Loading...
HomeMy WebLinkAboutO-11354J-96-114 3/22/96 IM 11354 ORDINANCE NO. AN ORDINANCE AMENDING SECTION 5 OF ORDINANCE NO. 6145, ADOPTED MARCH 19, 1958, AS AMENDED, WHICH ESTABLISHED FEES FOR BUILDING, PLUMBING, ELECTRICAL,_ MECHANICAL (INCLUDING BOILER AND ELEVATOR) INSPECTION, PERMIT AND CERTIFICATE FEES, THEREBY ADDING AND INCREASING REQUIRED FEES TO COVER COSTS FOR THE ENFORCEMENT OF THE SOUTH FLORIDA BUILDING CODE; CONTAINING A REPEALER PROVISION, SEVERABILITY CLAUSE, AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Section 5 of Ordinance No. 6145, adopted March 19, 1958, as amended, which provides fees for building, plumbing, electrical, and mechanical (including boiler and elevator) inspection, permit and certificate fees provides that the City Manager shall increase said fees when necessary to reasonably cover the cost for the enforcement of the South Florida Building Code; and WHEREAS, pursuant to said authority the City Manager filed a schedule of new charges with the City Clerk, which schedule became effective February 1st, 1996; and WHEREAS, the City Manager recommends that Ordinance No. 6145, as amended, be amended to reflect said increased fees and that in order to provide much needed services for the operation of the City of Miami, certain other fees be increased and additional fees established to cover the cost for the enforcement of the South Florida Building Code; 11354 NOW, THEREFORE, BE IT ORDAINED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Ordinance are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. Section 5 of Ordinance No. 6145, adopted March 19, 1958, as amended, which provides fees for building, plumbing, electrical and mechanical (including boiler and elevator) inspection, permit and certificate fees, is hereby amended in the following particulars:1/ " Sec. 5. - FEE SCHEDULE. The Gity Manager shall }neEease-the-ehar-ges as se €er�in th i Seetlen when neeessary to reasenably e9ver the eest fer the enfe eement of the south Fierida Building ^ede Whenever sa-mod eh arg es are to be inerreas ed , the G4:y Manager shall € € lea s e e a , , , of new eharges with the Gity Glark—whieh shall beeefiie effecec.-iye Re earlier than thirty (30) days a€ter sueh €iling= a. FEE FOR WORK WITHOUT PERMIT: When work is commenced prior to obtaining a required permit, a fee feur�T two (2) times that specified herein shall be paid. the payment of such fees shall not relieve any person, firm or corporation from fully complying with all of the requirements of all applicable regulations and codes, nor shall it relieve them from being subject to any of the penalties therein. The fee requirement shall be applicable to all divisions of the Building and Zoning Department. MINIMUM FEE.......................................$50-00 $60.00 1/Words and/or figures stricken through shall be deleted. Underscored words and/or figures shall be added. The remaining provisions are now in effect and shall remain unchanged. Asteriks indicate omitted and unchanged material. 2 11354 b. GENERAL FEES: (1) REINSPECTION FEES: FOR EACH REINSPECTION, EXCEPT WHERE OTHERWISE NOTED .........................$50.00 When extra inspection trips are necessary due to: (a) wrong address being given on call for inspection; (b) rejection of work due to faulty construction; (c) work not being ready for inspection at time specified; (d) failure to call for final or other inspections; (e) required corrections not being made at time specified; (f) fer eaeh seetlen-inhere—weEk was net eempleted ..,he final insPeetien ealled, a fee equal to 1-9% of the eWiginal permit —fee ar %59 99, whieheyer is greater- 4-Ej4 (f) no approved plans at the building site. The payment of reinspection fees may be required before any further permits will be issued to the person or firm owing same, and further inspections may be refused until payment of reinspection fees has been made. (2) REINSPECTION OF EXISTING BUILDINGS AND INSPECTION FOR CERTIFICATE OF COMPLIANCE FEE: Reinspection of existing buildings (by all sections) to determine compliance with the South Florida Building Code, the City of Miami Zoning Ordinance and other applicable ordinances (but not the annual inspection as required by City Code Section 2-87 (c)) and inspection of existing buildings after re- pairs, alterations or remodeling for a Certificate of Compliance, when a Certificate of Occupancy is not required: Each building up to two (2) stories and not ex- ceeding 20.,000 square feet...................$250.00 Additional for each story over two (2) stories......................................$150.00 For each floor over 10,000 square feet, additional per 1,000 square feet .........................$10.00 For the processing of every 40 year recertification 3 113354 application under Section 104.9 of the South Florida Building Code................................$100.00 For the processing of every application for subse- quent 10 year intervals following each 40 year re- certification.................................$50.00 For the processing of the initial application for structural glazing recertification and each subse- quent application under Sections 104.9 and 3315 of the South Florida Building Code..............$100.00 (3) RECERTIFICATION OF PLANS AND REVISED PLANS FEE, AND PERMIT CARD REPLACEMENT. (a) When plans are lost by the owner or contractor, a recertification fee is required to recertify a new set of plans: . 30% of original fee Minimum fee for residential uses.............$50.00 Minimum fee for commercial uses..............$90.00 (b) Revised plans and shop drawings (after approval of initial plans) per sheet revised and reviewed ............................. $45.00 $17.50 Minimum fee..................................$25.00 (c) Replacement of lost permit card..$40.00 $15.00 (4) DRY RUN FEE. Review of preliminary plans prior to application for building permit. Per 100 square_feet.................... .. ...