Loading...
HomeMy WebLinkAboutR-93-0663a J J-93-680 10/4/93 RESOLUTION NO. 9 663 A RESOLUTION AUTHORIZING AN INCREASE IN AN AMOUNT NOT TO EXCEED $8,130, IN THE CONTRACT BETWEEN THE CITY OF MIAMI, FLORIDA AND SHORELINE FOUNDATION, INC., DATED DECEMBER 16, 1992, FROM $30,638.00 TO $38,769.00, FOR ROBERT KING HIGH PARK - BRIDGE REPAIRS, B- 2950, CAPITAL IMPROVEMENT PROJECT NO. 331315, WITH SAID FUNDS TO BE PROVIDED FROM THE CAPITAL IMPROVEMENTS ORDINANCE NO. 10938 FROM FUNDS PREVIOUSLY APPROPRIATED TO THE PROJECT; FURTHER, RATIFYING THE CITY MANAGER'S WRITTEN FINDING THAT THE HEREIN INCREASE RESULTED FROM EMERGENCY CIRCUMSTANCES BY AN AFFIRMATIVE VOTE OF FOUR -FIFTHS OF THE MEMBERS OF THE CITY COMMISSION. WHEREAS, there exists a contract dated December 16, 1992, between the City of Miami, Florida and Shoreline Foundation, Inc. for construction of Robert King High Park Bridge Repairs, B-2950, Capital Improvement Project No. 3313315; and WHEREAS, an increase in the contract, not to exceed $8,130, is required to cover the cost of necessary extra work involving the installation of additional steel channels, steel brackets, sub -deck wood timbers, concrete support, and asphaltic pavement; and WHEREAS, the Director of Public Works, the Director for Parks and Recreation and the City Manager recommend the increase in contract to cover the additional costs; and CITY C0Ib9GSSI0jC MEETING OF 0 CT 14 1993 Revolution No, 93- 663 WHEREAS, the City Manager has made a written finding that a valid emergency exited for the work to continue to protect the health, safety, and welfare of the citizens of the City; and WHEREAS, funds to cover the increase are available from monies already appropriated to the project; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. After a duly advertised Public Hearing, the findings of the City Manager set forth in the Preamble to this Resolution are hereby ratified by an affirmative vote of four - fifths of the City Commission, and are hereby incorporated by reference thereto and adopted as if fully set forth in this Section. Section 2. The contract between the City of Miami, Florida, and Shoreline Foundation, Inc., dated December 16, 1992, for Robert King High Park Bridge Repairs B-2950, Capital Improvement Project No. 331315, is hereby increased in an amount not to exceed $8,130, from $30, 638.00 to $38,768.00, with funds for the increase to be provided from monies previously appropriated to the project. Section 3. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 14th Y MATTY HIRAI, CITY CLERK -2- _ day of October , 1993. XAVIER SUAREZ MAYOR 9 3- 663 e 4, SUBMITTED BY: CAPITAL. PROVEMENT PROJECT REVIEW DEPARTMENT �OF PUBLIC WORKS CAPITA IMPROV ENT ADMINISTRATOR PREPARED AND APPROVED BY: APPROVED AS TO FORM AND CORRECTNESS: III - CARMEN _, LEON- j A4& ASSISTANT CITY ATTORNEY CITY ATTO # - 3 - 93- 663 CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM �3 TO Honorable Mayor and DATE OCT Q o 1993 F,LE Members of the City Commission SUBJECT Robert King High Park Bridge Repairs Increase In Contract oage FROM C e s ai o REFERENCES City(r ENCLOSURES RECOMMENDATION: It is respecttully recommended that the City Commission adopt the attached Resolution authorizing an increase in the contract between Shoreline Foundation, Inc. and the City of Miami for Robert King High Park Bridge Repairs in the amount of $8,130; and further ratifying the City Manager's written finding that the increase resulted from emergency circumstances. BACKGROUND e Department of Public Works, in an effort to serve all residents of the City of Miami, has determined that it is now appropriate and in order for the City Commission to ratify the City Manager's decision to increase the contract6dated December 16, 1992 between the City and Shoreline Foundation, Inc. for construction of Robert King High Park - Bridge Repairs B-2950 in the amount of $8,130 for necessary extra work, and to ratify the City Manager's emergency finding that allowed the extra work to continue. The City Commission awarded a contract to Shoreline Foundation, Inc. for the construction of Robert King High Park - Bridge Repairs, Project No. 331315, in the amount of $30,638 on December 10, 1992. Generally, the project consisted of constructing miscellaneous structural repairs and modifications at the Robert King High Park bridge located at 7025 West Flagler Street. As the construction progressed, some unexpected conditions and problems were discovered that required immediate remedial action. These problems were directly related to the severe deterioration of the bridge and are outlined below: 1. Extension of steel channel to the pedestrian bridge to provide more support for a deteriorated section. 2. Replacement of four 3" x 12" P.T. wood sub -deck timbers with new 3" x 12" timbers due to excessive deterioration discovered after stripping the existing surface. 3. Fabrication of one steel bracket for support assembly.) �t' 93- 663 Honorable Mayor and Members of the City Commission Page 2 4. Remobilization of equipment due to further collapse of the base at the south asphalt approach. 5. Construction of one concrete support at south approach to bridge. 6. Installation of additional 1" thick hot -mix asphalt ! paving to replace existing deteriorated paving. It was decided that the most cost effective and expeditious manner to address all of the above problems was to allow Shoreline Foundation, Inc. to proceed with the extra work and complete the construction of the bridge repairs as soon as possible. Failure to expeditiously correct the aforementioned problems could have endangered the health, safety and welfare of our citizens. N Funds for the increase in contract are available from monies already appropriated to the project in the City's Capital Improvement Appropriation Ordinance, Project No. 331315. 33- 6�3 CITY OF MIAMI. FLORIDA INTEROFFICE MEMORANDUM .o File : February 1. 1993 FU : 8-295C &MMrCT; EMERGENCY FINDING Robert King High Park Bridge Repair3-INCREASE in Project Scope aOM IIEEEIIlNCEa , Cesar H. Odio City Manager VCLOGUM : Based on information supplied to me by the Director of the Department of Public Works, I have found that an emergency existed justifying the authorization for Shoreline Foundation, Inc. to undertake additional work at Robert King High Park Bridge Repairs project beyond the original scope of their contract. 4. The reasons for th,e emergency need and subsequent authorization to perform additional work are as follows: The City Commission awarded a contract to Shoreline Foundation, Inc. for constructing miscellaneous structural repairs and modifications to Robert King High Park Bridge in the amount of $30,638 on December 10, 1992. While proceeding with the repairs of the bridge, -several problems were discovered that required immediate remedial notion specially because some of the problems were due to the severe deterioration of the bridge. The additional work is outlined below: 1. Extension of steel channel to the pedestrian bridge to provide more support for a deteriorated section. 2. Replace four 3" x 12" P.T. wood sub -decking with new 3" x 12", 0.60 retention #2 grade timbers due to excessive deterioration discovered after stripping surface. 3. Fabrication of one steel bracket for support assembly. u. Remobilization of equipment due to further collapse of the base at the south asphalt approach. S. Construction of one concrete support at south approach to bridge. 6. Install additional 1" hot -mix asphalt paving. The total amount of the additional work (Increase in Contract) in. $8,130.00. Funds for the increase are available from monies already appropriated to the project in the City's Capital i Improvement Appropriation ordinance No. 10938, Project No. j 331315. cc: Eduardo Rodriquez, CIP Manager Dianne Johnson, Parks Department 0 - 2 - 93- C63