Loading...
HomeMy WebLinkAboutR-93-0782J-93-907 12/16/93 9 3 - 7082 . .• •1 •• E+• ■' r PRI11CIPLE, THE■Dr' D RECOMMENDATIONS OF THE FEASIBILITY STUDY FOR ■ . . ■ r PREPARED BY KENNETH LEVENTHAL AM COMPANY; •NY; AUTHORIZnG THE CITY MANAGER TO PROCEED THE IMPLEMENTATION OF THE REDEVELOPMENT PLAN SUBJECT TO AND OCUTIMENT UPON1 IDENTIFICATIOWAVAILABILITY OF NECESSARY FUNDnG FOR SAM REDEVELOPMENT AND 'U" COMPIMANCE WITH ALL APPLICABLE CITY CHARTER AND CODE PROVISIONS WHEREAS, pursuant to Resolution No.0 92-551, the City engaged the services of a multi -disciplined consulting te6n, headed by Kenneth Izventhal & Company, to conduct a feasibility study for the City -owned Mizmarinai at- Bayside for its redevelopment and future operation; and W EREAS , said consultants have made a presentation of their findings and recommendations to the City Commission; and WHEREAS, the -implementation of the proposed development plan will require funds for capital improvements in the total estimated amount of $4,750,000; and WI RERS, anticipated fmxxU g for said improvements is as follows: $1,500,000 from the Federal Emergency Management Agency ("FEMA") restoration reimbursements, as much as $2,600,000 from FEMA hazard mitigation funds, $400,000 from litigation settlement funds, with the balance of needed funds to be made available from such sources as Florida League of Cities Bond Pool, acid/or Florida Inland Navigation District grant funds; CITY COMKISSION MEETING OF DEC 1 6 1993 Heedu*m Na 93- 782 • 1�1• �1 •' �• �11 1. ••� I I •I • 1 • I Section 1. The recitals and findings contaJned in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. The findings and recommendations of the feasibility study for M mnarina-at-Bayside prepared by Kenneth Leventhal and Company axe hereby accepted, in principle. Section 3. The City Manager is hereby authorized to proceed with the implementation of the redevelopment plan subject to and contingent upon the identifioation/availability of necessary funding for said redeveloprcnent and compliance with all applicable City Charter and. Code provisions. Section 4. This Resolution shall become effective inmediately upon its adoption. PASSED AND ADOPTED this 16th day of December 1993. P. CLAtE, MAYOR ATI'E MAM B IRAI , CITY MEM ME WIN ME • •j . ••.,• �Ir • ••� a ••••� A% QUIM JOIW III CITY ATTORNEY I BSS:M4056 °3- '782 -2- CITY OF MIAMI. FLORIDA INTEROFFICE MEMORANDUM 34 TO; Honorable Mayor and Members DATE: � � � - 61�93 FILE: of the City Commission SUBJECT: Discussion Item: Miamarina Feasibility Study P' FROM: REFERENCES: Cesa o City I g ENCLOSURES: As indicated to you in previous correspondence, the Administration has engaged the services of a multi -disciplined consulting team to perform a comprehensive feasibility study for Miamarina at Hayside, its imminent reconstruction and future operation. It is now appropriate for the firm of Kenneth Leventhal and Company, along with its subconsultants, to present you with their findings. i 3q- 93- 782 CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Honorable Mayor and Members of the City Commission FROM : r Cesar] io City r DATE : DEC _ 61993 FILE : SUBJECT: Presentation of Feasibil- ity Study for Miamarina REFERENCES: ENCLOSURES: After Hurricane Andrew and upon notification to the City Commission, the Administration engaged the services of a multi - disciplined consulting team to perform a comprehensive feasibility study for Miamarina at Bayside, its reconstruction and future operation. The consulting team, headed by Kenneth Leventhal and Company, is now prepared to present its findings and recommendations for your consideration. At the conclusion, it is respectfully recommended that the City Commission adopt a resolution accepting, in principle, the results of this study. The City's Miamarina at Bayside suffered considerable damage as a result of Hurricane Andrew. Given the prior problems with the marina's revenue generation and functionality, and with input from the Waterfront Advisory Board and users, it was determined that rather than rebuild this facility to pre -storm condition, the City needed to reconstruct the marina with a new configuration to better accommodate commercial and recreational boaters, and to do so in a manner that would optimize revenue to sufficiently cover operating costs, debt service and provide a return to the City. A feasibility study was required to determine the most advantageous configuration and program. Through a competitive negotiations process, a consulting team was hired to conduct the study, and consisted of several firms of differing specialties to analyze the pertinent issues: design (physical plant, layout and connections), legal relationships, marketability, environmental constraints and requirements, financial viability, operational needs, and construction scheduling and budget. Kenneth Leventhal and Company, a specialist in real estate planning, has served as the prime consultant with these sub -consultants: Coastal Technology Corporation (permitting, hydrographic engineering), Wallace Roberts and Todd (architects, waterfront planning), International Marina Resources (market feasibility, design and operation), and Cummings -Grayson and Company (auditing, accounting). 93- 782 Honorable Mayor an :Members of the city Commission page 2 The study itself wa-s a three-phase process, beginning with an assessment of constraints and opportunities, subsequent conceptualization of potential alternative plans, and finally, the development of a comprehensive program for reconstruction and operation of the marina. In addition to a series of interviews conducted with both public and private sector parties, a technical committee comprised of staff from Public Works, Finance/Capital Projects, Marinas, the City Manager's Office, Law, and representatives from Bayside Marketplace and the Waterfront Advisory Board has participated throughout the process. Attached are which will be session. V highlights of the study and the recommended program, presented in greater detail during the Commission's 93- 782 -93 THU 10.55 KENNETH LEVENTHAL & CO, FAX NO, 3054478651 P,02 MIAMARINA AT BAYSIDE REDEVELOPMENT FEASIBILITY STUDY MIAMI, FLORIDA COMMISSION PRESENTATION DECEMBER 16, 1993 MAJOR CONCLUSIONS 0 SIGNIFICANT MARKET OPPORTUNITIES EXIST Day Boaters Transients 6 FACTORS CRITICAL TO ACHIEVING MARKET PENETRATION INCLUDE: Resolution of wave agitation and debris collection problems Facilities propertly designed for market Strong promotional effort - Provision of quality service • POTENTIAL TO GENERATE POSITIVE CASH FLOW AFTER DEBT SERVICE • UNIQUE OPPORTUNITY TO REBUILD A FIRST CLASS MARINA AT SIGNIFICANT REDUCED COST TO CITY FEMA disaster funds and potential hazard mitigation reimbursement Submitted into the pudic record in connection vrrith item 3 4 on 12 - 16 -q 3 Ma I:ty kli.rc.i City Clerk 93- 782 MIAMARINA AT BAYSIDE REDEVELOPMENT FEASIBILITY STUDY MIAMI, FLORIDA COMMISSION PRESENTATION DECEMBER 16, 1993 KENNETH LEVENTHAL & COMPANY WALLACE ROBERTS & TODD COASTAL TECHNOLOGY CORPORATION INTERNATIONAL MARINA RESOURCES, INC. CUMMINGS-GRAYSON & COMPANY, P.A. Submitted into the public record in connection with item 3 4 on 19 16 `9 3 Matt 2r Hirai. City Clerk 93- 782 PHASE I l,pjrentory & Evaluation 1 6 weeks --- _ -11 00 2� STUDY PROCESS • Legal • Operational H r1.4 W �• ALTERNATIVE: o �• • Marketing Concepts o a o • Layouts/Linkages ro �• m • Operation Concepts -- • Engineering Solutions • Slip Mixes — L' �� CD,.+ �' n PHASE II w Alternative Concepts e Report/Review 1 Finance Plan Concept Plan Operations/ Leasing Concept Permitting Strategy Project Development Schedule PHASE III Plan Development 4 weeks _ 4 weeks Report/Review Z MW Final Report MIAMARINA AT BAYSIDE REDEVELOPMENT FEASIBILITY STUDY MIAMI, FLORIDA COMMISSION PRESENTATION DECEMBER 16, 1993 GOAL: MAXIMIZE OPERATIONAL AND FINANCIAL PERFORMANCE Submitted into the public record in connection with item '� on IA ` 1"S Matty Hirai OBJECTIVES: City Clerk • OPTIMIZE AVAILABLE MARKET OPPORTUNITIES • IMPROVE LINKAGES WITH UPLAND USES • MINIMIZE ENVIRONMENTAL IMPACT • EFFECT THE DEVELOPMENT PROCESS QUICKLY 93- 782 MIAMARINA AT BAYSIDE REDEVELOPMENT FEASIBILITY STUDY MIAMI, FLORIDA COMMISSION PRESENTATION DECEMBER 16, 1993 SIGNIFICANT ISSUES DEFINING REDEVELOPMENT PLAN • Agreement with Bayside obligating City of Miami to provide first-class marina at location. • Existing level of wave agitation has negatively affected facility's marketability. • Pier 5 Boatmens Association agreement establishes specific parameters for commercial activity at Miamarina in terms of number of slips and rental rate structure. • • Synergy between Miamarina and Bayside Marketplace. No live aboards. Submitted into the public record in connection with item on I ;L `/ & "q 3. Matty Hirai City Clerk 93- 782 MIAMARINA AT BAYSIDE REDEVELOPMENT FEASIBILITY STUDY MIAMI, FLORIDA COMMISSION PRESENTATION DECEMBER 16, 1993 INGREDIENTS FOR SUCCESS IN TRANSIENT MARKET • MARKETING AND COMMITMENT Promote existence as a first-class boating destination Target local, regional and national boating community Commitment to making slips available to transient boaters • SERVICE • SLIPS To attract transient boaters, a marina must provide first-class service to achieve and maintain a competitive position Provide first-class slips with amenities that meet the needs of today's boating market Availability and flexibility resulting from a wide range of slip sizes and configurations to meet the demand of the current boating market and to accommodate the future of the industry (trend towards larger, wider, more powerful vessels). Submitted into the public record in connection with item 3 14 on IA -19 -9 3 Nutty Hirai City Clerk 93- 782 Market Segment Permanent MIAMARINA AT BAYSIDE REDEVELOPMENT FEASIBILITY STUDY MIAMI, FLORIDA COMMISSION PRESENTATION DECEMBER 16, 1993 PLEASURE BOAT MARKET CHARACTERISTICS Pros • Long term lease Transient • Proximate to urban area with tourist attractions • Yield higher rental rate • Parking is not priority • Proven market regionally Day Boater • Largest demand generator • Lack of similar facilities in Dade County • High turnover of boater "parking space" • Enhances upland uses Cons • Limited Parking • Limited on —premises facilities & services • Distant from residential areas • Occupancy is more volatile • Requires significant services & amenities • Untested market locally • Changes management strategy • Requires different docking facilities • Increased boat traffic Submitted into the public record in connection with item �'�' on 142 -/ 6 -q 3 Matty Hirai City Clerk 93- 782 PARKING GARAGE zlz Pon DOULLWARD fTlTI1RO IJNK TD OK.VXIVlINUL MNKtllt C 4 j DODGII ISI•AND IIHID011. Ilulvlus K I'SI'AUNANT OUIIl71NO3 PARKING I �� COHTAOL fOIN ' •r—• . UAT w,,LK ' / 1 rAov EN LINTS TO 10 A1lK IN ew coNCK Llie R A / 1.41 p lk/ aZ 111SCAYNII. Y. p. W StMEi•WAL DOCK DArA .LPL L!2rK M .N 11 / ♦ h..Ll 1■Y. ►1 .wM 1 ►I I.1wy Ia+. .