HomeMy WebLinkAboutR-97-0375n J-97-388 6/5/97 RESOLUTION NO. 97-- 375 'aa A RESOLUTION, AFTER A DULY ADVERTISED PUBLIC HEARING, AUTHORIZING AN INCREASE IN AN AMOUNT NOT TO EXCEED $12,048.34, IN THE CONTRACT DATED MARCH 28, 1995, WITH BRANCHING OUT, INC., FOR THE "ABOVE -GROUND TANK INSTALLATIONS, PHASE TWO, PROJECT B-5579 (Y) "; ALLOCATING FUNDS THEREFOR FROM CAPITAL IMPROVEMENT PROJECT NO. 311009, ENTITLED "REMOVAL OF UNDERGROUND TANK", PREVIOUSLY APPROPRIATED BY CAPITAL IMPROVEMENT ORDINANCE NO. 11337, AS AMENDED, FOR SAID INCREASE. WHEREAS, a contract dated March 28, 1995 exists, between the City of Miami, Florida, and Branching Out, Inc., for the "Above Ground Tank Installations, Phase Two Project, B-5579(Y); and WHEREAS, said contract was authorized pursuant to Resolution No. 94-842, adopted November 17, 1994; and WHEREAS, additional control valves for seven tank installations, and the disposal of nineteen (19) drums of tank sludge were required; and WHEREAS, an increase in the contract in an amount not to exceed $12,048.34 is required to cover the cost of the extra work; and WHEREAS, funds to cover said increase are available from funds previously appropriated by Capital Improvement Ordinance No. 11336, as amended, for Project No. 311009, entitled "Removal of Underground Tank"; CITY COAMISSIO,N MEETING Og JON n 9 1997 Regolution�o, 97- 75 NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. After a duly advertised public: hearing, an increase in an amount not to exceed $12,048.34, with Branching Out, Inc., in the contract dated March 28, 1995, for the "Above - Ground Tank Installations, Phase Two, Project B-5579(Y)" is hereby authorized, with funds therefor hereby allocated from funds previously appropriated by Capital Improvement Ordinance No. 11337, as amended, for Capital Improvement Project No. 311009, entitled "Removal of Underground Tank". Section 3. This Resolution shall become effective immediately upon its adoption. PASSED AND ADOPTED this 9th ATTEST: TER MAN CITY CLERK - 2 - day of June 1997. CAROLLO, MAYOR 97- 375 I BUDGET AND MANAGEMENT ANALYSIS REVIEW: i DIPAK PAREKH, DIRECTOR CAPITAL IMPROVEMENT PROJECT ("CIP")REVIEW: G SHEEHAN, CIP COORDINATOR i SUBMITTED BY: AMES J RIM DIRECTOR DEPARTMENT OF UBLIC WORKS APPROVED AS TO FORM AND CORRECTNESS: - 3 - 97- 375 ti. CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO Honorable Mayor and Members of the City Commission FROM : I and Marquez City Manager RECOMMENDATION: DATE : SUBJECT : 91 - May16,1997 FILE : Approval of Increase In Contract for Above -Ground Tank Installations, REFERENCES: Phase Two, Project B-5579(Y) ENCLOSURES: It is respectfully recommended that the City Commission adopt the attached Resolution, after a duly advertised public hearing, for an increase in the amount of $12,048.34, from $235,378.00 to $247,426.34 in the contract with Branching Out, Inc., dated March 28, 1995 for the Above -Ground Tank Installations, Phase Two, Project B-5579(Y). BACKGROUND: On March 28,1995, after a formal competitive bidding process, the City of Miami and Branching Out, Inc., entered into a contract for the Above -Ground Tank Installations, Phase Two, Project B-5579(Y), Capital Improvement Project No. 311009 "Removal of Underground Tanks". The project' -an o ginal scope of work consisted of the removal, testing and disposal of and rground fuel tanks at various locations citywide and surface restoration in t e area of the construction. At specified sites, nine (9) above- ground tanks and associated dispensing equipment were installed. At seven (7) of the new tank locations, the associated day tanks required the installations of solenoid and isolation valves. Additionally, resulting from the work there were nineteen (19) drums of tank sludge that had to be disposed of in a manner approved by DERM. The cost of this additional work requires an increase in the contract of $12,048.34. Funds are available from Capital Improvement Project No. 311009 "Removal of Underground Tanks" to cover the cost of the extra work. `-� 97- 375 yAkt 1Jy:t�7 Y 1 CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO : Walter J. Foeman DATE : May 16, 1997 F,LE P-5579(Y) City rk SuaJECT : Request To Publish Notice of Public Hearing FROM : James J. Kay, P.E. REFERENCES: Increase In Contract Interim Director Public Works Department ENCLOSURES: Advertisement Please make arrangement to publish A Notice of Public Hearing for objections to a proposed Increase in the Contract with Branching Out, Inc., for the Above -Ground Tank Installation, Phase Two Project B-5579(Y), G.I.P. 311009, 'Removal of Underground Tanks". The Public Hearing has been scheduled for June 12, 1997. APPROVE . Ivi Gallastegui Agenda Coordinator 97- 375 3 '1� 0 .1j,i?�'.'• �f t e e CITY OF MIAMI, FLORIDA NOTICE OF THE PUBLIC A public hearing will be held by the Commission of the City of Miami, Florida, on June 12, 1997, at a.m. in the City Commission Chambers at City Hall, 3500 Pan American Drive, Miami, Florida, for the purpose of hearing any objections from any interested parties -affected by an increase in the contract between Branching Out, Inc., and the City of Miami in an amount not to exceed $12,048.34 for the Above -Ground Tank Installations, Phase Two Project B-5579(Y), C.I.P. No. 311009. All interested persons are invited to appear and may be heard concerning these items. Should any person desire to appeal any decision of the City Commission with respect to any matter considered at this hearing, that person shall ensure that a verbatim record, of the proceeding is made, including all testimony and evidence upon which any appeal may be based. (City Seal) Walter J. Foeman City Clerk Miami, Florida 97- 375 5