Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R-95-0541
ell RESOLUTION NO. 9 5541 A RESOLUTION, BY A 4/5THS AFFIRMATIVE VOTE OF THE MEMBERS OF THE CITY COMMISSION AFTER A DULY ADVERTISED PUBLIC HEARING, RATIFYING, APPROVING AND CONFIRMING THE CITY MANAGER'S FINDING OF AN EMERGENCY SITUATION REQUIRING THE EMERGENCY CONTRACTING OF GOODS AND SERVICES IN THE TOTAL AMOUNT OF $1,359,191.25 FOR THE PROJECT ENTITLED "ORANGE BOWL MODERNIZATION PHASE III, SUPERBLOCK DEVELOPMENT - NORTH, B-624311, WITH MONIES THEREFOR ALLOCATED FROM THE CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 1994-95, INDEX CODE NO. 319302-830, PROJECT 404240 IN THE AMOUNT OF $1,359,191.25 TO COVER GOODS AND SERVICES AND $169,361.48 TO COVER THE ESTIMATED EXPENSES FOR AN ESTIMATED TOTAL PROJECT COST OF $1,528,552.73. WHEREAS, the City of Miami is committed to the University of Miami to develop a "campus -like" setting for the site around the Orange Bowl Stadium prior to the 1995 football season; and WHEREAS, Urban Architects, Inc., acting as the Consultants for the Orange Bowl, were directed to prepare a Master Plan for the site improvements of the Stadium as well as an estimated construction cost to develop the project in several phases; and WHEREAS, based upon the conceptual design prepared by Urban Architects, Inc., the Department of Public Works prepared the construction plans for the phase to be built in 1995; and :CITY COMMISSION MEETING OF J U L 1 3 1995 Resolution No. 95- 54.E into two parts: The first part inrluaes the actual site wox improvements, and the second part includes the purchase of goods that are to be fabricated by the manufacturer and installed on site; and WHEREAS, on May 17, 1995, the Department of Public Works solicited bids for the project named "Orange Bowl Modernization Phase III, Superblock Development - North, B-624311, for the construction of the site improvements; and WHEREAS, sealed bids were received on June 6, 1995 for the "Orange Bowl Modernization Phase III, Superblock Development - North, B-6243; and WHEREAS, the City Manager and the Director of the Department of Public Works recommended that the bid from R. L. Saum Construction Co. be accepted as the lowest responsible and responsive bid; and WHEREAS, the City Manager directed the Public Works Department to purchase on an emergency basis, several specialty items that are to be fabricated to order so they may fit the specific requirements of the design; and WHEREAS, the following goods and services were contracted to the listed suppliers, on an emergency basis: R. L. Saum Construction Co. $1,059,374.45 Construction of Site Improvements Mardan Fabricators $36,500.00 Supply and installation of three. (3) Ticket booths -2_ 95- 541 - 1? ARD Rolling Doors Supply and installation of nine (9) roll -up doors Design Awning and Structures Supply and installation of three (3) canopies with frames Consolidated Electric Supply Supply of two (2) high masts poles and lights Paramount Electric Dist. Supply of Promenade lighting South Dade Electric Supply Canopies lighting system Urban Architects Inc. Professional Fees for Conceptual Design $39,890.80 $96,000.00 $43,550.00 $50,766.00 $19,110.00 $24,000.00 NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. By a 4/5ths affirmative vote of the members of the City Commission, after a duly advertised public hearing, .the City Manager's finding of an emergency situation requiring the emergency contracting of goods and services in the total amount of $1,359,191.25 for the project entitled "Orange Bowl Modernization Phase III, Superblock Development - North, B-624311, is hereby ratified, approved and confirmed, with monies therefor allocated from the Capital Improvement Program Fiscal Year 1994-95, Index Code No. 319302-830, Project 404240 in the amount - 3 - 95_ 541 of $1,359,191,25 to cover goods and services and $169,361.48 to cover the estimated expenses for an estimated total project cost of $1528,552.73. Section 3. