RESOLUTION NO. 9 8 - 777
A RESOLUTION ACCEPTING THE BID OF RJB
BUILDERS CORPORATION, IN THE PROPOSED AMOUNT
OF $491,000.00, TOTAL BID OF THE PROPOSAL FOR
THE PROJECT ENTITLED "BAYFRONT PARK - APRONS
& SOUTH END WALKWAYS CONSTRUCTION, B-326411;
ALLOCATING FUNDS THEREFOR FROM PROJECT
NO. 331401, AS APPROPRIATED BY THE FISCAL
YEAR 1997-1998 CAPITAL IMPROVEMENT ORDINANCE
NO. 11623, AS AMENDED, IN THE AMOUNT OF
$491,000.00 TO COVER THE CONTRACT COST AND
$1,000.00 TO COVER THE ESTIMATED EXPENSES,
FOR AN ESTIMATED TOTAL COST OF $492,000.00;
AND AUTHORIZING THE CITY MANAGER TO EXECUTE A
CONTRACT, IN A FORM ACCEPTABLE TO THE CITY
ATTORNEY, WITH SAID FIRM.
WHEREAS, sealed bids were received July 2, 1998, for
"Bayfront Park - Aprons & South End Walkways Construction,
B-326411; and
WHEREAS, the City Manager and the Director of the Department
of Public Works recommend that the bid from RJB Builders
Corporation be accepted as the lowest responsible and responsive
bid; and
WHEREAS, Fiscal Year 1997-1998 Capital Improvement Ordinance
No. 11623, as amended, appropriated monies for the proposed
amount of the contract, project expenses, and incidentals under
Project No. 331401;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
C T COiVII0MON
MSSTENC or
JU L 2 1 1998
pmakifian rra
98-- 77
OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
Section.
Section 2. The July 2, 1998 bid of RJB Builders
Corporation, in the proposed amount of $491,000.00, for the
project entitled "Bayfront Park - Aprons & South End Walkways
Construction, B-326411, for the total bid of the proposal, based
on lump sum and unit prices, is hereby accepted at the price
stated therein.
Section 3. The total estimated project cost of
$492,000.00 is hereby allocated from Project No. 331401 as
appropriated by Fiscal Year 1997-1998 Capital Improvement
Ordinance No. 11623, as amended. Said total project cost
consists of the $491,000.00 contract cost and $1,000.00 estimated
expenses incurred by the City.
Section 4. The City Manager is hereby authorizedll to
enter into an agreement, in a form acceptable to the City
Attorney, with RJB Builders Corporation for the project entitled
"Bayfront Park - Aprons & South End Walkways Construction,
1� The herein authorization is further subject to compliance
with all requirements that may be imposed by the City
Attorney, including but not limited to those prescribed by
applicable City Charter and Code provisions.
- 2 - � 7 7`7
B-326411, total bid of the proposal.
Section 5. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.21
PASSED AND ADOPTED this 21st day of July , 1998.
ATTEST:
JOE CAROLLO, MAYOR
In acc0r&m with Miami Code Sec. 2-36, since the Mayor did not indicate approval of
Legislation by signing it in the designated place provided, r3aici iresir4;c ;;:'wy
mimes effective with the elapse of ten (10) days from the date of CGmrnissic3 s
regarding same, without the Mayor exercisi
Vila r J. eman, City Clerk
WALTER J. FOEMAN
CITY CLERK
AND CORRECTNESS :t'`/
TY
W2 7,19"4 : BSS : kc
If the Mayor does not sign this Resolution, it shall become effective at
the end of ten calendar days from the date it was passed and adopted.
If the Mayor vetoes this Resolution, it shall become effective
immediately upon override of the veto by the City Commission.
3 -
9 - 777
CITY OF MIAMI, FLORIDA 30
INTER -OFFICE MEMORANDUM
TO Honorable Mayor and Members DA7= JUL - 7 098 =,`E
of the City Commission
SUB-ECT Resolution Awarding Contract for
Bayfront Park - Aprons & South
End Walkways Construction, B-3264
z;O0V t RE=ERENCES
onald H. Warshaw ENCLOSURES. Resolution
City Manager
RECOMMENDATION
It is respectfully recommended that the City Commission adopt the attached
resolution accepting the low bid of RJB Builders Corporation, whose principal is
Ramon J. Barcia, president, a company located in Miami -Dade County, Florida, for
the project entitled BAYFRONT PARK - APRONS & SOUTH END WALKWAYS
CONSTRUCTION, B-3264, received on July 2, 1998, in the amount of $491,000.00
total bid, authorizing the City Manager to enter into a contract on behalf of the
City.
