HomeMy WebLinkAboutR-95-0206U-95-177 02/24/95 95- 206 RESOLUTION NO. A RESOLUTION ACCEPTING THE BID OF RONLO, INC. IN THE PROPOSED AMOUNT OF $163,196.50, TOTAL BID OF THE PROPOSAL, FOR THE PROJECT ENTITLED "HEAVY EQUIPMENT FACILITY PARKING LOT - PHASE I (SECOND BIDDING) B-4580"; ALLOCATING FUNDS THEREFOR FROM PROJECT NOS. 311018 ($69,086.10) AND 311030 ($122,819.72), AS APPROPRIATED BY THE FISCAL YEAR 1994-95 CAPITAL IMPROVEMENT ORDINANCE NO. 11205, AS AMENDED IN THE AMOUNT OF $163,196.50 TO COVER THE CONTRACT COST AND $28,709.32 TO COVER THE ESTIMATED EXPENSES, FOR AN ESTIMATED TOTAL COST OF $191,905.82; AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH SAID FIRM. WHEREAS, sealed bids were received February 21, 1995, for "HEAVY EQUIPMENT FACILITY PARKING LOT - PHASE I (SECOND BIDDING) B-4580"; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend that the bid from Ronlo, Inc., be accepted as the lowest responsible and responsive bid; and WHEREAS, the Fiscal Year 1994-95 Capital Improvement Ordinance No. 11205, as amended, adopted November 17, 1994, appropriated monies for the proposed amount of the contract, project expense and incidentals under Project Nos. 311018 and 311030 of said Ordinance. NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: CITY COM1V=ION MEETING OF MAR 0 9 1995 Resolution No. 95- 206 Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. The February 21, 1995 bid of Ronlo, Inc., in the proposed amount of $163,196.50 for the project entitled "HEAVY EQUIPMENT FACILITY PARKING LOT - PHASE I (SECOND BIDDING) B-4580" for the total bid of the proposal, based on lump sum and unit prices, is hereby accepted at the price stated therein. Section 3. The total estimated project cost of $191,905.82 is hereby allocated from Project Nos. 311018 ($69,088.10) and 311030 ($122,819.72) as appropriated by Fiscal Year 1994-95 Capital Improvement Ordinance No. 11205 as amended. Said total project cost consists of the $163.196.50 contract cost and $28,709.32 estimated expenses incurred by the City. Section 4. The City Manager is hereby authorized to enter into a contract`/ ,in a form acceptable to the City Attorney, on behalf of the City of Miami with Ronlo, Inc., for "HEAVY EQUIPMENT FACILITY PARKING LOT - PHASE I (SECOND BIDDING) B-4580", total bid of the proposal. Section 5. This Resolution shall become effective immediately upon its adoption. The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. - 2 - 95- 206 PASSED AND ADOPTED this 9th day of March , 1995. &10 ,.(:�) qa"le�� STE HEN P. CLA9K, MAYOR ATTE MATTY HIRAI CITY CLERK FRAN CASTA EDA, DIRECTOR COMMUNITY DEVELOPMENT SUBMITTED BY: WALDEMAR E. LEE DIRECTOR OF PUBLIC WORKS LEGAL REVIEW BY: X�9 G. MIRIAM MAER CHIEF ASSISTANT CITY ATTORNEY APPROVED AS TO FORM AND CORRECTNESS: A! QtANN t70S, I I I CITY ATTO Y -3- CAPITAL PROJECT REVIEW: ,:EbUARD RODRIGUE , DIACTOR ASSET NAGEMEN AND CAPITAL IMPROVEMENTS 95- 206 CITY OF MIAMI, FLORIDA so INTER-OFFICE MEMORANDUM TO Honorable Mayor and Members DATE : FEB 24 1995 FILE : B-4580 of the City Commission SUBJECT: Resolution Awarding Contract for Heavy Equipment Facility Parking Lot - Phase I REFERENCES: ( Second Bidding) FROM : Cesa O City er ENCLOSURES: Resolution RECOMMENDATION it is respectfully recommended that the City Commission adopt the attached resolution accepting the low bid of Ronlo, Inc., a company located within Dade