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 13th day of July 1995. STEP EN P. CLARK, OR AT WAL ER J. FOE CITY CLERK SUBMITTED BY: Co t4e- C- WALDEMAR E. LEE, DIRECTOR DEPARTMENT OF PUBLIC WORKS CAPITAL PROJECT VIEW: r UA 0 RODRfGUEZ, DIRECTOR ASSET MANAGEMENT AND CAPITAL IMPROVEMENTS LEGAL REVIEW BY: G. MIRIAM MAER CHIEF ASSISTANT CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: A! QUINN #04ffg, III CITY ATTCLROY GMMfW 191 - 4 - 95-- 541 r� 1 ' CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM 36 TO : Honorable Mayor and Members DATE : JUN 2 9 1995 FILE of the City Commission SUBJECT : Orange Bowl Modernization -- Ph III Superblock Development FROM : REFERENCES North Project -Resolution Cesar o Confirming The City Oer ENCLOSURES Contracting for Goods And Services RECOMMENDATION It is respectfully recommended that the City Commission adopt the attached Resolution ratifying, approving, and confirming the action of the City Manager and authorizing the EMERGENCY contracting of goods and services for .the project Orange Bowl Modernization, Phase III, Superblock Development -North, in the total amount of $1,359,191.25. BACKGROUND The City of Miami is committed to the University of Miami to develop a "campus -like" setting for the site around the Orange Bowl Stadium prior to the 1995 football season. The scope of work includes the closing of N.W. 6th Street between N.W. 14th Avenue and N.W. 16th Avenue, and N.W. 15th Avenue between N.W. 6th Street and N.W. 7th Street. This new area will be developed providing new parking, new access gates promenades, walkways, lighting, fencing, signage and landscaping. Urban. Architects, Inc., acting as the Consultants for the Orange Bowl, were directed to prepare a Master Plan for the site improvement of the Stadium as well as an estimated construction cost to develop the project in several phases. Based upon the conceptual design prepared by Urban Architects, Inc., the Department of Public Works prepared the construction plans for the phase to be built in 1995. Because of the time restrictions imposed by the beginning of the 1995 Football Season, the 1995 project was split in two parts. The first part includes the actual site work improvements , and the second part includes the purchase of goods that are to be fabricated by the manufacturer and installed in site. 95- 541 '01, i.r 1 On May 17, 1995, the Department of Public Works put out for bid the job named ORANGE BOWL MODERNIZATION PROJECT, PHASE III, SUPERBLOCK DEVELOPMENT - NORTH, B-6243 for the construction of the site improvements. On June 6, 1995, seven (7) bids were received and the lowest responsible and responsible bidder was R. L.'