : INITIAL REMISED COMMENCE DESIGN 10/84 07/85 AWARD CONTRACT 04186 BEGIN CONSTRUCTION 09186 BENEFICIAL USE 10/88 PROJECT COMPLETE 09/69 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------- •67 1961 FIRE A.O. BONDS TOTAL FUt6)ING t -------------------------------------------------------- 1 PROJECT DESCRIPTIONS i ! This project involves modifications and expenefoo OS t i Fire Station 83 to include interior modifioations. and ! the addition of a hose tower. ! ! The modifications to the garage will provide additional t ! space for Rescue Division Headquarters, Fireti9htfn9 jr ! Division Headquarters, storage space for medical equip- ! ! ment.tires .uniforms and firofighting appliances. t ! Hydraulic lifts of greater capocitqq will be installed ► ! to handle the jarggs aerials and articulating bows fir* ! ! operatus. Some office space will be added to acconeoda- f ! is Rescue Headquarters and allow better utilisation of ! clerical staff assigned to the Garage. Firefighting ! and Rescue Divisions. t � s ! ------------------------------------r_-r----------r--_r_rrr_- PRIOR Ate- ------ FUTURE COST ESTIMATES --------- --`--' TOTAL COST APPRO- PRIATIONS ESTIMATE PRIATXONS 1969-90 1990-91 1991-92 1992-98 1998-94 1191�+95� ------------------------------------------------------ ---- ( 0X1000) 272.0 272.0 1961.3 1961.3 889.0 869.0 12.8 12.8 38.2 38.2 --- 3173.3 --- 3173.3 PRIOR TOTAL APPRO- FUNDING PRIATIONS 3173.3 3173.3 3ii3.3 3ii3.3 ------ -----r-rr _rrrrr_►_ __r .r_r_.Y. o.o o.o o.o o.a 0.o APPRO- PRIATIONS<------------------ FUTURE F #4)3 M --- ----rr-r------r-y 1989-90 1990-91 1991-92 1992-93 1991-94 199µ-91j_ --------- --- - -- -----------------------------rr ( 8 X 1000 ) --------- - ----- ---------- ------r-- 0.0 _-----0.0 --- 0.0 0.0 0.0 0.0 REVISION DATE 05/16/69 . C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. i 313222 PROJECT NAME i FIRE APPARATUS REPLACEMENT AND MODIFICAT- - FY'86 ADDRESS t CITYWIDE NBRND LOCATION i 900. NBRHD SERVICE : 900 PROGRAM 002 PUBLIC SAFETY CATE80Rlf : 023 FIRE RESCUE DEPARTMENT i 028 FIRE RESCUE PROJECT MANAGER& 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM & FY88 FIRST YEAR OF APPROPRIATItNIS i FY88 PROJECT SCHEDULE & INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 09149 COST CATEGORIES LAND ACQUISITION DESIGN, CONSTRUCTION EQLJIPN04T ADMINISTRATION OTHER TOTAL.COST FUNDING SOURCES ------------------------- $66 1076 FIRE G-O 'Bows --------- -------.i- - TOTAL' FUHDXNe - a TOTAL COST ESTIMATE 105.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1909-90 105.0 lOS.O 105.0 PRIOR TOTAL APPRO- FUNDING PRIATIONS 105.0 105.0 ------------------ 105.0 1OS.O 0.0 APPRO- PRIATIONS 1909-90 AS OF M"169 r-.••-----------------------r--rr-r---r.-r- ! PROJECT pE$CRIPTIONi ) t ! This project involves the Modification and relurblen- t t me of seven (7) rescue units$ cab rsplaaement and ! ! refurbishment of tour (4) pumperer refurbleAtent of E t five (S) LTI aerials and refurbishment and Paine )' ! fitting of various pieces of emergenaq Medlcal t equipment and firefighting equipment. 1 $ ! t ! --r----------------------------------r;r.rirrr-r.r;r+rs.+r--r-�r.r --------------- MURK COST LSTIMATES --- ••--.r.•r-..s 1990-91 1991-92 1992-95 1999r94 Z9!'f'•9S --------------------------------------..'. t • X 1000 ) ----..--•- --..-• •-rr---r- r-r.r---r- r--r-r-r- o.o o.o o.0 -------- FUTURE FUNDING ------- ---•---------� 1990-91 19P1-92 1992-98 19986-94 1"4-96 --- - -- -------------------- -'----r------- t i x 1000-) -----------r----------- --------- --------- -------- -- 0.0 0.0 0.0 0.0 0.0 o'.O, REVISION DATE 06/80/99 i.. soAs ae O�I/S! M =PROf RAIi C T Y 0� CAPITAL PROJECTOK8mIPTION . ------------------rrwwwrrwrr.w _ ! PROJECT DESCRIPTIONS' s s1322s FIRE RESCUE NEW APPARATUS ACOUISXTXON - FYss 1 PROJECT (2) RO!!u0ADDRESS lloOtll!or« NAME pROJECT: CITY ; Acquisition of _ "WeLDCATIMI s 900 ! 1 No" SERVICE s 900 ! s 002 PUBLIC SAFETY Y 023 FIRE RESCUE ! ) CPRAOAR : DEPARTMENT : 028 FIRE RESCUE TOM MCLEAH ! ! ! is PACT MANAGER: 281 FIRST YEAR IN CAPITAL PROGRAM s FYss YEAR OF APPROPRIATIONS s FYa8 ! 1 1 FIRST PROJECT SCHEDULE s INITIAL REVISED ! ! 1 ) ` commENCE DESIGN ! ! AWARD CONTRACT BEGIN CONSTRUCTION -------------------------- SNEFXCXAL USE PROJECT COMPLETE TBO 09/•9 APPRD- FUTURE{AST ESrIYI�YE* r'--"r-�"�-"rrs 3 " TOTAL COST PRIOR -..- APPRO- TIONs <---•-------- 1991-92 1992-t8 1990-91 ----r---- 1"S•-" ESTIMATE 10lso-90 ------ PRIATiO------------------- -- --------- COSTCATEGORIES -- --------- --------- ACQUISITION DESIGN CONSTRUCTION 1100.0 1100.0 E60.0 �ATXOH 40.0 60.0 40.0 "~_" ------ ----------- w-wr 0r0. ---y---rwrwwwr�r► Yr O OTHER_ ____-__-_ --- ----- -- ---- - --'--- a.a 0.0 0r0 _ __—_—_—w_—__w 1200.0 1200.0 TOTAL COST PRIOR Ate— a--------------- -- FUTURE FUNDING _ »-------I984-l� ' 199i-1C TOTALwr. APPRO- PRIATIOIi 1990-91 1991-92--------- - lost-90 ---- -------- ----"- FUNDING-----"--- PRIATIONS --------- ' FUNDING SDKs ____-____ --------- —__---_ � • x loos ) -_ _----- - - 1200.0 1200.0 ------ ------ ----- ------0.0 a.a -----..r. aura o�a i66i 11►76 FIRE O.o. Ror+Ds_---1200 - -- --------------- -1200.0 0.0... ------- TOTAL' FUMING 1200.0 a , i pWSZON DATE 06/30/99 4440 nrysyy i CITY OF MIAMI CAPITAL ImPROVOKUT PROORAO PROJECT DESCRIPTION FYOD PROJECT NO. t $18224 PROJECT NAME t FIRE APPARATUS REFURS. A MODIFICATION - FY'89 ADDRESS : CITYWIDE NBRHD LOCATION a 900 NBRHD SERVICE : 900 PROGRAM a 002 PUBLIC SAFETY CATEGORY" : 023 FIRE RESCUE DEPARTMENT : 028 FIRE RESCUE PROJECT MANAGER: 261 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM : FY88 FIRST YEAR OF APPROPRIATIONS : FY89 PROJECT SCHEDULE _ INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 09189 COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EGUIPMENT ADMINISTRATION OTHER TOTAL COST AO OP ___ r rr---rr—rrrrrrrr—+rrrrrrrrrrrrr-r ! PROJECT DESCRIPTIONS-- - t t This pro eat involves the sodiflastiow and refurfIth ) t sent of i rescue unite and 1 stake body truck. t t F t ! 1 ! ! 1 ! 1 t Y ! t t--------------------- ----r---r—r...r-- -�rrrr �r—.►rrrr-rrrrrr4 PRIOR APPRO- FUTURE COST ESTIMATES-----------rrr..r TOTAL COST APPRO- PRXATIONS s---------------- ESTIMATE PRIATIONS loot -to 1990-91 1991-92 1992-98 1993-" Y3lM-9!i --- ---------r-----------r— ------ — 487.0 487.0 ----467.0----487.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS ----------------- ---- --------- `40 1981 FIRE G.O."BONOS -w�lf SL 467.0 487.0 TOTAL FNM1iQING - 487.0 - 467. 0 - - - - - - -'r ---- - ---- -- ----- 0.0 0.0 0.0 0.Q Q.Q QrQ APPRO-r PRIATIONS------------------ FUTURE FUM03M--------------- 1949_90 1990-91 1991-92 1!!2+l3 1993-94 1"4-90 -- --- — --------------------------rsrrr ( 0 X 1000 ) 0.0 REVISION DATE, 0410614t a mi C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 818224 PROJECT NAME S VIDEO PRODUCTION AND TRAINING ASSISTANCE ADDRESS - s 8425 JEFFERSON STREET NBRHD LOCATION S 404, 040, 404, 040 NBRHO SERVICE : 881 PROGRAM s 002 PUBLIC SAFETY CATEGORY " s 028 FIRE RESCUE DEPARTMENT s 028 FIRE RESCUE PROJECT MANAGER: 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM s FY89 FIRST YEAR OF APPROPRIATIONS s FY89 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 09/88 09/90 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION ADMIRATION OTHER TOTAL COST FUNDING SOURCES ----------- ------------- 440 1981 FIRt G.O. BONDS - 88 SL TDTAL FISIDiNG----------- a AS OF 06/29/50 ----------------------------------------------------------- [ PROJECT DESCRIPTIONS E ! ! 1 Pro 9pramwing production and purahass of video equipment f ! to b• used in conjunction with a media/confsrenes F ! center located at the Firs Training Center, will ! ! provide video tape viewing asrviaes to large audisness f [ that utilize the auditorium at this facility as well as [ ! enable the Department to participate in seminare and f ! record programming of interest, tranemittad by: [ ! satellite from the Federal ES#srgency Management Agency ) ! in Washington, D.C. ! ! [ Additionally, through the I -Net System the Department [ 1 can now have the capability of simultaneously training, [ ! schooling, and disseminating Information to all on -duty [ [ personnel, as well as improving communications with the ! [ news media, other departments, and other fire ! ------------------------------------------------------------ PRIOR APPRO- - FUTURE COST ESTIMATES TOTAL COST APPRO- PRIATIONS <------------- ----------------' ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-98 1998-94 1994-9s --------------------------- --- ---- ------------------------ 4 x 1000 ) 160.5 88.0 137.6 90.0 ----- ---- 298.1 ----- ---- 128.0 PRIOR TOTAL APPRO- FUNDING --------- PRIATIONS --------- 298.1 128.0 296.1 ' 123.0 127.5 47.6 liK-1 APPRO- PRIATIONS 1989-90 175.1 175.1 -- ----- ----- ----- ----- '0.0 0.0 '0.0 0.0 O'LO <---------------- -- FUTURE FUNDIN9-------------------* 1990-91 1991-92 1992-92 1998-94 1"4-96 --- ------------- -----------------i' • X 1000 )- --------- ----- ----- ----- ----- -„ 0.0 0.0 '0.0 0.0 'clRm REVISION DATE 40/40/40 . ■ .. W_iw_�if 0 I T Y O F Y I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : $13229 PROJECT NAME t FIRE RESCUE NEW APPARATUS ACQUISITION - FY189 ADDRESS : 02TYWTDE HBRHO LOCATION a 900 HBRHD SERVICE t 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY : 023 FIRE RESCUE DEPARTMENT 1 028 FIRE RESCUE PROJECT MANAGER: 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM s FY88 FIRST YEAR OF APPROPRIATIONS : FY69 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 09/69 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES j ------------------------- 203 FLA HEALTH 8 REHAS SERV. GRAN $40 1981 FIRE G.O. BONDS - 88 SL TOTAL -FUNDING - ------ t AS OF 06/29/69 - rrrrrr--rr------------rrrrrrrrrrrrrrrrr rrrrrrrr-r--rrrrr--r ! PROJECT DESCRIPTION: ! This project involves the replacement and sequisstien t ! of apparatus and equipment for FY•69. f 1 Anticipated expenditures include acquisition of S ! 1 Pumpers, 3 Quints, 2 Hazardous Material Van, and 5 ! ! Advance Life Support Vans in FY•69. i ! r ! ! ! ! 1 ! ! ! I t ! 1, ------------------------------ --------------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES---------------k ESTIMATE PRIATIONS 1949-90 1990-91 1991-92 1992-98 1993-94 1994-9s ----------------------- ---- --- - ------------------------------- ( t X 1000 ) 2165.0 4205.0 ------------------ 2165.0 4205.0 PRIOR TOTAL APPRO- FUNDING PRIATIONS -- T 65.0 65.0 2100.0 4140.0 - 2165.0 4205.0 2040.0- ------------------------------------------------------ 2040.0- 0.0 0.0 0.0 0.0 0.0 APPRO- PRIATIONS <------------------ FUTURE FUNDING-------------------r 1989-90 1990-91 1991-92 1992-98 1993-94 1914-90 -- -- - ------------------------------- ( e X 1000-f 2040.0- r ......... rrrr -rrrr rrrrr rrrr rrrrrrrr- ----r 2040.0- 0.0 a.a a.o REVISION DATE 06/30/89 313230 =101TS NAME FIRE RESCUE SPECIAL EQUIPMENT - FY'39 ADDRE: CITYWZDE NBRHO : 900 NBRHO SERVICE : 900 PROGRAM h• : 002 PUBLIC SAFETY CATEGORY : 023 FIRE RESCUE PRPDJECppNAGERs 231 TOM 028 EMCLEAN FIRST YEAR IN CAPITAL PROGRAM : FY69 FIRST YEAR OF APPROPRIATIONS : FY89 PROJECT SCHEDULE = INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE o9ia9 PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING -SAS ---------- $40 1961 FIRE G.O.'SONDB - •3 SL ------------------------ ,TOTAL FUNDING 4. a"� PRIOR TOCOST APPRO- ESTIMATE PRIATIONB 113.0 113.0 2.0 2.0 --------- 115.0 --------- 115.0 PRIOR TOTAL APPRO- - FUNDING PRIATIONS 115�0 115.0 ---- 115.0 115.0 --------r--r�r-1-r.11-.r ! PROJECT DESCRIPTION: 1 ! This project involves the purchase of tirstlRyhtfn 1 and rescue appliances, hazardous Material protest ve t squipwient. Baer9ency Medical alectronle *quip wnt Made � ! state of the art arson invostl9ativ equip"nt• !' ! Included are 100 eats of Aegis protective Cloth in ! Wits, 500 Portable Suction units. 200 Evoc-U-401 tiler: t 6 Roll -In -Cots, Medical boxes, backboards and sttieN ! various and sundry tirotiyhting and rescue aPPlianeos- i t t 1 ) t --------------------- N�� � rriwir�IririYl�ii�ris i' • PRIATIONS--------------- FUME 1989-90 1990-91 1991-92 --1992-98, -r�..8 ' •ri„ ------------------ f • X 1000 ) --------- ------ -- ------ -- ------o. o ---o. 0 APPRO- PRIATIONS •------------------ 1!!9-!i 1969-90 1990-91 1991-92 199?-!S------- •----- --------- ! e x 1000 ) ------------------ O.Q REVISION DATE 00/00/00 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. t 818282 PROJECT HAVE t FIRE DEPARTMENT COMPUTER ENHANCEMENT - FY'89 ADDOESS t 278 NW 2ND ST. STH FLOOR NbwW LOCATION 268 NBRHD SERVICE t 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY h : 028 FIRE RESCUE DEPARTMENT t 028 FIRE RESCUE PROJECT MANAGERS 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM t FY88 FIRST YEAR OF APPROPRIATIONS t FY84 PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 09/69 09190 COST CATEGORIES -- LAND ACQUISITION DESIGN LION ADMINISTRATION OTHER TOTAL COST AS OF 00129/89 _rrrrrrr r------------------- ------ ----------------- --------- ! PROJECT �BCRIPTZON: ! ! This project involve purchasof additional settwar• f ! and hardware for the Fe ir• 019potah Syatom and Manage- ! went Information Syystow (MIS). It also Includes t ! salaries for aomputor programmers and equipment lease !! ! payments. PRIOR APPRO- ------ FUTURE COsT comaTEs TOTAL COST APPRO- PRIATIONS <--------- -- --- ----9 ESTIMATE PRIATIONS 1949-90 1990-91 1991-92 1992-98 1999-94 t994-9M --- -------------------------------.. ( • X 1000 1 TOTAL FUNDING SOURCES __FUNDING ------------ ---- ------ ----- 840 1981 FIRE Q.O. BONDS- 68 SL 660.7 - rrrr rrrrr_r---------- --- ----- TOTAL FUNDING 680.7 IL 197.0 203.0 400.0 PRIOR APPRO- PRIATIONS 400.0 400.0 186.2 144.5 280.7 APPRO- PRIATIONS 1989-90 280.7 280.7 ---------- - - - - - - - - - - - - - - - - - ------ -0.0 0.0 0.0 1990-9% 1991-92 1992 1918-94 119I-!!1 --------------------- �.._-�---------- t • X 1000 -------------------- � ------0.0------0.0 .. -0.0 0.0 0.0 REVISION DATE 06/12 /89 , *„ i ... i_. ...._..._...--............_.. _. .....-«......--.r-....u., _..,� ....�.-�......�_—r�..:,—n•.+.i I.—w.w•...+.m...u. rYr'rr+-.�.11 ws:+!aLRwWII 3 CITY OF MIAMI AS Or OE/W6 CAPITAL IMPROVEMENT PROGRAM + PROJECT DESCRIPTION FY90 PROJECT NO. : 313231 PROJECT NAME s MIAMI FIRE MUSEUM ADDRESS a 1401 N. MIAMI AVENUE NBRHD LOCATION s 242 HBRHD SERVICE : 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY " : 023 FIRE RESCUE DEPARTMENT : 028 FIRE RESCUE PROJECT MANAGER: 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM s FY89 FIRST YEAR OF APPROPRIATIONS s FY90 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN TBD AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE PRIOR TOTAL COST APPRO- COST CATEGORIES ESTIMATE PRIATIONS ------------------------------------------- LAND ACQUISITION DESIGN 50.0 CONSTRUCTION 330.0 EQUIPMENT ADMINISTRATION TOTAL COST FUNDING SOURCES ------------------------- 25 US. HISTRC PRESRV GRNT - ANTIC 26 FLA. DPTO. STATE GRANT - ANTIC 30.OMNI TAX INCREMENT TRUST 867 1981 FIRE G.O. BONS ------------------------- TOTAL FUMING --------- 380.0 --------- 0.0 PRIOR TOTAL APPRO- FUNDING --------- PRIATIONS --------- 100.0 150.0 100.0 30.0 --------- --- 380.0 ------------------------------------------------------------ I PROJECT DESCRIPTION: tl t t ! The Miami Fire Museum is a joint project of the City of t ! Miami Fire Department and M ami Fire Museum, Inc., a 1 1 non-profit organization. The Projeot consists of oom- t ! lots refurbishment of "Old Station 820, located at t 1 401 H. Miami Avonue, in kespin with its on final 11 I architectural and hiatoria character. In that the, t 1 interior of the Fire Station has been completely modl- 1 ! tied over the past several years, certain portions such t ! as the barracks and apparatus bays will be recaptured t 1 and reworked into Museum display areas and quarters i ! for visiting fire dignitaries. The potential also t t exists for providing a suitable media/meeting area for 1 ! use by visiting school children touring the museum t 1 facility, the Senior Citizens Fire Safe -to) Survey Pro- 1 ! ram and other community -based organizations. The pro- ! ! act falls within the Omni Redevelopment Area. t ------------------------------------------------------------ APPRO- ------ FUTURE COST ESTIMATES PRIATIONS �------------------------s 1989-90 1990-91 1991-92 1992-98 199f-94 1994-M ------------------------------------ ( • X 1000 ) 30.0 20.0 330.0 -----30.0 ----350.0-6.0, APPRO- PRIATIONS <------------------ FUTURE FUNDING ------------------ "t 1989-90 1990-91 1991-92 1992-93 1993-90 1990-91 --------- --- ----- - - ------------ ------------------- ( • X 1000 > 100.0 150.0 100.0 30.0 __ __ _ _ __ 0.00 — — — — — — — — - — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - - --- , 11 , no I T- ri, r,_ r r, ", C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. 1 818284 PROJECT NAME , FIRE RESCUE NEW APPARATUS ACQUISITION FY'90 ADDRESS 1 CITYWIDE NBRHD LOCATION 1 900 NBRHD SERVICE 1 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY ° t 028 FIRE RESCUE DEPARTMENT : 028 FIRE RESCUE PROJECT MANAGER. 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM 1 FY90 FIRST YEAR OF APPROPRIATIONS t FY90 PROJECT SCHUXLE : INITIAL REVISED COMMENCE DESIGN TBD AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND AOOUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER ------ ------------ -------- TOTAL COST t AS OF 08129E89 ------------------r---------------------------�•-r�l.ir./Nr rrrr t PROJECT DESCRIPTIONS f t 1 This project involves the aeequioitien of equipment r 1 that is needed to respond to hazardous watertals r t incidents and to ioprevs the asllitV Of the FIro1Rote4#e ) t Department to deliver firs and emoryleneyl media&& r 1 services. specifically included are the fo1Isw1nylt r 1 ono hazardous materials trucks ens fsaw pumps ens firs 1 ! boats one air vans and one video van. t r 1 r ! r ! r ! r 1 1 t r ! r t r -------------------------------rr-----rr..r-fir► PRIOR APPRO- ------ FUTURE COST EST216416S TOTAL COST APPRO- PRIATIONS �--------- N---....rrr..r..r ESTIMATE PRUT20HO 1969-90 1990-91 1991-92 1992-99 19986-9* 8llsr9S --------------------------- --- ------- ------ ( 8 X 1000 ) $09.0 12.0 ------------------ $21.0 0.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS -- -------------------------- ----- --------- 809.0 12.0 821.0 APPRO- PRIATIONS 1989-90 847'loll F2RE 8.0.'BONDB 921.0 $21.0 r - ---- ------ rr�rrrr-'. rrr----- - r - - -- - -- - --------- TOTAL FUNDING 821.0 0.0 S21.0 - ----- -------r rr------- --------- ----- o:o Q:o a.Q a.a a.a - ------------ logo-91 1091-92 1992-95 -rr`--rr-N--------- 1998-94 1994�15'; -+-r--r�--, rN----.rr --- - -( e x ----- 1000 l ------Nr• - 0.0 ----- 0.0 -------- 0.0 REVISION DATE 04t:0109 6101 C I T Y OF M I AN I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT No. : 313235 PROJECT"NAME i FIRE APPARATUS REPLACEMENT i MODIFICATION FY90 ADDRESS : CITYWIDE NBRHO LOCATION : 900 NBRHD SERVICE : 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY s 023 FIRE RESCUE DEPARTMENT : 023 FIRE RESCUE PROJECT MANAGER: 231 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM s FY90 FIRST YEAR OF APPROPRIATIONS t FY90 PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT TBD BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACOMBITIO'N DESIGN CONSTRUCTION ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------- #67 1981 FIRE G.D .BOND6 _--_rrwrr�w .,TOTAL FUNDING PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS $27.0 3.0 ------------------ $35.0 0.0 PRIOR TOTAL APPRO- FUNDING PRIATION8 535.0 --------- ---- ---- — 535.0 0.0 APPRO- PRIATIONS ili9-90 $27.0 8.0 APPRO- PRIATIONS 1999-90 535.0 ............. AS of o#A29/0 . _--_—__—__—r—_--r----r-----------r----------r--------rr-.,rr1 ! Pao�cT DEscaIPTION: � I This pro *at involves the refurbishing and modifiaatioft t' I of existiingy apparatus in ardor to extend Useful 31fs- t ! 8pecifically this inaludes the followings Refurbishing F ! a total of ten Front Lino Pumpers utilizin existing F I bodies and two Training Pumpers whioh ors 'ta reaeSvf t ! new bodies, in addition all units are to reteivo Te110 t ! Brake Retarders and all standard shift tronowlesSens- to ! ! be converted to automatic tranemissionss sonvertln# onw ! ! Front Line Pumper and one Training Pumper is S ineh t ! hose capabilitVI and the provision of newlwoter t4"NO t ! for six pumpers. t t ! ! t ! t ! -------------------------.-y-�------------ys�.._l++----rrw....---.—..s..rrc.. (-----r-------- DOST EBTIIINTtl1 r---rr------rrrtc 1190-91 1991-92 I912-98 1!!0-94 fild-ft --r ------------- r--rrr-..r rrrrrrrr.. • X 1000 1 rr--r—r�t-- (------------------ FUTMi6 fVIDIt1M-....._..,.---------,t 1990-91 1191-12 1!lZ-IS l!'i�-14 i161�!'Mf --- - ---------------------- 0 X 1000 i --------- rr♦rrrrrr-------dA 0.0 0.0 0.0 0.0 O..aIR REVISION DATE 06120/69 ml� &-Ak A a a a IL CITY OF MIAMI AS OF06129/89 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECTNO. : 818286 -------------------------------------------y --------------- i PROJECT NAME : FIRE DEPARTMENT MASTER PLAN 1 1 PROJECT DESCRIPTION: The Firs n•oartment will fund a tomporar Planner ZZ t ADDRESS- : CITYWIDE NBRHD LOCATION : 900 ! position so be hired by the planning Department on a E NBRHD SERVICE : 900 ! 1 one-yoar contract bases in preparation of a 10 Year t Master Plan in evaluation and direction of Miami's Fire ) PROGRAM : 002 PUBLIC SAFETY ! ! and Rescue Services. The Planningq Department will t provide all managerial, tochnica1, computer, olorioal 1 CATEGORY : 028 FIRE RESCUE DEPARTMENT : 028 FIRE RESCUE ! and graphic resources in this regqard. Operatiens,artd the Fire Department's Division* 1 PROJECT MANAGER: 281 TOM MCLEAN ! ! inter -relationships of will be evaluated in terms of overall department goals, P FIRST YEAR IN CAPITAL PROGRAM : FY90 ! changes in urban development patterns, fire protection t i FIRST YEAR OF APPROPRIATIONS s FY90 1 no do, firs and rescue practices, public resource !' ! limitations, and community expectations. PROJECT SCHEDULE s ! INITIAL REVISED ! COMMENCE DESIGN AWARD CONTRACT TBD 1 BEGIN CONSTRUCTION ! t BENEFICIAL USE PROJECTCOMPLETE ! -------------------------------------------�..---.r---..-r.r.. TOTAL COST PRIOR APPRO- APPRO- PRIATIONS <--------- ___--- FUTURE COST ESTIMATES---------------� 1992-98 1" -" 1"4-95 COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 A --------- --------- --------- ---- ----- ---r ----- --r--r--- -r-r----- r-rr-rrr- ----r---------rr-r- — ---- c s x loon � _ LAND ACQUISITION DESIGN ETRUCTION QUIPMENT ADMINISTRATION " OTHER 75.0 75.0 --------- ------------------------- TOTAL COST --------- 75.0 --------- 0.0 --------- 75.0 ---------- 0.0 --------- 0.0 --------- 0.0 --------- 0.0 O.Q TOTAL PRIOR APPRO- APPRO- PRIATIONS ------------------ FUTURE 1991-92 FUNDING 1992-98 -----..-r---.-------> 1i98-98 1994-9M FUNDING SOURCES FUNDING PRIATIONS 1989-90 ---- - 1990-91 - --- ---- --------- rr-r-rrr-� ---------� -----------------r ..----- ------ .- - - - - - - - - - - - - - -- g x 1000 ) $67 1981 FIRS G.O. VMS 75.0 75.0 ------__- --r------ -r--r--- r :.? TOTAL FtSiDiNG----------- -----7s.o ------o.o -----75.0 ------o.o -- ---- 0.0 I REVISION DATE 06/30/69 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECTSCRIPTION PhOjECT°`NO. : 313237 PROJECT NAME- : FIRE RESCUE SPECIAL SUPPORT EQUIPMENT FY'90 ADDRESS `I : CTTYWXDE NBRHD LOCATION : su0 NBRHO SERVICE : 900 PROGRAM : 002 PUBLIC SAFETY CATEGORY : 023 FIRE RESCUE DEPARTMENT : 028 FIRE RESCUE PROJECT MANAGER: 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM : FY90 FIRST YEAR OF APPROPRIATIONS : FY90 PROJECT SCIAOULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT TBO BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE Ai OF 0012*100 ------------------------------------------«------rrrrrrrrr.r ! PROJECT DESCRIPTIONS r ! This project involves the acquisition of squft"nt that t ! is neasssarV to enable the Fire/Reooue Department to t ! use six now $quad Units alreadyy purchased. SposAfloslly ! ! this inaludes: retrofitting 206 and purch"Ifte 20 9e11 1 ! Contained Breathin Apparatus Unites purohasAnq varlous r ! Tools and Equipment to place 6 New Rescue Units and 2 ! Special Use Rescue Units into esrvAcei and purchasing��� t ! of 30 MTX Portable Radioe, 30 KoM Pade, S S�gyntor X-9000 ! ! Mobiles, and 10 Base Stations !'or Flre Stations. t ! ! ! r ! ! t t -------------------•------------------------------ - - TOTAL COST PRIOR APPRO- Ate- ST _-__-- FUTURE COESTIMATES------------- «> PRIATIONS i--------- 1991-92 1992-96 19986•94 199/-99 COST CATEGORIES ESTIMATE PRIATIOHS 1909-90 1990-91 M ------ - ---- ----- ---- ---- --------- --------- ------ c sxl000� LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT 200.7 209.7 ADMINISTRATION 3.0 3.0 OTHER -rr--r- _---_ _ _ _ TOTAL C08T-------------- ----- _ _ --- ----r---------- 211.7 0.0 0.0 -- TOTAL PRIOR APPRO- APPRO- PRIATZON8 ------------------ 1990-91 FUTURE 1991-92 FUNDIM 1992-93 --- --..«_-«.._-_«.-� 199i-98 1956-1 FUNDING SOURCES FLING PRIATION8 1989-90 - ----- ---- ----- --------- ------ «-. t X 1000 $67 1981 FIRE G.O. BONDS 211.7 211.7 - •----_ _ ------------.._...._. i TOTAL FUNDING `---------- --•- -- --------- 0.0 ---- 211.7 - 0.0 -- 0.0 0.0 0.0 0.01 ty, REVISION DATE 06130/69 PROJECT to.. 3111239 PROJECT NAME t NEW FIRE STATION 8 W ADDRESS 1455 H.W. 46TH STREET' HMM LOCATION t 123 HeRHD SERVICE t 121, 122, 123 PROGRAM s 002 PUBLIC SAFETY CATEGORY 023 FIRE RESCUE DEPARTMENT 028 FIRE RESCUE PROJECT MANAGER 1 281 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM FY90 FIRST YEAR OF APPROPRIATIONS t FY90 PROJECT SCHEDULE a INITIAL REVISED' COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 05/91 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES TOTAL FUNDING CITY or M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR APPRO- PRIATIONS $2.3 732.4 129.0 42.0 ---32.3 ------ ----- ---- 968.0 0.0 At (W 0012910_ . . . . . . . . . . . . . . . . . . . . . . - - - - - - - - - -•- - - - - - - I PROJECT DESCRIPTIONS 1 1 This project Involve* the replacement Of the **Xdrt11%# I Fire Station 0 12# built In 1935p with & 000 fadillig- I This Is ntceo:;rV,:: the existing 900111tV 10 in poser I structural condition and & n need *S major repalf I and expansion for present dag serviso ret"rommls, I of its alarm torrit:rV. The now faallltV would be I built to increase and MSXIMAZO $4u&r* 100"I* !or & I multl-gompany Station. -------- — ----- ------ --------- APPRO- PRIATIONS --------------- FUTtNK COST CRTIMAIRS' 1989-96 1990-91 1991-92 --------- --------- --------- 0 x 1060 32.3 732.4 129.0 42-0 32.3 968.0 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS - FUNDING PRIATION$ lost -go ------- --------- --------- 969.0 968.0 - --------- I ---------- 965.0 060 966.0 ------------------ FUTURE - 1992-99 --------- --------- --------- 0.0 0.0 C I T Y , O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT OESCRIPTION FY90 PROJECT N0. s 013233 PROJECT NAME : FIRE -APPARATUS REPLACEMENT 3 MOOIFIC. FY'91-FY'92 A. KIN s CITYWIDE tssRHD LOCATION s 900 NBRFD SERVICE s 900 PROGRAM s 002 PUBLIC SAFETY CATEGORY s 023 FIRE RESCUE DEPARTMENT : 023 FIRE RESCUE PROJECT MANAOERs 231 TOM MCLEAN FIRST YEAR IN CAPITAL PROGRAM s FY90 FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BESIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION AOUXPMENT DMINISTRATION OTHER TOTAL COST AS OF 08/9lJO - . . ------------------------------------------------------------ I PROJECT DESCRIPTIONs f ! E ! This project involves the rofurblehing os tire,froscuo ! apparatus necessary to maintain their useful 1lfe- ! Spocifically, this includes the refurbishing of the, ! followings Diesel Rescue units utilising exletieg ! bodies and chassis$ Seven $pars Pumpere utilizing ! ! existing bodies of which Six to rece,ivo Tolmm spoke, !' ! Retarders$ Six Diesel BLS/ALS Rescue Units utiltzing ! ! existing bodies and chassies and eight Aerial Units to t ! include Telma Brake Retarders, water monitor slide kXtsr! ! Barber Colman governors, and automatic tran"Iseiene ! ! where appropriate. Y ! PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES MM-----------v ESTIMATE PRIATIONS 1959-90 1990-91 1991-92 1992-93 191S-•94 1994-90 --------------------------- --- ------------------------------- ( f X 1000 ) 1293.4 20.0 ------------------ 1313.4 0.0 PRIOR TOTAL APPRO- FUNDING SAS FUNDING PRIATIONS 999 FIRE Q.0. BONDS - UNAUTHORIZED 1313.4 TOTAL FUNDING -- --------------4------- -------0.0 --- ------K; APPRO- PRIATIONS i939-9p 475.0 613.4 7.0 19.0 -- lei70 i3i.4 0.0 6.0 fiLMN <------------------ FUTURE FUNOM---------- ------ 1990-91 1991-92 1992--99 19ft-94 1914-9it --- -- - -- ---- -----� � • X 1000 ) 432.0 531.4 --- --- -------------------►- 452. 0 $91.4 0.0 0.0 04 ; PROJECT NO. s 321036 PROJECT NAME s GOLDEN ARM - PROPERTY ACQUISITION ADDRESS s SW 24 TERRACE AND 20 AVE. NBRND LOCATION : NBRHD SERVICE : 900 PROGRAM : 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY' : 031 HOUSING DEPARTMENT : 042 GENERAL SERVICES ADMINISTRAT. PROJECT MANAGER: 421 RON WILLIAMS FIRST YEAR IN CAPITAL PROGRAM : FY33 FIRST YEAR OF APPROPRIATIONS : FY33 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS. OF 001"/$s ------------------rrrw-rrrr-- Mr rr. ! PROJECT DESCRIPTION: f ! This acquisition of preportS is for neighborhood ! ! rehabilitation. Acquisition has already reaehad? fi ! its concluding stages on the tiret part of the f ! acquisition. t t t t t t ! t t t 1 t ! t t t 1 t; ---------------------------------------r-wr rrr--wrwr.rr-rrrr- TOTAL COST PRIOR APPRO- APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES --rr-N-r- --- N10 1992-9$ 1913-94 1"4-95 COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 --- --------- ------------------ ------------------------ --------- --------- --------- ---- - t X 1000 LEIACQUISITION 350.0 350.0 GN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER ----- - -- --.r....rrwr. ----- ....rr TOTAL COST ----- --- 350.0 350.0 ------ 0.0 -------- 0.0 --- 0.0 0.0 TOTAL PRIOR APPRO- �.PPRO- PR�.ATIONS --------------- FiJ'iURE --- 1991-92 F1id 1l92-93 rr-rrrrrr..-r-r-rr-r1 1-- 1------ FUNDING SOURCES FUNDING PRIATION8 1909-90 - ---- r 1990-91 ---- --rrr wrrr ----- --------- rrr-rrw-- rrwrrrrrr --- ,-rrrrrr-rr-rwwrr-rrrrwr-- --r wr-rw- - rr- rr-r- 6 X 1000 ) $95 1976 HOUSINQ G.O. BONDS - INT. 350.0 350,0 rrr rrrrrw rrr rr-rrrrrr rrw-rr '.. . _.rrr-rwrww--rr rrr..rrrr rr-- toTAL FtNibING --- ---- -- 350.0 - ---- -w - � 350.9 --- ----r r 0.0 wrrr-rrrw 0.0 -----r 0.0 0.0 0; 0 G'0 COWIXTION DATE ; 09130f h Aft PROJECT NO. s 321024 PROJECT HAVE s AFFORDABLE HOUSING PROGRAM ADDRESS s CITYWIDE NBRHD LOCATION : 692, 698 NBRHD SERVICE s 692, 694, 331 PROGRAM : 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY s 031 HOUSING DEPARTMENT : 044 HOUSING CONS. 6 DEV. AGENCY PROJECT MANAGER: 453 JEFFERY B. HEPBURN FIRST YEAR IN CAPITAL PROGRAM : FY82 FIRST YEAR OF APPROPRIATIONS : FY33 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT 12/83 BEGIN CONSTRUCTION 09/04 01/90 BENEFICIAL USE PROJECT COMPLETE 09/85 06/91 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 06/29/99 ------------------------------------------------------------ 1 PROJECT DESCRIPTIONS 1' 1 This prof. involves the use of Gon'l Obligation Nous3ng:1 1 Bond proeseds to acquire development sites throughout t i the City for the eonstruotin of approx. $00 units of 1 1 housing affordable to low and moderate income families. t 1 To date, 3 development sites have bean aaquirsd. On the 1 t Civic Center site, CODEC, Inc. has been selected b the t 1 City Commission to develop a 96 unit condo. project i 1 Melrose Townhouse Develop., Inc. was selected by the 1 1 City Commission to develop a 153 unit sales townhome 1 1 complex on the 8.5 acre site. In February, 1969, the 1 1 aforementioned project sponsors notified the City that 1 1 the not -for -profit Corp. would be unable to develop the 1 1 Melrose Nursery sits. Presently. the City is exploring 1 1 alternative development strategies for the site. On the 1 1 3 acre St. Hugh Oaks Academyy site, the City serving as 1 1 developer plans to conetruat a 30 unit single familyy 1 1 detached homes. 321027 was consol. to this proj in fsY67 1 1 1 ----------------------------------------------------- ------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONS--------------- FUTURE COST ESTIMATES---------------31 ESTIMATE PRIATIONS 1949-90 1990-91 1991-92 1992-93 1993-94 1994-99 ------------------------------------------------------ ----- - ( e X 1000 ) $000.0 8000.0 505.0 400.0 105.0 --------- $610.0 --------- 8400.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIOH8 ---------- -------- ----- --------------- 105.0 105.0 210.0 APPRO- PRIATION8 1989-90 884 1976 HOUSING G-O- BONDS 5844.2 5544.2 SS5 1976 HOUSING G.O. BONDS - 3M. 2765:S 2555.6 210.0 ---------------------------------------------------- TOTAL FUNDING 8610.0 6400.0 210.0 ----- ----- -----------�- 0.0 0.0 0.0 �0.0 or.a ------------------ FUTURE FUNDING-------------------s' 1990-91 1991-92 1992-93 1993-94 1994-96 --------- - -- ------ ------ ( • X 1000.) ----- --- ----- ----• - ----- ---- z: 0.0 0.0 0.0 0.0 0.at- REVISI0N DATE 07/26/89 I I. C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 321025 PROJECT NAME s MODEL CITY/L. HAVANA HOUSING DEMONSTRATION PROGRAM ADDRESS : SEE PROJECT DESCRIPTION NBRHD LOCATION 1 NBRHD SERVICE 1 121, 122, 123, 771, 772r 773, 774, 775, 776, 777, 774 PROGRAM 1 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY" s 031 HOUSING DEPARTMENT 1 044 HOUSING CONS. i DEV. AGENCY PROJECT MANAGER: 453 JEFFERY S. HEPBURN FIRST YEAR IN CAPITAL PROGRAM s FY86 FIRST YEAR OF APPROPRIATIONS s FY46 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 07/45 AWARD CONTRACT 09/45 BEGIN CONSTRUCTION 12185 BENEFICIAL USE 06/66 PROJECT COMPLETE 12/46 12/91 AS OF 06/29/69 ----rr-rr-rrr--r rr-- rr------ r-------r----------------------- ! PROJECT DESCRIPTIONS 1 ! t I This project involves the use of Cosmunity DOvslopment t ! Block Grant funds to acquire housing sits* in the ! I Community Development Target Areas of Model City; and t I Little Havana for the purpose of stisulatingg now t ! housing d*velopmont in those notgqhborhoods affordable t ! to low and mod*rate income familtso. ! I The parcels to be aaquired will include both vacant and-'! I blighted properties. The parcels will be disposod of t I through a comp*titivs selection process to be developed t ! by private builders and not -for -profit corporations. t I Dade County surtax financing will be used to finance ! I the •ales housing planned under this progqram. ! ! Dade County HUD will serve as agent to tfi* City for the t I purpose of acquiring tho •its:, rslocation and desoll- t ! tion activities. t t !. t ------------------------------------------------------------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES ---------------s" .' COST CATEGORIES ESTIMATE PRIATIONS lost -to 1990-91 1991-92 1992-93 1998-94 1994-96 ------------------------- --------- --------- --------- --- ---- --------- --------- --------- "Y • X 1000 ) LAND ACQUISITION 653.0 653.0 DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION 147.0 147.0 OTHER --------- --------------- TOTAL COST -- 1000.0 -- 1000.0 ----- _ 0.0 ----- -0.0 ----- _ 0.0 ----- _ 0.0 -----_ 0.0 a.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------------ FUTURE F NOXNQ -------------------� FUNDING SOURCES FUNDING PRIATIOHS 1949-90 1990-91 1991-92 1992-99 199d-94 1994-99 ----------------------- ------ - --------- --------- --- --- ---- ------- -- -------rr -rrrrrrrr 4 X 1000 ) 710 COBG--IOTH YR 1000.0 1000.0 r-rrrrrrr ----r-r rr --------- -----rrrr. ....- r r------- X-N-------- TOTAL FUNDING � r-rrr--rr 1000.0 ,.---r-rr- 1000.0 rr-r-rr-r 0.0 0.0 0.0 o,a L REVISION DATE 09/26/89 PROJECT NO. : 321026 PROJECT NAME : HOUSING LAND ACQUISITION PROGRAM ADDRESS : 111(TYNIDE NBRHD LOCATION : YOO NBRHD SERVICE : 900 PROGRAM : 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY" : 031 HOUSING DEPARTMENT : 044 HOUSING CONS. t DEV. AGENCY PROJECT MANAGER: 453 JEFFERY B. HEPBURN FIRST YEAR IN CAPITAL PROGRAM : FYe6 FIRST YEAR OF APPROPRIATIONS : FY46 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ----------- ►------------- 716 CDBe--IITH YR TOTAL FUNDING 4, INITIAL 08/85 11/35 03/06 03/a7 REVISED 12/91 C I T Y OF M IAN I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS of as/"/" ------------------------------------------------------------ ! PROJECT DESCRIPTION: e ! This project involves the use of Community Deve,lopms 4 r ! Block Grant funds to acquire individual parcels of f ! vacant land throughout the Cityy•s Communityy Developmen+•t f ! Target Areas to provide sites for construction by-pri-• !' ! vats builders of owner -occupied single family homes f ! affordable to low and moderate income families. t t The newly constructed single Easily home and parcel f ! will be sold to qualified low and moderate, income f ! families. The City will be, responeibls for acquiring f ! the parcels, relocation and the, demolition of any f ! improvements, if required. f ! Note: Project No. $21034, "Scattered Site, Affordable f ! Housing Dovelopoent Program," will provide funds f I for construction. f ! f ------------------------------------------------------------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONS--------------- FUTURE COST ESTIMATES ---------------> ESTIMATE PRZATIONS 1949-90 1990-91 1991-92 1992-94 1994-94 1"4-90 --------------------------- --- ------------------ ---- --------- t • X 1000 ) 1000.0 1000.0 4. ------- l000.0 ------- 1000.0 --- 0.0 ---- ---- 0.0 o.a ---- - a.o o.a. PRIOR APPRO- TOTALAPPRO- PRIATIONS ------------------ FUTURE Ft -------------------- FUNDING PRIATIONS 1969-90 1990-91 1991-92 1992-93 199E-94 if#d-$* --------- --------- --------- --- ---- l t X 1000 )- --------- --------- -..-----.war 1000.0 1000.0 - - - - -- 1000.0 -- - - - - 1000.0 ----- -0.0 - - - - - - ----- -0.0 0.0 - - - - - ----- ----- --+«R -0.0 -0.0 -o.o REVISION DATE 06/30/89 .1 r is . C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N. i 321034 PROJECT NAME SCATTERED SITE AFFORDABLE HOUSING DVLPMT. PROGRAM ADDRESS : CITYWIDE NBRHD LOCATION t 900 NBRN SERVICE t 900 PROGRAM t 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY t 031 HOUSING DEPARTMENT t 044 HOUSING CONS. 6 DEV. AGENCY PROJECT MANAGER: 453 JEFFERY S. HEPBURN FIRST YEAR IN CAPITAL PROGRAM t FY87 FIRST YEAR OF APPROPRIATIONS t FY87 PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 02/87 AWARD CONTRACT 06/87 BEGIN CONSTRUCTION 08/87 BENEFICIAL USE PROJECT COMPLETE 08/88 TBD PRIOR TOTAL COST APPRO- COST CATEGORIES ------------------------- ESTIMATE --------- PRIATIONS --------- LAND ACQUISITION DESIGN 150.0 150.0 CONSTRUCTION 3547.E 3547.8 EQUIPMENT ADMINISTRATION 809.0 300.0 OTHER ------------------------- TOTAL C08T --------- 4506.8 --------- 3997.E PRIOR TOTAL APPRO- FUNDIN SOURCES ------------------------- FUNDING --------- PRIATIONS --------- 357 OP. OSLO. BONDS SR. 36A - INT. $09.0 997 SP. OBLG. BONS SERIES 1986A 8997.E 3997.E ----- -------------------- TOTAL FUNDING --------- 4506.3 --------- 3997.8 e. APPRO- PRIATIONS 1939-90 509.0 AS OF 09/29/69 ------------------------------------------------------------ ! PROJECT DESCRIPTION: t I The Scattered Site Affordable Housing Development ! ! Pro ran provides for the development Of owner -occupied ! I residences including midrise, townhouse and single ! I family detached dwelling units in the City's Community t ! Development Target Areas and in other areas as doelg- ! ! nated by the City Commission. Interim construction t I financing is being provided through the issuance of ! I Special Obligation Housing Bonds. The Carver Branch- t ! YMCA site, a .9 acre parcel located at $770 N.W. 131h ! I Ave. in the Model City neighborhood is the location for ! I the Cityy'e first undertaking in the development of now ! I single family residential housing units under the Prog. ! ! The Carver Branch YMCA Project has been completed. Con- ! t struction is currently underway in the Wynwood neighbor t I hood on 2 new single family homes. Plans underway to ! t implement the Program in the Allapattah, Edison/Little ! ! River and Coconut Grove neighborhoods. t ------------------------------------------------------------ .--------------- FUTURE COST ESTIMATES ---------------> 1990-91 1991-92 1992-93 1993-94 1994-95. --------------------------------------------- ( • x 1000 ) ------------------------------------------------------ 509.0 0.0 0.0 0.0 0.0 0.0 APPRO- PRIATIONS------------------ FUTURE FUNDING-------------------� 1969-90 1990-91 1991-92 1992-93 1293-94 1994-95 --------- ----- - --------------------------------- l • x 1000-) 509.0 ---------------------------------------- ------ -- 509.00.0 e ♦ ■ . i REVISION DATE 06/30/89 47 II LI IIII�IN� P40JECT NO& $21095 PRECT OJNAME _ HOUSING PROGRAM ADMINISTRATION Atom" s CITYWIDE NwwD LOCATION : 960 MOM SERVZCE : too PROGRAM : 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY" s Gal HOUSING DEPARTMENT : 044 HOUSING CONS. i DEV. AGENCY PROJECT MANAGERs 453 JEFFERY B. HEPBURN FIRST YEAR IN CAPITAL PROGRAM s FY07 FIRST YEAR OF APPROPRIATIONS s FY07 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE TBO 09/90 COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION OADOMINXSTRATION TOTAL COST CITY OF NZANX CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS ------------------ FUNDING SOURCES 885 1976 HOUBZNG G.O. BONDS--' INT. ------------ TOTAL FUNDING s 1300.0 500.0 ------------------ 1a00.0 500.0 PRIOR TOTAL APPRO- FUNDING PRIATIONS 1300.0 $00.0 1300.0 ---500.0 APPRO- PRIA; O O 800.0 -s00.0 APPRO- PRIATIONS 1909-90 000.0 $00.0 PROJECT DESCRIPTION: ! This project provides funding to cover eminietrative, F ! costs and exponses associated with the pl ems, i 1 i lamentation and administration of non -Coif f ! lamentation Block Grant funded and othoe tsdmrra r *tat* 1 1 and local assistance housing programs and activities M! ! carried out by the Ageneg in furtherance of the MIA'* ) ! overall Citywide Housing Improvement Strotogy. ! ! N ! t ! ) ! ! 1 ! ---------------------------------------------- .--------------- FUTURff COBT ESTIMATESr 1990-91 1991-92 1992-9: 1*92-94 too#-9!i --------- ------------- ------ t t X loco ) ----- ----- --�------------ 0.0 0.0 0.0 0.0 <- - - - FUTURE FIB --- ---- logo-91 1991-92 1992-99 1995-94 1194-n --- - -----_-__---_--------- 0X1000) ----- -------------- -------- 0.0 0.0 0.0 0.0 dIN REVISION DATE 06/30/119 7j- C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO- C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO- s 821087 PROJECT NAME : SECOND MORTGAGE HOME LOAN POOL ADDRESS : CITYWIDE NBRHD LOCATION : 900 HBRHD SERVICE : 900 PROGRAMh : 003 SOCIAL AND ECON. ENVIRONMENT. CATEGORY : 031 HOUSING DEPARTMENT : 044 HOUSING CONS. 8 DEV. AGENCY PROJECT MANAGERS 458 JEFFERY B. lEPBURN FIRST YEAR IN CAPITAL PROGRAM : FY•• FIRST YEAR OF APPROPRIATIONS s FY88 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE PRIOR APPRO- TOTAL COST APPRO- PRIATIONS COST CATEGORIES _ ESTIMATE PRIATIONS 1969-90 ------------------------- ----- ----------- -- --------- LAND AOGUIRITION DESIGN CONSTRUCTION fOUIPMENT ADMINISTRATION OTHER 1500.0 1500.0 TOTAL COST 1500.0 1500.0 0. TOTAL FUNDING SOURCES FUNDING --....------------------------------ S!5 1976 HOUSING G.O.,BONDS - INT. 1500.0 ------------------------- --------- TOTAL FUNDING 1500.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1989-90 1500.0 1500.0 AB OF 08129t89 ---- ----------------------- -----------------r--------------r i PROJECT DESCRIPTION: 1 i This proisct will provide second mortgage financinq t ! for qual tied low and moderate income purahasor* In t i consction with the development of affordable borne- ! t ownership housing units on publicly -owned hosssites ! in the City- t t ! First mortgage homo purchase financing will be prov1- !' ! dod bV a consortium of local financial institutions. ! ! t' ! i t ! t t !--------------------------------------------------rr------ <--------------- FUTURE COST [STIMATES--------------rs 1990-91 1991-92 1992-98 3910-949lSr9S --------- -►------- --------- --------- • x ------r-- 1000 ) {, ------0.0 ------ O.O --r-r-r-- O'.0 ---- ----- 0.0 --------- &.O4 < ---- -------------- FuTunt 1990-91 1991-92 FUNWM.................. 1992-98 --------- ► 1918•94 1194-916i` ------------------ --- -t • x ---- 1000 ----- --s------• ----r-r---------r- 0.0 0.0 0.0 0.0 0.0 0.0 R<1VZEION DATE Oit2il�! PROJECT NO.,1 321038 PROJECT NAME s LITTLE HAVANA LAND ACQUISITION ADDRESS : SEE PROJECT DESCRIPTION NSRHD LOCATION s 498 NBRHD SERVICE s 499 PROGRAM : 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY" s 031 HOUSING DEPARTMENT : 044 HOUSING CONS. i DEV. AGENCY PROJECT MANAGERS 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM s FY90 FIRST YEAR OF APPROPRIATIONS s FY90 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN TOD AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES LAND ACQUISITION DESIGN EONSTRUCTION QUIPMENT ADMINISTRATION OTHER ------------------------- TOTAL COST FUNDING SOURCES 715'CD01B-- ISTH YR ----- --------- - - 4WAL FUNDING C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS - 500.0 ------------------ 500.0 0.0 PRIOR TOTAL APPRO- FUNDING PRIATIONS APPRO- PRIATIONS 1989-90 500.0 500.0 APPRO- PRIATIONS loss-90 500.0 500.0 ------------------------ 500.0 0.0 500.0 AS OF 081"Is! - ----------------------------------. ! PROJECT DESCRIPTION:--- ! ! ! This project involves the use of CommunitS Dsvelopment t ! Block Grant funds to acquire vacant, slur ond'bllghtod t ! proporties in the Little Havana Community Develsptaant t' ! Target Area for the purpose of stimulating now sUmu- !' ! latin q new housing affordable to low and moderate Irk- I ! case families in the neighborhood. ! The parcels to be acquire will be disposed of through t ! a competitive selection process to a privets stator t ! devoloper or provided at a write -down to a not -for -pre- t ! fit corporation. Financing to the housing unite planned t ! has not been determined or Identified at this time. ! ! ! ! t 1 t ------------------------------------------------------------ <--------------- FUTURE COST ESTIMATES ---------------> 1990-91 1991-92 1992-90 1999-94 1994-96 --- ------------------------------- -( 0x1000)- ----- --------- --------- ---- ---------------- 0.0 0.0 0.0 0.0 00 <------------------ FUTURE FUNDING------------------..s 1990-91 1991-92 1992-93 1998-94 1994-00 - - -- - ------------- ------------- • X 1000-) ------------------ . -------r- 0.0------0.4 ----- -0.0 O.MI O�.Mi REVISION DATE 07/27/89 PROJECT NO. t 321039 PROJECT NAME : MODEL CITY LAND ACQUISITION ADDRESS t SEE PROJECT DESCRIPTION NBRHO LOCATION : 121. 122, 123 HSRHD SERVICE : 121. 122t 123 PROGRAM : 003 SOCIAL AND ECON. ENVIRONMENT CATEQORY" t 031 HOUSING DEPARTMENT t 044 HOUSING CONS. 6 DEV. AGENCY PROJECT -MANAGERS 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM t FY90 FIRST YEAR OF APPROPRIATIONS : FY90 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN TOD AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN EONSTRUCTION QUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES -- --- ---T----------- 715 CDBQ-- 115TH YR ------------------------- TOTAL FLING C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS ------------------ 500.0 ------------------ Soo.o o.o PRIOR TOTAL APPRO- FUNDINQ PRIATIONS ------------------ $00.0 ------------------ 500.0 0.0 AS OF 08/Z9lS! --- -------------------- ---------------------------..--------- PROJECT OESCRIPTIONt � ! This project involves the use of Community Deveio nt ! 1 Block Grant fund: to acquire vacant slum and'bli fed 1 proportles in the Model City Cewwunity Development t ! Target Area for the purpose of stimulating now hoUsIngr 1 i affordable to low and moderate income families in the f ! neighborhood. f ! The parcels to be acquired will be disposed of through 1 ! a cowpetitive •election process to a private sector 1 ! developer or provided at s writo-down to o not -tor- 1 1 profit corporation. financing for the purposed housing 1 ! unite planned has not been determined or idontlfied 1 at this time. ------------------------------------------------------------ APPRO- PRIATIONS<--------------- FUTURE COST ESTIMATES ---------------> 1939-90 1990-91 1991-92 1992-98 1998-94 1994-90 --------- --- --------- ---- ..� C • X 1000 ) 500.0 --- ----- --------•-------------- ----- 500.0 0.0 0.0 0.0 0.0 0.0 APPRO- PRIATIONS ----------- •------ FUTURE F1NGN-------------------> 1939-90 1990-91 1991-92 1992-99 1993-94 1994-95 --------- --- - ---- --------- ------------------ 1 • X 1000 I 500.0 --------- ---------------• •--------- --------------- 500.0 0.0 0.0 0.0 0.0 0.0 REVISION DATE 07/27/09 ., I . 11 49 jai RAW ei MR xt:°L7` � i r i II1TBI�TIOtiALL� ����� � 'Ai ry�IBIS PAGE n V`�9;�"S'f 'IWAV `. S�S �- )f �s'Ua d' ..- *... ,. .. 4. tc . .,u ...y..« .4v s �+H in aR �.S'�ard: l4u't.r�:i�is='4n+5Zs }M M1i-N�11rt•.�,++.rIY +Y.�k Yfuw'J!W "TAX, � t. p'..w •ib�`nt:t:e'`4M10. .ZAla ads.:.«., xaik+�r:�iaxx.eP „:,ti�•..1di§eNe`..�.` C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 322029 PROJECT NAME : SE OVERTOWN/PARK WEST REDEVELOPMENT -PHASE I ADDRESS : SEE PROJECT DESCRIPTION HBRHD LOCATION s 251. 263 NBRHD SERVICE s 251, 263 PROGRAM s 003 SOCIAL AND ECON. ENVIRONMENT CAT GORY s 032 COMMUNITY DEVELOPMENT DEPARTMENT s 040 DEVELOPMENT PROJECT MANAGER: 972 MATTHEW SCHWARTZ FIRST YEAR IN CAPITAL PROGRAM s FT83 FIRST YEAR OF APPROPRIATIONS s FY83 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 10/32 AWARD CONTRACT 04165 07/65 BEGIN CONSTRUCTION 12/35 06/88 BENEFICIAL USE PROJECT COMPLETE 01/90 01/93 PRIOR APPRO- TOTAL COST APPRO- PRIATIONS COST CATEGORIES ---------------------------------- ESTIMATE PRIATIONS --------- 1969-90 --------- LAND ACQUISITION 16144.6 22346.1 6241.5- DESIGN CONSTRUCTION EOUIPMENT ADMINISTRATION 2465.4 3231.6 746.2- OTHER 730.0 730.0 TOTAL COST -------------- 19360.0 26347.7 ---6957.7- PRIOR APPRO- TOTAL APPRO- PRIATIONS FUNDING SOURCES FUNDING PRIATIONS 1909-90 3S RENT FROM ARENA 300.0 300.0- 143 MISCELLAN. OTHER REVENUE FUND 20.4 20.4- 432 CBDG - L. MATCH FOR UMTA GRANT 1436.6 1433.6- 651 SEOPW TAX INCREMENT TRUST 145.0 2194.2 2049.2- 704 COBG--4TH TR 217.9 217.9- 7011 COBG--STH YR $0.0 60.0- 706 CDBG--6TN TR 70.9 70.9- 707 CD0G--7TH YR 199.0 199.0- 701 CDBG--STH YR 223.0 225.0- 709 CDBG--9TH TR 225.0 225.0- 710 COBG--IOTH YR 245.9 245.9- 712 0086--12TH YR 130.A 259.9 129.5- 712 CDBG--IITH YR 143.0 143.0- 714 COBS- 11TH TR 226.1 236.1- 731 UN.OEPT. OF HUD, SEC 108 LOAN $959.4 $956.4 702 SEOPW DEVELOPER DEPOSIT 45.0 4S.0- 733 SEOPW RENTAL PROPERTIES 26.3 129.7 103.4- 704 LOAN FR GENERAL FUND BALANCE 1230.7 3235.7- 364 1976 HOUSING G.O. BONDS 12000.0 12000.0 6AS 1976 HOUSING G.D. BONDS - INT. 1100.0 1100.0 ------------------ TOTAL------FUNDIN-G (� I III I --------- 19360.0 --------- 26347.7 I III --------- do$?.7- AS OF 06/29/69 ------------------------------------------------------------ I PROJECT DESCRIPTION: ! I This project involves redevelopment of the Southeast t t Overtown and Park west areas bounded by 2-395, NO Sth t I Street, I-95, and Blseayne Boulevard. The implamenta- t I tlon of the proposed prosram for the subareas will ra- t ! suit In the contruction of approximately 1,900 resi- 1 ! dential units and 250.000 sq.ft. of commarcial spate. ! I t ! Major public investment will be supported by Tax ! Incranent Revenue Bends. Additional public support t ! will be directed to Ovortown though C.O. Block Grants t I and other federal and local resources. Rodevslopsent t ! of Phase I of the nine blocks adjacent to the Overtown t ! Transit Station is scheduled to occur between 1906 ! ! and 1993. t t Phase I entails the redevelopeont of 30 &ores of land ! ! adjacent to the Overtown transit station. !' ! r ------------------------------------------------------------ a-- - - - - - - - - - - - - FUTURE COST ESTIMATE8---------------s logo-91 1991-92 1992-98 loos-" 1994-991 ------------------------------------ -- 4 •x1000) --------------------------------------------- 0.0 0.0 0.0 0.6 0.0 a------------------ FUTUIK FUNDINB-------------------P 1t190-91 1991-92 lost-99 1993-94 1994-99 --------------------------- - -- t • X 1000 ) 0. --------------o.s------ -o.a ------ - o.a 5tt PROJECT'NO. i 322056 PROJECT"NAME t CAMILLUS HOUSE LAND ACQUISITION AOOPFQ8 a 726 N.E. 1ST AVE. NSRhu.LOCATZON 263 NBRHD SERVICE t 263 PROGRAM i 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY^ : 032 COMMUNITY DEVELOPMENT DEPARTMENT t 048 DEVELOPMENT PROJECT MANAGERc 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM : FY90 FIRST YEAR OF APPROPRIATIONS : FY90 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT TBD BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FLING SOURCES ------------------------- 715 CDBG-- 15TH YR TOTAL FUNDING. ---------- C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS 1000.0 i000.o o.o PRIOR TOTAL APPRO- FUNDING PRIATIONS ------------------ 1000.0 i000.0 0.0 APPRO- PRIATIONS 1989-90 1000.0 1000.0 APPRO- PRIATIONS 1949-90 1000.0 1000.0 AS OF 06/29/69 -------------------------------------------------------- I PROJECT DESCRIPTION: I' ! F 1 The porject involves the acquisition of the usmillue 1 1 House as a component of the Southeast OvertownlPark 1' ! West Redevelopment Project. The land will be, sesemblsd 1 I for a multi -use development Mich would compliment the I ! surrounding now development projects. 1 <--------------- FUTURE COST ESTIMATES ----- ------ ----v 1990-91 1091-92 1992-93 1998-94 1994-96 --- ------------------------------- ( s x 1000 ) ------ - ----- ----- - --- �-... 0.0 0.0 0.0 0.0 got <------------------ FUTURE FUNDING ------------------- 1990-91 1991-92 1992-98 1993-94 1994-16 --------- ---------------------------.. 0 X 1000 ----- - ----- - • ----- ----- -- ----+ -0.0 0.0 0.0 0.0 0.0 REVISION DATE 06/24/89 �►' 11, PROJECT NO. = 322057 PROJECT NAME = BE OVERTOMN/PARK !NEST PHASE II ADDRESS : BE OVERTOMN/PARK !WEST NNW LOCATION : 251, 263 NBRHD SERVICE = 251, 263 PROGRAM : 008 SOCIAL AND ECON. ENVIRONMENT CATEGORY" t 032 COMMUNITY DEVELOPMENT DEPARTMENT = 044 DEVELOPMENT PROJECT MANAGER! 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM s FY89 FIRST YEAR OF APPROPRIATIONS = FY89 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION ADMINISTRATION OTHER TOTAL COST C I T T O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FYIO PRIOR APPRO- TOTAL COST APPRO- PRIATIONS ESTIMATE PRIATIONS 1989-90 -------------- •--- --------- 719.7 719.7 719.7 0.0 PRIOR TOTAL APPRO- FUNDIHQ SOURCES FUNDING PRZATZONS 44 URBAN MASS TRANSP. ADM. -GRANT 719.7 •----------- ---- - •- --------- 719.7 0.0 a AS OF 06/29/09 --•----------•---------------------------------------------- t PROJECT DESCRIPTION! ! t The project Involves the devolopment of two block* t t wilhin he Southeast Ovortown/Park Moot Rodoveldpmsnt !' t Project area. The Development will include mixed user I t development. The development area has Aeon dee19ns4e4 t as Phase 11 of the said redevelopment Project- ----------------------------------- ------------------------ --------------- FUTUM am EiTIMAT"--N----N-----� �" 1990-91 1911-92 1992-9S 1998-94 1m-10` •-------- ---------------------- ------ t t X 1000 - ----•---------------------- ------ 71g.7 APPRO- PRIATIONS<----•---•---••---• FUTURE FUNDING -------------------� 198o-SO logo-91 1991-92 1992-9S --------- --- ----- --------- --------- --------- i-i x 1000 i 719.7 _ ----------- ---------------------------------- 71l.7O.O REVISION:DATE OS/28/95 A4i V X., ION Wo V-1 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 09/29/89 PROJECT NO. : $22025 ------------------------------------------------------------ PROJECT HAVE : GARMENT CENTER/FASHION DISTRICT EXPANSION I ! PROJECT DESCRIPTION: [ ADDRESS : SEE PROJECT DESCRIPTION ! ! NBRHD LOCATION : 241 ! This project involves land acquisition, bldg.demolition ! NBRHD SERVICE : 241 ! and business relocation in the Garment Contsr/Fashion ! ! District. The proje:t will remove sxlatinq slw and ! PROGRAM : 003 SOCIAL AND ECON. ENVIRONMENT ! bli ht in the area from NN 2nd Avenue to I-95 between ! CATEGORY` : 033 ECONOMIC DEVELOPMENT ! NM let. Terrace and 22nd Lane. ! DEPARTMENT : 045 COMMUNITY DEVELOPMENT ! ! PROJECT MANAGER: 452 FRED FERNANDEZ ! Land acquisition (Phase I S II) has been completed, 65 ! ! parcels have been acquired (10.7 acres) and cleared. ! FIRST YEAR IN CAPITAL PROGRAM : FY60 ! Also, a beautification program along N.W. FIRST YEAR OF APPROPRIATIONS : FY80 ! 5th Avenue, a signags program for the district t ! infrastructure improvements (Phase I), replotting and ! PROJECT SCHEDULE : ! rezoning have been completed. ! INITIAL REVISED ! ! COMMENCE DESIGN 12/61 ! Currently, a land disposition Plan for industrial reuse ! AWARD CONTRACT 12/82 ! of the land in Phase I is underway. BEGIN CONSTRUCTION 04/83 ! ! BENEFICIAL USE ! ! PROJECTCOMPLETE 02/86 TOD ------------------------------------------------------------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONS --------------- FUTURE COST ESTIMATES---------------s COST CATEGORIES ESTIMATE PRIATIONS 1949-90 1990-91 1991-92 1992-93 1998-94 1994-95 ------------------------- --------- --------- --------- --------- ------------------------------------ ( • x 1000 ) LAND ACQUISITION 169.0 169.0 DESIGN 1050.0 1050.0 CONSTRUCTION 1275.0 1275.0 EQUIPMENT 428.0 428.0 ADMINISTRATION 450.0 450.0 OTHER 206.3 200.0 6.3 ------------------------- TOTAL COST --------- 3598.3 --------- 3592.0 --------- 6.3 --------- ------------------------------------ 0.0 0.0 0.0 0.0 0.0 PRIM APPRO- TOTAL APPRO- PRIATIONS ------------------ FUTM FUNDING -------------------> FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-95 199d-94 1994-90 I----------r-------------- --------- --------- --------- -------- --------- ---- - ----------------------- ( s x 1000 ) 704 CDBG--41H YR 189.3 189.3 705 CDBG--5TH YR 1050.0 1050.0 706 CDBG--6TH YR 1175.0 1175.0 707 CDBG--7TH YR 434.0 427.7 6.3 709 CDBG--9TH YR 450.0 450.0 710 CDBG--lOTH YR 300.0 300.0 i-------------------------- TOTAL FUNDING --------- 3598.8 --------- 3592.0 --------- 6.9 --------- --------------------r---r--.--rrr-..