HomeMy WebLinkAboutR-92-0329J-92-309
5/5/92
92-- 329
RESOLUTION NO.
A RESOLUTION RATIFYING, APPROVING AND
CONFIRMING, BY A 4/5THS AFFIRMATIVE VOTE OF
THE MEMBERS OF THE CITY COMMISSION AFTER A
DULY ADVERTISED PUBLIC HEARING, THE ACTION OF
THE CITY MANAGER IN FINDING THE PREPARATION
OF THE VIRGINIA KEY MULCHING AND COMPOSTING
SITE TO BE AN EMERGENCY AND IN AUTHORIZING
THE ISSUANCE OF AN EMERGENCY PURCHASE ORDER
FOR SUCH SERVICES TO R. L. SAUM CONSTRUCTION
COMPANY, INC., FOR THE DEPARTMENT OF GENERAL
SERVICES ADMINISTRATION AND SOLID WASTE AT A
TOTAL PROPOSED AMOUNT OF $109,709.44;
ALLOCATING FUNDS THEREFOR FROM THE 1991-92
STATE RECYCLING GRANT, PROJECT NO. 197004,
ACCOUNT CODE NO. 420306-340.
WHEREAS, there is a need to continue and expand the City's
mulching operation at Virginia Key within the conditions
specified in the Mulching Permit issued by Metro -Dade Department
of Environmental Resources Management (DERM), and as required by
our application to the State of Florida, Department of
Environmental Regulation (DER) for a permit to compost the
material; and
WHEREAS, said work requires the construction of a retention
pond, two deep drainage wells, grading, shaping and compaction of
existing fill and limerock base material and asphalts concrete
surface at Virginia Key; and
CITY COMMISSION
MEETING OF
MAY 14 1992
Roeolution No.
92- 329
WHEREAS, said project when completed will allow the City to
obtain a State Permit to use the Virginia Key Mulching area as a
composting site; and
WHEREAS, informal bids were obtained from seven (7)
contractors and R. L. Saum Construction Company Inc., has been
selected as the lowest responsive and responsible bidder; and
WHEREAS, the City Manager has made a written finding that a
valid emergency need existed to accelerate the start-up of the
composting facility by waiving formal bidding and by accepting
the informal bid and awarding the site preparations project to
R. L. Saum Construction Company, Inc., at a proposed amount of
$109,709.44; and
WHEREAS, funds for these services are available from 1991-
1992 State Recycling Grant, Project No. 197004, Account Code
No. 420306-340.
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
Section.
Section 2. By affirmative vote of 4/5ths of the Members of
the City Commission, after a properly advertised public hearing,
the action of the City Manager in making an emergency finding,
waiving competitive sealed bids, and authorizing the issuance of
.qk
U
an emergency purchase order for the preparation of the Virginia
Key mulching area for composting to R. L. Saum Construction
Company, Inc., at a proposed amount of $109,709.44 is hereby
ratified approved and confirmed, with funding therefor hereby
allocated from the 1991-1992 State Recycling Grant, Project No.
197004, Account Code No. 420306-340.
Section '3. This Resolution shall become effective
immediately upon its adoption.
PASSED AND ADOPTED this 14th day of May , 1992.
ATTEST:
, CITY CLERK
PREPARED AND APPROVED BY:
RAFAEL O. 01AZ
DEPUTY CITY AT EY
APPROVED AS TO FORM AND CORRECTNESS:
X. OKIMN ES, II
CITY ATT EY
- 3 -
9 2 --
-o
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
Honorable Mayor and Members
of the City Commission
-ROM A�(,�
Cesar H. Odio
City Manager
DATE
SUBJECT
REFERENCES
ENCLOSURES
�t>►�i� - 0 1992 FILE
41
Resolution for the Emergency
Ratification of the Virginia
Key Mulching and Composting
Site Preparation
RECOMMENDATIDB
It is respectfully recommended that the City Commission adopt the
attached resolution ratifying, approving, and confirming the
award of a contract for the Virginia Key Mulching and Composting
Site Preparation to R. L. Saum Construction Company., Inc., a
non-minority/Dade County vendor as an emergency action by the
City Manager at a total proposed amount of $109,709.44.
Allocating funds therefor from the 1991-92 State Recycling
Grant, Project No. 197004, Account Code No. 420306-340.
