- RESOLUTION NO. 90- 345
A RESOLUTION ACCEPTING THE BID OF
MANTELL ENGINEERING CONTRACTORS, INC.,
IN THE PROPOSED AMOUNT OF $347,396.00,
TOTAL BID OF THE PROPOSAL, FOR DOWNTOWN
SANITARY SEWER REPLACEMENT - PHASE III
(B-5561), WITH MONIES THEREFOR ALLOCATED
FROM THE. 1990 CAPITAL IMPROVEMENT
ORDINANCE NO. 10642, PROJECT NO. 351281,
IN THE AMOUNT OF $347,396.00 TO COVER
THE CONTRACT COST; AND AUTHORIZING THE
CITY MANAGER TO EXECUTE A CONTRACT WITH
SAID FIRM.
WHEREAS, sealed bids were received April 5, 1990, for
DOWNTOWN SANITARY SEWER REPLACEMENT - PHASE III; and
WHEREAS, the City Manager and the Director of the
Department of Public Works recommend that the bid of MANTELL
-- ENGINEERING CONTRACTORS, INC., be accepted as the lowest
responsible and responsive bid; and
WHEREAS, the 1990 Capital Improvement Ordinance No.
10642, was adopted on September 28, 1989, and monies are
available for the proposed amount of the contract, project
expense, and incidentals under Project No. 351281 of said
ordinance;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI, FLORIDA:
Section 1. The April 5, 199no bid of MANTELL
ENGINEERING CONTRACTORS, INC., in the proposed amount of
$347,396.00, for the project entitled DOWNTOWN SANITARY SEWER
REPLACEMENT - PHASE III, for the total bid of the proposal, based
on unit prices, is hereby accepted at the price stated therein.
ON
Section 2. The amount of $?47,396.n0 is hereby
allocated from the 1990 Capital Improvement Ordinance No. 1.0642,
Project No. 351281 to cover the cost of said contract.
Section 3. The City Manager is hereby authorized to
enter into a contract 1/on behalf of the City of Miami with
MANTELL ENGINEERING CONTRACTORS, INC., for Downtown Sanitary
Sewer Replacement - Phase III, total bid of the proposal.
Section 4. This Fesolution shall become effective
immediately upon its adoption.
PASSED AND ADOPTED this 24th day of May
1990.
X7�YI- C
LEGAL REVIEW BY:
CHIEF ASSISTANT CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
"ATTOR
CAPITAL PROJECT:
CI R JECT MANAGER
SUBMITTE-DD BY:
'lam
- , .D., P.E.
DIRECTOR OF PUBLIC WORKS
1/ The herein authorization is further subject to compliance with
all requirements that may be imposed by the City Attorney,
including but not limited to those prescribed by applicable City
Charter and Code Provisions.
2 -
90- 345
0 'BIA SECURITY LIST
91D ITEM: Downtown Sanitar ; Sewer Re )lacemen - Phase III 6 �
DID NO. 89-90-084
DATE BIDS RECEIVW: _apri l_.5 , 1 2 2 Q
BIDDER
I*Mantell Engineering Contractor
TOTAL
DID AMOUNtT
$346,446.00
DID BOND tor) If �► ,��
CASHIER'S CHECK
5%BB
Site Tech Engineering Corp.
$467,784.00
$27,500.00 BB
Man -Con, Inc.
$490,805.00
5%BB
Lanzo Construction Co.
$548,174.00
5%BB
Ric -Man International, Inc.
$549,296.50
5%BB
MIRI Construction, Tnb.
$549,431.00
5%BB
Solo Construction Corp.
$690,699.00
5%BB
*Mantell Engineering Contracto
turned in only
one copy of his proposal
J ,
eel
received () envelopes on behalf of
Person receiving bids)
Public Works on 4,/i / S, /J� qL�
(City Department)
(date)
Received the hereinabove described checks this day of , 39
in connection with the herinabove cited bids, which were sent to Treasury Management by the City Clerk
for appropriate posting.
SICNED: DATE:
(treasurymanagement)
Bid No. 89-90-Oi?4 (. 7 !; _ e c , �,
i i xJ ,'f
ADVERTISEMENT FOR BIDS
Sealed bids for "DWI CWi1 SANITARY Sn- 4ER REPLACEtUTT - PHASE III, 19--5%1 011-he-wWia h • ttv -
Ci Ma r and the City Clerk of the City of Miami, Florida at l:m a.m. on the of
n , Pnner
at the City Clerk's office, first floor of the t1i, Ci a , an =r�can
Key, tti arm , Florida, 33133, at which time and place they will be publ i cly opened
and read.
