HomeMy WebLinkAboutR-93-0221J-93-210
RESOLUTION NO.930" 221
A RESOLUTION ACCEPTING THE BID OF EXPRESS
CONCRETE, INC., IN THE AMOUNT NOT TO EXCEED
$35,972.00, TOTAL BID OF THE PROPOSAL, FOR
CITYWIDE SIDEWALK REPLACEMENT PROJECT (FEMA)
H-1032; WITH MONIES THEREFOR ALLOCATED FROM
THE FEDERAL EMERGENCY MANAGEMENT AGENCY
(FEMA) IN THE AMOUNT OF $20,972 TO COVER THE
CONTRACT COST PLUS ANY ACTUAL FEMA
REIMBURSEABLE DESIGN AND ENGINEERING
EXPENSES, AND FROM THE FISCAL YEAR 1991-92
CAPITAL IMPROVEMENT ORDINANCE NO. 10938,
PROJECT NO. 341178 IN THE AMOUNT OF $15X000;
AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT
WITH SAID FIRM, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY.
WHEREAS, sealed bids were received on March 26, 1993, for
CITYWIDE SIDEWALK REPLACEMENT PROJECT (FEMA) H-1032; and
WHEREAS, the City Manager and the Director of the Department
of Public Works recommend that the bid from Express Concrete,
Inc., be accepted as the lowest responsible and responsive bid;
and
WHEREAS, the Federal Emergency Management Agency (FEMA) has
identified a portion of the sidewalk within the City as hurricane
damaged; and
WHEREAS, monies for the replacement of that hurricane
damaged sidewalk shall be reimbursed to the City by FEMA; and
WHEREAS, additional non -hurricane damaged sidewalk has been
identified as requiring replacement; and
WHEREAS, the Fiscal Year 1991-92 Capital Improvement
Ordinance No. 10938, as amended was adopted on December 5, 1991, ?tr
and monies are available for the proposed non -hurricane related
�F1
portion of the contract under Project No. id
11't commuIQn
Ordinance, lift7wo OF
R } �
9='
n
n
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
Section.
Section 2. The March 26, 1993 bid of Express Concrete,
Inc., in the proposed amount of $35,972, for the project entitled
CITYWIDE SIDEWALK REPLACEMENT PROJECT (FEMA) H-1032 for the total
bid of the proposal, based on lump sum and unit prices, is hereby
accepted at the price stated therein.
Section 3. The amount of $20,972 to cover contract costs
plus any FEMA actual design and engineering expenses will be
reimbursed to the City by the Federal Emergency Management Agency
(FEMA). The construction cost of $15,000 is hereby allocated
from the Fiscal Year 1991-92 Capital Improvement Ordinance No.
10938, Project No. 341178.
Section 4. The City Manager is hereby authorized to enter
into a contracty on behalf of the City of Miami with Express
Concrete, Inc., for CITYWIDE SIDEWALK REPLACEMENT PROJECT (FEMA)
H-10 32, total bid of the proposal.
Section 5. This Resolution shall become effective
immediately upon its adoption.
The herein authorization is further subject to compliance with
all requirements that may be imposed by the City Attorney,
�a
including but not limited to those prescribed by applicable
City Charter and Code provisions,
93 221
J0-N
PASSED AND ADOPTED this 15th day of April , 1993.
LEGAL REVIEW BY:
ASSISTANT CITY AT T RNEY
APPROVED AS TO FORM AND CORRECTNESS:
J S I
CITY ATTORly
CAPITAL PROJECT:
D R
CIP P T M NAGS
SUBMITTED BY:
�,, e,
L".
WALDEMAR'E. LEE, DIRECTOR
DEPARTMENT OF PUBLIC WORKS
CITY OF MIAMI, PLORIDA
} INTMOPPICE MEMORANDUM CAW5
To. Honorable Mayor and Members DATE. �t�►'^• F,�E H-1032 =
j of he City Commission APR 393
Resolution Awarding Contract
susJEcr: for the CITYWIDE SIDEWALK —
REPLACEMENT PROJECT (FEMA)
FROM Ce S d r H• Od i o REFERENCES .
City Manager
ENCLOSURES: -
RECOMMENDATION It is respectfully recommended that the City Commission adopt the
attached resolution accepting the low bid of Express Concrete, Inc.,
a company located within Dade County and within the City of Miami,
for CITYWIDE SIDEWALK REPLACEMENT PROJECT (FEMA) H-1032, received
March 26, 1993 in the amount of $35,972, Total Bid; authorizing the
City Manager to enter into a contract an behalf of the City.