$2.50 Per $1,000.00 (where square footage is not applicable) ....................... ...........$2.50 800 of total amount will be credited to the building permit when issued. No refunds will be allowed. (5) CERTIFICATE OF OCCUPANCY AND CERTIFICATE OF USE 4 11354 (a) Temporary Certificate of Occupancy Single family or duplex (each) ........... $100.00 All others (each) ........................$250.00 (b) Extension of Temporary Certificate of Occupancy Single family or duplex (each) ............ $50.00 All others (each) ........................$100.00 (c) Final Certificate of Occupancy The following fee shall be required for all groups of occupancies as defined in the South Florida Building Code. The Certificate of Occu- pancy shall remain valid for an unlimited time unless revoked; there is a change in the group of occupancy; an enlargement; alteration or addition to the occupancy or to the structure it occupies. Single Family or Duplex per building...$100.00 All others per building................$250.00 (d) Bonds required for unfinished work on Certifi- cates of Occupancy. (i) Amount is to be established by Chief of Section(s) involved and shall be 100% of estimated cost of required work. Cash Bond will be refunded less $50.00 or other bonds discharged, upon completion of re- quired work by owner. (ii) Methods for placing bonds may be: 1. Surety Company issuance of bond. 2. Cash bond. Payable by cash, or certified cashiers check. A copy of signed con- tract with -a contractor to do the work is also required. 3. Letter of Credit from a Federally Guaran- teed Insured State Certified Bank. The letter shall indicate the purpose of the 5 11354 line of credit. A copy of signed contract with a contractor to do the work is also required. (iii) If work is not done within specified time, the City will proceed to have the work done (1) through the Bonding Company if Method No. 1 was used; (2) through the contractor specified in the contract if Method No.-2 or Method No. 3 was used, using the proceeds from the cash bond or from the Bank Letter of Credit. (e) When a building is occupied prior to obtaining a temporary or final Certificate of Occupancy, a fee €eu4 ) times that peei i^ed the_ r-_ double the permit amount plus $100.00 fine shall be paid. The payment of such fee shall not re- lieve any person, firm or corporation from fully complying with all of the requirements of all applicable -regulations and codes, nor shall it relieve them from being subject to any of the penalties therein. (f) Temporary Certificate of Use on partial and/or Temporary Occupancy .......................$50.00 (6) VIOLATION NOTICE: When a violation notice and/or notification letter is sent ordering correction of an existing viola- tion, the following administrative fee is required to be paid, such payment being cumulative and in addition to any fines or penalties which may be im- posed as a result of a conviction for said viola- tion. Each violation notice and/or notification letter sent..........................................$35.00 (7) APPLICATION FEE (PAYABLE AT THE TIME OF APPLICATION) Application Fee.(rejected permit applications).$50.00 ($15.00 credit returned to applicant when permit is issued). All other permit applications ..................$35.00 6 11354 Application fees are charged when the permit is issued and are not refundable. No credit will be given if after review, a complete new design is submitted for review. (8) Fee for computer printout of property information, permits, inspections, etc. per sheet (all systems)..................................$1.00 (9) Fee for Building and Zoning information requested in writing (including file search for records of violations) ............................$'� $40.00 (10) Omitted item(s) from a permit will require an additional permit at.....................Double Fee (11) Fee for change of contractor; when original contractor waives right to refund (applies to all permit types: B,E,MA,MB,ME,MG,P,SG,L)........ $75.00 (12) Fire flow, pump and generator test departmental section involved in test.............$50.00 $60.00 (13) Minimum permit fee (applicable to building, plumbing, electrical and mechanical permits except where specifically noted otherwise).. $50.00 $60.00 (14) Fee for each inspector for tests conducted after normal working hours. (Example: smoke removal sys- tem test) (a) Up to four (4) hours minimum for each test..................................$350.00 (b) After four (4) hours (each inspector) per hour.....................................$60.00 c. REFUNDS, TIME LIMITATION, REVOCATION, ETC. The fees charged pursuant to this ordinance, pro- vided the same are for a permit required by Section 301.1 of the South Florida Building Code, may be re- funded by the Director of the Building and Zoning Department, subject to the following: (1) No refunds shall be made where any work, has commenced except where duplicate permits are issued for the same work, in which case a refund 7 11354 in accordance with paragraph (4) of subsection (c) hereof may be granted to the original permit holder providing that the duplicate permits were issued within ninety (90) days of each other and request for refund is received within ninety (90) days of the issuance of the latter permit. (2) No refunds shall be made where permit have be- come void as provided by paragraph 304.3(a) of the South Florida Building Code. (3) No refunds shall be made on permit fees of $'� $100.00 or less. (4) Refunds on permits or any item thereon, where fees are over Q�'� $100.00 will be refundable on a basis of (70%) (50%) of the balance over $$gig $100.00 such refunds be made to the closest dollar. (5) Full refunds may be granted to a permit holder whose permit is cancelled by owner authorization where work has commenced and such owner selects a second contractor to complete the work. The second contractor shall pay a full fee to complete the work unless the first contractor waives his/her opportu- nity to a refund in writing, or if