-Saum Construction Co., in the amount of $1,059,374.45. Also, the City Manager directed the Public Works Department to purchase, on an emergency basis, several specialty items that are to be fabricated to order so they may fit the specific requirements of the design. h The following goods and services were contracted to the listed suppliers, on an emergency basis: R. L. Saum Construction Co.' $1,059,374.45 ! Construction of Site Improvements Mardan Fabricators $ 36,500.00 Supply and installation of three (3) Ticket Booths ARD Rolling Doors Supply and installation of nine (9) Roll -up doors Design Awning & Structures Supply and installation of three (3) canopies with frames Consolidated Electric Supply Supply of two (2) high masts poles and lights Paramount Electric Dist. Supply of Promenade lighting South Dade Electric Supply Canopies lighting system Urban Architects, Inc. Professional Fees for Conceptual Design $ 39,890.80 $ 86,000.00 $ 43,550.00 $ 50,766.00 $ 19,110.00 $ 24,000.00 It is now recommended that the City Commission adopt the attached Resolution ratifying, approving, and confirming the action of the City Manager in authorizing the emergency contracting of goods and services for the project ORANGE BOWL MODERNIZATION, PHASE III, SUPERBLOCK DEVELOPMENT - NORTH, in the total amount of $1,359,191.25. Funding is available under CIP Project No. 404240 Index Code 319302-830. 95` 541 V UN Yb r' Lr. .• . .. ua... .. ...�.�. ......... -CITY OF MIAMI, FLOPIDA INTER -OFFICE MEMORANDUM �l) Walter F'oame n DATE : Ju nft 10, 19 95 FILE City Clerk SUFUFDT Request to Publish Noti, of Public Hearing rov a: MOM Emergency Resolution Waldemar E. Lee Director of Public Works ENCLCSUISE:S : Advertisement Please make arrangamonts to publish a Notice of Public Hearing fo; discussions pertaining to an. Emergency Resolution ratifying approving and confirming the action of the City Manager an, authorizing the emergency contracting of goods sand services fo. Lhe pio jduL "ORANGE BOWIE MODERNIZATION PHASE" III, SUPERBLOC' bSVELOPXENT - NORTH" in tho amount of $1, 359, 191.25 bctwc©n. thk City of Miami and R.L. Saum Conntriirt i on ro . , MArdAn Fehr,1ratcrr, Ard rolling Doors, Design Awning & Structures, Consolidates Electric Supply, Paramount Electric Distributors, South Dad( Eleatrice.1 Supply and Urban Architects Inc. The public hearing has boon scheduled for July 13, 1995. Please charge to index code 310202-2B7, Project # 404240. JO 111. J ' Cn C3 LLI LLt 4 C- to tnyvuuai \..VVLVL11L4L W. 95- 541 ti 441.14) :St au1l u► CITY or mxAMI, FLORIDA NOTICE; OF PUB.t,TC NRARTNri A public hearing will be 11kild by Lhe Commission of the City of Miami, Florida, on July 13, 1995, at in the City Commi.}sminn ChamhArs At C..i ty Ball, 3500 Pan American Drive, Miami, Florida for the purpose of hearing any comments by the City Commission from any interested parties affected by an Emergency Resolution ratifying, approving and confirming the action of the City Muraayvzt aad duLhoclzing the emergency contracting of goods and eervicers for the project "ORANGE BOWL MODERNIZATION PHASE IIT, SUPLRBLOCK DEVELOPMENT - NORTH" IN THE .AMOUNT OF $1,3591191.25 Between the City of Miami and R.L. Saum Construction Co., Mardan Fabricators, Ard Rolling Doors, Design Hwning & Structures, consolidated Mlectric supply, Fai•amvunL Slectric Distributors, South Dane Eilootrical Supply and Urban Architects Innr All intoaroixtod ra.r.RnnR x4rp i nvi t.Ad hn AppAnr And may be heard concerning this award. Should any person desire to appeal any decision of the City Commission with respect to any matter considered at this hearing, that person shall ensure that a verbatim reaurd of Llm VrvuwtPdluyu Is made, including all tccitimony and ovidonco upon which any appeal may be based. waiter r'oeman City Clerk Miami, Florida V05— 541 S j Via+ CIA_:�C�itI?1'_L2�T S 1D ITIN _ ORANGE BOWL MODERNIZATION PHASE III SUPERBLOCK DEVELOPMENT �,o�.