HomeMy WebLinkAboutR-95-0316J-95-176
4/11/95
RESOLUTION NO.
95- 316
A. RESOLUTION ACCEPTING THE BID OF VENECON,
INC. IN THE PROPOSED AMOUNT OF $69,000.00,
TOTAL BID OF THE PROPOSAL, FOR THE PROJECT
ENTITLED "CHEERLEADERS RESTROOM AND LOCKER
ROOM II AT ORANGE BOWL, B-6236" (SECOND
BIDDING); ALLOCATING FUNDS THEREFOR FROM THE
ORANGE BOWL OPERATING BUDGET, NO. 350503-340
IN THE AMOUNT OF $69,000.00 TO COVER THE
CONTRACT COST AND $14,416.00 TO COVER THE
ESTIMATED EXPENSES, FOR AN ESTIMATED TOTAL
COST OF $83,416.00; AUTHORIZING THE CITY
MANAGER TO EXECUTE A CONTRACT, IN A FORM
ACCEPTABLE TO THE CITY ATTORNEY, WITH SAID
FIRM.
WHEREAS, sealed bids were received March 28, 1995 for
"CHEERLEADERS RESTROOM AND LOCKER ROOM II AT ORANGE BOWL B-6236"
(SECOND BIDDING); and
WHEREAS, the City Manager and the Director of the Department
of Public Works recommend that the bid from Venecom, Inc. be
accepted as the lowest responsible and responsive bid; and
WHEREAS, Orange Bowl Operating Budget appropriated funds in
the proposed amount of the contract, project expense and
incidentals under Account No. 350503-340; and
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
CITY COMMISSION
MEETING OF
MAY 0 9 1995
Resolution No.
95- 316
Kt�.
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
Section.
Section 2. The March 28, 1995 bid of Venecom, Inc., in
the proposed amount of $69,000.00 for the project entitled
"CHEERLEADERS RESTROOM AND LOCKER ROOM II AT ORANGE BOWL B-6236"
(SECOND BIDDING) for the total base bid of the proposal based on
a lump sum and unit prices, is hereby accepted at the price
stated therein.
Section 3. The total estimated project cost of
$83,416.00 is hereby allocated from the Orange Bowl Operating
Budget, No. 350503-340. Said total project cost consists of the
$69,000.00 contract cost and $14,416.00 estimated expenses
incurred by the city.
Section 4. The City Manager is hereby authorized-" tc
enter into a contract, in a form acceptable to the City Attorney,
on behalf of the City of Miami with Venecom, Inc., Zor
"CHEERLEADERS RESTROOM AND LOCKER ROOM II AT ORANGE BOWL B-6236"
(SECOND BIDDING) total bid of the proposal.
Section 5. This Resolution shall become effective
immediately upon its adoption.
The herein authorization is further subject to compliance
with all requirements that may be imposed by the City
Attorney, including but not limited to those prescribed by
applicable City Charter and Code provisions.
- 2 - 95- 316
PASSED AND ADOPTED this lst day of May 1995.
ST PHEN P. CLAR , MAYOR
ATT
• 4
MAT'TY HIRAI
CITY CLERK
SUBMITTED BY:
WALDEMAR E. LEE
DIRECTOR OF PUBLIC WORKS
PREPARED AND APPROVED BY:
tk�S�ulf\.
'G. MIRIAM MAER
CHIEF ASSISTANT CITY ATTORNEY
APPROVED AS TO FORM AND CORRECTNESS:
A." QU NN JOB I II
CITY ATTO Y
GMM:osk:M 055
- 3 -
REVIEW BY:
TONY PAJlAlf5—DIRECT7R
CONFERENCE , CONVENTIONS & PUBLIC FACILITIES
35- 316
P*:.