BACKGROUND
Amount of Bid: $35,972 % of Cost Estimate: 104%
Cost Estimate: $34, 500.00
Source of Funds: Federal Emergency Management Agency (FEMA):
$20,972, and 1991-92 C.I.P. Ordinance 10938
Project 341178: $15,000
Minority Representation: 97 invitationa mailed
13 contractors picked up plans & specs
(4 Hispanic, 4 Black, 0 Female)
3 contractors submitted bids
(1 Hispanic, 2 Black, 0 Female)
Public Hearings/Notices: Bid notice published.
Assessable Project: No
Discussion: The Department of Public Workshas evaluated the bids
received on March 26, 1993, and determined that th.e lowest
responsible and responsive bid, in the amount of .$35,972 is from
Express Concrete, Inc., a black -minority controlled corporation.
Funds are available to cover the contract cost, and for such
incidental items as postage, blueprinting, advertising, and
reproduction costs from reimbursement to the City by the Federal t `"
Emergency Management Agency (FEMA) and Capital Improvement Funds.
— 4
i'AtUBL[C WORK9 b!?wRiMF,n � = i
FAC` r sHar
HURRICANE ANDREW RECOVERY CONSTRVCnON PROJECn 03/29
DATE r r I"s
job s: H-1032
PRoj=mAmrj CITYWIDE SIDEWALK REPLACEMENT PROD. (F
DSR 0. *
LOCATION: C i t wide
TYPg
PROJECT MANAGER: TOM WaMM C rt
INSURANCE
ASSOCIATED DEPARTMENT:
RESOLUTION I:
ADOPT®
IUD REQUEST: EM FORMAL E=�Nmwu EMERGENCY
DESCRIrrION: d replacement
of sidewalk damaged by Hurricane
Andrew as identified by the Federal Emergency Management Agency
non-hurricanea
ed sidewalk will be removed and replaced
under C.I.P. Project 341178.
* 29117 29116, 29108, 29107, 29103, 07772, 03061, 29115, 0 , ,
03093, 059762, 28607, 059741,
05974U, U59737, ' 28611,
03100 03103
a�areA�v caMn+Nu[awtwt
SCOPE or SERVICES:
CITY OLFISM Mr. AMOUNT ( %oA'ODNff:C'DSs
AWt AMd
DESIGN / ENGIXEERIrtG / atrllM • � * * �` �
I1LUZP1RtNTWG AND ADVERTISING • S �l
CONSTRUCTIQi! 35,972
CONST. INSP. & MANAGEMENT • EZJ Q I
r•�rrM s..+...r wu
OTAER Q (61
• AW sal W mwaknoAb dnir &W w~q@ gorNaa TOTAL f R
CONTRACTOIM INrORnMATIONi
Goer ®
NM• MIweMF
Too of WNW concrete
M
Yore of lstSIDUSIM Ms 14 years
Lies T9 7 1 i n S
N. Express Concrete-
A"nm DDVD H.W. 11 Avenue
Inc. T*bpbm _ 5_ 3 0418
P . 33142
CLAW jo err POA%W so"
CA~ Poems
ANIMONIV: o xAac X~AfW 1.Row
*Construction funding
SUN-CONTRAiI'TOR
FEMA Reimbursement - $20, 972
C.I.P. #341178 - 11hQ00
New
Total - $35,972
** This figure will be reimbursed
based on actual expense..
•-w
Mnuiw w rr�e was.e�
93- 221
MA -
TABULATION OF BIDS FOR
CITYWIDE SIDEWALK REPLACEMENT PROD.(FEMA) -1 S .
NOW
COIJC.. INC.
F 0 L C048T., INC.
J CONST CORP.
AM=
am NN 17 AY.
A8A8 S.N. 75 AY.
99 MN 183 ST-
LOCATED IN CITY OF MIAMI
Y
N
N
Lieensed i Insured se Per CltY Cede B Metro Ord.
Y 11
Y
Y
Did Bond Aeount
llV
My
Irregularities
N
Minwityt Owwd
Y
Y
Y
B�l.4s
D�.eo
77.7aa.00
IRREGULARITIES LEGEND
A — No Pousr-ef-Attornayr
D 8—No Affidevit ee to Cavite] A sarvlus Of la+dino CMNV It has been detereined by the Oepartunt of Public Morke
C—QhVnted Eats IOM that the lowest responsible and responsive bidder is
0—Pr000eel unsigned or IaproWlyr Signed or No corporate sael Express concrete. Inc. In the amount of ; .1% 972.00.
E_
6 - UWvW aid land
3 2 3
H - Cor'acted Ind
6C� Ms OIIpliests Did ProposeI BID w-se-ow
'lam - -