RESOLUTION NO.
A RESOLUTION REJECTING ALL BIDS RECEIVED BY
THE CITY IN CONNECTION WITH THE ORANGE BOWL
MODERNIZATION PROJECT PHASE II (1992) - JOIST
REPLACEMENT AND RESTROOM FACILITIES
IMPROVEMENT BID NO. 3231-E; FURTHER DIRECTING
THE CITY MANAGER TO SEEK NEW BIDS BASED ON
SUCH SPECIFICATIONS AS HE DEEMS APPROPRIATE
FOR THE PROCUREMENT OF SAID SERVICES, AND TO
BRING BACK SAID SOURCES AND SPECIFICATIONS TO
THE CITY COMMISSION FOR REVIEW AND APPROVAL.
WHEREAS, pursuant to public notice, sealed bids were
received January 21, 1992, for the joist replacement and restroom
facilities improvement at the Orange Bowl pursuant to Orange Bowl
Modernization Project Phase II (1992) Bid No. 3231-E; and
WHEREAS, despite the City Manager and the Acting Director of
the Department of Public Works having recommended that certain
bid received be accepted, the City Commission is not convinced
that sound procurement principles were fully utilized in this
proposed acquisition;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
- Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
Section.
CITY CO"OR(SSION
]V EE'TIPtG OF .
JAN 23 1992
92 50:
cESOLUTM 80. -
i
r
Section 2. All bids received by the City in connection
with the Orange Bowl Modernization Project Phase II (1992) -
- Joist Replacement and Restroom Facilities Improvement, Bid No.
i
3231-E, are hereby rejected.
Section 3. The City Manager is hereby directed to seek
new bids, based on such specifications as he deems appropriate
for the procurement of said services, and to bring back said
sources and specifications to the City Commission for its review
and approval.
Section 4. This Resolution shall become
immediately upon its adoption.
PASSED AND ADOPTED this 23rd day of an
ATT
MATTY HIRAI
CITY CLERK
PREPARED AND APPROVED BY:
CARMEN L. LE N
ASSISTANT CITY ATTORNEY
VIER L. ,SUABEZ,
APPROVED AS TO FORM AND CORRECTNESS:
p,. PESCITY AEY
CLL/ra/M2784
: 2-
- 2 -
effective
1992.
5
►YOR
50
1 7- 9 2 FRI
P . 02
�3
CITY 4F MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
JAN 1 61992 FILE:
8-3?31 r
�oHoofrthe eCity yoGO missionr ind rrs SATE:
SUBJECT: Resolution Awarding Contract
Pfor
ROJECT NPHASEWIIM(�ggZ;ZA7I0N
JOIST REPLACEMENT AND RESTR00
Cesar H. Odi o
FROM
FACILITIES IMPROVEMENT
.
City Manager ENCLOYUMES
RECOMMENDATION
It +is ' respectfully recommended atthe
t Commission
Citmmi ssion
adopt the attached resolution authorizing the
anager
to enter into contract on behalf of the City with the lowest
responsible and responsive bidder, subject to the final
approval of the professional sports franchise facility tax
bonds from the 4etropolitan Dade County Commission for the
ORANGE BOWL MOD RNIZATION PROJECT PHASE II (1992) - JOIST
REPLACEMENT AND RESTROOM FACILITIES IMPROVEMENT B-3231-E
which will be toceived on January 21, 1992. The project
consists of joist replacement and the construction of two
(2) new bathSta lumcilities. The 1501 N.W. 3 Street, Ct is Miami�oFlordd�t the
Orange Bowl
BACKGROUND
Cost Estimate: $6,000,000.00
Source of Funds Fiscal Year 1991-92, Capital improvement
-- -�'� Ordinance
minority_Repres ntation: 239 invitations mailed
Public Hearings Notices: No public hearing
Assessable Project: No
Discussion: T e Department of Public Works will evaluate
'the b1ds�'to b received on January 21, 1992, and will
determine whic will be the lowest responsible and
responsive bid, at which time a recommendation will be
submitted. Funs are subject to the final approval of the
professional sp�Orts franchise facility tax bonds from the
Metropolitan Dade County Commission to cover the contract
costblueprinting. pand f r such a verti si ng, iand areproduction itemsental as postage,
costs.
92-- 50
Attachment:
Proposed R isolution 3 ,I
FR I
U
P . 0 E
ECT PHASE
ORANGE P WL ACENTRANDATION RESTR00MJFACILITIESIIMPROVEMENT
r
- JOIST REP ACEM
I.
2.
3.
JOB NO. 8-3231-E
CONTRACTOR'S FACT SHEET
D.
255 Univer ity Drive, Suite 201
Coral Gab1 sl FL 33134
Principals
Domingo E. Gidi, President
Lila R. Gi i, Vice -President
Tel: (305) 444-2910
Contractorlis properly licensed and insured.
4. Subcontrac ors:
None 11ste in the proposal.
S. Experience Corporation established in 1985.
6. A hispanic minority contractor.
7. Project an Scope:
The project consists ofSrEpaBrSworeketto Yer C8lscayne Bayato
Bridge whi h connects
Claughton stand.
8.
The projec is located at the Claughton Island Bridge.
Forty (40) calendar days construction time.
Funds al l oda ted :
Con trac
Bid Price:
(Cont actor)
Estimat d Project Expenses
(City of Miami)
En sneering, Architectural,
S rveying, inspections, etc.:
Bl eprint:
Ad ertising and Postage:
Te ting:
SUBTOTA
Ind rect Cost Allocation
(City of Miami)
TOTAL F.JTIMATED PROJECT COST
Prepared by: N.IPantoja
$114,800.00
20,664.00
200.00
633.64
1,080.00
$137377.64
1:964.50
$1390342.14
92- 50