-- 0.0 0.0� 0.0 0.0 0.0 i REVISION DATE 00/01/99 55 Milli ,a'.. ... Iglu re n4 �f. iYi u'u Yi e. Li nip e PROJECT NO. s 322054 PROJECT NAME s EDISON CENTER GATEWAY IMPROVEMENTS ADDRESS ' s SEE PROJECT DESCRIPTION NBRHD LOCATION t 121, 122 NBRHD SERVICE : 121, 122 PROGRAM s 002 SOCIAL AND EDON. ENVIRONMENT CATEGORY s 033 ECONOMIC DEVELOPMENT DEPARTMENT : 038 PLANNING PROJECT MANAGER% 363 ELBERT L. WATERS FIRST YEAR IN CAPITAL PROGRAM s FY88 FIRST YEAR OF APPROPRIATIONS s FY88 PROJECT SCHEDULE _ INITIAL REVISED COMMENCE DESIGN 08/87 AWARD CONTRACT 04/89 BEGIN CONSTRUCTION 06/89 BENEFICIAL USE PROJECT COMPLETE TOD COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 0812t/89 1 PROJECT DEBCRIPTION:------------------------------------f t ! Thie project will improve the assthatic appearance ! ! of the area as well as to create a gateway is thr ! ! Edison Center Business District. Iwpravreeents will i ! include landscaping to buffer I-9S, street furniture. ! ! trash receptacles, lighting and slgnage. ! t ! ! t ! ! ! ------------------------------------------------------------ PRIM APPRO ------ �T ESTIMATES TOTAL COST APPRO- PRIATIONS <--------- --> ---- - PRIATIONS 1989-90 1990-91 1991-92 1992-94 199S44 1994-95 --------------------------- ----- -- --- ------ ( f 30) FUNDING SOURCES ------------------------- .15 CDBG--FUTURE YEARS 43.TACOLCY ECO. DEVL. CORP. GRANT 448 FLA DEPT OF TRANSPORT. GRANT 712 CDBG--I2TH YR 716 CDBG--IITH YR TOTAL FUNDING----------- 8.0 8.0 310.9 130.9 60.0 378.9 -138.9 - 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIOHS FUNDING - - -- ----- PRIATIONS --------- 1989-90 ----- ---- 240.0 54.9 24.0 30.0 30.0 376.9 54.9 24.0 30.0 ao.0 138.9 50.0 $0.0 80.0 30.0 30.0 ------------------------------ ------ ------ $0.0 90.0 80.0 0.0 0.6 <------------------ FUTURE FINDING ----------- ----A' 1990-91 1991-92 1992-93 loss-94 1994-90 --- ------------- --------- --------- --------r. ( f X 1000 ) 80.0 60.0, $0.0 �ttttilil h hl �I H f11 h I`1 11 h ,'� C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 419002 PROJECT NAME NORTHWEST RIVER DRIVE ACQUISITION - KREIDT PROP - ADDRESS : 300 NW RIVER DRIVE NBRHD LOCATION : 264 NBRHHD SERVICE : 264 PROGRAM s 003 SOCIAL AND ECON. ENVIRONMENT CATEGORY " : 033 ECONOMIC DEVELOPMENT DEPARTMENT : 042 GENERAL SERVICES ADMINISTRAT. PROJECT MANAGER: 421 RON WILLIAMS FIRST YEAR IN CAPITAL PROGRAM s FY38 FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EaUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------- INITIAL REVISED TBO PRIOR TOTAL COST APPRO- EST IMA TE PRIATIOHS ------------------ 34.0 $4.0 $4.0 APPRO- PRIATIONS 1989-90 34.0- PRIOR APPRO- TOTAL APPRO- PRIA17ONS FUNDING PRIATIONS 1969-90 684 PROP- Hs LEASE MANG ENT. FUND 34.0 94.0 34.0- ---------------------------------•------------------ TOTAL FUNDING 34.0 34.o 34.0— " OF 00129/"89 ---..----------r---r-----r--rr------rraaaarrr-rrrrra•rrrrrarr t PROJECT DESCRIPTION: N ! E t This propertyy acquisition is for tho Mia�l Rlver ! Re�HeveI ps�ent Prejeot. This property is air irlttlr0l N t part of this project- ------------------------------------- ----------- — - Cost 9ST21MATRIS I.` 1990-91 1991-92 19l2•!i 1993.94 1994-li9 --- ---- --------- t-4 x 1000 3- 34.0 0.0 --------- ------------------ FUTURE'i4' 1990-91 1991-92 1992-98 --------- -----"r,-----------..r t 1"6-94 ik99*-90 ------- -. rr..r..... -�- --- t x ------- 1000 ? 34-a ----- -r--r---r rrr-r-rr+- 34.0 0.0 0.0 0.0 0.9 � 'REV2sI0Ni DATE 0i/s0/ s. `4. Tm r4t+PA�7� , `Cr _ 5 3 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 031335 PROJECT NAME s BAYFRONT PARK REDEVELOPMENT - CORPS. OF ENGINEER$ ADDRESS : 100 BISCAYNE BOULEVARD NBRHD LOCATION : 263 NBRND SERVICE S 263 PROGRAM s 004 PARKS AND RECREATION CATEGORY " : 041 PARKS AND RECREATION DEPARTMENT s 043 DEVELOPMENT PROJECT MANAGERS 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM s FYe3 FIRST YEAR OF APPROPRIATIONS s FY33 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 01/62 AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE 04/04 PROJECT COMPLETE 06/66 PRIOR APPRO- TOTAL COST APPRO- PRIATIONS COST CATEGORIES ESTIMATE PRIATIONS 1989-90 ---------------------------------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES �.-------- ------ ---------.. . T07AL F1piDING --------- 0.0 --------- 0.0 --------- 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS FUNDING --------- PRIATION8 --------- 1909-90 --------- --------- 0.0 --------- 0.0 --------- 0.0 AS OF 06/29/09 ! PROJECT DESCRZPTIONs---------------------------- f I FOR INFORMATION PURPOSESa r This ppro sct involves constructlenr by the U.S. Corp*. i 1 Arwy Eng�nsero, which includes tilling, +or-1S00 linear 1 test of new bulkhead and adjacent Baywalk/ Courts* f 1 Piers at Chopin Plaza and adjacent to Bayeide Speoyalty l 1 Contort a ma or walkway connocting the Baywalk to 1 ! else ayyn• Bou ward, called the Flagler Strest Promenade ! ! and sito amenities including planting, lighting, lr�rl- ! 1 gation, benches and flagg ppoles. Thseo improvements 1 1 are being carriod out N Moral expense, in sxdhango 1 1 for th• Corps holding title to the land. The CIty has t ! paid for certain items outside of the Corps' budget, 1 1 and will execute a lease to operate and maintain the 1 1 entire project upon its completion by mid 1933. The f ! overall cost is estimated at •7 million dollars. 1 1 1 1 ! ------------------------------- ----------------------------- --------------- FUTURE COST ESTIMATES ---------------r 1990-91 1991-92 1992-93 1992-94 1994-9E --- ------------------------------- ( • X 1000 ) --------------------------------------------- 0.0 0.0 0.0 0.0 0.0 <------------------ FUTURE FUNDING -------------------> 1990-91 1911-92 1992--92 1993-94 1994-" --- ------------------------------- • X 1000 1 -------- ------ ------ --------- --------- .0.0 --- 0.0 0.0 0.0 0.0 �i COMPLETION DATE 09/SO/S9 _ c C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY PROJECT NO. 331299 PROJECT''NAME'` & FLORIDA EAST COAST RAILROAD SETTLEMENT (LAND ACG.) AOOREas & BISCAYNE BLVD. HE 6 ST. HBRHD L.uUATION & 268 NdRHO SERVICE : 263 PROGRAM : 004 PARKS AND RECREATION' CATEGORY" & 041 PARKS AND RECREATION DEPARTMENT & 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER& 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM & FYBS FIRST YEAR OF APPROPRIATIONS a FY85 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION- EQUIPMENT ADMINISTRATION OTHER TOTAL COST AS OF' 09129189 --------------r-------rr-w-r-rrrrwww-wrrrr I PROJECT DESCRIPTICN& 1 ! This pro�eat provides payment for logai servslees I as a result of the e#lnent do"An proeeedfeel• "&to # t I the Florida East Coast Roll ray Company. In asserdmwo t I with the provioiono set forth In tlllls CCenssnt fupplsr t I mental Final Judgment awarding costs and atternego" t ! fees. t ! t I t ! t t t. i t I t ------------------------------ -----------------------------� PRIOR APPRO ------ COST ESTIMATES TOTAL COST APPRO- PRIATIONS <------- -----s ESTIMATE PRIATION8 lost-90 1990-91 1991-92 1992-98 loot-!! 1!l141S ---•------------ ------------ --- ( •X1000) FUNDING SOURCES ------------------------- 342 CAPITAL IMP. FUNDS - FUND BAL. 178 1972 PARKS 6 RED G.O. BONDS -- ---------------------- TOTAL FUNDING 1788.6 1632.0 I78s.6 1s8Z.0 PRIOR TOTAL APPRO- FUNDING PRIATIONS 288.6 382.0 1450.0 1450.0 ------------------ 1788.6 1882.0 98.4- -----98.4- APPRO- PRIATIONS 1989-90 98.4- ------------------------------------ ----- o.o o.o o.o a.o ago (------- —----- ----- FUTURE FUNDING, ----------------- -* 1990-91 1991-92' 1992-98 1998-94 --- ---r--r- rrrrwr--- r ( • X 1000 ) -----— -------r---r-- --------- -----r--- 98.4- -0.0 0.0 0.0 0.0 COMPLETION DATE 09/30/49 ---r—rrrrn� 0. Su a s e •1 CITY OF MIAMI ar061"1S! CAPITA Ia PRROOGRAU OV SCRIPTI FY90 pa,OJECT' NO. : 931345 PROJECT NAME t TRIANGLE PARK RENOVATION8 -r_-ter.. r-rr...rr rrr !-WROJECT OESCRIP' C N= F9plaa1rtg the itLnaiAg and RisS�"` ! t GW 11 ST. AND 4 AVENUE ! This prsJsat inaludss ! •q++ipusnt. 1 t LOCATION t ground � mum SERVICE : 494 ! 1 : 004 PARKS AND RECREATION ! ! I CATEGORY" t 041 PARKS AND RECREATION PARKS AND PUBLIC FACILITIES ! DEPARTMENT 049 PROJECT MANAGERt 491 DIANNE JOHNSON ! ! FIRST YEAR IN CAPITAL PROGRAM t FY911 ! ! FIRST YEAR OF APPROPRIATIONS t FYBS ! ! PROJECT SCHEDULE t INITIAL REVISED ! ! O1M � DESIGN 08l86 091E6 CONTRACT ! ! WGIN Osi`66 10186 ! 077 SS !BENEFICIAL USE 07188 01tA9 PROJECT COUPLETE -------_,.---------------•�--....r...rr_..r_..r_..w.k,..wi...__..r_r_r.i+.r_+ PRIOR APFRO- APPROPIATIONS �,r..� ESTIMATES' 1992-9S9r9--S-..9-rrd +----------1-0-0-0 _I ` TOTAL COST ESTIMATE PRIATION1959-90 1990-91 1991-92 ___r---„ _1- --------- COST CATEGORIES ------ --i-X ----------------r_.__rM_ LAND A ITION .T •7 2Z.0 22.0 CONSTRUCTION EADILINISSTRATION ' $ 3 ......-.. ---_--0. ------- ------ --__M_r_..r. -- 0.01 00 OTHER ------------_-_....._ '---23.0 _-_____-_------O.O 0 0.0 0.0 TOTAL COST PRIOR ""--FUT1�-- r---TOTAL -91l-94 AO- PRIATION 1999-90 ------------- 1990-91 1991- 92 9 FUNONSOURCES FlqZRi PRIATIONS --------- -- --------- - =------__..r_-__M__-__-- _-� -------- s X 1000 995-'$ 8HXHE STATE REV., BONDS POOL 23.0 23.0 ___-_ __ ------- _ -0.0 -_ --_-_ -------- 0.0 �0.0 ---- -- -r0.0' _....r...»_..- -"0 O a.LR - _ --_-- -29.0 29.0 TOTAL i UNDING COMp1.ETION DATE 0liio/ir! #►E1► C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 NAME s LEMON CITY PARK IMPROVEMENTS t NE'59 ST-8 MIAMI COURT NBRm'LOCATION : 112 NNW SERVICE _s 112 PROGRAM: 004 PARKS AND RECREATION CATEGORY s 041 PARKS AND RECREATION ,PROJECTDEPARTMENT 049 MANAGERS 491 DIAKNNE JOHNSONIC fACILITIEB FIRST YEAR IN.CAPITAL PROGRAM s FY84 FIRST; YEAR OF APPROPRIATIONS : FY64 PROJECT SCHEDULE = INITIAL REVISED COMMENCE DESIGN 00/84 00/84 AWARD CONTRACT BEGIN CONSTRUCTION 00/85 00/88 BENEFICIAL USE 00/58 PROJECT COMPLETE 00/85 00/89 rrarr---rra-rrrrrrararrr ----------------------------- a-----a ! PROJECT pEBCRIPTZON: M ! t ! This project involves the purchase and inatoil�otiewr Of M ! playground equipment, site furniture, renovatio-andr F ! equipment purchase relans ted to the day cars *enter ! located in the park. Fundsng for this phase I eas pro- ! vided from community development funds. ! ! r ! P i !r !------------------------------raa-ara--.�-a-ara-rrrr-arrrrs- PRIOR APPRO- FUTURE OESTIMATES---------------s 1l14-911 TOTAL COST APPRO- PRIATIONS -------- 1992-98 CATEGORIES ESTIMATE PRIATIONS 1959-90 1990-91 1991-92 1!!Z-!i t!l3-14-- ------------------ ---------- � •X1000) LAND ACQUISITION DESIGN CONSTRUCTION ADMINISTRATION OTHER TOTAL COST 45.0 45.0 ------------------ 45.0 45.0 PRIOR TOTAL APPRO- FUNDING SANG S FUNDIPRIATZ -------------------------------------------- 709 COBG--9TN YR`` 45.0 45.0 ---------- -- ,-------- TOTAL +FUMING ---- 45.0 4. — — — — — — - — — .r—rrrr.rdir 0.0 0.0 0.0 0.0 0.0 0r* APPRO- _ _ PRIATIONS <------------------ FVT� r r -r - a-a-rrrrr.a� 198l-90 1990-91 1991-92 1992-95 ------------------ ---- -------------- -------r- a- ------ WIN • X 1000 ) ---------------W.--------- o.o W. o.00- REVISION DATE 08/01/09 01� 4. — — — — — — - — — .r—rrrr.rdir 0.0 0.0 0.0 0.0 0.0 0r* APPRO- _ _ PRIATIONS <------------------ FVT� r r -r - a-a-rrrrr.a� 198l-90 1990-91 1991-92 1992-95 ------------------ ---- -------------- -------r- a- ------ WIN • X 1000 ) ---------------W.--------- o.o W. o.00- REVISION DATE 08/01/09 01� PROJECT NO. : 381099 PROJECT NAME i MOORE PARK REDEVELOPMENT ADDRE69 t 765 NW A6 STREET NBRHD LOCATION : 681 NBRHD SERVICE : 681 PROGRAM 004 PARKS AND RECREATION CATEGORY^ s 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGERS 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY84 FIRST YEAR OF APPROPRIATIONS i FY84 PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 03/83 AWARD CONTRACT 12/83 04/84 BEGIN CONSTRUCTION 12/84 05/84 BENEFICIAL USE 09184 10185 PROJECT COMPLETE 09/34 09/89 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUMING SOURCES 446 CONTRIS PR DEBT SERVICE FUND 785 US INTERIOR UPARR FUND ------------------------- TOTAL Ft91DING . ok C I T Y O F M I A M I CAPITAL IMpf1OVEMEHT PROGRAM PROJECT DESCRIPTION FY90 AS OF 08/29/89 ----------------------- ------------------------------- ! PROJECT DESCRIPTIOM t t This project involves the complete rehabilitation of t t 19-acre Moors Park. Improvements include demolition t ! of all buildings except the tennis and day care centers 1 ! construction of a now recreation complex, renovation of t t the ballfields and playground, lightinth, plantin ,and 1 t overall site improvements. With were an 962 of thee* t ! aspects complete in 1965, remaining work Involves the f ! repair of the irrigation syystem and track. Operating t ! costs are not expected to inereaso,. but seine nominal ! t savings may accrue as a result of this project due to t t lower maintenance. t t t ! t ! t t t --------------------------------------------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES ----- ----- ---> ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-94 19l8-94 1994-99 --------- --------- --------- --- t-� X -------------- 1000 ) --------- --------- M w. 233.5 190.0 43.5 395.0 952.0 57.0- 13.5 13.5 48.0 48.0 ---1190-O ---1190:0 ------ 0.0 ------0.0 ------0.0------0.0 ------0-0 ------0.0 PRIOR APPRO- TOTALAPPRO- FUNOIHG PRIATIONS PRIATIONS 1989-90 <-------------_ ----FUTURE FUNDINi! 1990-91 1991-92 1992-93 ----------""-------' ' 199S.44 1994-95 --- ----- --------- --------- --------- --------- --- --- I 0 X -------------- 1000- 490.0 490.0 700.0 700.0 r-------- ___ 1190.0 ___ 1190.0 0.0 - 0.0 ------ 0.0 - 0.0 .rsr.r�fir- - 0.0 0.0 REVISION DATE 06/27/69 'I I I I all II f �I 11 63 CITY OF MIAMI ASOR'OSI"I" .` CAPITAL IMPROVEMENT PROGRAM PROJECT OESCRIPTZON FY90 pROJECTN0. a $91042 --- - ---- - ----------------------------►..,.--------- PROJEOT AAME t LUMMUS PARK REDEVELOPMENT ! PROJECT DESCRIPTION: ! ADDRESS-, t 404 HW 3R0 STREET 1 HOUND LOCATION t 264 1. . I ! ! This projsct involves the overall redevelopment at ! HtRHD SERVICE t 264 ! 1 Luwmus Park. The Wainer Howeeteadr located on the northeast corner of {he site, is ourrontly undergoing !' f PROGRAM t 004 PARKS AND RECREATION _ ! complete restoration through Dads Heritage Trust. ! t QATESOR e t 041 PARKS AND RECREATION ! Ft. Dallas Barracks and the park's wain recreation ! DEPARTMENT t 033 PLANHIHe PROJECT MANAGER: 387 ANA GELASERT ! ! building also require restoration and renovation. A waster plan including the development at an entry, ! ! plaza, ligqhting, site furniture, planting and other ! t FIRST YEAR IN CAPITAL PROGRAM t FY73 ! amenities is trsan9y prepared try the Ospartments of Works. -FIRST YEAR OF APPROPRIATIONS t FY78 1 1 Planning and Public Prior COOS funds appropriated for "Lummus Park Area ! -PROJECT SCHEDULE t ! Beautification," Project No. 331034. in the amount of ! !' INITIAL REVISED ! •180,000 are reallocated into this project. ! COMMENCE DESIGN 00/84 00/36 ! ! AWARD CONTRACT 00/66 ! : BEGIN CONSTRUCTION 00/84 00/35 ! ' BENEFICIAL USE PROJECT COMPLETE 00/86 TOO ------------------------------------------------------------ TOTAL COST PRIOR APPRO- APPRO- PRXATIONS t--------------- FUTURE COST ESTIMATES ---------- ----- 1992-93 1998-94 1994-99 COST CATEGM.Us ESTIMATE PRIATIONS 1949-90 1990-91 --- 1991-92 -- ------ --------- ------------------ ------- -------------------- " """ "-" --------- --------- ( e X 1000-) LAND ACOUISITIOH OESXG14 91.7 31.7 60.0 CONSTRUCTION 756.4 344.8 411.6 EQUXpmpff AOMINr$TRATION 3.3 3.3 OTHER 13.6 13.6 ----- ---- ----------_.,... ---- ---------------------------------- TOTAL COST 965.0 --------- $79.6 --------- 0.0 --------- 465.2 ----- ---- 0.0 0.0 0.0 Q+0 TOTAL FUNDING PRIOR APPRO- PRIATIONS APPRO- PRIATIOHS 19f9-90 <------------------ FUTURE 1990-91 1991-92 Fmom 1992-93 -r-----------------► 1993-94 1994y913 FUNDING SOURCES --------- --------- --------- ---- --------- -----------r-r-•r..k ------------------------ --------- • X 1000 1- 164 LUMMUS DOCKAGE.REVENUE 19.5 19.5 703 CO8A--3RD YR 57.5 57.5 704 CDBG--4TH YR .4 .4 706 COBS--6TH YR 147.9 147.9 712 COBS--I2TH YR 79.5 79.5 405.2 $99 UNDETERMINED 435.2 996 SUNSHINE STATE REV. BONDS POOL 75.0 75.0 --N-N-- --- N---- ••-_ -_ - _ _ TOTAL FUNDING $65.0 379.8 0.0 485.2 ----- 0.0 0.0 0.0 0.0 8k t, C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. t 331044 PROJECT HAVE VIRGINIA KEY PARK DEVELOPMENT - PHASE I ADDRESS s VIRGINIA KEY NBRHD LUUATZON : $91 NNW SERVICE s $91 PROGRAM s 004 PARKS AND RECREATION CATEGORY" s 041 PARKS AND RECREATION DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM s FY73 FIRST YEAR OF APPROPRIATIONS s FYS3 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 01/79 01/79 AWARD CONTRACT 00/34 05/36 BEGIN CONSTRUCTION 00/34 05/36 BENEFICIAL USE 00/e4 07/36 PROJECT COMPLETE 00/86 TOD AS OF 00/29189 ------- --------------------------------------- I PROJECT DESCRIPTION: ! r 1 Virginia Ksy is a 1005 &ors barrier Island in f04$cayns t 1 say oil the R#akenbacker Causeway. Development pro- ! ! posed for the Key will protest the iraggile environment t ! whiia facilitating beach access and allosin blcycling« t ! e&nosing, fiehinq, environment studies, wil lifs obeer- t ! vation, camp#ng, and slmilar resource based activities. ! ! t ! Facilities to be eontrueted include boardwalks, rest- t ! rooms, food concessions, picnic areas, camping facili- ! ! Also, shelters, nature trails, environmental study [ 1 center, and parking areas. A master plan has been ! ! developed by a private consultant, Synterra, Ltd. t ! 1 ! 1 ! t !. t 1 t ------------------------------------------------------------ P APPRO- TOTAL COST APPROPRO- PRZATIONS ------ FUTURE COST ESTIMATES �--------- - """- COST CATEGORIES ESTIMATE PRIATION8 1969-90 1990-91 1991-92 ---- 1992-98 --------- 1998-94 1994-ft ------------------ ------------------------- ----- --- - --------- --------- --- 4 • X 1000 LAND ACQUISITION DESIGN 335.0 135.0 200.0 614.9 614.9 LION ADMINISTRATION OTHER -- ------------------------ TOTAL COST 949.9 --------- 749.9 ------ -- 0.0 --- - -- 200.0 ----- 0.0 ------ -- 0.0 ------ 0.0 0"& PRIOR APPRO- FUNDING SOURCES TOTAL FUNDING APPRO- PRIATIONS PRIATIONS logo-90 <------------------ FUTURE 1990-91 1991-92 -- --- "FUMXDM 1992-98 --------- ----------------•••-r lots-94 1994✓9 ------ -- --- ---------------------------- --------- --------- ------- x loon i 36 FLA. OW BEACH MGMT. - ANTICIP 200.0 200.0 243_MISCELLAN. OTHER REVENUE FUND 66.8 46.6 602 FY82 FPSL FRANCHISE REVENUES 250.0 250.0 770 FLA REC DEV ASSIST. PROEM GRNT 200.0 200.0 $74 1972 PARKS 3 REC G.O. BONDS 8.1 3.1 996 SUNSHINE STATE REV. BONDS POOL 225.0 225.0 ------..----------•--_--------- TOTAL FUNDING 949.9 ------ -- 749.9 ------ - 0.0, _ k L7P REVISION.DATE 09/05/89 i � PROJECT, NO.. : 583058 PROJECT NAME. i AFRICAN SQUARE PARK RENOVATIONS ADDRESS t 1400 NM 62 STREET NBRHD LOCATION : 122 NBRHD SERVICE : 122 PROGRAM r 004 PARKS AND RECREATION CATEGORY" s 041 PARK$ AND RECREATION DEPARTMENT s 049 PARK$ AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JONNSON FIRST YEAR IN CAPITAL PROGRAM s FY80 j FIRST YEAR OF APPROPRIATIONS : FY88 i PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 06188 04/89 AWARD CONTRACT 00/84 12/49 BEGIN CONSTRUCTION 00/64 01/90 BENEFICIAL USE 00/64 08190 PROJECT COMPLETE 00/84 10/90 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION TR63.6 TRUCTION 529.8 EQUIPMENT ADMINISTRATION 6.6 OTHER TOTAL COST 600.0 TOTAL FUNDING SOURCES FUNDING ----------- --------------- $59 PRO. NEW PORT BRIDGE LAND SALE 800.0 917 FLA. STATE DIRECT APPROP -FY69 200.0 996 SUNSHINE STATE REV. BONDS -POOL 100.0 TOTAL FUNDING 600.0 L C I T Y O F M I A M= CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR APPRO- PRIATIONS 68.6 529.8 6.5 600.0 PRIOR APPRO- PRIATIONS 300.0 200.0 100.0 600.0 AS of 001"/ft r------_r--rr--r------------------ r-.rr.r. ! PROJECT DESCRIPTION: ! ! This project involves the complete renovation and t ! redesign of the African Square Park in the Model. 09t1es F ! area. !' ! This project calls for the demolition of the market t ! pavi111ona and the re-dosiyn of the amphitheatre, as t ! well as99the renovation or replacement of the rrecreotl�on ! ! andlbasketballecourtslwilleunderuoirehabilthe itatlla round ! 99 on. This, ! ! project is part of the Citywide Cighborhood Park ! ! Renovation Program. ! f ! ! ! ! ! ! ! ! APPRO- PRIATIONS --------------- FUTURE COST ESTIMATES---------«.---ry 1989-90 1990-91 1991-92 1992-9• 1998-94 1994-96 --------- ---- -------------------------------- •X1000) ------- 0.-0. ----- ----- 0 0 0.0 �0.0 0.0 0.11 APPRO- PRIATIONS------------------ FUTURE FUNDING -------------------► 1969-90 1990-91 1991-92 1902-95 1993-94 1994-91i --------- --r --------------r------- ----- t • X 1000 )- ----------------------------------------------------_ REVISION DATE 07/25/89 AMM& Abb" ai� Amos ...r r u :.. C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 331056 PROJECT HAVE s ROBERTO CLEMENTE PARK REHABILITATION AGGRESS : 101 NW 34 STREET HBRHD LOCATION : 241 NBRHO SERVICE : 241 PROGRAM s 004 PARKS AND RECREATION CATEGORY : 041 PARKS AND RECREATION DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGERS 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM s FY83 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 00/85 12/89 AWARD CONTRACT 07190 BEGIN CONSTRUCTION 00/85 08190 BENEFICIAL USE 06191 PROJECT COMPLETE 00186 09/91 AS OF 06/29/89 ------------------------------------------------------------ ! PROJECT DESCRIPTION: s ! 1 ! This project involves the physical expansion of the i ! park throa h the acquisition of 12 ad *cent land ! ! parcels and the complete rehabilitastion of the exist 1 ! inq facilities to correspond with the expansion. ! ! Individual elements that will be affected include the ! ! ballfields, the recreation buildingy, w" courts. and ! ! playyground. Other aspects that wl7l be improved i ! in ads sits lighting, planting, irrigation, fencinq, ! ! and overall site improvements. This project is part of ! ! the Citywide Neighborhood Park Ronovation Program. ! I. PRIOR Ate- TOTAL COST ESTIMATE APPRO- PRIATIONS PRZATIONS 1989-90 <--------- ------ FUTURE COST ESTIMATES 1990-91 1991-92 1992-OS 1998-94 1904-95 COST CATEGORIES ------------------ --------- --------- ---------------------------------- --------- --------- --------- t • X 1000 ) LAND ACQUISITION 900.0 900.0 DESIGN 120.0 190.7 70.7- CONSTRUCTION $00.0 1685.4 5ac-4- 40.0 40.0 ADMINISTRATION 40.0 20.9 19.1 OTHER --rr-- __ rr---- - ---rrr-- TOTAL COST �---^------- �--1900 0 _ - 1900 0 0.0 "--- 0.0 ----.. _ -0.0 0.0 PRIOR APPRO- TOTALAPPRO- FUNDING PRIATIOHS PRIATZONS 1969-90 <------------ ------ FUTURE Ft 1990-91 1991-92 1992-" "-----"-----------"' 199s-94 1994-95 FUNDING SOURCES ----1 --- --------- --------- --------- --------------------------------- --------- --------- • X )----- 1000 658 0. COUNTY SEAPORT LAND SETTLM. 300.0 300.0 j $59 PRO. NEW PORT BRIDGE LAND SALE 1000.0 1000.0 $73 1980'SANT. 0.0 B., 87 SL - INT 68.0 66.0 087 1980 HIGHWAY G.O.B.,86 SL -INT 45.5 45.5 891 64 STORM GO- BONOS, 86 SL -INT 113.5 113.5 $93 84 POLICE 00. BOND, 86 SL -INT 273.0 273.0 987 FLA. STATE DIRECT APPROP -FY89 100.0 100.0 --------- --------- -------rr TOTAL FUNDING 1900.0 1900.0 0.0 0.0 ------ 0.0 0.0 0.0 0.0 � I ..,...d wR ../../.. 89-BOfi 66 C I T Y O F M I A M I p CAPITAL IYPRDvERFNT PROGRAM PROJECTDESCRIPTION . FDY90 pRpJEOT Noy : 481070 pROJECT'HAW ATHALIE RANGE PARK REHABILITATION ADDRESS_ $25 10.62 STREET NdRFID LOCATION 1 112 t6 SERVICE . : 112 1 004 PARKS AND RECREATION CATEGORY. 1 041 PARKS AND RECREATION 1 049 PARKS ANo PUBLIC FACILITIES DEPARTMEPROJECT MANAGER: 491 OZANNE JOHNSON -IRST YEAR IN CAPITAL FIRST YEAR OF APPROPRIAATI0ONNSM 1 FY88 F PROJECT SCHEDULE = INITIAL REVISED COMMENCE DESIGN 00/85 06169 AWARD CONTRACT 00/55 10/89 ` BEGIN CONSTRUCTION 00185 11/89 BENEFICIAL USE 01190 PROJECTCOMPLETE 00187 02/90 COST CATEGORIES ------------------------- LAND ACQUISITION. DESIGN CONSTRUCTION ADMINISTRATION . OTHER-------------- i AL COST ----- PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS 10.0 10.0 110.0 110.0 5.0 5.0 - - --- 125.0 125.0 PRIOR TOTAL APPRO- pRIATIONB FUNDING OU -SR --------- SOURCES rrrrr-- 459 PRO. NEW PORT SttIDGE LAND SALE 100.0 25.0 !96 -SUNSHINE STATE REV. BONGS POOL -----rrr--r125.0 .—�rr rrrrrrr rrr TOTAL FUHDIHG w �1 a AS Of �t2918>M -----•---------------------rr..r,rr....r. 1 PROJECT DESCRIPTION. t 1 N t Formerly known as Edison Confer, this park requires N 1 substantial improvements to the sits and this proieat, as 1 lighting system which is addressed by ! part of the Citywide Neighborhood Park Renovat one, N 1 program. Additional improvements to this park''11 ! ! including court improvements and park furnishings aw - 1 ! be performed under separate projects in this pregr een established for the 1 A separate project has also SO -meter pool b1 I roplacoment of the existing pool with a 1 1 complox, which will contain reetroow facilities to t ! service the ballfloldo. (The restroos building was 1. 1 :rill,,,aly part of this project until the cemmencsment r ! f hpool complex design. 1 i 1 !--------- --------------------------------------t ------ lm GOT ESTIMATES- -----rrrrrrrrrrl PRIATIONS--------- loll-92 1992-99 1998-94 I994-!W 1089-90 1990-f1 ---r--------- ------ ( • x 1000 ) _---------------'.r"' ---- -------0.0 ------0.0 0.0 •0.0 APPRO- FUT�M F-►---r------- 7� PRIATIONS <------------------ 1992-93 1!f!-!4 1!ld►lO 1989-90 logo-91 1!!1-l2 r--rr --rrrrrrr r--rrrrrrr rrr.ar.rrr- -------------(-• x 1000 ) 100.0 25.0 --------------- rr—rrrrrr --rrrrrrr ---r125.0------0.0------0.0 0.0 0.0 REVISION DATE 08/14/69 J C I T Y O F M I A M I AS OF 00/29/89 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. 1 881099 PROJECT NAME : SWIMMING POOL RENOVATIONS ADDRESS s CITYWIDE }--PROJECT DEgCRIpTI0t1: --------------------------� ! Constructed s•"y years ayo, the City'e community to the t ! swimmin pools and faallitie9 have deteriorated NBRHD LOCATION : 900 HBRHD SERVICE : 900 ! point where routine maintenance and existing aeeese ! controls cannot alleviate functional and vandal-roloted ! M PROGRAM c 004 PARKS AND RECREATION ! problems. As the first phase of thin project, security ! fencing of a tubular steel picket design will be M f CATEGORY" : 041 PARKS AND RECREATION DEPARTMENT t 049 PARKS AND PUBLIC FACILITIES ! Installed at nine city pools. As part of the Citywide ! ! PROJECT MANAGER: 491 DIANNE JOHNSON ! Neighborhood Park Renovation ProIram. phase two will ! address the mechanical problems hrough the replacement ! FIRST YEAR IN CAPITAL PROGRAM i FY81 ! of underdeck pi ing, holding tanks, pumps and filtre- The affected by the latter work ! FIRST YEAR OF APPROPRIATIONS : FY81 ! tion systems. parks ! includes Curtis, Morningelde, Shenandoah, Virrick, I PROJECT SCHEDULE : ! West End, Williams, and Gibson. (Hadley and Range pools ! under separate projects in this program.) ! ! INITIAL COMMENCE DESIGN 00/81 REVISED 02/87 are covered ! If funding permits, additional improvements will be these Maintenance and ! ! AWARD CONTRACT 00/81 00/81 09/89 10189 ! made to the bathouses at pools. utility costs are expected to decline. ! BEGIN CONSTRUCTION ' BENEFICIAL USE 05/90 PROJECT COMPLETE 06/90 ------------------------------------------------------------ TOTAL COST PRIOR APPRO- APPRO- PRIATIONS FUTURE COST ESTIMATES--------------31 t--------------- 9 1!!2-l8 1!!8--- 1-----5 r COST CATEGORIES ESTIMATE PRIATIONS 1949-90 1990-91 1991-9 2 --- ---•------------------ ------- ------ ---------------------------------- --- ------ --------- e X 1000 ) LAND ACQUISITION DESIGN 165.0 177.8 12.8- 1400.0 280.0 1481.2 210.0 81.2- 20.0 EONSTRUNTION ADMINISTRATION 95.0 21.0 74.0 OTHER-- - - ----- - - ----- - TOTAL COST-----------------1890.0 ---1090.0 0.0 ----- 0.0 0.0 0.0 0.0 0 0 , TOTAL PRIOR APPRO- APPRO- PRIATIONS ---•--- FUTURE FUNVZW----------r ----------- ••"8-'•-- 1992-98 I9l8-l4 FUND� SOURCES FUNDING PRIATIONS 1999-90 --------- 1990-91 1991-92 --1l94... ------•----------------------------- ---•------- ----------------------- --------- ( • X 1000 ) 446 CONTRIB'FR DEBT SERVICE FUND 250.0 250.0 601 FYN FPSL FRANCHISE REVELS 440.0 440.0 996 SUNSHINE STATE REV. BONDS POOL 1200.0 1200.0 --•--------------- --------- ------ TOTAL FtNMZNG 1690.0 1890.0 0.0 0.0 0.0 0.0 0r0 REVISION DATE 07/0S/89 1�1 IININ� II I � �► i u C I T Y OF VXAMZ As, of oft",#6 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECTN0.< i 831143 -------------------- ---------- ----------- ----------...--- PROJEOT NAME t ANTONIO MACEO PARK DEVELOPMENT ! PROJECT DESCRIPTIONS r ADDRESS ,. -' _ sits mw 7 STREET! ! NNW LOCATION 1 594 ! Thie project Involved the acquisition of a 3-scro park F NBRND'SERViOE a 594 ! sits, Iosated on NR 7 Street botweon $lot and s7th t ! streets. Orl9in411y nawed slue Lagi000nr, tho park wasp r r GRAM PROS 004 PAW AND RECREATION ! later ronanod ter General Antonio Vases. Later CATEGORY S 041 PARKS AND RECREATION ! devolopnent of the park will create a passlvo, reseurco r DEPARTMENT t 049 PARKS AND PUBLIC FACILITIES ! based recreational area with beating, lenl4k1n9, anO r PROJECT'MAHAGERs 491 DIANNE JOHNSON ! play areas, and a hgqlstorio/nature trap and recreation* r FIRST: YEAR IN CAPITAL PROGRAM i FYSO ! willdbe�under9oneswithatheaaseistaneanofftha, moral ! FIRST YEAR OF APPROPRIATIONS i FYeO ! Antonio Maws Foundation. ! ,i PROJECT SCHEDULE INITIAL REVISED ! r' COMMENCE DESIGN 06183 05/86 ! r AWARD CONTRACT 12/83 ! r BEGIN CONSTRUCTION 06/64 ! ! BENEFICIAL USE 06/65 ! r PROJECT COMPLETE 06/65 05/36 ------------------------------------------------------------ PRIOR APPRO- TOTALCOST APPRO- PRIATIONS �-------------------~---� ------ FUTURE COST ESTINXTEs COST CATEGORIES ESTIMATE PRIATIONs 1969-90 1990-91 1991-92 1997-98 1993-94 1"4-95, --------r--------- --------- ----------------------- --------- --------- --- ------------- • X 1000 )- LAND ACQUISITION 1465.5 1504.0 1a.$- DESIGN 11.0 27.2 16.2- CONSTRUCTION 109.7 135.6 25.9- EQUIPMENT ADMINISTRATION 52.5 3.2 49.3 OTHER TOTAL C08T------- -- 1653.7 1670.0 21.3- ------..r..-ar•rs -rrr---rr:.. -- 0.0 --- 0.0 0.0 R«{F • .. PRIOR APPRO- TOTALAPPRO- PRIATIONS ------------------ PJTURCFUNOM --------------rr--i$ FUNDING SOURCES FUNDING PRIATiONS 1959-90 1990-91 1991-92 1"2-99 1993-94 i914- - --------------r--rr-------r--.rM --�- --------------------- ------- - - - -- - ----- --------- ----- - • X 1000 i- 70 PROPERTY RENT 150.0 150.0 193 CONTRIS FR GENERAL FUND 25.0 25.0 601 FY61 FPSL FRANCHISE REVENUE$ 450.0 450.0 740 US IHTER. LAND 6 WTR CONS. GRT 390.7 402.05�--- 775'VIRQINIA KEY LANDFILL SALE 175.0 175.0 ,w..•. $58 D. COUNTY SEAPORT LAND SETTLM. 16.0 16.0 678 1972 PARKS 6 REC Q.O. BOND$ 452.0 452.0 --- -- --- TOTAL FUNDING 1655.7 1470.0 ----r.. 11.3- --rr--•-----•-•rr- 0.0 0.0 0.4 Q.S 0.f1 c REVISION DATE 07/26/89 C I T Y O F M I A M I CAPITAL IMPROVEItENT PROGRAM PROJECT DESCRIPTION FYtO PROJECT N0. 1 $91227 PROJECT NAME r SAYFRONT PARK REM. DESIGN AND DEVELOP.— PHASE I ADDRESS 100 BISCAYNE BLVD NSRNDD-LOCATION 268 NBRND SERVICE s 900 . PROGRAM : 004 PARKS AND RECREATION CATEGORY" s 041 PARKS AND RECREATION DEPARTMENT : 048 DEVELOPMENT PROJECT MANAGERS 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM s FY79 FIRST YEAR OF APPROPRIATIONS s FY86 PROJECT SCHEDULE r INITIAL REVISED COMMENCE DESIGN 01/42 AWARD CONTRACT 10/85 BEGIN CONSTRUCTION 11/85 05/85 BENEFICIAL USE 12/86 PROJECT COMPLETE 12166 TOD COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTIONEQUIPMENT 0A �ISTRATION TOTAL COST FUNDING SOURCES ------------------------- AS OF OS/29/89' •--------------r----••- 1 PROJECT DESCRIPTIONS t � t t This project involves the redesign of Saytrent Park ! I by Isamu Noguahi working in conjunction with th• OitV*o t 1 design consultants. Funding is to bo used for design, t 1 the prepum aration of construction dosenter and eon- t ! struatien administration connected with the redevelop- t ! went of the entire park, and construction in tho north t I and. t I HOTEs Non -City sources at funding include "in -kind" ! ! service • provided by the U.S. Army Corps of Engineers! I in the amount of approximatoly e7 million. t 1 t t t t t i ! ------------------------------------- ----------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES---N-....-------s ESTIMATE PRIATIONS lost-00 1990-91 1991-92 1992-98 199S-94 1l11-9S ------------ ------ ------ --- --- ---------------------- 4 • x 1000 912.0 912.0 146.0 146.0 26.5 26.5 ------------------------------------------------------------------------ 1086.5 1086.5 0.0 0.0 0.0 0.0 0.0 O.tt TOTAL FUNDING 200 NATL ENdOW. FOR THE ARTS GRANT 50.0 480 BAYFRNT PK BANDSHELL PKG REV 78.5 601 FY81 FP$L FRANCHISE REVENUES 200.0 $12 FY80 FPBL FRANCHISE REVENUES 825.0 775 VIRGINIA KEY LANDFILL SALE 200.0 $58 0. COUNTY SEAPORT LAND SETTLM. 183.0 878 1972 PARKS 4 REC G.O. BONGS 55.0 ------------------------- --------- TOTAL FUtE3IN0 lOs6.5 PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTURE FUNDINS--------------- ---> PRIATIONS lost -to 1990-91 1991-92 1992-98, 1998-94 1994-90 ------------------ --- ---- ---..-...... ------ t • x 1000 $0.0 78.5 h 200.0 825.0 200.0 183.0 55.0 REVISION DATE 08/16/88 CITY OF M I A M 2 F CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT `ti0: • t ` 3s122s PROJECT'NAME : BAYFT. PK. REDVMT. - WALKWAY$ 6 LNDSCPING - AREA A ADDRESS :'100 BISCAYNE BLVD NOW LuUATIOH : 263 NBRHD SERVICE. : 900 PROGRAM : 004 PARKS AND RECREATION CATEGORY" : 041 PARKS AND RECREATION DEPARTMENT : 048 DEVELOPMENT PROJECT MANAGER: 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM : FY79 FIRST ,YEAR OF APPROPRIATIONS : FY86 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 01142 AWARD CONTRACT 05/85 BEGIN CONSTRUCTION 05/65 05/85 BENEFICIAL USE 12/86 07/88 PROJECT COMPLETE 12/06 10/88 v } t• As OF "12010 F ------------------------------------------------------------ I PROJECT DESCRIPTION: 1 ! t ! this project includes the, construction of dssi ate* i ! walkwo�rs site furniture, lighting, plantin ano P ! irrigatlon throughout the, north and of BaViront park. t ! Those elements funded through the Y.S. Dog*. of the ! ! Interior. Land and Water Conservation Fund are a part l ! of this project. ! ! G ! ) 1 ! N ! r ! r ! -------------------------- -----------r--N�-N-----�1--r_--�1i PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES ---------------� COST CATEGORIES- ESTIMATE PRIATIONS lost-90 logo-91 1991-92 1992-98 1"S-94' 1094-991 ------------------------------------------- --------- --- — ---- --------- ( t x 1000 ) LAND ACQUISITION DESIGN CONSTRUCTION! EOUNT ADMINISTRATION OTHER TOTAL COST 774.9 774.9 164.0 164.0 ----9a9.9 TOTAL FUNDING SOURCES FINDING 342 CAPITAL IMP. FUNDS - FIND GAL. 272.6 388 REVOLVING FUND 238.9 740 US'INTER. LAND s WTR CONS. GRT 427.2 TOTAL FUNDING 936.9 4 98-s.9 — -- 0.0 ----- ----- 0.0 0.0 -------0 -----r-rr .o PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1989-90 <------------------ FUTURE 1990-91 1991-92 FUNDING _--------------....-.r' 1992-90 1998.94 1t14- --------_-_---r_---------� --------- --------- --- ----- ---- c • x l000 i 272.6 238.9 427.2 --------- 936.9 --------- 0.0 - - ---- ---- - -- ----- 0.0 0.0 -------------- ---- 0.0 0.0 -----..--.. 0.� JREVISION DATE 10/12/88 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 331229 PROJECT NAME : BAYFRNT PARK REDVLPMT - WKWAYS a LANDSCPG - AREA B ADDRESS : 100 BISCAYNE BOULEVARD NBRHO LOCATION : 263 NBRHO SERVICE s 900 PROGRAM : 004 PARKS AND RECREATION CATEGORY" : 041 PARKS AND RECREATION DEPARTMENT : 046 DEVELOPMENT PROJECT MANAGERs 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM s FY79 FIRST YEAR OF APPROPRIATIONS s FYs6 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 01/42 AWARD CONTRACT Os/as BEGIN CONSTRUCTION 05/85 BENEFICIAL USE 12/86 07/8e PROJECT COMPLETE 12/36 10/88 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST " OF 08/29189 ! PROJECT DESCRIPTIONS C t t ! This projoct involves the contraction of walkways, t t planting and irrigation, and related site improvements ! t in the vicinity of the amphitheatre in the and of the t ! park. These elements are funded through the Fierida t ! Recreation Dovelopment Assistance Program matched with t t 6th year Community Devolopment Block Grant Funds. ! ! t t t ! ! ! t ! ! ---------------------------------------------------------- PRIOR ATION ------ FUTURE CAST ESTIMA1Ei TOTAL COST APPRO- PRIATIONS <------------------"-----' ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-OS 199:-94 1994-98. --------------------------- ----- - ------------------------------- ( • X 1000 ) 246.0 246.0 54.0 S4.0 --------- 300.o --------- aoo.o PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS ------------------------- ------ ------------ 706 CDB4--6TH YR 100.0 100.0 770 FLA REC DEV ASSIST. PROEM GRNT 200.0 200.0 ----------------------------=-------------- TOTAL FUNDING 300.0 $00.0 6. ---- ----- -------------------- ------0.0------0.0 0.0 0.0 0.0 0.0 APPRO- PRIATIONS <------------------ FUTURE F1iOINR-------------------r lost-90 1990-91 1991-92 1992-99 lots-94 loos-9R --------- --- ------------------------------- t • X 1000 ) ------ ----- ------- ----- --------- 0.0 0.0 0.0 0.0 0.0 4.0 REVISION DATE 00014/14 . AS OF as Y OIIPRO�EIENT PROGRAM CAPITAL PROJECT OESGRVTXON FYIO N--- rr--------+..rrrlr..rr+r+..r PR=,OTNO, s 831220 �T _ --------------------------------- LIGHT Town 1 PROJECT DESCRIPTIONS 1 HAMS s'BAYFRONT PARK REDEVELOP 100 BISCAYNE BOULEVARD: I This project involves the ths' Ifs F s NORM LOCATION 26s 900 ! tows. Go"loto with lases light show* ta► be' ! The J.L. Knight Foundation 1s aentributlss4 this HBRHD SERVICE s I used bV the C1ty exalualv019 in prejset. s 004 PARKS AND RECREATION 041 PARKS AND RECREATION 1 R M CPCIRAMY^ : DEPARTMENT s 048 DEVELOPMENT PROJECT MANAGERS $71 IERBERT J. BAILEY I I' I FIRST YEAR IN CAPITAL PROGRAM s FY79 I FIRST YEAR OF APPROPRIATIONS s FY86 I !! PROJECT SCHEDULE = INITIAL REVISED I I I M A 01162 COMMENCE DESIGN 5 0185 110/8 I S M AWARD CONTRACT 01186 BEGINCONSTRUCTION 0 I -------------- BENEFICIALUSE 12/06 PROJECT COMPLETE 12/96 10/68 ------------NNr------------rN-"••N---r PRIOR Ate- r- FUTURE GMTESTZMATEs>-----.•--N...�s PRIATIONG t---"---•--•-- 1992-99 19l-l4 TOTAL COST ESTIMATE APPRO- �Z�S" -9Z PRIATIONS 19Sl-l0 1!l0-11--N---N ---NON-r..--..- ------ •----- COST CATEGORIES--------- ------------------------- - ---------------•----•--r-• t e X I000 LAND ACQUISITION DESIGN 1572.0 1572.0 CONSTRUCTION 259.2 256.2 gQUXPMEHT : A ATION OTHER------0.0 __------- -------rN---- ---- . ...... ------0.0 0.0 0.0 0�0= --------- 0.0 ---------------------------------- 1330.2 1830.2 TOTAL COST .. ��/��.���/��� r. PRIOR A ' '__ _ _ rM�M�---M-r-•--N- --rr. Funot 1!!4- APPRO- PRXATX 99ir99 FUTOTAL NDING N199i-99 PRIATIONS !0 -- ---- RUM XNG SOURCES --- -------------------------- -ONTRIBUTION -1990-91-----1991_9Z ------------------ t t X 1000 I -- -- INC.INC 1000.0 841 ROU KN FOUJ�IDATION CONTRB 676.2 1000.0 67a.2 --------' 932 J. BONDS POOL 152.0 !96 SUNSHINE STATE REV. 152.0 ___----------- 0.0--------- ---___0.0 rNrrrrrr --- ---- 0.0 ------6.0 o . y �Y --- ------ -------------=----------- 1580.2 0.0 1580.2 TOTAL `FINmING REVISION DATE 00/01/69 5 ., .. . C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY110 PROJECT NO. s $31231 PROJECT NAME t BAYFRONT PARK REDEV.ADDRESS NORTH END 8 AMpHITH. - PH. I a 100 BISCAYNE BOULEVAPP NBRHD LOCATION : 263 NGRHD SERVICE s 900 PROGRt 004 PARKS AND RECREATION CATEGORY" i 041 PARKS AND RECREATION DEPARTMENT s 049 DEVELOPMENT PROJECT MANAGER: 971 HERBERT J. BAILEY FIRST YEAR OF CAPITAL SS PROGRAM s FFY786 PROJECT SCHEME 2 INITIAL REVISED COMMENCE DESIGN 01162 AWARD CONTRACT 09165 BEGIN CONSTRUCTION 10185 01/86 BENEFICIAL USE 10187 07168 PROJECT COMPLETE 10137 10183 PRIOR APPRO- PRIAT TOTAL COST Ate• ESTIMATE PRIATION8 198l-l0 COST CATEGORIES --------- --------- LAND ACQUISITION DESIGN CONSTRUCTION EOUIPM1[NT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCE$ AS OF 00/29/90 ------------------------------------1 I---- DE8CWTION, t t 1 This Project involves the canstructian at an sutdsar 1 1 amphitheater; subterranean building to support ! activities related to the amphitheaters and sits impre- t ! vements to include earthworko till and grading, *Ate t drainage, electrical. lighting, utilities. 0srtione t 1 of the park walkway system and irrigation. 1 t Proceeds from the Dads County Seaport Land Exchange ! Settlement were used to cover the eaeoeetforconstrue- t t of the Baytront Park Library, wakingweof ! tion ai t e promenade by the U.S. Army !. t Engineers. C ! r ! F t � 1 1, Z—_w_w__w—_r___r.r...rrrrr_r-----r--- ►w------.`.rrr----_------- FUTURE COST ESTIMATES •--------------- 1!!d-94 r1994-95 1990-91 1991-92 1992'-99 r..---„-.._.-..,. -----------w----_« -- ----�-fX 1000 f $75.0 375.0 5760.7 $760.7 15.0 15.0 0 r-------- _—_—_w—_— .�. w.—rr_60•• 08 6150.7 6180.7 --- __ 0.0 . 0.0 APPROFUHOZHIS - TOTAL APPRO PRIATIONS <-__r-------------- FUTURE92-98 2989-90 1990-01 1----1 FUNDING pRIATIONs - _- _ - -rw ------ •-- - -- _rrr—_-r— - ......... r1!ll�-l6+-1916•-9s�` ----- —r`----------- $4.7 34.7 $42 CAPITAL.3MP. FUNDS FUND GAL. 6014.0 6013.0 791 UG DEPARTMENT OF M1De WAG 103.0 103.0 r - r.r-.r..; COUNTY SEAPORT LAND SETTLM•-------r r-»r..rw r..rr.-rr• 0.0 SS8 O. __ -- - -------- ..-w--.0 0.0 ---------------------61lL0.7-61110.7 0.0 TOTAL. FUNDING i, REVISION DATE 0"16116 IT CITY OF M I A M I AS OF001"/S! CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO:^ 1 881282 PROJECT NAME : BAYFRONT PARK REDEVELOPMENT - PLAY SCULPTURES ADDRESS 1 100 BISCAYNE BLVD. HBRHO LOCATION 1 263 NORM SERVICE : 900 PROGRAM s 004 PARKS AND RECREATION CATEGORY" s 041 PARKS AND RECREATION DEPARTMENT s 048 DEVELOPMENT PROJECT MANAGERS 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM s FY86 FIRST YEAR OF APPROPRIATIONS s FY86 PROJECT SCHEDULE 1 INITIAL REVISED COMMENCE DESIGN 01182 01/52 AWARD CONTRACT 10/68 TBD BEGIN CONSTRUCTION 10/86 TBD BENEFICIAL USE 01/89 TBD PROJECT COMPLETE 01/89 TBD COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EGUZPMENT ADMINISTRATION OTHER TOTAL COST FLING SOURCES ----------- ------------- 912 LEE 8 TINA HILLS FUND ------------------------- TOTAL FUNDING PRIOR APPRO- TOTAL COST APPRO- PRIATIONS ESTIMATE PRIATIONS 1949-90 --------------------------- 186.7 127.6 8.9 --------------------------- 186.7 127.6 8.9 PRIOR APPRO- TOTAL APPRO- PRIATIONS FUNDING PRIATIONS 1989-90 --------------------------- ---------------------- ------------------------------------- ! PROJECT OE8CRIPTIONs f ! t t This project involves the oontructlon and installation t ! of woven playy sculptures In Bayfront Park in assordanso t ! with the des!gn plans prepared byy loomHe uohf. t ! The Los 8 Tina Hills Fund is aontributlny funds t t exelusiveiy for this project element of the park** t ! redevelopment. The play soulpturo will be located ! ! north and south of the Fla9ler Street Promenade which t ! will be constructed by the U.S. Army Corps of EngInsers, t ! The schedule for placement of these elements will be t ! established upen cospplotion of the North End and t ! Amphithostre Phases I and II and the Fla9ler Street ! ! Promenade. ! ! ! i --------------------------------------------------------- ----- ---------- FUTURE COST ESTIMATES ------------ p 1990-91 1991-92 1992-" 1999-94 1930-911 --- - ------------------------------- t i x 100' ----- ----- ----- - �_�..__ _.._-- -•. 0.0 '0.0 0.0 0.0 0.0 <------------------ FUTURE FUNDING -------------------* 1990-91 1991-92 1992-98 1998-94 1994-910 --- - -- --------------- -------------- --- '( • x 1000') - 186.7 127.8 8.9 -------------------------------------------------------- 186.78- REVISION DATE 07/05/69 0. NS-80e f fin IIII I III I I I I CITY OF MIAMI AS OF08129169 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FYVO PROJECTNO. i 331302 ------------------------------------------------------------ PROJECT. NAME 1 BAYFRONT PARK REDEV. NORTH END 8 AMPHITH. - PH II 1 PROJECT DESCRIPTIONS ADDRESS 1 100 BISCAYNE BLVD NBRHD LOCATION : 1 1 This project involves the completion phase of the North t HBRHD SERVICE 1 263 1 End and Amphitheater in the ongoing radevelopment of t 1 SaViront Park. Funding is to be used for design, t PROGRAM,+ 1 004 PARKS AND RECREATION ! preparation of asnstruction doeumento, oenstruat4•n ! CATEGORY : 041 PARKS AND RECREATION 1 and administration. t t DEPARTMENT 1 048 DEVELOPMENT ! t PROJECT MANASER3 971 HERBERT J. BAILEY ! FIRST YEAR IN CAPITAL PROGRAM t FY87 1 1 t t FIRST YEAR OF APPROPRIATIONS 1 FY87 ! t PROJECT SCHEDULE 1 1 t t INITIAL REVISED ! t COMMENCE DESIGN 01/82 1 t AWARD CONTRACT 05187 07/87 1 1 BEGIN CONSTRUCTION 06/87 08187 1 t BENEFICIAL USE 08/89 04/88 ! PROJECT COMPLETE 12/49 12/88 ------------------------------------------ PRIOR ADO - COST CATEGORIES TOTAL COST ESTIMATE APPRO- pRIATZONB PRIATIONS 1969-90 e--------- -----'-""''"-' 1990-91 1991-92 1992-93 1998-94 1994-911 ------------------------------------- ------------------------- --------- ------------------ --------- t • x 1000 ) LAND ACQUISITION DESIGN 99.0 99.0 CONSTRUCTION 4686.0 4686.0 EQUIPMENT ADMINISTRATION 99.0 99.0 OTHER 72.5 72.5 _ ---MN-- ----_-- -✓ --___-_-- -__•_---••------- TOTAL COST --- - ----- 4956.5 - -------- --------- 4956.5 0.0 --------- --------- -••------- 0.0 0.0 0.0 0.0 O.OE TOTAL FUNDING SOURCES FUNDING 788 NEW WORLD ACTION COM. - CONTR. 47.5 858 D. COUNTY SEAPORT LAND SETTLM. 224.0 $59 PRO. NEW PORT BRIDGE LAND SALE 2900.0 $73 1980 SANT. 3.0 B., 87 SL - INT 68.0 $87 1980 HIGHWAY G.O.B.,86 SL -INT 45.5 $91 84 STORM GO. BONDS, 86 SL -INT 113.5 893 84 POLICE GO. BOND, 86 SL -INT 273.0 996 SUNSHINE STATE REV. BONDS POOL 1285.0 TOTAL FUN4XNG 4956.5 PRIOR APPRO- APPRO- PRIATIONS------------------ FUTURE FUNDING-------------------r PRIATIONS 1989-90 1990-91 1991-92 1992-93 1993-94 1994-9M ------------------------------------ L • x 1000 ) 47.5 224.0 2900.0 66.0 45.5 113.5 273.0 1285.0 ------ 4956.5 0.0 0.0 0.0 O.fi 0-0 0.Or REVISION DATE 06/14/89 1 • .ME 0 1 T Y OF M I A M I AS or941 Ise CAPITAL I1IPROVEMENT PROGRAM PROJECT OESCRIPTION PR _ FY90 PROJEOT ND. • 4s14Q4----------------------------------- -------- PROJECT 14AM CITYW2OE NEIGHBORH000 PARK RENOVATIONS ( PROJECT DESCRIPTIONt E ADDRESS t CITYWIDE 1 t NQRHO LOCAT20N t 900 1 fhis project involves the renovation an4t improvement NORM SERVICE t 900 1 at neighborhood parks, located throughout the OS V.: ) ! Fundind c!s to be used for design, prepar4tiea of I PROGRAM t 004 PARKS AND RECREATION 1 bid an onstruction deeumente, conttruetienr t CATEGORY, t 041 PARKS AND RECREATION 1 construction administration, and the p%rehase of !! DEPARTMENT t 049 PARKS AND PUBLIC FACILITIES 1 materials and equipment. t PROJECT MAHAGERt 491 DIANNE JOHNSON 1 The project includos a 095,000 grant to the tittle; E ! Havana Development Authority for the renevallon ef. !. FIRST YEAR IN CAPITAL PROGRAM t FY57 1 MaXimo GOmet (Domino) Park, 02$,000 !or demelX*Xon< eA. f FIRST YEAR OF APPROPRIATIONS t FY47 t structures on the now park site where the Golden An* i PROJECT SCHEDULE: 1 Apartments.wero formerly located, and roof repair* toe ! I A a Shenandoah park recreation building. t INITIAL REVISED ! ! COMMENCE DESIGN 01/66 ! r AWARD CONTRACT 05/88 t t BEGIN CONSTRUCTION 04/6s ! t BENEFICIAL USE 03/99 t t PROJECTCOMPLETE 12/91--------------------------------------- TOTAL COST APPROOR- PRIATIONS <------------- FUTUpG COST cornkno COST CATEGORIES ESTIMATE PRIATIONS loss-90 1990-91 1991-95 1992-96 1995-94 1994.95 ------------------------- ------------------------------------ ------------r r.afr.-ris rrrr_rM.- ) LAND ACQUISITION ( 0 x 100 DESIGN 200.0 200.0- ECONSTRUCTITON $24.5 $92.6 257.5- ADMINISTRATION 410.0 95.7 314.s OTHER 94.6 94.6 TOTAL COST -------------- ---- --N-- -------- i-r► ----------------------------- ------------ -- ------ $28.8 478.0 49.2- 0.0 0.0 0.0 0.0 *-dk PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------------ FUTURE FUND"-------------------o FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1ss2-93 l"i-s4. 1994-9 ------------------------- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -------r- S" NEM PORT BRIDGE LAND SL - INT. 10.0 10.0 0 X 3000 ) 854.0. COUNTY SEAPORT LAND SETTLM. 6.0 6.0 059 PRO. NEW PORT BRIDGE LAND SALE 650.E 700.0 49.2- 906 SUNSHINE STATE REV. BONDS POOL 162.0 162.0 -------------------- - -- -- --------- ----- ---------------------------------------- TOTAL FUNDING 626.4 876.0 49.2- 0.0 0.0 0.0 0.0 REVISION DATE 07/06/99 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 331304 PROJECT HAVE : SEWELL PARK/RIVER SHORELINE STABILIZATION ADDRESS i SWEL. PK. 1901 NW S. RIV. NBRND LWATION : 692 HBRHD SERVICE : 692 PROGRAM : 004 PARKS AND RECREATION CATEGORY' : 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY83 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 09/67 08/69 AWARD CONTRACT 06/88 11/89 BEGIN CONSTRUCTION 05/88 12189 BENEFICIAL USE 02/90 PROJECT COMPLETE 10/66 02190 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTI EQUIPMENT ON ADMINISTRATION OTHER TOTAL COST AS OF 09/29189 ------------------------------------r ---------------------- ! PROJECT DESCRIPTION: t ! t ! Through a cooperative effort with Dads County, wtate t ! gqrant funds have been allocated to this pre#eot for ! ! Miami River shoreline stabilisation at Sewell Parr. t I The shoreline slope will be graded and limestone, rip- t ! rap will be placed at the river's edge. The effects t I of this project will positively impact environe�ental t ! concerns and recreational access to this site, with ! ! no increase in operating expense. ! t ! t ! t t t i ! ! t ! t ----------------------------------------- ------------------ PRIOR A ------ FUTURE COST ESTIMATES TOTAL COST APPRO- PRIATIONTIONS <--------- "------"--""" s ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-9; 1"5-94 1994-9E --------------------------- --- ------------------------------- ( ! x 1000 ) 13.0 19.5 99.0 95.2 5.0 2.3 117.0 -117.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS ------------------ - ----- --------- --------- As$ CONTRIB 'FR FY88GENERAL FUND 58.5 58.5 986 FLA BAY RESTOR./ENHANC- -GRANT 58.5 58.5. ------------------------- --------- --------- TOTAL FUNDING 117.0 117.0 t 8.8 2.7 ---- --------------r --------- ------ --- ---- 0.0 0.0 0.0 0.0 0.0 0.0 APPRO- PRIATIONS <-------------- - FUTURE Ft_NIDIM----•-•-------•--- r 1919-90 1990-91 1991-92 1992-98 199E-94 199E-96 ------ --- --- ----------------------- -r- --r-- ct x 100"0-1 -------------- ----- ----- --------- ••-------- 0.0 0.0 0.0 0.0 0.0 0.0 REVISXON DATE 06/26189 .' L ■ C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT MO. s 331805 PROJECT HAVE : BAYFRONT PARK REDEVEL. - SOUTH END S CHOPIN PLAZA AODRE88 1 100 BISCAYNE BOULEVARD HBRHD LOCATION : 263 HBRND SERVICE s 268 PROGRAM s 004 PARKS AND RECREATION CATEGORY : C41 PARKS AND RECREATION DEPARTMENT s 048 DEVELOPMENT PROJECT MANAGER: 971 HERBERT J. BAILEY FIRST YEAR IN CAPITAL PROGRAM : FY88 FIRST YEAR OF APPROPRIATIONS s FY88 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 01/82 AWARD CONTRACT TOO BEGIN CONSTRUCTION 09168 BENEFICIAL USE 03/69 PROJECT COMPLETE 04/89 AS OF 061"199 --------------------------------------- --------------------- ! PROJECT DESCRIPTION: r ! 1 ! This project involves the contruction• of the South t ! End of Boyfront Park, including those 010s1e:1tst whisk 1 i are part of Chopin Plaza Court. Upon completion. the ! ! south and of the park will hav0 a hall mphlihsatrs !' ! and ata99ei which incorporate an electrical vault, a ! ! concessions booth and a background wall for th0 !' ! Challenger Space Shuttle monuments path and weUer ! ! planting and irrigation. Available funds will not ! ! allow contraction of all of the designed improvements, t ! so bids for the work will be received in a fare that f 1 will allow the maximum construction possible. f ! t ( f ! 1 1 t ----------------------------------------------- ! t I PRIOR APPRO- TOTAL COST APPRO- PRIATIONS 49 ----------- ---- FUTWE COST ESTIrATES----•-------•--y COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-98 1993-94 1994-95 --------- ---- ----- -----------------------__-_ ( • X 1000 ) LAND ACQUISITION DESIGN CONSTRUCTION 1448.5 1448.5 EQUIPMENT ADMINISTRATION OTHER 70.0 70.0 TOTAL COST 1518.5 1518.5 PRIM TOTAL APPRO- FUNDINB SOURCES FUNDING PRIATIONS 786 NEW WORLD ACTION COM. - CONTR. 55.5 55.5 850 FLA STATE DIRECT APPROP - FY86 '750.0 750.0 987 FLA. STATE DIRECT APPROP -FY89 500.0 500.0 996 SUNSHINE STATE REV. BONDS POOL 213.0 213.0 TOTAL FUNDING ---------1510.5 1518.5 1. ------0:j------O:o------o:o------K5------o.a------a APPRO- PRIATICN8------------------ FUTURE FUND2N0 ------------------- 1989-90 1990-91 1991-92 1992-93 1999-94 1994-9 --------- ----- -- - --- ------------- ( 0X1000) ---- ------ ----' ------0.0------0.0 0.0 0.0 0.0 9.0 REVISION DATE 08/19/45 1 '.9 a ,AL . in 'lll C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY AS OF 06/29/89 PROJECTNO. : 331306 ------------------------------------------------- ----------- PROJECT NAME : BAYFRONT PARK REDEVELOPMENT - PEPPER FOUNTAIN ! PROJECT DESCRIPTION: ADORE 99 : 100 BISCAYNE BOULEVARD ! ! R NBRNO LOCATION : 263 ! This projeat involves the development of a major NBRND SERVICE : 263 ! fountain in eayyf�ront Park, dedicated to Senator and f ! the late Mrs. Mild0ed Popper. The fountain will be PROGRAM : 004 PARKS AND RECREATION ! located adjacent to Sissayne Boulevard and surrounded ! CATE80RY. : 041 PARKS AND RECREATION ! bg a circular plaza which is being constructed as a x DEPARTMENT : 043 DEVELOPMENT ! part of the U.S. Army Corps of Enginners Bagwalk, F PROJECT MANAGER: 971• HERBERT J. BAILEY ! Facilities and Flaglor Street Promenade. FIRST YEAR IN CAPITAL PROGRAM : FY83 ! t FIRST YEAR OF APPROPRIATIONS : FY86 ! �. PROJECT SCHEDULE : ! ! INITIAL REVISED ! COMMENCE DESIGN 01/32 ! h 1 AWARD CONTRACT TBD ! E BEGIN CONSTRUCTION 09/86 ! 1 BENEFICIAL USE 03/69 ! PROJECTCOMPLETE 04/69 ----------------------------------------- --------- PRIOR APPRO- TOTAL COST APPRO- PRZATIONS --------------- FUTURECOST ESTIMATli9' •-r-•---+-------> t COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-93 199i-94 I9"-" -- ----------------------------- ---------------- --------------- """ --------- --------- --- - c t x 1000 LAND ACQUISITION DESIGN 75.0 75.0 CONSTRUCTION 2439.0 2439.0 NT ADMINISTRATION 155.0 155.0 OTHER 31.0 31.0 ------------------ ---------------------------------- TOTAL COST 2750.0 --------- 2750.0 --------- 0.0 --------- ------------------ 0.0 0.0 0.0 0.0 0.0 PRIOR APPRO- TOTAL FUMING SOURCES FUNDING APPRO- PRIATIONS PRIATIONS _ ___ �- --------------- FUTURE FUMMM-------------, --1990-91 1991-92--1992_9S - 1993-94--1914_98 --------------- -------- --------- ----- -------------- ------ --1909-90 t e X 1000 708 NEW WORLD ACTION COM. - CONTR. 50.0 $0.0 996 SUNSHINE STATE REV. BONDS POOL 2700.0 2700.0 rsrrr-rr- rrrrrrr--. -------- -- TOTAL-- FUNDING—2750.0 -- -2750.0 ----- ---- 0.0 ----- ----- ------- -0.0 -0.0 0.0 0.0 0.0 I i REVISION OATS 00/16/90 PROJECT NO.:"* 1 531307 PROJECT: NAME :'CITYWXDE BALLFIELD RENOVATIONQ ADDRESS e 'CITYWIDE MDHn LOCATION t 000 ili" SERVICE : 900 PROGRAM : 004 PARKS AND RECREATION CATEGORY" : 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY80 FIRST YEAR OF APPROPRIATIONS : FYss PROJECT SCHEDULE : INITIAL REVISED COMMENCE DE8IGN 06/811 AWARD CONTRACT 12/87 07/89 BEGIN CONSTRUCTION 12/87 08/89 BENEFICIAL USE 10/89 PROJECT COMPLETE 06188 01/90 GMT CATEGORIES LAND A0008ITION DESIGN CONSTRUCTION EEGUTPVENTT OTHER STRATION TOTAL Cost C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECTD'N IPTIO As � osrnt� -------------------------------------------- I PROJECT DESCRIPTION: 1 ! n ! This project involves the rebuildSng of ballf2e140o t fence roplacesent and dugout construction in vorieus C ! parks across the City as part of the O&AV Ode weighbor- ! ! hood Parks Renovation Prograw. We anttleipato now "S t ! reductions In operating costs taniftionandit) 00 • 1' ! result. The affected parks Includoa A11 ottah- t ! Cowstook, Coral Gets, Curtis, Douglas.- NSetto gape 1 ! land, Shenandoah, Southoide and lest End. t t t ! ! ! ! 1' ! t : r --------------------------------------- r--------a-r TOTAL COST APPPRO- PRIATIGNS--------------- IrUTURE am lii/IMAm ---- f ESTIMATE PRIATIONS lost -to 1990-91 1991-92 lots-00 l"81-94 1190-10 ------------------ --------- --- --------rr-a------ -r-.--►----- t 4 X 1000 I 6.0 1s9.0 5.0 200.0 TOTAL FUNDING SOURCES FINDING ---------------- --------- 495- SUNSH110 " STATE REV. BONDS POOL 200.0 :.....-..r------------- r------- --------- TOTAL' FUNDING 200.0 19S.i 4.7 200.0 IOR APPPPRO-- PRIATION8 200.0 200.0 6.0 j 6. a - .a APPRO- PRIATIONS♦-------------r---- 1989-90 FUTURE 1990-91 1991-92 FUNDSMSa-rr----------r---- 1992-98 1918-94 1996-1i ' --------- ---- -------- --------- --------- riirriar-.► tt x 1000 1 ------ o.o - --- 0.0 ------- - 0.0 ------ ----- ----- 0.0 --------+ REVISION DATE 06/26/69 x PROJECT NO, : 331309 VITA COURSE RENOVATIONS ASS NAME : t CITYWIDE CITYWIDE NBRHO LOCATION 00 NND SERVICE t BR goo PROGRAM : 004 PARKS AND RECREATION PARKS AND RECREATION CATEGORY t 041 049 PARKS AND PUBLIC FACILITIES DEPARTMENT : PROJECT MANAGERt 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM t FY$6 OF APPROPRIATIONS t FY99 FIRST YEAR PROJECT SCHEDULE t AWARDCOMMENCONTRACTGN BEGIN CONSTRUCTION AL USE pRCjECTIETE COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION NT ADMINISTRATION OTHER jOTAL COST INITIAL REVISED 12/97 07/99 12/97 09/99 10/99 01/90 TOTAL COST ESTIMATE 5.0 143.5 1.5 -__ 150.0 TOTAL FNDING FUNDINGSOURCES ---___ -------- 996 _ BUNSHIHE STATE' REV. BOWS POOL-_ --- 0 -------_-_..__- -150.0 TOTA-L-FUNDING C I T Y O F p I A M I AS OF 00129189 �p CAPITAL IMPROVEMENT pROGRAM PROJECTFOYEESCRIPTION [--pROJECT DESCRIPTIONt ! I This proJeat Involves the rebuilding or rop'"""n °4 1 * the alto at Part t ! Vita ttouressiIn NeiiltbOrllQOdous eiirl/eelienOYatiOn PrQgra'�• ! ! Qt the City qq Oeete are eapeated« The ) ! additional operating took. Douglas - Not ! atisated Parks inaludOl dAllKiaioehO *%len, Pallet. t ! Grapoland. Hadley. ! Morningoide. Paco and Sou bside. E t ! t ! ! ! ! t E t ! ! ....._--------------- ---.---------..--«.-,.-..- ...........N APP$O- FUTURE COST ESTIMATES . •--.•-- t�i+1-95 APPPPj OO- PRIATIONS s-------------1911-92 1192-13 19f9----------- ` 1999-20 1990-91-------- PRIATIONS .._.. .._--- -----...... _..-.. ------------------ -t f - 1000 )- S.0 143.5 1.S _ ----1--------- ----- 0.0 -- " 0.0 50.00.0 PRIOR FUNDING PRiAA � <------------- --..- 992-99 APPRO- 1999_90 1990_91 1991-92 _-_-__ PRIATIONS ......•_--------- --- ------------------ ! x 1600 ) 150.0 --------- --_ - -------''0.0 0.0 Iso.O _..__.._0. ------ 0«0------ 0.i --- r -1999-9+11994-19, -- -------.o------- REVISION DATE 07106/89 1 v* 1111111111111111 II C I T Y OF M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 881809 PROJECT HAVE s ALLAPATTAN-COMSTOCK PARK RENOVATION ADDRESS : 2800 No 17 AVENUE NBRHD LOCATION s 682 NSRHD SERVICE : 632 PROGRAM s 004 PARKS AND RECREATION CATEGORY s 041 PARKS AND RECREATION DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY88 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 10187 08/88 AWARD CONTRACT 06/88 06/89 BEGIN CONSTRUCTION 06/88 10/89 BENEFICIAL USE 01/89 PROJECT COMPLETE 06/89 01/90 PRIOR APPRO- TOTAL COST APPRO- PRIATIONS COST CATEGORIES ---------------------------------- ESTIMATE PRIATIONS --------- 1989-90 --------- LAND ACQUISITION DESIGN 28.0 27.5 14.5- CONSTRUCTION 866.0 229.6 7.4 EQUIPMENT ADMINISTRATION 16.0 2.9 7.1 OTHER ___ ____ TOTAL COST 410.0 260.