the property owner can provide proof that the first permit holder was reimbursed for the permit fee, in which case the second contractor is entitled to a permit to cover the same work on a no charge' basis. If the first payment is expired the second contractor shall pay a full permit fee on unstarted work or a completion permit fee in accordance with subparagraph (b) of paragraph (16) of subsection d hereof. (6) A full refund may be granted to a permit holder who takes out a permit covering work outside the jurisdictional inspection area, or if permit is cancelled by the Department within ninety (90) days with no work being done. 8 11354 d. BUILDING PERMIT FEES: (Fees listed do not include plumbing, electrical, or mechanical installations, or use and occupancy fees) (1) NEW BUILDING AND/OR ADDITIONS: For each one (1) square foot of floor area: (a) Single family and Duplex ........... $0.44- $ 0.15 (b) Multifamily ........................44-.4- $ 0.20 (c) Commercial .........................$9.28 $ 0.25 (d) Institutional (hospital, etc.) ..... $9.20 $ 0.25 (e) Theater, auditorium, atrium, etc ... $0.23 $ 0.28 (f) Storage and Industrial use of Group E and F Occupancies ...................... $0. 2 $ 0.17 (g) Greenhouses and buildings for agricultural uses (nonresidential), screen enclosures, trailer additions, for each one (1) sq. ft. of floor area......................... ...... 2- $ 0.27 (h) Interior completion of space in new building while still under prime contractor for first $1,000 of cost...........................$50.00 For each additional $1,000 of cost ....... $10.00 (2) NEW CONSTRUCTION OTHER THAN AS SPECIFIED HEREIN: (a) Water tower, pylons, bulk storage tank founda- tions, sea walls, bulkheads, unusual limited - use buildings, freestanding rigid canopies, marquees, special foundations and similar construction: For each $1,000 of estimated cost or fractional part.....................................$9.00 (b) Metal, wood or other storage sheds (including prefab): First 100 sq. ft...................... ..$15.00 For each additional 100 sq. ft. or fraction thereof..................................$10.00 (Except for each service station underground storage tank and each approved fallout shelter 9 1_154 which conforms to specifications established by Civil Defense and Mobilization Agency and South Florida building Code) each ....... $20.00 (3) ALTERATIONS, REMODELING AND REPAIRS TO BUILDINGS AND OTHER STRUCTURES, INCLUDING SANDBLASTING & GUNITING: Up to $1,000 of estimated cost or fraction part........................................$30.00 For each additional $1,000 of estimated cost or fractional part.............................$15.00 Fire damage - Commercial - Minimum .......... $225.00 (4) INSTALLATION OF EXTERIOR OPERABLE WINDOWS AND EX- TERIOR SLIDING GLASS DOORS IN NEW BUILDINGS OR ADDITIONS EXCEEDING TWO (2) STORIES IN HEIGHT AND THE INSTALLATION, ALTERATIONS AND REPAIR OF SUCH WINDOWS AND DOORS IN EXISTING BUILDINGS OF ANY HEIGHT, AS FOLLOWS: New installation or replacement for each window or door unit* Grp—bethe first Units (Per sq. ft.).. ........................ $2 25 $0.05 For each ,chi tiena- unit* minimum ...... $2. 09 $35 . 00 * Unit is the opening between structural columns. (5) INSTALLATIONS OF CURTAIN WALLS, INCLUDING WINDOWS AND DOORS THEREIN AND THE ALTERATION, REPAIR OR REPLACEMENT OF STORE FRONTS AND SIMILAR FIXED GLASS: For each 100 sq. ft. er fEaetienal parr there^f up to 1,000sq. ......................$4.00 $7.25 (6) MOVING BUILDINGS OR OTHER STRUCTURES: Per building or structure (minimum) .......... $75.00 For each one (1) sq. ft. (does not include cost of new foundation or repairs to building or repairs to 10 11354 building or structure).......................$0 .11 (7) CONCRETE SLABS: (OTHER THAN PAVING) (Where separate installation not covered by prior permit). For first 100 sq. ft. or fractional part thereof.....................................$12.00 For each additional 100 sq. ft. or fractional part thereof......................................$5.50 (8) PAVING: APPLICABLE PERMIT FEES ARE SET FORTH IN PARAGRAPH (13) OF SUBSECTION f HEREOF. (9) ROOFING (INCLUDING REROOFING) AND REPAIRS: Single Family and Duplex For the first 600 sq. ft. (6 squares) per square foot........................................$ 0.07 For each additional square foot over 600 sq. ft. (6.04 squares and over) .....................$ 0.05 Multi -Family and Commercial For the first 500 sq. ft. (5 squares) per square foot........................................$ 0.07 From 501 sq. ft. to 1,000 sq. ft. (5.01 to 10.00 squares) per square foot ....................$ 0.06 For each additional square foot over 1,000 sq. ft. (10.01 squares and over) ....................$ 0.05 If required inspections are not called for prior to completion of work, a new permit shall be applied for at a quadruple fee and part or all of roof covering will have to be removed to allow necessary inspections by Building and Zoning inspector. (10) FENCES AND/OR WALLS: For first 100 lineal_feet or fractional part.........................................$30.00 11 11354 For each additional 100 ft. or fractional part......................................$12.00 (11) AWNINGS AND CANOPIES First $1,000 of estimated cost...............$15.00 For each additional $1,000 or fractional part thereof.......................................$7.50 Minimum Fee..................................$60.00 (12) SWIMMING POOLS (INCLUDING WHIRLPOOLS, HOT TUBS, ETC): For the first 5,000 gallon capacity or fractional part thereof .........................$50-00 $60.00 For pool over 5,000 gallon to 20,000 gallon capa- city or fractional part .....................$75.00 For each additional 1,000 gallon capacity or fractional part..............................$10.00 (13) TEMPORARY PLATFORMS AND TEMPORARY BLEACHERS TO BE USED FOR PUBLIC ASSEMBLY: BLEACHERS -LENGTH OF ROWS X NUMBER OF ROWS FOR TOTAL: For each 100 sq. ft. or fractional part of platform area.........................................