• 1 f hMll m ►►I. 1 rlr.n •I .w ►w • rlN.n M 1 YI■I lh ►. 1 rlulll MI■ 1 rlrl •h M MVN • .1Nm ►wIM 1 .IM►h M 1 fhrllm M 1 Y I•IYl Ya MI 1 f IMII •ev I.M .w Ir ■ .1vin ►w IW M ■ . 1 ■I .h M 1 .I.1yA .m M.w►q 1 .►•.IAm ' 1 • b MI ..1 .MIA I.M • AAlhl . 1 • r YI rill I.... UI .ma • ltrlN . • M Mall h.Mlf1 ►Cil1 Mr • IIfMIIr OAf WARTt IIr I.Il.11l AtrlM tllO Ilrlr IMI KDIMMI LCVMMtkL A O"ANY CORN. WM FL m.A.\ flo•aC■1 t'OIIaY1111 rw R Meo.t 1 ■mis Y MJ.A n7 1011.71 1tm A T lm4 ►+rA rl K !MARINA DOCKAGE DAM 267 fr LI,A ALf,p .I UP 1•IrblwI .Ir V rlvvy•I. bl wl YIr ItYV •Ir alwl •.►1I• A .�flV 1•IYblwl qlr • .IN.► r•Irbl..41 _._ r. .IMV 1 .Irblwl rt� r • .mil I•IYblwl rIr b/ . 1"...IA 1•Ir alwl VIr r I•..LL 1•Irblwl rIr . wM1A I.Irblwl rll. NI r twat• I.I. blwl _I� I. ti Ir.t ....s•1 bn r 1 � a REDEVELOPMENT STUDY FOR M", FLORMA D�AiT�(E:\� MIAMARINA AT BAYSIDE MIAMI, FLORIDA DEVELOPMENT CONCEPT PLAN BREAKDOWN OF SLIP MIX Maximum Boat Slip Configuration Size _ Number Percent Slip Orientation Slip Configuration in feet of Slips of Total Transient (1) Fixed Slips Dock B 45' X 22.7' 40 1 1% Dock B 50' X 22.7' 45 1 1 % Docks B & D 55' X 22.5' 50 44 44% Dock C 65' X 22.7' 60 2 2% Docks B & C 65' X 23.5' 60 24 24% Docks B & C 65' X 24.0' 60 4 4% Total Fixed Slips 76 76% Parallel Dockage Dock C 65 60 3 3% Dock D 70 65 8 8% Dock C 80 75 2 2% Dock A 119 112 6 6% Dock B 120 112 5 5% Total Parallel Dockage Slips (2) 24 24% Total Linear Feet of Parallel Dockage 2,229 Total transient slips 100 100% Excursion/Charter Fishing slips 35 (3) Floating Docks (Docks E, F & G) Day Boaters — linear feet of parallel dockage (4) 1,780 (1) Unoccupied transient slips expected to be utilized by day boaters. (2) Based on estimated demand. (3) Represents existing Pier 5 Association slips. (4) Day boat capacity Is estimated to range from 50 to 57 vessels. Source: Kenneth Leventhal & Company Submitted into the public International Marina Resources, Inc. Wallace Roberts & Todd record in connection wi.th� Coastal Technology Corporation item 3 4 on /2 — / 4 t/ 3 i City Clerk 93- 782 MIAMARINA AT BAYSIDE REDEVELOPED MARINA MIAMI, FLORIDA ESTIMATED FUTURE FINANCIAL PERFORMANCE YEAR 1 THROUGH YEAR 5 (in constant 1993 dollars) Estimated Advertising Cash Flow & Promotion Expense Estimated Payroll Expenses Availablefor Debt Service Estimated Percentof City Wage Private City Wage Private Year 1 Revenues Amount Total Revenue Scale Management(2) Scale Management 1 $1,157,549 $138,906 12.0% $465,422 2 1,462,603 146,260 10.0% 493,928 3 1,778,324 160,049 9.0% 493,928 4 1,961,842 176,566 9.0% 522,434 5 1,986,023 178,742 9.0% 522,434 (1) Includes management fee. (2) First year of full operations is estimated to be 1996. Source: Kenneth Leventhal & Company 9-6� $426,320 $115,191 $154,292 462,924 305,552 336,555 485,025 522,614 531,517 513,121 620,389 629,702 514,814 637,533 645,154 oa o � a p a � o 0 o 0 CD o m I� it'. C� MIAMARINA AT BAYSIDE REDEVELOPED MARINA MIAMI, FLORIDA ESTIMATED FUTURE FINANCIAL PERFORMANCE YEAR 1 THROUGH YEAR 5 (in constant 1993 dollars) Estimated Advertising Cash Flow & Promotion Expense Estimated Payroll Expenses Availablefor Debt Service Estimated Percent of City Wage Private City Wage Private Year 1 Revenues Amount Total Revenue Scale Management(2) Scale Management 1 $1,157,549 $138,906 12.0% $465,422 2 1,462,603 146,260 10.0% 493,928 3 1,778,324 160,049 9.0% 493,928 4 1,961,842 176,566 9.0% 522,434 5 1,986,023 178,742 9.0% 522,434 (1) Includes management fee. (2) First year of full operations is estimated to be 1996. Source: Kenneth Leventhal& Company w Go i CD r r • t-4 $426,320 $115,191 $154,292 462,924 305,552 336,555 485,025 522,614 531,517 513,121 620,389 629,702 514,814 637,533 645,154 m � n 0 � a. m o ~' � o 1 k W cn MIAMARINA AT BAYSIDE REDEVELOPED MARINA MIAMI, FLORIDA ESTIMATED STAFFING SCHEDULE YEAR 1 THROUGH YEAR 5 Year 1 Year 2 Year 3 Year 4 Year 5 City Private City Private City Private City Private City Private Job Position Operated Management Operated Management Operated Management Operated Management Operated Management Division Head 1 NAP 1 NAP 1 NAP 1 NAP 1 NAP Manager — Exempt 1 1 1 1 1 1 1 1 1 1 Secretary/Bookkeeper 1 1 1 1 1 1 1 1 1 1 Front Desk Supervisor 1 1 1 1 1 1 1 1 1 1 Cashier/Clerk 1 1 1 1 1 1 1 1 1 1 Cashier/Clerk — Relief 1 1 1 1 1 1 1 1 1 1 Lead Dock Attendant 1 1 1 1 1 1 1 1 1 1 Dock Attendant 5 5 6 6 6 6 7 7 7 7 Relief Dock Attendants 2 2 2 2 2 2 2 2 2 2 Ticket Collector 2 2 2 2 2 2 2 2 2 2 Relief Ticket Collector 1 1 1 1 1 1 1 1 1 1 Maintenance Person 1 1 1 1 1 1 1 1 1 1 Total 18 17 19 18 19 18 20 19 20 19 N Source: Kenneth Leventhal & Company n 0 W p' '-r O O o 0 o C� cu :71 I� Fes• MIAMARINA AT BAYSIDE REDEVELOPED MARINA MIAMI, FLORIDA ESTIMATED STAFFING SCHEDULE YEAR 1 THROUGH YEAR 5 Year 3 Year 4 Year 5 Year 1 Year 2 Private City Private City Private City Private City Private City Job Position Operated Management Operated Management Operated Management Operated Management Operated Manage n NAP 1NAP Division Head Manager — Exempt Secretary/Bookkeeper Front Desk Supervisor Cashier/Clerk Cashier/Clerk — Relief Lead Dock Attendant Dock Attendant Relief Dock Attendants Ticket Collector Relief Ticket Collector Maintenance Person Total GC G.9 1 00 1 NAP 1 1 � 1 1 1 j 1 1 1 1 1 1 1 1 5 5 6 2 2 2 2 2 2 1 1 1 1 1 1 18 17 19 Source: Kenneth Leventhal & Company NAP 1 1 1 1 1 1 6 2 2 1 1 (D 5 W -Z1 1 NAP 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 6 7 7 7 7 6 2 2 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 18 1 20 19 20 19 19 EQ MIAMARINA AT BAYSIDE REDEVELOPED MARINA MIAMI, FLORIDA ESTIMATED TOTAL CONSTRUCTION COST (in constant 1993 dollars) Hard Costs Dock and Piling Construction $1,682,165 Hydrological and Utility Costs 1,959,900 Other Construction & Redevelopment 364,650 4,006,715 Plus: Hard Cost Contingency Factor (10% of Hard costs) 400,672 Estimated Total Redevelopment Hard Costs 4,407,387 Total Soft Costs 312,033 Estimated Total Cost $4,719,420 Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation Submitted into the public record in connection with item _ on 1.2 - / 6 _ q 3 Matty Hirai City Clerk 93- 782 CITY OF MIAMI MIAMARINA AT BAYSIDE ESTIMATED CONSTRUCTION COST DOCK AND PILING CONSTRUCTION Transient Docks A Dock (6 slips) $24,680 B Dock (22 slips) 366,075 C Dock (41 slips) 415,630 D Dock (31 slips) 337,510 Total Transient Dock Construction Costs 1,143,895 Floating/Excursion Docks Floating Docks 486,270 Excursion Docks Finger Piers 42,000 Deck and Walkway Improvements 10,000 Total Floating/Excursion Dock Costs 538,270 Total Dock and Piling Construction Costs $1,682,165 Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation Submitted into the public record in connection with item 3 Q on 1.. - 16-5 3 . Matty Hirai City Clerk 93- 782 CITY OF MIAMI MIAMARINA AT BAYSIDE ESTIMATED CONSTRUCTION COST HYDROLOGICAL SOLUTIONS AND UTILITIES Fire Protection System $157,100 Domestic Water 136,200 Electrical (Docks Only) 576,200 Retrofit of Upland Electric Systems 96,975 Phone/Cable 83,800 Jet System/Debris Control (Bubbler) 22,125 Dodge Island Wave Baffle 497,500 B Dock Wave Baffle 390,000 Total Hydrological & Utility Costs $1,959,900 Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation Submitted into the public record in connection with item _ 34____ on 1 I -16 -g 3 . Matty Hirai City Clerk 93- 782 CITY OF MIAMI MIAMARINA AT BAYSIDE ESTIMATED CONSTRUCTION COST OTHER CONSTRUCTION AND REDEVELOPMENT COSTS (UPLAND) General Signage $15,000 Pier 5 Retrofit 22,650 Service Buildings 141,000 Furniture, Fixtures & Equipment 25,000 Pier Park Edge 186,000 Total Other Construction Costs $389,650 Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation Submitted into the public record in connection with item 14 -- on la ` 16 -9 3 . Matty Hirai City Clerk 93- 782 CITY OF MIAMI MIAMARINA AT BAYSIDE ESTIMATED CONSTRUCTION COST POTENTIAL FEMA HAZARD MITIGATION COMPONENTS Estimated Construction Component Cost Floating Docks $486,270 Dodge Island Wave Baffle 497,500 B Dock Wave Baffle 390,000 Retrofit of Upland Electric Systems 96,975 Transient Docks (Concrete) 1,143,895 Total $2,614,640 Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation Submitted into the public record in connection with item 3 �._ on I a - I ( - 91 Matty Hirai City Clerk 93- 782 TABLE .l MIAMARINA - DESIGN PERMITTING AND CONSTRUCTION SCHEDULE - ENTIRE PROJECT o. Descirlpflon --- --_ 1 2 3 4 6 8 7 8 9 10 11 12 1 2 3 4 6 8 7 8 9 10 11 12 1 TESTING AND FIELD SURVEYS - 2 Topographic Survey To _ �__. Rua hic P___. ury ____ _Y __ ..... 3 Bathymetric Survey }:� }`:: Ba m Y tric __... ury Y 4 Soil Borings polings 5 PERMITTING AND APPROVALS 6 Pre -Application Meetings <.<:1 1 •<' :..... Pr A icati n eeti s 7 Prepare and Submit Applications \, ::•}:;<' Pr are and Su.