HomeMy WebLinkAboutR-95-0534RESOLUTION NO.9 5- 534
A RESOLUTION, BY A 4/5THS AFFIRMATIVE VOTE OF
THE MEMBERS OF THE CITY COMMISSION, AFTER A
DULY ADVERTISED PUBLIC HEARING, RATIFYING,
APPROVING AND CONFIRMING THE CITY MANAGER'S
ACTION UNDER A HURRICANE EMERGENCY SITUATION
REQUIRING AN INCREASE, IN AN AMOUNT NOT TO
EXCEED $44,421.96, IN THE CONTRACT BETWEEN THE
CITY OF MIAMI, FLORIDA, AND MARINA POWER
COMPANY, INC., AUTHORIZED BY RESOLUTION NO.
92-7381 FROM $601,988.00 TO $646,409.96 FOR
REPAIR OR REPLACEMENT OF HURRICANE DAMAGED
ELECTRICAL AND FIRE PROTECTION EQUIPMENT
INSTALLED ON THE DINNER KEY MARINA PIERS,
PROJECT H-1003, CAPITAL IMPROVEMENT PROJECT NO.
414410, ALLOCATING FUNDS THEREFOR FROM FUNDS
AVAILABLE FROM FEDERAL EMERGENCY MANAGEMENT
AGENCY FOR HURRICANE ANDREW DISASTER RECOVERY.
WHEREAS, a purchase order contract authorized pursuant to
Resolution No. 92-738 adopted November 12, 1992, exists between
the City of Miami and Marina Power Company, Inc., for Capital
Improvement Project No. 414410, en.titled "Dinner Key Marina -
Rehabilitation of Pedestals and FHC, H-1003"; and
WHEREAS, an Increase in said purchase order contract In the
amount of $44,421.96 Is required to cover the extra costs of
repairing or replacing the hurricane damaged electrical and fire
protection equipment on the Dinner Key Marina Piers; and
CITY 'CO,Mi ►IISSION
IKEETUIG OF
J U 1. 1 3 1995
Resolution No.
95- 534
�H
4
Disaster Recovery and Risk Management Division, and the City
Manager recommended the Increase in the purchase order contract
to cover the additional costs; and
WHEREAS, monies are available from the Federal Emergency
- Management Agency Reimbursements for Hurricane Andrew Disaster
Recovery In the proposed amount of the Increase; and
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and Incorporated herein as if fully set forth In this
Section.
Section 2. By a 4/5ths affirmative vote of the members of
the City Commission, after a duly advertised public hearing,
ratifies, approves and confirms the City Manager's action under a
Hurricane emergency situation requiring an Increase, In an amount
not to exceed $44,421.96, In the contract between the City of
Miami, Florida, and Marina Power Company, Inc., authorized by
Resolution No. 92-738 from $601,988.00 to $646,409.96, for
"Dinner Key Marina - Rehabilitation of Pedestals and FHC, H-
1003"; with funds therefor hereby allocated from funds available
from The Federal Emergency Management Agency for Hurricane Andrew
Disaster Recovery.
Section 3. This Resolution shall become effective
Immediately upon Its adoption.
- 2 -
95�- 534
PASSED AND ADOPTED th I s 13th day of July 1995.
STEPHEN P. CLARK, MAYOR
ATTEST:
ALTER J. F E
CITY CLERK
SUBMITTED BY:
� -E
WALDEMAR E. LEE
DIRECTOR OF PUBLIC WORKS
CAPITAL PROJECT REVIEW:
EARD(ANAGE
RODRI EZ DIRECTOR
SS —ET EN AND CAPITAL IMPROVEMENT
PREPARED AND APPROVED BY:
h)m m "P�
G. MIRIAM MAER-
CHIEF ASSISTANT CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
A. QU IYNN JPNFeS, III
CITY ATTO t�Ky
— 3 —
r
1 CITY OF MIAMI, FLORIDA
' INTER -OFFICE MEMORANDUM 27
TO Honorable Mayor and Members DATE : JUN 2 9 1995 FILE :H-1003
of the City Commission
SUBJECT: Dinner Key Marina Rehabilitatior
Hurricane Damaged Pier Equipment
FROM Cesar o REFERENCES:
City r
ENCLOSURES:
RECOMMENDATION
It is respectfully recommended that the City Commission adopt
the attached Resolution authorizing a $44,421.96 increase in
the contract between Marina Power Co., Inc. and the City of
.Miami for repair or replacement of hurricane damaged electrical
and fire protection equipment installed on the Dinner Key
Marina Piers (Project H-1003). The existing purchase order
needs to be increased from $601,988.00 to $646,409.96 and the
costs will be paid from Federal Emergency Management Agency
(FEMA) reimbursements to the City.