CITY OF MIAMI, FLORIDA ��
INTER -OFFICE MEMORANDUM
Honorable Mayor and Members APR 13 1995 B-6236
TO: of the City Commission DATE FILE
Resolution Awarding Contract
SUBJECT : for Cheerleaders Restroom &
Locker Room II at Orange Bowl
(Second Bidding)
FROM : Ces dio REFERENCES:
Cit ager Resolution
ENCLOSURES:
RECOMMENDATION
It is respectfully recommended that the City Commission adopt the
attached resolution accepting the low bid of VENECON, INC.,. a
company loci ed within Dade County and within the City of Miami,
for "Cheerleaders Restroom & Locker Room II at Orange Bowl B-
6236" (Second Bidding received March 28, 1995 in the amount of
$69,000.00, total Bic authorizing the City Manager to enter into
a contract on behalf of the City.
BACKGROUND
Amount of Bid: $ 69,000.00
Cost Estimate: $ 91,000.00
% of Cost Estimate: 75.8%
Source of Funds: Orange Bowl operating budget No. 350503-340
Minority Representation: 264 invitations mailed
22 contractors picked up plans & specs
(11 Hispanic, 2 Black, 1 Female)
9 contractors submitted bids
(1 Hispanic, 1 Black, _ Female)
Public Hearings/Notices: No public hearing/Bid Notice published.
Assessable Project: No
Discussion: The Department of Public Works has evaluated the
bids received on March 28, 1995 and determined that the lowest
responsible and responsive bid, in the amount of $69,0,--.o,0b� is
from VENECOM, INC., a minority controlled corporation.
Funds are available to cover the contract cost, and for such
incidental items as postage, blueprinting, advertising, and
reproduction costs.
Attachment:
Proposed Resolution
95- 316 C? 7- J
FACT SHEET
PUBLIC WORKS DEPARTMENT
DATE 03 / 29 / 1995
JOB k: B-6236
PROJECT NAME:
CHEERLEADERS RESTROOM & LOCKER ROOM II
350503.340
LOCATION:
ORANGE BOWL STADIUM
TYPE:
PROJECT MANAGER ROBERTO SILVA
FEDERAL PARTICIPATION:
ASSOCIATED DEPARTMENT: CONFERENCES CONVENTIONS & PUBLIC FACILITIES
ASSESSABLE: [�
EMERGENCY: C�
RESOLUTION $f
BID REQUEST:
M FORMAL
® INFORMAL
DESCRIPTION: THE PROJECT CONSISTS OF FURNISHING ALL LABOR, MATERIALS AND E UIPMENT FOR NEW CHEERLEADERS
RESTROOM AND LOCKER ROOM APPROX. 1320 S .Fr. LOCATED IN ORANGE BOWL GROUND FLOOR
NECESSARY CONTN" ON TW SA09
SCOPE OF SERVICES:
Crnt
OUTSIDE
EST. AMOUNT (% OF CoNST. Com
SURVEY/PLAT
S
SITE INVESTIGATION
0
S
PLANNING AND STUDY
$ �% OF (EC)
DESIGN
S 7,286.00 6 % OF (EC)
SPECS AND BID PROCESS
$ 1,820.00 2 % OF (EC)
BLUEPRINTING AND ADVERTISING
S (E)
CONSTRUCTION [_]
s 69,000•00 (BID)
CONST. INSP. do MANAGEMENT
Q
S 4,140.00 6 % OF BID
OTHER Q
O
S — (E)
SUBTOTAL
S 82,240.00 16 %
(ENO. FEE)
INDIRECT COST (1.43%)
S 1,176.00 (E)
CONTINGENCIES (5%)
S
(Ec) EsnmrE comer. COeT: $ 91,000.00
TOTAL
S 83,416.00
M EeruuArE
CONTRACTOR'S INFORMATION:
C1asa: J 5
Non- Mlnorlty r--�
Type of Work: GENERAL CONSTRUCTION
May I r
Years o[ Eata6liahment: 2.5 YEARS
LAceme CGC 045393
Name: VENECON, INC.
Telephone (30S) 632-8616
Addrem: 1900 S.W. 1 STREET SUITE 212
AMI. FLORIDA 33135
CLASS: J■JOINT PePRIME S■SUB
Contact Person: OSCARBUSTAMAN'TE
PANORRY: BeBLACK HmHLSPANIC Fel'EMALE
SUB -CONTRACTOR
Names:
95- 316
BRYAN
cerBCS• accicra�rr nlnenT�nc �. a •www�..��
��� �.� .