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIAT20HS FUNDING SOURCES FUNDING PRIATIONS 1989-90 770 FLA REC DEV ASSIST. PROQM QRNT 150.0 No PRO. NEW PORT BRIDGE LAND SALE 150.0 150.0 996 SUNSHINE STATE REV. BONDS POOL 110.0 110.0 --------- ------------------------- TOTAL FUNDING --------- 410.0 --------- 260.0 0.0 AS OF ----------------------------------------. -------------------- ! PROJECT DESCRIPTION: t ! 1 ! This project is intended to encemlrass the Compute € I renovation of Allapattah-Cometook Park as part et the I I Citywide Neighborhood Park Renovations Program. Initial I ! funding in the amount of $2601000 has bees+ appropriated I I to pprovide sports lighting ter the plaVI" Courts and I ! ballfield. He increase to :Po costs are *xxppeated' I ! to result. Future needs, as prioritised bg neighboring.I ! residents and park users include a now recreation ! building and perimeter fencing. I ! ! ! I ! I ! I ! I ! I, ! I -----------------------------------------------------------.. i-------------- FUTURE COST ESTIMATES -----------••---► 1990-91 1991-92 1992-98 1998-94 1994-95 --- - -------------------- ------ ( f X 1000 ) 15.0 129.0 6.0 -------------------- --- 150.0 -- 0.0 0.0 0.0 0.0 ------------ ------ r Y , m Mom---------------r--• . 1990_91 1991-92 1992-98 1998-94 1"4- -- -------- --------- --------- --------.Y. ( 0 X 1000 ) 150.0 - - - - - - - - - - - - - - - -----• 150.0 0. 0.0, 0.0 REVISION DATE 06/26/89 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 08/29/8 PROJECT NO. s 331310 ----------------------- ------------------------------------- PROJECT NAME s GRAPELAHO PARK IMPROVEMENTS ! PROJECT DESCRIPTION: ADDRESS 1 1550 NW 37 AVENUE ! 1 NBRHD LOCATION s 594 1 This project involves improvements to Grapeland Park NBRND SERVICE s 594 ! as part of the Oitywide Neighborhood Park Renovations, E t ! Program. Primary needs at this sift are for *part and PROGRAM s 004 PARKS AND RECREATION ! socurity lighting, which is under studyy with the FAA. 1 CATEGORY " s 041 PARKS AND RECREATION ! Additional requirements include ronevstien of the DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES ! recreation building, partioularly utility :service* and E PROJECT MANAGERS 491 DIANNE JOHNSON ! roofing, parking lot expansion, and other site Improve- E ! ments, as funds allow. 1 FIRST YEAR -IN CAPITAL PROGRAM s FY68 ! FIRST YEAR OF APPROPRIATIONS s FY88 ! F ! 1 PROJECT SCHEDULE : ! INITIAL REVISED ! 1 COMMENCE DESIGN 10/87 ! 1 AWARD CONTRACT 06188 ! 1 BEGIN CONSTRUCTION 06188 ! 1 BENEFICIALUSE ! 1 PROJECTCOMPLETE 06/89 ----------------------------N-----..-N--..-►-��N....N..--N PRIOR APPRO- TOTAL COST APPRO- PRIATIONS --------------- FUTURE 0081 ESTIMATES---------------s COST CATEGORIES ESTIMATE PRIATION8 1969-90 1990-91 1991-92 1992-98 1"8-" IV14-9E --------- ------------------------- --------- --------- --------- --- ---------- C S X 1000 I LAND ACQUISITION DESIGN 26.5 26.5 CONSTRUCTION 216.0 220.8 4.6- EOUIPMENT ADMINISTRATION 7.5 2.7 4.0 OTHER _ 1 ---.-------- -------------- --------- TOTAL COST 250.0 --------- 250.0 --------- 0.0 --------- --------- ------N- ----- M---N . 0.0 0.0 9.0 0.0 0.0+' - PRIOR APPRO- TOTALAPPRO- FtUNDZNG SOURCES FUNDING PRIATIONS PRIATZONS 1969-90 <------------------ FUTURE FUNDS" -------------------, 1990-91 1991-92 1992-98 199E_!d --------------------------------- --------- --------- --- -------- - --------------�---- ----- -i- t •-X 1000 f ., 859 PRO. NEWPORT BRIDGE LAND SALE 150.0 150.0 W SlMSNINE STATE REV. BONDS POOL 100.0 - 100.0 " -- -------------- - - - TOTAL FUNDING 250.0 - - - - -- 250.0 - - - - - - 0.0 - - - - - - - - - ---------•- - - - - - - - - ------N- 0.0 0.0 0.0 0.0 0.0 .. DNrDATE OiI2i/S! C I T Y O F 9 I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N0. s 881811 PROJECT IUiE`. : HADLEY PARK IMPROVEMENTS/RE$TROOM FACILITIES ADORESR : 1500 W 50 STREET N0RHD LOCATION 1 123 NNW SERVICE : 123 PROGRAM : 004 PARKS AND RECREATION CATEGORY : 041 PARKS AND RECREATION DEPARTMENT 1 049 PARKS AND PUBLIC FACILITIES 'PROJECT MANAGERI 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FYAQ FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 10/87 12/67 AWARD CONTRACT 04/55 0e/58 BEGIN CONSTRUCTION 04186 04/09 BENEFICIAL USE 07189 PROJECT COMPLETE Od/ab 09/59 TOTAL COST COST CATEGORIES ------------r------------ --------- ESTIMATE LAND ACQUISITION DESIGN 5.0 CONSTRUCTION 68.5 t EQUIPMENT ADMINISTRATION 1.5 OTHER ---------------------------------- TOTAL COST 75.0 TOTAL FUNDING SOURCES -------------------- --------- FUNDING : 996 SUNSHINE $TATE REV. BONDS POOL 75.0 ?-L-•----..------------------------- TOTAL FUNDING 75.0 ion t ■G mutt M mm amme A: OF r----------..------------rr-r�rrrrrrr+i --------------------rr_ « ! PROJECT DESCRIPTION: i ! l ! This project involves the addition of a restroe� f ! building to sorviae the ballilolde on the west aids st t ! Hadley Park. Landscaping and related site 10prew*en4s t' ! will also be wade. This is part of the, Cltt�ywwi" NeAg - r ! borhood Park Renovation Pregrem. Addltienarll . thl* t ! Program calls for irrigation and pool renovat ows and t now park equipment so separate capital projects. t ! t ! ! ! t ! a } t ----------------------------- PRIOR APPRO- APPRO- PRIATIONS t--------------- FUTURE 00ST ESTII jM5------r---...-..� PRIATIONS 1959-90 1990-91 1991-92 1992-93 199E-94 1994-90 --------- --------- --- ---- --------- ------- --------- i 1000) -.. 7.9 2.9- 66.A 2.2 .S .7 ----- 75.0 _ ____--0.0 __--_-0.0 _-----0.0 ------O.Q r-----0.0 -r-----.Yf' PRIOR APPRO- APPRO- PRIATIONS PRIATION8 1999-90 <------------------ FUTURE 1990-91 1991-92 -----r--r-rr--- --sr• FW4Dz"& _ 1992-95 19936-94 191d- --------- --------- --- ---- ------ r--. -----r--- ---•--rrY.r t X 1000 1 75.0 ----- 75.0 ---__-0.0 -_-_--0.0----__0.0 --------- -----r_ 0.0 0.0 -------- d� REVISION DATE 06/26/49 PROJECT NO. s 331312 PROJECT NAME s LEGION PARK RENOVATIONS ADDRESS : 6447 HE 7 AVENUE NBRND LOCATION : 191 NBRHD SERVICE : 191 PROGRAM : 004 PARKS AND RECREATION CATEGORY" s 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGERs 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM s FYaa FIRST YEAR OF APPROPRIATIONS s FYA3 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 06/89 AWARD CONTRACT 10/37 10159 BEGIN CONSTRUCTION 10/07 11169 W.NEFICIAL USE 03/90 PROJECT COMPLETE 12/a7 03/90 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS; of 001s9/s! --------------------------------------------------------- r ! PROJECT pEgCRIp'TION: r ! This project consists primerAlli of renovations to the f ! existing recreation building at Legion Park, including f 1 rooting, willwork, electrical and air conditioning f ! upgrades, and demolition of the outdoor 01090. =f funds 1 ! pernit, porinotor fencing will be replaced. He t ! operating cost increases are entlelpated. Thle project ! ! is part of the Oitywids Neighborhood Pork Renovation ! ! Program, which also provides for a now Vito course and r ! park furnishings for Legion Park under separate capital ! ! projects. 1 ! f ! t ! f ! r •-------------------------------------- ram ---r----------- PRIOR APPR0- TOTAL COST APPRO- PRIATl'ONs <------ -------- FUTURE COST ESTINTC8"""`M'-"- -'} ESTIMATE PRIATIONs 1989-90 1990-91 1991-92 1992-98 1919-94 19#4-90 -- - ---- ----------- --------- --- ------------r ------.fir- l_4 X 1000 3S:0 3 0AB:S :3- 5.0 1.1 3.9 100.0 TOTAL FUNDING SOURCES FUNDING --------------------------------- 996 SUNMiIW STATE ,REV. BONDS POOL 100.0 ----------------------------- TOTAL FUNDING100.0 100.0 PRIOR APPRO- PRIATIONS 100.0 -100.0 0.0 APPRO- PRIATIONS 1909-90 0.0 --------- ----- ----- ----- ----- -�- 0.0 0.0 0.0 0.0 0.0- <------------------ + tfft= Fvw0R •�---rr...�___...�r�-r.rr 7� 1990-91 1991-92 1!!Z-!i 1!!!-!4 1!!1 90 --- --- -----------r- ------.+..r l i X 1000 • -------------- ---_.• __N--. -- `0.0 0.0 0.0 0.0 lF.O i _I_ . II I IIIII_ . _I_ III CITY OF MIAMI A9OFQ9l2*11191, CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT.'so : 331918 -------------------------------------------r----r---..--r-..r- PROJEOT NAME s MORNINGSIOE PARK RENOVATIONS ! PROJECT s P ADDRESS s, 750 HE 55 TERRACE ! g NNW LOCATION s 192 ! This project involves various renovations to ng�•� Mernf t NBRHD SERVICE s 192 ! side Park and part of the Citywide Neighborhood Park t • ! Renovations Program. The primary element of tho t PROGRAM s 004 PARKS AND RECREATION ! pro oat to the replacement of tho recreation building 1 CATEGORY s 041 PARKS AND RECREATION ! witA a now structure. Other improvements ineludsi the t DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES ! installation of security fencing and planting eleng the f PROJECT MANAGERs 491 DIANNE JOHNSON ! south side of the park, and, funds pormittin9, tho t ! trimming of mangroves and -the cleaning of the tidal t FIRST YEAR IN CAPITAL PROGRAM : FY88 ! basin. f FIRST YEAR OF APPROPRIATIONS s FY88 ! t PROJECT SCHEDULE INITIAL REVISED ! t COMMENCE DESIGN ' 10/87 04/89 ! 1 AWARD CONTRACT 10/48 09/89 ! t KOM CONSTRUCTION 10188 10109 ! fi BENEFICIAL USE 01/90 ! t PROJECTCOMPLETE 10/69 02/90 ----------------------- ------------.----_-------------...........� COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EauipmEmi ADMINISTRATION OTHER ------------------------- TOTAL COST PRIOR APPRO— TOTAL COST APPRO- PRIATIONS ESTIMATE PRIATIONS 1989-90 --------------------------- 42.1 380.5 23.2 4.2 450.0 TOTAL FUNDING SOURCES FUNDING ---------------------------------- $59 PRO. NEk PORT BRIDGE LAND SALE 250.0 006 SUNSHINE STATE -REV. BONDS POOL 200.0 ------- ------------- ------ --------- TOTAL FUNDING- 450.0 47.7 397.3 5.0 450.0 PRIOR APPRO- PRIATIONS 250.0 200.0 450.0 5.6- 16.8- 10.2 4.2 0.0 APPRO- PRIATIONS 1989-90 ------0.0 <--------------- FUTU K COST 1191'IMATES--------- ------ r 1990-91 1991-92 1992-94 1990-94 1994-90 --- - ------------------------------- 1 • x 1000 ) ----- - 0.0 ----- 0.0 -----------r-- 0.0 0.0 0..0 (-----r---- 1990-91 1991-92 ----------r--rr.►r.�iY•y t992-9S 199S-94 19#445 --- - i -x --------- ------------------ ---r---r.f-. 1000 1 -rr-- o.o --------- o.0 --------- -----r--- 0.0 0.0 ------...Y.. ford REVISION DATE 06/26/89 CITY OF M I A M I AS OF00129/69 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. t'331315 PROJECT NAME t ROBERT KING HIGH PARK BRIDGE RENOVATION ADDRESS t 7025 M. FLAGLER STREcT NBRHD LOCATION t 592 NORM SERVICE t 592 PROGRAM : 004 PARKS AND RECREATION CATEGORY t 041 PARKS AND RECREATION DEPARTMENT t 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM t FYee FIRST YEAR OF APPROPRIATIONS : FYee PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 10/67 12/ee AWARD CONTRACT 10/ee 07/e9 BEGIN CONSTRUCTION 10/ee 09/99 BENEFICIAL USE 12/69 PROJECT COMPLETE 10/e9 01190 PRIOR TOTAL COST APPRO- MOT CATEGORIES ESTIMATE PRIATIONS LAND ACQUISITION DESIGN 7.5 7.9 CONSTRUCTION 65.5 66.3 AOUXPMENT ATION 2.0 .e OTHER ------------------------- TOTAL COST --------- 75.0 --------- 75.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS ------------------------------------------------------------ ! PROJECT DESCRIPTINt t ! This primary aspect of this project involver the M ! renovation or replacement of the existing wooden M ! vehicular bridge at Robert King Park that seperatwe ! the front acreage from the Carlos Arbsieya Campground. t ! Design will be performed in-house by the Publte mks M ! Department. This project is part of the Citymids ! Neighborhood Park Ronovation Program. ! ! 1 ! B ! ) ! ------------------------------------------- ------rrrr_rr-rr. APPRO- PRIATIONS •--------------- FUTURE COST ESTIMATES----r-_--M-..-* 1999-90 1990-91 1991-92 1992-95 1999-94 It"-" --------- --- ---------------------.If -1 t x 1000 ) ------0.0 APPRO- PRIATIONS 996 SUNSHINE STATE REV- BONGS POOL 75.0 75.0 TOTAL FUNDING 75.0 ------ ---------- 75.0 - - 75.0 -- 0.0 --- ..�_... { ------------------ FUT= Ft+tNDlNiI'----------- ---> 1990-91 1991-92 1992--98 1996-94 1914-95: --- -------- - ------------------ ------ ---.. 1 • x 1000 ) ------- - ----------------�------ 0.0 -- - -a.o 0.0 0.01 6.6 AS of CAPITAL Y OIIpROFVEYEMMT PROGRAM PROJECT DESCRIPTION FY90 ---------- --- n PROJECT NO. `: : 331316 : VIRRZCK PARK RENOVATIONS ------------------------ ! PROJECT OESfSIIP rtON: 1 ! ! too sub tsnsva�E9 $.;NAME ADDRESS : $580 DAY AVE- $U 01tiai ! This protect calls ref Park t ! Virriak Pork as part of the of the 1 h* rw t1"iti • N� LOCATION : IIBRFID SERVICE : 381 In* U" ! Renovations Profram• Plans one antr "s, rol imp�sysmsntA is the oeetssl�ise t • PARKS AND RECREATION ! mushroom structures and ! buiidinl. inaludinq millwerkR eeo!lnq� and utiltc6lss" E : 004 CATEGORY : 041 PARKS AND RECREATION PARKS AND PUBLIC FACILITIES ! f ! -DEPARTMENT : 049 PROJECT MANAGER= 491 DIANNE JOHNSON ! FIRST YEAR IN CAPITAL PROGRAM : FY88 ! fl 1 FIRST YEAR OF APPROPRIATIONS : FY68 ! PROJECT SCHEME = INITIAL REVISED ! 1 U I COMMENCE DESIGN 10/68 10167 05169 10/6! U ' ! AWARD CONTRACT dEO.IN CONSTRUCTION 10/88 11/89 02190 ! _ r• -------rrN-•�-�r�•+�-- BEQIH CIAL USE PROJECT COIUPLETEPRIOR 10/69 08/90 TOTAL COSTMATE APPRO- •PPRO_ T"---N-r----rr-.f PRIAATTIONONS--------------tool-!Z �Z-!E s 1918.-14ESTifld-! 1990-l1 COST CATEGORIES pRIATIONS 1989-90 -------- --------- ------------------ --------- --------- • X 1000 ) END COUISITION 21.0 21.2 •2- 7.6- 169.0 176.6 t CONSTRUCTION ADMINISTRATION 10.0 2.2 7.8 ------N-..-•••w' 0•d OTHER--------- ------------------------� 200.0 --------- 200.0 ------G.O 0.0 0.0 0.0 TOTAL COST . PRIORAPPRO- M��� r�i--d*-rrrrr TOTAL APPRO- PRIATIONS PRIATION8 4------------------ !Z -I!!2-1 1flt0-!�t -NN-N- r.+-srrrrr r-rr.r.r-+ice: 1!6l-90 t990lt Ifll- FUNDING GORES FUNDING .•-------- --------- -------- - -----------------_ X 1000 1 --------•------------- .••• - PORT BRIDGE LAND SALE 100.0 • POOL 100.0 i59' PRO STATE REV - IlO�OB NE STATE 100.0 100.0 _ --------- -------•- ------------- - ---- Uil -b.0 996 --------- ------------------------- 200.0 --------• 200.0 0.0 0.0 0.O TOTAL Filmol G REVISION DATE 06/26/99 a a C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N0. : 831317 PROJECT NAME & JAPANESE GARDEN RENOVATION ADDRESS t WATAgH ISLAND NBRHO LOCATION t 29s HBRND SERVICE t 296 PROGRAM & 004 PARKS AND RECREATION CATEGORY" t 041 PARKS AND RECREATION DEPARTMENT t 048 DEVELOPMENT PROJECT MANAGER: 982 ARLEEN WEXNTRAUB FIRST YEAR IN CAPITAL PROGRAM t FYeA FIRST YEAR OF APPROPRIATIONS t FYQA PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 10/67 AWARD CONTRACT BEGIN CONSTRUCTION 07/89 BENEFICIAL USE 11/88 PROJECT COMPLETE 10/89 AS OF 06/29/69 ------------------------------------ ! PROJECT DESCRIPTION& ! The renovation of the Javanese Garden, originally !' ! donated to the City by the Ricoh Corporation in 19S1r ! will include the construction of a &Multipurpose t I pavilion, walkways, landsoapin and F ! isprovewente to the dry stroan gad, running stress f ! and fish pond and bridges. This project will be a !' ! joint public/private venture with this Ricoh Corporstion E ! watehinp Cityy funds. t ! The Garden sf+all be operated and maintained by a not- ! ! for -profit organisation at no cost to the City. t 0.1 PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATLM---------------► COST CATEGORIES ESTIMATE PRIATIONS 1949-90 1990-91 1991-92 19"-95 1994-94 --------- 1994-" --------- ----.►---w---------w------ --------- --------- --------- --- ---w w4 t x -------- loco -N------ LAND ACQUISITION ' DESIGN $6.4 36.8 CONSTRUCTION 494.5 494.3 EQUIPMENT ADMINISTRATION 5.0 5.0 OTHER ------ -- -------------- TOTAL COST --- 5a6.1 --- 536.1 ----- 0.0 ----- 0.0 --------- 0.0 ---- - 0.0 --------- 0.0 0.0: PRIOR APPRO- FL04MM SOURCES TOTALAPPRO- FUNDING PRIATIONS PRIATIOHS lost-t0 ------------------ FUTURE 1990-91 1991-92 FUNDING 1992-99 ----------------N- a IM-94 1996-9%." ---------------------- -� --------- --------- --------- --- -- -------- --------- --------- --------- i a x 1000 $84 CONTRIB'FR FYS8 GENERAL FUND 178.2 178.2 736 RICOH CORPORATION - CONTRIBIT. 336.1 336.1 876 1972 PARKS t REC G.O. BONDS 21.5 21.8 ----_-..-! -----__---w_---w-_----_-- TOTAL FUNDING --- $36.1 --- -536 1 ----- 0.0 ----- -- 0.0 ----- 0.0 ------N- 0.0 1-------- 0.0 0.0 m I........r... I11111 .............�. .....�...r� r.rr.w..w.......w�.....�. .. .. . r+n.�. .. . ..e Ru ..0 .' .w.. 4.4 �'.4e iirn.a f i' 'I IiM illli iFlfe1,ii9l Yl II �.CI II R II I'I i CITY OF MIAMI AS OF00/"/W CAPITAL XMPROVEN04T PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 931310 --- ------------ ----------r---------------r---r-r--rr -------- PROJECT NAME : CITYWIDE PARK, PLAYING CCURT RENOVATIONS t PROJECT DESCRIPTION: r DE E HBRID LOCATION 1 900Y ! This project involves the painting, resurfacing and/ ! NSRFD SERVICE : 900 t or construction of now tennis and basketball court* r ! in Parks throughout the City as a part of then Oitywsdw r PROGRAM : 004 PARKS AND RECREATION ! Neighborhood Renovations Program. Maintenance wets CATEGORY,* : 041 PARKS AND RECREATION ! may decrease slightly as a result. Ths tollewfng parka r r DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES ! are to be included: Coral Gate, Curtis, Eaton, Grande PROJECT MANAGER: 491 DIANNE JOHNSON ! Avenue, Grapeland, Kinloch, Kirk Monroe, Moors. ! ! Morningeide, Orange soul Playground, Peacock, Ran s, South- r FIRST YEAR IN CAPITAL PROGRAM : FY88 ! Reeves, Riverside, Robert Kin High, Shenandoah, r t FIRST YEAR OF APPROPRIATICNS : FYSS ! side, Virrick, west End, and Williams. ! r. PROJECT SCHEDULE INITIAL REVISED ! COMMENCE DESIGN 03/88 ! r AWARD CONTRACT 12/87 07/89 ! r BEGIN CONSTRUCTION 12/67 08189 ! r BENEFICIAL USE 11/89 t r PROJECTCOMPLETE 06/88 01/90 ----------------------------------- -----r--r---------rr«.--.. PRIOR APPRO- COST CATEGORIES TOTAL COST APPRO- PRIATICNS ESTIMATE PRIATIONS loss-90 --------------- FUTURE COST 101TIMAM ----------- 1990-91 1991-92 1992-90 1990-90 1994-90 -----------------------r--.� ------------- ---- --- ----- ------- - ---------- --------- --- - ------ • x 1000 ? LAND ACQUISITION DESIGN 25.0 6.0 19.0 CONSTRUCTION 440.0 408.5 43.5- EGUIPMENT ADMINISTRATION 35.0 5.5 29.5 OTHER - ------------------------ TOTAL COST - -- - - -- - - -- 500.0 --- - - - - - r-- 500.0 - -- -- 0.0 ----- err --r-rrrr-r ----err--- ----r--rr r---rrr-rl. 0.0 0.0 0.0 0.0 0.01` PRIOR APPRO- FUNDING SOURCES TOTALAPPRO- PRIATIONS FUNDING PRIATIONS 1989-90 <------------------ FUTURE FUND330 ------------------ 1990-91 1991-92 1992-93 2998-94 1994-9M- -----r-------------r-r----- .: ---------- ---------- --- - ------ - - - - ----- ----------- --- - - ----- 1 • x 1000 996 SUNSHINE STATE REV. BONDS POOL 500.0 500.0 ---r--r-- _ _ _ TOTAL-FUNDING----------- ----500.0----500.0 ----- -- O.Q --------- ----- -err- r+---rrrr 0.0 0.0 0.0 Q.0 0'•0 t REVISION DATE 06/29/49 IBM s ♦`. CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT MO. t $$1329 PROJECT NAM t WAINWRIGHT PARK RENOVATION - PHASE II 2045 BRICKELL AVENUE tie"SEERRVICE : $04 s 004 PARK$ AND RECREATION CGOR�` t 041 PARKS AND RECREATION PUSL PROJECTTMMANAGERs 491 DIAANNEAND JOHNSON C FACILITIES PR FIRST YEAR OF APPROPRIATIIONSM a FYI$ P PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN Ott$# AWARD CONTRACT 07/86 0$/68 BEGIN CONSTRUCTION 08/$6 12/88 BENEFICIAL USE 03/$9 PROJECT COMPLETE Of/$$ 10149 PRIOR TOTAL COST APPRO- COST CATEGORIES ----- w--------- -------- ESTIMATE __ PRIATIONS -_-__-_-_ LAW AC=S1TION 7.5 7.7 $#. tZ i4. # CONSTRUCTION EQUIPMENT EQUIPMENT 4.0 .6 ADMINISTRATION OTHER TOTCOST AL ----•00 100.0 ----P79.0 RIOR TOTAL APPROPRXATXOHS SOURCESFUNDING SOURCES --FUNDING --------- AS OF OS/29189 2 PROJECT DE#CRIPTION� f f I This pro sat aa11s for the addition of oertasn aetivs f and pass�vs recreation facilities to Wainwright Pork 2 I ae Part of the Citywids Nolghborhood Park Renovations t f Program. Initial work inaludss isPrswewNents to the 2 plonk areas tnew tables and benchest, a nd theaR- ( f gqround, repairs to the storage building and M f installation of a multi -purpose Playing 2 #iaondary Plans include the construct ian of a Pedes- r 2 trian acooss bridge at the north end of the Park. f. f 2 2 t 2 2 ( 2 !' 2 2' 2tt M ";'----------"'--'-------------------�----------_---------w------ APPRO- FUneat COST ESTIMATES --------------•: PRIATIONS `'f!l0--------i!l1-92 1992-93 199a1d 1!!4-sS 1949-90 -------------'------ ----- ---- --------- ----i ----� -- x loa�oi- .2- 24.0 3.2 -----zi.o APP"- PRIATION80 ------------------------ $#2� 0. COUNTY SEAPORT LAND #ETTLM. _27.0 73.0 73.0 #S9 PRO. NEW PORT BRIDGE LAND SALE 27.0 ---- --------- ------------------------- 100.0 73.0 --- 27.0 TOTAL FUN2)iN0 ------ ------------------------ ---------0. 0 -0.00.0 yMry1MMli �ii IYMII. DWI----_--w- 1!l0-91 2l91-l21"2-90 ---«.------ ------------�--- --------- ( s X 1000 I -------_------ww----------- __------- 0.0 0.0 -----.0.0 0.0 0.0 46 REVISION DATE 09121FISS ♦■ PROJECT MO s su use PROJECT NAME : CITYMMIDE'IRRIGATION PROJECTS ADM$$ t ' CITYWIDE NBRNO LOCATION : 900 HUM SERVICE s 900 PROGRAM r : 004 PARKS AND RECREATION CATEGORY° t 041 PARKS AND RECREATION DEPARTMENT : 049 PARK$ AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY88 FIRST YEAR OF APPROPRIATIONS s FY88 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 02168 02/49 AWARD CONTRACT 03/8e 09/89 BEGIN CONSTRUCTION 05/88 09/89 BENEFICIAL USE 06188 01/90 PROJECT COMPLETE 06166 01190 COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTZON EQUIPMENT ADMINISTRATION OTHER ------------ TOTAL C08T C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY AS OF 44129100 ---------------------------------------------------.r....-.., t PROJECT DESCRIPTION: 1 ! This project calls for the installation to etato-Ot- l" t the -art automatic Irrigation systems in several sAty t 1 parks as part of the Citywide Neighborhood Park Ronsve- t ! tion Program. These parks inoludo Aiiapattah-Qomstook. t ! Gropeland. Had1eV, Merningside and Robert King N1gh�.. ( The project is expected to result in decreased OPot- ! ating costs due to man -power and maintenance savings. t. ! t 1 t t � t 1 @ ! B' t ---------------------- -------rrrrrr-rr-----------..rr--rrrs-r PRIOR APPRO- TOTAL COST APPRO- PRIATIONS--------------- FUTURE COST ESTIMAIM ESTIMATE PRIATIONS lost-90 1990-91 1991-92 19l2-li 191 -li 1994-90 --------------------------- --- -- -------------- ______-__------- t 0 X 1000t 29.0 42.4 18.4- $52.0 858.2 1.2- 19.0 4.4 14.6 ------------------ 400.0 400.0 TOTAL APPROO-- FUNDING SOURCES FUNDING PRIATIONS 99f SUNSHINE STATE REV.=BONDS POOL 400.0 400.0 ------------------------ --------------- TOTAL'FUHDING 400.0 400.0 ------- ----- --------- ----rrrr- rr-rr-rrr --r----rr 0.0 0.0 0.0 0.0 0.0 04 APPRO- PRIATIONS <------------------ PIN4xw-rrsrr--- -rr+r17 1989-90 1990-91 1991-92 1992-" 199s-94 1994-1 --------- --- - ------------- ----rr--- --r-r-r.rr ( 0 X 1000 ) ----- ----- r---- --------- 0.0 --0.0 0.0 00.0 REVISION DATE 06/26/89 titi �-�f IN h h �. � �. �. � •_ �� C I T Y OF M I A M I AS OF08129180 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 931339 PROJECT NAME s CITYWIDE PARK EQUIPMENT REPLACEMENT ADDRESS : CITYWIDE NBRHD LOCATION 900 NBRND SERVICE : 900 PROGRAM s 004 PARKS AND RECREATION CATEGORY^ c 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM s FY88 FIRST YEAR OF APPROPRIATIONS : FY86 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 01/85 AWARD CONTRACT 03/68 09/66 BEGIN CONSTRUCTION 05/88 111$$ BENEFICIAL USE 06/88 02/89 PROJECT COMPLETE 06/88 09189 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER -=---------------- -- TOTAL COST ----------------------- ------------------------------------ t PROJECT' OEBCRIPTIONi ! ! This project involves the purchase and installation Of E ! various park furnishings as part of the Citywidf 0014b- f ! borhood Park Renovations Program. The egwipment in ! ! includes plonic tables, barbeque grills, bonohosr bike ! ! racks and drinking fountains. Parks include Allopettah,! ! Comstock, Coral Gate, Douglas, Gibson, Grand Avenue. F ! Grapoland, Hadley, Legion, Morningside, Pace-, Ranger ! ! Reeves, Southold*, Virrick and West End. ! ! ! ! ! ! --------------- -----------------------------------.�.� PRIOR APPRO- TOTAL COST APPRO PRIATIONS <------------- - FUTUM COST ESTZMATLS --••- ..�..--......s ESTIMATE PRIATIONS lost -to 1990-911991-92 1992-92 1998-94 1994-95 --------------------------- -------------------------------------• 8 X 1000 ) 41.6 41.6 124.4 124.4 14.0 14.0 ------------------ 160.0 180.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUMING PRIATIONS APPRO- PRIATIONS lost-90 ass O. COUNTY SEAPORT LAND SETTLM. 50.0 50.0 996 ILDNO SNE STATE REV- SOWS POOL 130.0 130.0 _-------- ------ --------- --------- TOTAL 'FUHO1HQ . 140.0 140.0 0.0 ---- ----- ----. .w. ----- 0.0 -- 0.0 0.0 0.0 0.01 <------------------ FUTURE FU DM ------------------- 1990-91 1991-92 1992-98 199E-94 1994-9 ----- ---- - ------------...--. - l-X 1000-)- , --- -.--------- o.0 000.0 .11 ue PROJECT NO.' 8 331340 PROJECT NAME : DOUGLAS PARK RENOVATIONS ADDRESS 1 2755 SW 37 AVE. NORM LOCATION a 891 NBRHD SERVICE : $91 PROGRAM t 004 PARKS AND RECREATION CATEGORIC : 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANdE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY88 FIRST YEAR OF APPROPRIATIONS i FY88 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 12/47 AWARD CONTRACT 04/48 10189 BEGIN CONSTRUCTION 05/64 11/89 BENEFICIAL USE 08/58 12/89 PROJECT COMPLETE 08/88 01/90 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 001? A00 ------------------------------------------------------------ I PROJECT DESCRIPTION: F ! E ! Th• Douglas Park Project providos for general renova- ! tiona to the parkr as part of the Cltyw do Neighborhood N ! Parks Renovation Program. Initial work ontallm tht E ! reconstruction of the parking lot. Funds permitting, E ! site improvomonts, furnishings and bullding rspslrs E ! will be undertaken as secondary efforts., ! N ! ! ! ! ! t ! ! E ! ! -------------------------------------- -------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE CAST ESTIMATES •---------> COST CATEGORIES ESTIMATE PRIATIONS lost-90 1990-91 1991-92 1992-98 1998-94 1994-95 ----------------- -------------------------------- --- ------------- ------------•----- -( 6 X 1000 ) LAN ACOUI8ITION DESIGN CONSTRUCTION ADMINISTRATION OTHER TOTAL COST 6.0 10.6 4.6- 89.0 $3.3 .7 5.0 1.1 3.9 ------------------ 100.0 100.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS 996 SUNSHINE STATE REV. BONS POOL 100.0 100.0 - -- TOTAL FUMING 100.0 100.0 a 0.0 0.0 0.0 0.0 0.0 -OS APPRO- PRIATIONS <- - --- FUTU1E FL04MINQ--------------- -A> 1989-90 1990-911991-92 1992-93 1993-94 1994-06 --------- --- ---- -- --------------------- '---...r.. -1 0 X 1000 ) ------- ----- ------ - -------------- --------.►.. 0.0 0.0 0.0 0.0 0.4 Ovs REVISION DATE 06/26189 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT OESCIWUDN PROJECT Na. s S41841 PROJECT NAIL; : GIBSON PARK RECREATION BUILDING IMPROVEMENTS : 401 HM 12 ST RHD LOCATION s 251 NSRHO SERVICE s 251 : 004 PARKS AND RECREATION CPATERGORY° : 041 PARKS AND RECREATION 049 PARKS AND PUBLICFACILITIES �PROJECT CNMAHAGERs 491 DIANHEJOHNSON FIRST YEAR IN CAPITAL PROGRAM s FY88 FIRST YEAR OF APPROPRIATIONS s FY88 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 05/86 08/89 12/89 AWARD CONTRACT 10/88 01190 BEGIN CONSTRUCTIiN 06/89 02/90 BENEFICIAL USE 06/89 04190 PROJECT COMPLETE 06/89 a4/9a APPRO- PRUTXONS 1989-to --------r PRIOR TOTAL COST ESTIMATE . APPRO- PRIATIONS COST CATEGORIES - ------ LAND ACQUISITION 29-0 21•2 � ISYTRRUCTION 164.0 176.6 AEQUXPMEDS RATION 8.0 2.3 OTHER --------- -------------- --------- 200.0 200.0 TOTAL COST ` PRIOR TOTAL APPRO- FUNDING PRIATIONS FUNDI'i --------- --------- ------------------------- POT 859 PRO. NEN ORS LANs. SALE 100.0 So$ SUNSHINE STATE REV..ISONDS POOL-w--w.w—w 100.0 --- ----- -�---------------------- TOTAL FUNDING Z00.0 Z00.0 6.8 1I«a- 5.6 AS OF "IZ9I" _ rrr.ErrrwrWwrra.+rwrrww...w..rwr..wa--------------r..rwwr.wir+r 1 !--PRttaECT pg�IPT20Ns !� ! As part of th:go Oitywido Noighberhea,* Parks RanaV�tU00 ! ! Pragr&N, thisrole** involves the ranavatias� anst�rar i ! oxpanoion of �ibsen Park Rooesatl0ft bull"ss�! ! priaarily to fee ores** than bo3dng UsightllAtln4 ! programs. A nominal inoraasa to apar4rtlstf oasts So � ! anticipated duo to additional *test. ! ! 1 ! F ! F ! 1 ! ! P ---------- -...rrrr-rr -------------------r-----' rrr.rr--W—.wrw--.r � E1�TIMA'�-'--'-"------rr--- r <--------------- F NOT 1998-�4 t994-9 1990-91 1991-92 1992- 98 ------ ------------------ ----------r,,: - ! • x loc-------- o ) s t ------- 01--------- a«O --------- 0.0 '�------— 0.0 —.---rr- ------ ---r--------r+ <------------ ----FUTURE, 2!l1-9Z Sr9S � 1999-14ll4�l 1990-91 --r-----... - t • x 1000 ) --------- ----r-.rr- rr«.rr�rir—r REVZlCt o OATS "124160 PR0 0T NO. : $91342 PROJECT: NAME : GRAND AVENUE PARK RENOVATIONS ADDRESS e, 280c GRAND AVENUE NBRND'LOCATION s 3e1 NBRNO SERVICE : Sol PROGRAM s 004 PARKS AND RECREATION CATEGORY' s 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FYSI FIRST YEAR OF APPROPRIATIONS : FYad PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 02185 Osll$ AWARD CONTRACT 04183 03/86- OEGIN CONSTRUCTION 05/33 12/E3 BENEFICIAL. USE 10/33 03189 PROJECT COMPLETE 10186 12189 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT OMINIBTRATION OVER TOTAL CAST C I T Y O F M I A ML I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AM OF`00129tS ' ---r---N—r---'�-�-- 1--PROJECT OESCR2PT20N: ----- t ! As part of the Citywide Neighborheod Park 4anrOV0001M t ! Program, this prejoat addressor the bvlidltnq ands PS&W' 1 ! ground needs of Grand Avenue Park. InAtIa2 0Wk I ! involves the inst41101160 of new plwjVound squApment. t ! to be followed bVy the renovation e# ! reerestled f ! building, inaluding roefing, ut,llity up evades, 119M �nM 1, ! and restroow ioprovesents. There Should be ndh Adpeet F ! on operating aosts. t, ! t I t ! � i ! t ! t ! --------------------------------------------N---INr�I-..-`.._� PRIOR APPRO- -_--- FUTM COST ESTIY m---•------•N•-••> TOTAL COST APPRO- PRIATIONS <--------- ESTIMATE PRIATIONS 1949-90 1990-91 1991-92 1992-95 199�-1A 1---•_ --M r_— -------- — --- -------------- r c e x 1004 ) 14.0 15.9 1.9- 129.5 132.5 4.0- 22.2 22.2 7.5 1.6 5.9 ---- -------------- 172.2 150.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATZONS ---------- T-------------- ------------------ 459 PRO. NEW PORT BRIDGE LAND SALE 72.2 50.0 SYS SUNSNINE STATE REV. BONDS POOL 100.0 100.0 TOTAL FUNDII� 172.2 150. alr�ri r "&r dmik&& 4066mw son" ihomi" cfilrrs Amliut A ----------------------------------�" -----S2.2------0- .0 APPRO- PRIATIONS <------------------ FUTURE FUNDING --------- -------r-.- 1909-90 1990-91 1991-92 1992-92 1999-94 1999-9 --------- --- — —'._r--r—rrwr—--------- r...rrirr.r. -� t x 1000 ) 22.2 r— ZZ.2 0.0 0.0 0.0 0.0 0. REVISION DATE 06/26/69 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : $91943 PROJECT NAME t KIRK MONROE PARK/ADDITIONAL TENNIS FACILITIES ADORE" : 3101 FLORIDA STREET NBRHO LOCATION : 381 HMO SERVICE s 361 PROGRAM s 004 PARKS AND RECREATION CATE60RY" t 041 PARKS AND RECREATION DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIAMNiE JOHNSON FIRST YEAR IN CAPITAL PROGRAM t FYse FIRST YEAR OF APPROPRIATIONS s FYSS PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 03/88 09/s8 AWARD CONTRACT 04/89 08/69 BEGIN CONSTRUCTION 05/$$ 09169 BENEFICIAL USE life$ 01190 PROJECT COMPLETE 11/ss 01190 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION ECUIPMENT ADMINISTRATION OTHER TOTAL COST AS OF 04/29/19 r ---------r---------r-r--------r ! ! I PROJECT DESCRIPTION: ! This project under the Citywide Neighborhood Parks t ! Ron ovati*no Program calls for the expansion of the F ! existing tennis complex at Kirk Menrse Park bw the,tin t ! construction of two now, additional oourts. t ! courts will be renovated under a soperste preject`.1 S t ! Operating costs are not expected to be affected. t r --------------r-----r-----------------rrrrrr-..r-r-rr-r-r.►..-r PRIM APPRO- --- FUTURE COST ESTIMAT[s1' •••�•----- I TOTAL COST APPRO- PRIATIONS------------ ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-99 1998-94 1914-96 --- ---- -------------------- -- ------ ------r-----rrr-r- ( 0x1000) 5.5 56.5 3.0 -6s.o TOTAL FUNDING SOURCES FUNDING ---------------------------------- $58 D. COUNTY SEAPORT LAND SETTLM. 65.0 ------------ --------- TOTAL FUNDING 65.0 f: 7.0 57.3 .s- .7 2.3 ----- ---- 65.0 --------- 0.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS lost -to 65.0 ---- 65.0 ----- 0.0 ----r --- ----- ----r---- 0.0 0.0 0.0 0.0 9.0t ------- ----------- FUTtmm FUNDING - - ------r---r� 1990-911991-92 1l92-ls 199ib-941!l4-s19 --- ---------..---.- r------ (-e x 1000—) -- - - - - - - - - - - - - - - --------r 0.0 0.0 0.0 0.0 0. REVISION DATE 06/26/60 OJT V Of N Z ANX CAPITAL ZWOOKMENT PROM" P 0jm OE R2PTION FYlO AS OF 00/'"11W P80.IE0T NOt s i91844 _-r-rr..__r«....r..�-------------.•rr..r.-..r....rrr, ! �pa-0-5- 7 DEICRIPT2V"S PNkVCT K4W s REEVES PARK SUiLDINS RENOVATZON S No 10 iTIKET ! As part of the OitV"do I�Nighborhoed Park Nraowtteni ! WIND L 251 NIfNI!!t LOCATION t 251 �y� # 2S3 ! PregrM, this project "Ile for rsnava-liow� to thisi NSRINf i existing recreation wilding at Reaves Park• ipwAAfe- ! PROGRAM 004 PARKS AND 490KATZOOI ! illye rooting, winder aN Nor iapraveswntev wil"tO t t up doe and repainting. Not "Ors" *"to� der- r CATEROR1i 041 PARKS AND REOREATZON DEPARTAKHT c 040 PARKS AND PUBLIC FACILITIES i crease siig+tiy with reduced raintenanee ra►grirwonts. t t PROXOT MANASERe 491 OZANNE JO NSON t ! FIRST YEAR IN CAPZTAL PROGRAM s FYSS ! � t ! FIRST YEAR OF APPROPRIATION t FYSS ! PROjm SONEO Ll t ! INITIAL REVISED t ! COMM[NCt OESION Of/fi Of/ff ! ! AWARD CONTRACT 0S/Sf 10/89 ! ! SESIN OONSTRUCTZON 04/98 11/89 ! DPAWWZAL USE 02/19 02/90 POMOTCOMPLETE 02/89 02/00 ! ------------------------------------ r TOTAL COST PRIOR APPRO- APPRO- PRIATZONS i------------- FUTUE Gov Es:ZUATEO 1991-92 1"2-96 1!!9-94 1994-96 COST CATE00RM ESTIMATE PRIATZONS 1969-90 logo-91 --------------------_--r_-r --..------r_-----rr-.... r----------- --------- --------- ---• 1 • x 1000 LAND AOGUZSZTZON 2. 0 1. ! 4.1 OONSTRUOTZm 124.o 132.5 f.e- AEOMZOUZNT /�TTRATZOH 6.0 1.6 4.4 OT-_rr_--rr -r--r---------------r---r-K ---r--------------------- --•_ -- _"--- TOTAL COST 150.0 -- 160.0 --_--- - 0.0 ------ Yt� 0.0 0.0 PRIOR TOTAL APPRO- PRIATIONS Ate- PRIATIONS 1949-20 FUTURE FLRtt7IM1a �-----•------------------------------'"'' 1990-91 1991-92 1"2 !01!!1- FUNDING SOURCES FUNDING -- ---- ------_---r---r-..-r------__---rrr ----_ -r_- --r-- -- --- - -- - - -- --- ------ - - - -- --- - -- ----- x 1000-) Mil! PRO. Ngi PORT SRZDAE LAND SALE $0.0 50.0 !!i SUNSHINE STATE REV. BONDS POOL 100.0 100.0 TOTAL FUNDING 150.0 1f0.0 0.0 0.0 0.0 0.0 0.0 0.0 REVISIOi DATE 06/26/99 PROJECT NO.PROJECT 14AME ; ADDRESSN$RND LOCATION 2 e NSRND SERVICEAT _ P ROJECTMANAGER$ 331346 SIMpSON PARK RENOVATIONS 55 SR 17 ROAD 293 293 004 PARKS AND RECREATION 041 PARKS AND RECREATION 049 PARKKS AND PUBLIC FACILITIES 491 FIRST YEAR OF APPROPRIAATIIONSM FIRST YEAR IN P: FY44 PROJECT SCHEDULE : COMMENCE DESIGN AMARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST INITIAL REVISED 04/44 05/69 off&$ 091.9 07/44 10/99 02/90 10/886 FUNDING -S-OURCES-_----_-- 474 1972 PARK$ 4 REC G-0. BONDS TOTAL FUNDING 4. CITY O F M I A M I AS Of OW"/85 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 ! PROJECT DESCRIPTION= ) I This project is intended to address the renevetiew I noods of the existing rsorsation building: At SlmPsom ! ! Park. Planned improvements m include root repiaasentr ! ! and the instailatien of security barer now windeve snO t ! steel doors. Na affect on operating costs are antle3- t ! patod, except ter nominal dooreaaes to intewanes t ! allocations. t Y ! ! ! ! ! ! ! t 4 r-------•--rrrrr-..--------------r------ r------------ •.-..---. PRIOR Ate- ------ IWTURZ CUT EITIMATES-•---r•r•rrrrr-r TOTAL COST APPRO- PRIATIONS--------- 1991-92 1992-OS 1998-" 1"4-95 ESTIMATE pilIATIONS 1949-90--1990-91 -- ----------irrrr-r-rr-•rrr -------- ------ ----- ----•-------------- ( • X 1000) ]i 4.2 5.0 •4- 29.4 29.6 •2 1.0 .4 .6 ----- 35.0 ----- 35.0 - - --- --------------0.0---`--0.6 TOTAL PRIOR APPRO- Ate- PRIATIONS - FUTURE FUI�tli <-------------1991-92 1992-98 logo-91 FUNDING PRIATIONS 1909-90 --------- ------------------ _-------- -_--__r-.. _-------- t • X 1000 ) 35.0 35.0 --------- --------- $5.0 RM&TON DATE 04/26/69 --r------ ------ 0.0 0.0 - - - - - - --- - - - - - - , 0.0 0• r-rr----- t •` ----rr-- 1 yg4rid 1 ol4r glob, r-rrrr+/�r_ r_rrr-rrr--. C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION As OF 091209 PROJECT.NO. : 331347 ------------------------------------------- ------- PROJECT HAVE i DUPONT PLAZA BAY/RIVERWALK IMP ROVEYENTB 1 PROJECT DESCRIPT2014: ADDRESS : HE BANK MIAMI RIVER 1 t WORM LOCATION t 263 t Construct and maintain a toopsrary ba 1riverwalk so t NBRHO SERVICE 1 263 t the casement parallel to the bulhead groat the Dupont t • t Plaza Hotel to the Intereentinental Metal with a short i PROGRAM : 004 PARKS AND RECREATION t transition pior at Ow on* Plaza Hotel. Contruation will t CATEGORY" : 041 PARKS AND RECREATION t include 40 concrete slab, interim landscaping, a path t' DEPARTMENT t 031 PUBLIC WORKS MANAGER: 313 PELAEZ i lighting, and a too orary 41 high chain link tons*. the t t PROJECT EUGENE t This will help to showcase downtown and provide t neceooary pedestrian Connection from *no Knight Cantor/ t FIRST YEAR IN CAPITAL PROGRAM : FY89 t Hyatt facitities to the Bayfront Park/Sayside area, as t FIRST YEAR OF APPROPRIATIONS t FY89 t no other development to prosentiyy proposed for the I 1 site. This construction is expooted to remain in place ! PROJECT SCHEDULE t t for a minimum of three years. t INITIAL REVISED ! C COMMENCE DESIGN 08/88 t t AWARD CONTRACT 10/68 t t BEGIN CONSTRUCTION 11/88 t t BENEFICIAL USE 01/39 t ! PROJECT COMPLETE 01/09 ---------------------------------------------- ------- ------- PRIOR TOTAL COST APPRO- TAPPRO- PRIATIONS �,� +, 4- --- FUTURE COST ESTIMATES rrrrrrrrrrrrrrr FUTURE COST CATEGORIES ESTIMATE PRIATIONS 1949-90 1990-91- 1991-92 1992-9 1998-" 1914-90 ------------------------- --------- --------- --------- --- --------------------------rr-r.�... 4 x 1000- LAND ACQUISITION DESIGN 5.5 5.5 CONSTRUCTION 90.0 90.0 EQUIPMENT ADMINISTRATION 4.5 4.5 OTHER ------------------- --- TOTAL COST 100.0 --- - 100.0 ----- 0.0 ----- ----- ----- ----- ----- --- 0.0 0.0 0.0 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS <- --- JVTURE FUNM-------------r-r FUNDIING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-98 1998y-94 1994-96 r------------- -------------- - --- --------- --------- -••-- --- --------- --rrrrrrr rrwrrr.rrr4 l 4 x 1000 >~ 962 MARINAS RETAINED EARNINGS 100.0 100.0 - ------ - --- - TOTAL FUNDING 100.0 --- - 100.0 ------ 0.0 ----- ----- ----- r---r -------- 0.0 0.0 0.0 0.0 0w0� L REVISION DATE 10/12/90 it +1, PROJECT NO. : 331346 PROJECT NAME s ATHALIE RANGE PARK POOL REPLACEMENT ADDRESS : 525 NW 62 STREET NSRHD LOCATION : 112 NBRND SERVICE : 112 PROGRAM s 004 PARKS AND RECREATION CATEGORY, s 041 PARKS AND RECREATION DEPARTMENT t 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY89 FIRST YEAR OF APPROPRIATIONS s FY69 PROJECT SCHEDULE s INITIAL REVISED C0MMENCE DESIGN 12/68 AWARD CONTRACT 02139 BEGIN CONSTRUCTION 03/89 BENEFICIAL USE 07/69 PROJECT COMPLETE 06/89 J CITY OF M I A M I AS OF08/29/8# CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 ------------------------------------------------------------ I PROJECT DESCRIPTION: t t This projeat calls for the demolition and roplacowent t t of the existing pool complex at Range Park. This will t ! be done on a fast -track basis so that aonetruation to t ! sssontiolly aowplete for sus r 1989. Design will copy t ! that originally developed for Joss Marti Park. Ths now !' t complex will include a 50-castor pool and complete bath- t ! house, now office and deck furnishings, weahenlaal and t t plumbing eauipwent, and fencing The heated pool will t ! be the City's largest, with both shallow and deep ends t ! and handicapped access. The both -house will contain t ! restrooes, looker 6 dressing area, and pool offloo. t ! The buildingg will also contain separate-seewee restroes t t taeilities to service the adjacent ballfields. t ! t' ! t t ! t t ---------------------------------------------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS --------------- FUTURE COST ESTIMATES ---------------> COST CATEGORIES ----------------- ESTIMATE PRIATION8 1969-90 1990-91 1991-92 1992-98 1915-94 1994-99 ------- --------- --------- --------- --- -� • x ---- 1000 --------- --------- --------- LAND ACQUISITION DESIGN 114.0 114.0 CONSTRUCTION 1755.0 1755.0 EaIIPMEHT 50.0 50.0 ADMINISTRATION 126.0 126.0 OTHER 55.0 55.0 r------rr----r TOTAL COST -- 2100.0 - - - 2100.0 r--__ 0.0 ---rr 0.0 ----_ 0.0 0.9 0.0 0.0' PRIOR APPRO- TOTAL APPRO- PRIATIONS ------------------ FUTURE F! -------r------------ r FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-93 19980-94 1994-ft ---------- ----- - - --- - -- --------- ------- - - - -- ----- - ---- -- tr• x ---- 1000 )- --------- -r_-r_r...r _--------.. 799 FY'89 SUNSHINE ST. BOND PROCOS 2100.0 2100.0 -- - - ---- - --r TOTAL FUNOiltG -- - - rr - -- _ 2100.0 - --- - --- - 2100.0 ---- -- --- 0.0 ---- - ---- 0.0 -- --- --rr o.a ----- - rrr 0.0 � ------rrr . os.a` rr,...rr-_-. .: .... 0.0 16 REVISION DATE 08/03/89 r le► PROJECT NO. s 881849 PROJECT NAME : HADLEY PARK POOL REPLACEMENT ADDRESS : 4800 HW 12 Avenue NBRHD LOCATION : 128 NBRHO SERVICE : 128, 900 PROGRAM s 004 PARKS AND RECREATION CATEGORY : 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY89 FIRST YEAR OF APPROPRIATIONS : FY89 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTTION EQUXPMEN OTHER ADMINISTRATION TOTAL COST FUNDING SOURCES ------------------------- INITIAL REVISED 10189 01/90 02190 06190 08190 TOTAL COST ESTIMATE 114.0 1755.0 50.0 126.0 55.0 iioo.o TOTAL --FUNDING C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 06/"149.. 71 ------------------------------------! 1 PRO --CT DESCRIPTION: ! This proSoe+ calls for the demolition and? replacement !' ! of the existing pool complex at Hadley Park. It present ! ! funding remains constant, the design of the now complex ! ! will copy that on lnall developed for Jose Marti Park ! ! The new complex will include a SO-mstor pool and comp- ! ! leta bath -house, now office and dock furnishings, meoh- ! ! anical and plumbing equipment, and fencing. The heated ! pool will have both shallow and deep ends and hands- ! ! capped access. The bath -house will contain rostrooms, ! ! lockers. dressing areas, and pool office. Since the new ! ! facility will be open year-round, both revenues and ! ! operating expenses are expected to increase proportion- ! ! ally. It funding is increased in the initial period, ! ! a separate divan well may be added, with requisite ! f design modifications, making this the City's first, and ! ! only. true Olympic swim training facility. ! PRIOR APPRO- APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES---------------r PRIATIONS 1989-90 1990-91 1991-92 1992-95 logs-94 1994-95 --------------------------------------------------------------- ( •X1000) 114.0 1755.0 50.0 126.0 55.0 2100.0 PRIOR APPRO- PRIATION8 564 GUARANTEE ENTL REV. BNDS -FY89 2100.0 2100.0 ------------------------------------------ TOTAL FUFEtING 2100.0 2100.0 a ------0:0------ o:o------o:o------0.0 APPRO- PRIATIONS <------------------ FUTURE FUNDING 1989_90 1990-91 1991-92 1992-98 -- --------------------------- ( t X 1000 ) - --- - -- - -- --- ----- ----- --- 0.0 0.0 0.0 0.0 REVISION DATE 06/24/69 --------------►—..r, 199>1-l4 1l9�1-l�. -----.iM---- - - - - - - - - y 0.9 a PROJECT NO- : 661450 REPLACEMENT TALCOLCY PARK ROOF HAVE : t 616t H.W 9 AVENUE ADDRESS NBRND LOCATION = NBRHD SERVICE 122 PARKS AND RECREATION : t 004 041 PARKS AND RECREATFAC PUBLIC FACILITIES FAG TEGORY : CAT CA �p 049 PARKS AND OIANNE JONNSo" OjVCTT MANAGER, 491 FIRST YEAR IN CAPITAL GRAM FY89 FIRST YEAR OF APPROPRIAT ONS = FY69 PROJECT SCHEDULE II ONCE DESIGN AwARO CONTRACT BEGIN CONSTRUCTION GL USE p jECTIACOMPLETE COST CATEGORIES --------------- LAND ACQUISITION DESIGN CONSTRUCTION ii T__ N OTHER TOTAL COST INITIAL REVISED 11/68 06/69 07189 09169 09169 TOTAL COST -ESTIMATE 60.0 10.0 5.0 -----95;4 TOTAL FUNDING FUNDING SOURCE$-------_-- _ ---- ___ _ ___ s LEAS£ MANG. ENT•�F�� a°s:o 664 PRWpORT 8RIDO£ LAB SL -- a46 ,NE1N ----- --- - --95.0 TOTAL FUNDING PRIOR ApPRO- PRIATION9 90 PRIATIONS------loss--- AS OF 08/29169 C I T Y FMM I A M I IT PROGRAM CAPITAL IMPROV�ESTIO14 PR�CT0 -_....r_ _ _---------------- ---------- --- "` "ppD,XCTr DESCRIPTIONS Park So the sits of the sports dsysl- ! root least* Contsrr ! Rslafanto iaaalcy the non-p ! ! opment pro t am run bgth The two reoreation but llnge snand funded bq ! real tho park were constructed In the the or qq toter Grote, ! de the cboth roogss and !laws orotosolonalnspool alisino ! ! dsslyn. both roofs are do ssverol ! condition. An outside dositorprswroval of the alsrs ! hw rsplaasssnt o4 all root � ! in rooting has rsao00ondsd fated to ! materials and tAddihe tionalnrk Is aontemp y ! ! story windows- of tfiSs ! repair interior tinishiiausi#of the 001 SI be ! ! continuous loaka4s• ! ! situation. a Lastt-track construction p ! ! implomonted. ! ! ------------------------------ <-- _-"_"_--- - FUTURE �!2 ;�`"'E1996-94 1991-92 -« 1994-95 -„-_------- 1990-91 ---- ----r- --_. ----�'0rX loco-}- 10`o -rr------ ------mo0.0 ---_ -95.° ------ 7 ------__-r_� APPRO- FUTURE FUNDIM c-_ - ___--'-1991+9Z - _ -199E-9d 1944-95� ADO- pROR IATIONS 1969-90 ----__-r 1990-91- _ _ '_«'-- "-_"--r PRIATIONS --------- •_"_�•6 X 1000 } ____-.v.� - a.o ��� 85 _ ----- ------------ -0.0 0.0 __-__ 95.0 ------4.0 R MISION DATE 08/01159 PROJECT NO. s 831851 PROJECT NAME : WILLIAMS PARK RENOVATION ADDRESS : 1717 NW 5TH AVENUE NBRHD LOCATION : 251 NOW SERVICE : 251 PROGRAM s 004 PARKS AND RECREATION CATEGORY, 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY90 FIRST YEAR OF APPROPRIATIONS : FY90 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 03/90 07190 08190 02/91 04/91 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF Of/29/091 ------------------------------------------------------------ I PROJECT DESCRIPTION: I 1 Williams Park is a 5 112 &are recreational property, ! ! located in Overtown that is heavily wood by neighboring I residents, primarily youth. Comprehensive renovation Is I ! necessary to bring the park and Its facilities up to 1 ! proper operating and buildinlg standards. Priorities for I i this renovation project incude substantial building I I improvements, installation of an Irrigation •getem, ! 1 balltield renovation and •eaurit andfor sports ! 1 lighting. It additional funding *comes available, I I of sr improvements would include: handball courts, new I ! playground, vita course and park turnishings, and 1 1 parking lot renovation. i 1 r I Pool and basketball court renovations are in process I I under separate projects in the Citywide Neighborhood I 1 Park Renovations Programs. ! 1 t -------- --- - ---- - --- - --------------------------------------- PRIOR APPRO- COST CATEGORIES ------------------------- TOTAL COST ESTIMATE --------- APPRO- PRIATIONS --------- PRIATIONS 1989-90 --------------- FUTURE COST ESTIMATES---------------s 1990-91 1991-92 1992-98 1996-94 1994-99 --------- --------- c • x --------- 1000 ) --------- ------------------ LAND ACQUISITION DESIGN 65.0 65.0 CONSTRUCTION 315.0 815.0 EOUIPMENT ADMINISTRATION 20.0 20.0 OTHER ------------------------- TOTAL COST --------- 400.0 --------- 0.0 --------- 400.0 --------- 0.0 --------- 0.0 --------- 0.0 ------------------ 0.0 0.0 PRIOR APPRO- FUNDING SOURCES ------------------------- TOTAL FUMING --------- APPRO- PRIATIONS PRIATIONS 1989-90 ------------------ FUTURE 1990-91 1991-92 FLING 1992-99 -------------------r 1993-94 1994-95 ---- ----- --------- ------- -- • X --------- 1000 ) --------- ------------------ 568 FLA STATE DIRECT APPROP. -FY90 400.0 400.0 --------- ---------------- TOTAL FUNDING --------- 400.0 --------- 0.0 --------- 400.0 --------- 0.0 --------- 0.0 --------- 0.0 ------------------ O.0 0.0 REVISION DATE 07/06/89 401 PROJECT NO. s Sal$$& PROJECT NAME v CITY OF MIAMI YOUTH CENTER AWWESS : TBD NbamW LOCATION s NBRHD SERVICE z 900 PROGRAM s 004 PARKS AND RECREATION CATEGORY" s 041 PARKS AND RECREATION DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM s FY90 FIRST YEAR OF APPROPRIATIONS s FY90 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 01/90 AWARD CONTRACT 06/90 BEGIN CONSTRUCTION 07/90 804EFICZAL USE 01/91 PROJECT COMPLETE 03/91 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 06/29/89 ------------------------------------� ! PROJECT DESCRIPTION: I The City of Mimi Youth Center project hoe been f I initiated to provide a broad spectrum of recreational f I oppertunitios to the youn4 people of the community as f I an alternative to unstructured and undeeirablo aativi- F 1 ties. The Center would house a gymnasium, bowling F I ails , lee rink, game roost orals and craft area,. f ! multipurpose area and office. Outdoor activities wouldI ! include a swimming pool, ballfiolds, tonnis and/or F I basketball courts, and raquotball/handball court, I I depending on the selected site. 8tylod after the, Mlasi F ! leach and Coral Gables Centers, operating costs are f I expected to run e97S,000 annualiV. t ! f I f ! I' ! f ! f I !` --------------------------------------- .....---..-��--------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS (--------------- FUTURE COST ESTIMATES---------------r COST CATEGORIES ESTIMATE PRIATZONS •1989-90 1990-91 1991-92 1992-98 1993-94 1"4-99 ---r------------------------- --------- -------- - ---- ------------- -----Orr- '" t x 1000 f LAND ACQUISITION TR TRUCTION 4906.0 EQUIPMENT 150.0 ADMINISTRATION $60.0 OTHER 300.0 TOTAL- COST--------------- TOfiAt. COST ---- ----- 6100.0 --------- 0.0 PRIOR TOTAL APPRO- FUNDING SOURCES - r--------------- FUNDING - - ------ - PRIATIONS - - -- -- -- - 384.0 2304.3 76.2 183.0 152.5 3100.0 APPRO- PRIATIONS 1989-90 42 PRIVATE%DEVEL.PR CONTRIS-ANTI 3000.0 563 FL.A STATE DIRECT APPROP. -FY90 100.0 100.0 $64 GUARANTEE ENTL REV- ENDS -FY89 3000.0 3000.0 ------------------------- --------- --------- --------- TOTAL FUNDING 6100.0 0.0 3100.0 C 2601.7 73.9 177.0 147.5 ---------------- -------- - --------- ------a. - 0.0 (- - - - ry,{A(t.--r-r-----------..-r y. 1990-91- 1991-92 1992-9s 1998-94 1994-9 ---- --- --------- ----r---- --------- 4 4 x 1000 3000.0 ----------------------- N--.- --------r --3000.0 0.0 0.0 0.0 0.0 REVISION DATE 08/01/89 .1 J I.g it III ��'.:L.1 III _.I I IIII�II C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 416047 PROJECT NAME s MELREESE GOLF COURSE IMPROVEMENTS ADDRE99 : 1802 "W 37 AVENUE NBRHO LOCATION : $94 NSRHD SERVICE s 900 PROGRAM s 004 PARKS AND RECREATION CATEGORY : 041 PARKS AND RECREATION DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGERs 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM s FY83 FIRST YEAR OF APPROPRIATIONS : FY83 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00/84 12/39 AWARD CONTRACT 03/90 BEGIN CONSTRUCTION '00/85 04/90 BENEFICIAL USE 08/90 PROJECT COMPLETE 00/86 09/90 PRIOR APPRO- TOTAL COST APPRO- PRIATIONO COST CATEGORIES ------------------------- ESTIMATE --------- PRIATIONS --------- 1969-90 --------- LAND ACQUISITION DESIGN 31.0 CONSTRUCTION 666.0 EQUIPMENT ADMINISTRATION 13.0 OTHER --------- ------------ ------------ TOTAL COST --------- 710.0 --------- 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS FUNDING SOURCES ------------------------- FUNDING --------- PRIATIONS --------- 1999-90 --------- 635 LAND SALES 710.0 - - - --------- ------------------------- TOTAL FUNDING -------- - 710.0 -- - --- 0.0 0.0 AS OF 09129/00 ---------------------- ----- ! PROJECT DESCRXPTIONs ! Melrose@ Golf Course, with over 120 sores, is one of t ! the finest local 18-hole facilities. At the• proten►t !' ! time, substantial root repairs or replacement So re- 1 ! quired. Additionally, this project would ineludr the P ! installation of a computerised rrigation s low, Sor !' ! complete coverage of the course. Other pro eat ! ! elements call for the rebuilding of *art pa he and t ! general landscaping improvements. t ! r ! 1 -------------------------------------- ------ �-------------- FUTURE COST ESTIMATES-------------•--31 1990-91 1991-92 1992-98 1998-94 --------- _--_----' 1994-99 --------- --- -- - t 8 x - ---- 1000 ) 31.0 666.0 13.p -0 - - - - - - - - - - - -"- ____710.0 _- --- .0 0.0 0.0 <------------------ FUTURE 1990-91 1991-92 FUNKKtM 1992-99 -------- -------------------r> 1998-94 t99i-.R --------- -------- - 0 x ---- ---- 1000 710.0 --_--.r--- -- ---- --- 710.0 --------- 0.0 r__.`__-►_-----_ 0.0 O.O 0 AV REVISION DATE 06/27/99 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 031952 PROJECT NAME : BRICKELL POINT PARK RELOCATION AND REDEVELOPMENT ADDRESS : 401-453 Bricksll Avoune NBRHD LOCATION : 404, 040, 404, 040 NBRND SERVICE : 263, 291. 292 . PROGRAM N : 004 PARKS AND RECREATION CATEGORY s 041 PARKS AND RECREATION DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 491 DIANNE JOHNSON FIRST YEAR IN CAPITAL PROGRAM : FY90 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 01/90 AWARD CONTRACT 03/90 BEGIN CONSTRUCTION 09/90 BENEFZCZAL USE 05/91 PROJECT COMPLETE 06191 COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS ESTIMATE --------- PRIATIONS --------- 1939-90 --------- 123.6 1363.6 137.0 35.3 --------- 171a.o --------- o.o --------- o.o PRIOR APPRO- TOTAL APPRO- PRIATIONS FUNDING --------- PRIATIONS --------- 1939-90 --------- 41 FLA. D.O.T. - ANTICIPATED 400.0 42 PRIVATE/DEVELPR CONTRIB-ANTI 1315.0 --0.0---------------------------------- TOTAL FUNDING 0.0 16 AS OF 09/29/69 ---------------------------------------------------------- ... ! PROJECT DESCRIPTIONS ! ! The City of Miami and Downt-l.n Oevelepment Autherit ! have :nrg:T*deextensive ns99otiations with the *111ASsre! Groupand reofthe SriciCeli familyy to effect a land l ! swap or this recreational property. Tho scheduled June t ! 1939 closing will perms! the City•s release of the t ! existing Or all Point Park to the Williams Group in t t oxchanya for a 2.24 &ere treat at the Mouth of the t ! Miami River. This capital project provides the neatest- t ! ary funding for the development of the ner park siter t t and is a stint effort of the ODA and parks Department. ! t It is anticipated that a master plan will be developod t t in-house by Public Works, and a design aempetitI n held ! t thereafter. The master plan and future development are ! t expected to contain the following facilities: picnic t ! area, water -based roareatien structures, riverwalk, t ! fitness trail, tennis or handball court, obeer t t t ------------------------------------------------------------ <-------------- FUTURE COST ESTIMATES---------------r 1990-91 1991-92 1992-92 1993-94 1914-9E --- ------------------------------- t i x loot-i 126.6 1363.6 137.0 $5.e --------- --------------------------- ----- 1715.0 0.0 0.0 0.0 0•0 <------------------ FUTURE FUNOM---------- ----r 1990-91 1991-92 1992-93 1995-94 1994-9E' ------------------ ---- a x 1000 ) 400.0 1315.0 -- -------A- ---------------------- 1715.0 0.0 0.0 0.0 0.0 REVISION DATE 00/0119% 4 - 1W III IIIIII lug PROJECT NO. s $$2236 PROJECT NAME : MIAMI STADIUM - ROOF REPAIRS ADDRESS s 2$01 NW LOTH AVENUE HBRHD LOCATION : 652 NBRHD SERVICE : 661 PROGRAM s 005 PUBLIC FACILITIES CATEGORY : 052 STADIUMS DEPARTMENT t 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 932 MAX.CRUZ FIRST YEAR IN CAPITAL PROGRAM t FY66 FIRST YEAR OF APPROPRIATIONS : FY86 PROJECT SCHEDULE _ INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT 10186 OEM CONSTRUCTION 10166 BENEFICIAL USE PROJECT COMPLETE 02187 10167 TOTAL COST COST CATEGORIES ESTIMATE frr_-r_r_•rrr__r_r_r- -___•f-__ LAND ACQUISITION $5.0 CONSTRUCTION 525.0 EQUIPMENT ADMINISTRATION 15.0 OTHER i RAL:'COST , 575.0 TOTAL fUNDINa SOURCES FUNDING ------------- — --- $+U2 CAPITAL IMP.. FtNND$ - FUND BAL. 575.0 _-------- ----r-------_--- TOTAL FUNDING 575.0 CITY' OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR APPRO- PRIATION8 $5.0 525.0 15.0 ---- iis 5 PRIOR APPRO- PRIATIONS 575.0 575.0 AS OF OA/M60 f--M«.•_..—_—_r--..rrs•••rr•r+..i�.+'• ----------------------- ! PROJECT DESCRIPTIONS f E' ! This pro oat lnvolvo� rop�laeln4 this Mlawl Sta#luw raof t t due to i o unooto aondttlons. ! 1 � 1 1 1 ! 1 1 ! t D -------------r---f----_--_-.w-_-----r-••---•r.ir-•i.r�iiif�llirl.►�i� APPRO- PRIATIONS 1969-90 - - - - - - - - - - - - - - - FUTURE COW ESTIMATES 1990-91 1911-92 1992-" 1"#-" ---------------------- --- —�' ---.•----.•.• � j --------- --- -f x 1000 ------ o:o ------o:o --------------- --------- --- 0.01 0.0 &.0 ---- APPRO- PRIATIONS 1969-90 �- --------------- Ftirm F1 -------- 1990-91 1991-92 1"2-9! 1 3•!f --- __-� I91�1" i ixl000� -__-----r--•-- - •rrrr.rrrra ------_ 0.0 ---_- 0.0 ------0.0 0.0E 0.0 COMPLETION DATE 09/$ M loll 0 I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N0. s 403004 PROJECT NAME s MIAMI STADIWr - PRESS BOX REPAIRS ADDRESS s 2301 NW 10 AVE NBRND LOCATION s 682 NBRND SERVICE s 900 PROGRAM s 005 PUBLIC FACILITIES : CATEGORY 052 STADIUMS DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 932 MAX CRUZ FIRST YEAR IN CAPITAL PROGRAM s FY84 FIRST YEAR OF APPROPRIATIONS s FY84 PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 06184 06185 AWARD CONTRACT 10/64 10/46 BEGIN CONSTRUCTION 10184 10186 BENEFICIAL USE PROJECT COMPLETE 02/85 10/87 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS •------------------ --------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES 842 CAPITAL IMP. FUNDS - FUND SAL. 685 ORANGE BOWL ENTERPRISE FUND 690 MIAMI STADIUM ENTERPRISE FUND ------------------------- TOTAL FUNDING 0. 30.0 30.0 490.0 490.0 80.0 80.0 AR OF 06/29/69 ---------- ! PROJEcY DEscaIPTIDN: r ! r ! This proieet involves refurbishing ine Mimi Stadluw r t Pro s• Box by replacing the floor, some interior well* ! ! and the windows facing the playing field. F t r t r ! r t ) ! r' ! r ! r ! t ! r ! r ! !t !------------------------------.