BACI:GROUND
As a result of Hurricane Andrew, all of the electrical (power and
lighting) and fire protection (fire cabinets and alarms)
equipment on the Dinner Key Marina piers was either damaged or
destroyed. Marina Power Co., Inc. was the original manufacturer
and/or supplier of this equipment and was approved as a sole
source by FEMA and the City to repair or replace it after the
hurricane. By Resolution No 92-738, the City Commission approved
a purchase -order contract in the amount of $601,488.00 with
Marina Power Co., Inc. to do this work on a unit price basis
based on the estimated damage in the FEMA-Damage Survey Report
(DSR).
The FEMA-DSR was the best estimate at that time. It was
recognized that the final cost would be determined using the unit
prices and the actual work required to repair or replace this
existing equipment. Equipment that was destroyed was replaced
with new equipment. Damaged equipment was taken to the
manufacturer's shop and completely rebuilt as new. Credits were
given for all reusable parts. Basically, when new or rebuilt
pieces of equipment were delivered to the job, they were invoiced
at the unit prices in the DSR. In addition, the City received
credits for the reusable parts and any equipment in the purchase
order not used. Overall, the pier equipment that was repaired or
replaced was the equipment originally in place before the
hurricane.
95- 534 oPI-o"71
The net increase in costs was a result of several factors. There
was more damage to the electrical equipment than could be
determined by the post hurricane visual inspections. The
additional costs for the temporary repair and early opening of
the Commercial docks and Piers #1 & #2 was not properly accounted
for in the DSR becausa this equipment -had to be temporarily
repaired and later rebuilt. The greatest benefit to the City was
the time savings which allowed the Dinner' Key Marina to reopen
much earlier than other local hurricane damaged marinas. We now
request the City Commission approval to increase Marina Power Co.
purchase order from $601,988 to $646,409.96 and to close out this
project.
Marina Power Co.'s work under their purchase order contract is
now completed and they have submitted a completed accounting of
their billing on this project. Their submittal includes an
analysis of their work in relation to their original purchase
order. Also, there is a listing of their invoices with the
credits, extras, and billing corrections. The final cost to
repair and replace the pier electrical and fire protection
equipment totals $646,409.96; this is a net increase of
$44,421.96 over the original purchase order. After carefully
reviewing Marina Power Co.'s billings on this project, the
Department of Public Works and the Hurricane Andrew Recovery Team
(HART) have determined that this increase in contract is
appropriate and that the costs will be paid by FEMA
reimbursements to the City. It is requested that the City
Commission approve the increase in Marina Power Co.'s purchase
order from $601,998 to $646,409.96 in order to close out this
project.
95- 534
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
Walter Foeman June 19, 1995
TO ,City ClerkDATE Fil:
Request to Publish
SUa,ECT Notice of Public Hearing -
Dinner Key Marina
Rehabilitation
FROM WaldemaL E. L , Director REFERENCEYurricane Damage Pier
�rer Public Works Department Equipment
ENCLOSURES.
INCREASE IN CONTRACT
Please make arrangements to publish a Notice of Public Hearing
for objections to a proposed increase in the contract with Marina
Power Company, Inc. for repair or replacement of hurricane
damayed electrical and fire protection equipment installed on the
Dinne,_ Key Marina Piers, Project H-1003,CIP 414410.
'i.'he Public Hearing has been scheduled for July 13, 1995.
AppXove
Allan Poms, Chief Architect
Civil Engineering (Highways)
John Jackson, Construction
Cost Analysis
Central
i
Elvi Gallastegui
Agenda Coordinator
95- 534
1
CITY OF 1K-Awl , FLORIDA
NOTICE OF '=r.;BLIC HEARING
A public hearing will be held w the Commission of the City of
Miami, Florida, on July 13, 1^35, at 10:00 a.m. in the City
Commission Chambers at City Hal'_, 3300 Pan American Drive, Miami,
rlorida, for the purpose c hearing objections from any
interested parties affected v an increase in the contract
between Marina Power Company, -..c. and the City of Miami in an
amount not to exceed. $44,421-25 for repair or replacement of
hurricane damaged electrical and. Lire protection equipment at
Dinner Key Marina, Project H-?_^"_, CIF No. 414410.
All .interested persons are in•r_t-ed to appear and may be heard
(-.oncerning this item. Should. --.nv person desire to appeal any
decision of the City Commission with respect to any matter,
considered at this hearing, t1a.t person shall ensure that a
verbatim record of the proceedings is made, including all
testimony and evidence upon wh_c.a any appeal may be based.
Walter Foeman
City Clerk
Miami, Florida
D5- 534