A RESOLUTION ACCEPTING THE BID OF DESIGN
AWNING AND STRUCTURES, INC., IN THE PROPOSED
AMOUNT OF $169,224.00, TOTAL BID OF THE
PROPOSAL, FOR THE PROJECT ENTITLED "BAYFRONT
PARK AMPHITHEATER - CANOPY REPLACEMENT,
H-1069"; ALLOCATING FUNDS THEREFOR FROM
MONIES TO BE REIMBURSED FROM PENDING
INSURANCE CLAIMS FOR CAPITAL IMPROVEMENT
PROJECT NO. 332060, IN THE AMOUNT OF
$169,224.00 TO COVER THE CONTRACT COST AND
$16,923.00 TO COVER THE ESTIMATED EXPENSES,
FOR AN ESTIMATED TOTAL PROJECT COST OF
$186,147.00; AND AUTHORIZING THE CITY
MANAGER TO EXECUTE A CONTRACT WITH SAID FIRM.
WHEREAS, the City Commission adopted Resolution No. 92-551
on September 10, 1992, for repairing damage caused by Hurricane
Andrew and required contracts in excess of $150,000 to follow
formal competitive bid and selection procedures and be submitted
to the City Commission for award; and
WHEREAS, sealed bids were received on March 17, 1994, for
the "Bayfront Park Amphitheater - Canopy Replacement, H-1069";
and
WHEREAS, the City Manager and the Director of the Department
of Public Works recommend that the bid from Design Awning and
Structures, Inc., be accepted as the lowest responsible and
responsive bid; and
CITY COMP41SSION
NEFTIR7G OF
MAR 2 4 11194
Resolution No.
94- 202
WHEREAS, fund will be available from monies to be received
from pending insurance claims, for the proposed amount of the
contract;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
Section.
Section 2. The March 17, 1994 bid of Design Awning and
Structures, Inc., in the proposed amount of $169,224.00, for the
project entitled "Bayfront Park Amphitheater - Canopy
Replacement, H-1069", for the total bid of the proposal, based on
lump sum, is hereby accepted at the price stated therein.
Section 3. The total estimated uroiect cost of
$186,147.00 is hereby allocated from pending insurance claims for
Capital Improvement Project No. 332060. Said total project cost
consists of $169,224.00 contract cost and $16,923.00 estimated
expenses incurred by the City.
Section 4. The City Manager is hereby authorized`/ to
enter into a contract on behalf of the City of Miami with Design
Awning and Structures, Inc., for "BAYFRONT PARK AMPHITHEATER -
CONOPY REPLACEMENT, H-1069", for the total bid of the proposal.
The herein authorization is further subject to compliance
with all requirements that may be imposed by the City
Attorney, including but not limited to those prescribed by
applicable City Charter and Code provisions.
-2- t4- 202
�"44
f' it
Section 5. This Resolution shall beoome effeotive
immediately upon its adoption.
PASSED AND ADOPTED this 24th day of Mph, 1994.
ATTE STEP EN P. CLARIt, MAYOR
MATTY HIRAI
CITY CLERK
SUBMITTED BY:
WALDEMAR E. LEE, DIRECTOR
DEPARTMENT OF PUBLIC WORKS
PREPARED AND APPROVED BY:
. MIRIAM MAER
CHIEF ASSISTANT CITY ATTORNEY
GMM/as/bss/M4214
CAPITAL PROJECT REVIEW:
DUA ROD GE DIRECTOR
ASSET MANAGEMENT AND
CAPITAL IMPROVEMENTS
APPROVED AS TO FORM AND
CORRECTNESS:
!7 /
A. QU N J S, I I
CITY ATTO Y
-3-
94- 202
_&e
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO Honorable Mayor and Members DATE
of the City Commission
SUBJECT :
FROM Cesar H . Odlo REFERENCES:
City Manger
ENCLOSURES:
RECOMMENDATION
FILE: H-10 6 9
BAYFRONT PARK AMPHITHEATER -
CANOPY REPLACEMENT
It is respectfully recommended that the City Commission adopt
the attached resolution accepting the low bid of Design Awning
and Structures,• Inc., a company located outside the City of
Miami, for Bayfront Park Amphitheater - Canopy Replacement,
received on March 17, 1994. The project consist of the
furnishing of all labor; materials and equipment for the
Bayfront Park Amphitheater - Canopy Replacement. The project
is located at 301 N. Biscayne Boulevard, Miami, Florida.
BACKGROUND
Amount of Bid:
Cost Estimate:
Source of Funds:
$169,224.00
$250,000.00
% of the Cost Estimate 67.7%
Pending Insurance Claims, Project No. 332060
Invitations Mailed:
.4
Minority Representation: 9 Contractors picked up plans & specs.
(3 Hispanic, 1 Black, 0 Female)
4 Contractors submitted bids
(1 Hispanic, 0 black, 0 female)
Public Hearings/Notices: No public hearing/Bid notice published
Assessable Project:
Discussion: The Department of Public Works has evaluated the
bids received on March 17, 1994 and has determined the lowest
responsible and responsive bid, was submitted by Design Awning
and Structures, Bradenton, Florida. The project consists of
the replacement of the Hurricane damaged fabric canopies at the
Bayfront Park Amphitheater. The work is highly specialized and
requires a company experienced in fabric covered structures.
