Loading...
HomeMy WebLinkAboutR-97-0481J-97-440 7/2/97 RESOLUTION NO. 9 7 ` 481 j A RESOLUTION ACCEPTINGTHE BID OF BENNETT ELECTRIC SERVICE CO., IN THIS PROPOSED AMOUNT OF $116,642.00, TOTAL BID OF THE PROPOSAL, FOR 'ITIE PROJECT EN`I'ITLED: "ATHALIE RANGE PARK SPORT LIGHTING PROJECT - SOCCER/BASEBALL FIELD (SECOND BIDDING), NO. B-6251;" i ALLOCATING FUNDS THEREFOR FROM PROJECT NO. 331070, AS APPROPRIATED BY THE FISCAL YEAR 1995-1996 CAPITAL IMPROVEMENT ORDINANCE NO. 11337, AS AMENDED, IN THE AMOUNT OF $116,642.00 TO COVER THE CONTRACT COST AND $20,428.78 TO COVER TIJE ESTIMATED EXPENSES, FOR AN ESTIMATED TOTAL COST OF $137,070.78; AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH SAID FIRM. WHEREAS, sealed bids were received April 22, 1997, for "Athalie Range Park Sport Lighting Project - Soccer/Baseball Field, Second Bidding, No. B-6251;" and WHEREAS, the City Manager and die Director of die Department of Public Works recorrunend that the bid from Bennett Electric Service Co. be accepted as the lowest responsible and responsive bid; acid WHEREAS, die Fiscal Year 1995-1996 Capital Improvement Ordinance 11337, as amended, appropriated monies for die proposed amount of die contract, project expenses, and incidentals under Project No. 322060; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA,- Section 1. The recitals and findings contained in die Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. The April 22, 1997 bid of Bennett Electric Service Co., in the proposed amount of $116,642.00, for die project entitled "Adhalie Range Park Sport Lighting Project - Soccer/Baseball Field, Second Bidding, No. B-6251" for die total bid of the proposal, based on hemp sum and unit prices, is hereby accepted at the price stated therein. Section 3. The total estimated project cost of $137,070.78 is hereby allocated from Project No. 331070 as appropriated by die Fiscal Year 1995-1996 Capital Improvement Ordinance 11337, as amended. CITY COMMSSION MEETING OF J U ! 1 0 1997 Revolution No. 9 / ` `� 01 Said total project cost consists of the $116,642.00 contract cost and $20,428.78 estimated expenses incurred by the City. Section 4. The City Manager is hereby authorized to enter into a contract', in a form acceptable to the City Attorney, on behalf of die City of Miami with Bennett Electric Service Co. for "Athalie Range Park Sport Lighting Project, Second Bidding, No. B-6251," total bid of die proposal. Section 5. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 10 th day of July , 1997. ( Lw" E CAROLLO, 1AY ATI'ES WALTER EMAN CITY CLERK CAPITAL PROJECT REVIEW: JI T SIiEEHAN, COO DINATOR, CIP SUBMITTED BY: Q Qe-- � J JAMES J. Y, INT IM DIRECTOR PUBLIC WORKS DEPARTMENT PREPARED AND APPROVED BY: "-,IA Z// JO L EDWARD MAXXX LL DIIPUTY CITY ATTORNEY W1721:CSK APPROVED AS TO FORM AND ' The herein authorization is further subject to compliance with all requirements that my be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions z 97- 481 A 4 CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: Honorable Mayor and Members of the City Commission I 1,4 FROM : 4PEdMarquez ity Manager RECOMMENDATION DATE : JUL . _ 1 i` n7 FILE : SUBJECT : Athalie Range Park Sport Lighting Project, No. B-6251 REFERENCES: ENCLOSURES: Resolution It is respectfully recommended that the City Commission adopt the attached resolution accepting the low bid of Bennett Electric Service Co. (BES), whose principals are John P. Higgins, President, and Kathleen M. Higgins, Vice President, a company located within the City of Miami, for the project entitled "Athalie Range Park Sport Lighting Project, B- 6251," received April 22, 1997, in the amount of $116,642.00 and authorizing the City Manager to enter into a contract on behalf of the City. One City of Miami project was previously awarded to Bennett Electric Service Co.: 1. Hadley