RESOLUTION NO. �. 1. S 6
A RESOLUTION RESCINDING RESOLUTION
NO. 90-343, ADOPTED MAY 24, 1990, WHICH
AUTHORIZED THE CITY MANGER TO ENTER INTO A
CONTRACT BETWEEN THE CITY OF MIAMI AND
Y AND W ROOFING AND REMODELING, INC., AND
ALSO RESCINDING THE CONTRACT SO AUTHORIZED;
ACCEPTING THE BID OF JORGE LARRAURI, G.C., IN
AN AMOUNT NOT TO EXCEED $18,571.00, BASE BID
OF THE PROPOSAL, FOR SIMPSON PARK BUILDING
RENOVATIONS PROJECT, B-2956, WITH MONIES
THEREFOR ALLOCATED FROM FISCAL YEAR 1990-91
CAPITAL IMPROVEMENT ORDINANCE NO.•10782,
PROJECT NO. 331346, IN THE AMOUNT OF
$18,571.00 TO COVER THE CONTRACT COST; AND
$4,427.00 TO COVER THE ESTIMATED EXPENSES,
FOR A TOTAL OF $22,998.00; AND AUTHORIZING
THE CITY MANAGER TO EXECUTE A CONTRACT, IN A
FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH
JORGE LARRAURI, G.C. FOR SAID PROJECT.
WHEREAS, sealed bids were received March 27, 1990, for
SIMPSON PARR BUILDING RENOVATIONS PROJECT B-2956; and
WHEREAS, Resolution No. 90-343, adopted May 24, 1990,
awarded the contract to Y and W Roofing and Remodeling, Inc.; and
WHEREAS, Y and W Roofing and Remodeling, Inc., was unable to
obtain the proper insurance as required by The City of Miami
Standard Contract Documents and Specifications; and
J�91�155
3/7/91
RESOLUTION NO. �. 1. S 6
A RESOLUTION RESCINDING RESOLUTION
NO. 90-343, ADOPTED MAY 24, 1990, WHICH
AUTHORIZED THE CITY MANGER TO ENTER INTO A
CONTRACT BETWEEN THE CITY OF MIAMI AND
Y AND W ROOFING AND REMODELING, INC., AND
ALSO RESCINDING THE CONTRACT SO AUTHORIZED;
ACCEPTING THE BID OF JORGE LARRAURI, G.C., IN
AN AMOUNT NOT TO EXCEED $18,571.00, BASE BID
OF THE PROPOSAL, FOR SIMPSON PARK BUILDING
RENOVATIONS PROJECT, B-2956, WITH MONIES
THEREFOR ALLOCATED FROM FISCAL YEAR 1990-91
CAPITAL IMPROVEMENT ORDINANCE NO.•10782,
PROJECT NO. 331346, IN THE AMOUNT OF
$18,571.00 TO COVER THE CONTRACT COST; AND
$4,427.00 TO COVER THE ESTIMATED EXPENSES,
FOR A TOTAL OF $22,998.00; AND AUTHORIZING
THE CITY MANAGER TO EXECUTE A CONTRACT, IN A
FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH
JORGE LARRAURI, G.C. FOR SAID PROJECT.
WHEREAS, sealed bids were received March 27, 1990, for
SIMPSON PARR BUILDING RENOVATIONS PROJECT B-2956; and
WHEREAS, Resolution No. 90-343, adopted May 24, 1990,
awarded the contract to Y and W Roofing and Remodeling, Inc.; and
WHEREAS, Y and W Roofing and Remodeling, Inc., was unable to
obtain the proper insurance as required by The City of Miami
Standard Contract Documents and Specifications; and
WHEREAS, the City Manager and the Director of the Department
of Public Works have recommended that the bid from JORGE
k
LARRAURI, G.C., be accepted as the lowest responsible and
responsive bid, since a lower priced bid was rejected as being
nonresponsive as well as nonresponsible; and
WHEREAS, Fiscal Year 1990-91 Capital Improvement Ordinance
No.; 10782 was adopted on September 27, 1990, and monies are
available for the proposed amount of the contract, project
expense, and incidentals under Project No. 331346 of said
Ordinance;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
,
Section i. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
4
t. Section.
Resolution too. 90-343, adopted May 24, 1990,
Section 2.
-
-;
�' and the contract entered into pursuant to such Resolution with
Y and W Roofing and Remodeling, Inc. is hereby rescinded.
{
1 Section 3. The March 27, 1990 bid of JORGE LARRAURI,
G.C., in an amount not to exceed $18,571.00, for the project
i
entitled ,SIMPSON PARK BUILDING RENOVATIONS PROJECT B-29561', for
r
the base bid of the proposal, based on lump sum and unit prices,
- is hereby accepted at the price stated therein.
ri
Section 4. The total project cost of $22,998.00 is
hereby allocated from Fiscal Year 1990-91 Capital Improvement
Ordinance No. 10782, Project No. 331346. Said total project cost
consists of the $18,571.00 contract cost and $4,427.00 estimated
,
ex enses incurred by the City.`
P
u�
=
Section 5.