$15.00 For 100 lineal feet or fractional part of seats.........................................$7.50 (14) DEMOLITION OF BUILDINGS: For the first 1,000 sq. ft. or fractional part of floor area................................$50.00 For each additional 1,000 sq. ft. or fractional part of floor area ........... ..... .........$25.00 (15) DEMOLITION OF SIGNS, FENCES, AND/OR WALLS AND STRUCTURES OTHER THAN ABOVE: For each $100.00 or fractional part of estimated 12 11354 cost up to$1,000.00 .........................$10.00 For each additional $100.00 or fractional part of estimated cost................................$5.00 (16) EXTENSION/COMPLETION OF PERMITS: (a) EXTENSION OF TIME PERMIT: et -Each request for extension ..... $ 40.00...$55.00 (b) COMPLETION PERMIT FEE: (This applies to all permit types: B, E, MA, ME, MG, MB,P, L, SG). For first $1,000.00 of cost................$30.00 For each additional $1,000.00..............$15.00 (17) TENTS, TEMPORARY PERMIT ONLY: For each tent up to and including 20,000 sq. ft. in area.....................................$50.00 For each additional 1,000 sq. ft. or fraction thereof......................................$7.50 (All tent permits shall be issued for a 30-day period only and fees are not proratable). (18) PAINTING: Over -$� $100 up to $500.00 of estimated cost or fractional part.............................$20.00 For each additional $500.00.................$10.00 (19) TREES: LANDSCAPING: Each tree (new, removal or transplant) ...... $10.00 Hedges per 100 lineal feet or fraction ...... $25.00 Ground cover per 1,000 sq. ft...............$20.00 (20) SIGNS: 13 11354 OWNER IDENTIFICATION: Single -faced, including channel -letter signs, per sq. ft.....................................$ 0.60 Double-faced, including channel -letter signs, per sq. ft.....................................$ 0.90 Painted wall lettering, per sq. ft......... $ 0.50 Sign repairs...............................$25.00 Promotional and Special Events Signs ....... $55.00 Temporary banners, flags, balloons, etc .... $55.00 Footing (each).............................$55.00 GENERAL ADVERTISING: New Construction, per sq. ft...............$0 .60 Sign repairs...............................$25.00 Embellishment (initial), per sq. ft........ $0 .60 Yearly Reinspection Fee (a) Small sign up to 100 sq. ft............ $35.00 (b) Medium sign 101 - 300 sq. ft........... $60.00 (c) Large sign 301 sq. ft. and greater .... $100.00 Footing (each).............................$55.00 Square footage is to be computed in this paragraph in accordance with the smallest calculable geometric figure. (21) PARKING AREA LIGHTING: Each footing and pole .......................$7.50 (22) ENERGY CONSERVATION PLAN REVIEW AND FIELD INSPECTIONS: For each square foot of floor area ........ $ 0.10 (23) RECREATIONAL COURTS (TENNIS,BASKETBALL, ETC.) For each 100 sq. ft ........................$11.00 For each $100 (where square footage is not 14 11354 applicable)................................$11.00 For each footing for posts other fence ...... $7.50 (24) Handrails/Stair Rails (per lineal ft.)..... $ 0.90 (25) Overhead Doors (each). .$6.50 (e) PRODUCTS CONTROL (City permit fees are no longer applicable) (f) PLUMBING PERMIT FEES: MINIMUM PLUMBING AND PAVING PERMIT FEE..$49.08 $45.00 (1) (a) ROUGHING IN OR CAPPED -OFF OUTLETS FOR ALL PLUMBING FIXTURES: For first roughing -in or capped off outlet....................................$6.00 Each additional roughing -in or capped -off outlet....................................$6.00 Replacement of old roughing -in ............ $6.00 (b) FIXTURES SET ON NEW ROUGHING -IN OR ON OLD ROUGHING -IN: First fixture.............................$6.00 Each additional fixture...................$6.00 (2) ALL OTHER FIXTURES, APPURTENANCES OF APPLIANCES NONCLASSIFIED AS PLUMBING FIXTURE BUT HAVING WATER SUPPLY OR WASTE OUTLET OR BOTH: (a) First roughing -in for waste outlet or connection.......... .............. .....$6,00 Each additional roughing -in for waste outlet or connection...............................$6,00 (b) First fixture, appurtenance or appliance set......................................$6.00 Each additional fixture, appurtenance or appliance set............................$6.00 15 11354 (3) (a) Interceptors and -.separators (septic tanks, settling tanks, etc., including drainfield for same): Up to 750 gallons.................$4-00 $35.00 Each additional 150 gallons...............$6.00 (b) Drainfield Relay: Up to 100 sq. ft ......... ........ ........$16.00 Each 100 sq. ft. or fraction..............$6.00 Type D manhole for interceptors and separators...............................$16.00 Interceptors and separators (being abandoned)........................$25.00 (4) SEWERS: (a) SANITARY SEWERS: Each building sewer where connection is made to a septic tank, to a private sewer connection system, to a building drain outside a building or to the city sewer, to an interceptor: Each connection (Residential) ..... $40.00 $45.00 Each connection (Commercial).............$60.00 Sanitary sewer collector system inside private property: Each 50 feet.............................$30.00 Type A, each manhole .....................$30.00 Repair to -sewer or any other waste line Up to$100.00............................$12.00 Each additional $100.00...................$4.00 Sewer capping ..................... $45.00 Sump pump (ejection) ............. 0 $45.00 Sewage treatment plant. .$150.00 (b) STORM SEWER: Roof drain inlet(each)....................$6.00 Roughing -in for each roof drain ........... $6.00 Catch basin on area drain................$12.00 Each catch basin inlet ............. ,..... $12.00 Soakage pit, trench or french drain 16 11354 First 100 eubie 50 lineal feet .......... $25.00 Each additional 1,00 eubie­ 50 lineal feet.....................................$12.00 Each soakage pit inlet...................$12.00 Each soakage pit manhole.................