- m t_ pp i atior s 8 Meet with Agencies x c. Met with A enc es - — ' fi:>{ � , :> Fie d In est_i atio s i 0_ re .9_ fired 9 Field Investigations Of required) 10 Permit Response 1 >r ;�;;�� Pe mit es � nse _.._ 1 _ _— �_. _ _- -- _ _-- _ ------- - _ Permit esp nse 2 f rec 11 Pemtit Response 2 Of req.) '` ...., Pe mit es ^p. nse _-- --3 -5 f re .— .)_ 12 Permit Response 3 Of req.) _ _ _..__ _— -_ . ••••• _ Issue - P rmit - -- -- - — - 13 Issue Permits 14 PLANS AND SPECIFICATIONS- ,t ............. Pre limin ry — lans — — _ -- 15 Preliminary Plans 16 Coord. Plan w/Agencies & Contractor � �::�:};fi;��: '"" Co rd. Ian/ A nci s & ont _ actq „�. "'' ' Co _ mi _ a evie PI n & esu -_ - - -- - -- — - - 17 Committee Review Plan &Results _ — ..... Fin I PI ns P epa ed 18 Final Plans Prepared _ v.,. . Co a evie s F al Ian 19 Committee Reviews Final Plans _ �• �- - E Pr _mi are Ge eral Specs 20 Prepare General Specs 21 Committee Reviews Specs m n x< Committee Reviews pec _ -- - -- -- -, •_-- Pr pare Te hnic I Srecs 22 Prepare Technical Specs I Lis of uali __ ed _..- ont _ acto ____..___ ____.. __ - ___ 23 List of Qualified Contractors 24 Committee Approves Bid & List 0 CD _p, Co mi a Approves ro es _.._- id & List 25 BIDDING & CONSTRUCTION SUPER. i '' Pr -Bid Mee ing 26 Pre -Bid Meeting _ _ _- Co trac -Qu stio s 27 Contract Questions 28 Review Bids & Award. >: `<: Re iew Bids & Award 29 City Commission Approvals Ci Co mi sion Approval;. - 30 Pre -Construction Meeting T] --_ _ ..... Pr -Co stru ion Mee ing �,.:•.: �,,,~ "` .•, Ell 31 Project Construction H _ -- --..._ _ _ 32 Construction Observations & Admin. r.. % . {{ _ _ <, 331 Final Approval MiAmARINA DESIGN PERMITTING AND CONSTRUCTION SCHEDULE - ENTIRE PROJECT No. Desorption Y F A YEA R 2 7 a 9 10 11 12 1 2 3 4 6e 7 a 9 io 11 12 1 2 3 4 6 6 I TESTING AND FIELD SURVEYS TolographicSurvay 2 Topographic Survey . . . Baymc$uV3 Bathymetrc Survey :tom Soi Boijingsl I 4 Soil Borings 5 PERMITTING AND APPROVALS Pre�Appli cation Neetr s 6 7 8 . . . . . . . . . . . Pre -Application Meetings Prepare and Submit Applications Meet with Agencies 1111,11 Pr are and Sutmit fications Me w4h A enc es Fie d In iesti atiots (it re wired 9 Field Investigations (if required) w== Pei rnit es k P nsel I 10 11 12 13 Permit Response I Permit Response 2 (if req.) Permit: Response 3 (if req.) Issue PPermitsIss Pei mift I Z es p � 2 (f re(L.1 ' - Pei -rise mites nsel 3 Of re I _.1 e P3rmit3 14 PLANS AND SPECIFICATIONS 15 Preliminary Plans Pre limin 3ry Filans, Co )rd. NIA nciqs & 'acintracto 16 Coord. Plan w/Agencies & Contractor Co nm* Revi PIE n & I tesu ts 17 18 Committee Review Plan & Results Final Plans Prepared Fin I PIE ins P -epa -ed Co mill ee F evie Ns Fi nal I fans 19 20 21 Committee Reviews Final Plans Prepare General Specs Committee Reviews Specs . . . . . . . . . . . . . . . . . . . . . . . . . . . . PrOpare Gereral Speos CD 0 Conmiflee Reviews 111pecs . . . . . . pare Technic 31 Specs 22 Prepare Technical Specs law— Us of Oualffied ',oriffactors 23 List of Qualified Contractors _V bw- 0 (D Conrnillee pproiesBid&List 24 Committee Approves Bid & List 25 26 27 BIDDING & CONSTRUCTION SUPER. Pre -Bid Meeting Contract Questions 0 .. .. Pre - Bid Mee Jn 9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Contrac. Questoilis J . . Re, riew Bids l&ftand 28 29 Review Bids& Award City Commission Approvals LL4 Cit Co mi ion App -ova L I Pre -Co ru . . . . . . . ition Mee ee ng 30 31 32 Pre -Construction Meeting I Project Construcfion Construction Observations & Admin. 331 Final Approval CA: 1 041 00 MIAMARINA - DESIGN PERMITTING AND CONSTRUCTION SCHEDULE WITH EARLYACTION TO INSTALL FLOATING DOCKS No. Uescription Y k A H 1 -1 Y E A R 2 T i-1-4-1 1 2 3 4 9 10 11 12 1 1 2 3 4 s a 7 a e to I 1 12 I TESTING AND FIELD SURVEYS 2 Topographic Survey . . . . . . TologrephicSurvay .. . ....... .._ . ........ ... .... ...... . . . . .......... . . .. . . ..... ... . ......... . .. . . ... .. ...... . ....... .. .. . .... ..... 3 Bathymetric Survey Ba ymetdc ury . ... ..... ........... . ........... 4 Soil Borings . .... ...... .. . .... . ....... . ..... .. . .. .. .... .... .. 6 PERMITTING - INITIAL MEETINGS . .. .. .... .... .. . . ... ....... . .. ..... .. .......... 6 Pro -Application Meetings P re -App Icati )n . .. sell gs ... .... ........... ........ . ... 7 8 0 Prepare and Submit Applications Most with Agencies EARLY ACTION - FLOATING DOCKS 71,001 Pre pare ... _end . - wl � .. Sut th A . It . ...Pp I pp! n 0 es . . . ..... . . ..... . ..... . ...... . ....... . ... . ..... 10 Separate Floating Docks Component BM4 Flolting DOC npor ant 1i Permit Response I rinse . ... ... ... . ... ... . ..... 12 13 Issue Permits Preliminary Plans (Floating Docks) Preliminy S60 P ansFlo In i ock ...... . . . .. .. ........ 14 16 Committee Reviews Plans Final Plans Co M PglI wie ns i l.... ... ..... .... 116 17 Advertise Bids Bidding and Award of Contract . ....... ...... Ad ertis Bid y...... ..... Bidding nd Award of C ontract 18 City Commission Approval C Commission pprqval .. .......... 118 Install Floating Docks . . . . . . . . . . . . . . . . . . . . . . . . . Install F Win Do ks ia PERMIT APPROVALS -FIXED DOCK .. .. ...... . . . ........ 20 Field Investigations (if required) . . . . . . . . . . . . . . . . . . . Fie d In estl atlo q Ired, 21 rmft Response I P:rmIt ........... ...... . . .. Pe mit esp6� 22 P Response 2 (If req.) Res_ a ....... . ... .. .. .. .. .... . .. 23 PenTift Response 3 if req.) . 24 Issue Permits .... .... Iss e P rmit . ..... . . . ...... .... . .... ... .. - 25 PLANS AND SPECIFICATIONS 1 . ......... . .. . .......... 26 Preliminary Plans (Fixed Docks) Preliml n6ry glans .......... 27 Coord. Plan w/Agencles Contractor . . . . . . . . . . . . . . . . . . . . . . . . . . .. ....... . .... ... .. .... . ..... 28 29 Committee Review Plan & Results Final Plans Prepared Co mitiee Rev1eNPlen& FJP4I.Rm.j. esu p is -ad .. f.AeNsFnal 30 311 Committee Reviews Final PlansCotee Prepare General Specs . .......... ....... . . CPI ..... I Plan- . ..... . ... ..... .. .... .. ....... ......... .. .... .... . .. .. . ..... .. 32 Committee Reviews Specs ......... .... .. Co m RevieNs Erpeci 33 Prepare Technical Specs ... Prepare T . . .. ...... . ..... ..... 34 List of Qualified Contractors .......... .. Lis, of uallned Cont cto 35 Committee Approves Bid & List .. CommIll pp�qyes Bid & List ...... ........ - ....... . .. ..... - ------- 36 37 BIDDING A CONSTRUCTION SUPER Pre -Bid Meeting .... ....... .. .. . . . .. ...... . ... . .. ... .. ......... . i .1, . .. ....... . ...... O'r"E -Bid Meeting . ­­.. . . ........... � ...... ... .... ... ... ... .. ........... . - .... .. .. ... 38 Contract Questions . . .... .... . Contrac Questio ... i s . ........ .. 39 Review Bids & Award .—I-1 .. ..... ... . . ...... Re Bid &Award ..... . . . ..... 40 City Commission Approvals 1. 111.111 sion Aqp 'o Vl�n 41 Pre -Construction Meeting ........ .. P_ M.W: i3­ tion 42 Project Construction .... .. . ..... 43 Construction Observations & Admin. ...... . . . . . . . . . . . . T)I 1441 Final Approval CD H CD rn (D rL 0 q 1­0 0 CD 0.1 tr (D 0 P. -.1 00 Z...n MIAMARINA - DESIGN PERMITTING AND CONSTRUCTION SCHEDULE WITH EARLYACTION TO INSTALL FLOATING DOCKS No, Y EAR I YVA11 2 1 2 3 1 4 1 5 6 — 7 8 1 9 10 11 12 1 2 3 4 6 8 1 7 8 9 10 It 12 1 TESTING AND FIELD SURVEYS I I 2 3 4 Topographic Survey Bathymellic survey Soft Borings i T 0 1 2NR Ic Suryy Ba ric urvJv ol S' Sol. Go.ings 5 6 PERMITTING -INITIAL MEETINGS Pre -App(Ication Meetings caflt7n Meetirigs 1 —4- 7 Prepare and Submit Applications Proppare an sugmit P I;auo S 8 9 Meet with Agencies EARLYACTION -FLOATING DOCKS _jA . ...... . as art Mekit with nci 10 Separate Floating Docks Component Sel. aratilt Flo ting Docks Coinpor ent 11 '12 13 Permit Response I Issue Permits Preliminary Plans Q%afing Docks) Tt s&se if I ;u; e Pe Prelimfinbry Plans (Roakin Docks) f 14 15 Committee Reviews Plans Final Plans Commi --9R-. VvAh_t__ FiniilPlins _4 16 Advertise Bids Ac _rfis �B_id sH_—H, 17 Bidding and Award of Contract Bidding nd of o 18 18 City Commission Approval lnsbfl Floating Docks Comte In misiton If oil provai Do6k 3 19 20 PERMIT APPROVALS - FUED DOCK Field Investigations (if required) F Field Investclued 21 22 Permit Response I Permit Response 2 (d req.) Permit Respbnsel I 1 Pei nit Res rise V 23 24 25 Permit Response 3 (f req.) Issue Permits PLANS AND SPECIFICA77ONS Permit es SW5a rmitih L 26 27 28 Preliminary Plans (Fixed Docks) Coord. Plan w/Agencies; & Contractor Committee Review Plan Results Its ,Preliminary 14nciis Committee Fie Plan & n & I Cont lesu -actors IS 29 30 M Final Plans Prepared Committee Reviews Final Plans Prepare General Specs —A :iXM1 Rin ... ... 0 P I PlAn m are.- s F repo __S -ad an! 7- f 32 Committee Reviews Spam dCo - - - - - - - C nml F evieWs Specs 33 34 Prepare Technical Specs List of Qualified contractors Preps Lil of 1 calified 31 S, Con dots i 35 Committee Approves Bid& L m* List 36 37 38 39 40 BIDDING A CONSTRUCTION SUPE Pre Bid Meeting Contract Questions Review Bids &Award City Commission Approvals PrIF K* _B id M Co 0 CitCofnmi I Ou istio 18 Wd & Akard Sion 4-- 41 42 43 Pre -Construction Meeting Project Construction Construction Observations & Adman. Pr o iru on ae g' S 44 Final Approval (D 0 0 CD 0 0 0 CD F-) 0 tr 0 Lo PHASE III MIAMARINA REDEVELOPMENT AND FEASIBILITY STUDY TABLE OF CONTENTS I. Final Concept Plan II. Estimated Future Cash Flow Available for Debt Service - Average City Wage Scale: Constant 1993 Dollars III. Estimated Future Cash Flow Available for Debt Service - Average City Wage Scale: Inflated Dollars IV. Absorption and Revenue Analysis V. Payroll Expense Analysis V1. Estimated Construction Costs V11. Design, Permitting and Construction Schedule f 93- 782 FMRR►JNK10ER] nINN1ALINRKMC Parr novu mw j DODGI! ISIAND DIUDGI, S RAMP: PUIURI! KIWAUKANT "URDINM ;KING / 111/ / PPOVEMENI3 TO Myt PA •o NEW CONCRETE KAMt BISCAYNE nnY ttvmxAMrAL Dom DATA i .am .tea M MIN / w M•Il \••• N M1M 1 wr.rll we. .