Loading...
HomeMy WebLinkAboutR-94-0284J-94-304 4/12/94 RESOLUTION NO. 9 4- 2 8 4 A RESOLUTION, WITH ATTACHMENTS, AUTHORIZING THE CITY MANAGER TO EXTEND THE CONTRACT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH MET CONSTRUCTION, INC., TO COMPLETE THE CENTRAL PLAZA IN THE SOUTH END OF MILDRED AND CLAUDE PEPPER BAYFRONT PARK; FURTHER AUTHORIZING THE CITY MANAGER TO INCREASE SAID CONTRACT IN AN AMOUNT NOT TO EXCEED $35,000; ALLOCATING FUNDS THEREFOR FROM CAPITAL IMPROVEMENT PROGRAM FUNDS. l WHEREAS, the Bayfront Park Management Trust (the "Trust") has managed the Mildred and Claude Bayfront Park (the "Bayfront Park") with the goal of ensuring maximum community participation; and WHEREAS, the completion of the South End of Bayfront Park will greatly enhance the enjoyment of Bayfront Park, Miami's Jewel by the Bay, by Miami's residents and visitors; and WHEREAS, Met Construction is presently completing work on the South end of Bayfront Park; and WHEREAS, completion of the South End Plaza located in Bayfront Park by Met Construction will save the City of Miami and the Trust the mobilization fees normally associated with major construction projects; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: �� '�` �'W (a .,'��t to ri �:� •�� .w.i' CITY COMMISSION MEETING OF APR 1 4 1994 Resolution No. 94- 284 Section 1. The recitals and findings set forth in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. The City Manager is hereby authorized/ to extend the existing contract, in a form acceptable to the City Attorney, with Met Construction to complete the Central Plaza in the south end of Mildred and Claude Pepper Bayfront Park, based on the attached specifications and budget, and is further authorized to increase said contract in an amount not to exceed $35,000, with funds therefor hereby allocated from Capital Improvement Program Funds. Section 3. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 14th day of April 1994. a '( � J-�Pat ATTEST' S EPHEN P. C ARK, MAYOR MATTY HIRAI, CITY CLERK PREPARED AND APPROVED BY: - ',�# P(4e, G. MIRIAM MAER CHIEF ASSISTANT CITY ATTORNEY GMM/jn/osk/M4265 APPROVED AS TO FORM AND CORRECTNESS: A. QU N JO E , TII CITY TTO The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. -2- 94- 284 04-08-1994 12:59 305 358 1211 SAVF°RONT PARK MONT TRUST ,1 MET CONSTRUCTION't INC. April 1, 1994 Mr. Allan Poms City Of Miami Department of Public Works 275 N,W. 2 Street Nfsami, F1 33128 Re: . Bayfront Park Redevelopment. South End Phase I Project No. B-2987 . We are please to submit the following quotation for the plaza slabs. P.12 406 NORTHWRST 64TH STREET MIAM, FLORIDA 38127 (305) 757.91504 FAX-757.4031 Letter No. 22 Install a concrete slab 6"• thick with a #30 pad @ 12" x 12" and a 2' x 2' pad of #50 over each jile. 2270 $5.00 er $11,390.00 ��yy 4 rn �j� �r�17 s Install a concrete slab 6" thick with a 430 pad Ga 12" x 12". 1023 $4.80 •er t $4,910100 -STAIRS t 235 17.00 er Cb $3.995.00 PL-VA BI1VG - . r ,+ , Install two floor drains with 4" pipes connected to a 6" catch basin pipe. $1,200.00 Install one Type "D" 3 5 " x 54" precast concrete manhole with cast iron frame and crate (CC,B.) $3,500.00 Install 220' of 12" PVC double walled pipe from C.B, #4 to C.B. #8 2201 @ $12, 00 ,per foot $2,640.00 Subtotal $27.635.00 15% Overhead $4,145.25 Subtotal $31,790.25 1 Mo Profit $31178.02 Total The total coat for this quotation is THraTY-Fovit TSQVBAND rTaN$ HUNDBtED FIFVY-EIGHT Dox LAiga Argx) 27 CENTS ($84,93S.27) Sincerely, N1ET CONSTRUCTION, INC. James R. Bergrab Superintendent Approved: Date; 94- 284