$25.00 Storm sewer collection system inside private property each 50 feet.............$42-8g $45.00 Storm sewer capping ......................$30.00 (5) CONDENSATE DRAIN: All types of air conditioner drains per unit.....................................$12.00 (6) WATER PIPING: Water Service Connection Each service from meter..................$25.00 Water service connection to each additional building.................................$12.00 Water connection to any water -operated device or equipment requiring water to operate, but not a plumbing fixture ...................$12.00 Solar water heater installations or repairs..........................$30-00 $50.00 Solar water heater booster connection or replacement..............................$10.00 Re -piping or repairs to water piping up to $100.00..................................$20.00 Each additional $100.00...................$4.00 Water main extension each 50 ft.......... $12.00 Backflow preventer (domestic water line).$45.00 (7) LAWN SPRINKLER: Each system..............................$60.00 (8) FIRE PROTECTION: Jockey Pump ...................... ......$30.00 Water supply to fire sprinkler system .... $30.00 Fire pump or domestic pump (new ors replacement).............................$35.00 Each standpipe...........................$30.00 Each hose rack or Fire Dept. outlet ...... $10.00 Each siamese or roof manifold ............ $25.00 Each sprinkler head .......................$1.00 17 11354 Each fire flow test ......................$40.00 Each fire hydrant,(Miami std. only) ....... $40.00 Minimum fire sprinklers permit fee ....... $60.00 Backflow preventer (fireline)............ $60.00 (9) SWIMMING POOLS: Swimming pool piping Installations (residential)...................$40.00 $60.00 (commercial).•• .. ........................... Swimming poolpipingreplacement or repair work .............................. $20.00-$45.00 Water connection to pool.................$12.00 Filter replacement .......................$20.00 (10) WELLS: All wells each.... $5.00 $45.00 Connection to or from wells per linear foot.....................................$12.00 (11) WATER TREATMENT PLANT, PUMPING STATION SEWAGE TREATMENT PLANT AND LIFT STATION: Water or sewer treatment plant interior plant piping .... ..............$60.00 $120.00 Lift station ...................$69.00 $120.00 (12) TEMPORARY TOILETS: Water borne or chemical For first installation at jobsite..........................$35.00 $45.00 Each additional installation per job- site..............................$7.00 $10.00 (13) PAVING AND/OR RESURFACING: First 500 sq. ft................... ....$35.00 Each additional 500 sq. ft. (or part�� thereof) ..................... .....$12.00 (14) MISCELLANEOUS: Siphon -breakers on old installations required when repair or unapproved closet is made, each................................$7.00 Hose bib..................................$7.00 18 11354 (15) ROUGH INSPECTION FOR BUILDINGS OVER 10 STORIES: Fee for each story over 10th.............$25.00 g. ELECTRICAL PERMIT FEES: Minimum fee, each permit ......... $40.00 $50.00 T Special request inspection (each request with permit). .$20.00 After second request. .$50.00 (1) ROUGH WIRING OUTLETS (LIGHT, RECEPTACLE, SWITCH, SIGN AND ALSO TELEPHONE AND OTHER LOW -VOLTAGE OUTLETS): 1 through 10 outlets .....................$20.00 Each additional outlet....................$1.00 Plug, mold, and strip light power rail .... $8.00 (2) SERVICES: (THE FOLLOWING FEES SHALL BE CHARGED FOR EACH SERVICE AND SUBFEED [FEED RAIL]) (a) 100 amps and under........................$7.00 101 amps-thru 200 amps...................$9.00 201 amps thru 400 amps..................$10.00 401 amps thru 600 amps..................$12.00 601 amps thru 800 amps..................$13.00 For each 100 amps over 800...............$5.00 (b) Temporary for construction ..... $ 40.00 $50.00 (plus fee listed above for 101 amps and over) (Renewal €ems additiena-3 shirty days) (c) Service repair and/or meter -change (adding 3rd phase, combining meters) .... $ 40.0. $50.00 (d) Temporary for testing (for a period of 30 days) ................ ...........fig $90.00 Renewal (for additional 30 days)......,.$30.00 (3) SWITCHBOARDS: Fees are the same computed on amps, paragraph (2) of hereof. as "SERVICES", as set forth in subsection g 19 11354 (4) EQUIPMENT OUTLETS OR PERMANENT CONNECTIONS: Compactor............................$6.09 $8.00 Deep Freezer .........................$6.0$ $8.00 Dishwasher...........................$6.00 $8.00 Dryer....... .......................$6.00 $8.00 Fan (Exhaust/Bathroom)...............$6.00 $8.00 Fan (Paddle/Ceiling).................$6.00 $8.00 Garbage Disposal .....................$6.00 $8.00 Oven.................................$6.00 $8.00 Photoelectric Switch.................$6.00 $8.00 Range................................$6.00 $8.00 Range Top............................$6.00 $8.00 Refrigerator(domestic)...............$6.00 $8.00 Refrigerator (commercial) per H.P. see Motor Schedule ...................$6.00 $8.00 Space Heater .........................$fir-0D $8.00 Time Clock...........................$6.00 $8.00 Washing Machine ......................$6.00 $8.00 Water Heater-Boiler(electrical)...... $§.08 $8.00 Air Conditioners, window and through -wall units, wall units, each outlet..............$7.88 $8.00 Air Conditioners, per ton, Central .......... $5.00 Fire Damage listed on permit (minimum) ............... ........ — $40.00..$50.00 Clear violations inspection (minimum)..........................$40.00..$50.00 Rehabilitation -Total (Apts) each unit ...... $60.00 Replacement of Equipment (a) If replacement size is same as existing, fee 50% of new fee. (b) If replacement size is larger than existing, fee is same as new fee. MOTORS: Each motor less than 2 H.P..................$6.00 Each motor 2 H.P. to 10 H.P... ...;.., $30.00 Each H.P. over 10 H.P. additional ..... ....... $2.00 (5) MACHINE OUTLETS OR TREATMENT CONNECTIONS: X-Ray - Portable...........................