�. "..� "___
lKC,V. Y/Yi
FORMAL BID
CHEERLEADER RESTROOM & LOCKER ROOM II.
Project Number: B-6236 Number: 350503-340
Project Manager: ROBERTO SILVA Date: 03/ 28 �5
Person who received the bids: A. CORRALES & R. SILVA Received at: CITY CLERK'S OFFICE. CITY HALL
Construction Estimate = $ 91,000.00 Timq I1:00 A.M.
BIDDER
VENECOM INC.
LEADEX CORPORATION
D.E.GIDI & ASSOC.CORP.
HECTOR R.OBREGON
ADDRESS
1800 MIAMS.W. I1 FL 3 ISTE.212
42NMIAMI FLE33 2504A,
255 UNIVERSITY Dr.
CORAL GABLES. FL. 33134
2146
MIAMI,NFL 331 5
HID BOND AMOUNT
B.B.CHECK S3,450.00
B.B.VOUCHER p95-030
B.B.VOUCHER #95-032
B.B.CHECK $3.900.00
IRREGULARITIES
MINORITY OWNED
YES
YES
YES
YES
ITEM No.
DESCRIPTION
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
BASE BID TOTAL OF ITEMS 1 THRU 2
$69.000.00
$70,B80.00
$76.800.00
$78,000.00
1
FOR FURNISHING ALL LABOR, MATERIALS AND
EQUIPMENT FOR NEW CHEERLEADERS RESTROOM
AND LOCKER ROOM (LOCATED IN ORANGE BOWL
GROUND FLOOR)
$63,000.00
$64,880.00
$70,800,00
$72,000.00
2
PROVISION FOR SPECIAL ITEMS
58,000.00
$8,000.00
$6,000.00
$8,000.00
* IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT
A - No Power -of -Attorney THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM VENECON INC.
B - No Affidavit as to Capital do Surplus of Bonding Company FOR THE TOTAL A14OUNT OF $69,000.00
C - Corrected Extensions
D - Proposal Unsigned or improperly Signed or no Corporate Seal E - Incomplete Extensions If the above contractor is not the loves8bide ex ri:
F - Non -responsive bidG - Improper Bid BondH - Corrected Bid----------- - -- - - --
1 -No First Source Hiring Compliance Statement ____l�S _______________________ t?--___________-____
J - No Minority Compliance Statement _
K - No Duplicate Bid Proposal----------------------------`-------------5`fiL�`1 f �1'-- - - - - - - - - - - -
L- No Bid ----------------------------------------------------- --- ---------
0
I
FORMAL BID
CHEERLEADER RESTROOM & LOCKER ROOM II.
Project Number: B-6236 Number: 350503-340
Project Manager: ROBERTO SILVA Date: 03,/ 28 95
Person who received the bids: A. CORRALES & R. SILVA Received at: CITY CLERK'S OFFICE, CITY HALL
Construction Estimate = $ 91,000.00 Time: 11:00 A.M.
BIDDER
7GECASSOCIATFS,INC.
NCI CONSTRUCTION
FORREST CONSe.MGMT.,INC.
RECIO AND ASSOC.,INC.
ADDRESS
63 AVE.
L 33165
42N.W. 27 AVE.SPE.304A
MIAMI, FL 33186
2452 N.W. 78 DT.
MIAMI, FL. 33t47
8053 N.H. 64ST.
MIAMI, FL 33166
BID BOND AMOUNT
B.115%
B.B 5%
8.13.5%
B.B.5%
IRREGULARITIES
H
MINORITY OWNED
YES
YES
YES
YES
ITEM No.
DESCRIPTION
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
BASE BID TOTAL OF ITEMS 1 THRU 2
E78,500.00
970.958.00
$79,137.60
$79.687.90
1
FOR FURNISHING ALL LABOR, MATERIALS AND
EQUIPMENT FOR NEW CHEERLEADERS RESTROOM
AND LOCKER ROOM (LOCATED IN ORANGE BOWL
GROUND FLOOR)
$72,600.00
$72,968.00
$73,137.60
$73,687.00
2
PROVISION FOR SPECIAL ITEMS
$6,000.00
S5,000.00
$6,000.00
$6,000.00
+ IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT
A — No Power —of —Attorney THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM VENECON INC.