County and not within the City of Miami, for "Heavy Equipment Facility Parking Lot - Phase 1 (Second Bidding) B-4580", received February 21, 1995 1n: the amount of $163,196.50, Total Bid; authorizing the City Manager to enter into a contract on behalf of the City. BACKGROUND Amount of Bid: $183,196.50 Cost Estimate: $183,000.00 % of Cost Estimate: 89% Source of Funds: From the 19th Year Community Development Block Grant Funds Project No. 311018 and from Impact Fees & matching funds from Project 311030. Minority Representation: 260 Invitations mailed 19 contractors picked up plans & specs (10 Hispanic, 2 Black, 0 Female) 9 contractors submitted blds (6 Hispanic, 1 Black, 0 Female) Public Hearings/Notices: No public hearing/Bid Notice published. Assessable Project: No Discussion: The Department of Public Works has evaluated the bids received on February 21, 1995 and determined that the lowest responsible and responsive bid, in the amount of $163,196.50 is from Ronlo, inc., a non -minority controlled corporation. Funds are available to cover the contract cost, and for such incidental Items as postage, blueprinting, advertising, and reproduction costs. Attachment: Proposed Resolution 9 5- 206 ~� FACT SHEET PUBLIC WORKS DEPARTMENT DATE: 0212211995 JOB #: B-4580 PROJECT NAME: Heavy E ul ment Facility Parkin Lot - Phase I LOCATION: 1390 N.W. 20 Street CIP#: 311018.36%; 311030.64% PROJECT MANAGER: Guillermo Acosta TYPE: C.D. FEDERAL PARTICIPATION: a ASSOCIATED DEPARTMENT: G.S.A ASSESSABLE: EMERGENCY: RESOLUTION #: BID REQUEST: FORMAL F—X-1 INFORMAL Q DESCRIPTION: The prolect is designed to create additional parking for vehicles to be serviced In the Heavy Equipment Facility. The project consists of demolition work earth removal and regrading), landscapIng, pavIng,drainage design, lighting, Irrigation, and tree planting. The purpose of the project is to provide adequate parking and Infrastructure at the Heavy Equipment Facillty since the Cltv of Miami's Motor Pool Is being sold to Jackson Memorial Hospital. IF NECESSARY CONTINUE ON THE BACK SCOPE OF SERVICES: CITY OUTSIDE AMOUNT (% OF CONTT. COST) SURVEYIPLAT SITE INVESTIGATION PLANNING AND STUDY [� 0 DESIGN 0 0 $10,980.00 6 %OF(EC) SPECS AND BID PROCESS 0 $500.00 BLUEPRINTING AND ADVERTISING FX $600.00 CONSTRUCTION 0 F �]X $163,196.50 (BID) CONTT. INSP. & MANAGEMENT 0 $11,423.76 7 % BID OTHER Testing 0 0 $2,500.00 (E) SUBTOTAL $189,200.26 INDIRECT COSTS (1.43%) $2,705.56 (E) CONTIGENCIES (EQESTIMATE CONS7.COST: $183,000 TOTAL $191,905.82 (E) ES77HATE CONTRACTOR'S INFORMATION: CLASS: = © = TYPE OF WORK: Parking Lot Project NON MINORITY YEARS OF ESTABLISHMENT: 20 MINORITY 09 NAME: RONLO INC. LICENSE E-1824 ADDRESS: 17435 S.W. 92 AVE. CONTACT PERSON: Ronald W. Scholer TELEPHONE ( 305 ) 235.2983 SUB -CONTRACTORS NAMES: Summit Electric - Electrical Aleman's Sprinkler - Irrigation Nature Way - Landscape CLASS: J= JOINr P• PRIME S- SUB 6ANORW; 8• BLACK H- HISPANIC I- FEMALE 111458aftl c.c.: AW3TAMOIRECTORS. A3500ATEDDEPT- COSTANALYSIS. aPMARAGER, RM OPMARAOER. V 5 — 206 9 CC C0 I FORMAL BID HEAVY EQUIPMENT FACILITY PARKING LOT - PHASE I B-4580 Project Number: B-4580 CIP Number: 311018-36%; 311030-64% Project Manager: GUILLERMO ACOSTA Date: 02/ 21 /_95 Person who received the bids: GUILLERMO ACOSTA Received at: CITY CLERK'S OFFICE CITY HALL Construction Estimate = $ 183,000 Time* 10:30 A.M. BIDDER RONLO