DACKQROUND
The Departments of Public Works and General Services
Administration and Solid Waste, in an effort to construct, permit
and start-up the City's Virginia Key yard/garden waste composting
facility without delay, have received informal quotes from seven
(7) contractors to perform this work. The project consists of
the construction of a retention pond, two deep drainage wells,
grading, shaping and compaction of existing fill and limerock
base material and asphalt concrete surface at Virginia Key.* in
order to obtain a State Permit for use as a composting facility.
The lowest responsive and responsible bid was from R. L. Saum
Construction Company, Inc., at a proposed total cost of
$109,709.44. The City Manager made a written finding that a
valid emergency existed and wadded formal bidding procedures in
order to accelerate the start-up of the composting facility and
to realize the savings projected from its operations.
The City Manager determined the emergency award of this contract
to be an appropriate action.
AMOUNT OF BID: $109,709.44
SOURCE OF FUNDS: Project No. 197004, Account Code No. 420306-
340 - State Recycling Grant
MINORITY PARTICIPATION: Award to a Non-minority/Dade County
Vendor
Attachments
92- 329
SW BY=MWLREMM WANAOEWINT 0-92 ; B'SS M CITY or MIP 90357960814 V 1
CITY or WIAI, FLORIDA
INTER -OFFICE MEMORANDUM
va Judy Si. Carter OATK April 15, 1992 f,Lt
Chief Procurement offleev
iueu�ar irmp�9pncy
preparstion of virgjnlm
'Key mulching and
" "'��„��sCompoeting Site
Pon E. Wil ame, Administrator -_
Deportment of General Services tencuxsu�
and 69I id waste
p
,This department hail verified available fundi.nq with the
Department of Budget that fnnria prA Avnf labia to cover the coat
of tha subject bid in the amount of $109*709.44, YY 91192 !State
Recycling Grant, Pro j+ech No. 197004, ]Account. Code Ift. 420306.340.
DUDOETARY REVIRW & APPROVED KY:
i no� Tie= Su` rape, 15irector -'
Department of Budget
92- 329
3
1AY- 4-92 MON 12:20 305 575 SiRA 0 ex
`s-
CITY OF MIAM1, FLORIDA
INTER -OFFICE MEMORANDUM
TO Cesar H. Odio DAtE`: SEC FILE
Ci Manager
Sue.,ECT Request for Approval/
Emergency Basis/Facility
Development/Virginia Key
Mulching Facility
FROM :Ron • Williams, Administrator REFERENCES
kep fitment of General Services
and Solid Waste ENCLOSURES: -
-' Thio memorandum respectfully requests your approval to waive the `
formal bidding process for the completion of approxitely -
$180,000 in work required to continue and expand our mulching
operation at Virginia Key, within the conditions specified in the -
Mulching Permit issued by Metro -Dade Department of Environmental
= Resources Management (DERM), and as required for our successful
application to the State of Florida, Department of Environmental
Regulation (DER) for a permit to compost the material.
The work required includes the installation of two (2) deep drain
wells (approximately $40,000), the spreading and grading of
limerock and the laying of asphalt (approximately $140,000).
The Department of Public Works has prepared the documents
required to formally bid these items, however, we anticipate that
it would require approximately four (4) months to complete the
bidding process, award the bids and begin the work, which will
take approximately one (1) month to complete. In the interim
period we would be forced to reduce our production of mulch at
Virginia Key and the storage of yard/garden waste because the
mulching permit does not allow the storage or further processing
for this material nor the accumulation of yard/garden trash
waiting to be mulched at the facility.
In light of the substantial savings projected for this department
through the diversion of eighty percent (80%) of our yard/garden
waste to Virginia Key our facility for composting and free
distribution to residents, we are compelled to request this
approval to meet this objective. It is important to note that
this goal is based on composting and that mulching is only the
first step in this process. In order to become permitted to
compost, however, we must first protect the ground and the
aquifer by overlaying the lime rock and asphalt and installing
the storm drain wells.
Your signature below will authorize us to waive the formal
bidding process for this work. Commission ratification of your
approval will be scheduled o the earliest available City
Commission Agenda
Approved:
Cesar 11. Od o, City Manager
92- 3.5
1
A�IARRFE
RATIFICATION OF EMERGENCY
ITEM: Preparation of Virginia Key Mulching and
Composting Site
DEPARTMENT: General Services Administration and —
Solid Waste
TXPE OF PURCHASE: Short term contract
REASON: This preparation is needed in order to
obtain a State Permit fot this site to
be used as a composting facility.