Park Sport Lighting Project. BACKGROUND Amount of Bid: $116,642.00 % of Cost Estimate: 97.2% Cost Estimate: $120,000.00 Source of Funds: Project No. 331070, as appropriated by Fiscal Year 1995-1996, CIP Ordinance 11337, as amended. Minority Representation: 185 invitations mailed 9 contractors picked up plans and specs 2 Hispanic, 2 Black, Female) 7 contractors submitted bids ( 1 Hispanic, 1 Black, Female) Public Hearings/Notices: No public hearing/Bid Notice published. Discussion: The Department of Public Works has evaluated the bids received on April 22, 1997 and determined that the lowest responsible and responsive bid, in the amount of $116,642.00 is from BES. Funds are available to cover the contract cost and for such incidental items as postage, blueprinting, advertising and reproduction costs. BES submitted a bid within 10% of the low bid received and had established certification of a primary office location within the City limits prior to submission of the bid as required by City Code Section 18-52.1(h). 1, W 97- 481 i J 1 0 FACT SHEET DEPARTMENT OF PUBLIC WORKS DATE: S / 8 / 1997 ATHALIE RANGE PARK SPORT LIGHTING PROJECT - JOB N: B-6251 PROJECT NAME: SOCCERIBASEBALL FIELD (SECOND BIDDING) CDBG • 331070 LOCATION: 525 Northwest 62nd Street TYPE; PROJECT MANAGER: Andr,s Bryan FEDERAL PARTICIPATION: ; 1 ASSOCIATED DEPARTMENT: ParKS Department ASSESSABLE: 0 EMERGENCY: RESOLUTION M: BID REQUEST: FORMAL ® INFORMAL O DESCRIPTION: The project consists of the furnishing of all labor, materials and equipment for the following: 1. Eight (8) 85 foot long round and one (1)15 foot long square concrete poles. 2. Electrical swithgear (main switches and lighting contactors). 3. Fiberglass enclosure (72" x 66" x 18"). 4. Conduit, wire runs and electrical/lighting hardware. SCOPE OF SERVICES: CITY OUTSIDE AMOUNT (% OF COSTT. COST) SURVEY / PLAT Q SITE INVESTIGATION a a s PLANNING AND STUDY Q $ 2,332.84 2 % OF BID DESIGN 0 $ 8,164.94 7 % OF BID SPECS AND BID PROCESS O $ 2,332.84 2 % OF BID BLUEPRINTING AND ADVERTISING Q $ 1,000.00 (E) CONSTRUCTION 0 EA s 116,642.00 (ero) CONST. INSP. & MANAGEMENT S a $ 4,665.68 4 % OF BID OTHER a $ (E) suBTOTAL s 135,138.30 15 % INDIRECT COSTS : (1.43%) $ 1,932.48 (E) (ENG. FEE) CONTINGENCIES (5%) $ (EQ EST24ATE CONST. COST: S 120,000.00 TOTAL i 137,070.78 (E) ESTIMATE CONTRACTOR'S INFORMATION: CLASS: Q O 0 NON • MINORITY TYPE OF WORK Electrical Construction MINORITY [1] Q 0 YEARS OF ESTABLISHMENT: 8 years LICENSE EC 0000625 NAME: Bennett Electric Service Company, Incorporated TELEPHONE: (305) 759-1665 ADDRESS: 6900 Northeast 4th Court Miami, FL 33138 CONTACT PERSON: Steve McConaughy, General Manager CLASS: J- JOfNT P. PRIME S- SUB MINORITY: B- BLACS H. HISPANIC F- FEMALE SUB -CONTRACTOR NAMES: C-.%My DocumentS%E s COPIES: ASSISTANT DIREGTORS. C05T ANAL75I5, HLE. Q 97- 481 3 a. r FORMAL BID ATHALIE RANGE PARK SPORT LIGHTING PROJECT - SOCCER/BASEBALL FIELD (SECOND BIDDING) Project Number: 11.6251 CIP Number: 331070 Project Manager: ANDRE' BRYAN Date: 4 / 22 / 1997 Person who received the bids: ANDRE' BRYAN Received at: CITY CLERK'S OFI'ICE, MIAMI CITY HALL Construction Estimate = $ 120,000.00 Time: 10: 30 a.m. BIDDER ELECT' CONTRACTING SERVICE CAPRICORNCONST CORP AMER LTO &SIGNALILATION BENNE TELECTRICSERVICE ADDRESS 2294 WEST 78 STREET HIALEAH, FLORIDA 31016 2450 SW 137 AVE. SUITE 211 MIAMI, FLORIDA 11175 1108 24th AVENUE EAST ELLENTON, FLORIDA 14222 6900 N E 4 COURT MIAMI, FLORIDA 11118 BID BOND AMOUNT $10.000 0113 BOND $10,000 00 BID BOND 5% 11DBOND 5%BID BOND IRREGULARITIES L L MINORITY OWNED NO YES NO NO ITEM No. DESCRIPTION UNIT PRICE 'TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL I PURCHASE AND INSTALLATION OF EIGHT(H) 85' • 0• AND ONE (1) 15- - 0• CONCRETE POLES $36,045.00 $29,146.00 $51,500.00 $41.700.00 2 PURCHASE AND INSTALLATION OF SWITCHGEAR FOR THE ELECTRICAL