INC. M. VILA k ASSOC, INC. LEWIS GREEN CONST. INC. P.J. CONSTRUCTORS INC. F do L CONSTRUCTION INC. ADDRESS 17435 SW 92 AVE. MIAMI. FI.A. 33257 4395 PALM AVE. HIALEAH, FL 33012 627 NE 83 TERR. /1 MIAMI. FL. 33138 4100 SW 70 COURT MIAMI, FL 33155 8095 R 21 LANE HIALEAH, FL 33016 CITY LIMITS NO I N0 YES NO NO BID BOND AMOUNT B.B. $15,000 B.B. 5% B.B. $12,500 B.B. 5X B.B. 5X IRREGULARITIES M L MINORITY OWNED NO YES,H YES,B NO YES,H DESCRIPTION TOTAL TOTAL TOTAL BASE BID: THE TOTAL OF $163.196.50 $169.588.00 $174,859.25 $179.313.30 $179,319.80 ITEMS 1 THRU 23 BASED ON A FORTY FIVE (45) WORKING DAY COMPLETION TIME * IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT A - No Power -of -Attorney THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM RONLO B - No Attt to capital ec surplus of Bonding Company C — Correcteded Extensions INCORPORATED FOR THE TOTAL AMOUNT OF $163,196.50 le D — Proposal Unsigned or Improperly signed or no Corporate Seal E — Incomplete Extensions F — Non —responsive bid If the above contractor is not the lowest bidder explain: G— Improper Bid Bond ----- ----------------------------------------------------------- H — Corrected Bid I — No First Source Hiring Compliance Statement —`--`—"`-----" —"—"--"—" --`—`—"—`— "—"—"—"--" —� "----`—`—` J — No Minority Compliance Statement ----------------------------------------------------------------- K — No Duplicate Bid Proposal _________________________ _ _—_—_--__—____-----__—_---_—_ L — Primary office Location Affidavit Incomplete _—_—_ SHEET 1 OF 2 M — Not a Licensed State of Florida Attorney— In —Fact - - - - - - - - - - - - - - - - - - - IW M _0. O�YA_AC_—__—_--_______—_—_--_____------ . FORMAL BID t'.3Z HEARTY EQUIPMENT FACILITY PARKING LOT - PHASE I B-4580 Project Number: B-4580 CIP Number:_ 311016-36%; 311030-64% Project Manager: GUILLERMO ACOSTA Date: 02j 21 95 Person who received the bids: GUILLERMO ACOSTA Received at: _CITY CLERK'S_ OFFICE, CITY HALL Construction Estimate $ _ 183,000 Time: 10:30 A.M. BIDDER P.N.M. CORPORATION HOMESTEAD CONCRETE AND DRYWALL ROYAL ENGINEERING CONST. MIR[ CONSTRUCTION INC. MODULAR CONTRACTORS ADDRESS 3780 NW 22 AVE. MIAMI, FLA. 33142 209 SW 4 AVENUE HOMESTEAD, FL 33090 715 SW 73 AVE. /4 MIAMI. FL. 33144 7340 SW 121 STREET MIAMI, FL 33156 8300 NW 53 STREET MIAMI, FL 33168 CITY LIMITS NO NO YES NO BID BOND AMOUNT B.B. 5% B.B. VOUCHER B.B. $10.000 B.B. 5a IRREGULARITIES C,H M MINORITY OWNED YES,H YES,H YES,H YES,H DESCRIPTION TOTAL TOTAL TOTAL TOTAL BASE BID: THE TOTAL OF $184,831.70 $186,495.50 i196,040.00 $198,246.00 NO BID ITEMS 1 THRU 23 BASED ON A FORTY FIVE (45) WORKING DAY COMPLETION TIME ' IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT A — No Power—aAttorney AffidavitTHE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM RONLO C — Corrected Extensions Capital Jc Surplus of Bonding company INCORPORATED FOR THE TOTAL AMOUNT OF 163, 196.50 D — Proposal Unsigned or improperly Signed or no Corporate Seal E — Incomplete Extensions F — Non —responsive bid If the above contractor is not the lowest bidder explain: G— Improper Bid Bond ---------------------------------------------------------------- H — Corrected Bid I — No First Source Hiring Compliance Statement —"------"'--'---------------------------------- ----------------- J — No Minority Compliance Statement----------------------------------------..