• 1 •wrllm M 1 w\■►aw •r I w\Yalt M\r 1 f\•I •w MMM • w\YaA N/r 1 wlrlw N I wrMlllm N 1 rw.ulm N 1 . rrll m H MIt� ■ w1Yaw •r •w •. • wt■•aw d , •. I w I.wlw m 1 w•w.r \ ww.lwm t •.{ W a1.1 w.•Iw slre • wrlN • 1 • rW •nl MI\N farW • wrlM a • /r M t•r wwylR ••Ol.w • wW N M1•pATi� ur rwua wrnl m Irw . r wr KEOM LVtlW IAL A C"ANY OORAL a = FL i amm lla•al•1 te■a\la on" It Nw• VOL rr•■ UMM." a•ua FLaluo ml a •aw a■l wn w AWK4 DOCXACE DA rA mmp L P. lk IL L P. a wJYV 1•Ir al = w\w 7 r\YV 1•Iw/rl rll r\w . wtYV r.lrr\1 \nll /w\w w�YV ••Iwrl rrl wlw wtYV •/t•r\I wll wllw w•I.V C•Irw11/Y/ r\rr . w..Il .•1rMI r1 ... ti w rwlll /•twe11 \.11 r\w r r /•Iwla 1 •1 w r11 ra l M\ r a• wrgll /•Iwwlrwl \r rs w.•1\u' 1•Iwra rLl r•\w r •ry r ww �..wl rw r . w REDEVE[APMENT 9MY FOR NMNWMAC AT ]AYSME MtAMI, FLORmA DATE Tr Iw Irw MIAMARINA MIAMI, FLORIDA HISTORIC PLEASURE SLIP DEMAND MAY 1991 THROUGH MAY 1992 Purpose of Visit/ Percent Size Number of Total Day Boaters 50 ft. or less 11,391 70. 5 % Over 50 ft. 727 4.5 Transient 50 ft. of less 3,676 22.8 Over 50 ft. 364 2.2 Total 1 1 1 % .source. Cft of AII& J, 93- 782 HISTORICAL MARKET MIX AT MIAMARINA May 1991 through April 1992 < 50 feet 11391 < 50 feet 3676 50+ feet 50+ feet 364 727 Transient Boaters Day Boaters co iF, Source: City of Miami MIAMARINA MIAMI, FLORIDA HISTORIC PLEASURE SLIP DEMAND MAY 1991 THROUGH MAY 1992 Boat Length Percent (in feet) Number of Total Less than 20 1,464 9.1 % 20 to .30 7,979 49.4 31 to 40 2,970 18.4' 41 to 50 2,297 14.2 51 to 60 814 5.0 61 to 70 302 1.9 71 to 80 119 0.6 81 to 100 166 1.0 Over 100 _47 _0.2 Total 1§.158 100.0 6 Source: City of Miami 93- 782 BOAT LENGTHS AT MIAMARINA w -11 00 16,168 slips rented Less than 30 feet 58% 31 to 40 feet 18% •''" .�", 'rya, ..,..�' . 51+ feet 9% 41 to 50 feet 14% Tour Boat Passenger Activity Passenger Mix Tour Boats Pau Hana Fiesta I Heritage of Miami Island Queen Island Lady Pink Lady 0% 20% 40% 60% 80% Percentage of Passengers ® Tour Groups ® Walk-ins 100% oa V Miamarina Tour Boat Activity Daily Passengers Week 601 Season Source: Individual Tour Boats )ekday 2415 Weeken 3083 Neekday 839 Off -Season Tour Boat Pau Hans Fiesta Hedtap of Miami Island Ousen Island Lady Pink Lady Total MIAMARINA MIAMI, FLOF40A TOUR BOAT PASSENGER ACTIVITY SELECTED TOUR BOAT OPERATIONS Estimated Passengers per D Passenger Number of Tours/Day Season —season Passer er Mix Ca city ee a� ee nd ee ay ee a eekday wee nd our roup c In 49 5 7 65 105 35 83 30% 70% 98 8 8 160 160 60 160 80% 20% 49 3 7 30 350 24 140 20% 80% 150 8 15 723 1,800 240 900 83% 1796. 150 8 15 72D 1,800 240 900 83% 17% 150 8 15 720 1,800 240 900 83% 17% 40 67 2,415 6,015 839 3,083 Source: Indv &W Tour Boats SELECTED STATISTICS REGISTERED PLEASURE BOATS DADE AND BROWARD COUNTIES FISCAL YEAR 1991 - 1992 Dade Broward Percent of Percent of Dade and Broward Total Percent of Dade and Pleasure Boat Size Number Dade Total Number Broward Total Number Broward Total 26 to 39 ft. 4,889 85.2% 5,326 78.4% 10,215 81.5% 40 to 64 ft. 801 14.0 1,352 19.9 2,153 17.2 Greater than 65 ft. 48 0.8 119 1.7 167 1.3 Total o,5,738 100.0 % 10.0% i�,535 , 100.0% � Source: States of Morlds, Department of Natural Resources e �■ SELECTED STATISTICS REGISTERED BOATS DADE AND BROWARD COUNTIES AND THE STATE OF FLORIDA 1987-1992 Dade and Broward Counties Pleasure (1) Commercial Total Fiscal Percem or Percent of Percent of State of Florida Year Number State Total Number State Total Number State Total Pleasure (1) Commercial Total 1966-1987 84,683 13.6% Z419 7.9% 87,102 13.5% 614,189 30,624 644,813 1987-19" 67,731 13.6% Z579 8.4% 90,310 13.4% 644,807 30,667 675,474 1988-1909 91,493 13.5% Z863 9.2% 94,356 13.3% 679.710 31,121 710,831 1989-1990 90,656 13.2% Z790 9.0% 93,446 13.0% 687,132 30,922 718,054 1990-1m 88,626 12.9% 3,151 10.1% 91,779 12.8% 685,075 31,126 716,201 1991-1992 86,672 127% 3,424 10.8% 90,096 126% 683780 31,792 715,572 Compound Annual Growth Rate (198a-1 M) l m Mm am Q 8' (1) Includes dealer boats and canoes Source: State of Florida, Department of Natural Resources SELECTED STATISTICS REGISTERED PLEASURE BOATS DADE AND BROWARD COUNTIES FISCAL'YEAR 1991--1992 Dade and Broward Total Dade County Broward County Percent of Dade Percent of Percent of and Broward Pleasure Boat Size Number Dade Total Number Broward Total Number Total Less than 12 ft. 5,675 12.4% 6,019 15.3% 11,694 13.7% 12 to 16 ft. 7,456 16.3% 7,572 19.2% 15,028 17.6% 16 to 25 ft. 26,925 58.8% 18,985 48.2% 45,910 53.9% 26 to 39 ft. 4,889 10.7% 5,326 13.5% 10,215 12.0% 40 to 64 ft. 801 1.7% 1,352 3.4% 2,153 2.5% Greater than 65 ft. 48 0.1 % 119 0.3% 167 0.2% Total 45,794 100.0% 39,373 100.0% 85,167 100.0% Source: State of Florida, Department of Natural Resources SELECTED STATISTICS REGISTERED POWER CRAFT BY LENGTH (1) FLORIDA 1987-1991 Under 16 ft. 16-25 ft 26-39 ft 40-65 ft. , Percent Percent Percent Percent Year Number of Total Number of Total Number of Total Number of Total Total 1987 314.385 50.8% 280,049 42.1% 32,632 5.3% 10,980 1.8% 618.046 1988 318,904 49.7% 281,741 43.9% 35,540 5.5% 6,053 0.9% 642,236 1989 325,106 48.3% 302,985 45.0% 37,965 5.6% 7,561 1.1% 673,617 1990 314,323 48.2% 296,903 45.6% 34,256 5.3% 6,086 0.9% 651,568 1"1 310,934 47.9% 284,936 43.9% 47,547 7.3% 6,091 0.9% 649,508 Compound Annual Growth Rate (1987-1991) _ 21 211 ,9.9% - 3.7 Z�L (1) Does not Include non- powered sail boats, auxiliary powered sail boats and non- powered canoes, rowboats and miscellaneous craft Source: National Marine Manufacturers Association yfe„ REGISTERED PLEASURE BOATS BY SIZE < 25 f t 32571 Fiscal Year 1991-1992 ^r)-4 ft 1471 ?6 to 39 f t 5326 Broward County O° Source: State of FLA; DNR < 25 feet 400F An+ feet 849 3 to 39 f t 488 Dade County MIAMARINA MIAMI, FLORIDA COMPARABLE NA71ONAL MARINAS Breakdown of 80pe by Size Estimated f of Day Boats TOtal slip 8fte 81" by Percentage of Peak Off —Peek Mafintll}l�ocatlon Snp! — Description size Total Weekday Weekend Weekday Weekend Anrtepoft Chy MUrIne ee Up to 40 lest 82 03% a a e e Atatap^ Maryland 40 to e0 feet a �% BrazillenfiNKmIen/Aumllan ?3 Up to 40 fast 0 0% 1 3 1 2 West Palm 8e8cft Fbrlda 40 to e0 lest 25 34% > so teat 48 06% DOCItB 1 s00 lenear Net NAP 100% 20 200 NAV NAV Belihm , Maryland Hwbw Iebnd 30 (1) NAV 4 35 3 2e TbmM FWkb Inr f HwbOf Marine 158 Up 10 24 fast 40 25% 3 3 0 0 Balls mm , Maryland 25 to 35 fast e2 56% 30 to as feet 28 17% Pk kednq VVFtairf ea Up t0 40 feet 41 e4% 0 12 0 0 Selefil, MaaaadtttIm"m 40 to W feet 12 1 e% > e0 rest 12 1 e% MW 39 328 UP to 30 test 184 W% 12 40 a 40 S8n Fmncl cq C&UkMIe 3710 40 Net as 20% 41 t0 45 feet 23 7% 48 to W lest e4 20% tit to e0 feet 10 3% , l YWterslde 38 tip toss Net 30 100% 12 s0 NAV NAV Novi* Vkglnla (Also 1.000 W of bulkhead) 00 NZ (1) Slip design allows various alzes; no set etp size and largest dp accomodedon Is 420 feet. Source: individual Marines, Kenneth Leventhal A Company MWAARINA AT BAYSIOE MIAMI, FLORIDA DOMPARABLE NATIONAL MARINAS 1M9 FMrrMI Rah Estimated EM2Rab.d /M2 ftMbt 8saaonlOR—aeawn Alappllaop►) YMr "mother 19112 F%rmranenV F hingl I\rktrrg 1drMaAlresSsn BsIR of slla Ooewenal SMamrl Tnm"mt Tow Baat Other Annrl A) Monfhty 151 TrramYnt (Di _on NY see to ftoos AmenllMta ArapdSo 0Bj Marina "as M 00% e0% 40% 0% 0% 6023 NAP 41.25(1) 00 be per hour 0 A1apok Maryland lad ftf brwbn/Asetrslbn im 12 62% f00% 0% 0% 0% WAD NAP 01.2".70 Free 1 % A S,C,D Nett RMm bosoh, Florid (rafurbhbe 4 C"Doels 1070 1800 bet P) NAV NAV NAV NAV NAV NAP NAP 01.00 0S for 4hm. 0 A,B4O,F,O SsMdlee, MMarybnd ldfbw bond 108B 20 20% 0% 100% 0% r ` 0% NAP NAP 01.00 fee 0 t►Ista, Florid M11a►IwMfMtartra 1078 tBi 14) 00% SO% BD% 0% 0% 00.2v NAY $1.08 08 for 2hm. 210 A,0,C,O,E,F,O,H,I,K fsMmrsw, Mlerybnd 00.18 FM11e1UMYKrF w" 85 f00% 88% 11% 4% 0% 10,20/ NAV 01.W $0.20 20 AB,C,E,F,O Sebot, hbeaahvaMSe 00.00 mmm 1M4 226 40% 80% 20% (t) 0% 00.24 4.08 01.00 $tofor4hrs. NAP A,B,D,E,F,O,H,1 ten FhsnaMee, O.illb" tlabfslds too Is vko* 1080 20 NAV 0% 02% •% 0% NAP NAP $1.00 08flat lee o A,B,C,F,O,1 Amenities A - 11b"Ity O - Shorerskoobn (1) Electric Is charged rparablyst a Not be of *Nor 03 of 00 chpendkq on vessel sin per might S — Yaw H — Idrtre Supply Shop R) Tour boats se not coneldewd in ft edp mbc 0 - C" Tebvblom I — Pump Out P) Thereare no ellps but)uK bulkhead which batch 0a 1lubor Place on Its Southern 0-Ilmi-Ity J - Pool and essbm en cad parlmetars. The nrAnaabo hot TO paddlebosts for rental and to neater taxis 1-Iaw *vFiefllty K — Fuel arrd,eeaees..e,er. bmrwlbw. F — H 0r1 Aoens Ill) Them am abo 0 T—beach which angs from 78 feet to 102 bat P) Renal ale per foot per chy. Source: kwM wl madme 1lemelb Low"t al A Company �.O 00 1•C Comparable National Downtown Marinas Estimated 1992 Slip Mix National Marinas Annapolis City, MD Brazilian/Peruvian Waterside, VA Harbor Island, FL Inner Harbor, MD Pickering Wharf, MA Pier 39, CA 40% 60% 60% 1992 Slip Mix 100% 120% Perm/Seasonal ® Transient J Tour Boat ® Fishing/Other Day Boats included in Transient Percents MIAMARINA AT BAYSIDE MIAMI, FLORIDA COMPETt11VE SUPPLY Breakdown of Slips by Ctrs Total gap Stm Nuaberof Pwowraego d Madna/I.ocation Slips on Sips TOW Dade County Biscayne Say Marriott Marina 190 Up to 36 feet a5 47% Miami, Florida 42 to 52 test so 44% 62 to 72 fed 10 5% > 60fed 5 3% Crandon Marina 222 (1) lip to 30 foot 90 4t% Miami, Florida 31 to 35 Md tie 28% 86 to 40 Md 25 11% 41 to 45 feet 25 11% 48to50Met 24 1f% Dinner Key Marina 5s2 Up to 00 feet 190 32% Miami, Florida 31 to 35 h* 121 21% as to 40 feet 117 20% 41to45fed st 14% ' 46 to 50 Mot 95 6!L 51 to 55 feet 11 2% 56 to e0 Met 12 2% 61 to 70 Met 10 2% > 70 Met 5 1% Sunset Harbor Marina 125 Up to35fest 19 19% Miaml Beach, Florida 50 to 65 Met 71 sm > 75Met 35 29% Miami Beach Marina 400 Up to45bet 12D sD% Miami Beach, Florida 64 to 00 Met 100 25% so to 65 Met 100 29% > 65 fed so 2D% Bmward County Bahia Mar Resort & Yatc hinp Canter WO Up to 45 fat 105 W% Fort Laudeedaie,Florida 48tosoteet Be 30% 80 to 200 feet ss 20% Pier 66 Merirra 76 Up to 45 Met is 21% Fort Laudetdals,Florida 469050Met 21 20% 51 to 55 feet a 7% a6bs0ket 25 W% 4190701001 a 7% 71 to so feet 2 !!