DISTRIBUTION CENTER . $6,749.00 $12,500.00 $5,000.00 $10,569.69 l PURCHASE AND INSTALLATION OF A 72• X 66' X I8- FIBERGLASS ENCLOSURE $6,157.00 $2,400.00 $8,800.00 $2,696.00 4 PURCHASE AND INSTALLATION OF CONDUITS, WIRES AND ELECiRICAULIGHTING HARDWARE. $62,691.00 $70,500.00 $50,922.00 $67,297.37 5 PROVISIONS FOR SPECIAL ITEMS $5,000.00 $5,000.00 $5,000,00 $5,000.00 BASE BID: ITEMS 1 -5 S116,642.00 $119,546.00 $121,222.00 S127,263.06 • IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THATTHE A •• No Power - of•Attorney LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM HENN Err ELECTRIC SERVICE B -- No Affidavit as to Capital & Surplus of Banding Company COMPANY, INCORPORA'fED FOR THE TOTAL AMOUNTOF $116,842.00 C Corrected Extensions D •• Proposal Unsigned or Improperly Signed or no Corporate Seul E -- Incomplete Extensions II' the above contractor is not the lowest bidder explain: F •- Non • responsive bid G -• Improper Bid. Bond Bennett Electric Service Company (BES) primary office is I ated in the City of Miami. H •• No Ccrtilicate ofCompetcncy Number BES bid amount is within 10% of Electrical Contracting Sq Ice (ECS) bid and has I •- No First Source tilting Compliance Statement accepted to perform the work at ECS bid. i J •• No Minority Compliance Statement Reference: City Code, Section 18-521 (h) K •• No Duplicute Bid Proposal L •• No City or County Occuputionul License for Electricul Work SHEE'r 1 OF 2 IM, I FORMAL BID ATHALIE RANGE PARK SPORT LIGHTING PROJECT - SOCCER/BASEBALL FIELD (SECOND BIDDING) Project Number: B•6251 CIP Number: 331070 Project Manager: ANDRE' BRYAN Date: 4 / 22 / _ 1997 Person who received the bids: ANDRE' BRYAN Received tit: CITY CLEI(K'S OFFICE, MIAMI CITY HALL Construction Estimate = $ 120,000.00 Time: 10: 30 a.m. BIDDER ENGINEER CONTROLS SYSTEM BEST ELECTRICAL EXPERTS SOUTHERN TkOPICAL ELECT ADDRESS 117S NE 125 STREET, SUITE 316 NORTH MIAMI, FLORIDA 33161 SOSO SAN CASTLE BLV D LANTANA, FLORIDA 33462 273 NE 163 STREET N MIAMI BEACH, FLORIDA 33162 BID BOND AMOUNT S%BID BOND 5%BID BOND NO DIDBONI) IRREGULARITIES L 0, L A.11, D, G. L MINORITY OWNED YES No YES ITEM No. DESCRIPTION UNIT PRICE '1'0'1'AL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE rOTAL I PURCI IASE AND INSTALLATION 01: L'IUI IT (8) 85' • n• AND ONE (1) 1 S' • 0• CONCRETE POLES $40.000.00 $82,31 1.00 $55,000.00 2 PURCHASE AND INSTALLATION OF SWITCHGEAR FOR THE ELECTRICAL DISTRIBUTION CENTER $9,000.00 $6.181.00 $39,000.00 3 PURCHASE AND INSTALLATION OF A 72• X 66• X I8• FIBERGLASS ENCLOSURE $1.500.00 $6,917.00 S6,500.00 4 PURCHASE AND INSTALLATION OF CONDUITS, WIRES AND ELECTRICAULIGHTING HARDWARE. $82,000.00 $47,494.00 $62,000.00 S PROVISIONS FOR SPECIAL ITEMS $5,000.00 S5,000.00 $5,000.00 BASE DID: ITEMS I - 5 $137,500.00 $147,903.00 S 167,500.00 • IRREGULARITIES LEGEND 11' HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THATTHE A •• No Power • of -Attorney LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM BENNE7T ELECTRIC SERVICE 0 •• No Aflidavit as to Capital & Surplus of Bonding Company CO111PANY,INCORPORA'1'ED FOR THE TOTAL AMOUNT OF $116,642.00 C •• Corrected Extensions D •• Proposal Unsigned or Improperly Signed or no Corporate Seal E •• Incomplete Extensions It' the above contractor is not the lowest bidder explain: F •- Nun - responsive bid G •• Improper Bid Bond Bennett Electric Service Company (BES) primary office is located in the City of Miami. 11 •• No Ccoilicute olTumpcicucy Number BES bid amount is within 10% of Electrical Contracting Service (ECS) bid and has t •• No First Source Hiring Compliance Statement accepted to perform the work at ECS bid. I -• No Minority Compliunce Statement Reference: City Code, Section 18-52.1 (h) K -• No Duplicate Bid Proposal I. •• No City or County Occupational License for Electrical Work SHEFI' 2 OF 2 10 NYC:" q ig 4 vr"