____—___—___—__________ K — No Duplicate Bid Proposal --------------------------- ----------------------------------- L — Primary office Location Affidavit Incomplete _---_--_ SHEET 2 OF 2 _ M --Not Licensed state -of Fiorlde Attorne —in—Fact—'------"------- — ----------------------_------ nd . 0. AC06TA AID IiF!!; HEAVY EQUIPMENT FACILITY -PARKING -LOT -PHASE I ---------- ---- - -- --------- Second Bidding- sID 190.: 94-95-085 3D>TE DID(s) OPIRIDs FEBRUARY 21, 1995-_10:30 a.mA- --------------- DIDDER TOTAL TID AMOUNT — — - - - - - - - - - - - - - - - — --------- -, RONLO, INC. $ 163,196.50 M. VILA & -------------- -----------rww,-_- ASSOCIATES, INC. $ 169,588.00 LEWIS GREEN CONSTRUCTION ------- $ 174,859.25 --------_- P. J. CONSTRUCTORS, INC. $ 179,313.30 F. & L. CONSTRUCTION, INC. $ 1799319.80 P. N. M. HOMESTEAD CORPORATION $ 184,831.70 CONCRETE & DRYWALL $ 192,974,50 ------ ROYAL ENGINEERING CONSTRUCTION $ 196,040.00 ---------------------- MIRI CONSTRUCTION, INC.--------L $ 198_246.00 _ NO BID MODULAR BID NOND-lor1 f— CASSIRRIS CBZCX B.B. $ 15,000.00 B.B. 5% B.B. $ 12,500.00 B.B. 5% -- - --- --- -- --- - -- ----- B.B. 5% B.B. VOUCHER B.B. $ 10,000.00 ----------------------- B.B. 5% ---------------------- � ------------------------------ --------------------- CONTRACTORS, INC. "i3 ers ror�e-vctZoYsstrr-crei�i are the other offers SL113_mittod in re2ponse to tkiis soliciit:'. , etr _he . byv r--iet-r d--Cts'------------ _____________________ ---------------- E------------- ------------- I--____-_--__- ------------- I- ______________ :y of ----- i- - - - - - - - - - - tt� 5, i �r1:7CA.-Z _ __ _ _ _---------- if c ny, ------------ r----------- --------------------- __-_--______-_ -- - - - - - - - - - - - - - - ir - - - - - - - - - - - - - - & - - - - - - - - - - - - - - - - - - - - - - - 4%'_`,''`^= A"r4 received (/0eaveiopes on aeheii of 7r n zQCQi�iat kids) Public War),q........................ I` 9 (City Lepart�oen---------- t � r--------- putt C tP Glsrk) RECE ND '95 FEB 21 A10:30 MAI J'F\)A CITY (ILE K CITY OF MIAMI, FL A. CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Matty Hirai City Clerk JFROM:�tte L peZ Department of Public Works February 1, 1995 DATE : FILE HEAVY EQUIPMENT FACILITY SUBJECT : PARKING LOT - PHASE I (Second Bidding) REFERENCES : BID NO. 9 4- 9 5- 0 8 5 ENCLOSURES: Contractors will submit bids for the above reference project to be opened on: February 21, 1995 Time: 10:30 A.M. Any bid submitted after the above appointed time will not be accepted by the City Clerk. Please make the necessary provisions for this bid opening. A representative from our Department will be present. We will notify you in writing if there will be a postponement or cancellation prior to the opening of bids. /11 ; t1 � ��y �WMa* BID. NO. 94-95-085 ADVERTISEMENT FOR BIDS Sealed bids for "HEAVY EQUIPMENT FACILITY PARKING LOT PHASE I (SECOND BIDDING) B- 4580", gill be received by the City Clerk of the City of Miami, Florida at 10:30 AM on the 21st day of February 1995, at the City Clerk's Office, first floor of the Miami City Hall, 3500 Pan American Drive, Dinner Key Miami, Florida, 33133, at which time and place they will be publicly opened and read. Any bid submitted after the above appointed time will not be accepted by the City Clerk. The project consists of demolition work (earth removal and regrading), landscaping, paving drainage design, lighting, irrigation, and tree