CITY OF MIAMI, FLORIDA
j'
INTER -OFFICE MEMORANDUM
-
'
to:
DATE : FILE : 13- 3 2 3 1 .r C
Honorable Mayor and Members MAR Z 1 991
of the City Commission
SUBJECT : Resolution Awarding
Contract for ORANGE BOWL
MODERNIZATION PHASE tI
(1 9 9 1)
-
- FROM :
REFERENCES:
Cesar Hi Od
s
City Manager ENCLOSURES:
_
#.
RECOMMENDATION
It is respectfully recommended that the City Commission adopt the
,-
attached resolution accepting the low bid of Harrison Construction
Corporation, a company located within Dade County and within the
LL
City of Miami, for ORANGE BOWL MODERNIZATION PHASE II (1991),
B-3231-C, received March 199 1991 in the amount of $4,0449903.04,
Base Bid; authorizing the City Manager to enter into a contract on
behalf of the City.
BACKGROUND
E—
Amount of Bid:
Cost Estimate:
Source of Funds:
$4,0449903.04 % of Cost Estimate: 90%
$4,500,000
Fiscal Year 1990-91 CIP Ordinance No. 10782,
as amended
Minority Representation:
244 invitations mailed
29 contractors picked up
(3 His anic 3 Black
plans & specs
0 Female)
2 contractors submitted bids
(0 Hispanic, 0 Black, 0 Female)
Public Hearings/Notices: No public hearing/Bid notice published.
Assessable Project: No
Discussion: The Department
of Public Works has evaluated the bids
:received on March 19, 1991, and determined that the lowest
responsible and responsive
bid, in the amount of $4,044,903.04 is
from Harrison Construction
Corporation, a non minority controlled
corporation. Funds:are available to cover the contract cost, and
for such incidental items
as postage, blueprinting, advertising,
and reproduction` costs."-
Attachment:
Proposed Resolution
�t
tVr
30
d�5rt'� r r�r z S i
ORANGE BOWL MODERNIZATION PHASE 11 (1991)
JOB R•-3231-C
CONTRACTOR'S FACT SHEET
1. HARRISON CONSTRUCTION CORPORATION
1000 NW 54th Streett
Miami, Florida 33127
Tel: (305) 757-0621
2. Principals!
John C. Harrison, Jr., President
3. Contractor is properly licensed and insured.
4 Subcontractors:
Steel Fabricators, Inc., S.I. Plumbind, Inc.
5'. Experience: Corporation established in Miami, Florida,
for more than 20 years. �€
t.
6. Not a minority contractor.
7. Project and Scope:
The project consists of the replacement of approximately t
1400 joists and related decking, water proofing and
miscellaneous structural repairs.
The project is located at 1501 N-W. 3rd St., Miami, FL
33125:
On
e hundred fifty (150) calendar days construction time.
8. Funds allocated:
a
Contract Bid Price:
$490449,903.04 ,
(Contractor)
Estimated.Project Expenses
(City of, Miami)
Engineering, Architectural,
Surveying, Inspections, etc 2569773.43
250.00
Blueprint*: 67076
Advertising and -Postage:
E 159000.00
Testing: €
`. 4,317,597.23
SUB -TOTAL
a . 842.11
1 Indirect Cost Allocation 57, s A
(City of Miami)
OTAL ESTIMATED PROJECT 'COST $4,375,439.34
tl y Y f
Prepared by Juan-B• Ordonez
I_
2f ( t A - � 4i •• 'G i 5
t
tEr CA yL ; i t A - —a•
k `q�sr t
y, � ♦ jx f f t• d f- y,
-44•
J��{� M Ma •,rh. of •. t F b � �.ry'"+ �.
.(fY )13 ( _ .k •.'i :' t •SIR" '� Y e`lei
Ott
e "1
n MB
• CH
C;H
sf .. NO
t�wned N0
i]
1
1
1
12.40
II(1991) B-3231-C
f BID 90--9 —06
PA
REGULARITIES LEGEND
� Nacrisa� Gonsi•�Q-�o�
power—af—Attomey t-� b i ca Sub w� i ¢ai
� I
— No ,davit as to Capital do Surplus of Bonding Company Gor oroliovt it'ta iowo: �� onsivd and
C Corrected 'Extensions si ned of No Corporate Seal res ohSibt� bid c t-�is
D proposal Unsigned or imporperly g
Incomplete Extensions • �.
- Non -responsive Bid
ImproperHid Bond
3/2c
Corrected Bid
/ til .IOB Nos
_ No First Source Hiring Compliance Staten►ant _ —C
. -• No 1 inority. Compliance Statement
10 Duplicate 811d " Proposal