B — No Affidavit as to Capital & Surplus of Bonding Company FOR THE TOTAL AMOUNT OF $69,000.00
C — Corrected Extensions
D — Proposal Unsigned or improperly Signed or no Corporate Seal If the a ove contract 1S not the 1 Wbider ain:
E — Incomplete ExtensionsF — Non —responsive bidG — Improper Bid Bond ------H — Corrected Bid------t' — ----------------
- -------------------
I — No First Source Hiring Compliance Statement_________________________________________—__—_—_—_—
J — No Minority Compliance Statement _
K — No Duplicate Bid Proposal — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — - - - - - - - - - - - -
SHEET 2 3—
L— No Bid — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — OF —
a
FORMAL BID
CHEERLEADER. RESTROOM & LOCKER ROOM II.
Project Number: B-6236 Number: 350503-340
Project Manager: ROBERTO SILVA Date: 03/ 28 ,K5
Person who received the bids: A. CORRALES & R. SILVA Received at: CITY CLERK'S OFFICE. CITY HALL_
Construction Estimate = $ 91,000.00 Time: 11:00 A.M.
BIDDER
MET CONSTRUCCTION INC.
-ADDRESS
MIAMI, FL 33127
BID BOND AMOUNT
B.B.5%
IRREGULARITIES
MINORITY OWNED
NO
DESCRIPTION
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
F
BASE BID TOTAL OF ITEMS 1 THRU 2
$04,900.00
1
FOR FURNISHING ALL LABOR, MATERIALS AND
EQUIPMENT FOR NEW CHEERLEADERS RESTROOM
AND LOCKER BOOM (LOCATED IN ORANGE BOWL
GROUND FLOOR)
$78,900.00
2
PROVISION FOR SPECIAL ITEMS
$6,000.00
IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT. OF PUBLIC WORKS THAT
A - No Power -of -Attorney THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM VENECON INC.
B - No Affidavit as to Capital & Surplus of Bonding Company FOR THE TOTAI, AMOUNT OF, $69,000.00
C - Corrected Extensions
D - Proposal Unsigned or improperly Signed or no Corporate Seal If the above contractor is not the to stWdex:
E - Incomplete Extensions
F - Non -responsive bidG - Im ro er Hid BondP P H -Corrected Bid ---- ----- - - - ---'---"---'"--
I -No First Source Hiring Compliance Statement�S�S__________--___---__---_-------- -----------
J - No Minority Compliance Statement _ ___ _______________________________________
K - No Duplicate Bid Proposal --- ---- _ SHEET 3 OF 3
L- No Bid -------------- --- ------------------------------------------------
DID RICDRITT 1.7ST
a CHEERLEADERS RLSTROOM & LOCKER ROOM II AT ORANGE
DIDITEM: -i.-------------------- ------------ _f_ _ --------
BOWL (SECOND BIDDING) B-6236
SID t0 : 94-95-091-----------.._._----------�_.._
SATIN DID(S) OPINED: �MARCH 28, 1995 11:00------ ---
r� �
TOTAL 31Ta SOND (or)
DIDDBR $IDAWDVNT CASSIRRri-CHECK
-_ r- ------ --- - -- -- - ! --- - -_ _---r-'- - _ ---- _ ---
_-_-_---- $ 69`000.00---_- BB. Ck #50526644$ $3,450.00
VENECON INC---
i.FMEX CORPORATION 70,860.00 BB.VOUCHER #95_030
D.E. GIDI & ASSOC. CORP. 76,800.00 BB VOUCHER #95-032
HECTOR R. OBREGON 78,000.00-�- BB CK #340454 $3,900.00
GEC ASSOCIATES, INC. 78,500.00 BB 5%
---- ----------------- ---------------------
NCI CONSTRUCTION 78��950. 00 BB 5 %
-- -_!--__
----- ----------..-..