-•rw-rwrrr-rrrr-rrrrrrrrrrrorr--rr- w- r -rrr rarrrror NORTH B-6243 oo-rro�.owr�.-rr rr r-o-r or .. rr rrrrsrw --- -------rr- r rrrw 311D Ito • t 94-95-153 �rY►rrrrr-rrrr-..brrrr rrr--rrrr.--r.rMr�r SASE DID(s) OPERED a DUNE 6, 1995 11:00 a.m. -oorrr rw-...wrrrrrr o- r or r-r r r �QYRL � I D_1Ql�D�e rZ E1nDER �ID .�IIQIIHY Si N11R.R CRICK sr rr rrrrrr rr/.-rroor- R.L. SAUM CONSTRUCTION --rrr-rr+►rr-•/mow $ 1,059,374.45 rr ror•rr'o-w.r rrr/. -rrr B.B. 5% r�wrrarrrw.roroorsro r--r-rr+-rrrro -ro-rr.r rrrrrr..rsowrrrrr PINO FONTICIELLA CONTRUCTION $ 1,262,523.80 BBB. $ 62,500.00 ` --.rr�rY-rrr-Yrrrr-!r rrr----rrlr 00 Oar rrrrr r+rr-rr rOrOdY -RECIO AND ASSOCIATES, INC. $ 1,397,600.00 B.B. 5% �.rrra.rorr lr rrr-.o rrrrrrrrw�orrr rorrro.rrwrra�rrrr PNM CORPORATION $ 1,394,493.00 B.B. 5% -.ar-r•r-r.--rrrr --rrrrrr rssrr rrr oorrr orrr.-rrrsrr-rr ASSOCIATES CONSTRUCTION CORP. $ 1,418,000.00 B.B. 5% . -rrr- -- -- - - - ---- - -r -----r�.or--------- - CONE CONSTRUCTORS OF MIAMI �.r,-•.•a+..----------- $ 1,508,388.00 sr-r.�rr�.w-rr rr B.B. 5% r---r-oo rrwr.-r-r rrr lror URBAN ORGANIZATION INC. ----a----------- $ 1,538,900.00 ------------ -s B.B. $ 80,000.00 --rrrrrrr-oa-srrrr---ram r - er- -! -r o- - -� nly a5 --- - - - -- -- er�'irom'�he vendors Tiste -�%rEii -a re tie received timgly_.�ga_,�tf_t� ��-dcs� iiYYr-irJ-rr r--__-- other offers submitted in respon e to tl-:s solzc.tEa !on, if any, ,r..� �.,.•et.y saiocst�slsxar3aFE�►_�'--------------- ------ -- m— — -- — — — — — — — — — — — w — — — — — — w — — — — — — — — — — -- — — r — — — -- — — — — — - -- ---- - - - - - - - - --L - - - - - - - - - - - - - - -- - - - -- ---- -- -- - - -- - - -- — -- --- -- — -- — — — — --} — — — — — — — — — — — — --} --- — — — — -- — r — ---- — — — -- - - -- - - - - - - - - - - - }. - - - - - - -- -- - - - --I. - - - - -- - - - - - - - - - - - -- - --------------------- -------------r -r --------rrror r-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _------------ ------r---- _--- --1-3/gI ----- - - - - - - r - ---- - -- - - -- - — M— — — — — — — — — dl - — -- — — — — — — — — — — — } — — — — — — — — — -- — — — -- — — -- -- — ----------4----r---_ ram.----} ---------------------- ------------- 4 ---M------•►---r----------------------- �. --r-r------------r.--------------- ------w-----r-r---r-...a 9 / Q receive® (�_) aavelopes on behalf of 0yr Y % P fc Q1BaSii---'-- (Citp Department) Yj _}. /► ' E2GRE (D putp cl 7 clerk) CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Walter F6eman DATE June 2, 1995 FILE City Clerk SUBJECT : Bid Opening Date Rescheduled - orange Bowl FROM : REFERENCES: Modernization -Phase III James J. Kay, eputy Director Department of Public Works ENCLOSURES: Please be advised that the bid opening for Orange Bowl Modernization, Phase III, Superblock Development - North, B-6243, scheduled for 11:00 a.m. on June 2, 1995 in -the Office of the City Clerk has been rescheduled to 11:00 a.m. on June 6, 1995 at the same location. An addendum has been mailed to all prospective contractors/suppliers and trades organizations with notification of this change. JJK/mm c-) �C) )::)w M CD=4 � Z-M N -- 7y O ALL BIDDERS ARE HEREBY NOTIFIED AS FOLLOWS: HP%NGE 1 o SHEET D-1 The Demolition Lejend Note {1} ADP "And Along N,W 14th Avenue. See Sh. G-1 CHANGE 2 OF 9 SHEET C-1 General Note No. 4 has been Milled lied and shall read as follows:Rework (Neatly) existing limeruck base under asphalt arras