The City Manager is hereby authorized to
r
enter into a contract-1 � on behalf of the City of Miami with JORGE
LARRAURI, G.C.,
for SIMPSON PARK BUILDING RENOVATIONS PROJECT
B-2956, base bid
of the proposal.
Section 6.
This Resolution shall become effective
immediately upon
its adoption.
PASSED AND
ADOPTED this 14th day of March , 1991.
XAVIER L. AREZ, YOR
^14
S
r
AT
MATTY HIRAI
41
CITY CLERK
4:/
The herein authorization is further subject to compliance
_-
with all
requirements that may be imposed by the City
- -
Attorney,
including but not limited to those prescribed by
applicable
City Charter and Code provisions.
s
3C
sMP
2
Y
Honurable Mayor M�K
4 i991 FILE :B - 2966
and Members DATE
of the City Commission Resolution Awarding
SUBJECT Contract for SIMPSON
PARK RENOVATIONS
PROJECT
3 REFERENCES
_�.. Cesar H. Odi o
i City Manager ENCLOSURES
's
RECOMMENDATIOPJ
It is respectfully recommended that the CithCChmauthorizedcthe
i Resolution No. 90-343, adopted May 24, 1990
City_Manager to enter into a contract between the City of Miami and
Y and W Roofing and Remodeling, Inca because they are unable, to
obtain the proper insurance required by th ndCado tothe lattached
therefore, their bid is deemed unresponsive, a p
`resulution accepting the bid of Jorge Larrauri, G.C., a, company
laceted within Dade Coufor
nty and not in the City of Miami,
51MPSON PARK BUILDING RENOVATIONS PROJECT - B9 d6, authorizing at he
27, 1990 i n the amount of $18,571.00, Base
City Manager to rescind a contract on behalf of the City.
BACKGRUUND
Amount of Bid: $lii.571.U0 % of Cost Estimate: 92.9%
Cost Estimate: $20,000.OU r°
Source of Funds Fiscal Year 1990-91 CIP Ordinance No 10782,
--as amended
f
y,
Minority Representation: 228 invitations mailed*;
14 contractors picked up plans ,& specs
' (8 Hispanic, 5 Bl ack, I Femal e)
., 8 contractors submitted bids tas
(5 Hispanic, 3 Black, 0 Female) Q
Public Hearings/Notices: No public hearings/Bid notice <X
published.
Assessable Proj ect: No A d
`# 0iscvssion The Depa�rttme.nt of Public Works has re�valuatel t�
4 s receiired on March 29. 1990, determir►ed that the lbwes
iF
res onsible-and responsive bid, in the amount of $18.57�..00 i frgr L r�
urge.arrauri, G,O, a hi spani c-mi nority controlled coFporei�
v i-1 ably t cover the contract cost,
nsre a A
i n de iral items as postage, blstse
ueprinting, as�v rti
1 iY yY -aF A
a t
Atthnleilt,
'Resion
-2"t'epfo
r;c. I Y
TOTAL UNIT TOTAL
PRICE
►_SZ� Oo ZZ iA
.�mlllll��l��I�!�II�IIIIIIII�I�iIIII�IiI�Ihi�iill���IIIIII��i�I�j�IIIIVIIIIIIIIIIVIIIIIII'�IIIIIflllillll11111iI1111111V111111V6�iIiIMIIII1NIPi�ii�i���isilauiiiiisiuIu,Ihi,IiiRAiuiH A
I
IE
TABULATION OF BIDS FOR
VJILvtiG
�I A
it fssion. City Msneper. City Clerk. Clty of MieNni. Florid
e at �t A• P.M. 3DRtE�
AtlIV*d:�sy the City Cohn AA
IMMME AS PER CITY CODE S METRO
'1 019 ago a�
Eris
UNIT TOTAL UNIT
'fAI�ITy 0WI UNIT TOTAL PRICE PRICE
MSCRIPTION PRICE
SO�•00
101bol- 1 D_ �,... o•
coo
II I II III I III 111111 11IIIYIliIIIIIIIII in IiI IIIIIIII I IIII IIIIII IIIIIIIIIIIIIIIII III1 dlA 11111111111111111111111III MINI 11111 111111111 111 11111111 111 1111 II
TABULATION OF DIOS FOR
P.N.
el
"IV**by ti>Fe pity Coselnission. City 'Nensper. City Clark. City of NisAi. Florida et ..,} su^
C, jt4SL4MCE AS PER CITY CODE c METRO ORD.
CORD ACCOUNT
OWED
aESCRIPTION
fMGULARITIES LEGEND
yor--
UNIT
PRICE
1f�S �'ES
UNIT TOTAL UNIT
PRICE
TOTAL PRICE
y �N�Z� Z7�000 00
co �►.O�D.
fe 5 -z9F-," em
THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED THAT
TOTAL
YES
UNIT TOTAL
PRICE
8e6 0•
.1