RECOMMENDATION: IT IS RECOMMENDED THAT THE AWARD BE MADE
TO R. L. SAUM CONSTRUCTION COMPANY, =_
INC., AT A TOTAL PROPOSED AMOUNT OF
$109,709.44.
I
r
TABULATION OF BIDS FOR
m
VIRGIN IA KEY MULCHING AND C O.VP OSTING SITE PREPARATION
A r,r_ wry kow—=L Qtu 0 U;nmi Sad �l_CO�S.I�t._oa�,!_..nuaAr
Bidder.
MXILA
R.1 SAUM COIST. J
ACOSTA TRACTORS1
MIRI CONST. IROENCA-DADE
Address 4395 PALM AVE.
7186 SW 117 VE.
102 WEST 27 St_
7540 SW 121 ST. (
7401 NMf T Sr
—
Located in the Ct!y of Miomi ......
i ._ .. No ...
_.. _ ._ NO . _.. _ ..
� .... _ .._.. ....
_. ..� _ _.._ .
NO
licensed & insured as Per City
1
Code & Metro Ordinance
A YEs
YES
YES
YES
YES
Did Bond Amunt
5%
5%
5% (CHECK)
Ali
utorities
9.0
A.c.H
8
Minors Qw11ad
(H)
NO (NM)
(H)
F YES H
YF5 H
�
I
r
i Sn. $2.00 $109.70824
r
M
N
W
I
MO:RIRMES
N
A w ft W —0—mWes
3 No`mr4wA e» to CO041 a Sw9�✓s d 8wr"4 �a'*0�'!
W
I�
c cw nud Eatmmwd
D: s�►� x►wupet* sq.e or so twowee» s.m
s: ray.-r woffw OW
r wevae Bs 9e.e
oft rost se:e. N* q ce"v Owe suit aft
. x Ne w 8w sty Cw"p6w" Sa Amw-
I
C1 •
K Me iwp"m ad
IL
Q
win ey rA S6rdmi
i
i
$111,850.00 1 $117,998.00
O
The DEPARTMENT OF PL3UC WORKS has determined BID
ihat the LOWEST RESMSIBLE and RESPONSIVE
BIDDER is R.L• SAUM CtNSTRUCTiON CO.. INC.
for the TOTAL of 17EMS 1 THRU 8 for the
TOTAL AMOUNT o: $.09708.24.
2111 ' Eg—"55�72
Pccge of 2
®119 'jI iiI il'"I'Illlllli'i' I" I1Ip'Iq1°i11 IIII 1' II I 1 �''i1" !''l�Illi'sill' ��1 I' ��I '�! I',I �I'I" P ii'�[i III 11I1I°lil' "'I I' 11g111li�lll�
_ illlil�i�
.
Q
TABULATION OF
BIDS FOR ^
; _
VIRGIN IA KEY
MULCHING AND CC} PC}STI TG SITE P EPA ATION
MUD
®
.
Bidder
CMA CORP.
.
SIGMA COAST. P.N.M. CORP.
Address
3G21 SW 7 ST.
4420 SW 97 AVE.
' 3780 NW 22 AVE_
+
_ ..... � •
mi
Located in the Ci of MiaYES
Ko
Yrt
Licensed & Insured as Per
City
Code & Metro Ordinance
YES
YES
YES '
Bid bond Amount
VOUCHER
VOUCHER
Sz --
C
f B
irregularities
• ... --•_ �+ --J
YES(H1
---YE5 (H)
1rEs (H)
I TOTAL BID: THE TOTAL OF ITEMS
fXURU FO t
$137.456.00 $160.204.96 $173.169.00
M
N .
F
�
I
: k W:-+�+�•�,
R Ne w+raslt a �+v k swabs d� Conte
The DEPARTMENT
LOWEST
OF PUBLIC WORKS
RESPONSIBLE and
has determined B16
RESPONSIVE
N
0+
W
�,,.�,la c,pa.ens
'"'0""'f' eO or "O � `` se.r
that the
BIDDER Is R.L. SAUM CONSTRUCTION
CO.. INC.
CC
oad owd
w
for the TOTAL of ITEMS i THREE 8
TOTAL AMOUNT of S109.708.24.
for the
v _, _
c
'. Seaeswewt
It rest Sewn. Nri+4 t�+gi.le�
x No �h ea"p6ar a Sfaufflwt
''U�
!
�Z
L
Page 2 of 2
JOB NC
_ - E-557:
I I
r