►---------------------------- APPRO- PRIATIONGi--------------- FUTURE COST ESTIMATES -------- -- --- --> 1969-90 1990-91 1991-92 1992-98 1998-94 1994-99 --------- --- ---- --------- --------- --------- I • X 1000 ) ----- ---- 600.0 --------- 600.0 ------K-0 0.0 ------------------ 0.0 0.0 --------------------------- 0.0 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------------ FUTURE FUNDING ------------------- > FUNDINO PRIATIONS 1969-90 1990-91 1991-92 1992-98 1993-94 1994-OS --------- --------- --------- ------------------ c 0X 1000 ) . --------------------------- 300.0 300.0 53.0 53.0 247.0 247.0 ----600-0 ----Goo-O --------- ---------------0.0 ------------------------0 0.0 COMPLETION DATE 09/30/09 saA . i C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY9O PROJECT NO. : 332232 PROJECT NAME a ORANGE BOWL. STADIUM — PRO —CLUB RECONSTRUCTION ADDRESS : 1501 N.W. SRO STREET HBRHD LOCATION : 772 NBRHD SERVICE : 900 PROGRAM : 005 PUBLIC FACILITIES CATEGORY' s 052 STADIUMS DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGERi 982 MAX CRUX FIRST YEAR IN CAPITAL PROGRAM s FY86 FIRST YEAR OF APPROPRIATIONS : FY86 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE AS OF 06/29/89 -----------------------------------------------------------! ! PROJECT DESCRIPTIONs t ! The Pro -Clue is an area used by football team and i ! other stadium users for prose conforenos• and meetings. ! At present time. our Pro -Cline is totally unaoaoptablo t ! in that it has deteriorated so mush that it can no f ! longer be used unless it is completely reconstructed. ! Plans call for the construction of a large nesting t ! room with concession area on the second level above ! ! gate 128, along with necossary entry foyer and access. TOTALCOST PRIOR APPRO- APPRO— PRIATIONS FUTURE COST RSTIMATES •--------------- '------��"""�-`' 1991-92 1992-9a 1915-94 1994-90 COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 ----� -- --------- ------------------------- --------- --------- --------- f X )----- 1000 LAND ACQUISITION DESIGN 89.0 $9.0 CONSTRUCTION 481.0 481.0 AQUIPMENT DMATION 20.0 20.0 ------ ----- TOTAL C08T-------------- ----$40.0 ----540.0 ------0.0 ------0.0 ------ 0.0 0.0 6.01 . TOTAL PRIOR APPRO- APPRO- PRIATIONS <-------------_---- FUTURE 1991-92 FUNDING 1992-92 ---------"---""---�' 99694 1----- 1------ FUNDING SOURCES FUNDING PRIATION8 1989-90 --------- 1990-91 --------- --------- ------- ------------------------- --------- --------- 1 •X1000) 378 METRO-DA'DE COUNTY RESORT TAX 540.0 $40.0 _ _ --------- ___-___-_ --- --_-__-_- ----------------- TOTAL FUNDING --------- 540.0 --------- 540.0 ------ 0.0 ------ 0.0 ------ 0.0 0'.0 M CITY OF M I A 0 1 AS OF08120109 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECTNO. : 402002 --------------------------------r---- PROJECT NAME 1 MARINE STADIUM RENOVATIONS I PROJECT DESCRIPTIONS I ADDRESS 1 8601 RICKENBACKER CAUSEWY I I NBRHD LOCATION 1 891 1 This :reject involves the replacement or repair of I NBRIEI SERVICE : 891 1 several concrete columns and beams at the Miami Marino I 1 Stadium. Humorous cracks and deterioration have boon I PROGRAM 1 005 PUBLIC FACILITIES I found in the super structure, slabs and supporting I CATEGORY" : 052 STADIUMS I beams. Reinforced steel is exposed throughout those I DEPARTMENT 1 049 PROJECT MANAGER: 932 PARKS AND PUBLIC FACILITIES MAX I areas, Particularly that facing the water. Engineering I dosiyyn bs in-house by the Department I CRUZ I rill por ormed of I Publia Works. The structural elasents will be sealod I FIRST YEAR IN CAPITAL PROGRAM 1 FY87 I after repair to guard against future erosion. It I FIRST YEAR OF APPROPRIATIONS : FY88 I fundingy permits, additional improvements May be made to I the axisting barge and electrical system. I PROJECT SCHEDULE: I 11 INITIAL REVISED I 1 COMMENCE DESIGN 02/89 1 I AWARD CONTRACT 09/69 1 I BEGIN CONSTRUCTION 10189 I I BENEFICIAL USE 01/90 1 I° PROJECTCOMPLETE 02/90 ------------------------------------------------------------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTUIE COST ESIXUATES--------r------> COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-98 1998-94 1994-90 ------------------------- --------- --------- --------- ---- - ------------------------------ t • X 1000 1- LAND ACQUISITION DESIGN 13.3 40.0 26.7- 'CONSTRUCTION 323.0 310.0 13.0 EQUIPMENT ADMINISTRATION 17.7 17.7 OTHER 4.0 4.0- ------------------------- TOTAL COST --------- 354.0 --------- 354.0 --------- 0.0 --------- ------------------------------------ 0.0 0.0 0.0 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------------ FUTURE FUNDING --------r----------s FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-98 1998-94 1994•-95 --------- ------------- - -- - - ---- --- -------- - --------- ---- - - - ---- ----- --- -------air t • X 1000 > 588 CONTRIB FR FY88 GENERAL FUND 354.0 354.0- 799 FY189 SUNSHINE ST. BOND PROCOS 354.0 354.0 ---------- TOTAL FUNDING --- - -- --- 354.0 - -- - 354.0 ---- --- - 0.0 - - --- - ----- - ------r-rrrrr--------- 0.4 0.0 0.0 0.0 6.0 ocuvaTnu nATc naI9a/aa• C I T Y O F M S A M I CAPITAL IMPROVEMENT PROGRAM PROJECT OE9CR1PTION PROJECT NO. 1:404281 PROJECT NAME : DRANK BOWL STADIUM - ADDIT. PRESS BOX FACILITIES ADDRESS t 1501 N.W. sal STREET NBRND LOCATION : 772 HBRHD SERVICE : 900 PROGRAM : 005 PUBLIC FACILITIES CATEGORY' t 052 STADIUMS DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 932 MAX CRUZ FIRST YEAR IN CAPITAL PROGRAM : FY67 FIRST YEAR OF APPROPRIATIONS : FY87 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 11186 AWARD CONTRACT 01/87 BEGIN CONSTRUCTION 02187 BENEFICIAL USE PROJECT COMPLETE 09187 PRIOR TOTAL COST APPRO- COST CATEGORIES _-��.-_��.------------- ESTIMATE --------- PRIATION8 --------- LAND ACQUISITION DESIGN 90.0 60.0 CONSTRUCTION 890.1 890.1 6.0 9.0 ADMINISTRATION OTHER ------------------------- TOTAL COST --------- 978.1 --------- 978.1 • PRIOR TOTAL APPRO- FUNDING 80URCE9 ------------------------- FUNDING --------- PRIATIONS --------- 378 ` METRO-O'ADE.. COUNTY RESORT TAX 259.3 976.1 048 FLA LEAGUE OF CITIES BOND POOL. ' 718.S .; .-.------------------------- TOTAL FUNDING --------- 976.1 --------- 978.1 Ai OF 001"189, PR ---------------------------- -- -------------------------�-- - ! OJECT DEBCRiPTiON: f' ! t ! This project is necessary to accommodate the overiloE t of prew� ss and madia. The exlsting Prose box 98GA]lftiaw t ! on the root are overcrowded. p ! This pro3ect will involve the building of 2 booth t 1 that wouiid accommodate 10 medla pereennah each. t ! The material and coot of the *awe is to bd datermllnedt t ! bV the City•* Public Work* Department. t ! t t ! t ! r ! 6 ! t ! t -------------- --•------ -r----_------------------- - ------ FUTURE COST EtZZMATEM PRIATIDNS t--___-_-_ �._a�_«.....-.�..s loot -to logo-91 1991-92 1992-98 119i-90 1994-16. --------- --- --------- --------------�_....-... ( • X 1000 1 --------- -------------------------- 0.0 Ate - -FUTURE r MO=1(fl PRIATIONB•----------------- 1969_90 1990-91 1991-92 1992-OS -- --- - ------•------- ( � X 3000 718.6- 718.8 ---- ----- -- ------ - 0.0 - ---0.0 0.0 0.0 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 404237 PROJECT NAME : ORANGE BOWL MODERNIZATION - P14ASE I ADDRESS : 3601 RICKENBACKER CSWY. HOUND LOCATION t 772 HOW SERVICE : 900 pRmJm . : OOS PUBLIC FACILITIES CATEGORY` t 052 STADIUMS DEPARTMENT : 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER: 932 MAX DRUZ FIRST YEAR IN CAPITAL PROGRAM t FY88 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 04188 AWARD CONTRACT 04/68 05/88 BEGIN CONSTRUCTION 06/88 BENEFICIAL USE 09/88 PROJECT COMPLETE 09168 TOD AS Or O*1"/S!!p ------------------------------------�.» ! PROJECT DESCRImON1 t 1 r ! This project is the first of a two phase-. •14 10222le11 r ! Orange howl Modernization Project. in this phase, r ! press levels 3, So and 6 will be 600p1e*4`4 renovaI" r ! and refurnished, including reelreeoe, concession and r ! seating areas, audio-visual 0ystoo* and utilitlee. A r ! new elevator tower will also be cenetruated to provide r ! isproved access for attendees and event etafl- r ! r ! r 1 E ! r ! 1 .! r -------------r----------------------rr—.ter--------•- PRIOR Ate- ----- FUTURE COST EST=MATES TOTAL COST APPRO- PRZATZONS �-----------•----•--r•-�••�tA COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-99 199E0-94 1994-90 ------ ---- -------------r---..r-------- --- t • X 1000 LAND ACQUISITION DESIGN CONSTRUCTION EOUIPUENT ADKD419TRATION OTHER TOTAL COST 86.0 60.0 26.0 922.0 740.0 182.0 178.0 420.0 242.0- 44.0 10.0 34.0 --------- --------- 1230.0 1230.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS 378 METRO-OAOE COUNTY RESORT TAX 760.0 685 843 FLA LEAGUE OF Cg CITIES ND PE FUND 450.0 POOL 1230.0 TOTAL FUNOZNG - 1230.0 1230.0 0.0 APPRO- PRIATIONS 1989-90 780.0- 460.0- ---1230.0 o.o — ---••— —m--- -- --m-----------I ---- -0.0 -0.0 0.0 0.0 DoM -------------- — FUTURE rummm ----------------r ..r:. ; 1990-91 1991-92 19lZ-93119t-94 1910•l6t 1 --- ----- ------------------ rrr•-r--rl 1 t X 1000-3 REVISION DATE 07/26/69 At- -AH1 �A C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 404234 PROJECT NAME t ORANGE BOWL MODERNIZATION - PHASE IZ ADDRESS : 1501 NW 3RD STREET NBRHD LOOATiuM s 772 HOUND SERVICE : 900 PROGRAM �• : 005 PUBLIC FACILITIES CATEGORY : 052 STADIUMS DEPARTMENT s 049 PARKS AND PUBLIC FACILITIES PROJECT MANAGER& 932 MAX CRUZ FIRST YEAR IN CAPITAL PROGRAM s FY90 FIRST YEAR OF APPROPRIATIONS & FY90 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 05/39 07/39 07/39 09/09 09191 AS OF 0612910 ---------------------------r----------..r.►.rrrs ! PROJECT DESCRIPTION: f M f This project is the second of the two phase, 019 !! 1 alllion 8range cowl Modernization Proje4t. T1tta phase f ! call* for the installation of a new P46110 addr**w M t eyotom throu9htout the stadium, for a now 4OmMWloat2on M ! eyste. within the four press box areas, fer the I 1 aonetruction of now podostrian rawpe and eon*Our*e*, t ! and for the construction of new rostroo" and oonaee- 1 ! elan stands. t t t 1 M 1 M; t 1 -------------------------------•-----.�---'--'�-'•---s--rrrr-.+.r PRIOR APPRO- TOTAL COST APPRO- PRIATXONB--------------- FUTUK COOT ESTI NATO r-- •--.•-rrr......r s COST CATEGORIES ESTIMATE PRIATIONS 1959-90 1990-91 19,91-92' 199Z-90 19yf-94 1994-90, ---------------------------------------------------- --------------------------------------- •X1000) LAND AOOUISITIOH DESIGN CONSTRUCTION Eaum1ENT OTHER ADMINISTRATION TOTAL COST FUNDING SOURCES 971.5 12710.0 971.5 12710.0 105.0 105.0 213.5 213.5 ------------- -------------- --------- -- 14000.0 0.0 14000.0 0.0 0.0 0.0 Q•O TOTAL FLWIIHG $48 FLA LEAAUE'OF CITIES aOND POOL 14000.0 PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTM FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-93 --------- --------- --- ------------- ( • X 1000 1- 14000.0 1�9-1�4 r--r.r�rrr - - - - - - - - - - - ---r-rrrr rrrrrrrr.rC'_ 0.0 0.0 a; i { jo iPAW J x � � -+i 1 � � C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N0. s PROJECT NAME s 333236 CGEC - ADDITIONAL TABLES AND CHAIRS ADDRESS t 3360 PAN AMERICAN DRIVE NBRHD LOCATION : $94 HBRHO SERVICE : 900 PROGRAM : 005 PUBLIC FACILITIES CATEGORY' : 053 AUDITORIUMS DEPARTMENT s 035 CONFERENCES AND CONVENTIONS PROJECT MANAGER: 951 MARTHA M. SCHWARTZ FIRST YEAR IN CAPITAL PROGRAM s FY88 FIRST YEAR OF APPROPRIATIONS s FY88 DEWL CCT SCHFIXI .E s COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES, ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EOUIP1ENT ADMINISTRATION OTHER TOTAL COST INITIAL 11/87 12/87 02/88 02198 FUNDING SOURCES ---------------------- 60l FY81 FPkL FRANCHISE REVEMES ..------------------------ TOTAL FUNDING REVISED 06188 10188 12/88 04/89 09/49 AS OF OS/29/89 --------------------------------------------------- ! PROJECT DE8CRIPTIONs P ! This prject involves additional acquisitiosr of tablest ! and cihe re for the Coconut Grove ExhibitIOW CsOter« ! Proposed acquisitions include 225 Krueger tA140, ! to match our existing stock 300 202x storage ! trucks for the No. 731 chairs and 2 starter bases ! for the No. 202x trucks. ! This project will not impact the C-G-i-C- operating F 1 budget. ) ! ! 1 ) ! p ! 1 1------------------------------------------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS --------------- FIYttEE COST ESTiIfATES •--•--___•••• -' < ESTIMATE PRIATIONS 1989-90 logo-91 1991-92 1992-98 199&-94+ 1994-95 -- --- ----. ( 8 X 1000 ) 34.2 $4.2 .4 •4 ---- •-- -------------------- ------------------------------------ �_.•- 34.6 34.6 0.0 0.0 0.0 00 TOTAL - FUNDING 34.6 l-34.6 PRIOR APPRO- APPRO- PRIATION8 PRIATIONS 1989-90 ------------------ FUTURE FUND3pS ....--...�...,....•..�-�t 1990-91 1991-92 1992-98 191W-94 2"440 ( i X 1000 ) 34.6 --- - --_ r------_-. - P -----34.6------0.0------�:0 ---- —0.0 0«0 rsnr ETTm nAlM 0l128189 C I T Y O F M I A M Z CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 A0 of 66/2s109 •k -------------- -----------------------------.. r--rr..�rrrs. PROJECT NO: t 420010 RIB. NAME t MIAMI CONVENTION CENTER - CONTRIB. FIRE ALARM REPL ! PROJECT OESCRZPTIONt ADDRESS : 200 SE i AVE- LOCATION t 293 t The existin tiro alarm systou which serves the MtiM's the on insl E t NBRHD ! complex needs to be replaced because f NBRHD SERVICE t 900 t manufacturer has gone out of buoin*ee and replacement uipsent E PROGRAM t 005 PUBLIC FACILITIES ! parts are no longer available. The existing has become an operational problem. causing salsa alarms I CATEGORY " : 053 AUDITORIUMS CONFERENCES DEPARTMENT t 053 AUDITORIUMS AND CONVENTIONS 035 ! to ! and the Fire Department has requested improvement' building code requirements. Because this i t PROJECT MANAGERt CONY ! West current ! is a critical life sasety item, the City and Hotel t FIRST YEAR IN CAPITAL PROGRAM t FY03 ! agreed to share the costs for hiring a consultant to ! recommend and proper* bidding documents to replace sire i ! ' FIRST YEAR OF ApPROPRIATI0N8 : FY33 h ! alarm system. It was further agreed that te cost of I I replacements would be spplit in proportion to the number !' PROJECT SCHEDULE t INITIAL REVISED ! of devises in each of the respective lease areas of the included t COMMENCE DESIGN 0I/37 ! Hotel and City with the Univerelty's gross AWARD CONTRACT 03/47 ! with the City. ! BEGIN CONSTRUCTION 09/37 02/33 ! t BENEFICIAL USE 01/98 07/03 ! PROJECT COMPLETE 03/88 09/69 -------------------------------------------------•---------- TOTAL COST PRIORAPPRO- APPRO- PRIATIONS -------------s <--------------- FUTURE COST ESTIMATES -- 1 1------ 3 - COST CATE80RIE8 ESTIMATE PRIATIONS 1909-90 - 199Q-91 ------- --------- ---- - --------- ---- -----"- --------------------------- --------- --------- e X 1000 ) LAND ACQUISITION DESIGN CONSTRUCTION 160.0 160.0 MIPI"T ADMINISTRATION 2.5 2.5 OTHER 162.5 162.5 --------- 0.0 ----- ----- ----- ----- ----------- ---- ---- ---- -- 0.0 0.0 0.0 0.0 TOTAL. COST TOTAL PRIOR APPRO- APPRO- PRIATIOH8 -----------_-_-..-.� FUTURM FUNDINQ---------------..-r-> 1992-99 19--- FUNDING SOURCES FINDING PRIATIONS 1939-90 --------- 1990-91 1991-92 - ------ ---- --------------------r-- r--Yrr--r "� --------------------------------- --------- X 1000 ) 241 CONVENTION CNTR REVENUE BONDS 162.5 162.5 ---------------_ - ----- ---------- ---------------------------------- TOTAL FUldJ2N0 162.5 --------- 162.5 ----- ---- 0.0 ---------0.q, 0.0 0.0 0.0 0'• G' k COMPLETION DATE 09/30/89 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. 420011 PROJECT NAME s MIAMI CONVENTION CENTER - REFURS. 8 EGUIPMT. FY'68 ADDRESS : 400 SE 2NO AVENUE NBRND LuuATION s 263 NORM SERVICE : 900 PROGRAM : 005 PUBLIC FACILITIES CATEGORY ^ : 053 AUDITORIUMS DEPARTMENT : 035 CONFERENCES AND CONVENTIONS PROJECT MANAGERS 993 TONY PAJARES FIRST YEAR IN CAPITAL PROGRAM : FY88 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE _ INITIAL REVISED COMMENCE DESIGN 11 / 67 AWARD CONTRACT 02/48 SEWN CONSTRUCTION 03/88 BENEFICIAL USE 05/88 PROJECT COMPLETE 07/88 09/89 COST CATEGORIES LAND ACOUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES 241 CONVENTION ONTR REVENUE BONDS ------------------------- TOTAL FUNDING t AS OF OS/29/89 ------------------------ ------------------------------------ I PROJECT DESCRIPTION: t i I The complex prograwmsd ter conventions, contereness. t ! concerts, sports •vents, and comunitV has boon in us& t ! since 1982 and it is recommended that replacement OILt ! existing carpeting for the major areas be, dons in order ! ! to properly maintain a first class tacilifty end to, t I comply with various agreements that the City here, in t ! this project. The existingcarpet is being replaced; t ! with new carpet and paver tile. Also deteriorated with t I plaza the is bean repaired. A recommendation was ! ! also "do to instal aisle curtains in the $000 seat t ! main auditorium. With aisle curtains this auditorium t ` 1 can be separated into smaller sections allowing con- t ! cert promoters and other convention and businsss people, 1 1 to use the auditorium wore frequently. ! ! --------------------------------------------------- -------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS �-------------------------' ESTIMATE PRIATIONS lost-t0 logo -*I 1991-92 1992-98 199i-94 1"4-99 --------- --------- --------- --- - ---- ------ ----------- --------- .... i X 1000 ) 262.5 262.5 ------0.0 ------ -------- ------ ------0.; �----0.0 PRIOR APPRO- TOTAL FUNDING APPRO- PRIATION8 PRIATIONS 1969-90 4----------- -------- FUTURE 1990-91 1991-92 --------- FUNIU :--- ----- -----------' 1992-9i 1998-94 1994-9E -----------•--------------- --------- --------- --------- --------- 4 s X 1000 262.5 262.5 ------..-.r rr....----r 262.5 262.S -. 0.0 _ ----- - ----- - 0.0 0.0 ----- -- 0.0 0.0 0.0 COMPLETION DATE 09/30/89 F m CITY OF M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT No. a saaOSS PROJECT NAME. RENOVATION OF MANUEL ARTIME COMMUNITY CENTER ADDRESS : 900 SW 19T ST NBRND LOCATION t 776 NBRND SERVICE : 776 PROGRAM : 005 PUBLIC FACILITIES CATEGORY t 053 AUDITORIUMS DEPARTMENT s 045 COMMUNITY DEVELOPMENT PROJECT MANAGERo 454 PABLO CANTON FIRST YEAR IN CAPITAL PROGRAM s FY65 FIRST YEAR OF APPROPRIATIONS : FY68 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 07/06 AWARD CONTRACT 12/86 07/8S BEGIN CONSTRUCTION 02157 Oe/se BENEFICIAL 118E PROJECT COMPLETE 06/07 12/89 COST CATES RIES ------------------------- LAND AOOUQSmON DESIGN CONSTRUCT20)U EQUIPMENT ADMINISTRATION OTHER TOTAL COST PRIOR APPRO- TOTAL COST APPRO- PRIATIONS ESTIMATE PRIATIONS 1989-90 --------------------------- 30.0 30.0 440.0 440.0 50.0 30.0 ----- --------- ----- —-------rr $00.0 500.0 0.0 0.0 TOTAL FU DZNG SOURCES FINDING --------------------- --- --------- So FLA CULTURAL FACILITIES GRANT 200.0 $50 FLA STATE DIRECT APPROP - FYI$ 500.0 ---------------------------------- TOTAL FINDING 500.0 PRIOR APPRO-------- . FUTURE FUNOSHIS APPRO- PRIATIONS <----------- PRIATICNS 1969-90 1990-91 1991-92 1992-98 - -------- --------- --- - ------------! ( •XI000) 200.0 300.0 ------ ------ rrr------ --------- 500.0 0.0 0.0 0.0 0.0 REVISION DATE 07/20/69 19 AS, OF 0SM/80 ..fi ----------------------- -----------------------------r----rrr I PROJECT DESCRIPTICNs ;. I This proposal for the renovation of the Manuel ArIbm F I. (Little Havana) Comunity Center to convert th* k I oxistin church suditerlus to a 724 seat iuli a�+Ipped ) I coswuni y theatre. It will alas bring the exist it, f I building up to buiidinq and the cede standarder an I is expected to reduce the City"• present level s9 ! I suboidy for the Center's operation. € ----------------------------------rrrrrrr.r.rrrrrrrrrrrirrrrrr <--- ------ FLffURE COST ESTIMATES 1991-92 1992-98 t!lt-" 3994-90 --- -------------- '-r--'r-----rr—rrrr C a X 1000 ) e' r—rrr—rr— rrr-err-r.r t. .►rrrr-w.-..rr-rrrr+rr> �a 119E-� 1914-1E ".�, C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 08/29/69 PROJECTNO. : 415002 PROJECT NAME i COCONUT GROVE EXHIBITION CENTER - REN. 8 EXPANSION ------------------------------------------------------------ ! PROJECT DESCRZPTICNt ! ! ADDRESS : $360 PAN AMERICAN DRIVE ! ! This project consists of the renovation and expansion ! 394 NBRt� LOCATION s 394 ! of the Coconut Grove Exhibition Center. Renovation of ! NSRHO SERVICE s t the exlstin facility will include life safety and code t PROGRAM s 005 PUBLIC FACILITIES PUBLICAUDITO ! ! complLane* improvements. The expansion consists of 45,000 square fast of flexible tint floor epees, which ! ! CATEGORY" : 005 UMS ! is column frost site improvements includin a now funding DEPARTMENT : 053 031 PUBLIC WORKS PUBLIC ! entrance/drop oft area and related work. in t PROJECT MANAOERa I. POM8 ALLAN! the amount of •5 million is being provided by the Mimi t FIRST YEAR IN CAPITAL PROGRAM : FY86 ! ! Sports and Exhibition Authority with an additional 02 million in City Funds. The prefect will be complete ! ! FIRST YEAR OF APPROPRIATIONS s FY88 ! in October 1969 for the American Society of Travel PROJECT SCHEDULE : ! Agents Conference. ! INITIAL REVISED ! ! COMMENCE DESIGN 10/87 ! ! ! AWARD CONTRACT 06/68 ! ! BEGIN CONSTRUCTION 07/88 ! ! BENEFICIAL USE 08/89 ------------------------------ PROJECT COMPLETE 08/89 ------------------------------ TOTAL COST PRIOR APPRO- APPRO- PRIATIONS <---------------FUTURE COST ESTIMATES---------------s 1991-92 1198-14 COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 --1914-95 r-1l92-98 -- -- ---------- - LAND ACQUISITION 665.0 665.0 DESIGN CONSTRUCTION 6368.0 6368.0 EQUIPMENT DMINISTRSTRATION 46.0 46.0 OTHER421.0 421.0 ----- - -----------------------� -0.0 TOTAL C08T--------------- -- 7500.0 7500.0 -- 0.0 ----- 0.0 0.0 0.0 0.0ti TOTAL FUNDING SOURCES FUNDING ------------`----------- - -------- - 148 CONTRIS b- SPORTS 6 EXHIB. AUT 5500.0 799 FY'89 SUNSHINE ST. BOND PROCOS 2000.0 ------------------------- --------- TOTAL FUNDING 7500.0 PRIOR APPRO- FUTURE Ftbl)M -------------- s APPRO- PRIATIONS <------------ PRIATIONS 1989-90 1990-91 1991-92. 1992-98 119s-94 119S-1 ---- r----------------- ( • X 1000 ) 5500.0 2000.0 ---isoo.o------o.o------0.0 REVISION DATE Oi/091st 0.0 ---------------o - --r-----r----r---r 0.0, 0. [;I: ass C I T Y O F M I A M I CAPITAL IM OROVE ENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 420012 PROJECT NAME s MIAMI CONVENTION CENTER - REFURB. 6 EQUIPMT. FY'89 ADDRESS S 400 S.E. 2ND AVE. NBRHD LOCATION 1 243 NBRHD SERVICE : 900 PROGRAM S 005 PUBLIC FACILITIES CATEGORY S 053 AUDITORIUMS DEPARTMENT s 035 CONFERENCES AND CONVENTIONS PROJECT MANAGERS 993 TONY PAJARES FIRST YEAR IN CAPITAL PROGRAM s FY88 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE s COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EOUIPMENT ADMINISTRATION OTHER TOTAL COST INITIAL REVISED 11/88 10/89 08/89 11/89 04189 12189 06189 01/90 09/89 TBD TOTAL COST ESTIMATE 20.0 96.0 FUNDING SOURCES ------------------------- 241 CONVENTION ONTR REVENUE BONDS ----AL-----iD---------------- TOTFUHINO PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1989-90 ------------------ 20.0 96.0 AR OF 06/29169 ----------------------------------rr-.r I PROJECT DESCRIPTIONS t t I t The complex programim d for conventions, eentereneese t I concerts, sports events, and community has boon in use N' I since 1982 and it is recommended that replacement et f I finish** and fixed equipment for the major areas be I I done in order to properly maintain a first class I I facility and to comply with various agreement* that N I the City has in connection with this project. I' I Both the Hotel and the Univer*ity are redecorating and. N I the City needs to make comparable improvements. The I ! building is about six E61 years old and tho consul- f I tant's report is recommended replacement of wall N I finish**, painting of interior and exterior surfsaas I I and replacement of fixed major equipment in the central I I plant. N I � I I ------------------------------------------------------------ <--------------- FUTURE COST ESTIMATES ---------------I 1990-91 1991-92 1992-98 1998-94 1994-96 --- - ---------------------- ----- U 0 X 1000 I --- --- ----- ----- ----- ---------------------.. 116.0 116.0 0.0 0.0 0.0 0.0 0.0 0'. t4�;-' PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------------ FUTURE FUIN1ZM------------------ FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-94 I998-94 1994-091 ---------------------------; --------- --------- --------- --- -- - ------ 1 X 1000 1I6.0 116.0 — _ ---- 116.0 -------- 0 --------- --------------- -0 ------------------------ 0 REVISION DATE 07/20/B9 IF a IR It, It, It"A C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 419006 PROJECT NAME : PIER FIVE MARINA FACILITY - PRELIMINARY EXPENSES ADDRESS t MIAMARINA HBRHD LOCATION t 263 NBRHD SERVICE t 263 PROGRAM : 005 PUBLIC FACILITIES CATEGORif : 054 MARINAS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGER: 981 JOHN GILCHRIST FIRST YEAR IN CAPITAL PROGRAM : FY66 FIRST YEAR OF APPROPRIATIONS t FY86 PROJECT SCHEDULE i INITIAL REVISED COMMENCE DESIGN 07/85 AWARD CONTRACT 10/85 03/89 BEGIN CONSTRUCTION 10/85 09189 BENEFICIAL USE 02186 10/89 PROJECT COMPLETE 02146 09/89 TOTAL COST PRIOR APPRO- APPRO- PRXATIONS COST CATEGORIES ------------------------- ESTIMATE --------- PRIATIONS --------- 1969-90 --------- LAND AOGUISITIOw1 DESIGN CONSTRUCTION 50.0 $0.0 EGUMPMENT Affi=STRATXON 10.0 10.0 OTHER ------------------------- TOTAL COST --------- 90.0 --------- 90.0 --------- 0.0 jl PRIOR APPRO- TOTAL APPRO- PRXATXONS FUNDING SOURCES ------ FUNDING --- - -- PRIATIOHS --------- 1989-90 -------..- 670 DINR KEY MARINA RET EARNINGS , 90.0 90.0 •-.r-rrrrrr�.--- 'TOTZ FUNDING ---- ---- 90.0 --------- 90.0 ..---- --•- -0.0 A$ OF 06/29189 ------------------------------------------------------------ t PROJECT DESCRIPTIONt t ) t This project involves the construction of 3% commorcial t I boat •lips At Miawarina parallel to the North pavillen 1 I of the asyyeimm do Sppecialty Center. The coerelal elipe t I will provide doakage spade to the Piar Five boatmen f I who were relocated while ea side was under construc- t tion. The improvements include widening at the quay t t side, installing now finger piece and providing t I amenities for commorcial fishing and tour beats. It 1' I not placed on Miamerina Renovation Pro set limestone t I r!p rap will be Installed as a wave at enuator and fiafr t I habitat under the expanded walkway settlement agreement t I with pier five boatman requires completion by Xoptew- t I bar $9. t t 1` t t'' t -----r---------------------------------rr..-.----------rrrr.. <-----r--------- FUTURE COST 99TIMAT"-------- ----r-s 1990-91 1911-92 .1s92 sa 1910-9'4 1"4-90 --- ------ ------------------ rr-Nrr-rr.-_ • X 1000 ) r - - - - - - - -----r-N ---d*- rr------�' --- - 0.0 0.0 0.0 0.0 0.0 <---- ----- - - PUTUM FUNOM -rr-rrr----rr------'yN.. 1990-911991-92 1992-99 199i-14 j990•-' --- -- ---- -----------r-�Irrrr--r---.-r-' -t 0 X 1000 ) ------- ---------Nr-- • --------- 0------.0 0.0 0.-0.0 0'.0 ' COMPLETION DATE 09/30/69 j CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION PROJECT NO. : A54009 PROJECT NAVE : BAYVISTA MARINA ADDRESS : 71 ST 4ND BISCAYNE BAY NBRNO LOCATION : 191 NBRHD SERVICE : 191. 192, 111. 112, 113, 114, 115 PROGRAM : 005 PUBLIC FACILITIES CATEGORf : 054 MARINAS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 941 ALFREDO RODRIGUEZ FIRST YEAR IN CAPITAL PROGRAM : FY88 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 10/97 04/89 AWARD CONTRACT 10/88 04/90 BEGIN CONSTRUCTION 12/88 06190 BENEFICIAL USE 06/89 06/91 PROJECT COMPLETE 06/90 06/92 i PRIOR TOTAL COST APPRO- COST CATEGORIES ESTIMATE PRIATIONS LAND ACQUISITION 1000.0 1000.0 DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST - - - 1000.0 1000.0 PRIOR TOTAL APPRO- i FUNDING SOURCES ----------------- - ---- FUNDING -------- - PRIATIONS ----- ---- 253 CERTF. OF PARTICIP. INTEREST 250.0 250.0 342 CAPITAL IMP. FUNDS - FUND SAL. 750.0 750.0 ------------------------- TOTAL FUNDING --------- 1000.0 --------- 1000.0 C AS OF 09129199 4 ------------------------------------------------�_ .__.._.._�. ! PROJECT DESCRIPTION: r I t I This project involves the acquisition and' development t ! of four acres of waterfront and ton acres of b 061tow t I into a marina and passive park in a neighborhoo# where i N no facilities other than beat ramps are prosen,12.' t I available. The land was acquired in earig It" at a N I cost of •1 million. The Planning and permitting t ! process will be in FY•69- Plans will be developed t ! there after to provide a park and marina facilities ! t for about 80 boat slips in this area. t ! Planning studies need to be done prior to deal n, t I federal, state and local porn need is be eb�ained. t ----------------------------------------- ------------------- APPRO- PRIATIONS --------------- FUTURE COST ESTIMATES------------_--Y 1989-90 1990-91 1991-92 1992-93 191t-94 1994-95 --------- ---- ------------------- ------------- ( 0 X 1000 ) - - ----- ----- ----- ----- - --------- -- - ---- ---- ---- ---- -- 0.0 0.0 0.0 0.0 0.0 0.0 APPRO- PRIATIONS - - -- --- FUTURE FUNDING------------------W 1989-90 1990-91 1991-92 1992-93 1997-94 1994-90 --------- --- --- ------------- -------- --------i • X 1000 ) ----- ----- - ----- ------------ 0.0 0.0 0.0 0.0 0.0 0. REVISION DATE 07/20/99 �� R *, wl •N PROJECT NO. s PROJECT a NAB 413004 LUMMUS PARK SEE PROJECT OESCR MARINA ADDRESS s NBRND LOCATION s 264 NBRHD SERVICE 1 264 PROGRAM : 005 PUBLIC FACILITIES CATEGORY" s DEPARTMENT s 054 MARINAS 091 PUBLIC WORKS PROJECT MANAGER: 941 ALFREDO RODRIGUEZ FIRST RF CAPITALPROGRAMs FY54 jPAp PROJECT SCHEDULE s COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES --- -------- ---------- ---- INITIAL 07/54 12/ss 05/68 09/96 09149 REVISED 10/86 10/s9 01/90 TBO C I T Y O F M I A M I AS OF 00/29/60 CAPITAL IMPROVEMENT PROGRAM PROJECTFDDEESSCRIPTION l--PROJECT-DESCRIPTION: t t This project lnvolvas lnprovontt to Cltg-awnad ! warina lacillties at a site along the Mlowl Rivers ! adjacent to LUVAsus Perk including the 1114101 Plensers ! Club. !' ! The iaProvewent• involve now boat slips along a ! renovated bulkhead with renovated upland imPrsvasrents. ! The project Include relecotinj the Mlan#i Pioneers ! Club and i.uwaue Park. A private oontributlen e! t ! •50,000 has boon received towards this project. ! ! t t__-___----..-.w----r_rr--------------------r_--r__-..tr__-----i PRIOR APPRO' ------ FUTURE COST ESTIMATES--_-•---rr----9 R TOTAL COST APPRO- PRIATIONS--------- 1992-90 1910-94t 191A-911 ESTIMATE pRIJ►TIONS lost -to 1990-91 1991-92--------------r--- ------------------ -- t i X 1000 t LAND ACQUISITION 255.0 DESIGN 294.0 29.0 CONSTRUCTION 5.0 EQUIPMENT 26.0 21.0 -------. DMINISTRATION OTHER----- OTHER --- --- - -a10.0 ---- ---- -5a.a ------0.0 ------ --------- --- 260.0 -0.a - ----- 0.0 ------------------------- TOTAL COST ~ IOR APPRO- _ _ -----------------� TOTAL AFRO- pRIATIONS 1959-90 <--------------t9--92 1990-91 1tt 199S-94 --_-i. FUNDING PRIATIONS --------- FUNDING SOURCES --------- _"- ------_-- --------- --------- t 0 X 1000 ---------------D 52 PRIVATE DEVELOPER CONTR IBUTIQN 50.0 $0.0 ----0 -_ -O.0 __ _---_--..' _-__--0 --__--0.0 0.0 UINRN:1CiERM�E sot_ --- - ----- --------- ----- --- -0.0 --- - __- -__-_ -260.0 0 ----------- -FUNDING- 510.0 $0.0 TOTAL REVISION DATE 0612518' PROJECT NO. s 413007 PROJECT NAME s MIAMARINA RENOVATION - PHASE I ADDRRsS s SEE PROJECT DESCRIPTION NBRHU LOCATION s 263 NBRHD SERVICE : 263 PROGRAM : OOS PUBLIC FACILITIES CATEGORY ° s 054 MARINAS DEPARTMENT : 048 DEVELOPMENT PROJECT MANAGERS 961 JOHN GILCHRIST FIRST YEAR IN CAPITAL PROGRAM : FY87 FIRST YEAR OF APPROPRIATIONS : FY87 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 01/86 AWARD CONTRACT 01/87 BEGIN CONSTRUCTION 02/87 BENEFICIAL USE 05/87 PROJECT COMPLETE 05/67 COST CATEGORIES ----------- 't------------- LAND AOMISITION DESIGN CONSTRUCTION EQUXPNENT OTHER STRATION TOTAL COST FUNDING SOURCES ------------------------- 670 DIM KEY MARINA RET EARNINGS -TOTAL FUNiDINA ------------ i C I T Y O F M I A M I CAPITAL IIWIIOVEM104T PROGRAM PROJECT DESCRIPTION FY90 AS OF 081291" ---------------------------------------- 1 PROJECT DESCRIPTION: 1 ! E 1 This projeet consist of the renovation of Pier* Ar It, r 1 and C at Mlamorina. The renovation include* the r ! removal of the existing concrete deck slab* on th* t 1 piers, limited repair of the existing conereto dock r 1 slabs on the piers, limited repair of the existing r 1 concrete pile cape, removal of the existing utllAtlesF r ! on Piers 8 and C, installation of now dock panels on r 1 all piers and installation of now utilities on Pier* f 1 B and C. Funding for this contruction job* ere identi- ! tied in the amount of 01,467,000. r . 1 The pro act also includes funding for the reimbursement r ii 1 of the 1,673,000 advanced to the clty by 8ay*ide i ! Center Limited Partnership, as well as the accrued r 1 interest of $375,000, for a total ayment to Bayside r ! Center Limited Partnership of •2,0p0.000. r 1----------------------------------------------------------- r PRIOR APPRO- TOTAL COST APPRO- PRIATXOHS s--------------- FUTURE COST ESTIMATES ---------------►> ESTIMATE PRIATIONS loss-90 1990-91 1991-92 1992-99 1998-94 1994-15 --------------------------- ------ - -----------------------------r- ( SX1000) 3917.0 3917.0 --------- 3917.0 --------- 3917.0 PRIOR TOTAL APPRO- FUNDING PRIATIONS 3917.0 3917.0 3917.0 3917.0 0.0 APPRO- PRIATIONS loss-90 0.0 0.0' %- -------- - FUTURE FUNOX G --- --f 1990-91 1991-92 1992-94 1993-94 1994-90 --------- - -------------------------------- ( • X 1000 ) --------- ---- ----r -_---r - - - - - - - - ---_r - 0.0 0.0 0.0 0.0 0.0 0.0 REVISION DATE 09/16/08 r CITY OF MIAMI AgOF06/291" CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION 1. FY90 PROJECT:NO. i 413013 PROJECT NAME t MIAMARINA - FISHERMEN'S PIER 5 -•-------------------------------------------------�...- 1 PROJECT DESCRIPTION': F ADDRESS t MZAMARINA i This project involves the contructlon of ,S dsI reldA 1 1 MORNO LOCATION t 268 t boat sllps at Mlamarina parallel to the North pavlZtettt NBRHD SERVICE : 263 1 of the Be side Specialty Center. Tltt OOMerelaT shot Plor Five, boatmen f PROGRAM t 005 PUBLIC FACILITIES _ t 1 WILL provide dockage @pace to the who were relocated while Bsyside was under eenstruc- CATEGORY^ s 054 MARINAS DEPARTMENT : 031 PUBLIC WORKS t t tion. The itmwpprovemente include widening of the, quop- aide, Inatslling now Linger ppiers and providing PROJECT MANAGER: 994 AURORA BADIA t amenities for cammsrcisi tithing and tour boats. FIRST YEAR IN CAPITAL PROGRAM t FY39 t 1 N F FIRST YEAR OF APPROPRIATIONS t FY89 ! f PROJECT SCHEDULE t t t _ 1 INITIAL REVISED COUMECOONTRACTN 1 AN t^ BEGIN CONSTRUCTION t N BENEFICIALUSE ---------------..r...rrr..� PROJECTCOWPLETE ----------------------------------- COST CATEGORIES LAND AOOUIBITZOM OESIGN QONSTRUCTION E0U2PlEHT ADMINISTRATIONOTHER --r------�---- TOTAL C08T PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <------------- - FUTURE COST Kamm** r---- -a...s ESTIMATE PRIATIONS lost-90 logo-911991-92 1992-90 1998-94 1904.9 ---- ---- ----- r-------- --------- r---r-- rF ------------------------ --- ----- c • x 1000 104.6 184.8 1820.0 1320.0 26.4 26.4 ---r--r- --r---r- ------------------ ------------------ ----- ---- -r 1531.2 1591.2 0.0 0.0 0.0 0.0 0-M TOTAL FUNDING SOURCES FUNDING ---��------------------ --------- ST BONG PROCDS 15t11 2 PRIOR APPRO-FUTURE FUNOM APPRO- PRIATIONB <--------- --------- PRIATIONS 1989-90 1990-91 1991-92 1992-98. ------------------ ----- ------------ r-------- (-• x 1000 7l9,F1f it SUNBNIlE ------1531_2 --- ..ram------------------- - ----- TOTAL FUNDING 1531.2 1531.2 ------ 0.0 {0.0 0.0 0.0 REVISZON DATE 00/191*9 C I T. Y O F M I A M I AS OF 00I29/89 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 414005 PROJECT NAME s GINNER KEY MARINA - RENOVATION/EXPANSION ADDRESS s $400 PAN AMERICAN DRIVE NBRND LOCATION s 394 NBRHD SERVICE s 900 PROGRAM : 005 PUBLIC FACILITIES CATEGORY' s 054 MARINAS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 983 ALLAN I. POMS FIRST YEAR IN CAPITAL PROGRAM s FY79 FIRST YEAR OF APPROPRIATIONS s FY86 PROJECT SCHEDULE s COMMENCE DESIGN AWARD CONTRACT BEG *CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION ADMINISTRATION._ OTHER TOTAL COST INITIAL 11182 11/82 07/83 09186 REVISED 04186 12/88 12/87 10189 TOD ------------------------------r---rr- ! PROJECT DESCRIPTION: C ! t ! This projsat consists of the renovation and expanslosa F ! of the exlsting Dinner Key Marina frow,374 to $42 ! ! boat slips and related i rovesents, while keeping than •!' ! facilities in operation. The project includes construe- f ! tion of 7 now plors, ronovalion of queyslde boat slips, t ! including the coaorcial area, new undorground ! ! utilities, replacement of doteriorated beat rasp and t ! bulkhead, improved roads and parking, a new landscaped ! ! baywalk, and related marina improvements and public t ! amenities. ! ! t ! M ---------------------------- -------- -------- ----- -------r.:.: PRIOR APPRO- ----- FUTURE COST ESTSM US TOTAL COST APPRO- PRIATIONS <---------- —"-r-"-""""�" ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-OS 1993-94 1994-90- --------------------------- --- ------------- ------------------ i x 1000 ) 700.0 700.0 10312.0 10312.0 1150.0 1150.0 500.0 500.0 200.0 200.0 ----------------------------------- --------------- 12862-.0 12862.0 0.0 0.0 0.0 0.0 0.0 TOTAL FUNDING SOURCES FUNDING 670 DIM KEY MARINA RET EARNINGS 442.5 799 FY'89 SUNSHINE ST BONG PROCOS 500.0 996 SUNSHINE STATE REV. BONDS POOL 11919.5 --------------------------------- TOTAL F1INDINB 1Z862.-0 PRIOR APPRO- APPRO- PRIATIONS •------------------ FUTURE FUN03M PRIATIONS 1969-90 1990-91 1991-92 1999-93 ------------------ ---`-t X 1000------ 762.0 12100.0 -12662.0 �9l�-94 1914-9'S -r-rr--r- 319.5- 500.0 180.5- -- __ --------------- -r..r_ 16 [#>�aaa-ZINC-�HNhltihh7 PROJECT NO. : 313011 PROJECT NAME: s MIAMARINA RENOVATION - PHASE II ADDRESS : SEE PROJECT OESCRIPTTON NBRHO LOCATION : 268 NSRND SERVICE s 263 PROGRAM s 005 PUBLIC FACILITIES CATEGORY s 054 MARINAS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERS 983 ALLAN I. POMS FIRST YEAR IN CAPITAL PROGRAM s FY90 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 10/89 Tao AWARD CONTRACT 06190 BEGIN CONSTRUCTION 08/90 BENEFICIAL USE 08191 PROJECT COMPLETE 12/91 COST CATEGORIES LAND ACQUISITION DESIGN EC�UIPMENTI� ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------- 099 UNDETERMINED ---------------------- TOTAL FUNDING C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 A$ OF 08/tf/6f ----------------------- ------------------------------------- t PROJECT DESCRIPTION: t ! The project consists of the reconstruction of existing t ! pigs A. Bs and C now piling and wave attenuater for t ! the Marina Basin. The wave attenuater will reduce t ! the heave prolonged ■eve action which has plagued the t I Marina since its construction. t' ! Now construction will replace existing deteriorated t I structure and improve or repair deficlonoies in newly] !' ! completed Marina construction. The work will be a t ! companion to the new pier five marina facility planned t I for the commercial boat slips adjacent to the North t I Pavillion of Bayside. ! t ! t ! t ! t ---------------------------------------------------------..-.. e PRIOR APPRO- TOTAL COST ESTIMATE APPRO- PRIATION8 PRIATION8 1989-90 --------------- FUTURE COST tfTZM M------------- 1990-91 1991-92 1992-98 199i-94 --------- --------- --------- --------- --------- --- t • x ---- 1000' 375.9 $75.9 2635.0 2685.0 53.7 $3.7 _ ---_- .... aiii.6 0.0 - --- 0.o -- aiii.s ----- o.o --------- o.o ----- 0.0 Q.o� PRIOR APPRO- TOTAL FUNDING APPRO- PRIATIONS PRIATIONS 1969-90 ------------------ FUTURE 1990-91 1991-92 ---- FUHMM 1992-99 --------- ------------ -------'" 19f3-" 19"-96 --------- --------.., --------- --------- --------- _-_ t x 1000)' 8114.6 3114.9 --------- $114.6 0.0 0.0 8114.6 0.0 0.0 ------ --- 0.0 --------- 0.0 1190 Woo NOW 42 ARE k�m SO- Mr�,40,71�r hl _�AAC, ir�n v.'1r�".k'`"%�#G.. NOR 57' et . . . . . . . . .... 's IA Kr Q A �K INTRNTIOXAI�Lt !i*AdWMKJ V 21 VMS -PAGE WQ ­v 4 my iS 7` Lltvv� own, OR C I T Y O F M I A M I CAPITAL IUMVEML74T PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. & 341096 PROJECT NAME : EDGEWATER STREET IMPROVEMENTS - PHASE I ADDRESS t SEE P40JECT DESCRIPTION NSRHD LOCATION t 243 HBRHD SERVICE : 243 PROGRAM t 006 TRANSPORTATION CATEGORY t 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER& 311 LEONARD HELMER$ FIRST YEAR IN CAPITAL PROGRAM t FY01 FIRST YEAR OF APPROPRIATIONS : FY85 PROJECT SCHEDULE = INITIAL REVISED COMMENCE DESIGN 00/84 00194 AWARD CONTRACT 00/65 09/65 BEGIN CONSTRUCTION 00/85 01/36 BENEFICIAL USE 00/36 12/86 PROJECT COMPLETE 00/66 10/48 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------- OiS logo HIGHWAY Q.O BONDS 875 19#4 STORM SEWER Q.O. BONDS ------------------------ T TAL FUNDING ' t AS OF 00129109 ! PROJECT DESCRIPTIONa ! ! This project consists of rebuilding strsets in thw t ! Edgewater area bordered by HE 20 St-, NE 351A Terr-. ! Biscayne Blvd., and Bloeayno Say. r 1 ! Improvement* will include asphaltic pavement, cencroto ! ! curbs and/or utters, concrete sidewalk. store ! drainage, bulkhead repairs and landscaping. ! ! t ! ! ! ! ! ! ----------------------------------- ----------------- TOTAL COST PRIOR APPRO- APPRO- PRIATIONS •-----------"----------•---`y --- FUTURE CAST ESTIMATES 1992-98 1995-94 1914-90 ESTIMATE PRIATIONS lost-90 1990-91 - 1991-92 --•- --------- ----«- « -«----- --------- --------- --------- --- •X 1000 ) 102.0 102.0 2041.0 2041.0 12.0 12.0 225.0 225.0 ----- 2300.0 2300.0 0.0 0.0 0.0 0.0 0•D 0-== TOTAL PRIOR APPRO- APPRO- PRIATIONS ------------------ FUTURE 1991-92 FU 1992-94 --«-'"-`•-'--1994-" loos-14 1994-t FUNDING PRIATIONS 1999-90 1990-91 --------- ---------- • X 1000 ) 1460.0 1400.0 900.0 900.0 ----- --------. _ --- COMPLETION DATE:,09/SO/S! I 11 PROJECT DESCRIPTION FY90 PROJECT NO. : 341108 PROJECT:.NAME s BUENA VISTA STREET IMPROVEMENTS - PHASE II ADDRESS : SEE PROJECT DESCRIPTION HBRHD LOCATION : 113 NSRHD SERVICE : 113, 114, 115 PROGRAM : 006 TRANSPORTATION CATEGORY" : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: all LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY61 FIRST YEAR OF APPROPRIATIONS : FY65 PROJECT SCHEDULE s COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 00186 02/55 00/66 02166 00186 05186 00/87 12186 00/87 10/87 ----------------- -------------------- r---------rrrrrrrrrrrrr !' PROJECT DESCRIPTION: p t This project is a continuation of street improvemente t ! in the Buone Vista area bordered ayy l4.W. 44 Street ! ! N.M. 54 Street. N. Miami Avenue and N.W. 2 Avenue. 1 ! 1 ! ! Improvements include as haltio pavement. concrete 1 ! sidewalks, concrete ours and/or gutters, store r ! drainage and landscaping. ! ! ! fi ! r t ! 1 ! fi -------r--------------------r-----rrrrrrrr..-rrrrM.rr..-Mrrrs PRIOR APPRO- TOTAL COST APPRO- PRIATIONS 4--------------- FUTURE COST ESTIMATES --r-- WIT CATEGORIES ESTIMATE PRIATIONS 1999-90 1990-91 1991-92 1992-99 19184-14 1994-90 - - -- -------------- ------------ --------- --- ---- ---- ---- --------r -- -� - ( o X 1000 ) LAND ACOUISITION DESIGN CONSTRUCTION EOUXPMENT ADMXNXSTRATX014 OTHER -- ---------------------- TOTAL COST FUNDING SOURCES ------------------------- $63 1940 HIQHWAY 9.0 BONDS 075 1984 STORM SEVER G.O. BONDS ------------------------- TOTAL FUNDING (4 63.0 63.0 1266.0 1266.0 7.0 7.0 139.0 139.0 ---1475.0--------0------------------ ----- 0.0 - - 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS <---------------- FUNDING PRIATIONS 1969-90 1990-91 1991-92F��1992-99 --------------------------- --- ---- --------- t • x 1000 ) - - - - - - - - - - - - - - - -- _` r«-------------- 1998-94 1l94-lS w $75.0 675.0 600.0 600.0 •rr-rrr-r- ----- rr- r--------------r-- --------- rrr-.rrrr rrrr--r-r 1475.0 1475.0 0.0 0.0 0.0 0.0 COMPLETION DATE 09/80/S9 .71 CITY OF MIAMI Ai OF091" S CAPITAL IPROJEC IMPROVEMENT F 9� PROJECT NO. a 341109 PROJECT NAME a WEST LITTLE HAVANA STREET IMPROVEMENTS - PHASE I ADDREfeR s SEE pROJECT DESCRIPTION NORM LOCATION : 471. 472. 493. 771 NBRMD SERVICE : 471. 472, 493, 771, 776 PROGRAM„ : 006 TRANSPORTATION CATEGORY t 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: $11 LEONARD HELMERS FIRST YEAR FY78 FIRST -YEAR OF APPROPRIATIONSM P: FY8S PROJECT SCHEDULE _ INITIAL COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES LAND AC=SITION DESCONSTRUCTION ADMINISTRATION OTHER ------------------------- TOTAL COST 00/86 00186 00/86 00/87 00/87 REVISED 09/8S 07/86 10186 10/97 10/67 ----------rr_rrr. ! PROJECT DESCRIPTION: !' ! This project consists of rebuilding streets 10 the ! West Little Havana area bordered b NM 7tA St.r ! SW 10th St., W. 17th Ave., and W. 174h Ave- ! Construction sill include asphaltic p*ve*srrtr Go"""� ! aida*alk, concrete curb* andlor gutters. star* ! drainage and landscaping. ! C ! 1 --- -------------- '--------------------------------•---------- PRIOR AppRO_ uql ..rr-rr..-r••.... 11 TOTAL COST AppRO- PRIATIONS -••�•• ESTIMATE pRIATi0N8 1961-90 1990-91 1191•!I 3!!Z•!S I�8`'OA l "� - -------- ---- --- --------r --------------------------- ( 4 x 1000 ) 113.0 2282.0 13.0 247.0 2628.0 TOTAL FUNDING 8OURCE8 FUNDING SS& �1980 HIGHWAY 8.0 BONDS 1725.0 875 1884.8TORM SEWER 0.00BONDS _ 900.0 --=-------- --- ------ 2625.0 TOTAL FINDINO* 113.0 2252.0 13.0 247.0 ---------------0.0 26Z5.0 0.0 0.0 0.0 PRIOR APP20-----•---------- fIJTUBlE FUNDZNIBS APPRO- PRIATIONS --- PRIATIONS 1969-90 1990-91 1l91-l2 - ------ -------------------------- ( • x 1000 ) 1725.0 900.0--------- ---------------o.o o.o 262s.0 0.0 co pL mac pATE 09180188 ------- -- o.a rat C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT,HO. s 941111 PROJECT 'NAME s N.N. a STREET -ROAD HIGHWAY IMPROVEMENTS ADDRESS 1 SEE PROJECT DESCRIPTION NORHD LOCATION : 252 MUM SERVICE t 252 PROGRAM s 006 TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FY01 FIRST YEAR OF APPROPRIATIONS s FY46 PROJECT SCHEDULE s COMMENCE DESIGN AWARD CONTRACT OEM CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 00/36 05/06 00/36 05/87 00/86 07/07 00/87 02/08 00/87 10/68 13Z AS OF 00/291" ----------------------- ------------------r------------------ ! PROJECT DESCRZPTIONs t ! This protect ceneiets of rebuildinq N.N. 0 0troot Road t I between N.M. 7 Avenue and N.N. IS Avenuor and N.W. t ! 10 Avenue between N.N. a Street Read and thw East-West I ! Expressway. t ! t t Improvements will include :nod/or pavowent, concrete ! I sidewalks, concrete curbs and/or gutters. store ! ! drainage and landscaping. ! t ! t ! t ! ! ! t t ! ----------- ---------------------------------------------- PRIOR TOTAL FUNDING SOURCES FUNDING d63 1900 HIGHWAY 0.0 OOHMDS 400.0 874 1976 & 1978 STORM SEWER G.O.B. 350.0 ---------------------------------- TOTAL FUNDING 750.0 I. PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1969-90 <------------------ FUTURE 1990-91 1991-92 FU94DWO--- ----- r----------s: 1997-99 190E-94 1994-90 --------------------------- --------- --------- --- --------- a X 1000 ) 400.0 $50.0 --------- ----- ---- --------- -0.0 - 750.0 - - 0.0 --- -- 0.0 -- -0.0 0.0 0.0 COMPLETION DATE 09/30/09 .��....-tea � -.r. r .�... r —';:� � ._.-.., r ..._... ► _..._.. r .�...� r .. r ... _. r:. F C I T Y O F M i A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N0. 1 341113 PROJECT NAME 1 WYNWOOD STREET IMPROVEMENTS - PHASE I ADDRESS S SEE PROJECT DESCRIPTION NBRHD LOCATION 1 241 NBRHO SERVICE 1 241 PROGRAM : 006 TRANSPORTATION CATEGORY s 061 STREETS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGER: all LEONARD HELMER$ FIRST YEAR IN CAPITAL PROGRAM 1 FY85 FIRST YEAR OF APPROPRIATIONS s FY56 PROJECT SCHEDULE's INITIAL REVISED COMMENCE DESIGN 00186 10/85 AWARD CONTRACT 00/86 05186 BEGIN CONSTRUCTION 00186 09186 BENEFICIAL USE 00/87 05/87 PROJECT COMPLETE 00187 10188 TOTAL COST COST CATEGORIES ♦------------------------ ESTIMATE --------- LLEIIAN�ISITION 30.0 CONSTRUCTION 601.0 EOU2P1ENT ADKD418TRATION 3.0 OTHER 66.0 TOTAL COST 700.0 TOTAL •68,1980 HIGHWAY 0.0 BONDS 450.0 875 19S4 MORN SEWER G.O. BONDS 250.0 -..----------------- --- TOTAL FUltflINS 700.0 AO OF 016129/89 --------------------------- -------- ----- M..rr-_---r--rr ! PROJECT DESCRIPTIONS 1' 1 t ! This project consists of reouildfn9 otreets in • ! ! portion of Wynwood bordered bg M.S. 25 Street, 1 N.M. 29 Street, N. Miami Avenue and 11'W'r 2 Awns. r ! Improvements include asphaltic pavement, concrete l 1 sidewalk, concrete curb* and/or gutters, stermr 1' ! drainage and landscaping. 1 ! t 1 F 1 P ! A ! 1 -------------------r--------rN__N_rM-MYf--tl.r--M -1- . I PRIOR! APPRO- APPRO- PRIATIONS <- -- FUTURE COST tiMAT[t ST-+-r-rrrrrrr--rlw f -1991-92 PRIATIONS 1949-90 1990-91-- 1992-90 1990-94 1994-90' --------- --------- --- -r-- r--rr-rrr -..rr-r..r►r r+r.r.�w.rrr.kr,. , t •x1000)- $0.0 601.0 3.0 66.0 PRIOR APPRD- PRIATIONS TAiPTPPRROO- PRZATIONS 1989-90 1---------r--- - runNot 1990-91 1991-92 rtmoserM.rrr-r.r.rrsrrr-r-rr 1992-95 �h 1990-94 1!l4-1 --------- --------- --- ---- N---- -------- --------- -----r-- t • x 1000) r 450.0 250.0 --- ----- -700.0 --------- 0.0 ----rr--- 0.0 -------rr 0.0 ----r 0.0 --------- 0.01 ------- a.a COWLETION DATE 09/84189 j� • PROJECTNO.. s 341118 -------------------------------------------------r--------rr PROJECT NAME s ALLAPATTAN STREET IMPROVEMENTS -PHASE II 1 PROJECT DEBCRIPTIONs ADDRESS s BEE PROJECT DESCRIPTION 1 D HBRHD LOCATION 1 632. 633 t This project is a continuation of street ImprovoNnto E' NBRND SERVICE s 632, 633, 634 1 in the Allapattah area bordered bg W.V. 28 Streatt, 1 N.N. 21 Street, NW 181h Ave., and NW 27th Ave. PROGRAM s 006 TRANSPORTATION ! D !` CATEGORY : 061 STREETS ! Inprovoments include asphaltic pavewsnt, conerstn DEPARTMENT : 031 PUBLIC WORKS 1 sidewalk, concrete curbs andfor gutters. me 0 ! PROJECT MANAGER: 311 LEONARD HELMERS 1 drainage and landscaping. f FIRST YEAR IN CAPITAL PROGRAM : FY81 ! 1 ' FIRST YEAR OF APPROPRIATIONS : FY86 ! PROJECT SCHEDULE s ! M INITIAL REVISED t P COMMENCE DESIGN 00/87 03/86 ! i AWARD CONTRACT 00/87 02/67 1 r BEGIN CONSTRUCTION 00187 04/87 1 i BENEFICIAL USE 00/89 02/89 t PROJECTCOMPLETE 00188 10/86 -------------- -------------- -------•---•--••ram-..r�r....r.-.+-r.+- PRIOR APPRO- COST CATEGORIES TOTAL COST ESTIMATE APPRO- PRIATIONS PRIATIONS lost-90 --------------- FUTURE COST ES'fI INX-'+-------"--"-"> 1990-91 1991-92 1992-98 1!l8rld 1914-10 ------------- ------------------------- --------- --------- --------- ---i- • x l000 � LAND ACQUISITION y DESIGN 97.0 97.0 CONSTRUCTION 1930.0 1930.0 I EQUIPMENT ADMINISTRATION 11.0 11.0 OTHER 212.0 212.0 TOTAL COST:- ------- - -----;2-C:0 ---2250.0 ------0.0 ------0.0 _ ------0.0 0.0 __ _ ----- �.0 PRIOR APPRO- ' FINDING SOURCES TOTAL FUNDING APPRO- PRIATIOHS PRZATIONS 19s9-90 <------------------ FUTUAM INS10M 1990-91 1991-92 19"-98 --- ----- r—------- -rr 199�-9: -------1S ; --------- --------- ------------------ ---------.----..r - - ---- --------- i x 1000) $63 1950 HIGHWAY 0.0 BONDS 1450.0 1450.0 $75 1984 STORM SEVER G.O. BONDS $00.0 $00.0 s TOTAL FUNDING 2250.0 2250.0 0.0 -------- ----- - ----------- 0.0 0.0 0.0 ------------------ a. 0.0 0.0 , COMPLETION DATE 09/80/89 C I T Y OF M I AN I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 341152 PROJECT NAME , CITYWIDE STREET IMPROVEMENTS - FY•87 ADDRESS : CITYWIDE NBRHD LOCATIONS 900 NBRHD SERVICE s 900 PROGRAM : 006 TRANSPORTATION CATEGORY s 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERS 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FY86 FIRST YEAR OF APPROPRIATIONS s FY87 PROJECT SCHEDULE S COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFIOIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITM DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST INITIAL 00/86 00187 00/87 00/88 00/66 REVISED 00/09 AS OF 00/29/00 ------- --------------------------r--- � PROJECT oESCRIPTiON, 1 1 This projaot aonsiets st ipreYin streets that have ! 1 detsrioratad to !As extent that C ly toraa+St as* ne 1 1 longer maintain the streets In a e490 aondstlen. t 1 t 1 1 1 1 1 t ! 1 ! T 1 F 1 h 1 1 ------------------------------r-rrr----rrrr---..r..rrrrr.�rr.r..r PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COMT EMI MATEM. rrr------..-----s ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-98 1998-04 1094-90 --------- --------- --------- --- ------ ------------r-- • X 1000 1 fUNQING SOURCES ---------------- 863 1950 HIGHWAY 4.0 BONDS 36S 1930 HIGHWAY G.O. BONDS -67,SL 875 1984 STORM SEWER G.O. BONDS ----'�-------------------- TOTAL FUNDING 52.0 52.0 1530.0 1530.0 6.0 6.0 112.0 112.0 1700.0 1700.0 0.0 0.0 0.0 0.0 o.a o�r� PRIOR APPRO- TOTAL FUNDING APPRO- PRIATIONS PRIATIONS 1989-90 <------------------ FUTURE 1990-91 1991-92 Ft NW4 1992-98 ....... rrr-w--i1� 1998-94 10104- --------- --------- --------- --- ---- --------- ---rrrrr- rrrrrr-is. l • X 1000-1 1300.0 1300.0- 1300.0 1300.0 400.0 400.0 -- 1700.0 -- 1700.0 --------- 0.0 ---- ----- --------- 0.0 0.0 ----- 0.0 _-------'-.. r0+0 -0..0 COMPLETION oATE `0lr�3af�: , nlWlll 11 I � PROJECT NO. ; 941066 PROJECT NAME : LATIN QUARTER STREET IMPROVEMENTS ADDRESS : SF< PROJECT DESCRIPTION HBRHD LOCATION : )ii NBRHD SERVICE : 777 PROGRAM : 006 TRANSPORTATION CATEGORY' s 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERo $15 JOSEPH H. OWSIAK FIRST YEAR IN CAPITAL PROGRAM s FYSO FIRST YEAR OF APPROPRIATIONS t FY60 PROJECT SCHEDULE i COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES -------- - ------------ ---- LAND ACQUISITION DESIGN CONEQUIPMENT TZON ADMINISTRATION THER TOTAL COST FUNDING SOURCES ------------------------- 142 US C01iMkRCE EDA FUND -r"'------------ TOTAL FUNDING i C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 INITIAL REVISED 00/79 00/S1 00/31 00/82 10/86 00/86 09/89 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS ------------------ 199.0 1672.0 129.0 199.0 1672.0 129.0 t 36 AS OF 00/29/09 ------------------------------------------------------------ I PROJECT DESCRIPTION: r ! t ! This project consists of improving selected streets in r 1 the Latin Quarter area bordered bV SW Sift St., SW 10th I I St.. SW 12th Ave. and SW 17th Ave. The project has ! ! boon divided into 3 phases. Phases 1, 2 and 3 have ! ! been completed. ! ! Motorpolitan Dade County constructed Phase 4 (SW 17 t ! Ave.) Improvements including asphaltic pavement. ! ! Concrete sidewalk, decorative brick sidewalk, concrete t ! curbs and gqutters, storm drainage facilities, docora- ! I tivo •treat lighting and landscaping. ! t ! ! t ------------------------------------------ ----------------- APPRO- PRIATIONS--------------- FUTURE COST ESTIMATIES---------------� 1959-90 logo-91 1991-92 1992-98 itts-94 1994-95 ------------------------- --------------- ( s X 1000 ) -- ----- ----- ----- ----- ----- --- ----- -------- ---- ---- ---- ---- - ---- 2000.0 2000.0 0.0 _ 0.0 0.0 0.0 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS .- --- FUTURE FUNDING ------------------> FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-99 1996-94 1994-SS ----- ---- -- --- ------------- ---- ----- --------- rrrr-rrrr •rr-rrrrr. ( s X 1000 ) 2000.0 2000.0 --------- -- - ----- - ----- ----- - ----- ----- ----- ---- -- --- ---- --- ---- ---- ---- 2000.0 2000.0 0.0 0.0 0.0 0.0 0.0 0.0 , . al v C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PRCJECTFDDEESCRIPTION PROJECT NO- 1 $41090 PROJECT NAME = MANOR STREET IMPROVEMENTS - PHASE III : SEE PROJECT DESCRIPTION HBRHD 123 HBRHO SERVICE : 129 RAM: 006 TRANSPORTATION CCATEGORRY^ s 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER& 311 LEONARD HELMERS FIRST YEAR M FY79 FIRST YEAR pF APPROPRIATIONS s FY83 PROJECT SCHEDULE a INITIAL REVISED COMMENCE DESIGN 00/03 00183 AWARD CONTRACT 00/43 00/98 BEGIN CONSTRUCTION 00/64 00/84 BENEFICIAL USE 00/34 00196 PROJECT COMPLETE 00184 10169 COST CATEGORIES - _•_--- _-- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENTADMINISTRATION OTHER TOTAL COST }ACING SOURCES ----- ------------------ PRIOR COST T0ESTIMATE. NS --------- PRIATTXO --------- 49.7 49.7 991.3 991.3 109.0 109.0 1150.0 1150.0 PRIOR TOTAL APPRO- FUNDING PRIATIOHS AS OF 00/20189 ---------------------------------------------------- 7-PROJECT-QEBCRipTION= t ! This projee# consists of rebuilding streets in e ! ! portion ai Model Olty bordered bW HW 44th St., ! ! NM 49th St., HW 71h AVe., and NW 12 Ave. t ! t ! Construction Includes asphaltic pavewent, aonorste � ! sidewalks, concrete curbs and/or gutters, etorw ! ! drainage and landscaping. t ! is •esentially aospleted and final ! ! Construction t ! paysants will be Bade in FY190. ! ! t ! ! ! ! ! f ! ! ! ------------------ ----------------- ----------- -------------- APPQO- -- FUTURE COST E=TIMATEB---------••• ---s pRIATIONS-_•---•--' igtl-92 1l92-l3 299i-94 1l14-911 lost-90 1910-91-------- ---- -------------{-t X 1000 )�--- --------� -------- 0.0 o.o _ -a.o .0 APPRO- FUNDINIS _-______ __ ,. PRIATIONS --------------91-92 19t2-9s--------- -------«, --------------------------- c * x 1000 ? 063 Igoe HIGHWAY 0.0 B 731.0 731.0 - -_--- -_--__------ ------_----- 419.0 731.0 -_-" -- $74 1976 s 1978 STORM 0.0.8- - -- ---------- ------ --------- 0.0 0.0 0.0 ----------�------------- -- 0.0 0.0 -0.0 TOTAL FUNDING•-1150.0 1150.0 w REVISION OATS 05116/99 a: " =Z IFE nmiiin �n I PROJECT NO. 1 341094 PROJECT NAME 8W 16TH 8TREET IMPROVEMENT ADOlNcS9 & SEE PROJECT DESCRIPTION NBRwu LOCATION & 492, 499 MUM SERVICE & 492, 493 PROGRAM : 006 TRANSPORTATION CATEGORY" & 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERt $11 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM % FY63 FIRST YEAR OF APPROPRIATIONS t FYs4 PROJECT SCHEDULE & INITIAL REVISED COMMENCE DESIGN 00/33 00/83 AWARD CONTRACT 00/84 07/84 BEGIN CONSTRUCTION 0e/84 10184 BENEFICIAL USE 00/85 01/96 PROJECT COMPLETE 00/85 10/89 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION CONSTRUCTION 1213.0 ADMINISTRATION 29.0 OTHER 132.0 ------------------------- TOTAL COST --------- 1435.0 TOTAL FUNDING SOURCES -----------r------------- FUNDING --------- C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION "DO AS. OF 001".*99 r r-----r--w r-r-r rrrll.ririrr./ PROJECT DESCRIPTION& 1 ! This proeat consists of rebuilding SI► 36ttM !t. ) ! Aotwen M 17th and 87th Ave., and Sat 2041v Qt'. 1 ! from OW 16th St. to approx. 300 it. north. 3 ! Construction will inelude asphaltic pavement, 1 ! concrete sidewalk, oonerots cures and/or outtors, r ! *taro drainage and landscaping. 1 ! Construction is essentially completed and tinaA. t ! payments will be *ado in FYt90. E ! 1� ! t r ---- r--------- -..