The project is located at North 1st Street between N. W. ist Avenue and Biscayne Boulevard.
The construction will include: Approximately 2400 l i near feet of B--inch to 12-inch polyvi rlyl
chloride and cast or ductile iron pipe saver with the deepest cut being In ± feet; Approximately
1600 linear feet of 6-inch extra ",�,.avy cast iron soil pipe or C-4-00 P.V.C. laterals;
Approxi mete ly 10 manholes from 4 to 10 feet in depth; Sidewalk and pavement repl acemnt in
construction area. City regulations will allow bidders to fwdsh performance and bid bonds in
accordance with Resolutions No. 8fi-953 and No. 87-915. For technical questions regarding plans
and specifications, please contact Daniel C. Brenner, P.E. Environmental Engineer, at (305)579-
6365. eve bidders will be required to gftdt, with their bid, a copy of the appropriate
ate
Certificate of CaWtemy, as issued by Dade Ca mV, which au #wlzes tt a bidder to performs tte
pr"aPosed work.
All bids shall be submitted in accordance with the Instructions to Bidders and Specifications.
New City regulations will require each bidder to submit proposals in duplicate originals. Plans
and specifications may be obtained from the office of the Director ofPub1 i c o s;7i 5 N.W. 2
Street, 3rd floor, Miami, Florida, 33128, on or after March 15, 1990. If bidders wish, a set of
plans and specifications will be mailed to them by writing to the Department of Public Works and
including a separate check. for $8. There will be a $20 deposit required for the first set of
plans and specs i ca ions . Additional sets may be pursed for a fee of $2tl per se a1 an-d-N s is
not refundable. Deposits will be refunded only upon the return of are set of plans and
specifications to the Department of Public Works, unmari;ed and in good condition within two (2)
weeks after the opening of the bids.
Bidders are alerted to the provisions of Ordinance No. 1053E regarding allocation of contracts to
rrrinority vendors. The City will expect prospective bidders to submit an Affirmative Action Plan,
as defined in said Ordinance, and as required in the Instructions to Bidders.
The City of Miami has adopted Ordinance No. 10032, which implements the "First Source Hiring
Agreement." The object of this ordi name is to provide employment opportunities to City of Miami
residents on contracts resulting in the creation of new pemmnent jobs. Contractors may be
eligible for wage rei►hursement under this program. For further information contact the
Department of Public Works, City of Miami, at (305)579-6i356.
Proposal incluceas the time of performance, and specifications contain provisions for liquidated
dannges for failure to complete the work on time. The City Commission reserves the right to
waive arty informality in any bid, and the City Manager may reject any or all bids, and
readvertise (B-5561 Req. 5579).
Cesar H. Odio
City Manager
n010V co-1 f ICU �, pfflo
ny
REQUISITION FOR ADVERTISEMEt. %� � This number must appear
T/DIV
COUNT CODE
DATE _ PHONE APPROVEtJ
PREPARED BY I `.; r, := r,
DIRECTOR OF ISSUING DEPARTMENT
Publish the attached advertisement times.
(number of times)
Type of advertisement: legal classified display
(Check One)
Size: Starting date _
First four words of advertisement
Remarks:
DO NOT TYPE BELOW THIS LINE. FOR USE OF FINANCE DEPARTMENT ONLY.
LINE
PUBLICATION
RATE(S) OF
ADVERTISEMENT
INVOICE
AMOUNT
0
A-1
B-2
C-3
D-4
E. 5
F3
F4
F5
F7
F8
F9
F10
F11
F12
LINE
TRANS
VOUCHER
DUE DATE
YY MM DQ
Adv. Doc. Reference
VENDOR
INDEX CODE
BJECT
PROJECT
11
13 1 117
18 1 125,34
39
42 45 50151
56
57 62163
65
66 71
0
1
2
4
1
1
V
P
2
1012
1
1
1
1 1
1 1
1
2
8171
1
21314
7
8 V P 121314
15 DESCRIPTION 36
64DISCOUNT 69
72 AMOUNT a
5
21010
2
0
1
Approved for Payment
White — Purchasing Yellow - Finance Pink -- Department
,;;;;r„a
tee
CITY OF MIAMI, FLORIDA CA�
INTER -OFFICE MEMORANDUM Zu -
TO: Honorable Mayor and Members DATE �� C ���0 FILE B-5561
of the City Commission u
SUBJECT . Resolution Awarding Contract
for DOWNTOWN SANITARY SEWER =
REPLACEMENT - PHASE III
FROM REFERENCES
Cesar H. Odio
City Manager ENCLOSURES
RECOMMENDATION
It is respectfully recommended that the City Commission adopt the
attached resolution accepting the low bid of Mantell Engineering
Contractors, Inc., a company located in Dade County, but not within
the City of Miami, for DOWNTOWN SANITARY SEWER REPLACEMENT - PH III,
received April 5, 1990 in the amount of $347,396.00, Total Bid;
authorizing the City Manager to enter into a contract on behalf of
the City.