FORREST CONSTRUCTION MANAGEMENT, INC. 79_ 137.60`--- BB 5 % '
RECIO AND ASSOC., INC. 79,687.00 BB 5%
-------------------- ------------ -----------------------
MET CONSTRUCTION, INC_-__-_-_-___-- 84,900.00 BB 50
-------------------------------------
" 0"r_rs f-orn the v��r(ndc�r s listed here►n
o'hs?r offers submitted in f res,�)onse to this
-----------
(Parson
----------------------
-,re the only offers
•�s;#a-.Fuze-.i�._1uL-- -
solic"t Zion, if any,
----------------------
------------ --..-----------------+----------------------
-------------------a---------------#----------------------
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
----------------------------- ----------------------
------------
- - ------------ I -------------- I ------------------------
------------- -------------&------------ - ------
��_ ,seceivad ( —) envelopes on behalf of
vltg bids)
Pubi is Wo gip- --------------- ou _- �!�-_------
�GitP m�partm�at)
• � S I G?iED e _
(DsPvtr tit lobs]
City of Miami Cash:
COLLECTIONS REPOW Checks: o 1)
Report of Collections Y
DR
N 0- 2 7 0 8 7 r - 1,�Departrnent/Division:, /�VI-1'e-. Prepared By:
eianature
LN
NO
TRANS.
CODE
DOCUMENT
REFERENCE NO.
I
SUBSIDIARY
ACCOUNT
INDEX
CODE
OBJ.
OF
REV
PROJECT
AMOUNT
(KEYPUNCH LEFT
ZERO FILLED)
'aet
DESCRIPTION
no.
R
P.
F.
series
G/L
no.
series
no.
-
---------
------
-----------------
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
—
— —
—
—
—
p� Get
-----------
------------------------
-
H+
---------------------------
------------
11
-
-----------------
---------------
-
-------------------
-
-
- ----------------------
-------
-----------------------
---------------------------------------
---------
----------------------------
IF
--------------
-------------
---------------------------------------
----------
----
-
------------
----------------------------
-------------------------------------
-----
-1-fl-
-------
------------------------------
C
FNITM
403
Rev.
06/8E
-I
Routing:
Carry
both
copies
and
funds
to
Treasi,ry
M .......
nt
lm—,.
n.
-
-----
fill
------
: — - J-0—y 1—fidgelFiVrIL; %,Hnary - uepartment (After valiclatea by freasury Management)
340454
fel CAPITAL. BANK
REMITTER South Florida's Bs�gk
*****HECTOR OBREGON******************* 67g11
MARCH 28 1995
PAY OTO THE
RDER OF *****CITY OF MIAMI�cIkde3tsk�k�Yok�t�k*>F�k�tok�k*>tiok�F�k�k*Tt�k�kak4nk�Yek9c9k�cic4e�c*o4�t�YokdF�kit�k�k Iw�:�
SOL TH
WEST 10 ir,., (0 0 L. U* •ug*.,v�aj!r O ,**�i,.
7c
DOLLARS
THIS DOCUMENT HAS A MICRO-MNT SIGNATURE LINE. SIMULATED WATERMARK, AND CHLOROSTAIN PAPER ABSENCE OF THESE FEATURES WILL INDICATE A COPY
CASHIER'S CHECK f
111113404540,. 1:06?0084141: 1150100050 20411'
s: rJay •x A.M 2 r> tq r'- a- y,„+.4� .✓'`�ty*"e"1'''r+4*�"Pj �.,a r-- z, r•rY: c+
Sr. Y.1 `s�.k.'..5� t;?,..�2 ..:; r, ors LU:'£�. _ a..+k�Li :r 'c• .,.. .,
t.... - .._ _ .. .... ._. ... _..._
PAY **THREE THOUSAND FOUR HUNDRED FIFTY DOLLARS AND 00 CENTS** $ **3450.00** 14
To **CITY OF MIAMI**
ti THE BARNETT BANK y
ORDER ****
OF
AUTHORIZ D SIGNAT
Issued — O—A V -- — ---
By Integrated PaymenI Systems Inc; Englewood, Colorado
g
First Interstate olDonver, N.A.; Denver CO'
11'60010150311' 1:10 200001B48 1093?? 505 2664Lt811,
THEVARIABLE TONE BACKGROUND AREA OF THIS DOCUMENTCHANGES COLOR GRADUALLY -AND SMOOTHLY'FROM DARKER TONES AT BOTH TOP AND BOTTOM TO THE LIGHTEST TONE IN THE MIDDLE:. -
l
A/J-m
CITY OF MIAM1, FLORIDA
INTER -OFFICE MEMORANDUM
To: Matty Hirai
City Clerk
FROM Li ssette Lopez
Department of P nbl Works
DATE : March 9, 1995 FILE :
SUBJECT: CHEERLEADERS RESTROOM &
LOCKER ROOM II AT ORANGE BOWL
(SECOND BIDDING) B-3259
REFERENCES :BID NO. 9 4- 9 5- 0 91
l�
ENCLOSURES:
Contractors will submit bids for the above reference project to
be opened on.