� si to fl5fort 1 1!c as to so feat 1 t% The nrnwKw ar the slp4 rwA tom pwww d9' 14 arts vary amu my 10 sue. M Does not IrWAW 17 comma" slps. soarer: IrtdMldtatl Markes, Kntuftt Lwttnds! ik Company 3- 782 Yy i �A. MIAMAR INA AT lAYSIDE MIAMI, FLORIDA COMPETITIVE MARINA •IIPPIY kbp Yaaf lum or EMlmaed Btlnraled 1652 •ll Mbt ion Rental Rab (per toot per day) QleaNi111 Mal Recent Number 1eo2 rnrnan n •aeon/D4-aneon F!►Nlnp 14mober MukaaA4Slon Irhebishment of fl e _ Oawrsney Seasonal Tmnslent Tow Not OIMr Annual seasonal Monthly Trenslent 0paces Amenities ass awdy I llemyfrlryMarflev" M4Marka /164 no (1) 63% 04% le% 2% t6% WO-0.50/ 6040-0.751 NAV 8125A125 NAV A,I,CA,E,F,%H, MkWA Fbflds 81035-0.50 1040-0.75 I,J/C It OandmMarkra "SO 23S p) 100% 63% 0% 0% 7% $23/123 NAP NAP •20 300 A11A,H,19 MYm4 Floods • 0bfarltltyIll fm 6112 94% 62% 4% 1' 0% 4%P)1027-41.35 627-8.35 NAV S1o0A1.60 330 A,I,CD,E,O,I WK Fbfldt 4 •hnallbl4ewtuft on In 00% 63% 0% 1% 0% 6037A0.37 11043MAS •06040.W 4113SA1.30 00 A,•,CA,E,D,H,I,J Mbnd le010011 " • Mbml leash aft (t) N•4 400 05% 70% 2% 0% 20% $040,10.30 t0d10.46 90850.50.125A1.00 1,100 A,•,CA,E,GAIK Miml •etch, FlOrlds ?Oki ands County Ion 90% •e% 6% 0% •% lrenard Ownrr • �hlaMarMeeftf�Nehpnpdfdar 1176 3W 00% 60% 40% 1% 6% 10065A0.05 SCAB-0.05/ 1120A1.20 SIX01.35 100 A,®,CA,E,F lft tatrbrdkb, FIo fta SOS5-0.95 O,KJ,K 7 PWO Marks 1166 U2 63% 75% 25% 0% 0% S1o0-S1.75/ HAV NAV NAV A,6,C,D,E,F Ft (aud rAls, Fbft S 1.75-62.70 O,H,I,J,K TebllrasrardOewlq 472 67% 00% 34% 1% 6% Mafbt Ana TobkDenrpeslls --W- 8% 03% --S%, �QY O,W, W W 00 zl�: Afaerdtbe A - 0e0kleal m - • w"WI,alots ! - VNsW H - Merle» supply shop O - Obbb lbbrlebn I - Pump Out D - fltewIII r J - Pool a - tatnrrdy R\e" K - Fuel F - ~ AaeN (1)40 Dwb alsombbb 362-olp 01 a%* bellye*Wbd is tpin oparalk>na In Sre 61 of 1004. AdAbnal1011es kmhxb a owlmming pool, retland two restaurants. ll) Figures Omm are pre-HurrlanoAndrew; cutmnfly orerka toaabout 136 operatlng sops with remalndsr belng repalredandexpected e Imaval`ble In eight meft s. (1) Dan not Include 126 dry serape Aallrr spolsand 30 moortnge IbralWats. saw": trrdMdual Marbnse Kenneth tasentlrl & Company Competitive Marinas in South Florida Estimated 1992 Slip Mix Permaneni 86% Dade County Perrnanen 59% Fish/Other ransie%nt 5% O° Seasonal Included in Permanent Category Tour Boat 1% Brows ' ish/Other 6% ransient 34% • DADE COUNTY'S COMPETITIVE MARINA SLIP MIX DIFFERS SIGNIFICANTLY FROM BROWARD COUNTY - PERMANENT USE DOMINATES DADE COUNTY AT 86%; ONLY 59% IN BROWARD • BROWARD HAS CAPTURED THE TRANSIENT MARKET WITH 34%; ONLY 5% IN DADE COUNTY - THIS REPRESENTS A POTENTIAL LATENT DEMAND FOR SUCH FACILITIES TO CAPTURE THE DAY BOAT AND TRANSIENT MARKET o COMPARABLE NATIONAL MARINAS EITHER CATER EXCLUSIVELY TO PERMANENT OR TRANSIENT MARKETS; ONLY INNER HARBOR • �6 SUCCESSFULLY COMBINES THE TWO ONYL WATERSIDE AND PICKERING WHARF PROVIDE TOUR BOAT OPERATIONS; NONE LISTED FISHING OPERATIONS IN ITS MIX 93- 782 MIAMARINA REDEVELOPMENT FEASIBILITY STUDY MARKET SEGMENT AND MARKET MIX e VESSELS 25 FEET AND UNDER REPRESENT OVER 90% OF FLORIDA REGISTERED POWER CRAFT MARKET i OVER 88% OF DADE COUNTY REGISTERED PLEASURE BOATS ARE UNDER 25 FEET; 83% IN BROWARD COUNTY e DADE AND BROWARD COUNTIES REPRESENT ALMOST 13% OF ENTIRE FLORIDA PLEASURE BOATING MARKET e 58% OF PLEASURE BOATS THAT VISITED MIAMARINA BETWEEN MAY 91 AND APRIL 92 WERE UNDER 30 FEET; 32% WERE BETWEEN 31 AND 50 FEET; THIS REPRESENTS A WIDE MIX OF VESSELS A DAY BOATERS REPRESENTED 75% OF PLEASURE BOATERS THAT VISITED MIAMARINA IN 91-92; APPROX 11,400 OF TOTAL 12,100 WERE UNDER 50 FEET. THE REMAINING 25% WERE TRANSIENT BOATERS �. Y� 93- 782 00 11:' MIAMARINA REDEVELOPMENT FEASIBILITY STUDY OPTIMIZATION OF OPERATIONAL AND FINANCIAL PERFORMANCE OPPORTUNITIES CONSTRAINTS • Potential to be a premier marina In the U.S. o Wave/surge situation has adverse impact on boating operations in the basin. • Limited destinations in Dade County. • Floating debris detracts from appearance of marina. • Hard Rock Cafe to stimulate increase in day boat demand. • Noise levels deter certain groups and segments of boating population. • Consideration of linear dockage in addition to conventional slips. • Utility expenses not billed back to overnight users represents lost revenue. • Capture a portion of transient boater market with Improved service and facilities. 0 Expenses are proportionately high due to low revenue base. • Permanent use can be met with commercial operations such as the tour boats. • Lack of adequate and proximate parking deters permanent and seasonal users. • 'Aggressive and strategic marketing will promote Mlamarina as an Ideal location for a variety of events and attractions, increasing use. • Existing revenue of approximately $2,200 per slip can be greatly Improved with efficient operations and effective marketing to major demand segments: day boaters and transient. • Creation of additional revenue sources such as billing of utility usage for overnight stays. OPPORTUNFI-Mb A1vIu CONSTRAINTS L EGEND JECENTER OF ACnVM PDEDESTRIAN CIRCULATION I DQCK LEVEL CIRCULATION BLOCKED VIEWS ram/ NOISE VIEW CORRIDOR DOCK ACCESS POU" po ENTIAL RESTAURANT SITE a OMWff 030AL auto R am e�,o�ruew�anraa am a �w�Or•��a® OIL Ka0. tun ■O � � REDEVEWPMWf MDY FM , A A AT 1BAYSME MAK FWMA nk" `y'j Vi/ � •R f MIAMARINA REDEVELOPMENT / FEASIBILITY STUDY r..4y LINKAGES WITH UPLAND USES OPPORTUNITIES CONSTRAINTS • Expanded activity from transient boaters, day Blockage of views by: -Shade structures boaters and excursion boaters -Pier Parts service buildings •Parking garage • Opportunity for enhanced user friendliness for excursion and day boaters e • Accessibility constraints: • Inadequate dockage/ sodbsslblilty for small boats •Excursion boat boarding, • Link with ad l scent activities: • ADA compllanoe • Outdoor safe's • Hard Rock Cafe' • Narrow dock level pedblitfifin corridors • Klee Park • Future restaurants • Cru9de terminal • Bayfront Park • Underutilized areas: • Ntlfth docks • plot 5 dCl M/ fiehing fleet • Opportwo4ty for Miamarina/ Bayside to link waterfront • plot Pfiek from D000nt Park to Bicentennial Park/ cruise terminal • Parking supply and conVHftINHO • Expand" aooesaibUlty to Brickell, Omni and PrefarMMq Arts Center with Metrorall extension • Security and safety: • Eit Mbldh 064t boarding • GMWd bdtfti't l • Potential. for linkages beyond downtown with water taxi • MOW • AMM-161Mwd problems (10 6"WiR nil conflicts • Opportunity fdr new activity ivi4 at North DOOM• • Llhkftb gatoway to cruise terminal FI i41Ng ulllkye Hletarlb 9111p I lieftWhi dudkolde dining Othdr tlitrlNdtlons • Opg6rttjhIti6+b fdi• eapanded dockage oh'dtit§idb cld b of �I�r Pbtk MIAMARINA 4 REDEVELOPMENT FEASIBILITY STUDY MARKET SEGMENTS AND MARKET MIX OPPORTUNITIES CONSTRAINTS • Major U.S. boating market. • Lack of adequate and proximate parking for typical space requirements. • 85% of registered boats are less than 25 feet in length, hence, do not require wet slip storage. • High -noise, high-energy atmosphere deters permanent and seasonal users. • Proximity to areas of sightseeing Interest creates demand for tour boat operations. • Presence of homeless and easy public access presents security concern for permanent/seasonal • Day boat market Is significant due to size of small users; a lesser extent for day boaters and tour vessel population in Dade and Broward Counties. operators. • Tourist and entertainment facilities at Bayside creates • Too far to fishing grounds for optimal charter fishing high-energy, high -traffic atmosphere conducive to operations. day boater activities. • Charter fishing not typically an impulsive purchase • Day boaters are not well served by related like most Bayside transactions. waterfront restaurants/entertainment complexes In Dade County. Broward County is a major attraction. MIAMARINA REDEVELOPMENT FEASIBILITY STUDY MAJOR ISSUES • TRANSIENT ORIENTATION • DAY VISITOR MANAGEMENT/IMPROVEMENTS • OPTIMAL LOCATION FOR: • DAY BOATS • FISHING BOATS • LARGE-SMALL/SHORT-TERM/LONG-TERM TRANSIENT • IMPLICATIONS/LINKAGE WITH HARD ROCK CAFE AND FUTURE DEVELOPMENTS •. UPLAND LINKAGES • EXCURSION BOAT ACCESS REQUIREMENTS • BAYSIDE WATERVIEWS • CROWD CONTROL/CIRCULATION/SECURITY • SMALL BOAT ACCESSIBILITY • WAVE AGITATIONMATER DEBRIS COLLECTION SOLUTIONS • PERMITTING STRATEGIES • CRITICAL PATH TO CONSTRUCTION/FACILITY OPENING qd 93- 782 MIAMARINA REDEVELOPMENT FEASIBILITY STUDY PHASE I - SCOPE AND METHODOLOGY • INTERVIEWS WITH VARIOUS CITY OF MIAMI OFFICIALS AND REPRESENTATIVES. • INTERVIEWS WITH REPRESENTATIVES OF NATIONAL MARINE INDUSTRY ASSOCIATION. • EVALUATION OF SOUTH FLORIDA BOATING MARKET. • SUBJECT PROPERTY AND UPLAND USE INSPECTION. • VISITATION AND INSPECTION OF SELECTED SOUTH FLORIDA MARINAS. •. EVALUATION OF COMPETITIVE LOCAL MARINAS. • INTERVIEWS WITH REPRESENTATIVES OF SELECTED DOWNTOWN\ URBAN MARINAS THROUGHOUT THE UNITED STATES. • EVALUATION OF MIAMARINA'S OPERATIONS AND HISTORICAL FINANCIAL PERFORMANCE. • ASSESSMENT OF THE HYDROGRAPHIC AND ENVIRONMENTAL ELEMENTS OF MIAMARINA. • ASSESSMENT OF WATER QUALITY AND FLUSHING STUDIES. • EVALUATION OF ENVIRONMENTAL ISSUES AS RELATED TO PERMITTING. 3 `I 782 Ma ket Operations Early Actions Opportunities Economics Engineering/ Technical d —`� Environmental/ & Constraints 77 Review National I Prototypes Urban Design Unkages to PHASE 1 1�ventory & Evaluation .