RESOLUTION NO. 9 4- 2 8 4
A RESOLUTION, WITH ATTACHMENTS, AUTHORIZING
THE CITY MANAGER TO EXTEND THE CONTRACT, IN A
FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH
MET CONSTRUCTION, INC., TO COMPLETE THE
CENTRAL PLAZA IN THE SOUTH END OF MILDRED AND
CLAUDE PEPPER BAYFRONT PARK; FURTHER
AUTHORIZING THE CITY MANAGER TO INCREASE SAID
CONTRACT IN AN AMOUNT NOT TO EXCEED $35,000;
ALLOCATING FUNDS THEREFOR FROM CAPITAL
IMPROVEMENT PROGRAM FUNDS.
l
WHEREAS, the Bayfront Park Management Trust (the "Trust")
has managed the Mildred and Claude Bayfront Park (the "Bayfront
Park") with the goal of ensuring maximum community participation;
and
WHEREAS, the completion of the South End of Bayfront Park
will greatly enhance the enjoyment of Bayfront Park, Miami's
Jewel by the Bay, by Miami's residents and visitors; and
WHEREAS, Met Construction is presently completing work on
the South end of Bayfront Park; and
WHEREAS, completion of the South End Plaza located in
Bayfront Park by Met Construction will save the City of Miami and
the Trust the mobilization fees normally associated with major
construction projects;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
�� '�` �'W (a .,'��t to ri �:� •�� .w.i'
CITY COMMISSION
MEETING OF
APR 1 4 1994
Resolution No.
94- 284
Section 1. The recitals and findings set forth in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
Section.
Section 2. The City Manager is hereby authorized/ to
extend the existing contract, in a form acceptable to the City
Attorney, with Met Construction to complete the Central Plaza in
the south end of Mildred and Claude Pepper Bayfront Park, based
on the attached specifications and budget, and is further
authorized to increase said contract in an amount not to exceed
$35,000, with funds therefor hereby allocated from Capital
Improvement Program Funds.
Section 3. This Resolution shall become effective
immediately upon its adoption.
PASSED AND ADOPTED this 14th day of April 1994.
a '(
� J-�Pat
ATTEST' S EPHEN P. C ARK, MAYOR
MATTY HIRAI, CITY CLERK
PREPARED AND APPROVED BY:
- ',�# P(4e,
G. MIRIAM MAER
CHIEF ASSISTANT CITY ATTORNEY
GMM/jn/osk/M4265
APPROVED AS TO FORM AND
CORRECTNESS:
A. QU N JO E , TII
CITY TTO
The herein authorization is further subject to compliance
with all requirements that may be imposed by the City
Attorney, including but not limited to those prescribed by
applicable City Charter and Code provisions.
-2- 94- 284
04-08-1994 12:59
305 358 1211 SAVF°RONT PARK MONT TRUST
,1
MET CONSTRUCTION't INC.
April 1, 1994
Mr. Allan Poms
City Of Miami
Department of Public Works
275 N,W. 2 Street
Nfsami, F1 33128
Re: . Bayfront Park Redevelopment. South End Phase I
Project No. B-2987 .
We are please to submit the following quotation for the plaza slabs.
P.12
406 NORTHWRST 64TH STREET
MIAM, FLORIDA 38127
(305) 757.91504
FAX-757.4031
Letter No. 22
Install a concrete slab 6"• thick with a #30 pad @ 12" x 12" and a 2' x 2' pad of
#50 over each jile. 2270 $5.00 er
$11,390.00
��yy 4
rn �j� �r�17
s
Install a concrete slab 6" thick with a 430 pad Ga 12" x 12".
1023 $4.80 •er t
$4,910100
-STAIRS
t
235 17.00 er Cb
$3.995.00
PL-VA BI1VG - . r ,+
,
Install two floor drains with 4" pipes connected to a 6" catch basin pipe.
$1,200.00
Install one Type "D" 3 5 " x 54" precast concrete manhole with cast iron frame and
crate (CC,B.)
$3,500.00
Install 220' of 12" PVC double walled pipe from C.B, #4 to C.B. #8
2201 @ $12, 00 ,per foot
$2,640.00
Subtotal
$27.635.00
15% Overhead
$4,145.25
Subtotal
$31,790.25
1 Mo Profit
$31178.02
Total
The total coat for this quotation is THraTY-Fovit TSQVBAND rTaN$ HUNDBtED FIFVY-EIGHT