--rr-------- -r----rrrrrr--rrr-r--.r.rr-----r- PRIOR APPRO- APPRO- PRIATIONS t- --- FUTURE COST ISI MATEt rrrrrrr�-r-r.rsrs PRZATIONS lost -to ltt-ol- -st-92 1992-9s 191G-94 3994-06 ------------------ --- ------------r rrw-r---r rrr-rrw-r i * x 10)-- 61.0 1213.0 29.0 132.0 --------- ---------------o.o---------------p-o 1435.0 0.0 PRIOR APPRO- PRIATION8 86S 1980 W&WAY 0.0 BONDS 961.0 961.0 074 19764 197S STORM OEM A.Q.B. 474.0 474.0 w--wr-rr------w----r--r -- --- -- --- TOTAL FLING 1435.0 1485.0 rk APPRO- PRIATIONS t-------- T-------- - FUTURE FUN03M 1989-90 logo-91 1991-92 1992--98 --------- --- ------r------ t s x 1000 ) ----- ----- ------------------ 0.0 0.0 0.0 0.0 REVISION DATE 05/16/69 ----- -------rr. ------------------- r` 3998-96 --------- 1994-90` --------- E j a. G. O. i T PROJECT NO. : 341103 PROJECT HAVE s NORTH RIVER DRIVE STREET IMPROVEMENTS ADD RES8 : SEE PROJECT DESCRIPTION NBRHD LOCATION : 264 NBRHD SERVICE : 264 PROGRAM s 006 TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD FELMERS FIRST YEAR IN CAPITAL PROGRAM : FY83 FIRST YEAR OF APPROPRIATIONS : FY65 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00/85 02165 AWARD CONTRACT 00/65 03/67 BEGIN CONSTRUCTIONd 00/85 07/87 BENEFICIAL USE 00186 03/88 PROJECT COMPLETE 00/86 10/89 COST CATEGORIES r LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION. OTHER — ----------------------- TOTAL COST -----------------------------r----r--r---------r--m---.ter----. ! PROJECT DESCRIPTIONS r t ! This project consists of rebuilding North River Drive, r ! between SW 2nd Ave., and N9 ath Strout. r ! r ! Improvements will include aopMltia pavoNnt, oonorutu ! ! and decorative brick sidewalk, osnarste orubt sneer t gutters, storm drainage and landscaping. r ! r ! This project is under construction. r ! r t The design of the decorative pavement and sidewalk r ! has been coordinated with the design of the i.ummu0 ! ! Park Development. t' ----------------------------------------------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- F11TtiME COST EBTiMIATES----------- - s• ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-99 1998-94 1994-96 --------------------------- --- -- --rrrr—..�Ih.tl- 8 x 1000 ) $7.0 1741.0 10.0 192.0 2030.0 TOTAL FUNDING SOURCE$ FUNDING 684 PROP. i LEASE MANG. ENT. FUND S00.0 $63 1920 HIGHWAY 9.0 BONDS 1200.0 1741976 8 1978 STORM SEWER G.O.B. 330.0 -----------rr------------- --------- TOTAL FUNDING 2030.0 $7.0 1741.0 10.0 192.0 --- --------- 2080.0 0.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1949-90 500.0 1200.0 330.0 - 2030.0 --------- -----r------------r—r----- 0.0 0.0 0.0 0.0si ----------------- FUTUIME FU NJU Mi--------------�_-...s 1990-91 1991-92 1992-95 199i.94 19l+f- --- ------ c x 1000 ) ------ ..—..—r..----------rr. 0.0 0.0 0.0 0.0 0.0 O.Op REVISION DATE 08/10/SS 89F-8t1� � Ilpplll PROJECT,.NO : PROJECT -HAVE s ADDRESS" � HBRHD LOCATION s NBRHD SERVICE t CATTEEAORY' : DEPARTMENT : PROJECT MANAGER: C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT OESCRIPTION FY90 341105 BE OVERTOWN/PARK WEST STREET IMPROVEMENTS -PHASE I SEE PROJECT DESCRIPTION 251, 263 251, 263 006 TRANSPORTATION 061 STREETS 081 PUBLIC WORKS 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY81 FIRST YEAR OF APPROPRIATIONS : FY68 PROJECT SCHEDULE s COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 00186 07185 00/96 05/87 00186 09/87 '00/87 05/88 00/87 Too AS of ow"160 ------------------•--------------------.-------.r---.�---r--r-+-. ! PROJECT DESCRIPTIONS 1 t This pro act consists of rseuildingg streets in the SE f ! Overtown�park Nest areas bordered by NW 6th St. f 1 1-395, I-96 and Biscayne Blvd, inaluding the osnstrno- f t tion of a Boulevard between N.N. 5th Street and N.N. f 1 10 th Straot. Lprovoments will include asphallIC f ! pavement, concrete sidewalk, concrete curbs and/or f ! yyuttors, store drainage, and landscaping. f t Project entails land acquisition design and construe- f t tion This Street will create a gateway to the Aron&: f t and the S.E. Overtown/Park !rest Project. f ! f : f t f ! f t 1" t f ! f -------------------- -------------------------------------- PRIOR -------- APPRO- ------ FUTURE COST ESTIYAI t-- ----- r TOTAL COST APPRO- PRIATIONS �--------- COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-98 1918-94 1994-90 ---- ------------- ------------------------------ --- --------------------------------- t x 1000 ) LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST 3164.0 1008.0 3640.0 206.2 3164.0 440.0 1820.2 129.6 566.0 3819.8 76.4 --- -- ----- - ----- 10038.2-5574.0 0.0 .4464.2 -0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS------------- ---- FUTtMiE ttNOlild FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1!l2--93 ---------- ---------------- --------•------------------- --- - -------------' ( s x 1000 ) 40 REiMBURBMNT FROM PORT OF MIAMI 250.0 724 FED RAILROAD LOAN 1700.0 $35 FEO RAILROAD GRANT 1700.0 664 1980 HIGHWAY 0.0 BONDS 1724.0 $64 1990 HIGHWAY G.O.B. 80 SL -INT 200.0 899 UNDETERMINED 4464.2 TOTAL FUNDING 10038.2 4. --------- ----------------------- 0.0 0.0.0. 0.0 .. 0 W I s 250.0 1700.0 1700.0 1724.0 200.0 4464.2 --------------------------- 0.0 4464.2 REVISION DATE 07/21/69 i � � f �illl, �I; �IIIHII;yIIN,tii!,ti �I ti� ,�l ,y ,ti ;ti C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AG OF 08/29/89 PROJECTN0. : 841115 PROJECT NAME : DOWNTOWN STREET IMPROVEMENTS - PHASE II ------------------------------------------------------------ ! PROJECT DESCRIPTION: t ADDRESS : SEE PROJECT DESCRIPTION HBRHD LOCATION : 263 I t street r This prola ebuildtdq NBRHD SERVICE : 263 t in the centraleatis business distrlataontlnuatlen.at t PROGRAM- : 006 TRANSPORTATION 1 t Improvements will include asphaltic pavowent, esnereft t sidewalk, concrete curbs and/or gutters, and stores t CATEGORY : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS ; drainage modifications. PROJECT MANAGERS 331 LEONARD MELMERS f t FIRST YEAR IN CAPITAL PROGRAM : FY78 t t t FIRST YEAR OF APPROPRIATIONS : FY86 ! t,. PROJECT SCHEDULE : t f t INITIAL REVISED ! t COMMENCE DESIGN 00/87 05/88 f t AWARD CONTRACT 00/47 05/89 ! t BEGIN CONSTRUCTION 00/67 07189 t t BENEFICIAL USE 00/88 04/90 PROJECTCOMPLETE 00/88 00191 ! -------------------- ------------- -- -- - - -�`+ -- PRIOR APPRO- -r----r-----r-! --- 1990-91 1991-92 1!!2-l8 1l18-9f 1!!!t-lEIE COST CATEGORIES ESTIMATE PRIATIONS 1949-90 ---- --------r ---------------r-.- - ------------ ------------------------- ---------- • X 1000 ) LAND ACQUISITION 'DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER --- ------------------- TOTAL COST 86.0 1716.0 10.0 168.0 2000.0 TOTAL FUNDING SOURCES FUNDING - --------------- 792 1970 NOWAY G.0- BONS -47 SL 1237.0 868 1980.NI4HWAY G.0 BONDS 138.0 675 1984 STORM SEWER A.O. BONDS 400.0 886 1980 NOWAY 0.0 BONDS - 86 SALE 225.0 TOTAL FUNDING 2000.0 $6.0 1716.0 10.0 188.0 _ _ ------ ' --- --- --- o ------------------ --------- --------- _ 840 PRIOR APPRO- PRIATIONS APPRO- PRIATIONS------------------ FUTUK 1989-90 1990-91 1991-92 FUND" 1992-98 ---- --------- -----i! 1!!8`-94 1!!6-W --------- --------- --- -rr--r-- --------- --------- -------- � • X 1000 ) 1287.0 138.0 400.0 225.0 --------- 2000.0 ------------------ ---r--- r 0.0 0.0 0r.0 r------rr o.a ----r---- r--rr-..r.r a.a a.tt 1:t I ffo IIIIIIIIIII I i 142 CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 341116 PROJECT NAME S MORNINASIDE STREET IMPROVEMENTS ADDRESS a SEE PROJECT DESCRIPTION NBRHD LOCATION : 191, 192 NBRHD SERVICE : 191, 192 PROGRAM- : 006 TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY80 FIRST YEAR OF APPROPRIATIONS : FY86 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------ ------------ LAND ACQUISITION CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST INITIAL REVISED 00/86 03/47 00/86 01/90 00/86 03/90 00/87 10/90 00187 00/91 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS 103.0 103.0 2059.0 2059.0 12.0 12.0 226.0 226.0 ------------------ Z400.0 2400.0 FUNDING SOURCES 860 1980 HIGHWAY A.O. BONDS -47 SL 875 1984 STORM SEWER G.O. BONDS ------------------------- TOTAL FUIDIIIG k APPRO- PRIATIONS AS or Get"/S9 F i -----------------NiiMirYr.► i PROJECT DESCRIPTIONS k. This proj00% consists of rebuilding detsrierated streoto n the Mornin9sid* area borders& by HE 55th Torr.. HE flat St.. Biscayne Bou=ovor# a" Biocayne Bay. improvements will include asphaltic pavemsnty concrete sidewalk, concrete curb* and/or qutter*p storm drainage and landscaping. <--------------- FUTURE OOST ESTIMATES---------------s 1990-91 1991-92 1992-92 1"8-#4 1994-08 --- ------------- ----------r-....r-i- ( • X 1000 ) --------------- -------- --- ---------- 0.0 0.0 0.0 0.0 PRIOR APPRO-NS ---rrr--- FUTU/1E iUNOINR TOTAL APPRO- PRIATIO<--------- FUNDING PRIATIONS 1969-90 1990-91 1991-92 1992-98 --------------------------------------------- ( t X 1000 ) 1400.0 1400.0 1000�0 1000.0 --- ------- 2400.0 2400.0 ------o.o------o.o REVISION DATE 05116/89 ------------ ------ ------------------o Q.0 0.D -------------------s•, 1!l8-94 1994-le�!r 1 ---------------- -- DID 0.0° • •, PRIOR APPRO- PRIATIOHS 116.0 2316.0 13.0 255.0 2700.0 PRIOR APPRO- PRIATIONS 900.0 1500.0 rr ..rrrr 2700.0 APPRO- PRIATIONS 1989-90 ------c.o APPRO- PR ATI N9 AS or 06/29109 ---------- -----------'------rrr-- ! PROJER CT SCRIPTZONs t ! Th proiect is a continuation of street rebuilding F ! Exproesw&Vt NW 54thr Parkrea St., X-95�and 1hr 9004 sitg ltwits. t 1 ) ! Construction will include asphaltic W0106411, conoretsi t 1 sidewalk, concrete curbs and/or gutters, sterw f ! drainage and landscaping. ---r----- -- FUTURE Cm ESTMM, v 1990-91 1991-92 1992-98 199i-94 1914-99 --- -------- ----- ------------- t t X 1000 ) — —----------rr----- ------0.0------0.4 -- - -0.0 0.0 as (---------------- FUTURE rummm —---------r—N<t.n 1990-91 1991-92 iota tS 1M— 94 3194-60 --- -- - ---------- ------'--rs- r..rrrrripY4 .. t f It 1000 ) --r-- rrrrrrrrr- rrr-rrrr+k 0.0 0.0 0.0 Dow o.� C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 341119 PROJECT NAME s MANOR STREET IMPROVEMENTS - PHASE IV ADDRESS : SEF PROJECT DESCRIPTION NBRHO LOCATION s 12:1 NBRHD SERVICE s 123 PROGRAM s 006 TRANSPORTATION CATEGORY^ : 061 STREETS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERS 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FY33 FIRST YEAR OF APPROPRIATIONS : FY86 PROJECT SCHEDULE s INITIAL. REVISED COMMENCE DESIGN 00/87 11/86 AWARD CONTRACT 00/87 09167 BEGIN CONSTRUCTION 00/37 12187 BENEFICIAL. USE 00/35 I1/53 PROJECT COMPLETE 00/88 11/89 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION DESIGN 116.0 CONSTRUCTION 2316.0 EQUIPMENT ADMINISTRATION 13.0 OTHER 255.0 TOTAL COST 2700.0 TOTAL FUNDING SOURCES FUNDING $75 1904 STORM SEWER G.O. BONDS 900.0 fSS; 19A0 '"WAY• 0.0 BOWS - 56' SALE1900.0 TOTAL FUNDING : 2700.0 i 0 I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO- PROJECT NAME : $41121 s SILVER BLUFF STREET IMPROVEMENTS ADDRESS : SEE PROJECT DESCRIPTION HBRHD LOCATION : 392 NBRHD SERVICE : 392 PROGRAM : 006 TRANSPORTATION CATEGORY t 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY83 FIRST YEAR OF APPROPRIATIONS : FY87 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT AODMINISTRATION OR TOTAL COST INITIAL REVISED 08/87 00/88 00/90 00/88 00/90 00/89 00/91 00169 00/91 TOTAL COST ESTIMATE 90.0 1802.0 10.0 198.0 2100.0 TOTAL FUNDING SOURCES FUMING 792 1970 HGiAY G.O. BONDS -87 SL 50. N0 863 1980 HIGHWAY 0.0 BONDS 50.0 579 HIGHWAY G.O. BONDS-UNAUT. 993 STORM SEWER- G-O- BONS -UNAUT 700.0 --- --------- - --- - -- -- -- - - - TOTAL FUNINO 2100.0 46 PRIOR APPRO- PRIATIONS 90.0 10.0 100.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - — - - ----------------rrrr.. 1 PROJECT DESCRIPTION: 1 ! 1 ! This project consists of rebuilding ssloetedt strsert9 1 in the area bordered byy S. Dixie Hi�ghwaV, Coral Wayr M 1 SW 27th Ave.. and 80 82nd Rd. ! Improvement* will include asphaltic payse»nt, osnorsts r 1 sidewalks, concrete curbs and/sr gutters, stersx f ! drainage and landscaping. ! M ! r ! r 1 M ! h ! M i 1 --------------------------------------- APPRO- ------ FUTURE URE COST ii l Kelm -me r----rrrrrrrirr►� PRIATIONB <--------- 1969-90 1990-91 1991-92 1992-93--1998-9d 199r-lll --------- --- -------------------- ( • X 1000 1802.0 198.0 - -- ---------��y. --------- --------- ----- A.. Q ---r ------0.0 •2000.0 0.0 PRIOR APPRO- - FUTURE FtNZM1G�- - - - - - - - - - - - - -----' APPRO- PRIATIONS <------------------ PRIATIONS 1969-90 1990-91 1991-92 1992-98--Y9l8-91 - 1191 10 ------------------ ----( -- )--- f X 1000--� --- 50.0 50.0 1300.0 ----70Q 0 100.0 0.0 2000.0 REVISION DATE OS/16/89 0..0 0.0 0.0 9.0, At--��!ti�lHll-ti C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. 1 341122 PROJECT NAME : BUENA VISTA STREET IMPROVEMENTS - PHASE III AODWSS t SEE PROJECT DESCRIPTION NBOW LOCATION t 113, 114, 115 NBRHO SERVICE 113, 114, 115 PROGRAM t 006 TRANSPORTATION CATEGORY^ t 061 STREETS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGERt 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM t FY63 FIRST YEAR OF APPROPRIATIONS : FY47 PROJECT SCHEDULE t INITIAL REVISED COWIENCE DESIGN 00/88 09/97 AWARD CONTRACT 00/90 00/90 BEGIN CONSTRUCTION 00/88 00190 BENEFICIAL USE 00189 00/91 PROJECT COMPLETE 00/89 00/91 COST CATEGORIES ------------N----------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT OAA � STRATION TOTAL COST TOTAL COST PRIOR APPRO- APPRO- PRIATIONO ESTIMATE -------- - PRIATIONS 1949-90 ------------------ 90.0 90.0 1802.0 10.0 10.0 198.0 --------- 2100.0 ------------------ 100.0 0.0 TOTAL FUNDING SOURCES FUNDING 792 1970 HGWAY G.O. BONDS -87 SL $3.0 363 1980 HIGHWAY 0.0 BONDS $0.0 $ill 1930 HIGHWAY G.O. BONS -87 SL 17.0 976 HIGHWAY G.O. BONDS-UHAUT. 1300.0 993 STORM SE'MER. G.O. BONS -UHAUT 700.0 TOTAL FUNDING 2100.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1969-90 --------- --------- $3.0 $0.0 17.0 AS OF oE/29/89 -------------------------------- -- r----r rr--r-r--r-r-- PROJECT DESCRIPTIONt � ! This pro1oot is a continuation of etrset Improvestonte 1 1 in the Buena Vista area bordered bE that Airport E f Exprosoaay, NM 54th St., I-95, and the F'.E.C. i 1 Railroad. F f i 1 Improvements will include asphaltic povemeht, oonerltor l 1 oidosalk, oonoroto curbs and/or guttere, stomp 1 ! drainage and landscaping. ! ! 1 f 1 ! r ------------------------------N---------.•-N <- --- FUTURE am ESTIMATEt----•»--------- s iota-l1- 1991-92 1992-90 1998-94 1994-90 --------- ------------------ c 8 x 1000 1 1402.0 1l8.0 <• --- N---•1--N..--1--M-� 1990-91 1991-92 1992-90 19950-94. 1914-1* ---- ---- --------- --------- --------�.. f a x 1000-) 1500.0 700.0 --- --- ----- - ----- 100.0 0.0 2000.0 { REVISION DATE 01/16109 ----- --- ------------------ --------- 0.0 O.0 0.0 Oh.Ot S' CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FT90 PROJECT No. : 341123 PROJECT NAME : SHENANDOAH STREET IMPROVEMENTS - PHASE II ADDRESS z SEE PROJECT DESCRIPTION NSRHO LOCATION : 493 NBRHO SERVICE : 493 PROGRAM : 006 TRANSPORTATION CATEGORI' t 061 STREETS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAG,ERs 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FY58 FIRST YEAR OF APPROPRIATIONS : FY57 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EaUSPMENT ADMINISTRATION OTHER TOTAL COST INITIAL REVISED 00/55 11/67 00/55 00/90 00/55 00190 00/59 00191 00/59 00/91 PRIOR APPRO- TOTAL COST APPRO- PRIATIONS ESTIMATE --------- PRIATIONS 1949-90 ------------------ 90.0 50.0 1502.0 10.0 195.0 2100.0 --50.0 - 0.0 TOTAL FUNDING SOURCES FUNDING $65 1950 HIGHWAY 9.0 BONDS $0.0 $76 HIGHWAY G.O. BONDS-UNAUT. 1550.0 995 STORM SEWER. G.O. BONDS -UNAUT 700.0 TOTAL FUNDING 2100.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1959-90 50.0 $0.0 0.0 AS; or 0S/2!/99 ------------------------------------- ---------------------- PROJECT DESCRIPTION: � ! Thi• project consists of rebuilding selected stresAw, t 1 in the 8 enandash area bordered bV 20 16th St., t ! SM 22nd St., SW 121h Ave-, and SW 27tR Ave. 1 t ! Improvements will include asphaltic. pavement, Cofterstor t ! sidewalk*, concrete curbs and/or gutters, store t fdrainage and landscaping. t 1 t ! t t t ! f -------------------------------------------.-------------- �-------------- FUTURE COST ESTIMATES ----------••••---, 19 20- 91 19 91- 9 2 1 !!2- 9 8 1 "8- 94 1994- 96 ---------------------------.------- ( 0 x 1000 ) 40.0 1402.0 10.0 195.0 --------- ----- ----- .2050.0 0.0 0.9 t--------------- FUTURE FUNIXm 1990-91 1991-92 1992-tt -------------------- < • x 1006 ) -- —, ; 1s50.0 700.0 -- ----- -----.•- ------- - ------ 2050.0 0.0 0.0 0.0 0.0 REVISION DATE 05/16/49 i C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 341124 PROJECT HAVE : EAST LITTLE HAVANA STREET IMPROVEMENTS - PHASE II ADDRESS : SEE PROJECT DESCRIPTION HBRHD LOCATION : 776 NBRHD SERVICE : 776 PROGRAM : 006 TRANSPORTATION CATEGORY" : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY83 FIRST YEAR OF APPROPRIATIONS : FY67 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 12/66 12/66 AWARD CONTRACT ll/S7 06/66 BEGIN CONSTRUCTION 02/86 10/66 BENEFICIAL USE 02169 00/90 PROJECT COMPLETE 00/99 00/90 COST CATEGORIES LAND ACQUISITION DESIGN ECONSTRUCT ION OAR STRATION TOTAL COST FUNDING SOURCES $56 SURFACE'HATER IMP. 6 HANG., F 6S6 1000 HIGHWAY G.O. BONDS -67 $75 1964 STORM SEWER G.O. BONDS ------------------------- TOTAL FUNDING w AS OF 04/29/69 --------------------------------------- ---r-rar--- ----r-rrr ! PROJECT DESCRIPTION: ! This pro ect is a continuation of street tmprsvements t ! in a per ion of Little Navarra borderat b4 9.W. I 1 t Street, S.W. S Street, 9.N. i Avenue and S.W. 12 Street t ( t ! Improvements will include asphaltic pavement, awwreto t ! sidewalk, concrete curbs and/or 9utter3. store *@wars t and landscaping. t t 1 t i t t' ! t i C t t r t r t ! 1 ----------------- M------------N-----------------------rr-r PRIOR APPRO- TOTAL COST 11PPR0- PRIATIONS <-r---- -------- FUT&W COOT E97IMATEI ---ar---....«.r ESTIMATE PRIATIOHS 1969-96 1990-01 1991-92 1992-93 1998-94 1"4-19 -----------------►--------- --r ---------------------- ---------- •-X loco . ■ 107.0 ND SL 107.0 2132.0 2132.0 27.0 27.0 234.0 234.0 2500.0 2500.0 0.0 0.0 0.o a.a a.a a7.® PRIOR APPRO- TOTAL FUNDING APPRO- PRIATIONS PRIATIONS 1989-90 <------------------ FUTURE 1990-91 1991-92 FjjN0m -----•--r-- ------tea" 1992-93 19*5-94 1994-�k: --------- --------- ------r-- --- ----- -- ----- --------- --aa-r-rir- 4 •x1000) 190.0 190.0 1400.0 1400.0 910.0 910.0 I -- -2500.0 - 2500.0 ----- - 0.0 ----r a0.0 ----r-rr- 0.0 ----- --------- 0.0 Q'.Q6 0.0 REVISION DATE 05/16/89 .. _ 01111111111111111 II CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 341126 'PROJECT NAME t MODEL CITY STREET IMPROVEMENTS -PHASE I ADDRESS s SEE PROJECT DESCRIPTION NBRHD LOCATION t 121, 122 NBRHD SERVICE : 121. 122 PROGRAM : 006 TRANSPORTATION CATEGORY' s 061 STREETS DEPARTMENT : 081 PUBLIC WORKS PROJECT MANAGER: 811 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM t FY84 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00/89 00189 AWARD CONTRACT 00/89 00/90 BEGIN CONSTRUCTION 00/89 00/90 BENEFICIAL USE 00/90 00/91 PROJECT COMPLETE 00190 00/91 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION ADMINISTRATION OTHER TOTAL COST PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS 90.0 50.0 1802.0 10.0 198.0 --- ------------ --- 2100.0 50.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS 792 1970 NOWAY G.O. BONS -87 SL 80.0 862 1970 HIGHWAY 0. 0 BONDS -70 SL 20.0 876 HIGHWAY G.O. BONDS-UNAUT. 1850.0 998 STORM SEWER. G.O. BONDS -UNAUT 700.0 TOTAL FUNDING 2100.0 k 80.0 20.0 APPRO- PRIATIONS 1969-90 0.0 APPRO- PRIATIONS 1989-90 -----50.0 •------0.0 4 A0 or Get"Inr rrr---rrr-rrrrrrr-rrr- r---------------------------r..r-rrrrr t PROJECT OE8CRIPTIONt t 1 ! This protect consists of rebuilding selestod streets t! in the northorn portion of the Model MV area t 1 bordered by HN 544h St., NW 71et St., the west Csty F I limits and I-9s. I Improvements will include asphaltic pavement, comwet• t ! sidewalk, concrete curbs and/or guttores *term f I drainage and landscaping. C ! F t 1" ! 1 E ! t -------r-----------------rr-r------ --rr-r--rr- <- --- FUTURE COST EXTIM us-r..r..-......rr.,..rr t» 1990-91 19l1-92 1l92-lS 191i-9t llS --- r ( e X 1000 40.0 1602.0 10.0 198.0 2050. 0 0.0 0.0 9.0 0. w <---------------- FUTURE FUNIX00 ----rrr-----r--- s 1990-91 19l1-92 1999i 801394 19ld-!B --- -------------rrrrrrr.. rr.F.rs.`-.. rr..r.rsi..r ( e x 1000 3 1850.0 700.0 _ -- --------- r--r---- rrrr..rrr rrr-rr-.rrr 2050.0 0.0 0.0 0.0 0#6 REVISION DATE 05/19/69 44-- m--, C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION PROJECT 00. : 341127 PROJECT NAME s WEST LITTLE HAVANA STREET IMPROVEMENTS -PHASE II ADDRESS : SEE PROJECT DESCRIPTION NBRHD LOCATION s 471, 472, 493, 771 NNW SERVICE : 471, 472, 493, 771, 778 PROGRAM s 006 TRANSPORTATION CATEGORY" : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FY84 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 00/09 00/99 AWARD CONTRACT 00/19 00/91 BEGIN CONSTRUCTION 00/89 00/91 BENEFICIAL USE 00/90 00/92 PROJECT COMPLETE 00/90 00/92 COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST TOTAL COST ESTIMATE 90.0 1802.0 10.0 198.0 2100.0 TOTAL FUNDING SOURCES FUNDING ---------- ut-------------- --------- 792 1970 HOWAY A.O. BONDS -87 SL 50.0 076 HIGHWAY A.O. BONDS-UNAUT. 1350.0 993 STORM SEINER. G.D. BONDS -UNAUT 700.0 TOTAL FUNDING 2100.0 4. PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1999-90 ------------------ $0.0 PRIOR APPRO- APPRO— PRXAT20HO PRIATIONS lost-90 ------------------ 50.0 50.0 0.0 AS OF 08/29/89 ------------------------------------------------------------ ! PROJECT DESCRIPTION: t ! t ! This prc!eci is a continuation of street Improvemnts ! ! in the western portion at Little Haven& bordered t ! by the NW 7th St., SW 161h St., W. 171h Ave., and 1 ! W. 27th Ave. f ! ! Construction will include asphaltic pavesiont, cenarsts F ! sidewalk, concrete curbs and/or gutters, store sewers r iand landscaping. ! t ! f ! F t F ! f ! f -----------------------------------------------------....M...... <--------------- FUTURE COST ESTIMATES ---- --- ------ --• 1990-91 1991-92 1992-98 loot-90 1"4-90 --- ---- -��--� �..--------- . 4 a x 1000-) 40.0 1802.0 10.0 19s.0 -zo-5o.0 •0.0 0.0 �- --- ---- FuTm F100INN--...��----- .»--- * i 1990-91 1991-92 1992-98 loos-94 --- ----- ------------------ -------+•' -x 1000 1 1350.0 700.0 -- ---- ----- ------------ ------ ----- ------ ---- 2050.0 0.0 OiO 0.0 Q.O.. REVISION DATE 05/16/69 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT OEBCRIPTZON FYIO PROJECT NO. x 'A41128 PROJECT NAME s EAST ALLAPATTAN STREET IMPROVEMENTS -PHASE ZI ADDRESS s SEF PROJECT DESCRIPTION NBRHD LOCATION s 651, 635, 635 NBRND SERVICE : 631, 635, 636 PROGRAM s 006 TRANSPORTATION CATEGORY- s 061 STREETS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERs $11 LEONARD 14ELMERS FIRST YEAR IN CAPITAL PROGRAM s FYSA FIRST YEAR OF APPROPRIATIONS x FY&S PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 00/S9 00/S9 AWARD CONTRACT 00149 00/91 BEGIN CONSTRUCTION 00189 00/91 BENEFICIAL USE 00/90 00/92 PROJECT COMPLETE 00190 00/92 AS OF 09/29/8*"` ----------------r.r-s-1-.r-rr.i-----r+.r.. ! PROJECT OESCRIMO14S 1 ! 1 ! This projett consists of the rebuilding at sslsots# 1 i streets n the eastern portion of Allapa4tah bordersxl ! ! bV the Airport ExpresowsV, S.R. $34, I-95, and ! 1 NW 17th Ave. C ! Improvements will include asphaltic paveoent, aonersts 1 ! sidewalk, concrete curbs and/or gutters, store 1 drainage and landscaping. ! 1 ! 1 ! i ! 1 ! t ! 1 ! 1 t It : ! ------------r---r-----------r------------r--r------- r------- PRIOR APPRO- TOTAL COST COST CATEGORIES ESTIMATE ----------------------- ------ APPRO- PRIATIONS PRIATIONS 1989-90 --------------- FUTURE COST ESTIMATES---------------s 1990-91 1991-92 1992-98 1"9-94 1994-95 --------- --------- --- S X -rr-r---- I004 1 --------- ---'------. .-.►------- LAND ACQUISITION DESIGN 90.0 $0.0 40.0 ON COMMENT 1802.0 1402.4 AOMINISTRATION 10.0 10.0 OTHER 196.0 198.0 TOTAL C08Tl-r-rrr-------- --- ---2100.0 ---- ---- 50.0 --------- 0.0 -- -- -- .2050.0 ------ -- 0.0 --------- 0.0 ----------------- " 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS ------------------ PUTtNtE Ft#40M --•- - - - - - - - - - - - - - - 3. a, FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-9i 1993-94 1994-95: -•-------------------------------- --------- --------- --- ---- --------- ------------------ 1 8 X 1000 l 792 1970 NOWAY B.O. BONDS -87 SL 50.0 $0.0 -$79 HIGHWAY 0.0. BONDS-UNAUT. 1350.0 1350.0 998 STORM SEWER. 0.0. BONDS -UHAUT 700.0 700.0. .. ----------- -- TOTAL FUNDING - 2100.0 ---- 50.0 ----- 0.0 - 2050.0 --------- 0.0 --------- 0.0 --------- ----- 0.0 0.0 a -m_ _ REVISION DATE 05/16/49 1 pp "A C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 841129 PROJECT NAME s BELLE MEADE STREET IMPROVEMENTS ADDRESS : SEE PROJECT DESCRIPTION NBRND LOCATION : 191 NBRHD SERVICE : 191 PROGRAM : 006 TRANSPORTATION CATEGORY" : 061 STREETS DEPARTMENT : 081 PUBLIC WORKS PROJECT MANAGER: 811 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY84 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00/89 00/89 AWARD CONTRACT 00/89 00/91 BEGIN CONSTRUCTION 00/89 00/91 BENEFICIAL USE 00/90 00/92 PROJECT COMPLETE 00/90 00/92 PRIOR APPRO- TOTAL COST APPRO- PRZATIONS COST CATEGORIES ESTIMATE PRIATIONS 1969-90 ---------------------------------------------------- LAND ACQUISITION DESIGN 77.0 50.0 CONSTRUCTION 1544.0 EQUIPMENT ADMINISTRATION 9.0 OTHER 170.0 ------------------------- TOTAL COST --------- 1800.0 --------- 50.0 --------- 0.0 PRIOR APPRO- TOTAL APPRO- PRIATZONS FUNDING SOURCES -----+--------- ---- FUNDING --------- PRIATIONS --------- 1989-90 --------- 792 1970 HGWAY O.O. BONDS -87 SL 50.0 $76 HIGHWAY G.O. !BONDS-UHAUT. 1150.0 998 STORM SEWER. G.O. BLS -UNAUT 600.0 -------------------- -------------- TOTAL FUNDING 1800.0 50.0 -----50.0 ------0.0 --- AB OF 06/29/89 ------------------------------------------------------------ ! PROJECT DESCRZPTIONs t t 1 t Thl• pro ect consists of the robuilding of solootod F ! streets �n the Bells Meads area bordered by the t t Little River, HE flat St., Biecayno Bay, and the E t F.E.C. Railroad. E ! t ! Improvements will include asphaltic. pavement, controls, t ! sidewalk, concrete curbs and/or gutters, stone drama- t ! go and landscaping. 1 t t 1 1 t t t ! 1' -----------------------------------------r------N------N-r' --------------- FUTURE COST ESTIMATES---------..rrr-.-: 1990-91 1991-92 1992-98 1995-94 1994-99 --- -------------------------------. 4 • X 1000 ) 27.0 1544.0 9.0 170.0 --- -------- ---------------------- ----------- .1750.0 0.0 0.0 0.0 0.6 � - --- MAW 1990-91 1991-92 1992-98 --- ------------- 4 • X 1000 ) 1150.0 600.0 --------- --------- --------- 1750.0 0.0 0.0 -r---------------t if93-fi 1994-!� , 1 C I T Y O F M I A M 2 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : $41159 PROJECT NAME s RENOVATION OF SIDEWALKS AND STREETS - FY•e6-FY'e9 ArW*RESS s CITYWIDE hmwHD LOCATION s 900 NBRHO SERVICE s 900 PROGRAM s 006 TRANSPORTATION CATEGORY" s 061 STREETS DEPARTMENT s 051 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FY57 FIRST YEAR OF APPROPRIATIONS s FYaa PROJECT SCHEDULE s COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 00/e7 00/33 00/84 00190 AS OF OS/2 M - -----------------------------------------r--.�-rr-s ! PROJECT DESCRIPTION: t Funds will be used to renovate sidewalks and streets 1 ! lnaludlnq streots :hers the existing eurtass how a i dot* riorate4. Reourlaeing helps protest the bee* !" ! amproves the riding surlaae and leproves visual t appearance of local streets. t !: I i ! 1 ! E` I E ------------------------------------------------- ---------- PRIOR A ----- FUTURE COST EiTIMATER TOTAL COST APPRO- PRIATIONS <---------------------r---' COST CATEGORIES ESTIMATE PRIATIONS 1959-90 1990-91 1991-92 1992-93 1993-94 1594-95 ------------------------ ---- ---- ------------- •-------- --------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------- 1247.6 515.6 732.0 15.0 15.0 -------------------------------------------------------------------------. 1265.E 515.E 750.0 0.0 0.0 0.0 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------------ FUTURE FUN03D O FUNDING PRIATIONS 1909-90 1990-91 1991-92 1992-93 ------------------------- --- -• ------------- t e x 1000 ) 792 1970 HG*AY G.O. BONGS -67 SL 76.3 796 SIDEWALK G.O. BONDS 25.4 $48 NEW PORT BRIDGE LAND SL - INT. 15.6 863 1960 HIGHWAY 0.0 BONDS 750.0 397 MUNICIPAL FUEL TAX $95.3 TOTAL FUNDING 1265.6 76.3 25.4 15.6 --}. 1993-94 -- --I9S4+lS 750.0 395.3 ----516.6 ----750.0------D.O------0.0------a.d------0.0 REVISION DATE 06/15/69 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : $41160 PROJECT NAME : LAWRENCE WATERWAY STREET IMPROVEMENT ADDRESS s SEE PROJECT DESCRIPTION NBRHD LOCATION : 694, 692 NBRHD SERVICE : 694, 692 PROGRAM : 006 TRANSPORTATION CATEGORY" : 061 STREETS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY47 FIRST YEAR OF APPROPRIATIONS : FY44 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00187 01/49 AWARD CONTRACT ONGOING 00/49 BEGIN CONSTRUCTION ONGOING 00/49 BENEFICIAL USE ONGOING 00/49 PROJECT COMPLETE 00/92 TBD AS OF 00/29/69 ----------------------------------- -------- I ! PROJECT DESCRIPTIONi ! These improvements Involver small paving and drainage r ! projects that demand immediate, attention such as t t paving all• s, widening lnter*oation*, and improveants r ! in conjunction with subdivision or building impreve, t ! sent*. r 1 This project consists of rebuilding N.W. 17 Place, t ! and N.M. 14 Avenue from H.W. 7 $Arco* to the, 1' ! east -west expressway. Imprevomont* Mill include r 1 asphaltic pavement, concrete sidewalk, concrete, € ! curbs and gutter* and landscaping. To be conetruelodi r' 1 in eoniunction with Lawrence Waterway Ronovation 1 ! Project. r t ! r t 1 1 p -------------------re,.•---------------------- rrrr-rrr-rr-r- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST EiTIMAT99------ ----rrrrti • COST CATEGORIES ESTIMATE PRiATION8 1949-90 1990-91 1991-92 1992-99 1993-94 It" -BEM ---rrrr--------------rrrr -------re, -----re,-- ----- rrrr ---- r - --re, -----rrrr -r-----re, l 4 x 1000 1 LAND ACQUISITION DESIGN 22.0 11.0 11.0 CONSTRUCTION- 430.0 215.0 215.0 ADMINISTRATION - 2.0 1.0 1.0 OTHER 46.0 23.0 23.0 ------------------------- --- --- --- ----r ro.o -----rrr- -----rrrr -----rrrr, TOTAL C08T soo.o zao.o iso.o o.o o.0 0.o . PRIOR APPRO- FUNDING SOURCES TOTAL FUNDING APPRO- PRIATIONS PRIATIONS 1969-90 <------- ----------- FUTURE 1990-91 1991-92 FUNDING 1992-98 .---re,-----_ -rrrr- 191t-94 tll9-9iB - ---r -r ---- rrr -----rrrr r-re,rr-re, -rrrrrrri� _ ------- --- -r--- ---------- --------- --------- --------- --r e x 1000 553 SURFACE VATER IMP. 3 MANG. FND 250.0 250.0 792,1970 NOWAY O.O. BONDS -47 SL 250.0 250.0 ----rrr-- " rrrrrrrrs ------------------------- TOTAL FUNDING --------- 500.0 --------- 250.0 --------- 230.0 --------- 0.0 --------- 0.0 rrr-rrrr- 0.0 O.0 0•S� IL REVISION DATE 08/02/49 "" �^ ■11111111111 II I III C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. i $41175 PROJECT NAME "'CITYWIDE STREET IMPROVEMENTS FY'e9/90 ADDRESS CZTYWZDE NNW LOCATION : 900 NSRHD SERVICE s 900 PROGRAM,, : 006 TRANSPORTATION CATEGORY i 061 STREETS DEPARTMENT " 061 PUBLIC WORKS PROJECT MANAGER: $11 LEONARD HELMERS .FIRST YEAR IN CAPITAL PROGRAM : FYSe FIRST YEAR OF APPROPRIATIONS r FYe9 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00/e9 AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 09/49 00/92 COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN i CONSTRUCTION EQUIPMENT OATS RSTRATION TOTAL COST TOTAL COST ESTIMATE FUNDING SOURCES ------------------------- 45 DADE COUNTY SCHOOL BOARD OONTR SSS 19SO HIGHWAY 0.0 BONGS ------------------------- TOTAL FUNDING 46 51.7 1059.5 5.7 112.9 122e.6 TOTAL FUNDING PRIOR APPRO- PRIATIONS 27.0 5ae.6 3.0 59.0 627.0 PRIOR APPRO- PRIATIONS AS OF 08/29/19 t PROJECT CESCAIPTION: ! These improvements involve small paving and drainage I' I proleats that demand immediate attention amok as !' ! paving alloys, widening intereaetlone, and improvements f I in eonjunation with subdivision or building Improve- f I menu. 1 t ! ! ! t I 1 ! f ! f ! f ! t I I ! t ---------------------------------------------------------- t APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES------------ 19e9-90 1990-91 1991-92 1992-99 199X-94 1994-95 --------- --------- c • x --------- 1000 ) --------------------------- 24.7 520.5 2.7 53.9 ---- 601.e ----- 0.0 ----- -0.0 --------- --- ----- 0.0 �0.0 0.0 APPRO- PRIATIONS <------------------ FUTURE FU 03DO------------------- s 19e9-90 1990-91 1991-92 1992-95 1993-.94 1994-95 -------- - ---- t • x ----- 1000-) --------- ------------------ 28.8 24.e 1200.0 627.0 573.0 ---- - -- --- ---- ---- ----- - --- ----- --- ----- ----- ----- --- ------ - ---- ---- 122e.S 627.0 6o1.e o.o G.o o.G o.o o.o REVISION DATE 05/04/89 ■ r mmk w .war ft.. - y_. CITY OF M I A M I AS Of 00/29/89 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 341176 PROJECT NAME : SOUTH E. OVERTOwN/PARK NEST 7TH 8 9TH STREET MALLS ADDRESS t SEE PROJECT DESCRTPTION NBRHD LOCATION s 251. 263 NBRHD SERVICE : 251, 263 PROGRAM : 006 TRANSPORTATION CATEGORY " t 061 STREETS DEPARTMENT : 046 DEVELOPMENT PROJECT MANAGER: 381 JACK LOFT FIRST YEAR IN CAPITAL PROGRAM s FY89 FIRST YEAR OF APPROPRIATIONS : FY89 PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 09/87 AWARD CONTRACT 12/88 11/89 BEGIN CONSTRUCTION OI/89 01/90 BENEFICIAL USE 06/89 06/90 PROJECT COMPLETE TOD TBD COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES ------------------------ 691 SEOPW TAX INCREMENT TRUST 863 1940 HIGHWAY 0.0 BONDS ------ TOTAL FUNDING 46 ---------------------------------------- ! PRO DESCRIPTION, t This project consists of the planning, deellyn, con - ! struetion and construction administration of the 7th t I and 9th Street Malls. The 7th Street Mall, to be t ! developed between N.N. 3rd Ave. and N.N. 1 Court will t ! be closed to vehicular traffic between N.N. 3rd and 2nd I ! Avenues. It will be a linear ppark primarily for resl- t ! dents of the developments to the north and south of It, t ! and it will be part of the first phase of this project. t ! Between N.N. 2nd Ave. and N.N. 1 Court the 7th Street t ! Mall will be oriented towards adfacent commercial dove- t ! lopment. The 9th Street Mall wi 1 be developed in 3 1 t phases: 1) NW 3 to 2 Avenue, and ! ! Hw I to Miami Avenue ! 2) NN 2 Avenue to NN I Avenue t 1 3) H. Mimi to Biscayne Blv. t rw TOTAL COST PRIOR APPRO- APPRO- PRIATIONS •----------- __-- FUTURE COST ESTIMATES---------------f 1991-92 1992-93 1998-94 1994-SS ESTIMATE PRIATIONS 1989-90 1990-91 ----- --------- --------- --------- ---- 564.3 4917.3 75.2 282.0 207.2 207.2- 181.3 1142.3 35.2 2317.6 65.4 467.1 915.3 551.5 18.8 123.3 263.2 51.0 95.2 6033.1 376.0 0.0 1446.9 2616.2 - 583.5 1010.5 -0•0 TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTURE 1991-92 FUNDING 1992-93 -------------------0 1993-94 1994-916 FUNDING PRIATIONS 1989-90 1990-91 ---- --------- --------- --------- --------- 5657.1 --------- --------- ----( e X 1446.9 10-- ) 2616.2 583.5 1010'.S 376.0 376.0 --------- --------- ------ 6033.1 - 376.0 --------- O.0 --------- 144i.9 --------- 2616.2 583.S 1010.5 Or REVISION DATE 09/02/89 I IN�ININIII I I � C I T Y O F M I A M I CAPITAL IMPWNEIIENT PROGRAM PROJECTFW�IPTION PROJECT qp. :.611177 t t SEE PROF CT D ES� CRIPTiOONCT" AO NUND LOCATION t 112 NBRND SERVICE + 112 + t 006 TRANSPORTATION CC t t 061 STREETS oat PtA34IC WORKS TMy pROJECT MANAGERS $11 LEONARD HELMER9 FIRST YEAR YEAR OF APPPROPRIATIONSS t FY90 PROJECT SCHEDULE t INITIAL REVISED COWIEHCE oESIBN 03/90 04/9 ABEB N CODNST TION 01/90 BENEFICIAL USE 09/90 00/99 PROJECT CDI�LETE TOTAL COST ESTIMATE COST CATE90XES---------- LAND ACaUISMON 25.6 DECONSSIGN 514.4 514.4 3.2 ADMINISTRATION 56.6 OTHER rr------- ------------------- 600.0 TOTA4 COST TOTAL FUNDING SOURCES - FUNDING --.-------r ----------------- 400.0 715 CDBB-- 15TH YR 97 SL 200.0 794 19S4 STORM Q•O BONDS_ --------- 600.0 TOTAL FUNDING a As of 0tt1B�Slk paT. ds -rrrrrrr ---r--rrrr--- ! PROJECT DESCRIPTIONS-------- -- 1 I This pro consists Of rsbuildin awlaAtod! stl►�rat+r ! in thO MUG Haiti n*lghb*rh**d a therS& b� d4r9� bq s 1 R1vor 4 street, Da North MYams Avenue ! 54 street, N.C. 39 street, •voteant, aensrsts � ! and N.E. 2 Avonus. haltic p I Ioprovesents will ineluds asP 1 curbs and/or 9uttars, Otero drainage and IanQssap�in4• t l ! These streat taprovsaen! will Qot#:oh it na now E ! Toussaint L•Ouvsrturs elsoontarg p 1 T 1 l 1 t' i --r-r--r- c --r--------------------------------------r-r-rrrrr APRPRIO PRIATIONS------------- - FUTURE �!2-Bss��1998-94 - - 1m -9M 19t9-90 1990-91 r PRIATIONS-----------r x 1006 1 2S.6 514.4 3.2 S6.A 0.0 600.0 ------0.0 0.0 PRIOR ------------------ 99 ----------- ---- , APPRO- PRIATZONS 1990-91 1991-92 2-98 PRIATIONS 1999-90 ---------- ------- ------- c s x loco 400.0 200.0 ------------------ -----r- ------ ----------- 00.0 REVISION _DATE 07/26/69 r.. r-------- -- - -----rr----rrrr 19lS-9d i777T'�ri•� -rr-rrr-rr rr-rrrrrr ,'.. rr-rr....rr r-..rrrrrr f s �. t► ` I s C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 041101 PROJECT NAME : BRICKELL TRANSIT STATION AREA STREET IMPROVEMENTS ADDRESS # RVE PROJECT DESCRIPTION NBRHD LOCATION t 4u4, 040, 404, 040 NSRHD SERVICE t 291, 292 PROGRAM s 006 TRANSPORTATION CATEGORY" t 061 STREETS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGERt 311 LEONARD HELMERS FIRST YEAR INM ; FYA1 OPRIAT ONSAL FIRST YEAR OF APPROPRIATIONS PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 00/85 00/91 AWARD CONTRACT 00/86 00191 BEGIN! CONSTRUCTION 00/86 00/91 BENEFICIAL USE 00/87 00192 PROJECT COMPLETE 00167 00/92 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST. PRIOR APPRO- TOTAL COST APPRO- PRIATIONS ESTIMATE PRIATIONS 1939-90 33.0 IONS 772.0 5.0 Ali. 0 ----900.0 --- --0.0 PRIOR TOTAL APP FLING SOURCES FUNDING PRIAT ----------- `►----------- -------------------- 576 HIGHWAY O.C. BONDS-UNAUT. 600.0 99& STORM SgWCR. G.0. BONDS -UNAUT 300.0 ------------------------ TOTAL FUNDING 900.0 AS OF G:/29/S9 I-- PRO.7EC77DESCRIPTION: ----------------------------------� I I This project consists of rebuilding selected strowty r in the area bordered by S. 19 Road, Biscayne Say. ! Miami River and I-9S Expressway. improvements will include ::phallic payswsn#, w1d0- walk*, concrete ourbe and/ gutters, store drainage and landscapin4. --------------- FUTURE FUTURE Ow ESTIMATE! ---------------> 1990-91 1991-92 1992-99 19961-94 1994-911 ---- - -- - ---------------------- w--r-r--+� t • X 1000 35.0 772.0 9.0 •5.0 - _ ____ _ ----900.0-"_---0.0 ----_ 0.0 0.0 0.0 •------------------ FUTURE FUNDING -- y 1990-91 1991-92 992 1998-9441994-9, --- --- -- ----------------------------': t• X 1000 ) 600.0 300.0 __ -- ----w ..wwww-rrw --------- -- o: o ---- -- —-_----0.0 --- -a. o w0. 0 0.0 --w---0.0 APPRO- PRIATIONS 1939-90 REVISION DATE 07124169 ► i Iln�llll II I I_ ___I i ..+ ... -n..w-ter.. .._.:: ... -. ... Id:{iliIY�IIiIYuflltlfiiL�Yi'Cllill'i118itail.liuFLll CITY . O F MIAMI CAPITAL PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 041191 PROJECT'NAME : EDISON-STREET IMPROVEMENTS -PHASE IZ `ADDRESS ` s SEE PROJECT DESCRIPTION HBRHD LOCATION 112 NBRlSj SERVICE s 112 PROGRAM „ : 006' TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: $11 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM t FYAS FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 00/90 00/92 AWARD CONTRACT 00/90 00/92 BEGIN CONSTRUCTION 00190 00/92 BENEFICIAL USE 00191 00/93 PROJECT COMPLETE 00/91 00193 COST CATEGORIES I..IIII IiIYllllly�il rIII.IIIIYIIbrIAYiiI�IMiIMill.liMll.11r111111.1� II�MIIMI�WMII�III��M AE OF 06/2f/S! rz4u -r-rr-------------------r -r--rrr.�-r-1ry- ! PROJECT DESCRIPTION: ! ! This project consists of rebuilding selected sero*te to f 1 the Edison Park area bordered by NO 54 $tr, NO 71 Si., f ! I-95, and the F.E.C. Railroad. ! Improvements will include sephollie poveMml, ceeroret* 1' ! sidewalk, concrete curb* and/or gutterer *tors. ! ! drainage and landscaping. f 1 f ! f ! f ! f ! f ! f ! f ! f t !` -----------------------------rr----rrrr-r-rrrrrr-rrr r.rrrr+r-. PRIOR APPRO- TOTAL COST APPRO- PRZATIONS--------------- FUTURE COST 9871"1" ESTIMATE PRIATIONS lost-90 1990-91 1991-92 Iota-l0 Itts-9: 3991-99 --------------------------------------------------------------- 4 0X1000) LAND ACQUISITIONDESIGN 90.0 CON 1T'ION 1602.0 EQUIPMEN ADMINISTRATION 10.0 OTHER 198.0 TOTAL COST 2100.0 TOTAL FUNDIN9 SOURCES FUNDING Y 876,HIGHWAY G.O. BONDS-UNAUT, 1400.0 O `STORN SEWER. G.O. BONS -TAUT 700.0 ------------------------------- TOTAL FUNDING' 2100.0 k 90.0 I�a2.o 10.0 196.0 ----- -r ----- -rrr--rAr Irrrr-r-w�r-'? - ---- -K-0 ----- -0.0 Oro A A 2I00.0 I-l--ww A•. QrY Y'rY . Yam :` . PRIOR APPRO- APPRO- PRIATIONS PRiATIONS 1949-90 <------------------ FU1 1990-91 1991-92 ---- - F1Nefsll!---- ••••-•-----------�' 1992-93 1991-90 ------------------ --r---- -- - - - - ----- - -- --- ---- --- ----- t • X 1000) 1400.0 700.0 --' k 0.0 0.0 0.0 -2i00.0 ------- --------- K0.�•�" ------ REVISION DATE 05/16199 ® = m =I = m 0 .-k 11'-� -J-� lfr C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. PROJECT NAME t 041132 t EDGEWATER STREET IMPROVEMENTS -PHASE II ADDRESS t SEE PROJECT DESCRIPTION NBRHO LOCATION t 242, 243, 295 HSRHD SERVICE : 242, 243, 295 PROGRAM : 006 TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FYdS FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 00/90 00/92 AWARD CONTRACT 00/90 00/92 BEGIN CONSTRUCTION 00190 00/92 BENEFICIAL USE 00/91 00/93 PROJECT COMPLETE 00191 00/93 AS OF 08/29/99' -----------------------------------------------------------f ! PROJECT DESCRIPTIONS t ! ! This project consists of rsbuildin4 sesectod steeete low t ! the Edgewater area bordered byy I-39S, WE it St., the f ! F.E.C. Railroad and Biscayne Oay. ! ! Iaprov4aente will include asphaltic pevownt, conoretf ! ! sidewalk, concrete curbs and/or gutters, stOPIR ! drainage and landscaping- ----------------------------- ------- ..---------•►-----rr.,� TOTAL COST PRIOR APPRO- APPRO- PRIATIONS < FUTURE COST RSTIMATEi---------------' --------- ------ 1991-92 1992-98 1199-14 28118 COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 ---- ----- --------- -------------.--...: - - -- --- ------------ --------- --------- --------- l • x loco LAND ACQUISITION 64.0 DESIGN CONSTRUCTION64 .0 126.0 1244.0 ADMINISTRATION ° 6.0 U20-----_ 1420 OTHER ------------------------- TOTAL COST ----- 1500.0 ----- 0.0 --------- 0.0 --------- 0.0 1500.0 ----- - 0.0 --------------- 0.0 O-MNB- TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------- FUTURE 1991-92 FUNQ2NB 1992-9i --'•--"'------------- 190-94� 199# I ��,���,���{{��/,�� Q FUNDIG SOURCES FUNDING .. PRIATIONS - 1969-90 --••969-90 1990-91 ------- - ------- --------- -------------- - ------ ---------------- --------•• -------- t •-X 1000 676'HIGHWAY�G.O. BOBS-UNAUT. 1000.0 1000.0 999 4TORM SEWER. G:O BONDS'-UNAUT 500.0 --------- --------- -------'-lir �.. TOTAL FUNDING' --------- - 1500.0 --------- 0.0 --------- 0.0 --------- 0.0 ----500_0 1500.0 0.0 REVISION GATE OS/16/69 CITY OF M I A M I CAPITAL IMNROYEMENT PROGRAM PROJECTD'SOCRIaTION PROJECT NA, ,' : 041139 PROJEOT`NAME : SEgELL`PARK STREET Ii0R6VEMENTS AOORESS,, : SEE= PROJM:CT DESCRIPTION' NNW I LOCATION s 692. 694 N011HO'SERVXCE s 692. 694 PROGRAM „• : 006 TRANSPORTATION CATEGORY t 061 STREETS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERS all LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY65 FIRST YEAR OF APPROPRIATIONS s PROJECT 8014EM LE s INITIAL REVISED COMMENCE DESIGN 00/90 00/92 AWARD CONTRACT 00/90 00192 BEGIN CONSTRUCTION 00/90 00/92 BENEFICIAL USE 00191 00/93 PROJECT COMPLETE 00/91 00/93 COST CATEGORIES --- LAND AC0UISIT1ON DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER ------------------------- roTAL COST 1El AR OF go/"/t! ----------------------------r-rrr----r--r ------------------- ! PROJECT OESCRIPTIONs ! This project conslats of rebuildinq **loot** strawft Am F ! the area bordered by HW 7 St.. the Mlawl River, !" I NW 17 Ave., and NW T7 Ave. t ! Improvements will include asphaltic pave+seatr Goner*to ! ! sidewalk, concrete curbs and/or gutters, storm droln"o t t and landscaping. ! ! t ! 1 t ! t ! t t t ----------------------------------- -------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMAIM ---------- ---> ESTIMATE PRIATIONS 1939-90 1990-91 1991-92 1917-95 tots -!A 1994-" --------------------------- --- ---------------------------- 0 x 1000) -- 77.0 1544.0 9.0 170.0 1300.0 TOTAL t FUNDING SOURCES FUNDING f"--------'--------------------- S76 HIGHWAY G.O. BONDS-UNAUT. 1200.0 993 STORM $EWER. G.O. BONDS -UNAUT 600.0 TOTAL FUNDING 1300.0 a ------------------ 0.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS1939_90 -- ------0.0------0.0 77.0 1544.0 9.0 170.0 ----- -- -------------------r-- 0.0 1600.0 0.0 0.0 0. �--------- --------- FUTUK FIMMDIN4 ------------------- --1990_91 1991-92--1992!s 1!!!-! 1994-1Ry ---------_--------- ---rrw-- , t X 1000 1200.0 600.0 0«Ot.L REVISION DATE 07/24/$9 � s � PROJECT NO. : 041134 PROJECT NAME s MANOR STREET XUPROVEMENTS-PHASE V ADDRESS s SEE PROJECT DESCRIPTION NBRHD LOCATION 1 123 HBRHO SERVICE s 123 PROGRAM �. s 006 TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FY35 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDl3..E : INITIAL REVISED COMMENCE DESIGN 00/90 00/92 AWARD CONTRACT 00/90 00/92 BEGIN CONSTRUCTION 00/90 00/92 BENEFICIAL USE 00/91 00/93 PROJECT COMPLETE 00/91 00/93 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 06/29/S9' -----------------------------------t ! PROJECTDESCRIPTION: ! t ! This project is a continuation of street rsbuildtny to t ! the Manor Park area bordered by the Airport Exprossway, t ! NW 54 St., I-95 and the west City limits. t 1 !' ! Improvements will include asphaltic pavement, concrete t ! sidewalk, concrete curbs and/or gutters, stores dralns"- f ! and landscaping. t ! t ! t ! t ! t ! t t l------------------------------------- ----------- PRIOR APPQO­ TOTAL COST APPRO- PRIATIONTIONS <--------------- FUTtxiE COST ESTIMATES ---------------s' • COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-93 1!!!-94 1l14-9 ------ ---- --------------------------------: LAND ACQUISITION DESIGN CONSTRUCTION ADMINISTRATION OTHER ------------------------- TOTAL COST 90.0 1302.0 10.0 193.0 ------------------ 2100.0 0.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS $7i HIGHWAY G.O. BOLDS-UNAUT. 1400.0 993 STORM SEVER. G.O. BONDS -UHAUT 700.0 TOTAL FUNDING ---- 2100.0 -- 0.0 -- 0.0 t 0.0 APPRO- PRIATIONS 1959-90 90.0 1502.0 10.0 190.0 ------------------------------------------- 0.0 2100.0 0.0 0.0 0.0' (------------------ FUTURE FUND ------- ----- ---- -,30 1990-91 1991-92 1992-98 1!l8-94 ----- - ----------------------- ....... ( • X 1000 ) 1400.0 700.0 ----- -- -'�--- ----- ----- --------- 0.0 2100.0 0.0 0.0 0«OF REVISION DATE 05116/89 s e'� PROJECT:, NAME : OOIIINYOIRt STREET YIPROVEMENTS-PHASE III ADDRESS : SEE PROJECT DE$rAZPTION HBRlD-LOCATION a 268 NBRHO 'SERVICE : 268 PROGRAM 006 TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERa $11 LEONARD HELMERS fiRST.YEAR IN CAPITAL PROGRAM : FY64 `FUST YEAR OF APPROPRIATIONS : PROJECT SCHtOULE : INITIAL REVISEO COMMENCE DESIGN 00/90 00192 `AWARD CONTRACT 00/90 00/92 BRIM 00/90 00192 BENEFICIAL USE 00/91 00198 PROJECT COMPLETE 00/91 00193 TOTAL COST ESTIMATE 43.0 •56.0 5.0 94.0 1000.0 TOTAL t:1NOINQ SOURCES FUNDING 676 HIGHWAY 13.0. BONDS-UHAUT 750.0 992 STORM GEM. A.O. BONDS -UNAUT 250.0 ►rrrr-rrr---rrrw---rrrr----------- TOTAL FUNDING 1000.0 PRIOR APPRO APPRO- PRIATIONS PRIATIONS 1949-90 t AA OF 001"109 - . ...: rrrrrrrr----rrrr-- rrrr--------r.----r r--rrrr—rrr....rr�r-rr-r�iwF I PROJECT DESCRIPTION: 1 ! This project is a continuation of street =sprevsment* ! in the Central Business Diairict. ! Improvements will include asph"110, pW401611 o 440440 t' ! sidewalk, csncrets curb and 9ttsr 81W 6tcrw d1'dt*&O f 1 modifications. ! 1 ! 1 1 1 ! ! ! E r rr rr -rrrr rr r r rf �r�rrrrrn+r-r.,rYr•ia.rrrrsrrrrrrrirrrrr..rrrr------i- 1990-91 1991-92 19ss-to 199644 1W-95 t •x100o1 44.0 $54.0 5.0 94.0 rrrr----- 0.0 ---rrrr-- 0.0 ------•-- 0.0 -- -rrrr -- 1000.0 rrr--rrrr 0.0 PRIOR APPRO- APPRO- PRIATZONS ----------------- FUTURE FU DIM PRIATIONS 1999-90 1990-91 1991-92 1992-98 ---rrrr-- --------- --- t x --r------ 1000 1 ►►rrrrrrr 750.0 250.0 rrrr-- —..— 0.0 ..--rrrr-- 0.0 ----� —r-- 0.0 ---rrrr— 1000.0 rrrr-- -- .. 0.0 REVISION DATE MUM ----=---- ----- 0.0 -0.0 ►rrrr--rrr--r—rr-rr�y F ,! 1�s-94 s9s4•ss �. rrrr-rrrr rr--rrr-r �a':. r-rrrrrrr rrrrrrrrr � C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY9a PROJECT NO. 1 041143 PROJECT NAME : LITTLE RIVER STREET IMPROVEMENTS - PHASE II t SEE PROJECT DESCRIPTION NSRHO LOCATION 111, 112 NBRHO SERVICE t 111, 112 PROGRAM i 006 TRANSPORTATION CATEGORY^ a 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PRO FIRST YEAR OF APPROPRIAATIOONSM = FY86 PROJECT SCHEDULE ; INITIAL REVISED COMMENCE DESIGN 00190 00/93 AWARD CONTRACT 00/90 00/93 BEGIN CONSTRUCTION 00/91 00193 BENEFICIAL USE 00/91 00/93 PROJECT COMPLETE 00/91 00193 APPROk PRIATIONS +-1959-90 TOTAL COST COST CATS O IES ------- ------------ ESTIMATE ---- LAND ACQUISITION 77.0 OESIGN CONSTRUCTION 1544.0 EQUIPMENT 9.0 ADMINISTRATION 170.0 OTHER --------- TOTAL -COST--------------- 1600.0 TOTAL FUNDING SOURCES FUNDING 376 HIGHWAY �.0. BowDS-UNAUT.1200.0 ��� 993 STORM SEVER. G.O. S,- __ ----------- TOTAL FUNDING •-1Soa.0 PRIOR APPRO- PRIATIONS 0.0 PRIOR APPRO- PRIATIOH9 AS of 09/29/90 ----------------------------------------------- i-- Ro. c+- i This projiect is a continuation of street rebuildingin i the Littie River area berd&rod by N. 71at Strut. he ! ! North City Limits, N.W. 7th Avenue and the F.E.C. i i railroad right of ray. i t Improvement& will include asphaltic paveeentr cenaret• ! sidewalk, concrete aurbo and/or gutters, storm drainage i ! and landscaping. 1 1 i ! 1, r --u.-------.i.------------------------..- --_---_--••—_...----_-- ` 1990-9i-__--1991-92 1992-93--199f-94 1"4-9. -------------- -------------- -- t 0-X 1000 77.0 1544.0 9.0 ---_170.0 ------co Q-_-__---.- ------0.01500.0 ------0.0 --------------- FUTt>/E 1=UHDZN4 -......_----------....-- it `-1990-91 - - 1991-92--1992_93--199t-94--11I14-lam: t0o0- 1200.0 4 649.4 -------------- --------------- w-- --------o -0.a1000. ------o.o APPRO- PRIATIONS --19a9-9a REVISION DAM 07/24/89 — a' 0*0 0.0 , i ..a „`;w„; w„y�����K _..nn�n.u�ni6rYtl.rn n�url.wiiir�Inr.rrw�rWml�lir�rr�A4rirn0 u.rYlr n19111i/LIIIIIIOH LIMI IY� 'I�W,�Mllnlu I u iio pinn.� ��m� C I T Y O F M I A 9 I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION "to PROJECT NO. t 041144 PPROJECT ROJECT NAME i OVERTOWN STREET IMPROVEMENTS -'PHASE IZ I SEE PROJECT DESCRIPTION NBRHO LOCATION S 251, 252 NBRHD SERVICE : 251, 252 PROGRAM : 006 TRANSPORTATION CATEGORY' S 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: $11 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM S FY85 FIRST YEAR OF APPROPRIATIONS i OD&XCT SCHEDULE S COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 00/90 00193 00190 00/98 00/91 00/93 00/91 00/93 00/91 00/93 At OF ---------------------------�.ti 1 PROJECT DESCRIPTIONS - k 1 ! This project is a continuatlien of street rebuildir ie! ! the Over{own area bordered bV N.R. Sth Strest, the ! Miami River, S.R. 336, Interstate 95, N.W. 22nd St!►esi ! 1 and the F.E.C. railroad right of way. r 1 E 1 Improvements will include asphaltic pavement, concrete f ! sidewalk, concrete curb@ and/or gutters, stsrw draln"e f I and landscaping. 1, ! 1' ! r ! E 1 ! ! i ! r !-----•---------•------------------------------------------ TOTAL COST PRIOR APPRO- Ate- PRIATIONS--------------- FUTURE COST ESTIMATI---i-•�--- s 1990-91 1991-92 1992-OS 1993-94 I994-�1Y COST CATEGORIES ESTZYATE PRIATIONS 1959-90 ----F ------------- ------------------------- --------- --------- --------- • x 1000- LAND ACQUISITION 51.0 CONSTTRRUCTION 51.0 1oao.o 1080.0 6.0 .0 ADMINISTRATION 3EOUXPMENT OTHER 113.0 -------------113_0 ------- -- ------ - - - ------------------------- TOTAL COST --------- 1200.0 --------- 0.0 --------- 0.0 --------- 0.0 0.0 1200.0 0.0 0.0 TOTAL PRIOR APPRO- APB' PRIATZONS <------------____-- FUTURE FlS10ING 1991-92 1992-93 --------- ----------30 1993-94 1994-95 FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 —--------- --------- --------- Q -- — — ----- - -- -- ------- --------- -------- ------------- ---------- -- ------ s x 1000 ) $76 HIGHWAY G.O. BONDS-UNAUT. $00.0 400.0 993 STORM SEWER. 0.0. BONN -UHAUT 400.0 --------- -------- 0.0, ------------------------- TOTAL FUNDING --------- 1200.0 0.0 0.0 0.0 0.0 1200.0 0.0 4 REVISION DATE 07/24/69 a Ilk T� T ij-� I ILI -XI, 1 C I T Y O F M 2 A M I CAPITAL MWNWVEMENT PROGRAM PROJECT OESCRIPTION FY90 PROJECT NO. : 041145 PROJECT NAME s ALLAPATTAN STREET IMPROVEMENTS - PHASE III ADDRESS s SEE PROJECT DESCRIPTION NBRHO LOCATION : 632. 633, 634 NBRHD SERVICE s 632, 633, 634 PROGRAM : 006 TRANSPORTATION CATEGORY" : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERS 311 LEONARD HELMER$ FIRST YEAR IN CAPITAL PROGRAM : FY86 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00191 00193 AWARD CONTRACT 00/91 00/93 BEGIN CONSTRUCTION 00191 00193 BENEFICIAL USE 00/92 00/94 PROJECT COMPLETE 00/92 00/94 COST CATEGORIES LAND ACOUISITION DESIGN EE CONSTRUCTION QUIPMENT ADMINISTRATION OTHER TOTAL COST AS OF 0012fffs ----------------------- ! PROJECT OESCRIPTIOlI: ! This prolsct is a continuation of stroot robuildin0 t ! in the A lapattah area bordered by the Miami River, 6 ! the Airport Expressway, N.W. 17 Avenue and N.W. 27 t ! Avenue. f ! Improvements will include asphaltic pavoeent, eenerste ! ! sidewalk, concrete curbs and/or gutters, store drsInager F N and landscaping. f ---------- ------------r----r------_---- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS--------- ------ FUTURE CAST ESTIMATES ---------------> ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-9i 1913-94 191E-9i --------- ------------------ --- - -----------------r---- -t x 10) 77.0 1544.0 9.0 170.0 1400.0 TOTAL FUNDING SOURCES ------------------------- FUNDING $76 HIGHWAY'G.O. BONOS-UNAUT. 1200.0 998 4TORM SEWER. 9.0. BONDS -UHAUT 600.0 ------------ -- TOTAL FUNDING• 1400.0 .1 77.0 1544.0 !.0 170.0 0.0 0.0 r----_ 0.0 ----- 0.0 -- 1100.0 ---- - 0.0 00 _ PRIOR APPRO- APPRO- PRIATIONS PRIATIONs 1949-90 <------------------ FUTURE 1990-91 1991-92 FUNDING 199I-93 --------- 3M.94 1l9S- --- -- ----------- --------- --------- --- ----- t • X ------- 1000 ) 1200.0 i00.0 - ---- - 0.0 ----- 0.0 ----- 0.0 ----- --t 0.0 -- 1800..6 --------------- 0.0 0.0 REVISION DATE 05/1619W, CI-TY OF MIAEMI CAPITAL ROVIZVENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT No. s 041146 PROJECT NAVE s SUENA VISTA STREET IMPROVEMENTS - PHASE IV AnORESs : SEE PROJECT DESCRIPTION. hvRHD LOCATION s 113. 114, 115 NBRHD SERVICE s 113, 114, 115 PROGRAM R : 006 TRANSPORTATION CATEGORY s 061 STREETS DEPARTMENT 1 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FY86 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 00191 00193 AWARD CONTRACT 00/91 00/93 BEGIN CONSTRUCTION 00/91 00193 BENEFICIAL USE 00/92 00194 PROJECT COMPLETE 00/92 00/94 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION ADMINISTRATION OTHER TOTAL COST AS OF QSI"Is ---------------- -----------------------------rrr------rr-r--. 1 PROJECT DESCRIPTION: 1 1 - r ! Thio project is a continuation of streoe robulldin_g p ! in the Buono Vista area bordered bV S.R. 195• M. 54 1 Streetr I-95 and the F.E.C. railroad right of way. ! Improvements will include asphaltic pavensnt, aonerato 1 ! sidewalk, concrete curbs and/or guttar*, sters drama" land landscaping. ! t ! F 1 t 1 1 ! t : r --------------'------------------------r,rr.r-r..r-..rrs.r-r--rr.r- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS--------------- FUTURE COST ESTIMATES --------------ems ESTIMATE PRIATIONS loop-90 1990-91 1991-92 1992-98 191E'-94 19946-9M --------------------------- --- ------------- ------ --- -r--r--ram ( •X1000)- 77.0 1544.0 9.0 170.0 1800.0 TOTAL ' FUNDING SOURCES --FUNDING '------------------------- ---- 876 HIGHWAY 8.0. BONDS-UNAUT. 1200.0 998 STORM SEWER. B.O. BONDS-UNAUT• 600.0 --------- TOTAL FUNDING 1800.0 ------------ O.Q 0.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS1919_90 -- ------o.o------0.0 --- 77.0" 1544.0 9.0 170.0 Q.0 O.0 ,. 1000.0 O.Q O.Ok �------------------FUTURE FVNDM --- ' 1990-91 1991-92 1992-99 91-rr----1---1-Y-�.Y.R 15-94 !a 1994-! A , -- ----- --------- ------'--- --------i �- (s x 1000 ) 1100.0 i00.0 ------ ---- 0.0 - 0.0 ---- --- 1600.0 ----�----- 0.0 ---------' 0..0 <54 REVISION DATE 05/17/89 1 = WE 9W .mow RM qw. 11h I I 1 11, f 1 p it r v C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 041147 PROJECT NAME : EAST LITTLE HAVANA STREET IMPROVEMENTS - PHASE III ADDRESS : SEE PROJECT DESCRIPTION NBRHD LOCATION : 772, 773, 774, 775 NBRHD SERVICE : 772, 773, 774, 775, 776, 777, 493 PROGRAM : 006 TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY86 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00/91 00/93 AWARD CONTRACT 00/91 00193 BEGIN CONSTRUCTION 00/91 00/93 BENEFICIAL USE 00/92 00/94 PROJECT COMPLETE 00/92 00/94 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST AS OF 08/29/89 ------------------------------------------------------------ ! PROJECT DESCRIPTION: ! ! This project is a continuation of street rebuilding in I ! the eastern portion of Little Havana bordered by the t ! Miami River, I-95, S.M. 11 Street (I-95 to S.t1. 12 t 1 Avenue), S.M. 16 Street (12-17 Avenue) and M. 17 ! ! Avenue. } 1 ! ! Improvements will include asphaltic pavement, concrete I ! sidewalk, concrete curbs and/or gutters, storm drainage I ! and landscaping. } t : ! I ------------------------------------------------------------ PRIOR APPRO- ------ FUTURE COST ESTIMATE! TOTAL COST APPRO- PRIATIONS �--------------------"---' ESTIMATE PRIATIONS 1999-90 1990-91 1991-92 1992-99 1293-94 1994-9$ --------------------------- --- - ----------------------------- ( s x 1000 ) -- 77.0 1544.0 9.0 170.0 1800.0 TOTAL FUNDING SOURCES FUNDING --- ---T----------------------- 976 HIGHWAYG.O. BONDS-UNAUT. 1200.0 993 STORM SENER.'G.O. BONDS -UNAUT 600.0 TOTAL FUNDING 1800.0 01 77.0 1544.0 9.0 170.0 ------0.0 ------0.0 ------0.0------0.0 ---1#00.0 ------0.0------0.0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1989-90 <------------------ FUTURE 1990-91 1991-92 FUNDING 1992-98 --------- -------------------> 1998-44 1.994-95 --------- ----- --------- --------- ------------------ ( 0 x 1000 ) 1200.0 900.0 ------o.o ------o.o ------o.o------o.o -- isoo.0 ------0.0------0.0 REVISION DATE 06/17/89 !G7 ISO _ IIIIIIIIIIIII IIII -rrr--rr- CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. i 041154 PROJECT. 'NAME i MODEL CITY STREET IMPROVEMENTS -PHASE 2Z ADDRESS. : SEE PROJECT DESCRIPTION NBRNO LOCATION S 121,122 NBRHD SERVICE : 121, 122 psimm : 006 TRANSPORTATION CATEGORY. : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM i FY87 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE i INITIAL REVISED >AAWARRDDCOCON RAACTN 00192 00/94 QEAIN CONSTRUCTION 00/92 00194 BENEFICIAL USE 00/93 00/95 PROJECT COMPLETE 00/93 00195 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT - ADMINISTRATION OTHER TOTAL COST __----.rrrr+rr..--.�r.�+.++:�rr..r.rrwr+r ! PROJECT DESCRIPTIONS ------ i ! 