� b weeks 00 A STUDY PROCESS Evaluatioo. and Concept Concept Selection Plan • Financial • Legal Operational C ALTERNATIVE: • Marketing Concepts • Layouts/Linkages • Operation Concepts • Engineering Solutions • Slip Mixes Report/Review 1 PHASE II Alternative Concepts d weeks Finance Plan Concept Plan Operations/ Leasing Concept Permitting Strategy Project Development Schedule PHASE III Plan Development 4 weeks Report/Review 2 MIAMARINA REDEVELOPMENT FEASIBILITY STUDY GOAL: MAXIMIZE OPERATIONAL AND FINANCIAL PERFORMANCE OBJECTIVES: • OPTIMIZE AVAILABLE MARKET OPPORTUNITIES • IMPROVE LINKAGES WITH UPLAND USES • EVALUATE ENVIRONMENTAL IMPACT • EFFECT THE DEVELOPMENT PROCESS QUICKLY • IDENTIFY SHORT-TERM ACTIONS 37 93- 782 93` � 82 3�0 PHASE I MIAMARINA REDEVELOPMENT AND FEASIBILITY STUDY TABLE OF CONTENTS I. Goal and Objectives II. Study Process III. Scope and Methodology IV. Major Issues V. Opportunities and Constraints V1. Market Segment & Market Mix Issues VII. Competitive Marinas in South Florida Vill. Comparable National Downtown Marinas IX. Selected Statistics: National, Regional and Local Registered Pleasure and Commercial Boats X. Miamarina: Tour Boat Passenger Activity XI. Miamarina: Historic Pleasure Boat Demand 93- 782 3y PHASE 1 OF MIAMARINA REDEVELOPMENT FEASIBILITY STUDY PRESENTATION ice CITY OF MIAMI DEPARTMENT OF PARKS AND RECREATION TECHNICAL COMMITTEE JUNE 21, 1993 PRESENTED BY: KENNETH LEVENTHAL & COMPANY WALLACE ROBERTS & TODD COASTAL TECHNOLOGY CORPORATION INTERNATIONAL MARINA RESOURCES, INC. 33 93- 782 MIAMARINA AT BAYSIDE MIAMI, FLORIDA ALTERNATIVE C e • Provides for the greatest amount of day boat floating dockage. • Three floating dock fingers allow for increased parallel transient dockage. • Character boat enhances scenic quality of marina and serves to balance pedestrian traffic. • Creates activity center on northern pier. • Excursion boat dockage redesigned to enhance views. • Security gate controls pedestrian traffic to day boat and transient dockage areas. • Turnstile and ticket office provides for effective day boat cash control. • Sight lines are kept open at amphitheater. 3d Disadvantage • No provision for ferry boat dockage. • Eliminates charter fishing slips and reduces number of excursion boat slips. 93- 782 MIAMARINA AT BAYSIDE MIAMI, FLORIDA ALTERNATIVE B j Advantage • Three floating dock fingers allow for increased parallel transient dockage. • Increased excursion slips and reduced charter fishing slips. t • Provides for some permanent dockage. i • Security gate controls pedestrian traffic to day boat and transient dockage areas. i i • Turnstile and ticket office provides for effective day boat cash control. i • Sight lines are kept open at amphitheater. Disadvantage • Least amount of transient dockage, • No provision for ferry boat dockage. -31 93- 782 FMRR UNK in KKYlffl41N1Al. MKKA'W PORT OWLUWIRD ♦ DODGU ISLAND URIDGU 1-7 rn WWAUKANT flulUNIK $ KQWVTAL WM DArA -&%a2 �� If—" • 'a Ig41t Ma ►1 1 41•.u4 •tom ►• w H • w /•\.Ia to ►• w Nr1a a ►••1\ 1 'aIr4. ►.wN s w•v•w NwN • -rvan ►11•N 1 .wlw ►••/MN / 41vaN N 1 4•war N•� 1 'awWt•4 NMN 'a 'a•aa.N NMN a 'a•11►w N 1 4 /�.LL •s NMN • 'aII.1►1t an 1 • •r M •wl 1••\1t •q\i\ • MM /.•'a1•. /M ..1.1►•41••1 •a'aIIt .. • • •'I •M •M 1'aYt tO1.• • a'atM w/r.1 r•N 1•w1'aN r.Iaw NwN aa.1�• r111I •w 9A. "-O M A wl.la awlN •t'a 1•r . w •�► IlAfil fAAI w.wilw Iu:1.� � w 1 w r CKLKNI01/ • as: • w lin wr w 1�. wll \.0 2LIAIT MI 1•arrl 1 Itwa1 y/— asvra /ww11aa/ cow."" •wa m •IIIAf.ltO.\ a111t "W"m Nnt R 'alum •mml a v= m4 MII R WNWA DMA GE DATA r•�t/ I.�r\n ral Iv.w w o./v t►w•I4e1 rr1 wIw � w.w\/ •.I4'aIl rrl Ir1'a M I .rl a. 1.1 wrl ral w1'a 11 4 /•MIa 1•I4 wr .••al 41w ti I. MI. 1.1 "11 rK1 Ir.w 4'aMIt I• I w •YI w.l I w '� 4l.rul 1.1 wIM IIIaI 4/ w w••Ia /•1rAI r1 In w r.•1•t 1• I o 01 wl l a1/ . •. w -41.Wa 1.1w V►l rill• .. w1 w, :� �. 'atw4 .raw •�I/ �. w " 41! REDEVELOPMENT STUDY FOR NUANAMIA AT PAYSBYS, M1AMl, FLORIDA DATE PM BOULEVARD 4 _ 1 �j�j'7 1 ►-r' I IIAMr1 i �~ M1AN�NY' ` Oo IN'd nrMe UNK TO SIWMINNIAI. rARK/11W. DODGE l5l AND OItID01: KrrUKn RMA PLA T IUILDINM 01%CAYNI{ RAY SCHEME B tT1•F1'iDAWAL V= DA rA Am era •P Km—m""_ NMN 1 rw1y�!• M 1 r tiY\1l \Y NMM . w'1'r\IR rn •. 1 r wwlw a •►wM • r\YRw MMM • �\Yry\ w\M ; r■r•w wMw r\Y •I\ w r r\rvv wl•. / rw+u� w w•s w r\v►w ►.ww • r\v•w w 1 rw111ar w M N . r wwyA I 1 • Y 0\r rl Ry1A •1•►r • y1r\► t • r FI 1\11 rri\lA •01r • R�1M ••••w1 r•r VAM r" r Iwua R•1r\• a r . � r it M.1.1r �w••..N1••1.+1+1.11�r K! m UW!lA1 L l O"ANY OOl'At. Go= %KLM\ow"Av �� rlua.aro. � � •"'-_ Al MA DOCKAGE DATA Mom► L/:R ALA.= r■o•v ■.Irr1\Y1 wr\r r\YI•r•Iwrrrw\1 r \,v •. 1•Irrr YM1 r\w. O w\1\l 1•I r0 111-1 r IW\IR 1.1rr1 YR1 A.� NI w 1'•YN 1•Irrr ral •r\i w r 1w\u 1•IrarrRl 1�\r _— —•IMR wMur aw••••�rrr rN. pD/1�iVllREDEMA)PMENT STUDY F 11r9A1[iJLL 7I1` AT BAYSI KM, FLORIDA DAM T MIAMARINA AT BAYSIDE MIAMI, FLORIDA ALTERNATIVE A Advantage • Parallel dockage of ferry boat, water taxi and excursion boat provides access to Bayside's south building and Hard Rock Cafe. • Provides for some permanent dockage. • Security gate controls pedestrian traffic to day boat dockage areas only. • Turnstile and ticket office provides for effective day boat cash control. • Sight lines are kept open at amphitheater. 36 11 Disadvantage • Least amount of floating dockage. • Multiple access points to/from transient dockage. 93- 782 IWIM uu1uvt t%§ u1%11,1uL- MIAMI. FLORIDA ALTERNATIVE DEVELOPMENT CONCEPTS BREAKDOWN OF SLIP MIX Maximum Alternative Orwelo went Concept Boat Previous/Exlsting (2) A Sits Number Percent Number Percent Number Percent Number Percent Slip Orlsrthtton Slip Configuration Qn feet) of Slips of Total of Slips of Total of Slips of Total of Slips of Total Transient Fixed Sips 45' X 227' 40 18 13% 1 1% 0 0% 0 0% eo' X 227' 55' X 225' Bo' X 272 6V X 320' 6d x 227' 65' X 23,5' Wx24.0' 70' X 37,0' Total Fixed Slips 45 47 50 0 55 0 55 0 60 47 60 0 60 0 65 13 77 1 80 6 90 5 155 2 139 Parallel Dodcage 65 60 70 65 80 75 119 112 120 112 Total Parallel Dockage (based on esUmated demand) Total Linear Fed of Parallel Dockage Total ko nelent skips 139 Permanent s11ps Floating Docks Day Boaters — linear feet of parallel dockage Farry Boat — linear feet of parallel dockage Excurabn Boats Parallel Dockage C.� Slips I Charter Fishing slips Water TOM — parallel dockage (1) Represents existing Pier 5 Association sips (2) Reflects number of slips according to maximum boat size (3) Reflects number of slips ` 8curor: Kenneth Leventhal i Company International Marina Resources, Inc. Waktace Roberts tk Todd 91—anal Tachnnbov Corporation 38 (3) 34% 1 0% 44 0% 0 0% 0 34% 2 0% 24 0% 4 9% 0 1% 0 4% 0 4% 0 1% 0 100% 3 8 2 6 5 24 2229 100% 100 7 (1) 1490' 65' 1% 0 44% 40 0% 0 0% 0 2% 0 24% 24 4% 4 0% 0 0% 0 0% 0 0% 0 0% 0 68 3% 3 8% 7 2% 2 6% 6 5% 5 24% 23 2159 100% 91 7 (1) 1770' 0 0% 0 0% 44% 40 39% 0% 5 5% 0% 4 4% 0% 0 0% 26% 24 24% 4% 4 4% 0% 2 2% 0% 0 0% 0% 0 0% 0% 0 0% � % 3% 3 3% 8% 7 7% 2% 2 2%' 7% 6 6% 5% 5 5% 25% 23 23% 2159 100% 102 100% 0 1770' 0 180' 9 8 (1) 20 (1) 12 26 21 (1) 9 (1) 0 70' 70' 70' R.s IUft1KK UNK TO KK7h !HIA1. KtKKIFIC PORT ooulkvnan a WIxiIS ISLAND ululxlL '- PARKING GARAGE FAMRIt RMAUKAw KUII1Kwt% 1AHOinurrvnewrio / / 1 / / - NAY WX , / / BISCAYNE RAY SCHEME A SUVEEWWrAt DOCK DATA \I wr1 1 •r •• f �ra.lw 1lrlll rA ►r1r f a waw •\wN \ r1M•w N ; �IwFaw N 1•J lw NIw / wfr.r\w NwM \ wlfr aw NIM 1 wrwaw M 1 wMarwY N 1 r ra.w Y M 1 w Mllw Y MwN • w\Maw •■wIr • w1lJ aw N 1 f I+alw M• M wry 1 rlwYaY 1 • 1!. w r1 Irww •ulll\ • wMM 1 . ri w rrl rwlu •r af.r�• r •11rr AIIMIr lr•1•r ••IOIIrI�w 1. !•�w.r l�r �nws r l..Iw ww1l lr11 wJf lr r w ornla a Vll• Iar r 1 J1 v gQnanwft A n w rriw w�.11w •u r IA/•f /A!0 r awiw ila:nile • I n w ii\iaMiu�� w\�rww w+.w wr Ir11r KFTO1 m U1vvm" a o0wo Y Oom Gma FL tuna 110 PON" mrua\w IMa It wl•.wll•w Ilne! Ila\IY r114 ft wun awree \ >® ••a W w MARWA DOCKAGE DAM nufsrrr Tf Vrr 1•Irrlrrl Tlr r It•!\I 1•IT MI r.I .�w T w1•\ar �•Irrlrrtl MIw A wlvu /•/wrl Mal w•w r let ar ••Irrl Mal wfw wlMar II .IIrIMaI rrr w Va1Y \•for�frci ela .. .Iwll 1•Iwrl Mwl w\w w r lwu r•ITrI MaI •• r r•IIaM 1•Irrl Mal fw w i w wrlu \•Irrl Meal wow w REDEVELOPMENT STUDY FOR WW(A WA AT BAYME M]AMI, FLORIDA DATO _ •• .n T PHASE 11 MIAMARINA REDEVELOPMENT AND FEASIBILITY STUDY TABLE OF CONTENTS I. Alternative Design Concept Drawings Il. Alternative Development Concepts: Breakdown of Slip Mix III. Alternative Development Concepts: Advantages & Disadvantages I 1 93- 782 PHASE II OF MIAMARINA REDEVELOPMENT AND FEASIBILITY STUDY PRESENTATION TO CITY OF MIAMI DEPARTMENT OF PARKS AND RECREATION TECHNICAL COMMITTEE FRIDAY, JULY 23, 1993 PRESENTED BY: KENNETH LEVENTHAL & COMPANY WALLACE ROBERTS & TODD COASTAL TECHNOLOGY CORPORATION INTERNATIONAL MARINA RESOURCES, INC. 33 93- 782 PHASE III OF MIAMARINA REDEVELOPMENT AND FEASIBILITY STUDY PRESENTATION CITY OF MIAMI DEPARTMENT OF PARKS AND RECREATION TECHNICAL COMMITTEE PRESENTED BY: KENNETH LEVENTHAL & COMPANY WALLACE ROBERTS & TODD COASTAL TECHNOLOGY CORPORATION INTERNATIONAL MARINA RESOURCES, INC. S 93- 782 Revel us$ Transient Slip Transient SHP - Day Boat Use Day Borate - Floating Docks Excutalon SHP Permanent SHP Telephone Other Income Total Revenues Cod of Saks Telephone Other Income Total Cost of Sates Gross Operating Income Operd" Expenses Payroll a Related Legal a Professlonal General a Administrative Utilities (1) Advertising a Promotion Security Maintenance a Repairs Total Operating Expenses Gross Operating Profit Fixed Expenses Insurance Reserve for Replacement Total Fixed Expenses MIAMARINA AT BAYSIDE REDEVELOPED MARINA - AVERAGE CITY WAGE SCALE MIAMI, FLORIDA ESTIMATED FUTURE CASH FLOW AVAILABLE FOR DEBT SERVICE (in constant 1993 dollars) 1996 1997 1991 19" 2000 Amount Ratio Amount Ratio Amount Ratio Amount Rdto Amount Ratio $657,000 56.8% $845,961 59.1% $1,047,696 60.8% $1,184,881 62.4% $1,209,063 62.8% 93,093 8.0 109.064 7.6 130,385 7.6 145,204 7.6 145,204 7.5 96,841 8.4 146,823 10.3 200,534 11.6 220,951 11.6 220.951 11.5 97,090 8.4 97,090 6.8 97,090 5.6 97,090 5.1 97,090 5.0 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 82,125 7.1 89,425 6.2 94,900 5.5 98,725 5.1 96,725 5.0 131,400 11.4 143,060 10.0 151,840 8.8 154,760 8.1 154,760 8.0 1,157.549 100.0 1,431.442 100.0 1,722,445 100.0 1,899.611 100.0 1,923,792 100.0 78,019 95.0 82.271 92.0 85,410 90.0 87,053 90.0 87,053 90.6 98,550 75.0 107,310 75.0 113,880 75.0 116,070 75.0 116,070 75.0 176,569 15.3 189,581 13.2 199,290 11.6 203,122 10.7 203,122 10.6 980,950 84.7 1,241,861 86.8 1,523,155 88.4 1,6%,489 89.3 1,720,670 89.4 512,021 44.2 544,570 38.0 544,570 31.6 577,119 30.4 577,119 30.0 17,363 1.5 21,472 1.5 25,837 1.5 28,494 1.5 28,857 1.5 69,453 6.0 78,729 5.5 86,122 5.0 94,981 5.0 96,190 5.0 34,726 3.0 40,080 2.8 44,784 2.6 49,390 2.6 50,019 2.6 138,908 12.0 143,144 10.0 155,020 9.0 170,965 9.0 173,141 9.0 46,302 4.0 57,258 4.0 68,898 4.0 75,984 4.0 76,952 4.0 25,466 2.2 42,943 3.0 68,898 4.0 75,984 4.0 76,952 4.0 844,237 72.9 928,196 _ 64.8 994,128 57.7 1,072,918 56.5 1,079,229 56.1 136,743 11.8 313,665 21.9 529,027 30.7 623,571 32.8 641,441 33.3 45,000 3.9 45,000 3.1 45,000 2.6 45,000 2.4 45,000 2.3 23,151 2.0 35,786 2.5 51,673 3.0 56,968 3.0 57,714. 