HomeMy WebLinkAboutR-94-0044J-94-69 1/13/94 RESOLUTION NO. 9 4 - 4 4 A RESOLUTION, WITH ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO EXTEND THE EXISTING CONTRACT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH MET CONSTRUCTION, INC. TO COMPLETE EMERGENCY WORK REQUIRED BY THE CITY OF MIAMI FIRE MARSHAL, MORE PARTICULARLY SET FORTH IN EXHIBIT 'A', ATTACHED HERETO AND INCORPORATED HEREIN, AT THE AT&T AMPHITHEATER, LOCATED IN THE MILDRED AND CLAUDE PEPPER BAYFRONT PARK; FURTHER ALLOCATING FUNDS THEREFOR, IN AN AMOUNT NOT TO EXCEED $50,000, FROM THE CAPITAL IMPROVEMENT PROJECTS PROGRAM. WHEREAS, the Bayfront Park Management Trust is constantly exploring new sources of earned income; and WHEREAS, a rental of the AT&T Amphitheater at Bayfront Park is an essential income source; and WHEREAS, the City of Miami Department of Fire -Rescue has mandated changes to the amphitheater's design to ensure the safety of the audience; and i WHEREAS, MET Construction, Inc. is currently working on -site and capable of making these changes required by the Fire Marshall; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. ____----------1 a'.1 - j v s° CITY COMMISSION MEETING OF JAI 1 3 1994 Resolution No, 94- 44 Section 2. The City Manager is hereby authorized`/ to extend the existing contract, in a form acceptable to the City Attorney, with MET Construction, Inc., to complete emergency work. required by the City of Miami Fire Marshal, more particularly set forth in Exhibit 'A', attached hereto and incorporated herein, at the AT&T Amphitheater, located in the Mildred and Claude Pepper Bayfront Park, with funds therefor, in an amount not to exceed $50,000, hereby allocated from the Capital Improvement Projects Program. Section 3. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 13th day of January,—, 1994. S EPHEN P. C ARK, MAYOR ATTE *46-*- - - MATTY HIRAI, CITY CLERK PREPARED AND APPROVED BY: CARMEN L. LEON ASSISTANT CITY ATTORNEY BSS:M4107 APPROVED AS TO FORM AND CORRECTNESS: AA CITY A The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. -2- 94- 44 SPECIFICATIONS Railings above seating, AT&T Amphitheater @ Bayfront Park 1) Description of work A. On highest curb above fixed seating construct a continuous pipe and cable railing to match adjacent similar railing. Required are 3451-0" of railing in five (5) continuous sections. Do not install before consulting architect for exact location. B. Installation: Use existing 30'-0 sections owned and stored by the City of Miami and stored at Bayside Marketplace. Railings and cable are reusable, but all new stainless steel turnbuckles will be required. Cut and reweld so that 5'-0 or 10'-0 segments will follow curve, changing directions (bending) only at posts. C. After layout is verified by architect drill holes 1/4" larger than pipe diameter. Grout with nonshrinking grout or approved equal. D. Cleaning and painting: Completely remove rust from pipes. Thoroughly clean weld areas. Paint exposed metal with zinc rich primer (FS TT-P-31). Paint entire railing in amphitheater, newly installed and existing, but not cables with light grey enamel to match existing. 2) Coordination of work A. Coordinate work and freshness of work to avoid various scheduled events in the amphitheater. SPECIFICATIONS Concrete Slabs at Amphitheater 1) General Concrete for slab on grade construction and for miscellaneous concrete features shall test at 3000 psi at 28 days. 2) Materials Concrete shall be a minimum 6-bag mix, and no additives shall be used except with written permission of the architect. In other respects, the requirements of City form materials and steel reinforcement as indicated in the plans for a completed job. 3) Curing Curing shall be by means of a spray -applied curing compound. 4) Hot Weather Placing and Curing Procedures EXHIBIT 'A' 194 - 44 If atmospheric conditions are such as to adversely affect the placing and curing of concrete, the Contractor shall take steps to overcome these unfavorable conditions. These may include limiting the maximum temperature of the concrete at the time of pour, shading the area where concrete will be poured, and wet -curing the concrete for the first 24 hours by covering it with burlap. 5) Finishes Trowel Finish: Follow floating by steel troweling after the moisture film sheen disappears from the floated surface and when the concrete has hardened enough to prevent fine material and water from being worked to the surface. When wet spots occur, delay finishing operations until waster has been absorbed, evaporated, or mopped up. Do not spread dry cement to take up excessive water. 6) Cold Joints Three slabs show cold joints which are necessary as a pattern for use as well as structurally. Adjacent slabs at cold joints must be poured alternately. SPECIFICATIONS Grease Trap and Installation 1) Quality Assurance: Comply with south Florida Building Code 2) Summary of Work: Install and supply 750 gallon grease trap as shown on attached drawings, including vandal -proof cap on supply inlet, 6" inlet system, 411 outlet system rising to 1211 below grade, proceeding south approximately 12'-0 to a specific point (consult architect) for penetration of underground roof, proceeding downward against wall 161-0 to a 45 degree elbow and 241-0 at 1/16" slope per foot to existing 4" san. connection at inv. +8.5 FT. patch penetration of roof slab and openings in floor to match existing finish in pattern. Consult architect on exact locations. 3) Products: Hubless cast iron soil pipe, CISPI std. 301, service weight, cast iron soil pipe and fittings, with neoprene gaskets conforming to CISPI Standard 310. Clamps and compression gaskets: ASTM C564. Clean -out plugs, cast bronze or brass, threads complying with AN51 B2.1, countersunk head, flush with ground. 4) Execution: Verify existing grades, inverts, utilities and obstacles prior to installation. Coordinate work schedule with park management before installation commences. Do not enclose, cover, or put into operation until system has been inspected and approved by inspecting authority. Place plugs in ends of uncompleted piping at end of day or whenever work stops. 94- 44