1 t This pro eat is a continuation of street;rebun"no if* ! ! the nort ern portion of the Model OM ors* borders. bytes 1 N.M. 54 Street, N-M- 71 Street, the' woat "10A ""ter ! and I-95. } ! Improvements will include aoPhaltisr eonarote }' ! sidewalk, concrete enrbs sndfor gutters,, o4orn4ralnoge x ! and landscaping. t H 1 r l--------err-------------------------------------------rrrr•r PRIOR APPRO- ------ FUTIMRE COMT E812MAUS --&• __* TOTAL COST APPRO- PRIATIONS--------- ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-99 119M-94 �99�� r-rr---rr err----r- r--r-rr- - --- ------------------------r- rerr ----` f x 1000 ) 90.0 1802.0 10.0 196.0 --------------------------- 2100.0 0.0 0.0 TOTAL FUNDING SOURCES FUNDING 876.HIQNMAY-0.0. BONDS-UNAUT. 1400.0 *#$ . STORM SEWER. B.O. $0 09 - 1NAUT 700.0 r------------------------------- TOTAL FUNDING. 2100.0 t --------------------- Q-O0.0 0.0 PRIOR APPRO---------- FUTURE FUNQIND APPRO- PRIATIONS--------- PRIATIONS 1969-90 1990-91 1991-92 1992-94 - --------- --------- ----- r ----- r-----rr --rr - • x 1000 ) ------0.0-r------- 0.0 ------------------ 0.0 0.0 REVISION DATE 07/24/89 1902.0 10.0 190.0 -- ------ ----- ---- -0.0 2100.0 f -rrrrrrrrrrrrrr-rrr� 1990-94 1994-06 ------err ---r----- 1400#4 Joe.* rrrryrrrrr- •100.0 rrrrr--rr � s`, C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 04115S PROJECT NAME t EAST ALLAPATTAH STREET IMPROVEMENTS - PHASE III ADDRE88 : SEE PROJECT DE8CPTDTION NSRHO LOCATION t 631, 635, 636 NBRUD SERVICE t 631, 635, 636 PROGRAM : 006 TRANSPORTATION CATEGORY" : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 311 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY87 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 00191 00/94 AWARD CONTRACT 00/92 00/94 BEGIN CONSTRUCTION 00/92 00/94 BENEFICIAL USE 00/93 00/95 PROJECT COMPLETE 00/93 00/95 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST AS OF 08/29/S9 ---------------------------------------------------------- I PROJECT DESCRIPTION: ! ! t ! This project is a continuation of street rebuilding in ! ! the eastern portion of Allapattah bordered bg the ! ! Airport ExpresswaV, State Road Sag, I-95 and N.R. 17 ! ! Avenue. ! ! ! ! Iwprovewents will include asphaltic psvesient, concrete ! ! sidewalk, concrete curbs and/or gutters& store drainage ! ! and landscaping. !` t ! ! ! ! F 1----------------------------------------------------------r PRIOR APPRO- TOTAL COST APPRO- PRIATIONS t--------------- FUTURE COST ESTIMATES-------------rr� r ESTIMATE PRIATIONS 19.9-90 1990-91 1991-92 1992-93 1993-94 1994-911 --------------------------- --- ------------------------«.•-r...►: t • X 1000 90.0 1602.0 10.0 198.0 --------- ---- ----- 2100.0 0.0 PRIOR TOTAL APPRO- FUNOING SOURCES FUNDING PRIATIONB .•--------------- ----- ------------------ 876 HIGHWAY 8.0 BONDS-UHAUT. 1400.0 994, GTORM , 991". G.O. Sam '-UNAUT• 700.0 .................. _-------- TOTAL FUNDING 1 2100.0 k --------- --------------------------- 0.0 0.0 0.0 0.0 APPRO- PRIATIONS t------------- ----- FUTURE FtNOINQ 1939-90 1990-911991-92 1992-98 --------- --- -------------- -t e X 1000 3 --------- ------ ----- -------- --------- 0.0 0.0 •0.4 _ 0.0 REVISION DATE 07124/09' 90.0 1902.0 10.0 190.0 _.-►►r -rrrr-rr.W ►2100.0 0.9� -rr....r-rrrr.e 1993-94 19g4-1 ----------------•"i i400.0 700.0 ---------- 2100.0 0.0 'I I wit -CITY Of MIAMI AM or OSi2va! � <` CAPITAL. IMPROVEMENT PROGRAM PROJECT DESCRIPTION PROJECTNO. s 041156 ------------------------------ •---------- r----rrr-.....�..rr_. PROJECT HAVE, 1 BRAPELANQ STREET IMPROVEMENTS ! PROJECT OEaCRIPTtON• H ADDRESS 1 SEE PROJECT DESCRIPTION t ! NBRND LOCATION 1 691. 695 NBRHD SERVICE 1 691, 695 ! 1 TAis project consists ei rebuildingselected attests t in the Grapoland area bordered by N.W. 7 Street, H.W. ! . _._ ! 20 Street. N.A. 27 Avenue and H.W. 37 Avenue. ! PROGRAM 1 006 TRANSPORTATION 1 !' CATEGORY" 1 061 STREETS ! Uproveaients will include sspAalile pave0mle aenaretf t DEPARTMENT : 091 PUBLIC WORKS ! sidewalk, concrete curbs and/or quttors. eterm drainage ! PROJECT MANAOERI 311 LEONARD HELMERS and landscaping. ! FIRST YEAR IN CAPITAL PROGRAM 1 FY87 ( ! FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE s INITIAL REVISED ! COMMENCE DESIGN 00/92 00/94 ! r AWARD CONTRACT 00/92 00194 t ! BEGIN CONSTRUCTION 00/92 00194 ! F BE:HEFICIAL USE 00/93 00/95 ! PROJECT COMPLETE 00/93 00195 ------------------------------------------- -.... PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES ------ ---------s COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-9S 1993-94 1994-0 --------- -------r'�' -.�-..r-,-...r.. - ------------------------------- -r---------------- --- ---- -t 4X1000) LAND AOMSITION 9a.M► CONSTRUCTION 18EGNI 02. 0 1802.0 EQUIPMENT AOMIHXGTRATION 10.0 10.0 OTHER 198.0 198.0 ---___�.a.` TOTAL- - -- --------- COST -- 0.0 -- 0.0 ----- --- ------- - 0.0 0.0 o.0 2100.0 PRIOR APPRO- q TOTAL FUNDING SOURCES FUNDING APPRO- PR3ATIONS PRIATIONS 19$9-90 4 ------------------ lRLTLElLE FUFDItiE1 --------------.•-•--� logo-91 1991-92 1992-94 1993-94 1gg4-gsi ------------------------- --------- ------------------ --------- -----------------------------------. L 4 X 1000) NIGNMAY `EZ 0. PONDS-UNAUT. 1400.0 >#40l1.0 991` STORM SEMER. A.O. BONDS -UNAUT 700.0 700.0 - --------------------- -- TOTAL FUNDING ------ 2100.0 ------------------ 0.0 0.0 ------ _-.. -- ------------------ --------- rr----. 0.0 0.0 0.0 2100.0 l � REVISION DATE 05117/69 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM pROJEOT DDEJMZPTION PROJECT NO. t 041157 NTg _ PHASE II ADORES NAME t DESIGN PLAZA STREET IMPROVEMENTS t grr PROJECT DESCRIPTION NBRHD LOCATION t It +t: lls mBRND SERVICE t 114. 115 PROGRAM t 006 TRANSPORTATION t 061 STREETS CATEGORY t 031 PUBLIC WORKS DEPARTMENT PROJECT MANAGER: 311 L.E0NAR0 NELMERS FIRST yEAR I" FIRST CAPITAL FY87 YEAR OF APPROPRIATIONS PROJECT SCHEDULE t INITIAL REVISED 00192 00194 COMMENCE DESIGN 00/92 00194 AWARD CONTRACT 00192 00194 BEGIN CONSTRUCTION 00193 00195 BENEFICIAL USE 00193 00195 RROJEOT COiMyLETE PRIOR APPRO- POZATIOMB COST CATEGORIES LAND ACOUISITIDN pESIGN CONSTRt1BTI0H OTNER TRATION ------ TOTAL COST TOTAL CST APPRO- PRIA ESTIMATE' --------- 39.0 772.0 4.0 85.0 900.0 TOTAL FUND-S S_- ---- - FUNDING------ ..,._ _ UHAUT. 600.0 76 HIGHWAY ti.0. Mgr UNAUT $00.0 !94 STORM SEWER• 2.0• BONS --_ r-_- rr rrrr---------rw�.r..r_r _ 900. 0 TOTAL FUNDING i As OF 0s/29150 ! PROJECT -DESCRIPTION$ t i project is a con#inuatian of street rebuilding t ! Thls proj lt.Er 3iStraa!#. ! in the Design Plasa area bordered by ! H.E. 41 Street. N. Mlaei. Avenue and Biscayne Baulovard. ave gnt, conere#s t t Ieprev;wenAs will include asphaltio {t ! t and decorative brick sidewalkr concrete our and/Or t t gut#ere. ;tore drainage and landecaping• t t ! t t t : t ! 1 _w____'_r------r-r_r_r--r_r-r__rw+.-rr.�w.�.._r.r.r_w'...rr.r-_.r,�wsw GMT ESTIMATES---------- i-wr-r_-----1!!1-! 1!!2-!i 199&-94 1!!4- 1990-l1r ---- --1 -r w__-r---,. __w_{-s-x 1000 i 39.0 772.0 4.0 •-- ...rw..wr - - -r--r_ ..+« _wrrr -0.0 __ _ ,.r w_wwrr----`0r0 o.0 900.0 -----_ . PRIOR _,P RO FUTUR F10103m 1!3r 9-4r1r"r4-r- APO- PRIAIX NE 1969-90 ---------------- s-1991901-92199Z:.99 -------r- rrr --------- -w PRIATI� -------_---- wr-4X --------- ------- 1000 } 600,.0 800.0 w..«► rr ----- a -9YY• _rr.«rrrrr w..wrrwrwr 0.0 w-/�p-- 1 « REVISION DATE 06117169 t7l, PROJECT No. : 041154 PROJECT WYNNOOD STREET IMPROVEMENTS - PHASE II S ,. i SEE PROJECT DESCRIPTION LOCATION s 241 NSRHD SERVICE : 241 PROGRAM : 006 TRANSPORTATION CATEGMt : 061 STREETS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGER. 311 LEONARD NELMERS FIRST YEAR IN CAPITAL PROGRAM : FY67 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 00/92 00/94 AWARD CONTRACT 00/92 00/94 BEGIN CONSTRUCTION 00/92 00194 BENEFICIAL USE 00/93 00195 PROJECT COMPLETE 00193 00/95 COST CATEGORIES ------------------------- LAND ACOUISITION DESIGN ECONS NT oN ADMINISTRATION OTHER ------------------------- TOTAL COST FUMING SOURCES ------------------------- PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONB ------------------ s2.0 1029.0 6.0 113.0 1200.0 TOTAL FUNDING 576 HIGHWAY G.O. SONOS-UNAUT. $00.0 993 STORM SEWER. G.O. BONDS -UNAUT 400.0 ------------------ --- - --- TOTAL FUNOZNG 1200.0 t PROJECT DESCRIPTION FY --rrr-r-r------------rrrr------rrrr-r- 1 -PROJECT OESCRZPTIONs !<: 1 This project is a continuation of street rebuilding to T t the WVnwood area bordered by N.M. 20 Streets the 1 t Airport Expressways i-9S the F.E.C. rallread. 1 ! Iaprovsssnts will Include asphaltic povessnt. censrole P t sidewalk, concrete curbs and/es, gutters• •tens dealndye t: 1 and landscaping. t t t ! ! 1 t !r t l ------------------------------------ rrrrr-------r-r----r-►rr MPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES ---------------> lost -to logo-01 1991-92 lost -to 19108-94 1094-M ----------------------------------------------------- 4 X 1000 )' $2.0 1029.0 --------------------------------------------- 0.0 0.0 0.0 0.0 0.0 PRIOR APPRO- APPRO- PRIATIONB <------------------ FUTURE FIMMOD41D PRIATIONS 1989-90 1990-91 1991-92 1992-98 ------------------ ----- -- ----- --------- ( 10) ------0.0- ----------------------------------- REVISION DATE 05/17/89 6.0 11r.a 1200.0 1993-94- 1994i-gs --------- r-------- „ Saa.a 4a0. a -1200.0 ------a.0 i CITY OF MIAMI AS or0812SISS, CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECTND. i 041199 ----------------------------------------------....----....-- PROJECT NAME s CORAL GARDENS STREET IMPROVEMENTS H PROJECT OESCRIPTIONi P AOOIWRS SEE PROJECT OESCRIPTZON ! H NBRNU LOCATION 492 t Thie project consists of robullding stroete sn the,ares, 1 NBRND SERVICE : 492 1 bordcrsd by S.N. 8 Streot, S.M. 1i Street, S.N. SR 1 I Avenue and S.N. 87 Avenue. t PROGRAM i 006 TRANSPORTATION! CATEGOR4 Construction will include aphaltle.Paveaent, concrete B : 061 STREETS I sidewalk, concrete curb* and/or gnttort, sterar drainage t DEPARTMENT : 081 PUBLIC WORKS I and landscaping. PROJECT MANAGER a All LEONARD HELMERS 1 FIRST YEAR IN CAPITAL PROGRAM s FY88 ! t FIRST YEAR OF APPROPRIATIONS t t t PROJECT SCHEDULE INITIAL REVISED 1 ) COMMENCE DESIGN 00/92 00194 ! N AWARD CONTRACT 00/92 00/94 t M' BEGIN CONSTRUCTION 00/98 00/95 1 t BENEFICIAL USE 00/93 00/95 s PROJECT COMPLETE 00/99 00195 --------------- -------------- ------------- -•------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONS i--------------- FUTtm OOST ESTIMATES --- +------ -----s COST CATEGORIES ESTIMATE PRZATZONS 1989-90 1990-91 1991-92 i992-95 3998-94 1"4—" ---------------r-.------- ------ - --------- --------- --- ---- ----- yP t H1 X 1000 ) LAND AOMSITION' ON 1256.0'EQUIPMENT 11Si.0 ADMINISTRATION 8.0 f.0 OTHER 142.0 149.0 ------------------------- -- TOTAL COST 1500.0 ----- ----- 0.0 0.0 ----- ----- ----- --- 0.0 0.0 0.0 --------- ---•...... 0.0 150M.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS ----------------.... PUT= PIUNCKM ....................06.0 FUNDING SOURCES FUNDING PRZATIONS 1989-90 1990-91 1991-92 I992-98 1918-94 1"4-00 ------------------------- --------- ------------------ --- ---- - --------- --.r.a.f�ii.► t • X 1000 ) aYi ;NZAHIfAY G.O. BDNMiS=UNAUT.. 1000.0 Joe o -998 STOIMi SEWER. A.Q. ` BONDS -UNAUT ' 5004,0 "too -----------------=------- -- TOTAL FUNDING 1500.0 ----- ----- 0.0 0.0 ------------------ ----- 0.0 0.0 0..0 ----------- ---- .0 1SQ0.0 r I r, REVISION DATE 06/02140 .rrA.9�waieM�kltl 9•T.71R?4�pr.-.�-7�r'�'•F--- CITY OF MXANX CAPITAL IMPROYEIENT PROGRAM PROJECT DESCRIPTION PROJECT W. : 041166 PROJECT 'NAME : EDGENATER"STREET IMPROVEMENTS - PHASE III ADORES$ = SEE PROJECT DESCRIPTION NBRHD LOCATION : 242, 248, 29S NBRHO SERVICE : 242, 243, 295 PROGRAM„ : 006 TRANSPORTATION CATEGORY : 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: $11 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM : FY88 FIRST YEAR OF APPROPRIATIONS t PROJECT SCHEDULE : INITIAL "COMMENCE REVISED DESIGN 00/92 00/94 AWARD CONTRACT 00/92 00/94 BEGIN CONSTRUCTION 00/93 00/95 BENEFICIAL USE 00/93 00/95 PROJECT COMPLETE 00193 00/95 PRIOR APPRO- TOTAL COST APPRO- PRIATIONG COST CATEGORIES ESTIMATE ---------------------------------- PRIATIONS 1949-90 --------- --------- LAND ACQUISITION DESIGN 64.0 ON 1286.0 EQUIPMENT ADMINISTRATION 8.0 OTHER 142.0 ----- ----- - - -------- - - ------ -- --. -- TOTAL C08T 1500.0 ----- ----- -- ---- -- 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONS FUNDING SOURCES FUNDING ---------------------------------- PRIATIONS 1989-90 ------------------ 876 HIGHWAY G.O. BONDS-UHAUT- 1000.0 993 STORM SEWER. Q.O. BONDS -UNAUT 500.0 ---------------------------------- TOTAL FUNDING 1500.0 ------------------ 0.0 0.0 174 AS OF 00/2918 —---------------- !--r-----1-------------------MII—lMa!l�li ! PROJECT OESCRIPTION: t ! t' ! This project is a continuation of *treat robuildift in ! ! the Edgewater area bordered bV I-396 N.9. 39 Strooi, ! ! the F.E.C. Railroad and Siosayns SaV. t ! Construction will include asphaltic Pavatent dsnar*ts ! ! sidewalk, concrete curb* and/or getters, *tore ! ! drainage and landscaping. ! t t ! t t ! t t t t t i t ! f t r t --------------------I---------q-------r-rr.rr----err..!-r.r..-r 4--------------- FUTM Wir lmlrm,N,, -rr------------ i 1990-91 1991-92 1992 98 1993-94 1994-99, --------- t •X1000) --------- --------- --------- --------- 64. 1284.0 0.0; 142.0, --------- 0.0 ----- 0.0 --------- 0.0 0.0 1500.0' 4- -r------------- - rY,MPvNom-'r'r--------------r- 199Q-91 1991-9? 1!9?-1 Y9f8-94 1194-90 --- f x -r----r-- 1000 ? rr-rr-r-rr rr.�rrrr-- •.rr-r---r� 1000.0 1 SQo. o t --------- 0.0 ------r-- 0.0 ------r-- 0.0 -----rrrr 0.0 -----r--- 1500.0 REVISION DATE 07/27/89 V C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N0. s 041167 PROJECT NAME s EDISON STREET IMPROVEMENTS - PHASE III ADDRESS- : SEE PROJECT DESCRIPTION NBRHD LOCATION s 112 NBRHD SERVICE : 1.12 PROGRAM s 006 TRANSPORTATION CATEGORY s 061 STREETS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: $11 LEONARD HELMERS FIRST YEAR IN CAPITAL PROGRAM s FYSS FIRST YEAR OF APPROPRIATIONS s PROJECT SC OULE s COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 00/92 00/94 00/92 00/94 00/93 00/93 00198 0019E 00193 00/95 AS OF 06/29/89 ----r------r----------------------r--------------rrrrrr ! PROJECT DESCRIPTION: t fThis project is a continuation of **root robvilding t ! 1n the Edison Park area bordered 69 N.R. 54 Stre6ty 1 ! N.R. 71 $treat, I-99 and the F.E.C. Railroad. 1: ! Construction will include asphaltic pavesent, seners#s f ! sidewalk, concrete curbs and/or gutters, store P drainage and landscaping. ! E ! ) ! t t ) ---------r—r-------r---Nrrrr+.Y—r..r+nlrrMYlwrr.rr—+s.YY�I�err.r.rrwf+ TOTAL COST PR20R APPRO- APPRO- PRZATIONS s--------------- PUTIM DOST ES'IiRATEB +-rs.rrr..rrsrrrs COST CATEGORIES ESTIMATE PRIATIONB 1969-90 1990-91 1991-92 1992-93 1!!8-l4 1994-08 ----fir—.fir-rrr.rrat�r�lls. ---------- rr—•�------r --- -------- --------- --------- --- 4 8 x --rr loco ) -rr�r.�r..r.► LAND AOGUISZTZON DESITRRUCTION T 1544.0 1544+o EOUXPNDff ADMINISTRATION 9.0 Shoo 17066 OTHER L 170.0 . — — — -- ----- ----- --- ----- --------- ----------------- TOTAL°COST 1.1800.0 0.0 0.0 0.0 0.0 0.0 0.0 ISO&* PRIOR APPRO- FUNDING SOURCES �i TOTAL F MZNO APPRO• PRZATIOHS PRIATIONS 1989-90 4t------•----------- FOTtSiE logo-91 1991-92 it"-" ------------..----- 1993-i4 1994 " ----------------- ------- --------- ---- ----- --------- --r ----rx 100-0 1 876 Ay G.O. POND6-U 4m • 1i00. Y 12Q _ 992itTt' NR SERER.. Q.O. BONDS -UNAVT .. $00. 0 •-------r-------- rrr.rr--ra -r---r---r--------a'—r.`--rr TOTAL—r—r— = FUNDING -- 1600.0 --------- 0.0 --------- 0.0 0.0 ' A 0.0 0.0 1800.0 REVI#ZON OATE''67/27Ift At OE 091"IfSM CZT Y OF NIANI-' CAPITAL IMPROVENW— p0 14 PROJECT DESCRIM N __ r r•rrr rrrrr....rrN•• •rrr•. ----------- _... ------ DESCRIPTI t t o4i16a ! PROJECT PROJECT IHO- t MANOR STREET IMPROVEMENTS - PHASE VI ! BEE PROJECT DIMPROVEMEN ! This project is a continuation of street rebui3ding try ) PROJECT N� bordered by the Air matt 6�M)'essw�lyt t HBRHD LOCATION t 128 HBRND SERVICE t 128 ! the Manor Park area ! N.M. 54 Waste I-!S and the wet oily will include asphaltist:�* �oonarste e 006 TRANSPORTATION ! Construction ! sidewalk, concrete curbs andter gut t landscaping - AM 06 CATEGORY' t 1 STREET8 081 PUBLIC WORKS ! drainage and ! E f DEPARTMENT t PROJECT "HAGER t 811 LEONARD FELMERS ! FIRST YEAR IN CAPITAL PROGRAM s FY88 ! ! FIRST YEAR OF APPROPRIATIONS t ! PROJECT SCHEDULE t INITIAL REVISED ! ! 1 ! 1 COMMENCE DESIGN 00/92 00/92 00194 00/94 ! ! AWARD CONTRACT BEARD CONSTRUCTION 00198 0019E 00/9S !-------------"' -------------------------------- BENEFICIAL USE 00/98 PROJECT COMPLETE00/98 00/9S -------------- APPRO- COST ESTIMATES----•r•N••NNt TOTAL COST PRIOR FUTun APPRO- PRIATIONS <--------------- 119d-!ll 19l1-l2 1!!2-!s 1�'"' ------r�` 1989-90 1------ •� --- ESTIMATE ESTIMATE PRIATIONS PRIATIONS CATEGORIES ----_---- -►------- --------- e X 1000 ) 77.0 ------------------------- 1Sd#•0 LAND ACQUISITION 77.0 ' CMOTRRUOTION 1544.0 170.0 AD TRATION 9.0 170.0 ------------------ ' ------------------ 9.0 1800.0 ------0.0 0.0 OTHER __ _--------- ----------- 1800.0 ---------------0.0 0.0 TOTAL COST ------------- PRIOR ------> , Ate- <------------------ FUTURE FUNDING 1!!8-!d 1994-98 PRIATIONS 199I-98 TOTAL FUNDING APPRO- 1990-91 1991-92 ---------•----.. PRIATIONS 1989-90-•-__------------ N ------ e - FUNDING SOURCES -'----- 1200.0- ! i00.0; --------.,-------------- -- $-l!lAUT. HIQHWAY�G.O. BOND 1200.0 600.0 _-r------- --rr•r•rr ------ -- ------Q.O 0.0 1800.0 876 STOW -SEWER. Q.o. BONDS -UNAUt 99l1 STORM ------------0.00.0 0.0 -0.0 -- -----=------------------- 1800.0 µ;me TOTAL FUNDING 4 REVISION DATE 07/27/89 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM pROJECT DIESWIPTIO14 pRDXCT NC, s 041169 OVEY-NT - PHASE III IMEST LITTLE HAVANA STREET I"PR PROJECT NAME PROJE T SEE PROJECT DESCRIPTION = 149M LOCATION : 471w 472e 493. 771 472. 493. 771s 77S "We SERVICE t 471. o06 TRANSPORTATION : PROGRAMCATEGORY" s 061 STREETS 031 PUBLIC WORKS CATEGORY s PROJECT MANAGER 311 LEONARD LMERS O"SM s FYSII FIRST YEAR OF APPPPROPRIAAT pROACT SCHEDULE INITIAL REVISED COMMENCE DESIGN oof92 00191 06194 00194 AWARD CONTRACT BEGIN CONSTRUCTION 00193 00193 0019E 0019E SpRO CCTIACOM PLETE 00193 00i95 TOE$TII ASTE COSTCATEGORIES- _+--___• - --------- LAND ACQUISITION 77.0 11i44.0 �SOUt MENTION 9,0 AOMvdSTRATION 170.0 OTHER _-_-- _rr_:_-____r___---- TOTAL COST -.,-•r ...r-- 1saa,a TOT FUNDING SOURCESFUNCzw UNAUT• $716998 . -UNAUT 1200.0 . $TORMA$t G.O.sBOWS 99i STORM.---�M100.0 r--- ----------------r_rr- TOTAL FUNDING ti PPRO- AppgO- IOR ATION ONS PRIATIONS ost-9a AS OF 00129189 ------------------------------------- - - pROJECT-RSCRIPTIM41,rei. i NW 7 Strootr F ! MIN Pfojoet lb#lseHav continuation bordorod bgN rIMtiul�ldiAg ;, sonoroto t t SM 16 $troot. W 17 Aronuo and M 41 AYonu ! Conetruotloo will inoludo iwPhillgut ere,POvo*l oidowalk, oonerots eurbo andler gu#tor'd. 0#01'! drain+rgs f ! and landecoping- j t s i r ! t t � i -rrr------rrr--.ss• __+___rr-rwr____++•-----_____-srrwY.YrirArrri.M _ rr,_rrss % t •__------_r_rr,.r FUTtMMS► �19lZ iem"'T'Ei99Sr9�t r 1994-90 •-__r_rrr -r _1-6-x 1000 1S4#.0n 9.01 Z7fT.0 -_r rrrrrrrrr r----- -X---���� s ___r_r s_—...._o.a 0,0 w 0..0 a.a 0.0 Finat fumme R0- APPRO_ pRIATIM ts_PRIOR r__-_r ---------- i99Z-9I .,�s, r--,s_rrrr rsrr-rr.r'i+rF PRIATIONS lost-90 --1990-lZ ------ s_wr-:rr rrr-r-rr_ 1300.i --------- -rr-__r-_ 1 • n 1000 i 60 rrr---- rrrrsrrrr rrrrrrr 0' 1* stF -_r__rr_r --- 0.0 0+0 0.0 0.0 REVISION OATMT 011I27/69 i ' M ....._....e. _. .. .. ...__...,.. .�... ......_.. n1.h _.__......... ._..,__... .__. .r ,......... nw-.-eau:.:.... •.w....+gun+. -...YYY.F.14 YY.I -Y IYi. YY � it . YI i Y �lY. IL �. MIL I L YIY IYIY I�I h... .rs...• r-..+ro+.ai. lC fx CITY OF MIAMI ASOF66129/Nflr CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECTNO. :.041170 -------------------------------- ----------- --- -------r-rr.r PROJECT NAME : CITYWIDE STREET IMPROVEMENTS FY`91 - FY•95 1 PROJECT DESCRIPTION, f ADDRESS , CITYWTrw HBRHD LOCATION : 900 ! 1 These Improvewent* Involve small paving and a i NBRHD SERVICE : 900 cN► asi 1 pro **to that demand immsdisto attsntSi'ow such 1 pav n9 alleys. Widening intersoollent, and imprevwsdtf or bulidIng imProvs- f PROGRAM, : 006 TRANSPORTATION ! in aonjuation with subdivisIon f CATEGORY : 061 STREETS 1 unto. ! DEPARTMENT : 031 PUBLIC WORKS ! PROJECT MANAGER: 311 LEONARD HELMER$ ; r FIRST YEAR IN CAPITAL PROGRAM : FY33 ! M t FIRST YEAR OF APPROPRIATIONS : 1 PROJECT SCHEDULE = INITIAL REVISED 1 COMMENCE DESIGN 00/33 TBD AWARD CONTRACT ONGOING ! M BEGIN CONSTRUCTION ONGOING 1 BENEFICIAL USE ONGOING ! PROJECT COMPLETE 00/93 00/94 ----------------------------••------•••'••r•.w•r...r.ra...►r•...•r.Y+: TOTAL COST PRIOR Ate- APPRO- PRIATIONS --------------- FUTURE COST ESTIMATiI ------ 1991-92 1992-98 199E-94 119d-91i COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 ----- ---- ----- ------------------ rr-rrr-Y-r ------aaa------------------------- ------------- ---- s X 1000 LAND ACQUISITION DESIGN 110.0 22.0 22.0 22.0 22.0 22.0 CONSTRUCTION 2145.0 429.0 429.0 429.0 429.0 429.0 EQUIPMENT ADMINISTRATION 10.0 2.0 2.0 47.0 47.0 2.0 2.0 2.0' 47.0 47.0 47.0t-F OTHER 235.0 ----- ---ss:,y ---------------------------------- TOTAL COST 2500.0 ------------------ 0.0 0.0 ------------------ $00.0 500.0 ------------------ $00.0 500.0 500.0 PRIOR APPRO- TOTAL FUNDING APPRO- PRIATIONS PRIATIONS 1939-90 ---------------- --- FUTUM 1990-91 1991-92 i1SE1ING------------------- i:' 1992-98 1995-94 1994-10 FUNDING SOURCES --------- ---- --- --- -- --------- ---rrr--- -•----rrr. i. ---------------------------------- Y $76 HIGHWAY G.O. BONDS-UHAUT. 2500.0 --------- ( • X 100000) $00.0 $00.0 ,t 500.0 500.0 500.01 --------- TOTAI. FUNDING--------------2500.0 -- 0.0 -- 0.0 ---- 500.0 $00.0 500.0 500.0 500.0t" 8 t REVISION DATE 07/27/89 ��:: II �I 1� ��� III . CITY.�� OF MIAMI AS OF 0012MV CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY§D PROJECT NO. 8 041171 ----------------------- — --- PROJECT NAME s REBUILD SIDEWALKS AND STREETS FY'1991-95 ADDRESS s CXTYWXOE High:Z: bond funds Will be Wood to r~9069'20603 H9RHD LOCATION 1 900 ; stre where the oxi6ting surfas* has d4vtOr16PO`t4dv •SERVICE HSRHO s 900 1 Resurfmainy helps protect the be**. U*r*vsw thv I riding our &Go and Isproveo v14V81 4OPSAWSR40 Of PROGRAM s 006 TRANSPORTATION CATEGORY' 1 061 STREETS legal stro0s. I DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERt 311 LEONARD HELVERS FIRST YEAR IN CAPITAL PROGRAM t FY68 FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE t INITIAL REVISED I COMMENCE DESIGN I t AWARD CONTRACT I 1 BEGIN CONSTRUCTION 00188 00191 BEHEFXCXAL USE 00/93 00/95 PROJECT COMPLETE 00/93 00/95 1 ------------------------------------ TOTAL COST PRIOR APPRO- APPRO- MATZON 4 --------------- FUTURE COST Esrj7",m 1991-92 1992-98 1990-94 1994-20 COST CATEGORIES ESTIMATE PRXATXON8 1949-90 - 1990-91 --------- --------- --------- --------- -- ----wi ------------------------- --------- --------- ------- 0 x 1880 LAND ACQUISITION DESIGN 2500.0 CONSTRUCTION 500.0 300.0 $00.0 $00.0 $00.0 EQUIPMENT ADMINISTRATION OTHER --------- ---------- - - - - ------------------------- --------- TOTAL COST 2500.0 --------- --------- 0.0 0.0 --------- --------- 500.0 $00.0 $00.0 $00.0 TOTAL PRIOR APPRO- APPRO- PRXATXOH8 1989-90 ------ FuTm rumovs --------- ------------ sm-ft 1990-91 1991-92 1992-98 I"S-94 FUNDING SOURCES FUNDING PRXATXOHB --------- --------- ----- --- -------- ------------------------ --------- s76 mXGHWAY'Q.O. BONDS-UNAUT. 1750.0 --------- --------- ( * X 1000 ) 850.0 350.0 $50.0 $60.0 &SOL* 150.0 150.0 390.0 350.0 at? MUNICIPALr FUEL TAX 750.0 --------- --------- - — ------ --------- TOTAL FUNDXHQ_ 2500.0 --------- --------- 0.0 0.0 --------- $00.0 500.0 500.0 Ne. 0 W-sof V=910", DATE 0#102f#9 h THT ; PAW ' �YCl L7E 4 � ■�■r��r�rir� � �i�,����i,���i�r~ray C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY PROJECT NO. s 343229 PROJECT NAME s DOWNTOWN COMPONENT OF METRORAIL ST-II - CONTRIBUT. ADDRESS f SEE PROJECT DESCRIPTION NBRHD LOCATION s 019. 491, 292, 295 NBRHO SERVICE s 263, 291, 292, 295 PROGRAM f 006 TRANSPORTATION CATEGORY" s 063 MASS TRANSIT DEPARTMENT s 038 PLANNING PROJECT MANAGER: 388 CLARK TURNER FIRST YEAR IN CAPITAL PROGRAM s FY86 FIRST YEAR OF APPROPRIATIONS s FY88 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 05/63 AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 01/94 COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST PRIOR APPRO- TOTAL COST APPRO- PRIATiONS ESTIMATE PRIATIONS lost-90 --------------------------- 7239.3 2000.0 --------- --------- 7ta9.a 2000.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS 198 CONTRIS'FR GENERAL FUND 172.3 172.3 250 LONG TERM DEBT INSTRUMENT 7007.0 695 CERTIFIC. OF PARTICIPATION -86 60.0 1927.7 ------------------------- --- - -- TOTAL FUNDING 7239.3-2000.0 4 1767.7- ---1767.7- APPRO- PRIATIONS 1989-s0- AS OF 09/29/99 ------------------------------------- 1 PROJECT DESCRIPTIC10 ! ! ! ! As part of the Dad* County Transit System, a downtown ! ! people mover component, consisting o Stages 2 and II ! ! is under construction in downtown Miami to facllitats ! ! the movement of people to and from transit stalls ! 1 their destinations. Phase I was completed and oppened ! ! for service in April, 1986. The City a, Miami has a ! 1 commitment Metro -Dade County to finance a percent&gs ! ! of the total projaot as* t as reflected below for stag9• ! ! II. Stage ZI is the north -south line, •xtendln9 north ! 1 to the Omni area and south to the Briskeli Avenue area. ! ! ! ! ! ! ! i 1 ---------------------------------------------------------r-- �--'------------- FUTURE COSTESTIMAT" 1990-91 1991-92 lost-ti 199i-96�-1994-95 ------------- ---- ------------------ 4 0 x 1000 ) 1800.0 2403.5 2608.5 -- ----------- -----------.--r i000.0 2603.5 2603.5 0.0 0.6 �------------------ FUTURE FUNDING - --- ---> 1990-91 1991-92 1992-95 1990-94 1994-00 --- ------------------------------- ( 8 x 1000 ) 1800.0 2604.5 2663.5 1767.7- ------------------------------------------------------ 1767.7- 1600.0 2003.5 2603.5 0.0 9.0 REVISION DATE 00/10/49 ,.. ►: M mnIHMMO s, _ C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 420002 PROJECT NAME : MIAMI CONVENTION CENTER PARKING GARAGE ADDRESS : 200 BE 1 AV NBRHD LOCATION s NBRHO SERVICE : 263 PROGRAM : 006 TRANSPORTATION CATEGORY s 064 PARKING DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERs 983 ALLAN I. POMS FIRST YEAR IN CAPITAL PROGRAM : FY77 FIRST YEAR OF APPROPRIATIONS : FY50 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 02/71 10/79 AWARD CONTRACT 10/79 09182 BEGIN CONSTRUCTION 05/84 11/80 BENEFICIAL USE 05180 02/51 PROJECT COMPLETE 02/83 12/84 COST CATEGORIES LA ND CQUISITION GN TION EQUIPMENT ADMINISTRATION - OTHER TOTAL COST FUNDING SOURCES PRIOR APPRo- TOTAL COST APPRO- PRIATIOHS ESTIMATE PRIATIONS 1989-90 --------------------------- 241 CONVENTION CHTR REVENUE BONDS 249 CONY. CENTER REV. BONDS -INT 695 CERTIFIC. OF PARTICIPATION -66 758 US DEPARTMENT OF NUD, WAG 955 DADE SAVINGS a LOAN ESCROW TOTAL FUNDING 46 AS OF 08/29/89 -----------r--------------------r---- ! PROJECT DESCRIPTION: t I I The Convention Center varking Garags f I The Convention Center Parking Garage is a oompanSon t I part of the Miami Convention Center Codex. The t I project consists of a ground level retail area With 10 t I levels of parking stove providing a total sf 1450 car I I parking spaces. Constructed above the Garage is a 37 t I storyy ottic* building now known as the Centrust Tower. I I Within the Garage building there 1s a MetreMover I' I station which is part of the downtown public tranpor- I I tation •yytom. The Garage is connected to and previdea I' I parking for the Convention Center, ConTrust Tower and t I other downtown patrons. The Garage is subetantiallg I I complete and in operation excapt for the loth level and t I unfinished work in other areas. Final copletien is I I pending the outcome of lltlgatlon. ---------------------- ------------------------------------- - - - - - FUTURE COST ESTIMATES----------t 1990-91 1991-92 1992-98 199S-94 1994-96 --- - - - - - ---------- - - - - - - - - -----f -i-0 x 1000 i- - - 2.0 2.0 20269.0 20269.0 905.0 $05.0 581.0 581.0 21757.0 21757.0 0.0 ------ 0.0 0.0 ----- ----- ---r--r-rrii 0.0 TOTAL FUNDING PRIOR APPRO- PRIATIONS APPRO- PRIATION8 1969-90 <-------- ---------- FUTURE 1990-91 1991-92 - ----- FLOOM H--------------r-r-s 1992-95 1998-94 1994- -------------------------- --------- --------- --------- --- t s x 1000 10176.0 10176.0 668.0 666.0 1063.0 1063.0 4994.0 4994.0 4854.0 4854.0 -----rrr- -0.9 --- ziisi_ o _ -zi;si.o -- o.o - - - -- o.o -- - o.o _ ---..- ----- 0.0 0.0 REVISION DATE 05/16/09 .. 4� Yi"N w PROJECT NO. : 351169 PROJECT NAME s WINONA SANITARY SEWERS ADDRESS s SEE PROJECT DESCRIPTION HBRHO LOCATION s HBRHD SERVICE : 592 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY s 071 SANITARY SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY84 FIRST YEAR OF APPROPRIATIONS s FY64 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 06183 06/88 AWARD CONTRACT 07/86 07/86 BEGIN CONSTRUCTION 10186 10186 BENEFICIAL UBE 07187 08/08 PROJECT COMPLETE 11/87 10/88 TOTAL COST COST CATEGORIEB ------------ r---- _------ ESTIMATE --------- LAND ACOUISITION DESIGN 300.0 CONSTRUCTION 6011.0 ADMINISTRATION 77.0 OTHER 662.0 TOTALlcO-BT---- ------ --- -- -7050.0 TOTAL FUNDING 801 a FUNDING --------- +--------------- --------- $71 1960 SANITARY BE= G.O. BONDS 7050.0 .--------------' - ------ TOTAL'PUNDING-7050.0 C I T Y O F M I A M 1 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 08/20199 Sr---r------r----r-----r-----r------- ! PROJECT OECRIPTxON: 1 ! 1 ! This project will provide sanatory sewers to that are* f ! bounded bv W. 60th Ave., SW Sth St., the F.E.C. ! Railroad trooko, and the northern City 11"to. ! ! This area is currently served bg soptie tank* and 10 !. ! zoned predowinotely singlo-fool1v and duplex. ! 1 ! 1 ! 1 ! F t 1 ! c ! a ! 6 ! -------------------------------------------------- ------ PRIOR APPRO- APPRO- PRZATIONS _ i------------- FUTURE COST EST MISS--------------sw 1991-02 1992-98 1!!S_" 1994-O 1 PRIATIONS 1909-90 1990-91 ------ ----- --------- ----- c 4 x 1000 I 300.0 6011.0 77.0 662.0 - r-- - 7050.0 ------0.0 ------0.0 -o.o o.� 0.0 G.i1s PRIOR APPRO- APPRO- PRxATIONS 1989-90 <------------ FtlTURE 1990-91-1901-92 FiNOtilil 1992-98 -----�-....-#*, -loss-" 1l14w+' PRIATIONS ---- --------- --------- --------- --------- --- -t 0 x 1000 1 7050.0 - --------- 1050.0 --------- 0.Q - -- 0.0 0.0 COMPLETION DATE 09/30169 K�mIWWIYIIrUlIMI�AIII��iuowr�MlrrYMMMriMrruMiufiNi'i7rYIXAiir�mlluuuApoi��r�n�pilY,�pnNeiO��Xuifid�illhl)11111Ul1.1giiil6l ui. it ull C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 - PROJECT NO. : 851170 PROJECT NAME : CITYWIDE SAN. SEWER EXTENSION - PRIOR TO FY'88 ADDRESS : CITYWIDE NBRHD LOCATION s HBRHD SERVICE : 900 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORIC s 071 SANITARY SEWERS DEPARTMENT : 081 PUBLIC WORKS PROJECT MANAGERS $12 DANIEL BRENMER FIRST YEAR IN CAPITAL PROGRAM : FY78 FIRST YEAR OF APPROPRIATIONS : FY86 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN ONGOING AWARD CONTRACT ONGOING BEGIN CONSTRUCTION ONGOING BENEFICIAL USE ONGOING PROJECT COMPLETE 09/85 12187 PRIOR TOTAL COST APPRO- COST CATEGORIES ------------------------- ESTIMATE --------- PRIATIONS ------ LAND ACQUISITION DESIGN 64.0 64.0 CONSTRUCTION 1872.2 1872.2 EQUIPMENT ADMINISTRATION 8.0 8.0 OTHER 142.8 142.8 --------- ------------------------- TOTAL COST --------- 1586.5 1566.5 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS 871 1980 SANITARY SEWER 944 M.D. WTR 8 90 AUTH. G.O. BONDS 45.0 REIMBSMNT 1541.5 45.0 1541.5 --------- ------------------------- TOTAL FUNDING --------- 1586.5 1586.5 a APPRO- PRIATIONS 1989-90 0.0 APPRO- PRIATIONS --1989_90 AS OF 0612P 'SS' PROJECT DESCRIPTIONS ! These extensions will provide sanitary sewer• to t ! unsewered pockets and provide tar modifications to - the, t ! existing ***or systom where required. ! ! t ! Modification costs for the existing system 0111 be, ! ! reimbursed to the City in total by the Via" - 084e, ! ! Water and Sower Authority Department of Dade, County. ! Now sanitary sewers laterals to serve unsewered pro- t ! gPornes will be contrusted and paid by the City eA tt I Miami. ! I 1 t t----------------------------------------------------------r <--------------- FUTURE COST ESTIMATES ----------------► 1991-92 1992-98 199S-94 1994-90 1990-91 ------------------ --------- --------- ( 8 X --------- 1000 --------- ------- — --- ------ ------ -- ------o.a� <------------------ r YfYAi 1990-91 1991-92 FUND=0 --- •r--------------- �` s 1992-SS 1996-94 1944-9'S ------------------ ( • X 1000 ------ --------- 0.0 0.0 0.0 0.0 0.0 0.0 COMPLETION DATE 09/30/89 11300 �. a PROJECT NO. t 851178 PROJECT NAME t FLAGAMI SANITARY SEVERS - FY'87 ADDRESS t SEE PROJECT DESr-RXPTIOH HBRND LOCATION t S91 HBRHD SERVICE : 591 PROGRAM t 007 PHYSICAL ENVIRONMENT CATEGORY t 071 SANITARY SEVERS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGER: 812 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM t FY81 FIRST YEAR OF APPROPRIATIONS : FY86 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 01/86 01/86 AWARD CONTRACT 07/86 04/57 BEGIN CONSTRUCTION 08/86 06187 BENEFICIAL USE 06/88 PROJECT COMPLETE 06/87 10/88 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 041"199 ----------------------- ! PROJECT �SCRZPTIONt t I The Flogami Sanitary (ewers pre eat gill provides severe t ! in the area bounded by the F.E.I• Railroad trooks, t ! SW 8th St., and the northern and western City limits. ! ! t ! The zoning in this area is predominately single-s ily t ! with commercial stripe along W. Flaglar St., SW Sth St. t ! and the SAL and F.E.C. Railroad tracks. ! ! t ! The additional funds will provide for construction of t ! deeper pipe on S.V. 4 Street to eliminate a pump ! ! station, and for boring and jacking a 10 inc sanitary t ! sever pips under the SAL Railroad. This proposed t ! sewer extension is necessary to provide service, to ! ! properties on S.M. 6 Street east of the Railroad. ! ! t t t. ! t ____---_-r-____-rr--_rr----------------------------r------r- . ■ TOTAL COST PRIOR APPRO- APPRO- PRIATIONS c--------------- FUTURE COST ESTIMATES ---------------► 1991-92 1992-98 1998-94 COST CATEGORIES ESTIMATE PRIATIONS 1999-90 1990-91 --- •r--- r _..-------------- --------- --------- -- --------- --------- c s x l000 � LAND ACC MSmON DESIGN 112.0 112.0 CONSTRUCTION 2280.0 2280.0 EQUIPMENT NMSRATION ADM IT 13.0 18.0 OTHER 245.0 245.0 ----- -r-- rrr- -rrrrrr-- -rrrrrruf-r --------- --------rr-_--_- TOTAL COST --------- 2600.0 _ - _ __ -__- 2600.0 --------- 0.0 -----r--- 0.0 ----- 0.0 0.0 0'•O TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------- FUTURE FUNDINS 1992-98 _ -rr..rrrrrrrrr.•, 1998-94 1994-*6 FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 ---- ----- 1991-92 ------------------ --------+ ------..... -----------=------------- --------- - - ----- - --------- 1 f X 1000 > $70 1975 8 76 BAN SEW G.O. BONDS 2600.0 2600.0 jpTAL Fp 2600.0 2600.0 0.0 0.0 0.0 0.0 sq" R COMPLETION DATE 09/80/89 " '"'" 1i911111u1w I11111116YiiiY 114111171YIIIli.l Ytllllu fY..lil.GiliYYitlY WIN ■'OlYiliNIlY111111yHiMI111III iph ddibi nlliYil1 llllllillllllllllllllgldlllll 11111111 IIII I II III 11111 I.W { i { CIT Y OF MMIAMI ASOF'001"►80 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. s 351176 --------------------- -- --------- —--------- ---------rrrr PROJECT NAME s FAIRLAWN SOUTH SANITARY SEWER IMPROVEMENT - FY•67 I PROJECT OESCRIPTIONs F ADDRESS s SEE PROJECT DESCRIPTION I r NBRHD LOCATION : 592 NBRHD SERVICE 592 I This project was originally included in the Oltyy�.w I r : I Fairlawn 8anitary Sewers, Project No. 000172. The I Fairlawn Oletriat has been split into the Fairlawn r PROGRAM „. : 007 PHYSICAL ENVIRONMENT I North District and Fairlawn South District. The, r CATEGORY : 071 SANITARY 8EWER8 DEPARTMENT .I remainder of the ons inol Fairlawn District as : 031 PUBLIC WORKS I described in the 1962-$a GIP has been desigynated r PROJECT MANAGERs 312 DANIEL BRENNER i as Winona Sanitary Sower Improvement (351169)ti r I Sanitary Sewers will be provided in the area bounded I FIRST YEAR IN CAPITAL PROGRAM s FY79 I by S.W. 57 Avenue. S.M. 61 Avenue. W. Flagler Street I' FIRST YEAR OF APPROPRIATIONS : FY86 I and S.W. 8 Street. r I The land use -in this area is predominately single- r PROJECT SCHEDULE s I faaily residential with commercial and melt& -unit I INITIAL REVISED I residential strips adjacent to the arterial Street*. i COMMENCE DESIGN 10/64 10184 I Additional funds are needed due to risinq construction I AWARD CONTRACT 11/65 07/87 I costs for sanitary sewer construction axperleneed in I BEGIN CONSTRUCTION 01/86 09/87 I the last 2 years. I BENEFICIAL USE 08/66 I I PROJECTCOMPLETE 10/86 00/88 ------------------------------------------------- ---------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS i--------------- FUTURE COST ESTIMATES---------------� COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-98 1998-94 1994-91 ---------------------------------- ------------------ --------- ------------------------------------ 1 • X 1000 LAND ACQUISITION DESIGN 85.0 $5.0 1716.0 1716.0 ECONSTRUCTION ADMINISTRATION 11.0 11.0 OTHER 188.0 188.0. - - - - - - --------- ------------------ --------- ----------�--0.0 iTOTAL C08T PRIOR APPRO- TOTAL APPRO- PRIATION8 ------------------ FUTURE FtNDINQ-+---r-------------r FUNDING SOURCE$ FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992`-90 1"S6" 1'"4-9M ---------------------------------- ------------------ .........--------- t 6 X 1000 1 $71 1980"SANITARY SEWER G.O. BONDS 2000.0 2000.0 -------- ----------------- ----- ---- —----------------- --- ----------- ..--- ------- TOTAL FUNDING 2000.0 2000.0 0.0 0.0 0.0 0.0 0.0 0.0 COMPLETION DATE 09/30/89 07, I'17'i �iilf �lil.l�nil. I1 Ihmrnlll e.. q .._.. C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NAME C2T17YW= SANITARY SEWER EXTENSIONS FY•66 : ADDRESS * CITYWIDE NBRHD SERVICE : 900 PROGRAM,. s 007 PHYSICAL ENVIRONMENT CATEGORY : 071 SANITARY SEVERS 061 ptiBLIC WORKS DEPARTMENT s PROJECT MANAGER: $12 DANIEL DRENNER FIRST YEAR IN CAPITAL PROGRAM s FYS6 FIRST YEAR OF APPROPRIATIONS : FYS6 PROJECT SCHEOtri.E t INITIAL REVISED COMM04CE DESIGN 09/65 AWARD CONTRACT 09/46 09/65 09/86 BEGIN CONSTRUCTION 10/86 10/06 12197 BENEFICIAL USE PROJECT GONE OS/87 10/SS TOTAL COST COST CATEGORIES ----- ----------------- --- ESTIMATE --------- LAND ACQUISITION 107.0 DESIGN CONSTRUCTION 1576.0 miumm 12.0 ADMINISTRATION 0 OTHER -_ - ---- ------------------------- TOTAL COST 1926.0 TOTAL NDING FtBOZNQ SOLMEB.._--_..-.._ -- --- $71 1950 SANITARY SEWER G.O.-BONDS 630-0 944 10.0- NTR S SWR AUTH. REIMBSMNT ------0 TOTAL FUNDING — — ------1925.0 fk PRIOR APPRO- PRIATIONS 107.0 1579.0 12.0 266.0 1926.0 PRIOR APPRO- PRIATIONS 610.0 1615.0 1926.0 /1PO- ATIONS AS OF 06/29/69 ! PROJECT-DESCRZPTZON= ! ! ! ! These extension* will provide sanitar!� eewere to ! unaewered pack and provide for 80411leations to the C ! existing sower aystes whore required. r ! os will be- f ! Modifioa#ion costs for the existing syst E ! reiwbureed to the Citq in total 69 the Miari-Qeds ! ! Water 6 Sewer Authority Oopartsen of Dade County. N ! N ! N ! P ! 1 ! = CAST lllIM10 Err-r-r--------s 1990-91 1991-92 1992-93 _ ---- --------r rrrr+rrrr.-rrrrr-r.. -__-`-• X 1000 )- -- _-__-_--------_- _____ 0.0 _--_ �0.0 0.0 0.0 APPRO- -FiJT#O1lE•-,.....----•----- r PRUTZ" <---«---------!!1-!Z 1092-98 1lOM-lS 11 4-� . 1969-90------ ----------------r-... _•--•- ." { i x 1000 O.O 0.Q MA, COMPLETION OATS 09180/89 -- - � NIIIINIIIII I_ , ._._.. „ .. _ yen,w.�u.�Hu���eu�K�Yv+wuwn!iwxi��luiie.,LlLu.u.�a� I&IIi n. CITY OF MIAMI ASOF0:I29/S! CAPITAL. IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECTNO♦ i 951163 ---r-----r----------------- -----------rr-araarrraaaa-rrr PROJECT NAME a SOUTH FLAGLER SANITARY SEWERS t PROJECT DESCRIPTIONS ADDRESS : SEE PROJECT DESCRIPTION NBRND LOCATION 1 593, 594 t This project will provide sonitarM sewers to *no arer N NBRHD SERVICE s 593, 594 ! bounded 6 W. 57th Avenue, W. Flsglsr Siroetp W. 47 F h ! Avenue and S.W. 9 Street. 1 PROGRAM t 007 PHYSICAL ENVIRONMENT CATEGORY : 071 SANITARY SEWERS t ! The zoning in this area to prodo"natfIV eler9Te-tasattyl DEPARTMENT s 031 PUBLIC WORKS ! and duplex with cowwerciai and wultipie-W A,t ! residential strips adjacent to the arterial stroeU. M I PROJECT MANAGERt 812 DANIEL BRENNER 1 FIRST YEAR IN CAPITAL PROGRAM : FY79 ! This prefect is funded btj a portion of funds pprovhoutlB 1 4"11681- FIRST YEAR OF APPROPRIATIONS : FY84 ( deei9nated for the Flaglor Sonitar0 Sewer* t M PROJECT SCHEOULE = ! R INITIAL REVISED N COMMENCE DESIGN 05165 05166 1 1 AWARD CONTRACT 01/86 11129 ! E BEGIN CONSTRUCTION 03/86 02/90 ! ! ; BENEFICIAL USE 02191 PROJECTCOMPLETE 01 /87 04191 -----------------------------------r.. rr-rr----r-a..�----. TOTAL COST PRIOR APPRO- APPRO- PRIATIDNS �---------- aaar--aar.rrr+s ----- FUTURE COST 50 MATES 1991-92 1992-98 1998-" 1994-90 COST CATEGORIES ESTIMATE PRIATIONS 1909-90 1910-91 --------- --- ----- ----------------- r-rNr-M. lraf...rr-r ------------------------- --------- --------- t e X 1000 1 LAND AMM IZUON DESIGN 256.0 193.0 63.0 CONSTRUCTION 5116.0 3635.0 1281.0EQUIPMENT ' ADMINISTRATION 65.0 50.0 15.0 OTHER 543.0 422.0 141.0 ----- ------ ----- ----- --------- -----a-,... -r-- -0.0 � ----------------------- ----- TOTAL COST - - 60000 --------- 4500.o --- 1500.0 0.0 0.0 0.0 O.O� PRIOR APPRO- � TOTAL FINDING APPRO- PRIATIONS PRIATIONS 1969-90 <----------- RUTM --err-......r..a....a..--...r 1990-91 - 1991-92 1"2-90 1909-" 1914•SO FUNDING SOLES --------- ------'-----------r aar-♦r.r..r rrrrr--rr. t • X 1000 ? 470 1975 i 76 BAN SEW 0.0. BONDS 6000.0 4500.0 1500.0 _ _ _ _ ------ ------ ssr...rr.rau. .rrr..-rrrr. ---------••--------r------ --- TOTAL ------- ----- 6000.0 ------- - 4500. 0 ------ 1504.0 ---0. o 0.0 0.0 0}.01 0'-.0 a. * REVISION OATS 06117149 PROJECT NO. i 351168 PROJECT NAME : SOUTH FLAGLER SANITARY SEWERS ADDRESS o SEE PROJECT DESCRIPTION NBRHD LOCATION : 593. 594 NBRHO SERVICE : 593, 594 PROGRAM., : 007 PHYSICAL ENVIRONMENT CATEGORY : 071 SANITARY SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY79 FIRST YEAR OF APPROPRIATIONS j FY84 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 05/65 05/86 AWARD CONTRACT 01/86 11/89 BEGIN CONSTRUCTION 03/86 02/90 BENEFICIAL USE 02191 PROJECT COMPLETE 01/87 04/91 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADTMINISTRATION OHER TOTAL, COST FUNDING SOURCES ------------------------- $70 1975 6 76 SAN SEW'G.O. BONDS ------------------------- TOTAL FUNDING lk C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 --------------------------------------------------rrrrrrr-r- ! PROJECT OESCRZPTION: !` ! This projjsat will provide sanitary sowers in then area, t ! bounded b W. 571h Avenue, W. Flagler Street, W. 47 t ! Avenue and B.M. 8 Street. t ! The zoning in this area is prsdowinetsly single-SmAly t ! and duplex with commercial and eultipio-unit t ! residential strips adjacent to the arterial streets. t I t ! Thie project is fundby a portion of funds previously t ! doslged nated for the Flaglor Sanitary Sewers 43611683. ! t ! t t t ! t' : t ------------------------------------r------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES---------N--N-s ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-93 1998-94 1l14-9y --------------------------- --- ------------------------------- ( s-X 1000 ) 256.0 193.0 63.0 5116.0 3835.0 1281.0 65.0 50.0 15.0 563.0 422.0 141.0 --rrrr--r 6000.0 rr r-rrr-- 4500.0 ..---rrrr- 1500.0 -rrrr--r- rr------- rr------- 0.0 0.0 0.0 PRIOR APPRO- TOTAL APPRO- PRIATIONB <------------------ FUTURE FUNDING FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-95 --------- --------- --------- --------- ------------------ 1 e x 1000 ) 6000_0 4500.0 1500.0 --- $000.0 - 4500.0 1500.0 0.0 -0.0 - -0.0 REVISION DATE 06/17/19 4 r�+�■�t��� a����F������Lrtiititi�rk C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 951174 PROJECT NAME t SOUTH GROVE SANITARY SEWERS ADDRESS t SEE PROJECT DESCRIPTION MBRFD LOCATION t 395 HBRFD SERVICE t 395 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY : 071 SANITARY SEWERS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGERt $12 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM t FY62 FIRST YEAR OF APPROPRIATIONS t FY67 PROJECT SCHEDULE t COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE INITIAL REVISED 00/87 03/87 00/S6 03/90 00167 06/90 06/91 09/69 09/91 TOTAL COST COST CATEGORIEG --------- ---------- ESTIMATE --------- LAND ACOUIBYTION SIGN DECONSTRUCTION 5.0 5116.0 EGUIPMENT , ADMINISTRATION: 65.0 OTHER 568.0 ------------------------- TOTAL C08T --------- 6000.0 TOTAL F'U"03M SOURCES - -- FUNDING --------- 471 1980, SANITARY 8EWER' A- O. OONDS 1 6000. 0 ----------------- . - TOTAL FUNDING 6000 0 PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1989-90 ------------------ AS OF 0912!/" ----------------------..--------------------------.r------- 1 PROJECT DESCRZPTIONt ! ! Sanitary *aware will be, eonetrueted in the area, 6000 tdr t ! byy Kus itot Avenue, Douglas Road, the, Southern City f ! Lisits, and LoJouno Road. j 1 ! ! ! ! ! ! ! 1 1 !` P ! ! ! F 1 !' ----------------------•------i.rM...r..rrrr+r-r�.Yfa.rrr.rr�r+rrG.iw1 �- --- FUTUM COST 1tSj'jmT"-+•r••-••• •••••••-•r•• 1990-91 1991-92 1912-9s 1!!►009# 1#"-** — — — --------r--r.�.. r.r.�rr•rrr-r.lYr.►�rii 1 • X 1000 1 256.0 5116.0 65.0 566.0 — - 6000.0 _---- 0.0 ---_- ---►—rr—.► -.. 0.0 --.rrr—r..— _—r—rr--..-----lY. PRIOR APPRO- APPRO- PRIATION8 PRIATIONS 19s9-90 ------------------ FUTUTMO 1990-91 1991-92 promo iO 1902-98 ---- -------••----ter ms-l4 1l1 --------- --------- --- -------- --------- --------------- t s x 1000 1 6000.0 ---6000.0 ----r 0.0 _ _ ----r _ ----- 0.0 0.0 0.0 0.0 f400 REVISM OATS 0s/17/119 al AS OF 001"I" C I T Y O F M I A M� CAPITAL IpROVEMENT PRIOR PRO =TFDE4�IPTION pROJECT NO. % 351273 FLAGLER SANITARY $ egNAME g aNORTH WE PROJECT DESCRIPTION HBRHD LOCATION t 593. 594 HBRN SERVICE : 593. 594 007 PHYSICAL ENVIRONMENT CATESlr t : 071 SANITARY SEWERS PUBLIC WCIRKS DEPARTMENT : PROJECT MANABERi 031 312 DANIEL eREHNER FFIIRRST YEAR OF APPPPROPRIATIIONS ITAL PROGRAMs FYa4 PROJECT SCHEDULE ' INITIAL REVISED DESIGN 01/69 O1/t9 Aw�CCMACT BEGIN CONSTRUCTION 05/e9 05 / 90 C 07/90 PROJECT COMPLETE TOTAL COST COST CATEGORIES ESTIMATE - --------------------------------- LAN A=ae'TION 200.0 DESIGN 3990.0 CONSTRUCTION 50.0 W)MINISTRATXON 440.0 OTHER __-- --------- TOTAL COST FUNDTING FUNDING SOURCES --------- _--T6 SAN SEW G.O. BONS $70 1975 & GPI, BONS 19tl0 SANITARY Ste__ 1715.0 2965.0 ------ S71 _ _NG ---- soTAL __ 4660.0 k __ _____---rrrrrrrrrrrrrrrr rrrrr rrrrrrrr.•--r�rr..--•+- ! PROJECT DESCRIPT"" ei t ! This pro�sct will provide sanitary *aware sktsv ! ! area bounded by M• 57 Avsnuf. N. City ! 47 Avenue and Fla9ler Street. t ! sin41°- t ! The zoning in this area Is prsdowinnd multiple - family !. and duplex with cewaercial and ! unit residential strips adjacent t° the artsrl�ai t ! streets. t i !This project is funded by a portion et tundsSowere ! tL.,01 designated tar "a Flaglsr Sanitary ) t ! rpp t--rrrrr_______________r-rrrr-Nr_-rrrrrrrrrrrrrr-rrrrrr---I. APRIOR pRIATI� <-------------1!!1FUTM COST ESTIMATES - -- 1w.96 PRIOR _ 1ATI 1!!I rNrrrrM N-Nr rr' PRIATIONS-!0 --- _ -91 - --•--• •rr.r---- ( • X 1000 ) 200.0 3990.0 50.0 440.0 isao.0 PRIOR APPRO- PRIATIONS __-------- ------0.0------0.0------0.0 0.0 0.0 APPRO-ley-------1!!4-!S pRZATIONB-------------1991-9ZFU:UA �!! __Nt 1969-90 1990-91 _91 --------- - ------ -------------`-• x 1000 ) . 1715.0 2965.0--------- ---- -----0 0 0.0 4660.0 .rrrrrrrrr rrrrrrrrr ---- V• ------oo o.o 0.o • .t3 REVISION DATE 09/03/89 all C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM' PROJECT DESCRIPTION FY90 PROJECT NO. : 351274 PROJECT NAME a CITYWIDE SANITARY SEWER EXTENSIONS - FY'87 ADDRESS : CITYWIDE HBRHD LOCATION : 900 NBRHO SERVICE : 900 PROGRAM., : 007 PHYSICAL ENVIRONMENT CATEGORY : 071 SANITARY SEWERS DEPARTMENT 1 031 PUBLIC WORKS PROJECT MANAGER& 312 DANIEL BRENIER FIRST YEAR IN CAPITAL PROGRAM : FY$7 FIRST YEAR OF APPROPRIATIONS : FY87 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 09185 09166 AWARD CONTRACT 09/86 09/97. BEGIN CONSTRUCTION 10186 10/47 BENEFICIAL USE PROJECT COMPLETE Os/67 10149 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST j AS OF 00/29189 ------------------------------------------------------------ ! PROJECT DESCRIPTION: t Sanitary Sowers shalt be provided at *elected 19ae*1000 1 t in small areas that are presently wnewered. N t } N t j 1 ! t � t ------------------ ----NN_-------------------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS--------------- FUTURE COST ESTIYATEM)----- ---N-N-._y ESTIMATE PRIATIONS 19f9-90 1990-91 1991-92 1*"-!a 1993-94 Is"_#* --------- --------- --------- --------- _N- ( 0 X 1000 ) 6.0 129.0 1.0 14.0 150.0 TOTAL FUNDING SOURCES FUNDING 61 t 194D SANITARY SEWER G.O. BONES 150.0 -_- ------- -"-----------ram - -------- TOTAL FUNDING 150.0 6.0 129.0 1.0 16.0 PRIOR APPRO- APPRO- PRIATIONS t------------------ FUTURE F NDZft- PRIATIONS 1999-90 1990-91 1991-92 1992-98 --------- --------- --- ---------- -..-- ( • X 1000 ) 150.0 --- - --- - --- -- ----- --------- 150 0 0.0 0.0 0.0 0.0 4 ---Im 1s9N-9p CITY OF MIAMI AB09 "04291 CAPITAL IIiOROVEMENT PROGRAM PROJECT DESCRIPTION PROJECT NO. : 951275 PROJECT NAME : CITYWIDE SANITARY SEWER. REPLACEMENTS - FY'07 ADDRESS : CITYWIDE HBRND LOCATION : 900 NBAHD SERVICE s 900 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORf : 071 SANITARY SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERs 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY87 FIRST YEAR OF APPROPRIATIONS : FY67 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 09/86 09/86 AWARD CONTRACT 09166 07/48 BEGIN CONSTRUCTION 10/86 10/88 BENEFICIAL USE PROJECT COMPLETE 05/87 06/69 COST CATEGORIES LAND ACQUISITION DESIGN CONBTRUOTION ADMINISTRATION OTHER TOTAL COST - r- -------------r----------------r-- —. W rr�+.s-rirl.s+r.M ! PROJECT OESCRIPTIONs E t These extensions Will previds few the ra010401001¢ at F ! sxistinq doterloratod sawors and sawore w=th An- 1 ! suffielent capacitoi in conjunction with 011y at M1401 t ! Nlghway leprovawanta- On* profcot wAIA invoSvo thmm ! eontruction of new ***or* to a11*lnat* exlstIP4440110 1 ! tanks in aonjuntlon with now CIIV at MAaw# straat 1 ! improvements. ! ! 1 1 ! 1 ! fi ! !---------------------------ar..--..----r----------.rr.--rN...r.�r.s. PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE am ERTIMAIEB r-r-r—rrrrrrrrr�. ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-93 I"S-" E994-ft -------------- ------------- --- -------r-..-rr r-rrrrrrr •-risNrs f It 1000 I 70.0 1412.0 18.0 155.0 1655.0 TOTAL FUNDING SOURCES FUNDING ---------------- 873 1980 SANITARY SEWER G.O. BONDS $5.0 $44 M.D., WTR S SWR AUTH. REIMSSMNT 1640.0 ---------------------------------- TOTAL FUNDING 1655.0 k 70.0 1412.0 18.0 155.0 -- - 1655.0 ------ 0.0 ----- - ----- 0.0 0.0 ___ ____ ----- -----------.�.. 0.0 9.0 0.9 PRIOR APPRO- APPRO- PRIATIONS PRIATIOH8 1989-90 <------------------ FUTtm 1990-91 1991-92 ---- FUND2NO---------------j---3 1992-91 199*-94 t9lt�►9W --------- --------- -----•�—r► --------- --------- ---- -- — — — l t x 1000 i $5.0 1600.0 ----- - -------------- _ __ -----------------..-,...... --1655.0 0.0 0.0 REVISION DATE 08/11/06 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION PROJECT NO. s a1113?6 ONCT HAVE s go PROJECT DESCRIPTION GEM IMPROVEMENJ 1' NlMRND LOCATION s 633 NSRHO SERVICE s gas PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY" s 071 SANITARY SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGER: $13 DANIEL BREMNiER FIRST YEAR IN CAPITAL PROGRAM : FYa7 FIRST YEAR OF APPROPRIATIONS t FYaa PROJECT SCHEDULE s COMMENCE. GN AllAiM3 CON RACTT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES --------•---------------- LAND ACQUISITION DESIGN CONSTRUCTION ASTRATION TOTAL COST INITIAL REVISED 10187 10/67 0616a 07/89 08l68 10189 06/90 04l69 04190 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS 54.0 54.0 1084.0 1084.0 14.0 14.0 131.0 1Aa1.0 13aa.o TOTAL FUNDING SOURCES FUNDING __-'------_—r------------ -! S71 :19td BAN{ITARY Sp" Q.O. BONN 1383. oA TOTAL FUNDING !SO- PRTZOHB 159-90 _--r_r--_ AR Or 00129199 bnfi _ _ _ _.. __-------_--------r,yrwirr.s...�----•w• --1� 1 PROJECT- DESCRIPTIONs M 1 This proasat will provide sanitarV ewwwr• to NN.M. as N ! Street bwtwwen N.M. 37 Avenue and N.R. SO Avenue and ! is being oonstruated In son "notion with the t ! robuildln99 Of N.M. as $trey by the Flees" N ! Departmen# of Transportation. ! ! N 1 N 1 1 1 � ! N 1 N 1 t e --------------- _ I" -r----rr-r----so ,t...r--__------- FUTMMIE ".' It>IeTIMA 1990-91 1991-91 =nZ•!a 191arS4 -; -0 NC 1000 N _-------- ------0.0 __..--_0.0 "`__-_-0.0 0.0 PRIOR APPRC- APPRO- PRIATIONS <----------------- FtAEMi199s PRIATIONS 1989-90 1------ 1991 lI --------- -----_ � 13aa.0 '----- --`1263.0------0.0 i0.0 --------- ------0.0 0.0 w: ■ -r---rrrr r—r-r-.MjM.► r----r-r-r---1"44 199a�9A mr4zs=w DATE 09.0"199 A�: 0.0 DID PROJECT NO.'' PROJECT NAME : :TEE 351279 LAST SANITARY SEWERS'' t SEE PROJECT DESCRIPTION N R : $95 .SERVICE : 007 PNYSSCAL ENV=RONMENT SANITARY SEWERS DEPARTMENT : 071 031 PUBLIC WORKS DANIEL BRENNER PROJECT MANAGERS 312 FIRST YEAR IN CAPITAL PROGRAM s FY88 FIRST YEAR OF APPROPRIATIONS : FY33 PROJECT SCHEDULE = INITIAL COMMENCE DESIGN 01 / 83 07/89 AWARD CONTRACT OEM CONSTRUCTION 09188 BENEFICIAL USE PROJECT COMPLETE 06/89 R�SSED 09/90 12190 12/91 03/92 TOTAL COST COST CATEGORIES -rrr-r--r-r-------------- ESTIMATE CpUtSITIOW 213.0 ComeTRUCTiON 4263.0 ATZON 69:0 4---- OTNER -- s0000 TOTAL COST TOTAL FUNDING SOURCE$ - F(NDING ----- ------------------------• g38'1960 SANITARY G.O. S. - SANITARY SEVER G.O. 88 SL 1000.0 BONDS 1400.0 1171'1980 872 1980 SANITARY SW G.O.d. -97 SL---2600_0 -------------=----------- 5000.0 TOTAL FUNDING i O I T Y O F Y I A K I CAPITAL IMPROVEMENT PROGRAM' PROJECT DESCRIPTION FY9 1 PROJECT DESCRIPTIONS 1 t This project will provide Wa/1ltaE' StMFB' TA Avenue,, ,, ! This Prd9 ueaaWa�ad arse bounded Merlee AveSw+r. ! Royal Read. Oou9lae Reado the aeut City - ! Ssaoayl+a ray• E ! ) ! 1 ! M ! .1 ! ) ! 1 ! 1 ! 1 ! ------ ------- ---rrrrrrrrrrrrsrrrrrrr./rrr+-r- PRIOR E TEN �� e APPRO- PRZATIONS •--r-too•----1991-92 1�1'-9i 19i�-14 tll+t-l0 PRIATZONS1969-90--------r-----� NrrNNr--------- ---- ----- ------- - 4 ! X 1000 ) 171.0 42.0 3410.0 $53.0 44.0 11.0 -N 375.0 94.0 ------ _----rlrrr rr-rrrrrr -------N r---" 0.0 - 4000.0 --------- 1000.0 0.0 0.0 PRIOR------------------- pRIATIONS------------------ FtN 1!l8-94 ld-! 1992--92 APPRo- PRIATZONS 1989-90 -1990-91 1991-92 - r-rrrr-r - ----- -- rrrrrrrrs rrr,�..rrr+ -------.- -------- --------- t f X 1000-) 1000.0 1400.0 2600.0 ------0.0 ------------------ 4000.0 1000.0 REVISION DATE 07/24/89 .......... t 0 I T Y O F M I AM I At OF OS4M#* CAPITAL ZiIPROVEtl�NT PROW" PROJECT DESCRIPTION FV90 PROJECT_ NO : 8ai279 µ -rr---r ---_-N------N---,.-1.rr+rrr-r-r-.rr�wN-.r PROJECT NAME a THE LAST SANITARY SEVERS' I PROJECT DEBCRt =ONE ADDRESS BEE PROJECT DESCRIPTION NBRFM? tOCATIuN : 8t5 I This Prejoat Will provide oanstar e0~0 too ! rowainins unooitered area bounded Mlarlas Aver . + L N!" SERVICE t 895 I naval Road, Douglas Roadf the lout Oity Lielts and PROGRAM t 007 PHYSICAL ENVIRONMENT ! Bieoayno Ray. I CATEGOR# t 071 SANITARY SEWERS DEPARTMENT t 081 PUBLIC WORKS ! 6 PROJECT MANAGER: 812 DANIEL BRENNER• ! I FIRST YEAR IN CAPITAL PROGRAM % FY88 I I 1 FIRST YEAR OF APPROPRIATIONS t FY88 PROJECT SCHEDULE 9 INITIAL REVISED ! COMMENCE DESIGN 01 /86 01 /68 ! AWARD CONTRACT 07/89 09/90 ! BEGIN CONSTRUCTION 09/88 12/90 ! M BENEFICIAL USE 12/91 PROJECTCOMPLETE 06149 08/92 ! ------------ --------------------------------"" TOTAL. COST PRIOR Ate- ------ FUTURZ COST ESTIMAT[R APPRO- PRIATIONS <--------r---------------t" 1990-91 1991-92 1912-*$ 1"S_" I9lr-!S � COST CATEGORIES ESTIMATE PRIATIONS lost-90 rrrr --- -------N--N- -- ---rr-rrr-r-rrrrrr--r rrr---rrr rrr-rrr-- r---r---- * X 1000 1 LAND ACQUISITION DESIGN 218.0 171.0 42.0:, CONSTRUCTION 4268.0 8410.0 858.0 EDUXPNENT ADMINISTRATION 55.0 44.0 11.0 •. OTHER 469.0 875.0 94.0 ---- - r------- - : rrrrr---rrrrr-rrrr-'-rr-r-. r-rrr--rr TOTAL COST 5000.0 -rrrrr-rr 4000.0 rrrr-rrrr 3000.0 r--•r-rr-- ----- 0.0 0.0 0.0 0'•O 0..0� TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTURE 1990-91 1991-92 FU IDIM 1l92-90 s --- ---------------- r 1998-t*FUNDING 1l14-9E 4 SOURCES FUNDING PRIATIONS 1989-9 _ _ ----� -----N-- rrNr-.►err --rr-r-rr - ---------------------------------- --------- - ------ -- --0 _ - -t • X loco-) $38`1940 SANITARY G.O. B. - 88 SL 1000.0 1000.0 $71'1980 SANITARY SEWER G.O. BONDS 1400.0 1400.0 ¢` $72 1980 SANITARY SW G.O.B. -67 SL 2600.0 2600.0 -rrr --------- --------- ------------------------- -----rrr- TOTAL FUNDING 5000.0 rr- rr---r000 4000.0 ---- 1000.0 ----r 0.0 0.0 0.0 Q.O 0.0 8 1. REVISION DATE 07/24/69 A Atirrti�h:�hhf C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECTD9IPTION PROJECT NO. : 351280 PROJECT NAME t SE OVERTOWN/PARK WEST SANITARY SEWERS ADDRESS t SEE PROJECT DESCRIPTION HBRiD LOCATION t 251, 263 HBRHD SERVICE : 251, 263 PROGRAM „+ t 007 PHYSICAL ENVIRONMENT CATEGORY : 071 SANITARY SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERt 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY87 FIRST YEAR OF APPROPRIATIONS t FY87 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 01187 AWARD CONTRACT 07/67 BEGIN CONSTRUCTION 09/87 BENEFICIAL USE PROJECT COMPLETE 03/88 00190 COST CATEGORIES LAND DESIACOUISITION CONSTRUCTIONEOUIPMENT ADMINISTRATION OTHER TOTAL COST AS OF 00/2!/89 ------ ! PROJECT DESCRIPTION: 1 ! This project will provide replacement sanitar r sewers to the Overtown/Park West Redevelopment i I Project and will be constructed in con uction, with f I the rebuilding of streets by the City n the come t ! area. The project is bounded by the following streetst ! I NW 10 street, NW 3 Avenuo, M 5 Street and Miami. ! Avenue. I ! ! An agreement between the City Manager and the County ! ! Manager will require the CIA to pa for infrastructure f ! improvements (water lain replacement) that were I ! constructed in this project to servo the S.E. Overtown/C I Park West redevelopment area. 1 1 N ! t ---------------------------------------- ----------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--------------- FUTURE COST ESTIMATES---------------y ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-96 19986-94 1994-90 --------------------------- --- ---------------r---rr--r-�-r..rir►:. ... ( • X 1000 ) 100.0 810.0 5.0 65.0 1000.0 TOTAL FUNDING SOURCES FUNDING II FEC RAILROAD REIMBURSEMENT 58.0 $71 1920 SANITARY BE= G.O. BONDS 692.0 944 M.D. WTR 8 SWR AUTH. REIMBSMNT 250.0 TOTAL FUNDING 1000.0 A 39.0 771.0 5.0 65.0 900.0 PRIOR APPRO- PRIATIONS 100.0 400.0 400.0 900.0 $1.0 $9.0 - 100.0 APPRO- PRIATIONS I989-90 42.0- 292.0 150.0- - ioo.o ----- -..