3.0 68,151 5.9 80,786 5.6 96,873 5.6 101,988 5.4 102,714 5.3 Cash Flaw Available for Debt Service 68,592 r 5.9 232,879 16.3 432.354 25.1 521,583 27.5 538,72728.0 (1) Assume* utilities for transient slips are billed to users. Notes: Cost of sales ratio Is to departmental revenues. All other percentages are to total revenue. Th fl Its a In constant 1993 dollars and, therefore, do not reflect the Interim effects of Inflation. The comments and assumptions contained In this report are an Integral part of these prospective a I a Estimates of payroll and related expenses do not reflect contractual step Increases. The Impact at nc may have a material Impact and result In a higher payroll & related expense, therefore reducing ca fl able for debt service. Source: Kenneth Leventhal a Company -mow MIAMARINA AT BAYSIDE REDEVELOPED MARINA - AVERAGE CITY WAGE SCALE MIAMI, FLORIDA ESTIMATED FUTURE CASH FLOW AVAILABLE FOR DEBT SERVICE (in Inflated dollars) 198e 1997 1998 1999 2000 Revenasse Amount Ratio Amount Ratio Amount Ratio Amount Ratio Amount o Transient Slip $739,036 56.8% $989.654 59.1 % $1,274,682 60.8% $1,499.253 62.4% $1,591,044 62.8% Transient Slip - Day Boat Use 104,717 8.0 127,589 7.6 158,633 7.6 183,730 7.6 191,079 7.5 Day Bonds - Floating Docks 108.933 8.4 171,762 10.3 243,981 11.6 279,573 11.6 290,756 11.5 Excursion Sop 109,213 8.4 113.582 6.8 118,125 5.6 122,850 5.1 127,764 5.0 Permanent Slip 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 Telephone 92,379 7A 104,615 6.2 115,460 5.5 122,388 5.1 127,284 5.0 Other Income 147,807 11.4 167,363 10.0 154,737 8.6 195.821 8.1 203.654 6.0 Total Revenues 1,302,085 100.0 1,674,565 100.0 2,095,618 100.0 2,403.614 100.0 2,531,590 100.0 Cost of Sales Telephone 87,760 95.0 96,245 92.0 103,g14 90.0 110.149 90.0 114,555 90.0 Other Income 110,855 75.0 125,538 75.0 138,552 75.0 146,866 75.0 152,740 75.0 Total Cost of Saba 198,616 15.3 221,783 13.2 242,467 11.6 257,015 10.7 267,295 10.6 Gross OperatingIncome 1,103,469 84.7 1,452,802 86.8 1,853,151 88.4 2,146,599 89.3 2,264,284 89.4 Operating Expenses Payroll & Related 575,953 44.2 637,070 38.0 662,553 31.6 730.240 30.4 759.450 30.0 Legal a Professional 19,531 1.5 25.119 1.5 31,434 1.5 36,054 1.5 37,974 1.5 General & Administrative 78,125 6.0 92,102 5.5 104,781 5.0 120,181 5.0 126,579 5.0 Utilities (1) 39,063 3.0 46,8W 2.8 54,486 2.6 62.494 2.6 65.821 2.6 Advertising & Promotion 156,250 12.0 167,459 10.0 188,606 9.0 216,325 9.0 227,842 9.0 Security 52,083 4.0 66,983 4.0 63,825 4.0 96,145 4.0 101.263 4.0 Maintenance & Repairs 28,646 2.2 50,238 3.0 83,825 4.0 96,145 4.0 101,263 4.0 Total Operating Expenses 949,652 72.9 1,085,859 64.8 1,209,509 57.7 1,357,583 56.5 1,420,192 56.1 Gross Operating Profit 153,817 11.8 366,943 21.9 643,642 30.7 789,016 32.8 844,092 33.3 Fixed Expenses Insurance 50,619 3.9 52,644 3.1 54,749 2.6 56,939 2.4 59.217 2.3 Reserve for Replacement 26,042 2.0 41,865 2.5 62,869 3.0 72,108 3.0 75,947 3.0 Total Fixed Expenses 76,661 5.9 94,508 5.6 117,618 5.6 129,048 5.4 135,164 5.3 Cash Floor Available for Debt Service 77,157 5.9 272,435 16.3 526,024 25.1 859,968 27.5 706,928 28.0 CO (1) Assumes Willies for transient slips are billed to users. C.� Notes: Cost of sales raft Is to departmental revenues. All other percentages are to total revenue. These ive financial analyses are expressed In inflated dollars and, therefore, do reflect the Interim effects of inflation. The comments and assumptions contained in this report are an integral part of these prospective M ci a ® e Estimates of payroll and related expenses do not reflect contractual step Increases. The impact of ep ea 00 may have a material Impact and result In a higher payroll & related expense, therefore reducing cash lia j`• for debt service. 9 Source: Kenneth Leventhal & Company if Revenues Transtalt Slip Transient Slip - Day Boat Use Day Bosts - Flos" Docks Excursion Slip Pei., Slip Telephone Other Incans Total Revenues Cost of Saks Telophone Other Income Total Cost of Saks Gross Operating lnconrne Operating Expenses Payroll a Related Legal a Profewlonel Manegennmrt Fee General & Administrative Utilities (1) Advertising & Promotion Security Maintenance & Repairs Total Operating Expenses MIAMARINA AT BAYSIDE REDEVELOPED MARINA - MANAGEMENT COMPANY OPERATED MIAMI, FLORIDA ESTIMATED FUTURE CASH FLOW AVAILABLE FOR DEBT SERVICE (in constant 1993 dollars) 1998 1997 1998 1999 2000 Amount Ratio Amount Ratio Amount Ratio Amount Ratio Amount Raft $657,000 56.8% $845,961 57.8% $1,047,696 58.9% $1,154,881 60.4% $1,209,063 60.9% 93,093 8.0 140,225 9.6 186,264 10.5 207,435 10.6 207.435 10.4 98,841 8.4 146,823 10.0 200,534 11.3 220,951 11.3 220,951 11.1 97,090 8.4 97,090 6.6 97,090 5.5 97,090 4.9 97,090 4.9 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 82,125 7.1 89,425 6.1 94,900 5.3 96,725 4.9 96,725 4.9 131,400 11.4 143,080 9.8 151,840 8.5 154.760 7.9 154.760 7.6 1,157,549 100.0 11462,603 100.0 1,778,324 100.0 1,961,842 100.0 1.986,023 100.0 78,019 95.0 82,271 92.0 85,410 90.0 87,053 90.0 87,053 90.0 98,550 75.0 107,310 75.0 113,8W 75.0 116,070 75.0 116,070 75.0 176,569 15.3 189,581 13.0 199,290 11.2 203,122 10.4 203,122 10.2 990,990 84.7 1,273,022 87.0 1,579,034 88.8 1,758,719 89.6 1,782,900 89.8 303,292 26.2 318,542 21.8 318,542 17.9 333,792 17.0 333,792 17,363 1.5 21,939 1.5 26,675 1.5 29.428 1.5 29,790 123,028 10.6 144,382 9.9 166,483 9.4 179,329 9.1 181,022 69,453 6.0 80,443 5.5 88,916 5.0 98,092 5.0 99.301 34,726 3.0 40,953 2.8 46,236 2.6 51,008 2.6 51,637 138,906 12.0 146,260 10.0 160,049 9.0 176,566 9.0 178,742 46,302 4.0 58,504 4.0 71,133 4.0 78,474 4.0 79,441 25,466 2.2 43,878 3.0 711133 4.0 781474 4.0 79441 758,537 65.5 854,902 58.5 _ 949,167 53.4 1,025,162 52.3 1.033:166 10.8 1.5 9A 5.0 2.6 9.0 4.0 4.0 52.0 Gross Operating Profit 222,443 19.2 418,120 28.6 629,867 35.4 733,558 37.4 749,735 37.8 Fixed Expanses Insurance 45,000 3.9 45,000 3.1 45,000 2.5 45.000 2.3 45,000 2.3 Reserve for Replacement 23,151 2.0 36,565 2.5 ' 53,350 3.0 58,855 3.0 59,581 3.0 Total Fixed Expenses 68,151 5.9 81,565 5.6 98,350 5.5 103,855 5.3 104,581 5.3 Cash Flow Available for Debt Service 154,292 13.3 336,555 23.0 531,517 29.9 629.702 32.1 645,154 32.5 W I (1) Assumes utilities for transient slips are billed to users. Notes: Cost of sales ratio la to departmental revenues. All other percentages are to total revenue. These anti are expr In constant 1993 dollars and, therfore, do not reflect the Interim effects of inflation.Cff The comments and assumptions contained In this report are an Integral part of these prospective fin a w A Source: Kenneth Leventhal A Company -.4 MIAMARINA AT BAYSIDE REDEVELOPED MARINA - MANAGEMENT COMPANY OPERATED MIAMI, FLORIDA r ESTIMATED FUTURE CASH FLOW AVAILABLE FOR DEBT SERVICE AND INCOME TAXES (In Inflated dollars) t;p C.� I Revarnus Transient SNP Tranalent Slip - Day Boat Use Dry Boat - Floating Docks Emsolon Slip Permanent Sup Telephone Other knwo Total Revenues Cod of !Nabs Telephm Otter Income Total Cost of Salsa Groat Ope dit Income dam Eqmses PWW & Raleted Legal 3 Pmksekx* Management Fee Gerwel b Administrative Umes (1) AdvertWng 3 Promotion Maintenance & Repairs Total Operating Eximmses Gros Opers" Prom Fixed Expenses Ireurarrce Reserve for Replacement Total Fbed Expenses Cash Flow Awllabk for Debt Swvks It" lttt lttt 1t000 Mount Ratio Ratio NnwuM Ratio Arnount Rated Amount Ratio Anwint Rath $739,036 50.8% $989,654 57.8% $1,274.682 58.9% $1,499,253 00.4% S1,591,044 00.9% 104,TIT 8.0 164,043 9.8 228,619 10.5 262,471 10.6 272,970 10.4 108,933 8.4 171,762 Wo 243,981 11.3 279,573 11.3 290,756 11.1 109,213 8.4 113,582 6.6 118,125 5.5 122,850 4.9 127,TS4 4.9 0 0.0 0 0.0 0 0.0 0 0.0 0 0.0 92,379 7.1 104,615 6.1 115,460 5.3 122,388 4.9 127,284 '4.9 147,807 11.4 187,383 9.8 184,737 8.5 195,821 7.9 203,654 7.8 1,302,065 100.0 1,711,039 100.0 2,163,603 100.0 2,482,355 100.0 2,613,471 100.0 87,700 95.0 96,245 92.0 103.914 90.0 110,149 90.0 114.555 90.0 110.6% 75.0 125,538 75.0 138,552 75.0 148,888 75.0 152.740 75.0 198,618 134.4 221,783 132.5 242,467 131.3 257,015 131.3 267,295 131.3 1,103,489 84.7 1,489,256 87.0 1,921,137 88.8 2,225,341 89.6 2,346,175 89.8 341,162 20.2 372,649 21.8 387,555 17.9 422.353 17.0 439,248 16.8 19,531 1.5 25,668 1.5 32,454 1.5 37,235 1.5 39,202 1.5 138,390 10.6 168,907 9.9 202.552 9.4 226,908 9.1 238.212 9.1 78,125 6.0 94,107 5.5 108,160 5.0 124,118 5.0 130,674 5.0 39,063 3.0 47,909 2.8 56,254 2.6 64,541 2.6 67,950 2.5 156,250 12.0 171,104 10.0 194,724 9.0 223.412 9.0 235.212 9.0 52,083 4.0 68,442 4.0 86.544 4.0 99,294 4.0 104,539 4.0 28,60 2.2 51,331 3.0 86,544 4.0 99,294 4.0 124,539 4.0 853,251 65.5 1,000,114 58.5 1,154,607 53.4 1,297,156 52.3 1,359,575 52.0 250,218 19.2 489,142 28.6 766,329 35.4 928,184 37.4 9861600 37.8 50,619 3.9 52,644 3.1 54,749 2.5 56,939 2.3 59.217 2.3 26,042 2.0 42,776 2.5 64,908 3.0 74,471 3.0 78,404 3.0 76,661 5.9 95,420 5.6 119,657 5.5 131,410 5.3 137, 1 5.3 173,558 13.3 393,722 23.0 60 672 29.9 798,774 32.1 8o WN 32.5 (1) Assumes utilities for transient slips am bided to users. cff Notes: Cost of sales ratio Is to departmental