in the parking lot where access aisles are proposed. Refer to the demolition Man (Sh. D-1). Also Paving Lend second note shall read .as follows; Remove existing asphalt and rework M stinv 1imeruck, RP pave area with 1" Type S-III asphalt to face of SWIM Meet proposed elevations at picket f e n C e {See Grading Plan SH. C-2). CHANGE 3 OF 9: SWEET C -z Grading Scheme has been changed accordingly. f ?. i�.Jta i + fi{h1 1i i� s�t5597 :1 i,I r ,: °x „ ti CHAN0E 4 OF 9: SHE11,1-2 Typ. Efec. box at cuncrato culumn and hears detail US been mgdi fiac.} CHANGE 5 OF 9:-PROPQQAL PAV 2.Q Has Deen modified for proposal Paje 2d revised. (Attached) GHANIE 6 OF 9: The color i ntegrd tod concrete color shal l be : L.M. Scofield Company, Chrumix Admixtures for CunCrete, "C-13, Tawny Pink CHARGE 7 OF 9: Tht jidder5 are herolL alerted that the }yid !ir net}uirt4_ din yaks opening date h�� en kpA is to --� CHANGE 8 OF 9: Sheet A- 1 , VI n t i n j Schedule; Sol id Sad un ::grass fever System or on finely ;traded 2" soil blanket shall h^ ArgentineQjYja So 1 id Sod. Pruv itt._ pruduc r. 1 i teratuve for approvals prior to application, i,,;iRft;3L 9 OF 9: Add the following to Gonoral Notes on Shoot S-1: Es - Expt)ve6 I-xtorior concrete surfaces including columns :,nd tie beams above grade shall receive two coats of Thuroc,uat t 851U Pearl Gray culorj over a base coat of Thor•oseal with Acryl 60. Contact: Thoro System Products, Miami, Fl , at 1- 800- 327-1570 Pruuide pruduct liLerature for approvals prior - to appliCdtiOn. 7` - Refer to Sheet A - 4 , PI aza; Gate Elevations f:ar information regarding the textural finishes of Life olumns and tie beams. THIS ADDENDUM IS AN ESSENTIAL PART OF THE CONTRACT DOCUMENTS A40 SHALL BE MAK A PART THEREOF. 'W,aldemar }..e Dircrctor of Pualic Works P ge 2 of 2 , . is .� ;l t::r �' �-# �_� - h � %1 f". li t:{ •+ �.' l �: 1 4S''A! f►1't Public Works Department 275 N.W. 'end Street Minnti, FL 3: 128 Fax Number; (305) 579.6871 Tu: i Phone: _ Fax hone: CC-. From: _ Phone: Fnx phone: �'7�,� For your review E) Reply ASAP (] Please Comment 410 ftl CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO : Matty Hirai DATE : May 18, 1995 FILE City Clelc j SUBJECT : ORANGE BOWL 'MODERNIZATION I PHASE SUPERBLOCX _ . DEVELOPMEP]T -NORTH B-6243 FROM REFERENCES Liette Lopez BID ,NO'. '94`-95-'153 Department of ' Public Works ENCLOSURES: Contractors will submit bids for the above reference project to be opened on. June 2, 1995 Time; 1r:00=AM. Any bid submitted after the above appointed time will not be accepted by the City Clerk. Please make the necessary provisions for this bid opening. A representative from our Department will be present. We will notify you in writing if there will be a postponement or cancellation prior to the opening of bids. c� rn Ol k BID N0. 94-95-153` ,ADVERTISEMENT FOR BIDS Sealed ,._,_bids for "ORANGE BOWLMODERNIZATION, PHASE ITI' SUPERBLOCK DEVELOPMENT NORTH.B-6243" will be received.by the City Clerk of the City of Miami, Florida at 11i00 AM on the 2ndday of June, 1995,' at the City Clerk's Office, first floor of the Miami City Hall, 3500 Pan American Drive, Dinner Key, Miami, Florida, 33133, at which time and place they will be publicly opened and read. Any bid submitted after the above appointed time will not be accepted by the City Clerk. The project consists of the furnishing of all labor, materials and equipment for the site development of the Orange Bowl Stadium including new parking areas, new access