$15.00 20 11354 X-Ray - Stationary .........................$20.00 Diathermic.:................................$15.00 Isolation Units (L I M)....................$50.00 Linear Acceleration ........................$75.00 Magnetic Imaging...........................$75.00 Diagnostic & Operating Tables..............$75.00 (6) GENERATORS AND TRANSFORMERS, COMMERCIAL AND RESIDENTIAL HEATING EQUIPMENT AND STRIP HEATERS, RECTIFIERS: Each up to and including 5 KVA or KW ......... $6.00 Each generator or transformer over 6 KVA or KW thru 10 KVA or KW...........................$12.00 Each generator or transformer over 11 KVA or KW thru 15 KVA or KW...........................$15.00 16 KVA or KW thru 20 KVA or KW..............$20.00 Each generator or transformer over 21 KVA or KW or KW thru 25 KVA or KW.....................$30.00 Each generator or transformer over 26 KVA or KW thru 50 KVA or KW...........................$60.00 51 KVA or KW or over ........................$60.00 Plus for each KVA or KW over 50.............$0 .75 (7) WELDING - MACHINE OUTLETS: Up to 25 amps ........................$7.00.. $8.00 For each additional 25 amps or fractional part thereof .............................. $7.99— $8.00 (8) SPECIAL PURPOSE OUTLETS, VIDEO GAMES: (COMMERCIAL) Popcorn, doughnut, drink machines, coin music machines, toasters, coffee urn, expresso, deep fryer, telephone booths, refrigerator display cases, etc. each ................... ............... $7.00— $8.00 Painting - bake ovens, each.................$35.00 (9) SIGNS: First 100 bulbs, including ballast .......... $20.00 (NOTE: Minimum fee for electrical sign)...,.$20.00 Each additional ten (10) bulbs or fraction thereof......................................$4.00 Transformers.(neon or ballast) for first ..... $9.00 Each additional transformer or ballast ....... $4.00 Flasher or control...........................$9.00 21 11354 Time clock or photo electric switch .......... $6.00 Sign repairs,connection and reconnection........................$15.0.8..$25.00 (10) FIXTURES: Lights - 1 thru 10 sockets...................$7.00 1 thru 10 fluorescent tubes ......... $7.00 Each additional ......... ....................$1.00 Lighting fixture "heads", each...............$7.00 Flodd lights or light standards, each ........ $7.00 Parking lot lights, mercury vapor or quartz, charge per light.............................$7.00 (11) (Reserved for future use) (12) ROUGH INSPECTION FOR BUILDINGS OVER 10 STORIES: Fee for each story over 10th................$25.00 (13) PLUGMOLD AND STRIP LIGHTING: First 10 feet...............................$20.00 Each foot thereafter .........................$1.50 (14) TEMPORARY WORK ON CIRCUSES, CARNIVALS, TENTS, SHOWS, ETC.: Equipment ground, each................$7.00..$8.00 Service* Outlets** First temporary for Construction ........... $150.00 Each additional temporary for construction..$75.00 * This fee is the same as set forth in paragraph (2) of subsection g hereof. ** These fees are the same as set forth in para- graphs (1) and (13) of subsection g hereof. (15) MINIMUM PERMIT FEE INCLUDING REPAIR WORK NOT ELSEWHERE CLASSIFIED .............. .�48.06,.$50.00 (16) BURGLAR ALARM, FIRE DETECTION SYSTEM, LIFE SAFETY SYSTEMS, INTERCOM, COMPUTERS; ENERGY MANAGEMENT SYSTEM; LOW VOLTAGE CONTROL SYSTEM Installation, central system, control panel...............................$220.00..$30.00 22 11354 Heads or target area, each...................$1.00 Smoke detector, each .........................$1.00 Speaker, each................................$1.00 Bell - Alarm Station, each...................$1.00 Proximity Station, each......................$1.00 Sensor.thermostats... ............... .........$1.00 Reinspection fee, semi-annually.............$20.00 Installation of Master Control..............$30.00 Each new outlet..............................$2.00 Fire alarm and/or Fire pump test per hour ... $50.00 Cable risers (each) .........................$40.00 Each Additional Floor ........................$5.00 Computer Terminal............................$2.00 (Computer, Cable TVC, Fiber Optics, Telephone) (17) MASTER TELEVISION AND RADIO RECEIVING ANTENNAE: TV and radio antenna devices, wall outlets, suppressors, splitters, lighting arrestors, receivers, input devices, audio amplifiers, ground connections, etc. 1 thru 5 devices ... ..... ....................$20.00 Each additional device .......................$1.00 Disci (Satellite)............................$20.00 (18) PARTIAL DEMOLITIONS: Removal of Electric Cicuits: 1st circuit.................................$30.00 Each additional circuit ......................$3.00 (19) SWIMMING POOLS, SPAS & HOT TUBS ..... $30.0g..$90.00 (Light, Pump, Timer -and Bonding) Swimming pool combination with spa new or repair. .$150.00 (20) U.P.S. SYSTEM (Uninterrupted Power Supply)................$75.00 h. MECHANICAL PERMIT FEES: Miscellaneous fee(not specified anywhere else) first $1,000 cost(labor and materials)..$30.00 23 11354 Each additional $1,000 cost (labor and materials)....................................$10.00 (1) AIR CONDITIONING AND REFRIGERATION: Mechanical Air Permit (minimum fee) ........... $60.00 (Includes all component parts of the system; however, the fee for water, electric and gas lines and connections is a separate fee and such fees appear elsewhere in this ordinance). (Chiller fee per ton where BTU rating is not known, Substitute one horsepower for one ton). Temporary A/C installation (per ton or fraction thereof)...............................$8.00..$15.00 Each ton capacity or fractional part hereof ............... ........... .......$8.00..$15.00 Minimum Fee (except window air conditioning units) for each individual system ............ $58-98..$60.00 Window air conditioning unit, for each unit .................................. 0..$25.00 ROUGH INSPECTION FOR BUILDINGS OVER 10 STORIES: Fee for each story over 10th..................