--- ----- rr-r-- --- -------.tar o.0 0.0� 0.0 0:0 <- --- FUTURE PUNOM --------r---r---r-.t tx 1990-91 1991-92 1!!2-!S t9ll.•94• 1l9f- -4 i-x 1000 7 - - - - - ----r ---------..-r...r - - - - - r--: 0.0 -0.0 o.Q ro.a 0.0 REVISION DATE 07/24/8! 01 ,' ■ iI PROJECT. NO. 981261 PROJECT NAME t DOWNTOWN SANITARY SEVER REPLACEMENTS - PHASE III ADDRESS t SEE PROJECT DESCRIPTION NBRND LOCATION : 268 NBRND SERVICE : 268 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY s 071 SANITARY SEVERS DEPARTMENT i 081 PUBLIC WORKS PROJECT MANAGERS 812 DANIEL BREMNER FIRST YEAR IN CAPITAL PROGRAM : FY68 FIRST YEAR OF APPROPRIATIONS o FY88 PROJECT SCNEMLE : INITIAL REVISED COMMENCE DESIGN 10/87 12/89 AWARD CONTRACT 04/88 06190 BEGIN CONSTRUCTION 06188 08/90 BENEFICIAL USE 01/91 PROJECT COMPLETE 12/48 08/91 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EDUIZPMENT ADMINISTRATION OT HER TOTAL COST AS Or ----------------•---------------•-------------------.. ! PROJECT DEESCRIPTIO is t ! This project will provide replaeement eanitae6 eewele ! to the area bounded by North IST Streetr BiscayW ! Boulevard. South 1ST street and West 1ST Avenue. 1 ! Total Cost Relabureable byy alarm-Oade Water ands ! Sewer Authority Department- ! R ! The preject will be constructed in conjunction withr t ! the streat rebuilding project (Project No. "1119f k ! within the same area. ! 1 ! I t ! —r---------------------------- ----rr..r-rrrrr--rrrrrr•rrrrrr�r PRIOR APPRO- _ DO TOTAL COST APPRO- PRIATIONS----•---------- FU'FUTURE92-!i ESTIMATES -r---� ESTIMATE PRIATIONS 1989-90 1990-91 1901-92 i9 ---------------------- ----- ---------— --------- •-------- ....N—..r—r. ( 0 x 1000 ) 84.0 84.0 682.0 682.0 9.0 75.0 75.0 9.0 ------------------ $00.0 $00.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS ------ ---------- ------- ------------------ $71 1980 SANITARY SEWER 6.0- BONDS 50.0 $0.0 944 11.0- NTR 8 UR AUTN- REIMBSMNT 750.0 750.0 ---------------------------------- ------ TOTAL FUNDING $00.0 600.0 0.0 9.0- t r 9.0 APPRO- PRIATIONS 1989-90 ------0.0 -----r..-- -rr---r--- -r---rrr—. rrr---•r— _ �— — ------------ 1990-91 1991-92 1$"-99 •—....------ ---------� 1900-9# --- ----- ------rr— r-r-rr—r.r --------- ( 0 X 100a ) -•---••-- --------- ------- -- ----- —- —•---• 0.o a�.a • REVISION DATE 07/24/89 'a ! - f■■■itit�'i�i'�i'il,i`iri`I!Irlr1 �! 0 I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. t 331282 PROJECT NAME t BUENA VISTA/LITTLE HAITI SAN. SEWER REPL -PHASE I ADDRESS SEE PROJECT DESCRIPTION NBRHD LOCATION : 113 HBRHD SERVICE t 113 PROGRAM t 007 PHYSICAL ENVIRONMENT CATEGORY' 071 SANITARY SEWERS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGERt 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM t FYss FIRST YEAR OF APPROPRIATIONS t FY59 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 01/89 00/90 AWARD CONTRACT 03/8e 00/90 BEGIN CONSTRUCTION 06/s$ 00/90 BENEFICIAL USE 00191 PROJECT OOOLETE 10/66 00191 COST CATEGORIES LAND AOOUISITIOH DESIGN CONSTRUCTION EQUIPMENT OA MNISTRATION ------ ------------------- TOTAL COST As OF 06/29/8! ---------- ------------ --------------r---rr-rrrrr-rrrrr •rrrrr I PROJECT DESCRIPTIONS t This pro�act consists of the reploeoment of dotorke- ! I nated •anitar •ewers within the area bounded bV N.V. t ! 41 Street, N. Z Avenue N.N. 71 Street and N.E. Znd ! Avenue. t ! Mainline sewer and service lateral replacement will t ! be reimbursable bV Miami Dade Water s Sewer AutheritV ! ! Department. Now lateral extensions shall be paid t ! with SaniterV Sewer G.O. Bonds. This protest shall ! I be done in conjunction with the new atrei robuilding I ! work bV the CItV in the same area. t ! 1 ! i r-r---------------------------------rrrrrr rrr-----r----r---- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS <--rrrrrr------- FUTURE GMT ESTIMATES---------------r ESTIMATE PRIATIONS lost -to 1tt0--11 1901-92 19#2-90 199i-94 1994-99 --------------------------- --- -------- - --------- ----------rrrrr..rr. x 1000 1 13.0 236.0 3.0 23.0 300.0 TOTAL FUNDING SOURCES FUNDING ---------------------------------- $71 19$0 SANITARY SEWER Q.O. BONDS 30.0 944 M.D. WTR I SWR AUTH. REMOUNT 270.0 ------- ------ ----- ------ TOTAL FUNDING 300.0 13.0 236.0 3.0 23.0 rrr..---�..r --- 800.0 ----- 0.0 ----r -r 0.0 rrr-rrrrrr 0.0 •rrrrrrrr rrrrrr-rr PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1959-90 t------------------ FUTURE 1900-91 199i-92 FUN M 1999-93 --------- --------- r-------rrs lots-94 1994-96i --------- ------ --------- --------- --------- 0 x --------- 1000 1 30.0 270.0 -------af"-.. ---- 800.0 ----- -0.0 --------- 0.0 rrrrrr-- 0.0 ----- -0.0 --------- 0.0 0.0 REVISION DATE 09/17/00 . . 1 H .ifi..i.�'.uurrt .. .....n ._.. `:. »..: ....... .. ... ... .»_ ti..:. �. .' •:.. .::'w .. .. _ `� ...... _.: . .... ...... •.;..... M,. _ .... CIT Y OF MIAMI AS OF00129109 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECTNO. s 881285 --- ------------------------------ ---------•-----rrrr r..r..r...+ I PROJECT NAME s SHENANDOAH SANITARY SEWER REPLACEMENT - PHASE I ! PROJECT DESCRIPTION. ! ADDRESS s SEE PROJECT DESCRIPTION ! I This project consists of the, replassment e9 dste�ie- NBRHD LOCATION s 498 ! rated sanitary sowers within the, area bounded 89 HBRHO SERVICE s 498 I S.M. 16 Terrace, S.M. 24 Avenuo, S.R. 19 Street and PROGRAM„ : 007 PHYSICAL EHVZROIMENT ! S.M. 27 Avenue. 1 CATEGORY s 071 SANITARY SEWERS DEPARTMENT s 031 PUBLIC WORKS I ! Mainline sewer and service lateral replacement will 1 PROJECT MANAGER: sit DANZEL BRENNER I ! be reimbursable by Miami -Dade Water and Sower Authority Department. Now lateral extenelow shall t FIRST YEAR IN CAPITAL PROGRAM : FY88 I ! be paid with Sanitar Sewar O.O. Sonde,. This, project shall be done in con unction with the, now street 1 t FIRST YEAR OF APPROPRIATIONS s FY89 I rebuilding work by t e City In the same area. PROJECT SCHEDULE s I C INITIAL REVISED I r COMMENCE DESIGN 01/88 00/90 I t' AWARD CONTRACT 05/88 00190 1 t BEGIN CONSTRUCTION 06188 00190 ! 1 BENEFICIAL USE 00/91 ! PROJECTCOMPLETE 10/66 00191 ---~------------------------------------------`�`--�---- TOTAL COST PRIOR APPRO- APPRO- PRIATIONS •--------------- FUTURE 0061 IMTIMAM-------rrrrrrrs 1912-1S 1992-94 3l14-1996 COST CATEGORIES ESTIMATE PRZATIONS 1989-90 1990-11 1991-92 -------------------r•r rr..rrrrrr -----------------r---------------- --------- ------------------ t X 1000 I LAND AOGUISITION DESIGN 9.0 9.0 IC RUCnpH 171.0 171.0 KQUXPMENT ADMINISTRATION 2.0 2.0 ' OTHER 18.0 16.0 - rrr-rrrr rr.rrrrrrr -rr..-rrr-, NALrrrrCOST--rr..-----rrrrrr--------- TOT0 200.0 ----r 20.0 --- --- -rrr rr 0.0 _ -------r r-rrrrrrr 0.0 0.0 d1.0 d.0 o•ar TOTAL PRIOR APPRO- Ate- PRIATIONS <----------- rrrr•r..•..rr..r..rrrry ------- FUTUR[ Ft�I1M' 1991-92 1»2-98 1"0_94 1994'-!5 FUNDING S FUNDING PRZATZONS 1989-90 1990-91 ---- ------------- rrr-rrrrr r-------- -rrrr-rrL----------------------- --------- --------- t • It 1000 I 471 1980 SANITARY °SEWER G.O. BONDS 70.0 70.0 944 M.D. WTR 8 SIR AUTH. REIMBSMNT 180.0 180.0 --rrr rr-rrrrr r-rrrrr-r rr-rrrrrs -r-- r rr--r-rr-rrrrr--rrrr--r----------- TOTAL FUNDING 200.0 ------r-- 200.0 rr--rrrr.0 r 0 - rr-----r 0.0 0.0 0.0 !. REVISION DATE 05/17/89 f I � I �Il�lllllfl IY�111141111�YIfff.r ... ... ��+ C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF O8/29/$* " 0 PROJECTNO. s 351267 --- ------------------------------------- PROJECT NAME s CZTYWIDE SANITARY SEWER EXTENSIONS - FY'89 8 FY'90 1 PROJECT DESCRIPTIONt 1 ADDRESS i CITYWIDE 1 f NORM LOOATION : 1 Sanitary Sewero will Be provided at select" 2eeatiene ! NBRHO SERVICE s 900 1 in small related areas that are proeentiy uneewered. 1 PROGRAM t 007 PHYSICAL ENVIRONMENT 1 1 CATEGORY s 071 SANITARY SEWERS f f DEPARTMENT s 031 PUBLIC WORKS 1 1 PROJECT MANAGER: 312 DANIEL BRENNER 1 f 1 f FIRST YEAR IN CAPITAL PROGRAM s FY89 1 1 FIRST YEAR OF APPROPRIATIONS s FY89 1 f I f PROJECT SCHEDULE : 1 f INITIAL REVISED 1 f COMMENCE DESIGN 01/69 Too 1 f AWARD CONTRACT 05/89 f f BEGIN CONSTRUCTION 06189 1 f BENEFICIAL USE 1 f PROJECT COMPETE 10/69 ---------------- r-r------------- --N--- --r--rr--r--rr--r--- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS -- - - - - - - - FUTURE COST ESTIMATE!-•--r--------r- COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1190-11 199E-92 1992-99 I918-•94 19946.9>M ------------- --- ------------- --------- --------- --------- ---- t • X 1000 ) --------- ---N---- --------- . LAND ACQUISITION DESIGN 15.0 15.0 CONSTRUCTION EOUXPMENT 294.0 298.0 ADMINISTRATION 4.0 4.0 OTHER 38.0 93.0 -------------- --- Tosi►t. cost -- -- as0.0 --- s00.0 ------ 0.0 ----- 0.0 0.0 --------- 0.0 --------- 0.o -----rrr-. Osat .. PRIOR APPRO- TOTAL FUNDING SOURCES FUNDING APPRO- PRIATIONS PRIATIONS 1989-90 ------------------ FUTM 1990-91 2991-92 FUNOM 1992-9= 1"a-94 19940" ------.------------------ --------- --------- --------- --------- -• X 1000 1 -866 19SO SANITARY :G.O.;.G. - 66 SL $50.0 350.0 --------,....-------------- ' ''--------- TOTAL . Fi!ND2NG 350.0 --------- 350.0 -----a--- 0.0 --------- ----r---- 0.0 0.0 ---rr-..-.c.c 0.0 .r. 0.0 r—..--r.iul�l.. 0*0 REVMSION DATE as/80/49, ■Irrlllll/�II�iIOO.nomn Wnmunu .m. r CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO.: $ 051283 pROJEOT NAME $ WATSON ISLAND SANITARY -SEWERS. ADDRESS :.SEE PROJECT DESCRIPTION NBRND LOOATION : NBRHD SERVICE : 263. 296 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY : 071 SANITARY SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER$ 312 DANIEL BRENNER FIRST.YEAR IN CAPITAL PROGRAM : FYSa FIRST YEAR OF APPROPRIATIONS : PROJECT SCNMOxri-E $ INITIAL REVISED VOMMENCE DESIGN TBO AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIALUK PROJECT COMPLETE PRIOR TOTAL COST APPRO- COST CATEGORIES ESTIMATE PRIATIONS LAND �amON DESIGN COHSTRUOTXON" sa. o 1663.0 EOUXPMENT A HISTRATION 21.0 183.0 OTHER ------0.0 TOTAL C08T------------------1950.0 PRIOR TOTAL APPRO- FUNDIN6 SOURCES ----------------------- --FUNDING ---- PRIATIONS --------- SS9 1980 SAN SEW 00 BNDS -UNISSUED 1150.0 ---1950.0 ------0.0 =-------�-------------- --- TOTAL FUNDING I. APPRO- MATION9 1189-10 A9 OF 09129180 ----------------rrrr—r rrrr..r..r ! PROJEcs oEacRSPSION= � ! ! This Project will provide sanitary sswere to Watso$' ! Island should the island be rodeveleped Wilk any ! increase in land use. Funds will not bt appeopprrtoted 1 ! for the project until a seMlstesRt 10 reeehed b the ! ! City Comission to redevelop the island. The pro Seat ! would consist of the coneiruction of a puwpin ! station on Watson Zoland, a subequ4nm Moro* eairr !' ! across Biscayne Bayy, and a 9raVAIV syst6w throw r ! Bicentennial Park is Biscayne Boulevard! of approx- !` ! imateiy HE 12.Street. N t C ! 1 ! N !---- ------------------- ---------------- r---r---r--..rrrrrrrru, --------------- FUTM 009T SaMdMi •--r—rrrrr—rr—r,1r �,. ...:4 --1990-91 1991-92 IM-90 1998-*4 -------- ------ ----- ---- ,--- c s x 100-0-- sa.o 21.0 183.0 --rrrr----------- ----- 1950.0 0.0 0.6 0.0 0.0 " �—----------- —r — FUTURE -r---r-rrr---rrrrrr$ 1990-11 1991-92 lost -to 2904-99 ---- --rr —rrrrrrr— rrrr.i.-errs r—rrslii+ri+ s x 1000 l &a, .0 — -- ----- ----------- -r'r►....-r-r- 0.0 1950.0 0.0 0.0 0«Ila :0F40r REVISION DATE Setllli9 ------. 00 APPRO- PRIATIONS --1981--90 F'. PROJECT NO. s 051204 PROJECT NAME s CITYWXOE SANITARY $EWER EXTENTIONS ADDRESS s CITYWIDE HBRNQ LOCATION t 900 NBRND SERVICE s 900 PROGRAM t 007 PHYSICAL ENVIRONMENT CATEGORY` t 071 SANITARY SEWERS DEPARTMENT s 081 PUBLIC WORKS PROJECT MANAGERS 812 DANIEL BRRENNER FIRST YEAR IN CAPITAL PROGRAM s FY9S FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN TBO AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EGUXPMENT ADMINISTRATION OTHER TOTAL COST TOTAL COST ESTIMATE 80.0 640.0 10.0 70.0 750.0 TOTAL FUNDING SOURCES FUNDING 9s9 19S0 SAk WW'GO BNDs UNISSUED 750.0 ------------------------- --- ----- TOTAL FUNDS -750.0 CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 60/"1" FY'91-95 t PROJECT-DESCRIPTiONt' E t f I ssni#ary satrars shall bs provided at sslsat*d loaalso"or N I in *moll oraas #ha# or* Pr*00041y unssrrsrsd.. t E t ! t P ! 1 t r t r t f t t t t t 6 ------------------------------------------ PRIOR APPRO- PRIATIONS PRIOR APPRO- PRIATI APPRO- PRIATXOHS 19�9-10 APPRO- PRIATIONS 1989-90 --------- --------- FUTURE COST 60 101hus 1991-92 1992-98 1990-94 1994- 1990-91 - - -____ t____ •-X 1000-} 6.0 126.0 6.0 120.0 6.0 124.0 6.0 129.0 0.0 120.0 2.0 2.0 2.0 2.0 2.0 14.0 14.0 14.0 14.0 14.0 -r-r---wrr.. --. 150.0 __ IS8.0 --------- ISO-* --------- 150.0 is*,* <------------------ FUTURE 1990-91 1991-92 ru"M 1992-to --------- - �- * , 1s9s-94_r199-4. ` --------- ----t-s-X 150.0 --------- 1000 ? 150.0 150.0 150.0 150tie 150. O 150. a l5tt. a 150. a 150. REVISION GATE 07I24100' 1M I n R x -z 111�ll 1 71 711�117 PROJECT NO. : 352254 PROJECT NAME + PUMP STATION RENOVATIONS - FY'68 ADDRESS + SEE PROJECT DESCRIPTION NBRNO LOCATION + 900 HBRHD SERVICE + 900 PROGRAM + 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER+ $12 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM + FY88 FIRST YEAR OF APPROPRIATIONS : FY88 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 09/87 00/89 AWARD CONTRACT 02/58 00/89 BEGIN CONSTRUCTION 03/88 00/89 BENEFICIAL USE 00190 PROJECT COMPLETE 09/88 00190 COST CATEGORIES ------------------------- LAND ACMBXTION OESIGH CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER ------------------------- TOTAL C08t FUNDING SOURCES ------------------------- S75 1984 STORM SEWER G-O- BONDS wr r rwrrir TOTAL FUNDING 4 TOTAL COST ESTIMATE TOTAL FUNDING 0.0 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR APPRO- PRIATIONS 23.0 469.0 6.0 52.0 550.0 PRIOR APPRO- PRIATIONS A6 OF 06/29/69 r----------------------------r------r ! PROJECT DESCRIPTION+ ! t ! The City of Miss& owns and operates tour c4) stero ! ! **war pumping stations. It is anticipated that major !' ! equipment repalcesents will occur the next live ! years at these stations. ! Theo* stations are located at the following inter- ! 1 sectione+ ! ! ! ! N.M. 7 Street and N.M. 17 Place !` ! N.M. 6 Street and N.M. 18 Avenue r ! S.M. 4 Street and S.M. 7 Avenue t ! N.N. if Street and N.W. 5 Avenue r' ! This project is combined with project No. 8552164- ! r ! ! ! --------------------------------------------------------..r-- APPRO- PRIATION6 lost-90 <--------- --- r-r-r w : ------ FUTURE COST ESTIM ICS 1990-91 1991-92 1992-OS 1998-98 1914-99 ----- ---- --------- --------- --------- 4 x --------- 1000 ) 23.0- 469.0- 6.0- 52.0- -----..�� --------- 550.0- --------- 0.0 --------- 0.0 ------------------ 0.0 APP/RyO-- PRIATION9♦-------------- 19 89- 90 --- FUTURE 1990- 91 1991 w t2 M FUNDING -----------r-rw-rs.ry 1 "2-98 l tli-94 1 "440 --------- ------ w-- ------------------ rrrrrrrr.M. --------- ax 1000) $50.0 550.0- - --- --- - - ---- - ----------------------------------------------- 550.0 550.0- 0.0 0.0 0.0 &.0 m.9 • _ _ --mow-l"Pimmillawn � IIW A I I Ili - ....._. ... Ilia CITY OR MIAMI AS OFOS��I�Sl�"_ CAPITAL IMPROYEI1ENT PROGRAM PROJECT DESCRIPTION FY90 • I PROJECT `s SS2176 —w--w-rw--w----------------r--rr----------rr .�+r-.Yr.r.�rrrrr...►s 1 DOAH STORM SEWS PROJECT HAVE : $tW:NANER ! PROJECT DESCRIPTION& � .NAME ADDRESS i SEE PROJECT DESCRIPTION � ! This project will prOvid* 6evert to on are+ berdereo !� NBRMD LOCATION i t by S.W. 4 Street, S.M. 22 Street, S.M. 12 AvenaM a** NWt1iD 8ERYiCE t 493 _ S.M. 22 Avenue. 1 . PROGRAM = 007 PHYSICAL ENVIRONMENT, :: ! CATEGORY" t 072 STORM SEWERS DEPARTMENT : 031 PUaLIC WORKS 1 PROJECT MANAGER: 312 DANIEL BRENNER 1 FIRST YEAR IN CAPITAL PROGRAM s FY78 t 1 FIRST YEAR OF APPROPRIATIOMS i FY82 ! 1 PROJECT SCHEDULE s INITIAL REVISED � COMMENCE DESIGN 06/64 � 1 AWARD CONTRACT 05/17 K02H CONSTRUCTION 06/47 BENEFICIAL USE PROJECT COMPLETE 11/40 ! rr------------r---------r---------r--rr�rrrrr.r�-rrrr-r�r-r- TOTAL COST APam APPRO- - PRIG s------------r - FUTURE 1!!1-l2 COST 99TIMATti.--- 1992--- 1!!i-!4 1!!4rlW CO8T,CATEGORIES ESTIMATE PRIATICNS 1949-90 1990-91 -r------r ---.---..-- ----r -----------rr-------------- "" --------- --------- --r-r---r 1 • X IOOQ 1 LAND AOOUISITION DESIGN 22.0 22.0 ONSTRUCTION 684.0 634.0 EQUADMINISTRATION 3.0 3.0 OTHER 49.0 49.0 --------- rrrrr-r-rr-rr-- ------w----rr—--w—r---- TOTAL COST- 708.0 ..—w—ww w 708.0 ----- --------- -0.0 0.0 0.0 o.a TOTAL PRIOR APPRO- APPRO- ------------- PRIATIONS Ft1TtMK 1991-92 FtS14ti r-....-r...r-r..r--:r--rs 1992-95' 1!! =l4 1>!r-! " FUNDING 80URCES FUNDING PRIATIONS 1969-90 1990-91 -- -r-rr-r -r— ---- —r------rrrrrr—r--r--------------- --------- r—w------ c • x 1400 $74 1976:6 1978 STORM SEWER G.O.S. 12.0 12.0 $75 '1904 STORM SEWER G.O. BONDS 696.0 696.0 --------- --------� rr-rr�.....k .«•�.---- _ ----------- ---- - -- 706.0 ------- - 705.0 _ _ ----- -- ----- 0.0 0.O o.o a.a 0.0TOTAL-FLING A . COMPLETION DATE 09/30/89 _ �77 lilt '� :_ _ ,_ � i •d;nn w ru .w i � W-WW-rrill `i,`'�`�I��`�r�rAry�Ih�]�rJ� C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 352179 PROJECT NAME : ORANGE BOWL PUMP STATION MODIFICATIONS ADDRESS : NM 7TH ST 8 NN 17TH PL NBRHD LOCATION : 694 NBRHD SERVICE : 694 PROGRAM„ : 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY79 FIRST YEAR OF APPROPRIATIONS : FY82 PROJECT SCHEDULE : COMMENCE DESIGN AWARD.CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- INITIAL REVISED 12/89 09190 12/90 10/91 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS ------------------ LAND ACQUISITION_.;, DESIGN 5.0 5.0 CONSTRUCTION 93.0 $3.0 EQUIPMENT ADMINISTRATION 1.0 1.0 OTHER . 11.0 11.0 ---------------------------------- TOTAL COST ' 100.0 --------- 100.0 PRIOR TOTAL APPRO- FUNDING SOURCES FUNDING PRIATIONS .874,1976 51978 STORM,SENER A.O.S. .---------'; � 100.0 100.0 - --------------- --------- TaTLL CtIMTNA 100.0 --------- 100.0 I; As OF off"199 -------------------------------------------------r- rr.........• ! PROJECT DESCRIPTION: F' ! r ! Install now controls, overhaul pumps 1 and' Zv r ! construct automatic start for auxillarW Power unit. t ! Wood has arisen for the addition of onor M 000 1p:r t ! pump in this station. OrI#InaT construction planar for ! this station Provided for this additional pmw. r ! ! ! ! ! r ! ! ------------------------------ r--------- r--..--.ram-.r..r.------- APPRO- PRIATZONS - --- FUTtme coal ii liM"s -------rill✓--r1i i 1989-90 1990-91 1991-92 191I-18 1"0-f4 1994-99 --------- --- ---- --r ------rr-r- ( • x 1000 )- -0.0 0.0 0.0 0.Q QrY 6f�Q APPRO- PRIATIONS - --- F!tfr E Fi9N16iNC------------rr.►rrf 1989-90 1990-91 1991-92 1 "Z-9: 1"0-94 1!! --------- --- --------- --- --------- -----.r.b.rat 1-• x 1000 1 ------ r-r--- --------- ------ 0.0 ------0.0 --- 0.0 0.0 &.0 Q " RE 11ON DATE 05117/9! As OF off"199 -------------------------------------------------r- rr.........• ! PROJECT DESCRIPTION: F' ! r ! Install now controls, overhaul pumps 1 and' Zv r ! construct automatic start for auxillarW Power unit. t ! Wood has arisen for the addition of onor M 000 1p:r t ! pump in this station. OrI#InaT construction planar for ! this station Provided for this additional pmw. r ! ! ! ! ! r ! ! ------------------------------ r--------- r--..--.ram-.r..r.------- APPRO- PRIATZONS - --- FUTtme coal ii liM"s -------rill✓--r1i i 1989-90 1990-91 1991-92 191I-18 1"0-f4 1994-99 --------- --- ---- --r ------rr-r- ( • x 1000 )- -0.0 0.0 0.0 0.Q QrY 6f�Q APPRO- PRIATIONS - --- F!tfr E Fi9N16iNC------------rr.►rrf 1989-90 1990-91 1991-92 1 "Z-9: 1"0-94 1!! --------- --- --------- --- --------- -----.r.b.rat 1-• x 1000 1 ------ r-r--- --------- ------ 0.0 ------0.0 --- 0.0 0.0 &.0 Q " RE 11ON DATE 05117/9! CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION "SO At OF 00129►00 PROJECTNC. : $52162-----------------------------r--------------s.-..rrr....r.. PROJECT NAME : FLAGAMI STORM SEWERS PHASE I U PROJECT pESCRIRTZON: 1 ADDRESS s SEE PROJECT DESCRIPTION U 1 NBRHD LOCATION s $91. 592 t This project involves aon•teuallon o6 �Ie!!t><w• etes�wk 1 NBRHO SERVICE s 591. 592 I sewer • st•o for the area bounded m am St., F.11.0 . , y bbyy U Railroad. ». Flaglor St. and SW t7th Ave. 1 PROGRAM : 007 PHYSICAL ENVIRONMENT 1 CATEGORY" : 072 STORM SEWERS U 1 DEPARTMENT : 031 PUBLIC WORKS ! b PROJECT MANAGERs 312 DANIEL BRENNER ! 1 FIRST YEAR IN CAPITAL PROGRAM s FY35 FIRST YEAR OF APPROPRIATIONS s FY65 U 1 PROJECT SCHEDULE s ! 1 INITIAL REVISED ! COMMENCE DESIGN 01/65 04/90 E AWARD CONTRACT 05165 12/90 ! 1 BEGIN CONSTRUCTION 02/85 02/91 ; ! BENEFICIAL USE 12/91 ! 1 PROJECTCOMPLETE 02/92--------------- -------------------------r..rr-.r-r----r.�� PRIOR Ate- _----- FUTURE COST ESTIMATES --------- rr----* TOTAL COST APPRO- PRIATIONS <--------- COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-99 1!- --- 1------ -------------- rr—rr-.ter.- —r�—rrrrr LAND ACQUISITION DESIGN 100.0 100.0 CONSTRICTION 1364.0 1364.0 EQUIPMENT ADMINISTRATION 16.0 16.0 OTHER 116.0 113.0 ---- 0--- .0 --- ------ - OTAL ------- TCOST------------ 16Q0.0---1600.0- ----- -- 0.0 0.0 0.0 0.0 0.0 PRIOR APPRO--------� TOTALAPPRO— PRIATIONS------------------ FUTURE--rrrr-rrr-- FUNDING SOURCES FUNDING PRIATIONS 1969-90 1990-91 1991-92 1992-93 1993-9d 1994-15 ---- r- --—--------- -rrr.��llirYr- ----- —-- --------------------- X 1000 )s 66S STORMWATER UTILITY TRUST FUNDS 770.0 770.0 675 1964 STORM SEWER G.O. BONDS 630.0 1600.0 770.0-' ----------- --------- -------------------------------------N-0--- 0.0 TOTAL FUNDING 1600.0 160Q.Q O.Q 0.0 O.0 O.0 O.O A REVISION DATE 07/27/80 cur � C I T Y OF MIAMI AS OF00/2t/S! CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION .., . FY90 PROJECT NO. : 852184 ------------------- ------------------------------------- ---- PROJECT NAME : LAWRENCE PUMP STATION - MODIFICATIONS ! PROJECT DESCRIPTION: E ADDRESS : SEE PROJFr.T DESCRIPTION ! f NBRHO LOCATION : 775 ! This project involves major renovation at the t NBRHD SERVICE : 775 ! Lawrence Storm Sewer Pumping Station. Me. 961 at 8W 416 1 ! St. and SN 7th Ave. and major medlileatlons to the mr- t PROGRAM : 007 PHYSICAL ENVIRONMENT ! chanical and electrical aq�ipmont In the pump station. t CATEGORY-: 072 STORM SEWERS ! Funding from pro cot 852254 Is being combine# with Wd f DEPARTMENT : 031 PUBLIC WORKS ! this project to the major renovation at tho t PROJECT MANAGER: 812 DANIEL BRENNER ! Lawrence Pump Station. ! t FIRST YEAR IN CAPITAL PROGRAM: FY85 ! i FIRST YEAR OF APPROPRIATIONS : FY`S ! r PROJECT SCHEDULE INITIAL REVISED ! ! COMMENCE DESIGN 08/85 071#6 ! f AWARD CONTRACT 10/65 08/99 ! i BEGIN CONSTRUCTION 12/85 05/89 ! 1 BENEFICIAL USE 12/89 ! f PROJECTCOMPLETE 06/66 02/90 ----------------------------- PRIOR APPRO- TOTAL TOTAL COST APPRO- PRZATIONS <--------------- FUTUM am COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 IM-90 1995.94 116f- ------ -- - r ------ ------ --------- --------- --- ------------- --------- r-----sr� -�-f X 1000 LAND ACQUISITION. DESIGN 58.0 19.0 S4.0 CONSTRUCTION 1056.0 884.0 672.0 EOUZPMENT ADMINISTRATION 14.0 5.0 9.0 OTHER 127.0 42.0 65.0 f- ----- --- -- ----------- ------------- TOTAL COST 1250.0 -- -_--- - - 450.0 --- --_-_- 800.0 _-__- ----- ----r --s----rrrss r_r-rrnfWrs, ---- ---- - 0.0 0.0 0.0 0.0 a: . PRIOR APPRO TOTAL APPRO- PRIATIONS - --- FUTUIK FUlOZNM-------------- FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 in*_#$ IM-94 119M- ------------------------- --------- --------- --- ------_------ --- _.r_--r------- 1 f X 1000 t 5511 SURFACE'WATER-IMP. 4 it". FWD 250.0 250.0 $65 STORMWATER UTILITY TRUST FUNDS $50.0 550.0 875 1964 STORM SEWER G.O. BONDS 450.0 450.0- $90 1984 STORM 0.0 BONGS - 86 SALE 450.0 450.0 ----------- -- TOTAL FUMING 1250.0 --- - 450.0 --- 600.0 ----- ----- rr_rrss_r. +.errs:--r- rrr..rr_r� 0.0 0.0 0.0 .B 0.0 i REVISION DATE 06~69 2 ai CITY OF MZAMX CAPITI PROJECT DESCRIPTION FY90 --- -rrr--.r---rrr•r•a�Irr-rrrr....r�•r y iS2187` ! PROJECT DESCRIMON= t : 'COCEIN<) i GROVE STORM SEWERS SEE PROJECT. �BCRIPTION ! phis pro set involves aenetruate� et steew d4rt� 1 ADDRESS . selected NSRHD-LOCATION = $94 ! at dRd-M Donald St in Oak Ave*, Tlrrt&UAve. 0" � I• NBQHD.BERVICE = 994 ._ ! Bird Rd.. McDonald St., Oak 1 i S.W. 27 Avenue. = 007 PNYSacAL ENVIRONMENT CPROGR ORP. 072 STORM SEWERS ! 1 APARTMENT : 031 PUBLIC WORKS ! 1 ! ) PROJECT MANAGER= $12 DANIEL BREMNER ) FIRST YEAR IN CAPITAL PROGRAM : FYBS ! � FIRST YEAR OF APPROPRIATIONS = FY86 ! ) PROJECT SCHEDULE = INITIAL REVISED ! 1 DESIGN 1 c�oMwENCE'oESI 04/86 03/86 1/ae � AWARD CONTRACT OS/S6 03/59 ! _ BEGIN CONSTRUCTION 09/89 - rrrrr.. BENEFICIAL u. .�wE.—•—•—•r••rr•—•—•-rrrrrr+.r AT •, NrrN• rNrrrr� ... ,. PROJECT COMPLETE 12/a6 12/89 �r FUTURE M �. Nrrrrrr�r 994 !!h-9 1990i:w -- ------ 1992-99 99t-94 1990-91 199I-92 ,r-.,rrrrrr --------- __ ----- •r—rNNr rrrYNr�r COST CATEGORIES LAND ACOUISITION DESIGN .` OONSTRUCTION EQUIPMENT ADMINISTRATION OTHER ----------------- TOTAL COST FUNDING SOURCES .$75`.1984 STORM 8EWER 8.0. BOMB STORM TOTAL FU►DING PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS 32.0 32.0 639.0 639.0 9.0 9.0 70.0 70.0 --- --------- 750.0 ------ 750.0 PRIOR TOTAL APPRO- FUNDINA PRIATIONS _ 750.0 750.0 --- 750.0 1750.0 APPRO- PRIATIONS --19e9-90 0.0 APPRO- PRIATIONS --19t9_90 0.0 ------N- rarrrrrr rrrr•rrr.r ------0.0------0.0 0.6 0.0 0.a — FUTURE � rrr..rr+—rrrrra►r+rrsi ------------- l9i-�Z 1992-99 19046." 199s-911 1990-91 _— rrr�,,,r,r„F rrrrrrrrr X 1000) ar ra N •r•--- ------rrr rye YIMf ------0.0 0.0 � ' w PROJECT NO. : 952190 PROJECT NAME : TAMIAMI STORM SEWERS - PHASE II ADDRESS : SEE PROJECT DESCRIPTION HBRND LOUATION : $92. 593 HBRHD SERVICE : 592, 593 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY85 FIRST YEAR OF APPROPRIATIONS : FYI? PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 00166 00/90 AWARD CONTRACT 00186 00191 BEGIN CONSTRUCTION 00186 00/91 BENEFICIAL USE PROJECT COMPLETE 00166 00/92 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRICTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES TOTAL COST ESTIMATE 865 STORMWATER UTILITY' -TRUST FUNDS $75 1964 STORM SEVER 0.0; BONDS -L—----------- TOTAL FUNDING ' 77.0 1534.0 20.0 169.0 1800.0 TOTAL FUNDING 500.0 1300.0 iaoo.o C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FT90 PRIOR APPRO- PRIATIONS 77.0 1534.0 20.0 169.0 NW. ; PRIOR APPRO- PRIATIONS 1400.0 ISOO.0 APPRO— PRIATIONS 198l-l0 ------0.0 APPRO- PRIATIONS 1969-90 500.0 500.00.0 - AS OF 00/29f61 ---------------------------------rr•r. ! PROJECT DESCRIPTION: F ! This project Involves construction of a trunk was* F ! •Votes to receive flow from Taelawi Store Sewers t f cosplated during FY 1902-88. Ths systom will sommat F f into an existing Outsell iseatod at NW 7tR St. and t ! HW 57th Ave. and will serve the area bounded 6yq F ! NW 7th St., W. 57th Avo., SW 8th St., and Ir. 62nd Av. t ! f ! t ! t ! t ! t f F ! ! ! C ..----r-.�r_r-•..rrr•rr-rrrrr-rrrr�r.rrr..rrr�Yr+l.r /.rrrrrrrria-irrrrr ♦------------- FUTURE COST 1S7F MATft-••r......r......►.•: w i!l0-11 1!l1-11 1992-98 199ir91 f x 1000 ) ------------------ FUTURE FUND=o-------- -------rr.�r:. 1910-91 1991-92 1992-98 1991694 1990•►W- --- ----------------•-•r..-� _-rr�.rrrr 1 f x 1000 1 ---------------- -----------r__-+-- •-rrr-rri. - 0. 0 0.0' 0..0 0.0" too REVISION DATE 00/08/89 89-8a6 I �IIIIIII iji' Iwo ..- i011j'YIIIYIIYii II7 PjL,Jlitl um i ii CITY OF YI'ANX Alwr CAPITAL IIPRONEMEW PROGRAM PROJECT DESCRIPTION FY90 PROJECTW. 352194 ---rr—•.---•r-------------------------- ------- t PROJECT OESCR2PT20Na 1 PROJECT NAME a LAWRENCE WATERWAY DREDGIN9 i 6ULXHEAOING E ADORES$ s SEE PROJECT DESCRIPTION _ ! This project involves construcllan 09 UulkMadAn !" NBRNO LOCATION s 691. 692 ! and culvert construction adjacent to xhS, rAl O 1 L' 'NBRHD SEi�VICE s 694. 692 t we and the deedgin¢ o9 the Lawrence 7�atN'MoW''1'e0 71h $treat l0 the Mlani River. Thf Lawe�" 1 PROGRAM. s 007 PHYSICAL ENVIRONMENT CATEGORY s 072 STORM SEWERS ! N. . ! WaterwaV is located between N. M'. 1Y11r PlsOlr arrd' 11M« lies north c9 N-W. 7th, Stroet« 'DEPARTMENT : cal PUBLIC WORKS ! lath Avenue and PROJECT MANAGER& 312 DANIEL BRENNER t' FIRST -"YEAR IN CAPITAL PROGRAM s FYAS ! !. i FIRST YEAR OF APPROPRIATIONS s FYaa ! 1 f PROJECT SCHEDULE ! INITIAL REVISED COMMENCE DESIGN 03/67 10149 i 1 AWARD CONTRACT 01/88 00/90 BEGIN CONSTRUCTION 03/8e 00/90 ! BENEFICIAL USE 00191 PROJECT COMPLETE 05/09 00/91 -w-------•err—r-arrr-rrrwrrwrwrwrrrrrr.wrrww- TOTAL COST M20R Ate- ------ FUTURE GMT 9STMIft--•---rr-....-.+�....r> APPRO- PRIATIONS <--------- 1l10-91 1991-9E IM-98 z!!i"'!hi 3990-!� COST CATEGORIES ESTIMATE PRIATION9 lost-90 ---rr.rr -rrsrrrrr ----------- ---- ------ ---- -••-------- •-••••-•• -•••-•..---•----------------------- c • x 1000 1 LAND ACOUISITION DESIGN gTRUOTTON 6s.o 1279.0 EQUIPMENT AOM2NLTRl►TION 16.0 OTHER 141.0 --------- TOTAL.COST ------ -- TOTAL FUNDING SOURCES FUNDING IL ------------------------ --------- 474.1976 6 1978 970RM`SEWER 11.0.8- 1500.0 TOTAL FUNDING 1500.0 w 1 s 64.0 1279.0 15.0 141.0 r—r—rrr - 1500.0 --------- 0.0 ------- — ----- ___ 0.0 0.0 PRIOR APPRO- APPRO- PRIATIONS 1989-90 <------------------ FUTURE 1990-91 1991-19 j!!?-1 199R�1d 7o94-lE PRIATION8 --- ------------------ ---a--rr - .ter...--rrsrr -r—.err—r—. t • x 1000'1 1500.0 --------- wr-rue--- --------- -------- 00.o 15— -------— - ------------------ 0.0 0.0 0.0 9.0 0.0 REVISION DATE 05117/95 PROJECT NO. : 352195 PROJECT NAME : ENGLEWOOD STORM SEWERS ADDRESS s SEE PROJECT DESCRIPTION NBRHD LOCATION t 492 NBRHD SERVICE : 492 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAOERt 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY65 FIRST YEAR OF APPROPRIATIONS t FY68 PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 10167 12/69 AWARD CONTRACT Os/as 06190 BEGIN CONSTRUCTION OS/Ott 08/90 BENEFICIAL USE PROJECT COMPLETE 10/88 02/91 TOTAL COST COST CATEGORIES ------ - -- - --r-- ESTIMATE - --------- LAND ACQUISITION DESIGN 66.0 CONSTRUCT"" 1665.0 AOtIrPMENT DMINISTRATION 17.0 OTHER 150.0 ------------------------- TOTAL COST --------- 1600.0 TOTAL FUNDING SOURCES FUNDING --- ------------------ ------ $75 1944 STORM SEWER G.O. BONDS S90 19d4 nTnDU G 0 BONDB -'06 SALE 1600.0 ' rrrrrrrr--r---rrr------- -- r-r-r-- TOTAL FUNDING 1600.0 t+ j C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR APPRO- PRIATIONS 25.0 •511.0 6.0 56.0 600.0 PRIOR APPRO- PRIATIONS APPRO- PRIATIONS 0.0 APPRO- PR9990 600.0 600.0- 600.0 600.0 0.0 AS or Go/"/$* -rr---r----r-r-rr---r-------------------------r---------rr-r t PROJECT DESCRIPTZONt f ! This projret invoivrs construction of a iocai drainage f ! aystrst in tAs arsA'boundrd by SW 161h St., SW 071f► f ! Avo.• SW tth St.. and SR 27th Avs. ! f ! f ! f t f ! f ! f t f ! r. ------ --------- ------------------------- rrr-rr rr.rr-r--r----- - (--------------- FITIM COOT EST3MTZ9--------------- • 1990-91 1991-92 1992-OS 199i-14 1914»9s --- ------------- (-0X1000)- 43.0 $54.0 11.0 42 ------0 ft .1000.0 -0.0 -0.0 �0.0 01«0 (------------------ FU M FUNOMR -------------r--r.". p 1l90-91 1991-92 1992--98 1998-94 1994w-f -------------------- '----- ---r r-----ar-irt -t-0X1000) _1000.0 .. <_. 1000.0 �0.0 0.0 0.0 REVZSZON DATE 07/24/69 IIIIJIIII IIIIIIIL . I in i I I a II I i CITY OF M2'AMt CAPITAL IIIf+ROYMMO PROOftAM PROJECT DESCRIPTION FY90 PROJECT -NO. : 352230 PROJECT. NAME s.MAGNER -CREEK RENOVATION - PHASE III ADDRESS S'NM 20 ST. - NO 14 AVE. NBRHD LOCATION s 685 NBRHD SERVICE 685 PROGRAM , : 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 812 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY86 FIRST YEAR OF APPROPRIATIONS S FY86 PROJECT SCNEDULE S INITIAL REVISED COMMENCE DESIGN 01/86 08/87 AWARD CONTRACT 05/66 02190 BEGIN CONSTRUCTION 07/86 04/90 BENEFICIAL USE 12/90 PROJECT COMPLETE 12/86 02/91 COST CATEGORIES ------•--- ------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST ------------------------------•-r-..--- ! PROJECT DESCRIPTIONS ! 1 ! The aonstruation Of s box ouivor stores sonar In rf�Sar ! Crook between N.W. 201h Street and I$-*- 14th ! Area aoverin9 store sonar will br AXIS&& and mod- ! t ! ! E ! E ! 1 ! t ) ! 1 ! 1 --r--------------------------�.—.r—_rar�i—MrM..r--..--rr.rrlr�i.r yr PRIOR APPRG- TOTAL COST APPRO- PRIATIONS 5------------- Ftl'flSiE COST EITIYAEE:--------»_-.--•S' ESTIMATE PRIATIONS I!8l-90 1990-9I 1991-9I it" -to ------------------------------------ ------- —--------- +-------- rr.............Y � • X 1000 ) 77.0 1584.0 20.0 169.0 1800.0 TOTAL FUNDING SOURCES FUNDING $74 19776 iA973 UTILM STORM SEWER TGF�s 900.0 ------------------------- --------- TOTAL FUNDING' 1800.0 a 77.0 1584.0 20.0 169.0 ieoo.o PRIOR APPRO- PRIATIONS 1800_0 -- ii-00 o ------------- r-------- ------0.0------0.0------0.0 `-0.0 0.0 0.0 APPRO- PRIATIONS------------------ FtjTi9iE. ! r.r —rr_r �_—..r—.. 1989-90 1990-91 1991-92 1992-99 1998-94 1994-M --------- ------ -- ---------�I------------ -1 ! x 1000 ) 900.0 900.0- ------------- ------ -------0.0 0.0 0.0 REVISION DATE 0SIOS109 — r 1 r 11 r : Ir I IF 11 i r 4 r 11 r . C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : $52250 PROJECT NAME : CITYWIDE STORM DRAINAGE MASTER PLAN ADDRESS : CITYWIDE NBRND LOCATION : 900 NBRND SERVICE : 900 PROGRAM - : 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY85 FIRST YEAR OF APPROPRIATIONS : FY85 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT 03/85 BEGIN CONSTRUCTION BENEFICIAL USE 10188 PROJECT COMPLETE 06186 12/68 COST CATEGORIES LAND ACOUISITION DESIGN CONSTRUCTION EGUtPMENT AS OF 06/29/69 ----------------------- ------------------rr--r------N—rrrr— ! PROJECT DESCRIPTION: E' ! The development of a *term drainage master plan for th4 E ! entire city. The City of Miami i* respensable for E ! providing and me ntalning storm drainage faellltie* on r ! city streets. The •tors drainage master plan will ! ! provide for city wide storawatsr monagoment preV40 ! ! that will provide flood protection for the entire o ty.j ! The @cape of this project was expanded in FY''87 to ! ! include a study for a user toe program in order to E E generate revenues to implement the Master Plan ! recommendations. ! ! ! New telephone and computer equipment will be purchased t ! for implementation of the stormwster utility program. ! ! ! E !---------------r---------------------------------------- PRIOR APPRO- ------ COST ESTiMATat TOTAL COST APPRO- PRIATIONS s--------- --------- TOTAL ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-95 191t-9ir 191046 --------------------------- --- -----------------------_..�..r •X1000) 396.0 396.0 ADMINISTRATION 54.0 54.0 OTHER r—�r—rr-r rrrrrrrrr rrrrrrr.R r-------------------------- TOTAL COST --- 450.0 --------- 450.0 ------r— 0.0 •..•--- 0.0 —r---- 0.0 0.0 0.01 11wtN c PRIOR APPRO- TOTAL FUNDINE APPRO- PRIATIONS PRIATIONS 1989-90 ------------------(K 1990-91 1991-92 /(Nl1 191Z-13 r..rrr..rrrrrrrrrrr.Wr �s Illi-94Y 1l11 FUNDING SOURCES r -r--•rr•r --------- r--r--rrr. rrrrrrirr• rrr-rr�r.l4 'r-r------------------------------ - --------- --------- --- --r -( • x 1000 ) 665 STORMMATER UTILITY TRUST FUNDS 100.0 100.0 873 1984 STORM GEM Q.Q. BONDS 350.0 350.0 ---- ---�-- -----rrr- ---rr--rr r-r..rrrdN► r----r•--------------------------- TOTAL FUNDING 450.0 --------- 450.0 --------- 0.0 --- ----- 0.0 6.0 0.0 0.0 0.O c w4utaN CAM womm PROJECT NO. r $52251 PROJECT NAME a CITYMIDB LOCAL DRAINAGE PROJECTS ADDRESS : CITyWrnE NBRNO LOCATION 1 900 NBRHD SERVICE : 900 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT s O81 PUBLIC WORKS CITY Of MIAMI CAPITAL jurnoVEMENT PROGRAM PROJECT DESCRIPTION FY FY-aa PROJECT MANAGERt 312 OANIEI. BRENNER FIRST YEAR IN CAPITAL PROGRAM : FYd7 FIRST YEAR OF APPROPRIATIONS : FY37 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 04/37 04/97 AWARD CONTRACT 12/67 01/39 BEGIN CONSTRUCTION 02/33 04/89 BENEFICIAL USE 01/90 PROJECT COMPLETE 07/33 03190 COST CATEGORIES ---------- -•------------- LAND ACQUISITION DESI CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER •------------ ------------ TOTAL COST FUNDING SOURCES ----------- -------------- 175 1984 STORY OEM 9.0- BONGS - ------------------------ TOTAL FUNDING k s AS OF "12918* -----rrrr-- rrrrr---s-+►--rrr•-+r�r+r ! PROJECT Oil CHI 7 ! Each fiscal yoar two contracts or* awarded to bu3.60 ! lea drainage structure& in two War arsos: then 1 ! Northen district which includes thf iAtir* 40" 1' ! north of S.M. S Street and tho $author* 040"tsrsat ) ! which include* the entire area eoulk O9 S.!- 81ft ! Street. ! t ! Approxiaatoly •400,000 is budgeted for each 010trl6t F ! to build drainage structures. That' are generally ! independent covered ditches and french drains- t ! ! ---------rrrr-r-------------- --••---rr--,r—�.-.�a--wrrrrrr--«Hr PRIOR APPRO- TOTAL COST APPRO- PRIATIONS •--------------- FUTURE COST iSTIMATEO rrrr- r-r ESTIMATE PRIATIONS 1989-90 logo-*1 1!!1•!Z ------ goof-!4� I!!4►!� .. ------------ -rrrr---- --- ---------•-- r-rrwlrrw-►s-llsr- ---�N-rr! t x 1000 ) 51.0 51.0 1023.0 1029.0 13.0 19.0 113.0 113.0 - 1200.0 - 1200.0 PRIOR TOTAL APPRO- FUMING `- PRIATIONS 1200.0 1200.0 -- ---- -12200.0 - 1200.0 ------w-- --------- 0.0 ------ 0.0 0.0 0.0 0.9 0.0 APPRO- PRIATIONS i-------------- FUTUR ! 1lg2-li rrrrrrrrr-r.«-wr-r--1M "1-94 11"0-90 k 1989-90 19l0-91 loss-92 -- w-- rr •wrrwr--• rrrr-rrrr .Rrr---rra. ----rrrr.. f o x 1000 1 r ------0.0 --- --0.0 ----- ------0.0 0.0 --------- 0.0 0«0� REVISION DATE 09/17/89 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAU PROJECT DESCRIPTION FY90 AS OF 0t/29/" PROJECT NO. t 352256 - --------------------- PROJECT NAME t LEJEUNE STORM SEWERS - PHASE I t PROJECT DESCRIPTION: f ADORES$ t SEE PROJECT DESCRIPTION ! 1' NBRHD LOCATION t 593 t The project will provide now storm sowers to the r NORHO SERVICE t 593 ! area bounded by N.M. 3 Street, N.M. 47 Avenue, Mast t I Floglor Street and N.M. 48 Avenue. The, requlrsd t' PROGRAM �• : 007 PHYSICAL ENVIRONMENT ! appropriation for FY'1987-80 represents a portion of t CATEGORY s 072 STORM SEWERS t the project •xp;nose incurred, to date from deleted f DEPARTMENT : 031 PUBLIC WORKS t project No. 352181 (LsJoune Store Sewers). The t PROJECT MANAGER: 312 DANIEL BRENNER t I remaining project expenses incurred for 352181 have boon included in tho Le.7oune Storm Sewers - Phase ZZ ! r FIRST YEAR IN CAPITAL PROGRAM t FY88 ! (now project). f FIRST YEAR OF APPROPRIATIONS t FY68 ! f . ! f PROJECT SCHEDULE INITIAL REVISED t ! COMMENCE DESIGN 07 / 88 01 / 90 ! t° AWARD CONTRACT 12/88 07/90 [ f BEGIN CONSTRUCTION 02/89 09/90 ! r BENEFICIAL USE ! PROJECT COMPLETE 07/89 09/91 ----------------------------------------- --r-r--r-----rrarrr TOTAL COST PRIOR APPRO- APPRO- PRIATIONS <--------------- FIXTURE COST [EST MAkTKO----r--- rats COST CATEGORIES ESTIMATE PRIATION$ 1949-90 1990-91 1991-92 1912•90 199i-94 1994-96 -----------------r---------------- --------- --------- --- -------------- r-r---ar- rarrrar..- -4-X 1000 ) LAND ACOUISITION DESIGN 25.0 17.0 9.0 CONSTRUCTION $11.0 341.0 170.0 EQUIPMENT ADMINISTRATION 6.0 4.0 2.0 OTHER 58.0 38.0 20.0 -------------- --- - - TOTAL COST 600.0 ----- - 400.0 ----- 0.0 --- ----- --------- 200.0 0.0 0.0 0.0 % 0 PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------------ FUTURE F!------rrrr-r.r-r-r 1994-1 FUNDING SOURCES FUNDING PRIATION$ 1989-90 logo-91 1991-92 1192-99 1993-94 --i'---------------------- --------- --------- --------- --- - - - ------------- ------ -- • x 1000 ) 794 1984 STORM 0.0 BONDS - 87 SL 600.0 400.0 200.0 _- ------- -- --_ -- - ----_ --- ------►------- ------r--: --------- TOTAL FUNDING 600.0 . 400.0 0.0 200.0 0.0 0.0 9.0k Ok.O 16 REVISM DATE OS/17/89` I I, AS OF 0812900" C I T Y O F pROORAII CAPITT Dirt j--------- jyONI- PROJECTa 1 952257 M sENERs - PNABE II ea 14..0. 7x Street. W. 57� AVM` eyote�r 1 The roioot will revile •hew' store, �"+�a ACTCT' NAPE LEJEW j tot arcs eo Yyel;ts ani LeJ�+ R°�• Ir : SEE PROJECTRDESCRIPTION OCATION : 593: S94 1 tAo south oily E }Ip BERVICE _>< 59a. 594 1 ON ENT i PROGRAM : 07 11TORMPmYsI$E�K� 1 t 072 STORM CATEGORY' 1 DEPARTMENT : 0s1 PUlII,.IC 1 ' OJECr ANAGER~ 312 DANIEL BREHNER 1 t i 1 FIRST YEAR I CATIONS CAPITAL PROGRAM = FY/O 1 FIRST YEAR OF APPROPRIA ! 1 PROJECT SCHEDULE s INITIAL REVISED01/911 1 N COMMENCE DESIGN 07/91 1 09/91 r--.r--r---------•"rrrrr--•- A� I IN � RCIAL�1'ION ---- PROJECT ggNECOMPLETE OR PRUTIO"APPRO-s < 1!l0-11 - 199I-1 11 -1 TOTAL Op8T 1969-90 --__-- PRIATIONS ESTIMATE ------- -- X 1000 COST CATEGORIES -------------- - ----------------- -- 55.0 $5.0 50.0 1705.0 LAND ACQUISITION � 1705.0 12.0DESIGN r--r--rN come 22.0 10•0------- `1 0---------------0.0 0.0� a•°� s 15a.0 107.0 0.0 A0MMSTRATIO14 -__- -- p.0 isaa•0 ...rr OTHER_ ------ 2000.0 167.0 ---- rumol"`�!!i-!4 N Il9i-! TOTAL COST PRIOR PRIATIONS <---- -91 1991-92 APPRO• - 1992-lM r..rrr OTAL APPRO- 1969-90 1l90- ---.N- T-------------- - FUNDING PRIATIONS--------- • X 1000 FUNDINGsouaCEQ ------- ----17o - $3a0 ----- -- _---167.0 1---• - ®.0•s6. ---a,Or SSQER 15aa.0 -------- __ 74 19ONOB0.0 183:.0 $75 19$4 GTORMSO--- 16-7- --------- 2000.•0 a _ - N-0-'r01 -irarr0r� r,. TOTAL REVISION DATE 06/30/69 .. &L .rrr*m C I T Y O F It A M I As of 051291$9 CAPITAL IMFPROV1 NT PROGRAM PROJECT TION e9-FY'9a i- �rto.�Ct-o�scRs�'►low:________________________a #� PROJECT NO. s 562267 t PROJECT NAME' s 3622620E LOCAL DRAINAGE PROJECTS - FY` ! Each tioeal year two aan#raata are awardad for s CITYWIDE ! construction of local drainage 14161lit"SO aitoi Ng�SLOCATION s 900 ! son#rant will conslats of aPP i He" SERVICE ! locatod city*ido- dg : p07 PHYSICAL ENVIRONMENT ! roxiMa#aiy •1,000.000 to Oa They for *&fosse root PROGRAM : 072 STORM SEWERS ! ARP ara 9 t 3Y = pia PUBLIC WORKS ! to build dra1naga struaturas+ DEPARTMENT s 031 DANIEL BRENNER t indspondsnt covarod di#ohas and French drains - PROJECT MANAGER 5 ! t FIRST YEAR IN APPITAL ROPRIATTIONSM s FY69 FIRST YEAR OF APPROPRIATIONS ! T PROJECT SCHEDULE s INITIAL REVISED ! 12106 ! ! COMMENCE DESIGN 04/69 ! AWARD CONTRACT 07109 ! ---------------'---""----sass..-+.- BEGIN CpN$TRUCTIOH 09190-a----------------•-------•• BENEFICIAL USE 09/90 _ pROJECT TE APPRO- OpsT EITIMA' 90 ••••,•«•••••--, �i PRIOR PRIATIONS <-•----•---.•--il41-9Z 1o92-oS!!i-!�i TOTAL COST APPRO-PRiATIONS -90 1l1O-41 -a.... --------- ---_----- -----....... . ESTIMATE39Sl-_- _aa - - -'-- COST CATEGORIES --------- -----_ -taeal 1000 T- LAND ACQUISITION 65.0 91.0 S4.0 DESIGN 1705.0 622.0 1083.0 w"TR9•Q 13.0 a-s----e-.-�22.0 120.0 --------- ADMINISTRATION 151,Q 69.0 -a'12---e 0.0 -a-O-. OTHER -r_a------ ---T_____-__------ 2QQ0'Q T0 .0 ------ TOTALCOST e -....-,.-.3»...1M PRIOR APPR - Funm ---•------- 1914-26 APPRO- PRIATIONS <-----_--_..aa-1l91-9Z 3l12 1993-r! - TOTAL PRI!►TSONS -90 lose-!3 - - ••--•---'`• --"'-- F U DING l9�9--.---a- uff��/y b - FUND ------ •..-.----- FtNOING SOURCE# _r_-ar_a_ �W� _-__-__-_-..-- 1 S X 3000 T •------------------- 740.0 623.0 ........ ----- --- A'TER UT6LSTY 20r Q�FUNDe 13 59.0 647.00.0 -••------- ---••` a«Ok •611= STORM6 T S 647.0 ..- ,._47 ----- _ ------ -- tool 1454 STORM $EWER G-_..------------'.._-1270.0 -O. e ,...�..--.------------------ 2000.0 73a.a TOTAL FUNDINS s • REVISION DATE 091161!9 2016 CITY OF MIAMI AS OF68"049 CAPITAL xI "OVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECTNO. t 352271 -------------------------------------------------------- PROJECT HAVE i LITTLE RIVER STORM SEINER RETROFITTING i PROJECT OESCRIMON: ADDRESS t SEE PROJECT DESCRIPTION ! NBRHO LOCATION a 191 t In 1987 the Florid& Logielsture enacted legislation ! NBRHD SERVICE t 191 ! entitled the Surface water Improvement and Mtn&qement ! ! Act, also known as the SWIM Act. This legislation ! PROGRAM : 007 PHYSICAL EHVIROHMENT ! authorized the preparation and administration o3 & CATEGORY' : 072 STORM SEWERS ! long-term program to reduce pollution and improve water tributaries. The, ! ! DEPARTMENT : 031 PUBLIC WORKS ! quality in Biscayne Bay and its by South !' PROJECT MANAGERt 312 DANIEL BRENNER ! clean-up program will be administered the I ! Florida water Management District (SFWMD). I FIRST YEAR IN CAPITAL PROGRAM : FY89 ! A cost sharing contract has boon successfully negoti- FIRST YEAR OF APPROPRIATIONS t FY89 1 ated to tha satisfaction of both the City of Mums and ! ! the SFIMID. The City .rill be roeponolble for all design t PROJECT SCHEDULE : ! permitting, Construction and quality control (inspeo- ! INITIAL REVISED ! tion). t COMMENCE DESIGN 10/39 04/89 ! This particular project is located in the area bordered Boulevard ! ! AWARD CONTRACT '10/89 07/69 ! by N.E. 79 Street, N.E. da Street, Biscayne BEGIN CONSTRUCTION 10/69 10/89 1 and the Little River. BENEFICIAL USE 10/90 01/90 ! PROJECT COMPLETE 10/90 03/90 ------------------------------------------------------------ PRIOR APPRO- TOTAL COST APPRO- PRIATIOHS <--------------- FUTURE COST ESTIMATES---------------s COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-93 1918-94 1"4-90 --------------------------- -----------r•--------------------- --------- --------- --------- --------- U s x 1000 ) LAND ACQUISITION DESIGN 10.0 9.0 1.0 CONSTRUCTION 179.0 170.0 9.0 EQUIIPMEHT ADMINISTRATION 3.0 2.0 1.0 OTHER 20.0 19.0 1.0 ----- ----- r-r- ---.� ---- r•-r-•---r-r-r•rr••r r•••r •• - TOTAL COST - -- •rr 212.0 -- -- ---- - 200.0 ---- •-••- 12.0 ----- ----- ----- rr-- -•rr 0.0 0.0 0.0 0.0 0..0 TOTAL FUNDING SOURCES FUNDING APPRO- PRIATIONS PRIATPIONS 1989-90 <------------------ FUTURE FINDING ----- ---------- 1990-91 1991-92 1992-93 199S-94 3994-99 ---- ..---- --------- x ---------- +-------------- --------- --------- --------- ---- -------------- t e x 1000 ) 883 SURFACE' WATER IMP. S MANG. FND 100.0 100.0 $75 1984 STORM SEWER G.D. BONDS 100.0 100.0- $90 1984 STORM 0.0 BONDS - 86 SALE 112.0 112.0 rrr-r-•r--•-• r-- TOTALFUNDINGr212.0 r• r-r -r--rr r - 200.0 --------- 12.0 ----- r-- --------- --------- ----- --- --------- -0.0 0.0 0.0-0.0 0.0 t REVISION DATE 07/24169 � �ito f fi i1 I hl'1111 I'� C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FYIO AS OF 08/29/S! PROJECTNO. : 852272 ------•---------•---------------------------------•---•----- t PROJECT NAME s CIVIC CENTER STORM SEINER RETROFITTING ! PROJECT DEfCR2PTI0Ns ADDRESS : SEE PROJECT DEGODIPTION NORM LOCATION : 685 ! 1 1 In 1907 the Florida Legislature enactedlegislation t NBRHD SERVICE s 685 I entitled the Surface hater Improvement and Manaqanent t 1 Act, also known as the SWIM Act. This leyi&lotton 1 t PROGRAM,,. s 007 PHYSICAL ENVIRONMENT ! Authorized the preparation and administration sf a CATEGORY : 072 STORM SEWERS 1 long -tore program to reduce pollution and improve crater t DEPARTMENT s 081 PUBLIC WORKS I quality in Biscayne toy and its tributarlos. Tho 1 PROJECT MANAOERs 812 DANIEL BRENNER I *lean -up program will be adminstered byythe South I I I Florida Water Management District (SF%1C). FIRST YEAR IN CAPITAL PROGRAM t FY89 I A cost sharing contracts has boon successfully no **A- I FIRST YEAR OF APPROPRIATIONS s FY89 ! ated to the satisfaction of both the City of Miset on# 1 1 the SFWMD. The City will be responsible for all design F PROJECT SCHEDULE s I Permitting, aonstruation and quality control tinapoo- 1 COMMENCE DESIGN INITIAL REVISED 10/86 04/69 I tlon). I 1 This particular project is located in the ors& bordered I AWARD CONTRACT 10/89 10/89 1 by N.W. 14 Street, the Miami River, N.W. 12 Avenue and t BE02H CONSTRUCTION 10/89 01/90 1 N.W. 15 Avenue. 1 BENEFICIAL USE 10/90 10/90 1 t PROJECTCOMPLETE 10/90 12/90 ------------------------------------------------------------ PRIOR APPRO- TOTAL COST APPRO- PRIATIONf �---•----- ------ FUTURE COST ESTIMATES------- COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1992-9S 1998 94 1994-OS -----------------------------rr rr----r------------------ --------- ----------r------- --r t • X 1000') LAND ACQUISITION DESIGN 88.0 28.0 5.0 CONSTRUCTION 659.0 554.0 105.0 EOUIPMENT ADMINISTRATION 9.0 7.0 2.0 OTHER 79.0 61.0 18.0 __ _ -------- ---0.0 ~-----0.0 TOTAL COST -------'------ --- 700.0 _ __ ' 650.0 180.0 -- 0.0 -- 0.0 0.0 TOTAL FUNDING SOURCES FUMING 558 SURFACE WATER IMP. 8 MANG. FND 890.0 $55 STORMWATER UTILITY TRUST FUNDS $90.0 i'OTAI.'FUNDING Teo. 0 I, PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1989-90 s------------------ FUTURE 1990-91 1991-92 FUNDING ------------. 1992-90 1998-94 1914-1i --------------------------- --------- --------- --- ---- t • X 1000 ) - 890.0 250.0 180.0 _ ---.�- -ir --- - '650.0 --- 130.0 -----------►-- 0.0 0.0 ----- ----- _ 0.0 0.0 0.0 REVISION DATE 09/16/89 ., � N�INIIIIIIIII CITY OF MIAMI AS or00/29169 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT N0. 1 352273 PROJECT NAME : RIVERSIDE STORM SEWER RETROFITTING ADDRESS t SEE PROJECT DESCRIPTION NSRHD LOCATION : 773 NSRHD SERVICE : 773 PROGRAM-,t : 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERt 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM t FY89 FIRST YEAR OF APPROPRIATIONS t FY89 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 10/88 10/89 AWARD CONTRACT 10139 01/90 BEGIN CONSTRUCTION 10/89 03190 BENEFICIAL USE 10/90 10190 PROJECT COMPLETE 10190 12/90 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION DESIGN 870.0 EQUIPMENT ADMINISTRATION ISTRATION 11 OTHER .0 TOTAL COST 1020.0 TOTAL FU OXNG SOURCES FUNDING --------- - ----------- ------ --- 553 SURFACE WATER IMP. : MANG. FND 510.0 $65 STORMWATER UTILITY TRUST FUNDS 510.0 ---------------------------------- TOTAL FUNDING 1020.0 4 PRIOR APPRO- PRIATIONS 44.0 $70.0 11.0 95.0 1020.0 PRIOR APPRO- PRIATIONS 416 --------------- ----------------------------------------- 1 PROJECT DESCRIPTION: t t r I In 1967 in* Florida Legielature enacted legislation f ! entities the Surface Water Improvement and Manaaggosent t ! Act, also known as the SWIM Act. This leqislatian t ! authorized the preparation and admialstratlon of a t I long-term program to reduce pollution and isprov+o f 1 water quality in Biecayyno say and its tributaries. t ! The clean-up program will be administered by tho South t ! Florida Water Management District (SFWMO). !' t A cost sharing contract has boon successfully negoti- 1 ated to bhe satisfaction of both the Oltyy of MiaMi. ) 1 and the SFWMO. The City will be responsible.for sYl 1 1 deoign, permitting, construction and quality control !' I (inspection). t I This particular project is located in the area bordered 1 1 by Fla ler Stroot, the Miami River, N.W. 6 Avenue and 1 1 N.W. 12 Avenue. 1 ! t ------------------------------------------------------------ APPRO- PRIATIONS--------------- FUTURE COST ESTIMATES---------------s 19A9-90 1990-91 1991-92 1992-90 1995-94 1994-" ------------------------------------ ( • x 1000 ) ----- ----- ----- rr-r-..r---r--r-rr-r----r-r o. 0 -: 0 0.0 �. a 0.0 APPRO- PRIATIONS <- --- FUiM FVND a rrr-rr-r-r----rrrrr> 1989-90 1990-91 1991-92 1992--90 1"$-" 2994•95 --------- --- ----------------rrrr-w--------- ( •-x 1000 ) 510.0 510.0 --------------- ---------- ---. 1020.0 `---- 0.0 -- 0.0 -- 0-.0 0.0 0.0 0.0 REVISION DATE 06/19/89 PROJECT NO. s 352252 PROJEOT NAME r S.M. 6 STREET STORM SEWERS ADDRESS s $WE PROJECT DESCRIPTION NBRHD LOCATION t 4u4, 040, 404, 040 HBRHD SERVICE s 291, 775 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY " 1 072 STORM SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERS 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY87 FIRST YEAR OF APPROPRIATIONS s FY90 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 11187 09/89 AWARD CONTRACT 01/85 06190 BEGIN CONSTRUCTION 02/88 09/90 BENEFICIAL USE PROJECT COMPLETE 05/68 09/91 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT GATHER STRATION TOTAL COST CITY OF M I A M I AS OFOS/29109 CAPITAL IMPROVEMENT PROGRAM PROjECT DESCRIPTION FY90 --_----•►---------------------------.,-. ! PROJECT DE8CRIPTIONs f ! This project consists of a positive conneatlen trove t ! a structure at S.M. 8 Street on 0.9. 6 Aven u is an f ! existing box culvert at the interseation of S.M. 6 !' Street and S.M. 3 Avenue. This will relieve s @ever* f ! drainage problen located at S.M. 9 Street ar.d S.W. 6 f I Avenu• and provide new drainage iaelllties an S.W. i f ! Street. f ! f ! ! ! f ! f ! f ! ! t f ! f ---------------------------------------N-_-N-__N----. PRIOR APPRO— TOTAL COST APPRO- PRIATIONS s--------------- FUTURE COST ESTIMATES ....... NN—....rs ESTIMATE PRIATIONS 1989-90 1990-91 1901-92 1"2-93 1993—" 1993-•90 ------------------ ---- -----_---M---M-M--•Y -_-_ _ tlMY. t a X 1000 1 26.0 512.0 6.0 56.0 coo.o TOTAL FUNDING SOURCES FUNDING --------------- ---------- --------- 865 STORMWATFR *UTILITY TRUST FUNDS 600.0 TOTAL-Ft=XN6 - ---- - - 600.0 , ■ .. 26.0 512.0 6.0 56.0 ------ o.o ---- soo.o ---- ----- --0.0 0.0 --------- O.o *46, PRIOR APPRO— APPRO- PRIATIONS s------------------ FUTURE FUNDING PRIATIONS 1969-90 1990-91 1991-92 1l92-98 1"S-9i --------- --------- ---- - ------ 1 • X 1000 ------ --__- 600.0 --- -- - - - - -600.0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -.r.`{,� 7:Ft 0.0 0.0 0.0 0.0 0.0 0.1 REVISION DATE 07/27/99 ��W� �_�.� . `....«` 11%Illilai�WII6YIllllulwleduru i inleueuunun�luWwwxxiwNUNe.umYliuu. nun nunnnnnllnn l it ihii i u ulli lwni l� a liuillJ ii �iMi ��iii I iigi i it i V I � II A CITY OF MIAMI CAPITAL 2Mp1MKMKKT PROGRAM PROJECT DESCRIPTION P06XCT NO. 1 tS2274 PROJECT NAME 1 HEAVY EQUIPMENT FACILITY STORM SEWER RETROFITTING ADDRESS � 1 1840 NW 20 ST HBRHD LOCATION 1 685 NBRND SERVICE 1 635 PROGRAM 1 007 PHYSICAL ENVIRONMENT OATEGORf 1 072 STORM SEWERS DEPARTMENT 1 031 PUBLIC WORKS PROJECT MANAGERS 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM 1 FY39 FIRST YEAR OF APPROPRIATIONS 1 FY90 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 06/49 03/90 AWARD CONTRACT 03/90 69100 BEGIN CONSTRUCTION 09 / 90 BENEFICIAL USE PROJECT COMPLETE 03/91 03/91 -r----r-r---------------------------- rr-----r-rrrr. ! PROJECTDESCRIPTIONS fi t To prevent the dleshergo of pollutsnts into waVwr' :e 1 Crook, the store vert at 1800 N.M. 10th Strast ! t to be retrofitted, that ter portions of the onialln . 1 t store *ewers need to be replaced or reconstructs* with F 1 faciiitiss that will retain or retard the 91OW Of 11 1 pollutants into the Mural environment. Thts retre• t fitting consists of o seebinatien of deep d+ra40000 1 wells, sxfiltratl*n drainer freaso and ail interceptors F t and possibly rerouting e9 sanitary sewerw 10 hoWd I t nontoxic pollutants. t' t 1 F ! t t t t ------------------------ PRIOR APPRO- ---- FUTURE COST ESTIMAM TOTAL COST APPRO- PRIATIONS �-------•---' COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 lott-to 1994644 1!lO-IS ------------------------ ------ ------------------- - --------------- •---------------- • X 1000 ) LAND ACQUISITION DESIGN CONSTRUCTION EOU2PMENT ADMINISTRATION OTHER --------------- TOTAL COST FUNOINQ SOURCES —--------�-------------- 568,'SURFACE WATER IMP. S MANG. S37`1904`STORM Q.O. BONDS -33 SL ------------------------- TOTAL FUNDING 49.4 FND 43.4 366.0 $66.0 10.1 10.1 94.1 94.1 _ —r rr—rrr— r-r-r—rra ---ioie.s -- o.o ioia:s ---•- o.o ---- _ a.o --rrr a o �.a ar.� TOTAL PRIOR APPRO- APPRO- PRIATIONS <------------------ FUTURE:FUNOINS 1991-92 ----------•"-----""'° 1992 98 i!!"S 94 1991 FUNDING PRIATIONS 1999-90 1990-91 -( rrrr-r--- ------------------ --------r r-r-w---- --------- — ---- ---- --- s X 1000) 31s.3 313.3 700.3 700.4 rrr-- r—..rrrrrs r. .`—rrrrrrs --------- 1013.6 --------- 0.0 -------- — 1013.6 --------- 0.0 --------- 0.0 Go 0.0' M•M REVISION GATE 04/15/49 "" •� - - � 1 I 1 .I i II IV , II IIII IN ,NI I 1 II � � � � r- f C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AM OF 06/2!/S! PROJECT NO. : 052166 ---_----_r_--_r__-rr_—_r-------------rr---r—rrrrr.rrr_.rr.. rrrws PROJECT NAME : GRAPELAHD STORM SEWERS - PHASE I ! PROJECT DESCRIPTION: r ADDRESS : SEE PROJECT DESCRIPTION ! t NBRHD LOCATION : 404, 040, 404, 040 ! This project will provide sterwr sewers, for a portion, f MONO SERVICE : 691 1 of the Grapeland Heights area between the Comfort and t ! Tamlaai Canals from MIN 27th Ave. to NM 07th Ave,. Ths E PROGRAM : 007 PHYSICAL ENVIRONMENT N area is low in elevation with poor sell conditions and 1 CATEGM? : 072 STORM SEWERS ! extensive pending after moderate rain,. t DEPARTMENT : 031 PUBLIC WORKS ! ! PROJECT MANAGER: 312 DANIEL BRENNER t NOTE: See project No. 052246 for Phase, ZZ FIRST YEAR IN CAPITAL PROGRAM : FY78 ! FIRST YEAR OF APPROPRIATIONS : ! t PROJECT SCHEDULE : ! t INITIAL REVISED ! !` COMMENCE DESIGN 11/65 00190 ! !' 1 AWARD CONTRACT 04/86 00/90 1 BEGIN CONSTRUCTION 06/85 00/90 1 BENEFICIAL USE N PROJECT COMPLETE 08/07 00/91 ------------------------N PRIOR APPRO- TOTAL COST APPRO- PRIAT20HO t--------------- FUTMSIE COST ES'iiMATEs "------"---"--"s COST CATEGORIES ESTIMATE PRZATIONS 1909-90 - --- 1990-91 1991-92 1!l2-99 1998-li !Sl1�•li - --------- ----- -----r--r--r— ••—••r-••!r'-'-.. --------------------------------- ---- -------- 0 x 1000 .. LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST 47.0 939.0 12.0 102.0 -1100.o 0.0 0.0 TOTAL FUNDING SOURCES FUNDING S$S$TORMM *ER UTILITY TRUST FUNDS 500. 0 $74 1976'S 197A STORM SEWER G.O.B. 600.0 ----------- -- --------------------- TOTAL FUNDING 1100.0 PRIOR APPRO- APPRO- PRZATIONS PRIATZOH8 1989-90 ------------------ ------------------ 47.0 939.0 12.0 102.0 -- ----- i100.0 0.0 0.0 s------------------ PUT= FUNJI Mir 2!!0-l1 19l1-l2 i!!2•!8 -t 0 x 1000 ?� 500.0 600.0 ----- NN N_------ -_-N 1100.0 0.O 0.0 REVISION DATE'07/24/S!� 0.0 6.0 PROJECT HO+ s 052191 ST 8TORM 8EMER8 NAYS s .apINEHUR � g� PROJECT DECRiPTION "MM LOOATIO14 : 631 Hiq SERVICE : $31 _ s 007 PHYSICALENVIRONMENT PROGRTERAM : 072 STORM SEWERS DEPARTMENT t 031 PUBLIC WBOR= PROJECT MANAGERS 312 DANIEL SREtSiER FIRST YEAR IN CAPITAL PROGRAM s FY33 FIRST YEAR OF AppROPRIATI0N8 = PROJECT 8•E = INITIAL REVISED COww" DESIGN 11/86 AWARD_ CONTRACTION 011e7 SEWN6ENEFXCIALT� 09/87 TdD PRIOR COST CATEGORIES--------- - LAIfO A0=91TION CONSTRUCTION� AOMDUSTRATICN OTHER --------•- .------� TOTAL COF TOTAL COST APPRO- ESTIMATE PRIATIONS 64.0 1279.0 16.0 141.0 1500.0 __--- 0.0 PRIOR FUNDING PRIAAPRO- TZONS —..MV"f: SOIVCES----------------- C.1 t Y O F M Z A M I CAPIT;h O TI A1It FY90 _ ------••-r'---r-rr.11rir� _-r-r-------------------. ! PROJECT DESCRIPTIONS 1 ! provide a new s4er�r pwlf' teR ly ! This project •111 pr 28th St.s MIM i1 Avei.e 1 t serve the ;u. and to 17th Ave. thn prosoo,t 1w." 1 ! NM 20th 8t.. or drat w9�r Problem* i presently suitors major ! 1 1 1 t 3 ! t§ ! 3 t i 1 ---------------------------- -••-- rrN <--------------- FUTURE COST tt?•,l:SZMA 1!!>l••!d 3!!It 1990-91 1991-92 -rrrrrrr•• r••--""r` -------------- ----i-i- X 1000 APPRO- PRIATIONS '0 865 $TCRMMATER UTILITY BOWS -FU ST D 1000.0 ------ ---------- 993-11TORM SEMo•-'D:---- -----0 -- 0.0 0.0 r--------•r-------. 