gates, promenades, walkways, lighting, fencing, signage and landscaping. Bidders will furnish performance and bid bonds in accordance with Resolutions NO. 86-983 and No. 87-915. For technical questions regarding plans and specifications, please contact Juan B. Ordonez at (305) 579-6865. The prime contractor shall have a Certification of Competency as an Engineering Contractor. Prospective bidders will be required to submit, with their bid, a copy of the appropriate Certificate of Competency, as issued by Dade County, which authorizes the bidder to perform the proposed work. All bids shall be submitted in accordance with the Instructions to Bidders and Specifications. New City regulations will require each bidder to submit proposals in duplicate originals. Plans and specifications may be obtained from the office of the Director of Public Works, 275 N.W. 2 Street, 3rd Floor, Miami, Florida, 33128, on or after May 17 1995. If bidders wish, a set of plans and specifications will be mailed to them by writing to the Department of Public Works and including a separate check for $B. There will be a $20 deposit required for the first set of plans and specifications. Additional sets may be purchased for a fee of $20 per set and this is not refundable. Deposits will be refunded only upon the return of one set of plans and specifications to the Department of Public Works, unmarked and in good condition within two (2) weeks after the opening of the bids. Bidders are alerted to the provisions of Ordinance No. 10062 and 10538 regarding allocation of contracts to minority vendors, contractors, and subcontractors. All bidders must submit an Affirmative Action Plan with their bids. (Ordinances are contained in Bid Specifications). The CityofMiami has adopted Ordinance No. 10032, which implements the "First Source Hiring Agreement." The object of this Ordinance is to provide employment opportunities to City of Miami residents on contracts resulting in the creation of new permanent jobs. Contractors may be eligible for wage reimbursement under this program. For further information contact the Department of Public Works, City of Miami, at (305) 579-6856. Proposal includes the time of performance, and specifications contain provisions for liquidated damages for failure to complete the work on time. The City Commission reserves the right to waive any informality in any bid, and the City Manager may reject any or all bids, and readvertise (B-6243, Req.2598). Cesar H. Odio City Manager i i �.,: =S'e �li��?�3 �>i dl4PU Sealed bids for "ORANGE BOWL MODERNIZATION, PHASE III, SUPERBLOCK DEVELOPMENT —NORTH B-6243" will be received by the City Clerk of the City of Miami, Florida at 11:00 AM on the 2nd day of June, 1995, at the City Clerk's Office, first floor of the Miami City Hall, 3500 Pan American Drive, Dinner Key, Miami, Florida, 33133, at which time and place they will be publicly opened and read. Any bid submitted after the above appointed time will not be accepted by the City Clerk. The project consists of the furnishing of all labor, materials and equipment for the site development of the Orange Bowl Stadium including new parking areas, new access gates, promenades, walkways, lighting, fencing, signage and landscaping. Bidders will furnish performance and bid bonds in accordance with Resolutions NO. 86-983 and No. 87-915. For technical questions regarding plans and specifications, please contact Juan B. Ordonez at (305) 579-6865. The prime contractor shall have a Certification of Competency as