BACKGROUND
Amount of Bid
Cost Estimate:
urce of Funds
$491,000.00
$450,000.00
% of Cost Estimate: 109.1 %
Fiscal Year 1997-1998, CIP Ordinance 11623, Project 331401
Minority Representation: 185 Invitations mailed
12 Contractors picked up plans and specs
( 3 Hispanic, 2 Black, 1 Female)
4 Contractors submitted bids
( 2 Hispanic, 0 Black, 0 Female)
Public Hearings/ Notices: No public hearing/ Bid Notice published.
Assessable Project: No
Discussion: The Department of Public Works has evaluated the bids received on
July 2, 1998, and determined that the lowest responsible and responsive bid, in the
amount of $491,000.00, is from RJB Builders Corporation, a hispanic minority
controlled corporation. Funds are available to cover the contract cost and for such
incidental items as postage, blueprinting, advertising and reproduction costs.
off. 98- 777
FACT SHEET
DEPARTMENT OF PUBLIC V�. ARKS
DATE 7 / 6 / 1998
BAYFRONT PARK - APRONS AND SOUTH
Job Number.: B-3264
PROJECT NAME: END WALKWAYS CONSTRUCTION
CIP Number.: 331401
LOCATION: 301 North Biscayne Boulevard, Miami, Florida
PROJECT MANAGER: Ira M. Katz, BFPMT Executive Director
OTHER TYPE:
FEDERAL PARTICIPATION:
ASSOCIATED DEPARTMENT: Bayfront Park Management Trust (BFPMT)
ASSESSABLE:
EMERGENCY:
RESOLUTION No.:
BID REQUEST: FORMAL ® INFORMAL
DESCRIPTION: The project consists of the fumishing of all labor, materials, tools and equipment for the
walkway construction, apron sandblasting, apron grinding, apron grouting, walkway landscaping and lighting
around the fountain and laser tower at Bayfront Park.
(IF NECESSARY, CONTINUE ON THE BACK)
SCOPE OF SERVICES: PUBLIC WORKS
COST OUTSIDE COST (% OF CONST. COST)
SURVEY / P.LAT $ $
TESTINGS $ $ (E) %
DESIGN $ $ %
ADVERTISING $ 1,000.00 (E) $ (E)
CONSTRUCTION $ $ 491,000.00 (BID)
CONST. INSP & MANAGEMENT $ $ %
OTHER: $ (E) $ (E)
SUBTOTAL $ 492,000.00 %
INDIRECT COSTS (1.43%) (E1 (P.w. ENG. FEE)
CONTINGENCIES (5%)
(EC) - EST. CONST. COST $450,000.00 TOTAL $ 492,000.00
(E) - ESTIMATE
CONTRACTOR'S INFORMATION:
CLASS: = 0 NON - MINORITY
TYPE OF WORK: General Construction MINORITY O 0 0
YEARS OF ESTABLISHMENT: 24 years LICENSE CGCA08825
NAME: RJB Builders Corporation TELEPHONE: (305) 661-7741
ADDRESS: 5301 SW 60 Place, Miami, Florida 33135
CONTACT PERSON: Ramon J. Barcla, President CLASS: J = JOINT P = PRIME S = SUB
MINORITY: B = BLACK H = HISPANIC F = FEMALE
SUB -CONTRACTORS:
NAMES: Aneco Electrical Construction (ELECTRICAL)
C. Dacw MIE CCELXBAYFRON1\8-3204�FACTxL.S RETURN TO PUBLIC WORKS AFTER SIGNED
�.. ery aroma
COPIES: ASSISTANT DIRECT;M5. cvsT AIVALToum. rmm,...'--
98- 777
FORMAT, BID
BAYFRONT PARK - APRONS & SOUTH END WALKWAYS CONSTRUCTION
Project Number: B-3264 CIP Number: 331401
Project Manager: IRA M. KATZ Date."'07/02- 98
Person who received the bids: A. CORRALES Received at: CITY CLERK'S OFFICE. CITY HALL
Construction Estimate = 450,000.00 Time: 11:00 • A.M.
BIDDER
ADDRESS
AARYA CONSTR. & DES. INC.
7657 NW 50 ST.
MIAMI, FL 33188
RJB BUILDERS CORP.