1500.0 TOTAL FUIOZNQ AS OF 08t!lI�SS 04.0 1279.0 16.0 141•e __ _ -rr+----- - ------------0 0 I500.0 0.0 nilm--rirrrrr-lr--r'•rr--' } ` i990-11 ----i!!1 92!! =9l�-4 1914-9$ r1.Y-----M _ _----- ----�-� X 1000 1 -r- ----500.0 100a•WNr..---y-- r---N Y/r� ---�►- ---. -------ram �`•. 0' ------0.0 0.0 1500.0 - --'.-.... t -ow III ',�'' �IIIIIIIIII If 1 I' I ► III III I 111IF 11 1 11 r n r 1 1 1 11 1 e 11 r I IF III r I r I r . PROJECT NO- s PROJECT NAME 9 062193 0tX0" STORM SEWERS I : ADDRERHp�LOCATION SEE PROJECT DESCRIPTION : S94 HBRlD SERVICE s $94 : 007 PHYSICAL Ey�VIROHNENT CATEGORY 072 STORM SEWERS 031 PUBLIC WORKS DEPARTMENT : PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL OGRAM = FY35 YEAR OF APPROPRIATIONS PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 10/86 01/67 TOO AWARD CONTRACT BEGIN CONSTRUCTION 03/67 BENEFICIAL USE PROJECT COMPLETE ' 10/87 TOTAL COST COST CATEGORIES ----------------------- --------- ESTIMATE LAND AD OUI 21.0 CONSTRUCTION 427.0 ADMINISTRATION OTHER 7. 0 -------------------- TOTAL COST -`- ---- $00.0 TOTAL FUNDING SOURCES ----- - FUNDING 991 STORM SEER. G..b-;.,BONDS -UNAUT 600.0 TOTAL FUNDING 500.0 C I T Y O F M I A 0 1 CAPITA ICT DESEMENNPTIPONMAM FY90 PRIOR APPRO- PRIATIONS APPRI � ATIONS 0.0------0.0 PRIOR APFUU- APPRO- PRIATIONS PRIATIONS 1969_!0 AS OROSl"ist ----r-------------- ----------------------- -r ! PROJECT OESCRIPTION� !I f f This project involve* aenstruatiew of • pwrAtivf steep ! sower 899t4m to NWservo te 39!b Ave. a'MdrNM 13�tlt�t� TtIM 81G. • � NW R ! f ! !h I ! ! ! -------------------------------rNr-rim- s--------------- FI1Tm COOT EmMATEf --- 1991-92 im-!S 19W94 19l0-l1 --r---rN ii-Ni-r.► ----'�-'-ram -.,. t • x 1000 1 21.0 427.0 5.0 47.0 _ ------0.0 --------- 0.0 --i -iii r S00.0 6.0 EAR ------ FUTURE - --- 1991-" FEIO<ZMIO-----i---------w-.ra I!91-98 1 " 1990-91 ----- --------- ----�-! x 1000 -------------Yws-r -r1-�Y�iilwlu- 0.0 fy.0 f100.0 ft—aslCf4 DATE mso/$* PROJECT NO. : 052196 PROJECT NAME NORTHWEST STORM SEWERS ADDRESS SEE PROJECT DESCRIPTION NBRHD LOCATION : 121 NBRHD SERVICE : 121 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY^ : 072 STORM SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY85 FIRST YEAR OF APPROPRIATIONS : PROJECT -SCHEDULE _ INITIAL REVISED COMMENCE DESIGN 10/87 Teo AWARD CONTRACT 03/88 BEGIN CONSTRUCTION 05/88 BENEFICIAL USE PROJECT COMPLETE 10/88 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION 43.0 DESIGN CONSTRUCTION $52.0 ADMINISTRATION 11.0 94.0 OTHER -------------------- TOTAL COST FUNDING SOURCES ------------------------- TRUST S75 19864MWATU SJtO]8 STORM SEWER 0.0. BONDS -•------------------ TOTAL FUNDING nun�ou�ono ion du... i CITY OF MIAMI AR OFOefS9f8! CAPITAL IMPROVEMENT PROGRAM PROJECTDESCRIPTION FY90 r---r--------N-r-----.. i+r- ! PROJECT DESCRIPTION: 1 ! r ! This prr9ojeccyt involves construct-' sf s laesl ! N.W. 71stsstreatiN.W.e12th+Avenue OOft* N.V.-62nd S'tree 1 ! P ! 1 ! 1 t ! ! i ! 1 ! 1 ! ! ----------------------------------- .�----- N---- ----- -•'. PRIOR A - - - COST ESTiMATs ----- APPRO- PRIATIONS <--------------- PRIATIONS 1989-90 1990-91 1991-92 1992-l3--1!!S-!4--191+f-1W --------- ( • x 1000 ) ----- i000.o --------- 0.0 PRIOR TOTAL APPRO- FUNDING PRIATIONS 0.0 APPRO- PRIATIONS 1989-90 100.0 900.0 _ 1000.0 43.0 $52.0 11.0 94.0 _ ------N---r --- - _ 0.0 1000.0 0.0 0.8 0.0 --------- FUTURE FUNDING ------------------- i 1990-91 1991-92 1922-93 1993-94 1994"!M' --- -- - - --------- ----- --------- --------- c 0xl000) 100.0 ----900_0 _--------- -rr---r-+r 0.0 1000.0 1000.0 0.0 REVISION DATE 05/30/09 A . 1 11 1 r t R MI r it k 11 PROJECT NO. t 052197 PROJECT NAME s LIBERTY STORM SEWERS ADDRESS t SEE PROJECT DESCRIPTION NBRHD LOCATION t 121 NBRHD SERVICE : 121 PROGRAM t 007 PHYSICAL ENVIRONMENT CATEGORY ^ s 072 STORM SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGERt 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM t FY85 FIRST YEAR OF APPROPRIATIONS t PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 10/87 TBO AWARD CONTRACT 03/88 BEGIN CONSTRUCTION 05/88 BENEFICIAL USE PROJECT COMPLETE 09/88 TOTAL COST COST CATEGORIES ----------------- -------- --------- ESTIMATE LAND'A000ISITIOH DESIGN 60.0 CONSTRUCTION :- 1194.0 EQUIPMENT ADMINISTRATION 15.0 OTHER 131.0 ------------------------- ---- TOTAL COST --- 1400. 0 TOTAL FUNDING SOURCES FUNDING -- ---•- --- -------------- 865 GTORMWATER UTILITY- .TRUST FUNDS 400.0 993 STORM SEWER. A.O..QONDS -UNAUT 1000.0 0 I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 R�IOR- APPRO— PRIATIONS 0.0 PRIOR APPRO- PRIATIOM APPRO- PRIATIONS 1989-90 0.0 APPRO- PRIATIONS 19S9-90 ------------------------- --------- --------- --------- TOTAL FUNDING • 1400.0 0.0 0.0 At/ OF 0O/1!"/S!' ---------------- ------------------ I PROJECT OESCRIPTXON[t ! i nle project involves eonstrustlet► of a Mewl P ! dralnaqq• •yst•w In the area branded 69 N-M IM Ave.,, f 1 NW 71st 8t., NW 12th Ave.. and W d2nd St. F t P ! t< t !` ! I r M ! 6 ! t' t r I -----------r----------- --------r-------�I..i rr.�r---i.iirif a1.1/f�I1+If .; <--------- ------ FUTURE' T URY 0001 EST aw0T—r•-r_.r_.r---r-r, 1990-91 1991-92 IM-90 1"3694 _------- t� .- I ---- • X ---- 1000 --------- 60.0 1194.0 15.0 IS1.0 ----_ 0.0 -- 1400.0 --------- 0.0 r—rra_rr.r 0.0 .irr.-r+r1.FIW.rF.. <- --- FUTURE 1990-91 1991-92 fUNDI19' 1992--93 •-----_---------* 1915-90 I910� -----�---_ --_- --- i x ---- 1000 ) --------- 400.0,.,��' 1000.0 _. -- ----- 0.0 -- 140o.0 ----- 0.0 0.0 0.� ._ _ �IR4MIMIYI�MifllgNllilllillhllllllllll a nn a wi � � � � � � :.:�-..�.�..r+.�+uwi'���:n`.�J4+i.,v�i:�[•w+�+�mrbr.'.+ti�,.i�r'�""'.�`wi�✓ccr.:N4 k � - - .. - C I T Y O F M I A M Z CAPITAL IMPROVEMENT PROGRAM pR0.7EOTO'�IpTIO" pRpJECT N0• t 052193 fAIRNAY STORM S .NAME a 8EE PROJECT DESCRIPTION NdRlSf ` LOtta 'ION a : 112 �R11p SERVICE : 112 ' 007 PHYSICAL ENVIROM�NT CPATERBatY° : : 072 STORM SEVERS 031 PUBLIC WORKS DEPARTMENT t PROJECT MANAGER 312 DANIEL BREMNER FIRST YEAR OF AL PROM : FY35 CTOPRIA ITS _ APPR FIRST pROJECT SCHEDULE = INITIAL REVISED G0 DESIGN 10/37 0/53 TBO AWARD CONTRAQT BEGIN CONSTRUCTION-. 05/36 ROJEBENEFIC USE CTCOIETE 10/66 TOTAL COST ESTIMATE COST CATEGORIES --- - ---------------- --------- LAND ACQUISITION 43.0 DESIGN 552.0 CONSTRUCTION T 11.0 ADMINISTRATION 94.0 OTHER --- ----~- ------------ 1000.0 TOTAL COST TOTAL FUNDING- SOURCES ---------- -FUND--- 993 STORM BAR. A.O•.BONDS -UNAUT--- 1000_0 —r'---------------------.— TOTAL FUNDING 1000• o 46 OR APPRO- PRIATIONS APPRO- PRIA` OMB 0.0 APPRO- PRZATION9 --1939_90 -----rr—r--'-rrrr• ----------------rr------- ! PROJECT OESCR2PTIONs 3 ! i ! This pro3aas involve• aonetruallo Avr��F.E•0• 1 ! ey,too in the area bounded " ! i ilroad. NE 2nd Avo., and N. i2nd It - Re f t ! t E ! 1 ! P I --rr- ----------------r------- NN••---rNNr- -r—rr-rrrrrrN- ESTIIIAT!!M< rr..rrr-r++�- r=' •--------------- FUTURE OW 19l2-93 1998-94 119i-sM 1990-91 1991-22--r---r-------"rrr t •X1000) 43.0 352.0 11.0 94.0_ -- ----- ------ — 0.0 1000.0 ------o.o-------0.o <------95 ---------- - FUTURE 992 90 199s-94 N------- 1990-91 1991-92---•---------- N-- ----7-0 x 1000 ) 1000.0--N----- _ ___ r—r--rrrr � • w, 0.0 _G.0 000.0 0•G V REVI920N DATE 05/18/89 a ai or I - - •-�� ��iw t t III IIIU 1 1 II IF 11111 I U 11 , I a f e t 1 ► ' 6 I f I & CITY OF M I A M I AS OFOd/29/89 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : 052199 --- ------ -------------- ----------------------------N------- PROJECT NAME : WEST END STORM SEVERS -PHASE II ! PROJECT DESCRIPTION& ADDRESS : SEE PROJECT DESCRIPTION t NBRHD LOCATION : $92 ! This project involves the, design and'eonstrwstlem eA i ! NBRHD SERVICE : $92 ! no* storm sewer system to provide, drainage, to the, f2ad Avenue, t C ! area sounded by the Tamiaml Canal, N.W. PROGRAM : 007 PHYSICAL ENVIRONMENT ! W. Flagler Street, and the F.E.C. Railroad right -of- t CATEGORY" : 072 STORM SEVERS t way. DEPARTMENT : 081 PUBLIC WORKS t t PROJECT MANAGER: 812 DANIEL BREN! ! t' FIRST YEAR IN CAPITAL PROGRAM : FY83 ! FIRST YEAR OF APPROPRIATIONS t ! E PROJECT SCHEDULE : ! f INITIAL REVISED t COMMEWDE DESIGN 01/88 TBD ! t AWARD CONTRACT 10/88 t !F BEGIN CONSTRUCTION 12/88 ! BENEFICIAL USE 12/88 ! t PROJECTCOMPLETE 10/69 -------N-----NN-N---N .-----..-------------- ------ PRIOR APPRO- TOTAL COST APPRO- PRZATZONS --------------- FtnAw OOWT EliiilAj"-•�--••------.•--•• COST CATEGORIES ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 1992-98 1"9-9d IM-to -------=---------------- --------- --------- --------- --- -------- t 0x1000) ----- LAND ACSZTION._, OUI DESIGN 128.0 128.0 CONSTRUCTION. 2556.0 2558.0 EOUXPMENT ADMINISTRATION . ° 88.0 88.0 OTHER 281.0 281.0 -------------- TOTA1. COST -- a0o0.o ------ o.o ----- o.o ----- ----- -- o.o o.o e000.o 0.a 040 PRIOR APPRO- TOTAL APPRO- PRZATIONS ------------------ FUTURE FUNDSHO---------.•••--.•.•--.•••�* FUNDING SOURCES FUNDING PRIATIOHS 1989-90 1990-91 1991-92 1992-98 1915-94 1S- ----------------------- --------- --------- --------- --------- --------- --------- c•x1000) ---N--N--------M! 993 'STORM SEWER. G.O.-_BONDS -UNAUT $000.0 8000.0 ----=--+-------- --=---------- --3000.0 --------- --------- --------- T0TAL'F<wDING 0.0 0.0 0.0 0.0 30o0.9 0.0 0.0 e REVISION 0ATE.05/18/89 AS OF0ii2100 CITY OF MIAMI CAPITAL IMMVBKNT PROGRAM PROJECT DESCRIPTION FY90 . PROJECT. NO- : 062200 _-_----_,.-------- _r— .. ! -PROJECT DESCRIPTIONS PROJECT NAME i AUBURN STORM SEWERS S SEE PROJECT OESCRIPTION ' 1 1 I Thie Project involvsa construct'" a! a 1�►eaI `SA 1 74* 9RN0 LOCATION i 491 ! oyatoo for the area bounded b KWII St., and W *- 3T t+ e" SERVICE S 491 _. ! Ave., Fla ler 1 E -ROGRAM : 007 PHYSICAL ENVIRONMENT CORM' : 072 STORM SEVERS 1 DEPARTMENT S 031 PUBLIC WORKS PROJECT MANAGER: $12 DANIEL BRENNER 1 FIRST YEAR IN CAPITAL PROGRAM S FY65 t 1 FIRST YEAR OF APPROPRIATIONS S i 1 PROJECT $gd:0!lE.E S INITIAL REVISED � 1 1 1 COMMENCE ^ DESIGN 10/67 Tim ! AWARD CONTRACT Od/dd 1 1 BEGIN CONSTRUCTION 05/dd ! r-«.rrr..rrr_..rr«.....rrr BENEFICIAL USE PROJECT COMPLETE 10/40 _--------r------------- � TOTAL COST .�yy� w,� pRIC#R - FUTURE W+�T �e�T r------r+-rrrrr APPRO- PRIATIONS <-_-----""-__--_ 1992-99 1'1!!i-!�4 1�994-" 1'9I-12 ESTIMATE - - ,•----------------rr_r..-..«.-.»r--r pRIATIONS 1989-90 1990-11 COST CATEGORIES ---__---- .,---.��------------------ ------------------ --- - - - -c`s-x 1000-)- LAND HjADQUISITION $5.0 1705.0 DESIEW - 1705.a CONSTRUCTION 22.0 BTOTHER R ATION 22.0 . 166.0 168.0 __ ,�„„__ _ -----r _ r-_w--r_--_rr__r --- 2000.0 --------- __ -0.0 0.a 2000.0 TOTAL COST ` PRIOR ^- • RO �C��, �� r rrrYrYrrrMrr«ir«lrrrrrY �l! 1!! !#1 APPRO- PRIATIONS <------------------ 1"S-94 rrrr.�wr-r 1969-90 1990-91 1991-92 1992-9>� " FUTOTAL NDING PRIATIONS _ r----- ......... ------------------ - �c�•_x -F!� --------- __ram-----r+r_------ laaa !A.y G�T- ORMWAy. ER �,:ibITTRUST FUNDS 500.0 1500- a .rrrr.rwO+.w0V . .►.r- ,.,. rwar«+0.� „`BTORMSEWER, s- 0.,, BONDS -UNAUT 15aa-a __--_------ -r w--_---0-.- ---------------- - f1 2000-0 -Y' _j9695-9- ---j------ -------- 20ao-o . o 0.0 00 TOTAL FUNDING� PROJECT NO- s 052201 PROJECT NAME s GLENROYAL STORM SEWERS ADDRESS : SEE PROJECT DESCRIPTION HBRHD LOCATION : 771 MUM SERVICE : 771 PROGRAM - s 007 PHYSICAL ENVIROWN04T CATEGORY" s 072 STORM SEWERS DEPARTMENT t 001 PUBLIC WORKS PROJECT MANAGER: ail DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY05 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE S INITIAL REVISED COMMENCE DESIGN 03/a0 TSO AWARD CONTRACT 09/08 BEGIN CONSTRUCTION 12/00 BENEFICIAL USE PROJECT COMPLETE 07/09 TOTAL COST CURT CATEGORIES ESTIMATE LAND ACQUISITION $5.0 CCOONSTTRRUCTION 1705.0 ADMINISTRATION 22.0 OTHER 100.0 --------- ------------ww----------- TOTAL COST 2000.0 TOTAL FUNDING SOURCES FUNDING ------------------------- --------- 9t STORM 8EMER. G.O. BONDS -UNAUT 2000.0 ----..--..-----------------..-ww------ 'tOTAL.FUNDING 2000.0 1 r■ C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 06129/89 ------------ ! DE----------SCR PROJECT IPTIONS ---..----....�� ------------------------.. f ! Y ! This project involves aonatruation elf a witl" GAGPIR N ! sower systsw for the area bounded b W. Fla¢t*r" St.. ! NW 22nd Ave.. NW 7th St.. and NM 17tk Ave. r ! N ! ' p r t � ! t ! M � c ! --------------------- ...N--r-N--------N..r----r-r-rr-----.►r PRIOR APPRO- APPRO- PRIATIOlIS <-----------.•-"-.•'--r..-.. e ------ FUTURE COST ESTYIMT'M' 1991-92 1"2 !i 1!l0-94 PRIATIONS 1909-90 1990-91 ---- -----M-- -----rrY-�--..N--if --------- --------- --- 0 X 1000 l 17oa.,a 22.0 l�s.o 0.0 0.0 w---- 0.0 0.0 ----- --------- 0.0 2000.0 I.IP PRIOR APPRO- APPRD- PRIATZON8 <------------------ FUTURM 1990-91 1991-92 -----"--- FUND" ---rN- ..�F 1!!2-90 1"S-94 i!! PRIATIONS 1989-90 ----- -------- N--r - --- ------- t ! x 1000 1 2000.0 --------- 0.0 --------- 0.0 --------- --------- 0.0 0.8 ----...----------r-- r---- 0.0 2001�.0 89-80fi . C I T Y O F M Z A M I CAPITAL IMPROVEMENT PROGRAM PROJECT OE8CRIPTION FY90 PROJECT NO. t 052202 PROJIECT'NAMB : LAWRENCE STORM SEWERS -PHASE II ADDRESS s SEE PROJECT DESCRIPTION NGRHD LOCATION t 776 NBRHD SERVICE t 776 PROGRAM t 007 PHYSICAL ENVIRONMENT CATEGORY" t 072 STORM SEWERS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGERt $12 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY84 FIRST YEAR OF APPROPRIATIONS t PROJECT . SCt EDU LE t INITIAL REVISED COMMENCE DESIGN 0$/66 TOD AWARD CONTRACT 09/86 BEGIN CONSTRUCTION 11/88 BENEFICIAL USE PROJECT COMPLETE 08/89 TOTAL COST COST CATEGORIES ESTIMATE LAND ACOUXSITION DESIGN 64.0 CONSTRUCTION 1279.0 EOUIPMENT ADMVaBTRATXON 16.0 OTHER 141.0 TOTAL COST 1500.0 TOTAL FUNDING SOURCESFUNDING ---------------------------------- 99S STORM SEVER. G.O.-BONDS -UNAUT 1500.0 --------------- --------- TOTAL FUNDING 1500.0 PRIOR APPRO- PRIATIONS PRIOR APPRO- PRIATIONS APPRO- PRIATIONG 1�as-90 ------a:a APPRO- PRIATIONS --1989_90 ------o.o------0.0 --- At, OF 0812VIS9 --------------------------------------------..-..----..,......�.�..' ! PROJECT DESCRIPTIONt I ! r ! This project involves construction of nis store eewrr b ! facilities to alleviate the amount of stores,910* hater r t the Lawrence Pump Station located at SM 4th St. and r ! 8W 7th Ave. and reduce the amount of direet runoff Ants r ! the Miami River. t ! The new storm sewer facilities will be constructdd im: r ! the area bounded bV 8W lot St., 8W Sth Ave., 8W Sth St. r t and SW 12th Ave. ! ! r t ! r t r ! r ! r ! r -•----------------------- <--------------- FUTURE COST ESTIMATES -••••»••-••-••• •••• •• s 1990-91 1991-92 1992-98 I09i-9d 191f» --- ------- --- --- ( f x 10) "-a 1279.0 19.0 141.0 ----- -- ----- ---- -.0 a.o N0.0-isaa.a a.d ------------------ FUTURE FUNDING ----- ----------r-- r 1990-91 1991-92 1992-93 1998-94 1994-991 --------------------�•----------..--..--N----- ( • x 1000 ) lsaa.a ----- - ------------ ----------------- 0.0 0.0 -- 0.0 150a.0 0.0 REVISION DATE 05/18/89 .. PROJECT NO. s 052203 PROJECT NAME s AVALON STORM SEWERS ADDRESS s SEE PROJECT DESCRIPTION NBRHD LOCATION t 391 NBRHD SERVICE s 391 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY" s 072 STORM SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGERS 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY32 FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 09/66 TBO AWARD CONTRACT 04/69 BEGIN CONSTRUCTION 06/39 BENEFICIAL USE PROJECT COMPLETE 01/90 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION DESIGN CONSTRUCTION4263. 0 EQUIPMENT ADMD412TRATION 55.0 OTHER 469.0 TOTAL C08T 5000.0 TOTAL FUNDING SOURCE$ FUNDING - -------e---------------------- 365 STORMWATO UTILITY' -TRUST FUNDS 500.0 993 STORM SEWER. G.O.J`BONDS -UNAUT 4500.0 TOTAL FUNDING 5000.0 n 111 1111111 11 uI i w l M i r 1� t N r I f 11 6 11 r a P A I CITY OF M I A M I AM OFOS/29/89 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR APPRO- PRIATION8 0.0 PRIOR PRIATO� -------------------------------------------------------- t PROJECT DESCRIPTIONS t ! t t This project will provider a now storm sewer systes for f ! serve the area bounded by SW 22nd St., SM 32nd� Ave., f t U.S. 1, and SW 37th AV*. This *Votes will coneist of t t covered ditches with overflow to a positive drainage, ! ! system. This overflow lino will be constructed in t t 8.W. 32 Avenue from U.S. 1 to Grand Avenue, and then t ! through the Coconut Grove Business District to t ! Blecayne BaV. A pumping station may also be required'. i ! t ! t t t t t ! t ! t --------------------------- -----M------------ APPRO- PRIATIONS c=-------------- FUTUR1K COST iSTIMATEt-----.•---------> 1949-90 1990-91 1991-92 1992-98 1990.94 1994-9$ --------- ----- - -----N---- •X1000) 213.0 4263.0 0.0 APPRO- PRIATIONS 1!Sl-90 0.0 0.0 55.0 469.0 -- ----- ----- ---^---------- 5000.0 -0.0 0.0 0.0 <------------------ FUTURE FUNDING ---- --------------�* 1990-91 1991-92 1992-99 1 "s-.14 1994- --- - ----- - -------------_------_- 4 • X 1000 ) 4500.0 -- ------------ -------------- 5000.0 0.0 -0.0 0.0 0.0 REVISION DATE 07/24/89 ."_ ... . „ .. _ . KMkMnM1Nl11MR. MiFIMIIIM{IM:1M17Ni�IM11SI,IL� i I i l .1!, i. -.a.,.uw+-w+!-.+?w'a•+' ... _i,.�. .... .. ..: .�.�.�s. .. ...__Y. ..`W�.+�.+�++�--F��•—.�--•e. �.._. _. .. ...... .. .. �,m.wr..4r+a 6;ir+:k t I III�k k 0ITY OF MIAUI AS OF8012Ist a CAPITAL IMIPROVEIMEMT PROGRAM PROJECT DESCRIPTION FY90 PROJECTt .062209----r-----rr--------,r----rr----. r-----r«----.r.►rrr.�r�sr.a PW=OT NAME s LAWNVXEW STORM SEWERS I PROJECT DESCRIPTIONS ADDRESS : SEE PROJECT DESCRIPTION NNW LOCATION 1 778 1 This preieat Involves asnetrustlom at a soe&A eres"09 N NORM SERVICE : 776 ! *yyetaa in thf area 6~d*d OM SW Sift Ot. w 40 111h AV*. # t 1 Floolar St. and SR 22nd Ave. PROGRAM s 007 PHYSICAL ENVIRONMENT ! 1 CATEGORY s 072 STORM SEWERS - ! DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER i FIRST YEAR IN CAPITAL PROGRAM s FY85 FIRST YEAR OF APPROPRIATIONS 1 !t PROJECT SCHEDULE : ! INITIAL REVISED !. COMMENCE DESIGN 01/84 TBD ! 1 ! F. AIrARO CONTRACT 03/39 BEGIN CONSTRUCTION 05109 ! k BENEFICIAL USE ! N PROJECTCOMPLETE 10/89----------------------------------------- ..--..------ PRIOR APPRO- _ FUTURE OOff iOrMTEO TOTAL COST APPRO- PRIATIONS <-----------rr — —rrrrr.►rrr.r.r-� COST CATEGORIES ESTIMATE PRIATIONS 1969-90 logo-91 1991-92 1992-98 islS-fa 119i-lS ------------------------------------------------- --- ---- r-------- --err---w rrrrrr--- • X 1000 LAND ACQUISITION 4&. 0 DESCONSTRUCTION $52.0o 452.0 EQUIPMENT <` ADMINISTRATION 11.0 11.0 OTHER 94.0 94.0 ------------------------------------------ ------ --------- ---------- ----- i TOTAL COST 1000.0 0.0 0.0 0.0 0.0 �0.0 1000.0 r 0.0' PRIOR APPRO- TOTAL APPRO- PRIATIONS <------------- ---- FUTURE rumulIIQ ----------- -- ---- FUNDING SOLES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-98 19SS-94 1994-95 If r-- r--r -------------- t • X 1040 ) 993 STORM SENER._G.O. BONDS -UNAUT 1000.0 1 '`4 _ r --I- -------- ------------------ ----r --- ----►—ra --r-- .. µ --rrr rrrrrrrr .. --------•--------- --------------rrr— TOTAL FUNDING 1000.0 0.0 0.0 0.0 0.0 0.0 1000.-0 0.0, w REVISION DATE 07/24/119 PROJECT NO. s 052211 PROJECT NAME : FLAGAMI STORM SEWERS -PHASE II AODWSS SEE PROJECT DESCRIPTION NORM LOCATION : 591 NBRHO SERVICE s 591 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY : 072 STORM SEWERS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGERt $12 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY85 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 02/69 TBD AWARD CONTRACT 07/89 BEGIN CONSTRUCTION 10/89 BENEFICIAL USE PROJECT COMPLETE 08/90 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADDRM NISTRATIOi O ------------------------- TOTAL COST C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FYgo AS OF OS<2!/S9 --r------------rr---------- r-------r- t PROJECT DEsc�sPTION: r t I This project lnvoivst Construction of a french drain f I systew with an overflow connection is the FlagaMl r f Phase I Project. Construction will inoludf the area ! ! bounded byy S.W. s Street, Flaglsr Street. S-W. s7th f ! Avenw and S.M. :2nd Avenue. t ! ! t ! r i f t ! ! f ! r ! f --------------------------- rrrrrrrrrr--r---rrriYrr�.arrrr 111r r.Y r PRIOR APPRO- --- FUTURE am 95MUTES TOTAL COST APPRO- PRIATIONS--rrrrr-r--• rr-rrr-rrrrrrr♦ ESTIMATE PRIATIONS 19s9-90 logo-91 1191-92 1992-911 119i-9d 1994-N ------------------ --------- --r -- -----r -rrr--rrr rrrrrrrrr r•rr-rrr.► ( •x10oo) 0s-0 1865.0 17.0 150.0 1600.0 TOTAL FUS Dw SOURCES FUNDING - ------------------- ----- --------- sss STCRMMATER UTILITY.TRUST FUNDS 600.0 go& STORM SEWER. G.D. BONDS -UNAUIT 1100.0 ---------------------------------- TOTAL FUNDING 1400.0 t PRIOR APPRO- APPRO- PRIATIORS PRIATIORS lost-t0 ------------------ ------ -- ------ -- 0.0 0.0 go.0 lost:. o ----- o--------------- 07 0 --rrrrrrr rrrrr.11M.r�r. .o o.0 1soo.fl eon �------------------ fruTm rMM--------------r-ri-'.� 1990-91 1991-92 1992-9s 1998-94 1! !t --- -------------- ---- ------- r--- ---- t • x 1000 ) !)oa.0 1I00.o ------------- ---- ----- —----- -------- r.1r 0.0 0.0 -0.0 -- 1s00.0 6.0 REVISION DATE 09/19189 ,� .. ..,. .�..�.. ._, w..a.w .�-+.r.wuw+'�a.�.�ay..u.`..n..�+v+P+,...^rc'+r"`. yNWu�".'.:--^+.r"�_•_"".�'""".F`.."""�.._.._ �...._.,..._.J..`....-..--�_ PROJECT NO. t 0522DI PROJECT.HAME s LOCAL DRAINAGE PROJECT - FY191-195 ADDRESS : CITYWIDE HBRND LOCATION t 900 NBRHD SERVICE _: 900 PROGRAM „ : 007 PHYSICAL ENVIRONMENT CATEGDRY : 072 STORM SEWERS DEPARTMENT : 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY66 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN TBD AWARD CONTRACT TOO BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES LAND DESIGN SITION CONSTRUCTION AwjzplNw DMINISTRATION OTHER TOTAL COST CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR TOTAL COST APPRO- ESTIMATE PRIATIONS 170.0 $410.0 45.0 $75.0 4000.0 r 0.0 PRIOR TOTAL APPRROWSill FUNDING SOURCES FUMING PRIG APPRO- PRIATIONS lost -to 0.0 APPRO- PRIATIONS 19t9-90 ----------- r------------- 065 STORMMATER UTILITY TRUST FUNDS 4000.0 ___ wr--r.-------rrrr-wrw--r - --r --- -- -- r- 0.0 rrrr-- 0.0 TOTAL FUNDING 4000.0 4. ---------------i--..--r--------irrr- --------------------rrrr-- t PROJECT DESCRIPTION: 1 1 ! Each fiscal yel two contracts are, asiard" to Dus,,& ! local drainage structures citywide,. W t 1 ! E t !� ! p ! 1 ! 1 t p ----------------rrrr-------M---------rr--a-r--srrr.YYN�Nr• t--------------- rUT= COST UTImAime r-rNr-r-Nrrrr► 1992-981 1994-90 1990-91 1991-92 --------- -r-rrrr-- N------- --- -t 0 X ---- 1000 1 34.0 34.0 34.0 64.0 34.0 662.0 662.0 662.0 662.0 662.0 9.0 75.0 9.0 75.0 9.0 75.0 9.0 75.0 9.0 75.0 -w-rrrr-- . 800.0 ---rrrr-- $00.0 --r - -rrrr $00.0 -------r r too.* --------- toss --- --------------- r UTMrumm ------------------- 1' 1990-91 1991-92 1092-92 19901-94 1994-90 --- -----------Nr-r-r rrrr----.r --rrrrr-r ( ! X 1000 ) $00.0 $00.0 t000 0�r0-Nrt00.0 ____- 600.0 800.0 500.0 am.0 600f.0 REVISION DATE 07/24/09 .11111IN111-111 IF 11 1 r 1 I IF 111111I I III 111 I III IF ■I 11I1 1] 11 1 F jj r CITY OF M I A M I AS OF08/29/09 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. 1 OS2253 PROJECT NAME s PUMP STATION RENOVATIONS - FY'91-95 ADDRESS 1 SEE PROJECT DESCRIPTION NBRHO LOCATION 1 900 NBRHD SERVICE : 900 PROGRAM 007 PHYSICAL ENVIRONMENT OATEGORY" t 072 STORM SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGER: 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY87 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE 1 INITIAL REVISED COMMENCE DESIGN TBD AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION DESIGN 0 CONSTRUCTION650. EQUIPMENT ADMINISTRATION 10.0 OTHER 95.0 ------------------------- TOTAL COST --------- 1000.0 TOTAL FINDING SOURCES FUNDING ass STORMWATER UTILITY TRUST FUNDS 1000.0 - fiOTAL FUNDING 1000.0 L PRIOR APPRO- PRIATIONS 0.0 PRIOR APPRO- PRIATIONS APPRO- PRIATIONS 19al-90 APPRO- PRIATIONS 1959-90 ------------------ ------------------------------------------------------------ I PROJECT DESCRIPTIONI 1 The City of Miami owns and operates tour (4) store 1 ! sewer pumping stations. It is anticipated that N&JOP 1' 1 equipment replacements will occur over the next ! i years at these stations. ! 1 F ! These stations are located at the following inter- ! I sectional I' 1 t ! N.W. 7 Street and N.W. 17 Place ! 1 N.W. 6 Street and N-W. 19 Avenue 1 1 S.W. 4 Street and S.W. 7 Avenue 1 ! N.W. 16 Street and N.W. S Avenue ! 1 ) 1 M i E 1 ) ------------------------�(--------------...-....-rr /1`-------r------------ ( - --- FUTURE T URE Cyr TES ---------rrr-rr 1990-91 1991-92 1!!2-94 --r-r-rr- r---r -----r----s-----rr-rss rsr-rssirM 0x1000) 9.0 9.0 9.0 9.0 l0 170.0 170.0 170.0 170.0 170*6 7 2.0 2.0 2.0 2.0 2«0 19.0 19.0 19.0 19.0 19.E ---- sr---s -r--Nr l . 200.0 200.0 200.0 200.0 am.* h (- --- --- -r 1990-91 1991-92 19l2-99 1"S-94 1914-90: --------- ... --- ------- ------ --------- • x 1000 ) 200.0 200.0 200.6 200.0 -- -- -- - --------- -- - ----- --------- 200.0 200.0 200.0-200t.0 200.6 IIIIIIN 1 :---.�:��, .:..: �Illf!11JIIPRWIMRIIPMAR ORI- 1uIlllXl ltl114 �I II __....,._.... �+.rm..w.—.+ — .�.-._.... --ecrtvsewwrs.u•.ylywrr-wWyr _.:.. ..,,.._. s. .. . ,. .. ..,:,. �.•-. _...,.. �.. .. _ -Tyr•...—•. ...�� 'U. I PROJECT NO. s 052256 PROJECT NAME r REID ACRES 8TORM SEWERS` ADDRESS s SEE PROJECT DESCRIPTTpN NBRHD LOCATION t 112, 191 NBRHO SERVICE s 112, 191 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY" t 072 STORM SEINER$ DEPARTMENT s 061 PUBLIC WORKS PROJECT MANAGER 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FY66 FIRST YEAR OF APPROPRIATIONS : PROJECT SCHEDULE s INITIAL REVISED COMMERCE DESIGN 07166 Tao AWARD CONTRACT 12/89 BEGIN CONSTRUCTION 02/89 BENEFICIAL USE PROJECT COMPLETE 10/e9 COST CATEGORIES LAND ADOUISmON DESIGN CONSTRUCTION EQUIPQENT OADDK[H'STRATION TOTAL COST CITY OF MIAMI CAPITAL IYPkOYEAENT PROGRAM PROJECT�9SOCRIPTION PRIOR TOTAL COST APPRO- ESTIMATE PRIATZONS —-------- --- ------ APPRO- PR TZONSS 1980-90 APPRO- PRIATIONS 19�l-90 908 STORM SCR. G.O. BONDS -UNAUT 1400.0 ----------- —r ----- --------- TOTAL FUNDING 1400.0 0.0 0.0 60.0 1194.0 15.0 131.0 — ------ -- -- ------- 1400.0 0.0 PRIOR TOTAL APPRO- FUNOINB SOURCES FUNDING PRIATIONS --------------------- ---- --------- --------- As OF --------------------------------------------- I . PROJECT OESC MPTIONs ! The ro ect will provide a ositive stor+r,deein 1 I systis�o the arcbounded N.E. 71 Street# I Rallread, N.C. 02 Street and N.E. 2 Avemm. Reef 1 t and lack construction under the F= Reitread at, N-C. 1 ! 71 Srest will be required,. The positive. outl"S, ISO& f ! will be constructed on 1I.9. 9 Avenue, to the LA"Je f ! River Canal. 1 1 1 ! f f 1 t 1 -------------------r----rr-•-.-r----r+Rr-.ter-.---.ter---rrr—rr�l.wrr #- --- FUTIBE am ES'iI""s -r-- •••-• •••�� r 1990-91 1991-92 IM-20 19918-94 1994-00 ---------- -rr-----r ( 0 X 1000 ) 60.0 1194.0 15.0 1U11.0 0.0 1400.0 0.Q! 0.� O.a �— --- 199o-91 1991-92 1992-98 ilWS-94 1994-99 --- ( i X ---- 1000 ) -----r--- —r------- ---r---r— 1400.0 -- r-- 0.0 —r 1400.0 --------- 0.0 -.-------- &.& --------- 01.0 REVISION DATE 05119/$! i �' 1 l� 1 II Idl �I III ail ! � ! � ► � r � r ■ � s � „� � �� � N' C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT H0. s 052259 PROJECT NAME s WASHER CREEK RENOVATIONS - PHASE IV ADDRESS t SEE PROJECT DESCRIPTION HBRHD LOCATION 1 685 HBRHD SERVICE 1 685 PROGRAM t 007 PHYSICAL ENVIRONMENT CATEGORYw : 072 STORM SEWERS DEPARTMENT : 081 PUBLIC WORKS PROJECT MANAGERS $12 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM t FY86 FIRST YEAR OF APPROPRIATIONS t PROJECT SCHEDULE 1 INITIAL REVISED COMMENCE DESIGN 10/88 TOO AWARD CONTRACT 05169 BEGIN CONSTRUCTION 07189 BENEFICIAL USE PROJECT COWtXTE 12/89 LAND ACOUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST PRIOR TOTAL COST APpRO- ESTIMATE PRIATIOHS 66.0 1365.0 17.0 150.0 1600.0 - 0.0 PRIOR TOTAL APPRO- FtADiNH SOURCES FUNDING PRIATIONS - -- ---- ----- ------ --- --------- APPRO- PRIATIONS lost-!0 0.0 APPRO- PRIATIONS lost-!0 So$ (STORM SEWER. A-0., BONDS -UNAUT 1600.0 ----- r----------------rr .. -- --- ---- - TOTAL FUNDING-1600.0 0.0 0.0 l AS OF 08/29/8! ------------------------------------------------------------ I PROJECT DESCRIPTION# f ! f ! The construcilon of box culvert star* sewer to f ! Wagner Crook betwoow N.W. 14 Avenue and 1#.*. 10 Street. f ! Area covering store sewer will be filled and sodde+f. ! f f j ! ! f ( f ! f ! f ------r-------------------------------r-rr--.�rrrrsrrr+.�.rsrrs .--------------- FUTtm COST tSTIM IMO-N-iN-M-Ni-s 1990-91 1991-92 1992-90 1990-90 ----- r--'- /994-915 ---..-ir-- --------- 1 0 X ------ 1000 > --------- y 68.0 1a65.o 17.0 150.0 ----- 0.0 -- 1600.0 --r------ 0.0 - - - - - — - - — 0«0� ------r.r.r <- -a/T= i�9o-�i--- i�si=rl2 r� -rr-N-r------r.rrWr.►�b.. --- —t ---- --------r ii-rr•--- ---NrA:-. X 1000 > �.. --------- 0.0 -- 1600.0- --------- 0.0 --------- --r---= .■ :� I 1 •..:. .•� w•f•••••�` Mr�11wiMYllr111111Y IYII IY II :. .� W twrH.!+. .muww__... Wi+w++�x.Vww+ ru• x.i.w..R w.e......w u....r.....iy..r...'w,r......».........+...,..nr.«.�......+....... _n.... ��,. .ru....+w..m. .4rM. ........w-evt^'.r....�va.. .....a.awe.. .nr ....... _ uriaw.w 1.'' CITY OF MIAUI ANR"OFo0'o "I" CAPITAL IMPROVEMENT ORMAN PROJECT DESCRIPTION FY90 PROJECTNO. t 052260 -----------------------------------rrr--r-rr..--r PROJECT NAME t BELLE MEADE STORM SEWERS - PHASE I 1 PROJECT DESCRIPTION: 1' ADDRESS s Mir PROJECT DESCRIPTION i N NORM LOCATION i 19t 1 This project will provide therm $*wars to"'th0 DIX1 HAORMVP N NORM SERVICE t 191 Cost � N.E. 9 Street,eseVne 1 NorthboundeLib PROGRAM t 007 PHYSICAL ENVIRONMENT ! 1 CATEGORY" : 072 STORM SEWERS I 1' DEPARTMENT : 031 PUBLIC WORKS i 1 PROJECT MAHAGERt $12 DANIEL BRENNER ! n 1' FIRST YEAR IN CAPITAL PROGRAM s FYSS ! FIRST YEAR OF APPROPRIATIONS 1 N PROJECT SCHEDULE INITIAL REVISED ! COMMENCE DESIGN 01/90 TBD 1 N AWARD CONTRACT 06190 1 N' BEGIN CONSTRUCTION 08/90 ! BENEFICIAL - USE 1 N PROJECTCOMPLETE 02/91 --------------------------------r-.•-••••••••.r..rrrr....r..-r....-..rr PRIOR APPRO- TOTAL COST APPRO- PRIATIONS tr-------------- FUTURE COST ElTiMATES rrrr-rrrr-rr. rY►> COST CATEGORIES ESTIMATE PRIATIONS 1989-90 1990-91 1991-92 1"2-98 199&44 1"440 --------- rrrrrrrrr rrrrrrrr.l. ---------------------------------- --------- --------- --------- --------- c • x 1000 1 . LAND ACQUISITION DESIGN 85.0 $9.0 # CONSTRUCTION 1705.0 1705.0EQUIPMENT ADMINISTRATION 22.0 22.0 OTHER 186.0 144.0 # ------------------------- ---- ----- TOTAL COST 2000.0 --------- 0.0 --------- 0.0 --------r --------- 0.0 0.0 --------- --------- -------r- 0.0 2000.0 0.0 PRIOR APPRO- r TOTALAPPRO- PRIATIONS <------------------ FUTURE FUNDING -------------------: FUNDING SOURCES FUNDING PRIATIONS 1989-90 1990-91 1991-92 1992-98 199S_94 1994-99 ------------------------- --------- -------- - ---- ----- ----- ------------ -0 x 1000 ------------------ rrrrrrrrr... 99l STORM SEINER. G.O. BONDS -UNAUT 2000.0 rrr-rrrrr 2000.0 rrrrrrrr---------- r rr rr-- - rr-rrrrr-rrrr-rrrr-r r rr---------- TOTAL FLING 2000.0 --------- 0.0 --r------ 0.0 --- ---r rr 0.0 0.0 0.0 2000.0 0.0 REVISION DATE 05/30/19 r I III II III / IIII 1III F I F a F I F 1 it 4 r II F 8 F ff C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT 062MZPTION FY90 PROJECT NO. t 052261 PROJECT NAME t N.W. 71 STREET TRUNK MAIN STORM SEWER ADDRESS t SEE PROJECT DESCRIPTION MORHD LOCATION : 111. 112. 121 NBRHD SERVICE s 111, 112, 121 PROGRAM t 007 PHYSICAL ENVIRONMENT CATEGORY" t 072 STORM SEWERS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANABERt $12 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM t FY88 FIRST YEAR OF APPROPRIATIONS t PROJECT SCHEDULE t INITIAL REVISED COMMENCE OESIGN 10/90 TOO AWARD CONTRACT 06191 BEGIN CONSTRUCTION 08/91 BENEFICIAL USE PROJECT COMPLETE 06/92 PRIOR TOTAL COST APPRO- COST CATEGORIES ESTIMATE PRIATIONS --------------r---------------------------- LAND ACQUISITION DESIGN 285.0 CONSTRUCTION 4690.0 EQUIPMENT ADMINISTRATION- 60.0 OTHER 515.0 TOTAL COST 5500.0 TOTAL FUNDING SOURCES FUNDING - --------------------- ------ --- 865 STORMWAtER UTILITY TRUST FUNDS 500.0 993 STORM SEWER. S.O. BONDS -UNAUT $000.0 ------------------------- --------- TOTAL FUNDING 5500.0 r---rr0.O IOR APPPPRO- PRIATION8 AS OF OS/29/*89' -----rr---------------------------4--4 f PROJECT DESCRIPTIONt f i This pro ect will provide positive drainage for N. t f 71 at between N.M. 17 Avenue and N. MSse3 Avenue! ! ! and also provide a relief *Votes and overflow oennoe- t ! tion for the Llborty 40821#71, fralrway 1052198? and t ( Northwest (052196) store sower district project. This f ! project is a recommendation of the Store urainote f ! Master Plan. The trunk main will be constructed a t ! N. 71 Street to either N. Miasl Avenue or N.E. 2 Avenue t ! at which point the main will be extended north to f the Little River Canal. t �, f t 1 M' ! E ! F ---------------------------------------------r rr� r.Y1 rfti-,r�rY.11-r APPRO- PRIATIONS <-------------- FUTURE COST ESTIMATES --- s 1969-90 1990-91 1991-92 1992-98 1!!9-!d 1ll4-1 ------------------ --------------------------- r----..r-r c e X 1000 ) 20- 4s9dr. 6111.0+ 51i>kSP APPRO- PRIATIONS<------------------ FUTM Fop.---------------...4s 1989-90 1990-91 1991-92 loss-9s 1998-1d 11i1Nr. '" ---r----- ---- ---r --------- r-------- r---r- . t • X 1000 ? ------ r-------- --r---r-r 0.0 0.0 0.0 0.0 0.0 0.0 REVISION DATE 07/24/49 r-rrrrd7,W � �` ss0a>y� PROJECT NO. s 052262 PROJECT NAME :-KXNLOCH STORM SEWERS AOOPr4S s SEE PROJECT DESCRXMON' MBRHu LOCATION s $98. 594 NBRI4D SERVICE : 593, 594 PROGRAM s CATEGORY s 007 PHYSICAL ENVIRONMENT 072 STORY SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAOERi 312 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY88 "FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN 10/90 TOD AWARD CONTRACT 06/91 BEGIN CONSTRUCTION 06/91 BENEFICIAL USE PROJECT COMPLETE 04192 TOTAL COST COST CATEGORIES ESTIMATE --------------ir---------- - --------- LAND ACQUISITION DESIGN 65.0 CONSTRUCTION 1705.0 EOUXPMEHT ADMINISTRATION 22.0 OTHER 188.0 TOTAL. COST 2000.0 TOTAL FUNDING SOURCES FUNDING $65':BTORMWATER UTILITY TRUST FUNDS 500.0 STORM SEWER. B.O. BONDS -UNAUT 1500.0 TOTAL FUNDIFIG 2000.0 CITY OF VIAKX CAPITAL I11PROVEIENT PROGRAM PROJECT DEBORXP'TIO14 FYlO PRIOR APPRO- PRIATIONS 0.0 PRIOR APPRO- PRIATIONS Ai 0'F' "10"04 --------------- -----------------------------------rrs-r--r--. ! PROJECT pESCRIPT'ION: � ! This project will provide additional *ter* ss�'M , r ! to the area bounded by N.M. 7 Street. Mess. 42 Avomew t ! S.M. •th Street and West 47 Avsnus. A ppeessltivM F ! overflow sewer will be constructed alonq 14.M. 49 Avenue N ! to the Tawlawi Canal as part of this project. ! 1 ! F ! 1 t _ f t ! APPRO— PRIATIONS ------a------------r--. i--------------- FUTURE OOBT 'm 1999-90 1990-91 1991-92 1992-94 1915-94 1994-90 --------- ------------------- ----------rr----rr l • X 1000 ? $%-aa 1703.0 22.0 1Si. 0 ----- ---- ------rrr ------------------ -------- 0.0 --0.0 0.0 0.0 0.0-2000.0 APPRO- PRIATIONS <- --- FiwIND --- rrr—r-------rr 1989-90 1990-91 1991-92 1992-98 3924-" 1994-90 --------- --- — —-..—rr.r..—.l.. r..a-'srar.rr rrr ----r— ( t x 1000 )--_ �00.0 1'd00.0 ----- ----- ----- ------------------ --rns—iiY--------ss.rs -0.0 0.0 0.0 0.0 0.0 0.0 2000'.0 REVISION DATE 07/26/89 �a•�ifa�IINE�����F� �'� 1�1ti�i�nh�� PROJECT NO. s 052263 PROJECT NAME s WAGNER CREEK RENOVATIONS - PHASE V ADDRESS s SEE PROJECT DESCRIPTION NBRHD LOCATION s 636, 252 NBRlO SERVICE t 636, 252 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEOORT : 072 STORM SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT MANAGER: $12 DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM s FY88 FIRST YEAR OF APPROPRIATIONS s PROJECT SCHEDULE t INITIAL REVISED COMMENCE DESIGN 10/92 TBD AWARD CONTRACT 05/93 BEGIN CONSTRUCTION 07/93 BENEFICIAL USE PROJECT COMPLETE 01/94 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF Gol"lS9 ------------------------------------------------ -----------. ! PROJECT DESCRIPTION: ! ! The construction of box culvert storm sewer- ands t ! bulkheadiny of Wagner Crook between Of.*. 14 Strowl' N ! and N.N. 11 Sirest. The scope of work along certain N ! •sgments of this project maV enlV include dredging N ! of the crook bottom. ! 1 N ! t ! ! N ! F ! 1 ------------------------- -------------------------------- PRIOR APPRO- TOTAL COST APPRO- PRIATIONS •--------------- FUTURE COST E1112" tM---------------> ESTIMATE PRIATIONS lost -to logo-91 1991-92 19t2-92 199i-94S1994-90 ----------------------- ---- --- ----..-----------'--------- -----.r-tea l t X 1000 M 05.0 1705.0 22.0 186.0 2000.0 TOTAL FUNDING SOURCES FUNDING 993 STORM 6EVER. G.O..SONDS -UNAUT 2000.0 ----------- 70TA1. FUNDING 2000.0 ------0.0 PRIOR APPRO- PRIATIONS ------0.0 APPRO- PRIATIONS lost-l0 ------o.o------0.0 --- 0046 17Mi- 4 lSi.O 0.0 0.0 0.0 0.0 2000..0 �- ---- - FUTURE FU OM -----------------* 1990-911991-92 1992-95 199Z-94 1904-96 --- ----------------------------- -• X 1000 3- 2000�-0 ----- ---------------------- 0.0 0.0 0.0 0. 0 2006.0 REVISION DATE 07/26/49 2000.0 20W- 0 CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS, or "♦"A4 ---------------------------- ---- .rr---- r+•.rrrrrrrr-rrrrr.. PROJECT NO.'' : 052264 PROJECT NAME : BELLE MEADE STORM SEWERS - PHASE II ! PROJECT DESQRZPTION'r 1 ADOREBS t SEE PROJECT DESCRIPTION NBRHO LOCATION : 191 HBRHD t ! TAe projoat will provide a etarw sewer *vote* lav otwifte **, I' River, Sisasyns Be:ris+ta��,� tit.• SERVICE : 191 , 1 ! area bounded b Llttle 72 Terrace, an Blooeyne� Baq. t PROGRAM : 007 PHYSICAL ENVIRONMENT t t f CATEGORY' : 072 STORM SEWERS t DEPARTMENT : 081 PUBLIC WORKS t PROJECT MANAGER: $12 DANIEL BRENNER C F FIRSTYEAR IN CAPITAL PROGRAM : FY08 ! t ) 6 FIRBT,'YEAR OF APPROPRIATIONS : ! 1 PROJECT SCHEDULE : INITIAL REVISED ! t t COMMENCE DESIGN Td0 ! ! ) AWARD CONTRACT t BEGIN CONSTRUCTION BENEFICIAL USE ------------- PROJECT COMPLETE PRIOR TOTAL COST APPRO- APPRO- ------ FUTURE COST ESTIMATES rrr-r--rr.r.r.r-r+ri PRIATIONS--------- 1969-90 1990-91 1991-92 1992-90 9!t-!i COST CATEGORIES ESTIMATE PRIATIONS --- -----rrrr-rrr - --19"4-99 ------------------ --------- ---___ 00 ) LAND ACQUISITION DESIGN CONSTRUCTION ENT ADMINISTRATION OTHER TOTAL COST FLUM40 SOURCES 85.0 1705.0 SS.O 1700.0 22.0 22.0 158.0 188.0 _ -rrrr. rrrrrrrrr rrrrrrrrr rrrrrrrrr rr-2000.0---___0.0 rr-rr-0.0------0.0 rr-r 0.0 0.0 0.07 2000.0 PRIOR APPRO---------- FUTURE FUND" TOTAL APPRO- PRIATIONS •--------- FUNDING PRIATIONS 1989-90 1990-91--1991=l2 rrl9fZ_9S -r-r-rrrr------rrr r-------- r-----• - 10-- ) rrrrrr•.rrrrrrrrrrrr� 19fS-9d 191N-98 rrrrrrrrr rrrrrrrrr 99SSTORM SEWER- G.0• BONDS -UNAUT 2000.0------------------ ------ -- ----- ----------- ------ --- rrrirrr--rrrrrrrrrrrrrrrr rrr rrrrrr 0.0 0.0 0.0 0.0 0.0 0.0' TOTAL FUNDING 2000.0 REVISION DATE 09/08/89 . PROJECT NO. s 052265 PROJECT NAME t FAIRLAWN STORM SEWERS ADDRESS s SEE PROJECT DESCRIPTION NBRHD LOCATION t NBRHD SERVICE s S93 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY t 072 STORM SEWERS DEPARTMENT s 031 PUBLIC WORKS PROJECT.MANAGERs ail DANIEL BRENNER FIRST YEAR IN CAPITAL PROGRAM : FYaa FIRST YEAR OF APPROPRIATIONS t PROJECT SCHEDULE t COMMENCE DESIGN INITIAL RETOOOED AWARD CONTRACT 10/99 BEGIN CONSTRUCTION 12/89 BENEFICIAL USE 10/90 PROJECT COMPLETE TOTAL COST COST CATEGORIES ESTIMATE 120.0 DONSTRUCTIOtI 2558.0 EGUIPl�l1T ADMINISTRATION 33.0 OTl91R 281.0 TOTAL COST $000.0 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PRIOR APPRO- PRIATIONS PRIOR APPRO- PRIATIONSloss r-r-rrrrr o.o APPRO- AR OF 00/29/89 ----------------------------------------------------- ------ ! PROJECT OESCRIPTIONs 1 This project involve* the oontructiost et a pesittw t ! store server *Votes for the area boanded apprexieately t ! by 8W ath St.r W 57th Ave. r NN 7th St. and R 47th t 1 Ave. t t ! t ! ! ! ! t t t t ! ! t t r ----------------rrrrr—.terrarrrrr.rrrrr..rr.r.rr.rar.r.�rr.r�rrrrrrrr <------------- FUTURE am ii cSfm•a-rr wrrr.�rrrr..r: 1990-91 1991-92 1992-98 1"S_94 199d-$* --a ----------rr-r--a------- r-rrrr..rr t 0 x 1000 1 125.0 255S.0 38.0 201.0 -a--aa--a --aa--rrar-rrr rrrrrrrr--raaaras 0.0 0.o a000.o 95 0.0 TOTAL APPRO- PRIATIONS t------------------ FUTURE FUN03 M FUNDING SOURCES FUNDING PRIATIONS 1959-90 1990-91 1991-92 1992-98 ----- ---rrrrr— --------- --------- --- ---- atilt -r--r---- 1000 % 965:8TORMWATER'UTUITY-TRUST FUNDS $00.0 $00.0 994 STORM ; SENER. A.O, BOMB - N+IAUT 2500.0 2$00.0 -r.r..-rii�l.-rarr-----rrrrrrr -- rrrrr a- rrrrr -3000.0 ---- .. -rr- rrrrrrrrr TOTAL FUNDING 0.0 0.0 �O.Q' 0.0 3000.0 ----------rrar-a...►.. P 199s-ss 1990-90 rrrraaarr aara-rrrr ----r -----W 0.0 aa.a C I T Y O F M I A M I CAPITTAALL IQ R PROGRAM FY90 PROJECT NO. : 052266 -PROJECT NAME t GRAPELAND STORM SEWERS - PHASE'll ._ AOORE88 t SEE PROJECT DESCRIPTION HSRHO LOCATION t 691 NBRHD SERVICE t 691 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY s 072 STORM SEWERS DEPARTMENT t 031 PUBLIC WORKS PROJECT MANAGERS $12 DANIEL BRENNER FIRST YEAR IN CAPITAL a FYOeI FIRST YEAR.OF APPROPRIATIONSM PROJECT SCHEDULE = INITIAL REVISED COMMENCE DESIGN 00/90 TOO AWARD CONTRACT 00190 BEGIN CONSTRUCTION 00/91 BEl*FICIAL USE PROJECT COMPLETE 00/91 TOTAL COST COST CATEGORIES r - ----------- ESTIMATE ----- LAND`ACOUIBITION 72.0 DESIGN CONSTRUCTION 1449.0 EQUIPMENT ADMINISTRATION 19.0 , � 160.0 OTHER --- -- -------- TOTAL CO8T -r-� ---- 170 i7oo.o TOTAL ,_FUNDING SOURCES --------------- FUNDING - ---- 9!s STORM FEWER- G.'O. SOHN -UNAUT 1700.0 r------ -rr---r-------rrr---1700.0 TOTAL FUNDING PRIOR APPRO- PRIATIONS 0.0 PRIOR APPRO- PRIATIONS APPRO- PRIATIONS ------0.0 APPRO- PRIATIONS --1969-90 -- -- -- 0.0 ------ 0.0 "J" uS3:16114Y1111IA. YI JI � + __ ._....v �_.,....-..�-.—•-•ggi1Y1C14FWi1YiYnli i I � � � ii lO�M.L� ' r 71 ASS t>F Offly►l►iP r-----------rrrr.r-rr-rr-+.rr....r -rr-rrr-rrr--r-r-r-rrr--rrrr-r �y ! PROJECT DESCRIPTION: ! This projsas wlli provide sterw sore' to s tAveno6o u ! of the area bonded by N.M. 27 Avem ov N.V. ) 1 N.R. 7 Street and the East -Most Exptsssra- 1 t 1 p ! - 1 ` p ! 1 ! 1 ---------------------rrrrrrrrrrr-rr-rrr�r.r.rrrrrrrrrrrr+,rriY'- N�R. Go"EgTMTES -rr-r •rrrrr-rr. r-rrr-r-r r--r-ir-- 6 X 1000 ) 78.0. 1449.0 19.0 160.0 ---------0.0------Q.O 0.0 1700.0 0.0 ---------r------- FUTURE �- i!!i-l4 1194-91i 1990-91 1991-l2 i!!z-lf --------- ------------------ ---- ------4 x 1000) 1700.0 -r-rir-r- 0. 0 O. 0 0.0 REVISION DATE 07124/09 II C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. 353002 PROJECT NAME INCINERATOR PROPERTY - FEA918. AND STRUCT. STUDY ADORE" t N.M. 20 STREET NBRHD LOCATION s 900 HBRHO SERVICE t 900 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY t 073 SOLID WASTE DEPARTMENT : 032 SOLID WASTE PROJECT MANAGERt $22 JOSEPH A. INGRAHAM FIRST YEAR IN CAPITAL PROGRAM t FY37 FIRST YEAR OF APPROPRIATIONS t FYs7 PROJECT 9CHEOULE t INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT 06/93 TBD BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 06166 00/69 COST COST CATEGORIES TOTAL OESTIMATE ------------------------- --------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST 0.0 TOTAL FUNDING SOURCES FUNDING r---------------------- ---------- $60 1970 POLLUT. 6.0 BONDS - 86 SL ------------------------- --------- TOTAL FUNDING 0.0 w PRIOR APPRO- PRIATIONS 50.0 10.0 60.0 PRIOR APPRO- PRZATIONS 60.0 60.0 APPRO- PRIATIONS lost-t0 50.0- 10.0- 60.0- PRIATION8 loaf-90 AS OF 00/29189 -----r--------- ! PROJECT DESCRIPTION: f I This project involves conducting a fsasiblxlty and i structural study of onvironoentaI planning�. daslyyn, I I and economic analysis of the Old Inoinerater Fael�ilty ! ! by professional planning and design consultant ,services f I to evaluate the Clty's options for rouse of this ! I facility. (Refer City Comm. meeting $112104, Rosolu- I I Lion 66-422). t I More specifically, this property could be used for f I recyellnpp, a solid waste cogeneration facility, a f I refuse fired •team gonoratinq plantt and/or el"Irle f I q:nesting solid waste to anorg plant. The waste- I t to- energy industry is expected to develop into a f I multi -billion industry over the next decade. ! ! t ! t t t ------------------------------------------------------------ <- --- FUTURE COST ESTIMATEi--------------> 1990-91 1991-92 1992-98 191tt-94 IM-95 --------- --------- ----- ------------r--r-- ( t X 1000 ) ------------------ 0.0 0.0 0.0 0.0 *fie <------------------ FUTURE FUNOM--------------.r�.w►r� 1990-91 19t1-sz ltsl-!i ltl0-:4 1io4�!!9 --- ------ ---------------r ...Yrrr.ffrMti%i, ( s X 1000 ) 60.0- -- ------ ---- ------------ 60.0- 0.0 0.0 `0.0 0.0 0.0 DELETION DATE 09/80/09 .. am" MI .I...11 OP91U.poa nu,.i CITY OF MIANI CAPITAL IMpROVEMMNT PR09AM PROJECTFOTElSCR3PTI004 PROJECT NO- s 355001 SOLID WASTE COLLECTION EQUIPMENT ACQUISITION pROJECE NAME S Alams CITYWIDE HIMHO LOCATION = MOM SERVICE s 900 PROGRAMe 007 PHYSICAL ENVIRONMENT 073 SOLID WASTE CAtiOR: : DEPARTMENT s 032 SOLI WASTE 322 JOSEPH A. INGRAHAM PROJECT MANAGERS XAST YEAR IN CAPITAL PROGRAM FY87 FIRST YEAR OF APPROPRIA IT ONS S FY87 PROJECT SCHEDULE S COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION ° CCT=COMPLETE COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EADMINISTRATION OTHER ------ --------- TOTAL COST FUNDING SOURCES - -------------------- INITIAL REVISED 00/69 TOESTIMOT MATE 604.0 --- 66.0 -752.o FUTAL NDING —rr752.0 - 767 70 POLLMT GO BONDS 70 81.. BALC--------- —...r--r---r 752.0 TOTAL FUNDING 4 -rrr----r -----r—rr 0.0 0.0 -rr--r-rr --------� rrr..----- O. O`O AS OF 0SI"hil ------------------ r—r-rrr--rr---rrrrr+-rr..r--- 1 p---- DESCRIPTION: ) ROJECT! This pre�eet invelvaa ppurahaee of a Pao Leader, * so ! up Truckee DuRpetere. Hydro-Cranee,othsr vehialet and ) 1 containers. This equipment will be Used `Primars" Lien, t ! support aolleotion of trash in the City 1 tAie s;.hPo� will litteraaanetthroughoput the Cit�{•eleo� ) ! inq tr nt wi11 1 Duwpeters will Sj utiliseOverall.gthisrequitPOosupeort t M the aollsotion e!lortp appearance of the Cltg 1 serve to improve the physieat ape 1 M through sificiont colleatien and transferal of 9ardNM t ! and trash. t ! t ! --------------I---------rrr-------r......------- . PRIOR FUTURE "Ti111A=! r"—or PRIA 4--------- -r F92 199 - f99Mr 94� — Ate_ 1--- !i - ` i!l0-11 1!!i-!Z rrr-----rr...-+•- PRIATIONS------- -- --- r-r-i-j x 1000 ) 654.0 69.0 L-------------- ----------O.o 0.0 0.0 752.0 r-----r---+rrr-rrr 0.0 0.0 PRIOR <---------rr-- -- Ftodzm i AppaoFUTURE - APRRO- PRIATIONS 1l11-9 1992 PRIATIONS 1989-90--i!l0-91------------------ ----------•------• l s x 1000 752.0 _ ----- ----75Z.0------0.0 0.0 .cvisxoN DATE 10/14188 PROJECT NO. : 353008 PROJECT NAME a SOLID WASTE COLLECTION MINI -SITE ADDRESS 1290 H.W. 20 STREET HBRHO LOCATION : Gas HSRHO SERVICE s 631v 632. 633, 634P 635. 636 PROGRAM ^ : 007 PHYSICAL ENVIRONMENT CATEGORY : 078 SOLID WASTE DEPARTMENT t 032 SOLID WASTE PROJECT MANAGERS 322 JOSEPH A. INGRAHAM j FIRST YEAR IN CAPITAL PROGRAM s FY67 FIRST YEAR OF APPROPRIATIONS s FY87 f PROJECT SCHEDULE _ INITIAL REVISED COMMENCE DESIGN 00/86 Tdo AWARD CONTRACT 00/89 BEGIN CONSTRUCTION BENEFICIAL USE 00/S9 PROJECT COMPLETE C I T Y O F M I A M I CAPITTAALL IMMTR� SCRIpTIOf�AM JECFY90 AS OF 08/29/89 _ ------------------ -- r -NW. 20TH STREET 1 PROJECT DESCRIPTION$ H ! This prefect involves the design and censtr0 isa e6 & f 1 min dump sits for City of Miami residents. Thi• N 1 tacilit will be used as a drop Ott Th�nCityratrash ! only and will not inoluds garbage• T It 1 physical appearanee will improved through an additlenaZ 1 means of transferring trash. ! ! This project i• being embarked upon as a result of ! State Mandatory reeyeling programs, also to be in ! 1 concurrence with the City,* comprehoneive planning 1 program. U' ! 1 ! r ! N -------- ------------------------ --- -- ---- ------------------ - PRIOR TOTAL COST APPRO- COST CATEGORIES ------------------------- -ESTIMATE PRIATIOHS !I LAND ACQUISITION 30.0 30.0 DESIGN 300.0 300.0 CONSTRUCTION EQUIPMENT ADMINISTRATION 33.0 33.0 OTHER --------- --------- ------------------------- a6a.o a6a.o TOTAL COST PRIOR TOTSAPPRO- FUNDING SOURCES - FUND--- PRIATIONS --------- ------------------------- 860 1970 POLLUT. 0.0 BONDS - 66 SL ----- 363.0 ----- ----363.0 ------------------------- TOTAL FUNDING ----$63.0 a APB- --- FUTURE COST ESTIMATED ---- -- -----!h!S 1969-90 1990-91- ---------------- i • x 1000 ) 30.0- 30.0 291.6- 291.6 33.0- 33.0------- ----------------- ------ ------------------ ----- 0 0 .0 0.0.0 oral as4.6- 354.6 APPRO- --------•-------->' FUTURE FUNDING - PRIATIOHS <------ ------------ 1918-14 1914+M 1969-90 1990-91 1991-92 1992-98-------- -------------------- -- `S --X 1000 ). 354.6- 354.6 ------------------ ----- --------- ---- 0.0 O.Or 354.6- $54.6 REVISION DATE 08/19189 CITY OF MIAMI CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 PROJECT NO. : $53005 PROJECT NAME STREET AND SIDEWALK SWEEPING EQUIPMENT PURCHASE ADDRESS : CITYWIDE NBRHO LOCATION : NBRHD SERVICE : 900 . PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY" : 073 SOLID WASTE DEPARTMENT : 032 SOLID WASTE PROJECT MANAGER: 322 JOSEPH A. INGRAHAM FIRST YEAR IN CAPITAL PROGRAM : FY37 FIRST YEAR OF APPROPRIATIONS : FY87 PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN AWARD CONTRACT 00/37 BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE 00/39 TOTAL COST COST CATEGORIES ESTIMATE LAND ACQUISITION DESIGN CONSTRUCTION 652.5 ADMINISTRATION OTHER 62.0 TOTAL COST 714.5 TOTAL FUNDING SOURCES FUNDING $60 1970 POLLUT. 8.0 BONDS - 36 SL 714.5 TOTAL FLING 714.5 PRIOR APPRO- PRIATIONS 652.5 62.0 ----714.5 PRIOR APPRO- PRIATIONS 714.5 714.5 714.5 APPRO- PR11e9 l0 ------ o. -0 APPRO- PRIATIONS --1969-90 AS OF 001"9 'f ------------------r--------rrrr.-rr-rr ! PROJECT DESCRIPTION: t ! h :ni• project Involves te purchase of equipmont to ! perform weekly stroot-sweeping as wolf as 0idsw83ft ! cleaning for all business areas and arterial stroefs� t ! as well as the nightly sweepinq of tho Central Business F ! District. Th• equipment includo* vacuur swoeWer t ! mechanical owooper*r a pressuro oloonerr power blewere ! ! and flusher*. More *pecificallyr this equipment t ! will support the *weeping of 32 miles of downtown t ! streets daily, 167 miles of arterial streets once a' ! week, and keep dobris end trash off the streets ! and right-of-way :roar. In an effort to continue to ! ! provide *pool al •ervico to the community for economie E ! and cultural development of the City, this equipment ! ! will be used during clson-up for Grand Prix, Calls t ! Ocho, Orange Bowl Parader Goombayr and Paso* Day. ! ----------------------------------------------------------rs <-------------- FUTURE COST ESTIMATER---- -- ---- -- JP 1990-91 1991-92 1992-93 1992-94 1914-9E --- - ---------------------- --------r ( f 1000 ) -- -- ------ ------------- - <------------------ FUT= FUNOKM -------------------r r-1990-91 1991-92 1992-93 1919-941 1994-n ----------------------- -Nr---N 0 X 1000 ) ----- ___ ---------------. rr------ -0.0------0.0 ----- -0.0 0.0 0.0' 0.0 REVISION DATE 06/24/97 s -#if■llllll l'llf!'l�'1`i'1hh7hh� C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FYSO PROJECT NO. t 353007 PROJECT NAME : LITTER CONTAINERS REPLACEMENT PROGRAM ADDRESS t CITYWIDE NRRHD LOLAPION t MUM SERVICE t 900 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY" : 073 SOLID WASTE DEPARTMENT : 032 SOLID WASTE PROJECT MANAGER: 322 JOSEPH A. INGRAHAM FIRST YEAR IN CAPITAL PR06RAM t FY63 FIRST YEAR OF APPROPRIATIONS t FYSS PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 04/86 AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL. USE PROJECT COMPLETE 00/92 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT Its NR ADMINISTRATION OTHER TOTAL COST A8 OF 04/2f/89 -------------•-r-----•----------- 1 PROJECT DESCRIPTION: ---- ! !. 1 This project involves implementation of the Citywide ! ! program for collection of garbage, trashr and rubbish. t The Department of Solid haste has determined there it ! ! a need to replace old litter containers which are t ! unsightly, weather worn, broken irrepstable ! ! throu9hout the City of M1401- Initiallyy, five hundred litter containers will be ! ! ppurchased and installed throughout the City.- ! It is anticipated that 25 containers would be needed ! ! per year for the following four 441 year* for i rePlacewont end expanded service. 1, ----------------------------------- ------------------------- PR OR ----------- FUTURE COST ESTINATEB---- --------- --s TOTAL COST APPRO- PRIATIONS ---19 ESTIMATE PRIATIONS lost -to 1990-91 19s1-92 ------ 1------ 1------ --------------------------- - a x 1000 TOTAL FUNDING SOURCES FUNDING ---- ------------------ --------- s6o 1970 POLLUT. 0.0 BONDS - 86 SL 281.2 --•------------------------------ T�TAL FUNDING 2s1.2 ,. 236.3 C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FYSO PROJECT NO. t 353007 PROJECT NAME : LITTER CONTAINERS REPLACEMENT PROGRAM ADDRESS t CITYWIDE NRRHD LOLAPION t MUM SERVICE t 900 PROGRAM : 007 PHYSICAL ENVIRONMENT CATEGORY" : 073 SOLID WASTE DEPARTMENT : 032 SOLID WASTE PROJECT MANAGER: 322 JOSEPH A. INGRAHAM FIRST YEAR IN CAPITAL PR06RAM t FY63 FIRST YEAR OF APPROPRIATIONS t FYSS PROJECT SCHEDULE : INITIAL REVISED COMMENCE DESIGN 04/86 AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL. USE PROJECT COMPLETE 00/92 COST CATEGORIES LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT Its NR ADMINISTRATION OTHER TOTAL COST A8 OF 04/2f/89 -------------•-r-----•----------- 1 PROJECT DESCRIPTION: ---- ! !. 1 This project involves implementation of the Citywide ! ! program for collection of garbage, trashr and rubbish. t The Department of Solid haste has determined there it ! ! a need to replace old litter containers which are t ! unsightly, weather worn, broken irrepstable ! ! throu9hout the City of M1401- Initiallyy, five hundred litter containers will be ! ! ppurchased and installed throughout the City.- ! It is anticipated that 25 containers would be needed ! ! per year for the following four 441 year* for i rePlacewont end expanded service. 1, ----------------------------------- ------------------------- PR OR ----------- FUTURE COST ESTINATEB---- --------- --s TOTAL COST APPRO- PRIATIONS ---19 ESTIMATE PRIATIONS lost -to 1990-91 19s1-92 ------ 1------ 1------ --------------------------- - a x 1000 TOTAL FUNDING SOURCES FUNDING ---- ------------------ --------- s6o 1970 POLLUT. 0.0 BONDS - 86 SL 281.2 --•------------------------------ T�TAL FUNDING 2s1.2 ,. 236.3 11.3 11.3 11.3 9.5 '_5 .5 .S --------- ----- - ..� ----245.8 ---- 11.s - li-S - - 11.6 --------- 0.0 0.0 0.0 PRIORAPPRO- APPRO- PRIATION8 <---------__------- FUaN1[ 1990-91 1991-92 -_r_r--_rr ---------� 1992--98 1998-14 1'94 t!� PRIATIONS 1989-90 - ---- ----r---r rrrrrrrrr rrrrrrrrs --------- --------- --- l • x 1000 ! 245.8 11.8 ll.s 11.8 --------- _-___ - -- 245.6 11.6 ll.s 11.8 --------- 0.0 a:a a•O REVISION DATE Ostia/OS .!4 PROJECT NO. s 353009 PROJECT NAME : SOLID WASTE EXPANDED FACILITIES ADDRESS : 1290 NW 20 STREET NBRHD LOCATION : 635 NORM SERVICE s 900 PROGRAM s 007 PHYSICAL ENVIRONMENT CATEGORY#, s 073 SOLID WASTE DEPARTMENT s 032 SOLID WASTE PROJECT MANAGERs 322 JOSEPH A. INGRAHAM FIRST YEAR IN CAPITAL PROGRAM : FY89 FIRST YEAR OF APPROPRIATIONS S FY39 PROJECT SCHEDULE s INITIAL REVISED COMMENCE DESIGN TBD AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENT ADMINISTRATION OTHER TOTAL COST FUNDING SOURCES -------------------- TOTAL COST ESTIMATE 1.0 20.0 4.0 C I T Y O F M I A M I CAPITAL INPROVEiENT PROGRAM PROJECT DESCRIPTION PRIOR APPRO- APPRO- PRIATIONS PRIATIONS 1949-90 1.0 20.0 4.0 ------ -- - -- - - --- -- 2s.0 2s.o PRIOR TOTAL APPRO- FUNDING PRIATIONS --------- -- -- -- --- $60 1970 POLLUT. 0.0 BONDS - 66 SL 25.0 25.0 -------------—�•----r ..---- — --- ---- — — — — — — — — -- TOTAL FUNDING 25.0 25.0 a APPRO- PRIATIONS 19$9-90 ..�,,.., N, I I I If4.f .. ... ....__.-_.�... ... _:.��., �' oNMYMIiiIII�iYlYuoilull� i, •14L�... t —rrrrr—rrrrr-r—r--rr --—-------rrr--------- ! PROJECT DESCRIPTIONS E ! This project involves the expenelon of two l'dWlant• N ! areas of activities that oontrilwte toy th*, omiertft,1 f running of the Oopartment, as follow* ! f N ! 1) Increase the present storage faoillty an Ienalfig N ! of part of property, for storage at equipment,.- N ! dumpeters, roll offs, eta. N ! 2) Increase the present space of the aommuniaatlon f ! room. N ! N ! k ! E ! t ------------------------------------------------ --------------- FUTWE COW ESTIMUS r••-,• •r----••.�••-s 1990-91 1991-92 1992-98 199i-94 1994-1t --- ----- ------r-- -----r--- --------- (! X 1000 ) ...... rrrr ----r--------r rrr---•--- r---rrM.-- a. o o. o o.o �- ---- FUTUK F1NiDIM-----•------w- ----- > 1990-911991-92 1992-§$ 1999'-94 1994-95, --r - ---------r---------ii1---------- ( t X 1000 ) — — --- — ---- --- -- ----- ---- ----- ----- rrr— rrr— rrrr —rr— r—rr 0.0 0.0 0.0 0.0 0.0 0.0 REVISION DATE 06/03/89 s 11 PROJECT N0. _ PROJECT NAMEADDRESS : NBRHO LOCATION : NBRND SERVICE : PROGRAM = CATEGORY' t DEPARTMENT = PROJECT MANAGER: 353010 SOLID WASTE COLLECTION EQUIPMENT N.W. 22 AVE 8 11 STREET 900 900 007 PHYSICAL ENVIRONMENT 073 SOLID WASTE 032 SOLID WASTE 322 JOSEPH A. INGRAHAM FIRST YEAR IN PROGRAM i FY90 FIRST YEAR OF APPPPROPRIATIONSS : FY90 PROJECT SCHEDULE : COMMENCE DESIGN AWARD CONTRACT BEGIN CONSTRUCTION BENEFICIAL USE PROJECT COMPLETE COST CATEGORIES ------------------------- LAND ACQUISITION DESIGN CONSTRUCTION EQUIPMENTADMINISTRATION OTHER TOTAL COST FUMING SOURCES INITIAL REVISED C I T Y O F M I A M I CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTION FY90 AS OF 08/29/09 -----------------rr.r—r r.rrr.rrrr ! PROJECT pESCRZPTION: � ! t ! This project involves buying n:w 9arbay* equipmsnt suoA ! as a Pay Load:, Pick-up trunks. dumpsters, alai aranos, f ! with front-end loaders. hydro -cranes and street f ! vehicles and containers. This equipment will also hslp ! ! to collect trash from litter cans. t' ! This equipment consist of: f Claw type cranes with front end leaders ! ! 2) 6 Nydro-cranes f ! 3) 1 Flat bed truck with hydrolitt and tailgate ! 4) 2 3/4 ton pick-up trucks with hitch f ! S) 1 Roll -oft truck M ! 6) 2 Dump trucks f ! f -------------------�-------------- !-------------------------- PRIOR APPR0- -- - FUTURE COST KSTIMATEW-------'--31 TOTAL COST APPRO PRIATZONS------------ 1992-99 1"8-IA 1! ` ESTIMATE PRIATIONS 1969-90 1990-91 1991-92 _------ --N--_------. -------------- ------ --- ------------------ ---- t t X 1000 1 1341.0 133.0 --------- 1474.0 --------- 0.0 PRIOR TOTAL APPRO- FUNDING PRIATIONS 670.0 671.0 67.0 66.0 --------- 737.0 --------- • 737.0 APPRO- PRIATIONS 1989-90 860 1970 POLLUT. G.O BONDS - 86 SL 1474.0 -737.0 TOTAL FUl�It� 1474.0 0.0 737.0 --------- _-------- 0.0: 0.0 ------------------ 1991-92�UAKF VQ 1990-91 ___ t s X 1000 ) 737.0 _----___ ----737.0 ------__ 0.0 0.0 0.0 rrr Od •----------------...ws 1995-" I194i ------------------i ---- ------0.0 0.0