an Engineering Contractor. Prospective bidders will be required to submit, with their bid, a copy of the appropriate Certificate of Competency, as issued by Dade County, which authorizes the bidder to perform the proposed work. All bids shall be submitted in accordance with the Instructions to Bidders and Specifications. New City regulations will require each bidder to submit proposals in duplicate originals. Plans and specifications may be obtained from the office of the Director of Public Works, 275 N.W. 2 Street, 3rd Floor, Miami, Florida, 33128, on or after May 17 1995. If bidders wish, a set of plans and specifications will be mailed to them by writing to the Department of Public Works and including a separate check for $8. There will be a $20 deposit required for the first set of plans and specifications. Additional sets may be purchased for a fee of $20 per set and this is not refundable. Deposits will be refunded only upon the return of one set of plans and specifications to the Department of Public Works, unmarked and in good condition within two (2) weeks after the opening of the bids. Bidders are alerted to the provisions of Ordinance No. 10062 and 10538 regarding allocation of contracts to minority vendors, contractors, and subcontractors. All bidders must submit an Affirmative Action Plan with their bids. (Ordinances are contained in Bid Specifications). The City of Miami has adopted Ordinance No. 10032, which implements the "First Source Hiring Agreement." The object of this Ordinance is to provide employment opportunities to City of Miami residents on contracts resulting in the creation of new permanent jobs. Contractors may be eligible for wage reimbursement under this program. For further information contact the Department of Public Works, City of Miami, at (305) 579-6856. Proposal includes the time of performance, and specifications contain provisions for liquidated damages for failure to complete the work on time. The City Commission reserves the right to waive any informality in any bid, and the City Manager may reject any or all bids, and readvertise (B-6243, Req.2598). Cesar H. Odio City Manager I ,,,..., . � ,;...,,�;-'?3-;3.; ; .l 1: Sh:�1f f'1.1�.' i C' }t�;�F°1{�. ^� �`? l ti. • ; � 1 f � , City of Minim µ F � Date: ? ,�"' Sj G 7 Time: _ L �'... P, Number of pagan including cover sheet: Public Works Department - ..._ _�. ..._._.._ -27.5 N.W. Znd Street Miami, PL 53128 F'a\ Number, (305) 579.6871 I r; n :..�'•.., .,:a,•z�.:sr�;.�u�emrs��..sJ�:' s:.�.Baas;u:�.ti�:�'es.:xis:ss�ar�rn�:'e�tr�saanrasr�u.�sra�t;�.t���:�w,�+ 4 Urgent For your mvlew f 1 Reply ASAP ` t.,x C c t�.•.,; <:s}!; i{ i...� i+} �Sj' 4,, t� 7 t''f(P (�-,7�;, ^5i."�:'. � ''•�: l�1 5 ,�' T•�,_N1 � _S. l � � 4' � .� A.. ! � (r 1 t•..: �5 �.. � � t ;� �r__�/� _� �L.;`�.-'�..- �r � �� , y� .% J i l i �• A ,:�1� � � ( i . 1 IA } It N .. � -. ..... :. . �,a.�sa.�..rwa�+wa•ara.�ra.e...�., •. .n i..nr r. ......w .�..e....n. i... i. nit And" Aj € f:� ,,,�..:t trs::>ti t'i .'�t3.i1 i };: 1•(t. �.r• r ■P�T�i �:.x�J C �'Y.x4 � •��. -.• T1.h �"� '.` ., 35�.. .'{��1 •Re'i�11tY i�� • f�. � i .. Mayo I.hl' ill', ...l t 1. 1 1 iQ_ j i 1 l;' Lill • r 1 !! • 1 ` 1 i 1 i i i t i'j t , _ e ( e i , ! I _ , _. 11 An i i :. • ! r 1(1 i i y y t ( �. f '•. s a: 011) NO. 9 4 -T et 9F 5} _NDvr•RTIsrrinnT FOR F IUS kintee bids for "ORANGE tSC1V'JIt Ntt)oF`nmi`I.ATION, PHASH 111, 5UPS trfiC,,,`k,`c+;` t r.