5321 SW 80 PL.
MIAMI. FL 33155
D.E. GIDI & ASSOC. CORP.
4472 CORAL WAY
MIAMI, FL 33145
S & S CONTRACTING, INC.
8346D NW S. RIVER DR.
MEDLEY, FL. 33188
BID BOND AMOUNT
B.B. 5x
B.B. sx
B.B. 5x
B.B. i2z,5oo.00
IRREGULARITIES
F
MINORITY OWNED
-
YES
YES
YES
ITEM No.
DESCRIPTION
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
UNIT
PRICE
TOTAL
BASE BED TOTAL OF ITEMS I THRU 3 + ADD.`A"
i415,300.00
$491,000.00
$525,092.00
$568,044.00
1
I FOR FURNISHING ALL LABOR, MATERIALS AND
EQUIPMENT FOR THE CONSTRUCTION OF A
WALKWAY, APRON WORK, AND WALKWAY
LANDSCAPING.
$296,000.00
$329,000.00
=334,835.00
=404,129.00
2
ALLOWANCE FOR IRRIGATION
$15.000.00
i15,000.00
=15,000.00
=I5,000.00
3
PROVISION FOR SPECIAL ITEMS
$35.000.00
$36.000.00
S35,000.00
S35,000.00
ADD.ITEM A:
FOR FURNISHING ALL LABOR, MATERIALS AND
EQUIPMENT FOR THE SUPPLY AND INSTALLATION
OF LIGHT STANDARDS, FIXTURES AND BASES
=89,300.00
$112.000.00
$140,457.00
i113,915.00
• IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF PUBLIC WORKS THAT
A - No Power —of —Attorney THE LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM
B - No Affidavit as to Capital & Surplus of Bonding Company RJB BUILDERS CORPORATION FOR THE TOTAL AMOUNT OF $ 491.000.00
C - Corrected Extensions
D - Proposal Unsigned or improperly Signed or no Corporate Seal
E —Incomplete Extensions If the above contractor is not the lowest bidder explain:
F - Non -responsive bid THE LOWEST BIDDER_AARYA_CONTRACTING_ INC._ ______
DID NOT MEET THE GENERAL CONTRACTOR
G - Improper Bid Bond UA------ FOR ----
H - Corrected Bid �____________ EXPERIENCE AND SUB![ITTAL IN THE TECEINICAL_SPEC[FICATIONS (i.e.____
1 — No First Source Hiring Compliance Statement zO RS INIMUl1 EXPERIEI!CWDLIST_ OF_ 10G.C_ doELECTRIC SUB_ PROJECTS WITH BID— — — —
J — No Minority Compliance Statement — — --_ _
K — No Duplicate Bid Proposal — — — ----------------------- �� ------------
L — No Bid ----------------- ------- 71 �� —
LOFM C. P NCOAST PAIA ASLA
Arw1wbwet wW Lsndscs� Architect
v
ffl
N
July 7, 1998
e
e
�n
p Mr. Jim Kay, Director
15 Department of Public Works
444 SW 2nd Ave.
N Miami, FL 33130
e
r Dear Mr. Kay:
A Mr. Alan Poms faxed to me the bid tabulation for the formal. bidding
on *Bayfront Park - Aprons & South End Walkways Construction".
telephoned Mr. Poms, asking him to also send the list of projects his firm
had accomplished over the last twenty years. Mr. Poms explained that no
o such list was submitted with the bids, as required by the Technical
i
o Specifications.
a
a Item 8 under the Special Conditions section of the Technical Specifications
9 clearly states: "General Contractor Qualifications: in addition to City of
o Miami requirements listed in these specifications, Contractor must have
X twenty years of experience in the Miami area, submitting with his bid a list
0 of ten similar projects for which he was registered general contractor."
o I telephoned Mr. Saml Sams of Aarya Construction and Design, Inc., the
o apparent low bidder, and asked him to fax to me the required list and a
u resume of his experience. When he did so, I learned that the list of projects
a was satisfactory, but that he had been with Aarya Construction for a
e period of only eight years.
s It Is my belief that Aarya Construction Is a non -responsive, unqualified
s' bidder for this project. The second low bidder, RjB Builders Corporation,
it did submit a satisfactory list of jobs, and demonstrates the required
4C twenty years of experience. For that reason, I recommend RJB Builders as
= contractors for the Aprons & South End Walkways Construction project
s
= Most sincerely,
0
Y
N Lester C. Pancoast, FAIR ASLA