Loading...
HomeMy WebLinkAboutR-90-0776J-90-177 10/18/90 A M90MITIONt AUIUORIEING THE CITY MMM TO MCECM A GIFT Al2M MENr, IN A FORM ACCEPTABLE TO THE CITY ATMRNEY, WITH LAM IAUISE CURRY', THE DONOR, WHICH WILL PROVIDE THE CITY $69,500 FOR THE axnmICN OF THE CEO UZENM boORIAL PPDJWr; FURMHER APPPMM THE CREATION OF A $200,000 TRIMt THE ANNUAL, INCOME OF WHICH WILL BE USED BY THE CITY FOR THE CONTINUED BEAUTIFICATION AND LANDSCAPING OF THE MEMORIAL, SUBJECT TO THE CONDITION THAT THE CHMIMM VII MEMMIAL COMMITTEE, AND/OR THE NEW WORLD CENTER FOUNDATION DEMONSTRATE THE FINANCIAL ABILITY TO COKPIM THE CHAT L ENGER NMRIALL . BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: CITY OF MIAMI. FLOAIDA INTEA,OFFICE MEMORANDUM IT R Financial Status_ A total of $183,581 was raised from contributions. Events and interest added an additional $13,110 bringing the total to: $196,691. The total cost for the work performed, to date, is $272,796. Funds were expended in the amount of $196,691 leaving $76,105.43 in outstanding bills that have yet to be paid. Additional Work Mr. Shoji Sadao, project architect representing the designer,' the late Isamu Noguchi, has indicated that the structural integrity of the Memorial is in question and that certain additional work ; needs to be undertaken as soon as possible. The following is an itemized list of the additional work required as mentioned- in letters to the City from Mr. Sadao; dated January 24, 1989 =-and. June 20, 1990: 1. Installation of lightning arrestors 2. Ordering and installation of grating for the 15pit surrounding' the Memorial 3. Completion of all required electrical work 4. Drainage of standing water from the pit and inspection of base plates and struts for corrosion 5. Galvanized steel covers to.be fabricated and sealed in place on each hub s 6. Installation of 27mm bolts to plug holes in' the neutral axis of each hub node 7. Set screws on ends of struts to be tightened,. and holes sealed with sealant compatible with strut paint finish S. Additional weldingon anchor base late`' and. p inspection of earlier field welds s x 9. Replacement of a missing nut on aa'anchor bolt on one of the top anchor , ,platen r S c 4 J .• � � i7�� 9h �r.` ,�,�h, 'x x,�" ,A"r`'�F��b�„ ��rh� S�1 a��fPR� �N�rrR �a ri � • ' ,� t _ � � �'�r,..�'r` �a . '�}_ss_.w.3=z�_.Rs r_.i . r. � r s9 •.gym ..F t. �.�� `'�.`Wy' t,< 4 Stets To Complete The. Memorial 1. payment of the following outstanding bills' Weidlinger Associates $15,987.22 Curry Yndustires 50625.66 Nippon Steel 35,000.00 Callies Electric 2,600.00 huller & Sadao 5,248.48 FPL 525.00 Epperson Crane 533.50 Ralph Renick 5-85.57 37b.105.43