The contractor must remove the existing canopies, test and
repair the support cables and fabricated and install new fabric
coverings.
Attachment: 9 Q- 202
Proposed Resolution
a
• MAR-23-94 WED 11:20 PUBLIC WORKS FAX N0, 5796871 P. 03
FACT SKEET
HURRICANE ANDREW RECOVERY CONSTRUCTION PROJECTS
DATE : 3/ 23/ 1994
JOB*: H-1069
PROJECT NAME: BAYFRONT PARK AMPHITHMATER - CANOPY REPLACEMENT
DSRN:
LOCATION: 307 Biscayne Boulevard • Miami
CIPM 332060
PROJECT MANAGE, R:Alberto Ccrrales
S MMZ,A FARTICIPATION: C.�
A&SOCIXrED DHPAR1'h1ENT: PIUBI.IG MaKS �.
RESOIXTION N.
ADOPTED
DID REQUEST: FORMAL = INFORMAL 0 EMERGENCY
DESCRIPTION: The prolect consists of the fumishing of all labor msterlel and equipment for therelace ent of the
Sa nt Park Am hitheather canopy
gonverin a demB ed by Hurricane Andrew. The ra /acement is bCng paid for by the
C' s Insurance Company. The work Includes demolition and removal of the existing can2ey fabric coverings testln 6
repok as necessety of the existing
cable structure and comp/ate replacement of the fabric coverings Including hardware.
Of NECESSARY CONg Utl ON THE Up
SCOPE OF SERVICES:
CITY OUTSIDE EST. AMOLWr (% OF Comm COST)
PLANNING AND STUDY
Ma>L Ariowed
SPECS AND BID PROCESS
S 2 % OF (i`c)
BLUEPRINTING AND ADVERTISING
S M
CONSUUCTION (Oaaign-Bulld)
0 S 169,224.00 (BID)
CONST. INSP. & MANAGEMENT
S. 16,923.00 10 % or (BID)
McJudny Renew ofSkho
OTHER
(- S
SUBTOW $ 186,147.00 _414
Avom ror costs i 4j%
S (E)
CON77Na4NGES (6V
s
(Irc/ ESTMAM COW. Cos I-
TOTAL S 186,147.00
M INMAN
CONTRACTOWS INFORMATION:
Clan: J :_ ,# S
Non -Minority •.„' .tag:„;:
IjW ur Work:
Minority L a l
Years or &tabliahment:
Liceme CGC034923
Names Design AamkW & Structures Inc. Telephone_(813) 792-7118
Addres 3104 29th Ave,
Bradenton. Fl 34208
Contact Person: Gerald D. Mellin
SUB -CONTRACTOR
Neruea: Fie. Wire & Ridging Works
CLASS! , ^mmr P-PRows s-sum
RETURN TO PUBLIC WDRKa AFTlR SgNEDI
Ca-
OPIE... ASSIST ANT DIRECTORS, COSTANALYSIS, FILE, ASSOCIATEDDEPT CIP ADMINISTRATOR REV, 3191
U- 202
I
FORMAL BID
BAYFRONT PARK AMPHITHEATER — CANOPY REPLACEMENT
Project Nurnben H-1069 __ CIP Number: 332060
D
Project Manager: ALBERTO CORPAS hate: 0341-7/ 94-.
Person who received the bids: A. POMS Received at: ___CITY CLERK'S OFFICE. CITY HALL
Construction F.stilrltite = $ 300.000J - _. Time;., 11:00 A.M.
BTDDFR
DESIGN AWMHO & STRUCr.
BIBS?AIR, INC.
VIAW BEACS AWNfNr_ CO.
SOVEREIGN CONSf. GROUP
ADDRESS
3101i 29THI AV9. E.
BR FL. 34ZO8
0 LAWRENCB BELL, DRIVE
Aeal-Ir:,RST, NY. 14J1
3B
` 282 NR TH ST.
btiami, Fl. 33IZ7
8605 I41I 71>'M AM#23
FIIALFAli GARDENS M33016
BID BOND AMOUNT
BIBVOUCHER
C4161000.00
C4131918160
C.C.#L4,600.00
IRREGULARITIES
- YES
NO
-
No
No
MINORITY OWNED - T------- -
ITEM No,
DESCRIPTION
UNrr
TOTAL
UNIT
TOTAL
UNIT'
TOTAL
UNIT
TOTAL
BASE BID TOTAL OF STEW 1 THRU 3 -
PRICE
PRICE
PRICEPRICE
-
_
r
$L8fl,2'.4.00
$266,000.00
$27R,370.00
$"0,000.00
TFW. COMf'IFTL� REUOYAL OF THE DAMACB FABRIC
t
STRUCTURES AS REQUIRED INCLUDING THE
FURNISHING OF ALL LABOR, EQUIPMPNT AND
MATERIA!, DISPOSAL OF DBBRiS, TMTDJG AND
—
_
EVALUATION OF BYLSTING WRE ROPE AND FrMN
$1I,382.00
$9,000.00
Y18,200.00
$41.000.00
2
FOR FURN0HING ALL LABOR, MATERIALS AND
--
— -
—
SQUIP)AF:NT FOR THE COMPIFTE REPLACEMENT
OF THE DAYAGE FABRIC STRUCTURES AND ALL
RELATED CONSTRUCTION WORK
$230,4UO.D0
A70.00AUENTON,
$235,
$2?.4,600.00
3
CASH ALLOWANCE FO'MORK, MATERIALS AND
R
_ -
______---
-.--------
BQUIPMF,NT. THE NECESSITY FOR WHICH COULD
-
-�
NOT R6ASoNABLY BE FORESEEN PRIOR TO
`
BEGINNING WORK ON THE FACILITY.