BACKGROUND
Amount of Bid: $347,396.00
Cost Estimate: $500,000.00
% of Cost Estimate: 69.5%
Source of Funds: 1990 CIP Ordinance No. 10642, as amended
Minority Representation: 192 invitations mailed
14 contractors picKed up plans R specs
(4 Hispanic, 2 Black, 0 Female)
7 contractors submitted bids
(2 Hispanic, 1 Black, 0 Female)
Public Hearings/Notices: No public hearing/Bid notice published.
Assessable Project: No
Discussion: The Department of Public Works has evaluated the bids
rece'eved an April 5, and determined that the lowest responsible and
responsive bid, in the amount of $347,296.00 is from Mantell,
Engineering Contractors, Inc., a non -minority controlled
corporation. Funds are available to cover the contract cost, and
for such incidental items as postage, blueprinting, advertising, and
reproduction costs.
t,. solution attacned
C
90- 345
lu-
DOWNTOWN SANITARY SEWER REPLACEMENT
PHASE III
JOB NO. B-5561
CONTRACTOR'S FACT SHEET
1. MANTELL ENGINEERING CONTRACTORS, INC
3051 N.W. 129 STREET
Miami, Florida 33054 Tel: (305) 697-82:30
2. Principals:
Victor Mantell, President
Michael Mantell, Vice President
3. Contractor is properly licensed and insured.
4. Subcontractors:
Paving - General Asphalt
S. Experience: Corporation established in 1984
6. A non -minority contractor.
7. Project and Scope:
The project consists of the construction of approximately
2,400 linear feet of 8-inch to 12-inch polyvinyl chloride
and cast or ductile iron pipe sewer with the deepest cut
being 10+ feet; Approximately 1,600 linear feet of 6-inch
extra heavy cast iron soil pipe or C-900 P.V.C. laterals;
Approximately 10 manholes from 4 to 10 feet in depth;
Sidewalk and pavement replacement in construction area..
The project is located at North 1st Street between N.W. 1st
Avenue and Biscayne Boulevard.
Eighty (80) working days construction time.
8. Funds allocated:
Contract: S 347,30.6.00
Project Expense 62,531.00
Blueprint: 450.00
Advertising: 600.00
Testing: 2,500.00
Postage: 60.00
SUB -TOTAL $ 613,517.00
Indirect Cost 5,913.00
TOTAL S 419,450.00
Prepared by: E.M. Pelaez
90- 345
C4
CR
TABULATION OF BIDS FOR
DOWNTOWN SANITARY SEWER REPLACEMENT - PHASE 111 (6-5561)
AmealTed bV Me C11V NWAGWg Glk L Flarlds at 41: 00 A,K_ an April It AM
Mow K4*-= DC. LAM CONEY. CO. MIC-MAN DIT.- DC UM COW- INC.ISW =W- CW-
a Not" Ord.
Y
v
y
Y
y
Bid ftf1d Amowt -A
587.600.00as
al
ds
Nswrity owl*d
9
y
TOTAL BID: THE TOTAL OF Mel I THM Be
IMM ON (10) NOWNS DAYS CINUTION TM TM
SUN or
347, M.00
467,784.00
Oft 906.00
841L 174.00
541L 298.50
340.431.00
am 800.00
IRREGULARITIES LEGEND
A - w Pow-or-Attwmy
B - ft Affidavit as to C001ta2 3 8"IUR of 00ndlft COMMY It has been determined by the Department of Public Works
C - Owi%eted Extwwlom that the lowest bidder to Mantall Engineering Contractor
D -p-owe2 umiowd or isprowly Sioned or Na CmWstv 6e*1 Inc. in the amount of $ 347.396.00
E -
F-
lwww Bid aw
H - cwmt*d aid
K -No OW11cate Bid Propo"I
". ": S.J.C.
BID 89-90-084