$20.00 Cooling tower, -first $1,000 value or fraction thereof.......................................$40.00 Each additional $1,000 value or fraction thereof.......................................$10.00 (2) FURNACES AND HEATING EQUIPMENT, INCLUDING COMMERCIAL DRIERS, OVENS AND OTHER FIRED OBJECTS NOT ELSEWHERE CLASSIFIED (Includes all component parts of the system except fuel and electrical lines as noted in paragraph (1) of subsection h hereof). Per K.W. (or 3413 per BTU). .$3.00 Minimum fee. .$45.00 24 11354 e'er eaehadditienal-BOA-,-000 BTU per her e= fEaehlenal-parttheree€........................$zq Emeept fer For unvented space heaters and vented wall heaters (no duct work) First such unit...............................$10.00 For each such additional unit..................$5.00 (3) YEARLY INSPECTION FEE FOR ELEVATORS, ESCALATORS AND OTHER LIFTING APPARATUS: Mechanical Elevator Permit (minimum fee )..$60.00 (a) Inspection Fees - Type Installation and number of floors. Elevators: First two (2) floors .......................$45.00 Plus for each additional two (2) floors ..... $7.00 Transporting assembly ......................$60.00 Sidewalk lift (no floor limits) ............ $50.00 Stage lift (no floor limits)...............$70.00 Auto Park lift (no floor limits) ........... $70.00 Man lift (no floor limits).................$60.00 Boat lift (no floor limits)................$60.00 Dumbwaiters: First two (2) floors .......................$30.00 Plus each additional two (2) floors ......... $7.00 Escalators.................................$60.00 Roof Window Cleaning Machine...............$70.00 Certificate Issuance Fee for an Elevator; Escalator or Dumbwaiter.... .......... $10.00 Duplicate Certificate... .........$5.00 TEMPORARY ELEVATORS USED IN CONSTRUCTION: The elevator shall be inspected every thirty (30) days and a Certificate Fee Collected in accord- 25 13154 ance with the number of landings the elevator serves. The Certificate in the car shall be up- dated to reflect the latest inspection date. (b) ELEVATOR AND ESCALATOR PERMIT FEES: To install or move each elevator or escalator (residential) .......... $'0.9Q..$300.00 Non-residential fees: To install or move freight elevator ....... $300.00 To install or move a hydraulic elevator ... $450.00 To install or move escalators.............$240.00 To install or move dumbwaiters ............ $150.00 Key box for each Fire Division ..... $4$.0$..$50.00 (All other devices, per value basis plus yearly inspection fee: See 3(a) above)). (c) Installation of lifting apparatus and transporting assemblies, including dumb alteEs, cargo lifts, residential e evaters and wheel- chair lifts (each). .$100.00 ...................... (All other devices, per value basis plus yearly inspection fee (see 3 (a) above)). For estimated s+- up te-$1,8$9............ $30. 00 Fer ezreh auuitienal $a 000 er- €raetienal part thereef....................................$10.00 Reinspection Fee (applies where violation notice was served)................................$28.00 Annual Elevator Repair Permit Fee Repairs other than Major Repairs ........................$400.00 (From October to September) Casing for Hydro Elevator Permit Fee per Foot .................. .....$2.00 Minimum Casings Fee ...........:.. ......$25.00 Alteration and modernization of elevators and other transporting apparatus (major repairs): 26 11354 thereef.................................... $� .00 Eaeh additional $1 ; 0 0 0.0 0 e r f �-aetlenalpapt- tamer-eef....................................$ago Per apparatus. .$100.00 Manlift. .$300.00 ................................. (d) ELEVATOR HOISTWAY CONSTRUCTION PERMIT FEES 1-5 Floors ....... ........................$150.00 Each additional (5) floors or fraction thereof....................................$50.00 (4) AMUSEMENT RIDES AND DEVICES: For each portable unit or temporary unit ................. .............$CEO.00— 175.00 For each permanent unit installed or altered..................................$150.00 Semiannual inspection (permanent installation only) For each ride or device at any one (1) location..........................$40.00..$60.00 (5) BOILERS AND PRESSURE VESSELS AND POOL HEATERS: Mechanical Boiler Permit (minimum fee)...$60.00 Installation permit fees (Does not include installation or connection of fuel and water lines). Steam Boilers, Hot Water Boilers, Water Heaters, Storage Tanks and Heat Exchangers (as defined in the ASME Boiler and Pressure Vessel Code). Each Steam Boiler. .$125.00 Less than 1 HP te 49 HP.. 20 HP-t e 2 49-HP (ea e h )- ....... • = .. . 2 HP te- 99 (eaeh ... �-00 600 HP an - Over (,--assh), .................... $ 2 5 0 . 0 0 Steam -driven prime movers, each ........... $100.00 Steam -utilizing equipment, each ............ $40.00 27 11354 Unfired pressure vessels (operating at pressures in excess of 60 psi and having a volume of more than 5 cu. ft.)...........................$75.00 Boiler repairs requiring inspection, welding re - tubing, etc., (includes internal and hydrostatic inspection). Minimum fee for estimated cost up to $1,000....................................$60.00 For each additional $1,000 or fractional part thereof....................................$10.00 FEES FOR PERIODIC REINSPECTIONS: Steam boilers (semi-annual), Hot Water Boilers, including Water Heaters classified by code as Low Pressure Boilers (Annual) External Inspections Only=.. .$125.00 Less than 4 HP to 19 HP, Eaeh00 . . . . . . . . . . . . . $50. 20 HP-te 249 HP, Eaeh°"'W-.o.00 ..................... 250 1 P and -Over, Eae °'4 QQQ .................... Internal inspection, hydrostatic test and external inspection .......................$60.00 Internal inspection and external inspection .......................$50.00 Hydrostatic_ test only.....................$50.00 Unfired pressure vessels (annual) Over 60 psi or 5 cubic feet ....... $50.90..$75.00 Certificate Fee...........................$10.00 Duplicate Certificate ......................