planting along the west side of the Heavy Equipment Facility located at 1390 NW 20 Street. Bidders will furnish a bid bond in accordance with Resolutions No. 86-983 and No. 87-915. For clarification of technical issues as presented in documents and specifications, please contact Leonard Helmers, P.E. Chief Civil Engineer, Project Manager, at (305) 579- 6865. Prospective bidders will be required to submit, with their bid, a copy of the appropriate Certificate of Competency. as issued by Dade County,in accordance with Chapter 10 of the Metropolitan Dade County Code, which authorizes the bidder to perform the proposed work. All bids shall be submitted in accordance with the Instructions to Bidders and Specifications. New City regulations will require each bidder to submit proposals in duplicate originals. Plans and specifications may be obtained from the Office of the Director of Public Works, 275 N.W. 2 Street, 3rd Floor, Miami, Florida, 33128, on or after February 1, 1995. If bidders wish, a set of specifications will be mailed to them by writing to the Department of Public Works and including a separate check for $8. There will be a $20 deposit required for the first set of specifications. Additional sets may be purchased for a fee of $20 per set and this is not refundable. Deposits will be refunded only upon the return of one set of specifications to the Department of Public Works, unmarked and in good condition within two (2) weeks after the opening of the bids. Bidders are alerted to the provisions of Ordinances Nos. 10062 and 10538 regarding allocation of contracts to minority vendors, contractors and subcontractors. All bidders must submit an Affirmative Action Plan with their bids. (Ordinances are contained in Bid Specifications). The City of Miami has adopted Ordinance No. 10032, which implements the "First Source Hiring Agreement." The object of this ordinance is to provide employment opportunities to City of Miami residents on contracts resulting in the creation of new permanent jobs. Contractors may be eligible for wage reimbursement under this program. For further information contact the Department of Public Works, City of Miami, at (305) 579-6856. Proposal includes the time of performance, and specifications contain provisions for liquidated damages for failure to complete the work on time. The City Commission reserves the right to waive any informality in any bid, and the City Manager may reject any of all bids, and readvertise (B-4580, Req. 2581). Cesar H. Odio City Manager '95 FEB -2 A 9 :59 A.I... 41, „�f�0.! GIT.Y (;l_CRit CITY OF MIAI`'I. HJ, n 41 BID. NO. 94-95-085" ADVERTISEMENT FOR BIDS;G Sealed bids for "HEAVY EQUIPMENT FACILITY PARKING LOT PHA5t-,I (SECOND BIDDING) B- 458011, will be received by the City Clerk of the City of Miami, Florida at 10:30 AM on the 21st day of February 1995, at the City Clerk's Office, first floor of the Miami City Hal .