Loading...
HomeMy WebLinkAboutR-92-0478J-92-566 7/16/92 192- 478 RESOLUTION NO. A RESOLUTION AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH 3W CORPORATION, INC., FOR EXTERIOR WATERPROOFING AT THE NORTH DISTRICT POLICE SUBSTATION, AND ALLOCATING FUNDS THEREFOR, IN AN AMOUNT NOT TO EXCEED $19,550.00, FROM "MIAMI POLICE DEPARTMENT BUILDING RENOVATIONS AND EXPANSION", CAPITAL IMPROVEMENT PROJECT NO. 312015; FURTHER RATIFYING THE CITY MANAGER'S WRITTEN FINDING THAT THE HEREIN WORK RESULTED FROM EMERGENCY CIRCUMSTANCES BY AN AFFIRMATIVE VOTE OF FOUR -FIFTHS OF THE MEMBERS OF THE CITY COMMISSION. WHEREAS, the City Manager has made a written finding thatta valid emergency exists to provide exterior waterproofing at the North District Police Substation; and WHEREAS, the building exterior wall surface and vertical and horizontal stucco jointing, as specified by the Architect of = Record and as constructed by 3W Corporation, original substation contractor, require that an elastomeric coating and sealant be applied to prevent moisture from penetrating inside of the building; and WHEREAS, the Director of Public Works, Chief of Police and the City Manager recommend the contract for the exterior waterproofing work be awarded to 3W Corporation, Inc., to thereby maintain the Substation's General Contractor warranty and performance guarantee; and WHEREAS, funds to cover the exterior waterproofing work are available from "Miami Police Department Building Renovations a d Expansion", Capital Improvement Project No. 312015; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. After a properly advertised public hearing, the findings of the City Manager set forth in the Preamble to this Resolution, are hereby ratified by an affirmative vote of four -fifths of the members of the City Commission and are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. kk t Section 2. The City Manager is hereby authorizedl1 to enter into a contract, in a form acceptable to the City Attorney, with 3W Corporation, Inc., for exterior waterproofing at the North District Police Substation with funds therefor hereby allocated, in an amount not to exceed $19,550.00, from "Miami. Police Department Building Renovations and Expansion", Capital Improvement Project No. 312015. Section 3. This Resolution shall become effective immediately upon its adoption. V The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. -2- 92- 478 r:: PASSED AND ADOPTED this 16th day o ATTE : MATTY HIRAI, CITY CLERK SUBMITTED BY: WALDEMAR E. LEE ACTING DIRECTOR OF PUBLIC WORKS PREPARED AND APPROVED BY: CARMEN L. LE097 ASSISTANT CITY ATTORNEY VIER L. 1992. Z, MAYOR CAPITAL PROJECT REVIEW% ,XdfUARDO RODRIGUEZ CAPITAL IMPROVEMENT MANAGER APPROVED AS TO FORM AND CORRECTNESS: A. QUINN JONE , III CITY ATTORPSW M3085/CLL/csk -3- 92- 4'78 JUL —16-92 T,HU 7 31 P. 02 CITY OF MIAMI, FLORIDA i INTER -OFFICE MEMORANDUM ' to : FILE DATE ME SUBJECT : EMERGENCY FINDING Need for exterior aterproofing at I the North District Police ! FROM : REFERENCES : Substati o Building Cesar H. Odio C i ty Manager ENCLOsums : Based on information supplied to me by the Dir ctor of the Department of Public Works, I have found that an EME GENCY Exists Justifying the authorization for 3W Corporation to proceed with Exterior Waterproofing at the North District Poli a Substation located at 1000 N.W. 62nd Street. The reason for the emergency need and subsequent authorization for 3W Corporation to perform the work is as followsi: The North District Police Substation Building was completed and opened for use in January, 1989, The constructed by 3W Corporation in accordance with th plans and specifications. The exterior walls of consists of stucco with plastic vertical and horizo configuration for an aesthetic appearance. Th( condition of water penetrating the exterior wall. - window areas of the building. The Department of Public Works requested that 3' investigate the water penetration problem with This was done with a recommendation to coat the exi with an elastomeric sealant. The coating recom evaluated by Public Works Department Architect and I by an outside Architect Consultant. The appli elastomeric coating is the recommended treatment t moisture problems inside of the building. constructed, building was Architect's the building ital j of sti ng re exists a and at the Corporation he building. arior surface endation was igineers, and ation of an prevent the 3W Corporation proposed to perform the exterior Waterproofing work for $19,650.00, The Department of Publitc Works has determine that this is a fair and reasonable cost ad recommends that the work be done. ++ Funds for the work are available from "Miami Poli a Department Building Renovations and Expansion" Capital Improv ment Project No. 312015. , JHJ;mh �. 92- 478