March 28, 1995 Time: 11:00 AM.
Any bid submitted afte►• the above appointed time will not be
accepted by the City Clerk. Please make the necessary provisions
for this bid opening. A representative from our Department will
be present. We will notify you in writing if there will be a
postponement or cancellation prior to the opening of bids.
c� 710
Ca
BID NO. 94-95-091
;ADVERTISEMENT FOR BIDS
Sealed bids for "CHEERLEADERS RESTROOM AND LOCKEROOM II (SECOND
BIDDING) B-6236" will be received by the City Clerk of the City of
Miami, Florida at 11:00 AM on the 28th day of March, 1995, at the
City Clerk's Office, first floor of the Miami City Hall, 3500 Pan
American Drive, Dinner Key, Miami, Florida, 33133, at which time and
place they will be publicly opened and read. Any bid submitted after
the above appointed time will not be accepted by the City Clerk.
The project consists of the furnishing of all labor, materials and
equipment for a new Cheerleaders restroom and locker room II at the
Orange Bowl as shown in the plans and specifications. Bidders will
furnish performance and bid bonds in accordance with Resolutions NO.
86-983 and No. 87-915. For technical questions regarding plans and
specifications, please contact Roberto Silva at (305) 579-6665.
Prospective bidders will be required to submit, with their bid, a
copy of the appropriate Certificate of Competency, as issued by Dade
County, which authorizes the bidder to perform the proposed work.
All bids shall be submitted in accordance with the Instructions to
Bidders and Specifications. New City regulations will require each
bidder to submit proposals in duplicate originals. Plans and
specifications may be obtained from the office of the Director of
Public Works, 275 N.W. 2 Street, 3rd Floor, Miami, Florida, 33128, on
or after March 13, 1995. If bidders wish, a set of plans and
specifications will be mailed to them by writing to the Department of
Public Works and including a separate check for $8. There will be a
$20 deposit required for the first set of plans and specifications.
Additional sets may be purchased for a fee of $20 per set and this is
not refundable. Deposits will be refunded only upon the return of
one set of plans and specifications to the Department of Public
Works, unmarked and in good condition within two (2) weeks after the
opening of the bids.
Bidders are alerted to the provisions of Ordinance No. 10062 and
10538 regarding allocation of contracts to minority vendors,
contractors', and subcontractors. All bidders must submit an
Affirmative Action Plan with their bids. (Ordinances are contained
in Bid Specifications).
C
The City of Miami has adopted Ordinance No. 10032, which implements
the "First Source Hiring Agreement." The object of this Ordinance is
to provide employment opportunities to City of Miami residents on
contracts resulting in the creation of new permanent jobs.
Contractors may be eligible for wage reimbursement under this
program. For further information contact the Department of Public
Works, City of Miami, at (305) 579-6856.
Proposal includes the time of performance, and specifications contain
provisions for liquidated damages for failure to complete the work on
time. The City Commission reserves the right to waive any
informality in any bid, and the City Manager may reject any or all
bids, and readvertise (B-6236, Req.2592).