$5.00 Shop inspection of boiler or pressure vessel, per completed vessel ......................$80.00 (6) FIRE SUPPRESSION SYSTEMS CO2, Halon and Dry Powder Systems and other piped fire extinguishing systems, including reinstalla- tion, modification, or alteration, €er estimiated eest up-te 1,000.90 (full installation including discharge test ....................... 0..$105.00 11354 Minimum Fee..........................$40.0g..$105.00 (7) STORAGE TANKS FOR FLAMMABLE LIQUIDS: NOTE: Regulatory control over installation of this item is exercised by the fire Prevention Bureau of the Fire, Rescue and Inspection Services Department. (8) INTERNAL COMBUSTION ENGINES: Stationary ............................ $.3Q.-08..$50.00 FULL LOAD EMERGENCY GENERATOR TESTS ......... $125.00 (9) OTHER FEES: Pressure and process piping, and other mechanical piping work: For estimated cost up to $1,000...............$30.00 For each additional $1,000 or fractional part thereof.......................................$10.00 Sheetmetal work, duct work, and component part replacement: For estimated cost up to $1,000...............$30.00 For each additional $1,000 or fractional part thereof.......................................$10.00 Commercial kitchen hood. .$125.00 Ductless fan. .$30.00 Venting systems of any kind up to $1,000 in value ......................... ..$40.00 For values in excess of $1,000......... .....$10.00 (10) NATURAL GAS AND LIQUEFIED PETROLEUM: Minimum Gas Permit Fee (residential)..¢'�..$45.00 Minimum Gas Permit Fee (commercial) ........... $60.00 29 11354 Each rough outlet (running lines)..............$8.00 Each set appliance (connections)...............$8.00 Service (includes cylinder, regulator and/or one meter).....................................$8.00 Change of Company (no additional outlets or appliances) ....... ............................$10.00 Major repairs to piping First $1,000 cost.............................$20.00 Each additional $1,000.00 or fractional part of cost ........................$7.00 $-7 unvented)........................... ........... Additional meters considered as services ....... $7.00 Gas main: on private property (each 50 lin. ft.).............................$7.00 Underground LP gas tank .......................$35.00 Change from master meter to individual meter (per meter or service) .............. ................ $7.00 Additional tanks added to existing services, each...........................................$7.00 Addition of gas fire safety shutoff valve, each.........................................$7.00 Natural and/or LP gas dispensing unit, including compressor or pump and related installations..$50.00 AIR OXYGEN CO2 AND DRY NITROGEN STORAGE TANKS (First tank)............................$40.00 Any additional tanks..........................$10.00 Medical Gas Piping, for first $1,000.00....... $30.00 For each fractional $1,000 or fractional part thereof.......................................$10.00 Minimum Mechanical fees ...............$50.00..$60.00 (11) MECHANICAL INVOICES: Administrative Fee.............................$3.00 Whenever any owner or user of an elevator/boiler subject to this Ordinance fails to.pay,fgr4any Mechanical Invoice within thirty (30) days, there will be a delinquent fee of $10.00 in addition to the fees charged......................:.:....—$4()—Q0 Delinquent fee. .$10.00 30 11354 (12) TEST FOR SMOKEPROOF TOWERS AND SMOKE REMOVAL SYSTEMS: (a) Tests conducted as required and prescribed by the Building and Zoning Department on a one (1) time and/or annual basis for smoke removal or approved pressurized systems in stair tower, atrium or similar areas: For each stairway and/or smoke removal system.......................................$150.00 (b) If annual test is not conducted, a fee of $1.00 per 1,000 sq. ft. of building will be charged for each day past one year from date of previous test." Section 3. All ordinances or parts of ordinances insofar as they are inconsistent or in conflict with the provisions of this Ordinance are hereby repealed. Section 4. It any section, part of section, paragraph, clause, phrase or word of this Ordinance is declared invalid, the remaining provisions of this Ordinance shall not be affected. Section 5. This Ordinance shall become effective thirty (30) days after final reading and adoption thereof. PASSED ON FIRST READING BY TITLE ONLY this ?9th day of February , 1996. 31 1.1354 PASSED AND ADOPTED ON SECOND AND FINAL READING BY TITLE ONLY this 25th day of April ATTEST: / WALTER J. AN CITY CLERK P EPARED AND APPROVED BY: `` IRMA M. ABELLA ASSISTANT CITY ATTORNEY 1996. ST HEN P. CLARK, MAYOR APPROVED AS TO FORM AND CORRECTNESS: 32 1.1354 t CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO : The Honorable Mayor and DATE : FILE Members of the City Commission FEB 2 ►oo� SUaIECT: Proposed Ordinance Amending Section 5 of Ordinance 6145 Cesa o FROM : City e REFERENCES: ENCLOSURES: Recommendation It is respectfully recommended that amendment to Section 5 of Ordinanc and redefining required fees to South Florida Building Code. Background the City Commission adopt the e No. 6145, adding, increasing cover the enforcement of the In order for the City of Miami to continue to protect the life, safety and public welfare of its citizens, the proposed amendment adding, increasing and clarifying fees is required. The cost of properly enforcing the South Florida Building Code continue to increase. The Building and Zoning Department has reviewed its fee schedule and determined that it has become necessary to bring the cost up to the level of service that is being provided year after year. It has also found that some fees are not properly defined and the department is taking this opportunity to clarify them. New fees are being added for services that are presently -being provided. The fees are already part of the fee schedules for other municipalities and need to be properly identified in our fee schedule. 1 ��ln 1354