__3500 Pan American Drive, Dinner Key, Miami, Florida, 33133, at which time and place they will be publicly opened and read. Any bid submitted after the above appointed time will not be accepted by the City Clerk. The project consists of demolition work (earth removal and regrading), landscaping, paving drainage design, lighting, irrigation, and tree planting along the west side of the Heavy Equipment Facility located at 1390 NW 20 Street. Bidders will furnish a bid bond in accordance with Resolutions No. 86-983 and No. 87-915. For clarification of technical issues as presented in documents and specifications, please contact Leonard Helmers, P.E. Chief Civil Engineer, Project Manager, at (305) 579- 6865. Prospective bidders will be required to submit, with their bid, a copy of the appropriate Certificate of Competency,. as issued by Dade County,in accordance with Chapter 10 of the Metropolitan Dade County Code, which authorizes the bidder to perform the proposed work. Al bids shall be submitted in accordance with the Instructions to Bidders and Specifications. New City regulations will require each bidder to submit proposals in duplicate originals. Plans and specifications may be obtained from the Office of the Director of Public Works, 275 N.W. 2 Street, 3rd Floor, Miami, Florida, 33128, on or after February 1, 1995. If bidders wish, a set of specifications will be mailed to them by writing to the Department of Public Works and including a separate check for $8. There will be a $20 deposit required for the first set of specifications. Additional sets may be purchased for a fee of $20 per set and this is not refundable. Deposits will be refunded only upon the return of one set of specifications to the Department of Public Works, unmarked and in good condition within two (2) weeks after the opening of the bids. Bidders are alerted to the provisions of Ordinances Nos. 10062 and 10538 regarding allocation of contracts to minority vendors, contractors and subcontractors. All bidders must submit an Affirmative Action Plan with their bids. (Ordinances are contained in Bid Specifications). The City of Miami has adopted Ordinance No. 10032, which implements the "First Source Hiring Agreement," The object of this ordinance is to provide employment opportunities to City of Miami residents on contracts resulting in the creation of new permanent jobs. Contractors may be eligible for wage reimbursement under this program. For further information contact the Department of Public Works, City of Miami, at (305) 579-6856. Proposal includes the time of performance, and specifications contain provisions for liquidated damages for failure to complete the work on time. The City Commission reserves the right to waive any informality in any bid, and the City Manager may reject any of all bids, and readvertise (B-4580, Req. 2581). Cesar H. Odio City Manager i � v City of Miami 2581 This number must .V REQUISITION FOR ADVERTISEMENT appear in the V.. advertisement. INSTRUCTIONS: Please type and attach a copyf th2 advert!t VItb this rgaulsltl2n. 1. Department: 72. Division: Public Works Administration 3. Account Code number: 4. Is this a confirmation: 5. Prepared by: CIP . #' 317.018 R Yes ❑ No Lissette Lopez 6. Size of adveitiseme ZZ 9 4 - 9 5 _ d8 §tarting date: 8. Telephone number: 192U1-2 7 2-1-95 579-6865 9. Number of times this advertisement is 4o be 10. Type of -advertisement: ubiished: once ® Le al El Classified ElDis la 11. Remarks: "HEAVY EQUIPMENT FACILITY PARKING LOT, -PHASE I (SECOND BIDDING) B�.4580 12. Date(s) of Advertisement Invoice No. Amount Publication izri . .,.. 01 i 13. Approved .,. ❑ Disapproved Department Director/Designee Date Approved for Payment Date C IGS/PC 503 Rev. 12/89 j Routln% Forward_ white and Canary to G.S.A. (Procurement Management) and retain Pink coon. L0101 nRIJU 9 wn: nnna - u.o.M.; %,anary - vepartment