Cesar H. Odio
City Manager
6A
`"- City of Miami `` ��"
REQUISITION FOR ADVERTISEMENT This number must
appear in the
advertisement.
INSTRUCTIONS: Please ty a and atta h a comof the adygrtisement with this reguisitign.
,1. Department:
Ptiblic Works
2. Division:
Admi.ni.strat:l.on
3. Account Code number:
CIP# 350503-340
4. Is this a confirmation:
13 Yes ❑ No
5. Prepared by:
Lis.set.te Lopez
6. Size of advertisemeq /} _ 9 5 _ 0
350503-287
T. Starting date:
3/13/95
8. Telephone number:
5/3-6865
9. Number of times this advertisement: is to be
published: o u c e
10. Type, of advertisement:
LJ I-e al ❑ Classified ❑ Display
11. Remarks:
"CHEERLEADERS RESTROOM & LOCKER ROOM lI AT ORANGE BOWL (SECOND BIDDING)
B — 6 2 3 6
12.
Publication
r
r t Ma Men"
; _
Date(s) of
Advertisement
Invoice No.
Amount
n
Uj
13.
Approved
❑ Disapproved
Departme�Directo Designee Date
Approved for Payment Date
C IGS/PC 503 Rev. 12/89 1 Routing: Forward White and Canary to G.S.A. (Procurement Manactement) and retain Pink coov.
wo i mou i iun: wneze - %;anary - ueparrment
BID NO. 94-95-091
ADVERTISEMENT FOR BIDS
Sealed bids for "CHEERLEADERS RESTROOM AND LOCKEROOM II (SECOND
BIDDING) B-6236" will be received by the City Clerk of the City of
Miami, Florida at 11:00 AM on the 28th day of March, 1995, at the
City Clerk's Office, first floor of the Miami City Hall, 3500 Pan
American Drive, Dinner Key, Miami, Florida, 33133, at which time and
place they will be publicly opened and read. Any bid submitted after
the above appointed time will not be accepted by the City Clerk.
The project consists of the furnishing of all labor, materials and
equipment for a new Cheerleaders restroom and locker room II at the
Orange Bowl as shown in the plans and specifications. Bidders will
furnish performance and bid bonds in accordance with Resolutions NO.
86-983 and No. 87-915. For technical questions regarding plans and
specifications, please contact Roberto Silva at (305) 579-6865.
Prospective bidders will be required to submit, with their bid, a
copy of the appropriate Certificate of Competency, as issued by Dade
County, which authorizes the bidder to perform the proposed work.
All bids shall be submitted in accordance with the Instructions to
Bidders and Specifications. New City regulations will require each
bidder to submit proposals in plicate originals. Plans and
specifications may be obtained from the office of the Director of
Public Works, 275 N.W. 2 Street, 3rd Floor, Miami, Florida, 33128, on
or after March 13, 1995. If bidders wish, a set of plans and
specifications will be mailed to them by writing to the Department of
Public Works and including a seQarate check for $8. There will be a
$20 deposit required for the first set of plans and specifications.
Additional sets may be purchased for a fee of $20 per set and this is
not refundable. Deposits will be refunded only upon the return of
one set of plans and specifications to the Department of Public
Works, unmarked and in good condition within two (2) weeks after the
opening of the bids.
Bidders are alerted to the provisions of Ordinance No. 10062 and
10538 regarding allocation of contracts to minority vendors,
contractors, and subcontractors. All bidders must submit an
Affirmative Action Plan with their bids. (Ordinances are contained
in Bid Specifications).
The City of Miami has adopted Ordinance No. 100321 which implements
the "First Source Hiring Agreement." The object of this Ordinance is
to provide employment opportunities to City of Miami residents on
contracts resulting in the creation of new permanent jobs.
Contractors may be eligible for wage reimbursement under this
program. For further information contact the Department of Public
Works, City of Miami, at (305) 579-6856.
Proposal includes the time of performance, and specifications contain
provisions for liquidated damages for failure to complete the work on
time. The City Commission reserves the right to waive any
informality in any bid, and the City Manager may reject any or all
bids, and readvertise (B-6236, Req.2592).
Cesar H. Odio
City Manager