revenues. All other percentages are to total revenue. Ive na cal a n I dollars and therfore, do Include the Interim effects of Inflation. The comments aril assumptions contained In this report are an Integral part of these pros 1 one Source: Kenneth Leventhal a Company MAAAARINA AT SAYS= REDtVELOM AAARINA M M, FLORIDA A111111111101tIPTION AND REVENUE ANALYSIS (In constant 1003 dollars) 19M 1M7 It" Tt1Mn1�Mt Rassnua Anslysla Rental RatdLknaer FoctfDay Represses aft Bat length R.oay Number of Sklps Edl naked Oooupled ft Nights Estkneted Trenelent Sop Revenues TMVMWA S11p - Zky most Use Average 9" AvsNeblsiay CYdealay (Mandey-Fric!") C?'clas0ey (Saturday - may) Occupancy (Mandsy - F►b+y) Oompency (Saturday -may) EdkndW Day BablWeak (Mon - Fri) Esanntad Day B eftlWeek (Sat - Sun) Estknetad Annual ay Bosh Rental Rd&Vsy Boat Wh wats9 TrieWent slipOsy Boat Revenues 19" 2000 $1.00 $1.10 $1.20 $1.25 $1.25 40 43 46 49 50 $0.00 $47.30 $55.20 $61.25 $62.50 100 100 100 100 100 45% 49% 52% 53% 53% 16,425 171885 18,980 19.345 19,345 $557,000 5845,961 51,047,6% 51,184,881 $1.209,063 55 51 48 47 47 1 1 1.25 1.25 1.25 2 2.5 3 3.5 3.5 25.0% 30.0% 33.0% 35.0% 35.0% 85.0% 87.5% 90.0% 90.0% 90 0% 89 77 99 103 103 187 223.125 259.2 296.1 296.1 13,299 15.581 18,626 20,743 20,743 $7.00 $9.00 510.00 $10.00 510.00 $03,093 5140,225 $186.264 $207,435 $207,435 Day mat Remus Anaysh Linear Fast Avell" I A02 Representative Bat length 28 Day Boat CepacRy 57 Cyctesfay (Mm* - Fey) 1 Cycleday (Saturday - Sunday) 2 Occupancy (►day - Friday) 25.0% 0ocy (fin aY - Sunday) 85.0% Estknoted Day BostsWeek (Mon - Fri) 72 Estmated ay BostsWeek (Set - Sun) 195 Esth. Annual ay Hosts 13,834 Rental RalefDay Bat 57.00 Esil., Day Bost Revenues W6,841 broom► Flshlrrg moat Remus AnaWs Rental Rateflkrear Foot/Day $0.19 Slip length 40 Revenuel811p/Yesr $2,774 Number of Sips 35 Estknaled Exnxxalon Slip Revenues $97,090 Kwwrslon IPantief DockW Remus Rental RateOLInser Fool/Day SO. oo Paralm Dockage (pnser Ibat) 162 Eatkneted 9curslon Slip Revenues SQ Ferry most ftralla) Dockage Remus Rental Rate/Lineer FoolfDey $0.00 PeraN Dockage Mieer fed) 58.5 Estmated Ferry foal SHA Revenues SO .� Wder Text Dockage Remnue 00 Rental RsteA.hw Foot/Day $0.00 Pang" Dockage (linear fed) 63 Estimated Water Taxl Slip Revenues So s Source: Kenboventhel & Compeny 1,002 1,e02 1,602 1,602 30 31 32 32 53 52 50 50 1 1.25 1.25 1.25 2.5 3 35 3.5 30.0% 33.0% 35.0% 35 0% 87.5% 90.0% 90.0% 90.0% 80 107 110 110 234 279 315 315 18,314 20,053 22.095 22.095 $9.00 $10.00 $10.00 $10.00 $146,823 $200,534 $220.951 $220,951 $0.19 $0.19 50.19 $0.19 40 40 40 40 52,774 $2,774 $2,774 $2.774 35 35 35 35 597,090 $97,090 $97,090 597,090 $0,00 $0.00 $0.00 $000 162 162 162 162 so SO $0 $0 $0.00 $0.00 $0.00 S0,00 58.5 58.5 58.5 58.5 SO $0 $0 SO $0.00 $0 00 $0.00 $0.00 63 63 63 63 SO SO $0 so to MIAMARINA AT BAYSIDE REDEVELOPED MARINA MIAMI, FLORIDA PAYROLL EXPENSE ANALYSIS - AVERAGE CITY WAGE SCALE (in constant 1993 dollars) ` Year 1 Year 2 Year 3 Year 4 Year 5 Selary/Person Number Total Salary Number Total Salary Number Total Salary Number Total Salary Number Total Salary Division Head (1) 14,500 1 $14,500 1 $14,500 1 $14,500 1 $14,500 1 $14,500 Manager - Exempt $38.750 1 $38,750 1 $38,750 1 $38,750 1 $38,750 1 $38,750 3ecretaWftokkeeper 24,900 1 24,900 1 24,900 1 24,900 1 24,900 1 24,900 Front Desk Supervisor 24,900 1 24,900 1 24,900 1 24,900 1 24,900 1 24,900 CashlerICMrk 22,600 1 22,600 1 22,600 1 22,600 1 22,600 1 22,600 Cashier/Clerk - Relief 18,080 1 18,080 1 18,060 1 18,080 1 18,080 1 18,080 Lead Dock Attendant 27,550 1 27,550 1 27,550 1 27,550 1 27,550 1 21,550 Dock Attendants 23,750 5 118,750 6 142,500 6 142,500 7 166,250 7 166,250 Relief Dock Attendants 9,500 2 19,000 2 19,000 2 19,000 2 19,000 2 19,000 Ticket Collector 22,600 2 45,200 2 45,200 2 45,200 2 45,200 2 45,200 Rellef Ticket Collector 9,040 1 9,040 1 9,040 1 9,040 1 9,040 1 9,040 Maintenance Person 19,350 1 19,350 1 19,350 1 19,350 1 19,350 1 19,350 Subtotal 18 $382,620 19 $406,370 19 $406,370 20 $430,120 20 $430,120 Payroll Taxes & Benefits -Part time $4,727 $4,727 $4,727 $4,727 $4,727 (10.25%) Payroll Taxes & Benefits -Full Time 124,673 133,473 133,473 142,272 142,272 (37.05%)` Total Estimated Payroll Expenses $512,021 $544,570 $544,570 $577,119 $577,119 (1) Reflects 1/3 of salary Hourly DaysNYeek Hours Rate Salary Relief Schedule Dock Attendant 2 8 $11.42 $9,500 Cashier 4 8 $10.87 $18,080co I co Ticket Collector 2 8 $10.87 $9,040 l o D Marioer - Exempt Secretary/Bookkeeper Front Desk Supervisor Cashier/Clerk Cashier/Clerk - Relief Lead Dock Attendant Dock Attendants Relief Dock Attendants Ticket Collector Relief Ticket Collector Maintenance Person Subtotal Payroll Taxes & Benefits (22%) MIAMARINA AT BAYSIDE REDEVELOPED MARINA - MANAGEMENT COMPANY OPERATED MIAMI, FLORIDA PAYROLL EXPENSE ANALYSIS (in constant 1993 dollars) 19" 1997 1998 19" 2000 Salary/Person Number Total Salary Number Total Salary Number Total Salary Number Total Salary Number Total Salary $35,000 1 $35,000 1 $35,000 1 $35,000 1 $35,000 1 $35,000 25,000 1 25,000 1 25,000 1 25,000 1 25,000 1 25,000 20,800 1 20,800 1 20,800 1 20,800 1 20,800 1 20,800 15,600 1 15,600 1 15,600 1 15,600 1 15,600 1 15,600 13,300 1 13,300 1 13,300 1 13,300 1 13,300 1 13,300 15,600 1 15,600 1 15,600 1 15,600 1 15,600 1 15,600 12,500 5 62,500 6 75,000 6 75,000 7 87,500 7 '87,500,:. 5,000 2 10,000 2 10,000 2 10,000 2 10,000 2 10,00d 12,500 2 25,000 2 25,000 2 25,000 2 25,000 2 25,000 5,000 1 5,000 1 5,000 1 5,000 1 5,000 1 5,000 20,800 1 20,800 1 20,800 1 20,800 1 20,800 1 20,600 181,100 17 $248,600 18 $261,100 18 261, 100 19 $273,600 19 273,600 Total Estimated Payroll Expenses 54,692 57,442 57,442 60,192 60,192 $303,292 $318,542 $318,542 $333,792 $333,792 AFT CITY OF MIAMI MIAMARINA AT BAYSIDE ESTIMATED TOTAL CONSTRUCTION COST Hard Costs Dock and Piling Construction Hydrological and Utility Costs Other Construction & Redevelopment Total Hard Costs Plus: Hard Cost Contingency Factor (10% of total hard cost) Total Estimated Redevelopment Hard Costs Total Soft Costs Total Estimated Costs Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation 16 $1,682,165 1,959,900 389,650 4,031,715 403,172 4,434,887 313,908 $4, 748, 795 1 DRAFT 93- 782 1 CITY .oF MIAMI MIAMARINA AT BAYSIDE ESTIMATED CONSTRUCTION COST DOCK AND PILING CONSTRUCTION Transient Docks A Dock (6 slips) B Dock (22 slips) C Dock (41 slips) D Dock (31 slips) Total Transient Dock Construction Costs Floating/Excursion Docks Floating Docks Excursion Docks Finger Piers Deck and Walkway Improvements Total Floating/Excursion Dock Costs Total Dock and Piling Construction Costs Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation $24,680 366,075 415,630 337,510 1,143, 895 486,270 42,000 10,000 538,270 $1,682,165 DRAFT s 93— 782 CITY OF MIAMI MIAMARINA AT BAYSIDE ESTIMATED CONSTRUCTION COST HYDROLOGICAL SOLUTIONS AND UTILITIES Fire Protection System $157,100 Domestic Water 136,200 Electrical (Docks Only) 576,200 Retrofit of Upland Electric Systems 96,975 Phone/Cable 83,800 Jet System/Debris Control (Bubbler) 22,125 Dodge Island Wave Baffle 497,500 B Dock Wave Baffle 390,000 Total Hydrological & Utility Costs $1,95%900 Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation /Y DRAFT 93- 782 MIAMARINA - DESIGN PERMITTING AND CONSTRUCTION SCHEDULE 0. bescriplion Y E A R 1 _Y F A R 2 1 2 3 4 6 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 341 TESTING AND FIELD SURVEYS Topographic Survey BathymetrIc; Survey Soil Borings PLANS AND SPECIFICATIONS Preliminary Plans Coord. Plan w/Agencles & Contractor Committee Review Plan & Results Final Plans Prepared Committee Reviews Final Plans Prepare General Specs Committee Reviews Specs Prepare Technical Specs List of Qualified Contractors Committee Approves Bid & List City Commission Approval PERMITTING AND APPROVALS Pre -Application Meetings Prepare and Submit Applications Meet with Agencies Field Investigations (if required) Permit Response I Permit Response 2 (if req.) Permit Response 3 (if req.) Issue Permits BIDDING & CONSTRUCTION SUPER. Pre -Bid Meeting Contract Questions Review Bids & Award City Commission Approvals Pre Construction Meeting Project Contstruction Construction Observations & Admin. Fl* A2eroval To Be So 20 phic Sury By hymetricSiurvey I Bo ins ractc rs Pr liminary Flansi Co Co )rd. Tian iAG enci s & Con, nmit ee evie w PI n & Res Its. Final Co Prepare Pl-, ins F repp -ed mil ee $evle Ns F inal 3Ian ., General Spe-,s Co nmit ee evi ws Spe Pr pare Technical Specs Lis Co of :Iualffied on actors . . . . . . . . . . . . . ....... irimit ee iTpr yes I W & List MR. cit, f Col rimls flon, %ppr val Pr Pr Application N eetIrIgs are and Sutmit \ppll,.atiols Met w th A genc as 3 Pei Id In iesti latioi is (I req ifired if rel.) mit les lRes rise ns Pe E Pe M" It Re Pe ons t mit 2 2--lif esponse e rel:)__..__. 3 s e Permis Pr E -Bid Me E ling wg�ii Coitrac Review citif Qu3stions Comis P r e Bids - : Cor & sion strudtion and Approva ls Mee Ing 5! !Inl CITY OF MIAMI MIAMARINA AT BAYSIDE ESTIMATED CONSTRUCTION COST SOFT COSTS Topographic Survey Bathymetric Survey Permitting Costs Soil Borings Permitting Fees Architectural & Engineering (1) Total Soft Costs $8,000 5,000 25,000 10,000 25,000 7.5% 240,908 $313,908 (1) Full service fee through construction excluding floating dock costs. Does not include city allocation for management. Amount is net of $25,000 allocated to Permitting Fees. Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation U.- 'DRAFT 93- 782 CITY OF MIAMI MIAMARINA AT BAYSIDE ESTIMATED CONSTRUCTION COST OTHER CONSTRUCTION AND REDEVELOPMENT COSTS (UPLAND) General Signage Pier 5 Retrofit Service Buildings Furniture, Fixtures & Equipment Pier Park Edge Total Other Construction Costs Source: Kenneth Leventhal & Company Wallace Roberts & Todd International Marina Resources, Inc. Coastal Technology Corporation $15,000 22,650 141,000 25,000 186,000 $389,650 DRAFT' 93- 782 I Of