Loading...
HomeMy WebLinkAboutR-97-0534J-97-497 7/17/97 RESOLUTION NO. 9 ( 534 A RESOLUTION AUTHORIZING RENOVATIONS OR REPAIRS TO THE EMERGENCY EXIT STAIRS LOCATED AT THE 5TH LEVEL PRESS BOX AT THE ORANGE BOWL STADIUM; FURTHER AUTHORIZING THE CITY MANAGER TO TAKE WHATEVER STEPS ARE NECESSARY TO ASSURE THAT SAID REPAIRS ARE COMPLETED PRIOR TO THE COMMENCEMENT OF THE UNIVERSITY OF MIAMI FOOTBALL SEASON. WHEREAS, the Orange Bowl will host the University of Miami football games beginning September 13, 1997, and other various scheduled events; and WHEREAS, the emergency exit stairs*located at the 5th Level Press Box are corroded and cannot be utilized until repaired; and WHEREAS, the City Manager requests authorization from the City Commission to proceed with said repairs; and WHEREAS, the City Manager further requests authorization to seek three informal quotes and award the contract for repairs to the lowest and responsible bidder for an .amount not to exceed $20,000; and WHEREAS, the Public Works Department has estimated that the costs for said renovations or repairs to be at an amount not to exceed $20,000; and WHEREAS, funds are available from the General Operating Budget, Index Code No. 350503-840-404000 to cover the costs for said renovations and repairs; CITY COMOSSION MEETING OF o U L 2 4 1997 Resolution Na 97-- 534 • NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. Renovations or repairs to the emergency exit stairs located at the 5th Level Press Box at the Orange Bowl Stadium are hereby authorized. Section 3. The City Manager is hereby further authorized to take whatever steps are necessary to assure that said repairs are completed prior to the commencement of the University of Miami football season. Section 4. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 24th day of July r APPROVED AS TO FORM AND CORRECTNESS: W1734:BSS 1997. - 2 - 97- 534 S '.. CITY OF MIAMI, FLORIDA 42 r' INTER -OFFICE MEMORANDUM TO: Honorable Mayor and Members DATE: July 15, 1997 FILE e Cit Commission idwar SUBJECT: Orange Bowl Stadium: Resolution Authorizing the dd ar ez City Manager to Proceed FROM: City Man< REFERENCES. with repairs to the 5th Level ENCLOSURES: Press Box Emergency Exit and award bid RECOMMENDATION It is respectfully recommended that the City Commission adopt the attached resolution authorizing the City Manager to proceed with the necessary repairs to the stairs at the 5th level press box emergency exit at the Orange Bowl Stadium. The City Manager is further authorized to award the contract for repairs to the lowest and responsible bidder. BACKGROUND The emergency stairs at the 5th level press box have corroded and pose a safety hazard. The stairs are necessary to provide a quick and safe exit from the press box in the event of an emergency. The Public Works Department has assessed the damage and recommends the stairs be replaced at a cost not to exceed $20,000. Due to the necessity for these repairs, the administration requests authorization from the City Commission to seek three informal quotes from qualified firms. We further request authorization to award the bid to the lowest and most responsible bidder in order to expeditiously proceed with the necessary repairs. The funds to cover project costs are available from the FY'97 Operating Budget Index Code 350503-840- 404000 in an amount not to exceed $20,000. 97 534 � E JOB REQUEST PUBLIC WORKS DEPARTMENT DATE:? / 14 / 1997 JOB No.: B-6279 CIP No.: PROJECT NAME: O.B. 5th. LEVEL PRESS BOX, STAIR No. 4, REPLACEMENT OTHER TYPE: 350503-840 LOCATION: 1501 N.W. 3RD. STREET. PROJECT MANAGER: JUAN B. ORDONEZ FEDERAL PARTICIPATION: E ASSESSABLE: F-1 ASSOCIATED DEPARTMENT: CONFERENCES, CONVENTIONS & PUBLIC FACIL=S EMERGENCY: RESOLUTION No.: BID REQUEST: FORMAL: L J INFORMAL: DESCRIPTION: FURNISHING ALL LABOR NATERIALS AND EQUIPMENT FOR THE REPLACEMENT OF THE EMERGENCY EXIT METAL STAIRS TO THE STH LEVEL PRESS BOX EAST END AT THE ORANGE BOWL STADIUM (IF NECESSARY, CONTINUE ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE (% OF CONTT. COST) COST COST SURVEY $ (E) $ (E) % TEST/LABS $ (E) $ 1.000.00 (E) DESIGN & BID DOCUMENTS $ 500.00 (E) $ (E) % ADVERTISING $ (E) $ (E) CONSTRUCTION $ (E) $ 18,500.00 (E) CONST. ADMINISTRATION $ (E) $ (E) % OTHER $ (E) $ (E) SUBTOTAL $ 20,000.00 % INDIRECT COSTS (1.43%) $ (ENG.FEE) (E) ESTIMATE TOTAL $ 20,000 DATES: DESIGN COMPLETION (ESTIMATE) 07 / 01 / 1997 CONSTRUCTION COMPLETION (ESTIMATE) 08 /30 / 1997 BUDGET:(TO BE FILLED BY THE CIP ADMINISTRATOR) CIP ORDINANCE # FUNDING SOURCES AMOUNT $ g - $ $ APPROVED BY: NAME SIGN DATE PUBLIC WORKS DIRECTOR I M997 ORIGINATED DEPARTMENTS DIRECTOR / /1997 p `jl / 534 / /1997 3 CIP ADMINISTRATOR COPIES: ASSISTANT DIRECTORS, COST ANALYSIS, FILE, ASSOCIATED DEPT. REV.6/97