`'ELC7PMCNT - WORTH 8-62 4 3" Will be t.uceived by the City Clerk of ho t,i y r'ef �Mi iTtlL, Florida rides at 11=00 P11 on Y.11t;' 2nd day of June, .i,j; , Clerk's ` lisit:e, first': f:i.aor of the Mi,-Amj. Cit-y Fla. j., .iJi(�� �r}'"1 ".('i1° ,� t-An lit r Cli5 nex Key, Miami, r.lo F.da, .3::3.133, nt: which time and place ; i Q will }pos ),F: i.c l y ppen€ d and read. Nny bid submitted after the abovo oni3o,xnte:f t iLt A wrf._i !. not: be acenpt ed by t'ho City Clark. pi,-O to ct Consists of the furnishing of all labor, Tr) ,,,,r rn anj sqtt:,i pment fQr the site development of the s`)t',"itlge Rowi. Stadium inalwa,qg low parking areas, now access gates, p,CtJtfie1't,g.den, walkways, lighting, t'7T1agz i; nd landscaping. J3.,t;ftlers will fern ..ah F7n.Ct;ormi'tX'!co Kui i) "E ;..it iat;Vr::.z.'dnnce with t3e:ool:ttf-onu No, 06-98:3 and No. 87.915. Fow k- ,.h i .yl.lt_'C3t.?.i; nx regarding F.?.i.i3ns and qpef• if icr}i: ions, i71.E'ase nw ? ina, a ,.dutlez at (30 ) :779_.6065. `S.'he p1:1.me nvntractar shall .haver a CarkM :n ..y,F;• u =artcy as ant Rogineeriny Cuintxactor. PyoupowtWo id . ; Nil! hK qc e.red to ),;t tstttli.t'.t with their bid, a copy of: the approprinip corwifiaNno 01 rrAfeLCY&k, as issnu t Jay t:adiCf.)unt:yr which �it�sr dzen __ Wo perform the proposed wnrk. .., `tlbl'T4t.t:..hd in accnrdance ai.t:.t. 't:iic. 71'I.:t;r.tC .. + Yoqnl.k:.it ':t�.i.r)Ii:?. Now City L'''•iit).F,,)k,.i.T)Xi� 071.1: 1potsrilm in Ctti�e%1.l t(`:* �t..tt zCt lft 1�Jans d `y° ..,. +'. is i YiN'i' '-; t) t S.f,`e ,', f t h e Vrech"l, ! b r y- r i i o r i t. s , 1306, on Cyr I 1 4+ ➢' rt� t' I ra � ;' t' l 3 _. h,�; ,_ .., Von, ,� ._ �I is plans r.��rlil i!`?i� :? 'i'i t f' `c`it..!_t7�t�l:7 t1i.� l i :if;' l4t� t �.:�;- F'"c-) * i r - A'r --u L1•.. w.''Lks and .LiIC;lt`,tIinq a 'nFa.: p `'.f. t.. ( kin a t 0 r-e '_iit r 'tits.red for the f'i..ra 3 clans r ' i f t.•. x't,. t_t ns , r!'s`. o t .e S"vs may he puxchased 1 ' & at P per to, 7 Ond this tau PoQ i„y: iktlii$b.lt,` - Pap0qVs 4l1 } 3 be refunded only !tp.3C. 01 one tiit:.'.t of plans and to Lhe F_iej_"kenLment: or Pi,'n i .Works, }.t"sl)TttlY;}yed and w good !:.P4t:i i.f.) ?+.; twl thi -n two ( ) ) nPo"ing of the bids. 1'i mxryk'tit G ) rl i i'* i_ t:,f?d to t e, �e .i. v £t,i t :' t e T'.• 062 had s . L. 3 �'► � _ . _ . ..r:.� i.Itttrl�� M"d . 1 i• t. i ,. x ;J r s t: t;j�� Z v':i�1rt] t 1. t{�ti:c2t. I,fltt of f2i`1Sl.t.rt?t' � :3 tr) �1tt.l.dYe'.'.T:`S:ty vendors, s f, nuhrantrnmove. All biddoxs must : :b}Xi4li Alf a:i`e Action P1r with reir i::.s,t,t.'',: lfJr .t.uane".r•?-`.'s are contained in Bid Specifications). r ;i:y. {'1i F+i&t' i has f+ti.;)j;)i:ed Ori_t:f.11<'tronf; No. 1003.2, WF2S.ch iIYIp.ZI:`?flf?3"t the t, M "q Agreement. The object (o I.C r.'rl r � � { tot itti s 7 �, t�st�� :; iunitit.to Ct tQf Miamiresidents an tUni.iucts ..su r ; q:ng ills the <;:1:'eat" han of jobs. CUtl.k ract.( r.5 w! ,Ay he l.i:CYftf. e for evt1gc t:et.Yii;tLT:'soma t: undex Ct'iu F'.)L`o+:.T:t'xm. I Forrt,r�i�A4,r Information .4;t):lLm 't'. l:he Department.r-..tt fl.bWorks.r Miami, .. t 3 Public i. i' !-. t'_ f +'1 � i c'iltl i ,. �j� f S r_,)`{:}pnaati. 4;n lu'es 0he time ofti(r''IQ and � M ezr'OVt.O:<.I O f'r' C l Cjlt:Id t,PA dnmaqom inn t.ii..ture to 4:!:emplgto the work on t..).FTte. TirP:, City t,.oUSt ? S 1•t"]'.i ,. . i. x ) * ra r any :,• t any bid, t ' k * t' : the i . t_j { waive t 3't t informality t' f)'1"(:6�1 �. '! • �` .l . S <::lY l i) .1 v and Chu City d.,,,t; M;rTTr'ger may roject nny ur AIL F;)ldp , ;'"3.sili reai..iV'arti ii; Qiz,:4.i . l 1,•. y M J ia C Wes c 1: 0 3