$25.000.00
9s �,000,00
$1a,000.00
$25,000.00
* IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT
VI
A - No Power -of -Attorney THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM DESIGN
B - No Attidavo. as W Capital & Surplus of Bonding Company AWNING & STRUCTURES FOR THE TOTAL AMOUNT OF 169,224.00
C - Corrected Extensions
D - Proposal Unsigned or improperly Signed or no Ccrporal.e Seel
s - Incornplste Extensions If the above contractor is not the lowest bidder explain:
F - Noll -responsive bid _____ _______________________________ _------------
G - Improper Bid Bond �aTu
R - Corrected Bid ------------------------------------- --------- -- -
- ---_-_--_-_-------------------- ----�--�- _-
I - No FlraL Source Hiring Qomplience Statement -_-_ _- _ -_ -_ -_ - - --
J - No Minority L'ornpliance Statetnrnl ,fy�7i - ------ ------
-----------------SHRET
lf - No Duplicatr. Bid Proposal 1 ON 2
Prspued aF J. ram-----------------------------•-------------------.---•---=-----'--•-----
-0
C
tX3
c-
C-.)
c�
n
FORMAL BID
BAYFRONT PARK AMPHITHEATER — CANOPY REPI.ACEMENT
Project Number: H-1069 CIP Number.: 332060
Project. Manager. — COIZI2ALES _ Date; 034_IZ % 84
Person who received the bids: A. POMS Received at: CITY CLERK'S OFFICE, CITY_HALL _
Construction F.,timatt_ 304Li}Q01Q(),_.. ._ Time: 11:00 A.M.
DIDDER _
DESIGN AWNG k STRUGT.
DIRDAIR, INC.
MTAMI RUCH AWNING CO
30VERZIGN CONST. CROUP.
U605 NW 79TH AYE423.'
H190AH GARDENS, FL3301
ADllRESS
31M 29TH AVE. E.
ARADSIITON, F_L_'3_4208_
66 LAWRENCE DELL DRM -
AUBE=, KY. 14221
C315,000.00
282 XV 36M ST.
Mlnmi, Pi. _3_31H7 _
-- L C. S13,910.50
BID BOND AMOUNT.'
B.I9 VOTICHF,R —
C.Cs14,500D.D0
-- —
IRREG tTI,ARITII; 5
--.----•_.—
MINORITY OWNED
YES
YES ^ ~~
rro�--
-� YES
No.
DESCRIPTION
_
UNIT
PRICEITEM
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
ADDITIVE AL'CLRNATB A THRU B
A
-
FOR FURNISHING ALL LADOII, EQUIPUENT AND
1QATSRIAL FOR PROVIDING STAINLESS STEEL
-�
�-
--- -,-
-
v
;4,800.00
CUPS AND PINS AND NICKEL. SfAIN1.FM STEEL
GRObMTS RATHER THAN THY GA1VAN17M ML
T3
AND BRASS TRJLT IS SPECIFIED.
16.735.00
33,5DO.U0
$33,800.00
R
FOR FURNISHING ALL LABOR, FQU1PMENT AND _
MATERIAL TO PR04-IDE VIWN HOLES IN THE
^ �
-
"AMPBI-WALK" CANOPY VALLEY SECT10143 (15 on)
—
A5 PM DRAWING NO. SK-1 (1/17/94)
LRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT
A - No Power -of -Attorney TI3E LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM DESIGN
R - No AIIldavit as to Capita! k Surplus of Bauding Company AWNING Pic STRUCTURES FOR THE TOTAL. AMOUNT OF 1.89 22,4.00
C - Corrected Rxterisions
0 - Proposal Unsigned or improperly Signed or no Corporate Seal
E - Incomplete Extensions If the above contractor is not the lowest bidder explain:
F - Nola --responsive bid
G - Improper Bid Bond 4a��y�____..---------------_------------------------ ----------
Ii - Corrected Bid - --
_ ----_--_-_
I - No First Source Hiring Compliance Statement J No Minarity Compliance Statement
-
___
IS - No Duplicate Bld Proposal __.._------------- - -----_ -----------------------------
vre %r.a OrJ. Nr r - - - - - ----SHEET 2 OF 2 _