Loading...
HomeMy WebLinkAboutO-11633J-98-341 3/23/98 - ORDINANCE NO. 11633 AN EMERGENCY ORDINANCE AMENDING SECTION 5 OF ORDINANCE NO. 6145, ADOPTED MARCH 19, 1958, AS AMENDED, WHICH ESTABLISHED FEES FOR BUILDING, PLUMBING, ELECTRICAL, MECHANICAL, INCLUDING BOILER AND ELEVATOR, INSPECTION PERMIT AND CERTIFICATE FEES (THE "BUILDING PERMIT FEES"), THEREBY. ADDING AND INCREASING REQUIRED FEES TO COVER COSTS FOR THE ENFORCEMENT OF THE SOUTH FLORIDA BUILDING CODE; FURTHER AMENDING THE CODE OF THE CITY OF MIAMI-;—.FLORIDA, AS AMENDED, BY PROVIDING FOR -CODIFICATION OF SAID BUILDING PERMIT FEES AS SECTION 10-4 OF SAID CODE; CONTAINING A REPEALER PROVISION, SEVERABILITY CLAUSE, AND PROVIDING FOR AN EFFECTIVE DATE; AND PROVIDING FOR INCLUSION IN THE CITY CODE. WHEREAS, Section 5 of .Ordinance No. 6145, adopted, March 19, 1958, as amended, provides fees for building, plumbing, electrical, and mechanical, including boiler and elevator, inspection permit and certificate fees (hereinafter referred to as the "Building Permit Fees"); and WHEREAS, the City Manager recommends to the City Commission the amendment of tkie Building Permit Fees by increasing certain fees and establish certain additional fees to cover the cost for the enforcement of the South Florida Building Code in order to provide much needed services for the operation of the City of Miami and the codification of said fee schedule; 11633 NOW, THEREFORE, BE IT ORDAINED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings set forth in the Preamble to this Ordinance are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. Section 5 of Ordinance No. 6145, adopted March 19, 1958, as amended, which provides fees for building, plumbing, electrical, mechanical, including boiler and elevator, inspection permit and certificate fees, hereby amended, and the Code of the City of Miami, Florida, as amended, is hereby amended by adding new Section 10-4 to said Code in the following particulars:! "Chapter 10 BUILDINGS Sec. 10-4 Building Permit Fee Schedule a. FEE FOR WORK WITHOUT PERMIT: When work is commenced prior to obtaining a required permit, a fee of two (2) times that specified herein shall be paid. The payment of such fees shall not relieve any person, firm, or corporation from fully complying with all of the requirements of all applicable regulations and codes, nor shall it relieve them from being subject to any of the penalties therein. The fee requirement shall be applicable to all divisions of building and zoning department. MINIMUM FEE.......................................$60.00 ii Words and/or figures stricken through shall be deleted. Underscored words and/or figures shall be added. The remaining provisions are now in effect and remain unchanged. Asterisks indicate omitted and unchanged material. - 2 - 11633 b. GENERAL FEES: All permits will be assessed a construction debris removal fee of 20 of the cost of construction with a minimum fee of $20.00 and a maximum fee of $2,500. (1) REINSPECTION FEES: FOR EACH REINSPECTION, EXCEPT WHERE OTHERWISE NOTED .................... .$50.00 WHEN EXTRA INSPECTION TRIPS ARE NECESSARY DUE TO: a. wrong address being given on call for inspection; b. rejection of work due to faulty construction; C. work not being ready for inspection at time specified; d. failure to call for final or other inspections; e. required corrections not being made at time specified; f. no approved plans at the building site. The payment of reinspection fees may be required before any further permits will be issued to the person or firm owing same, and further inspections may be refused until payment of reinspection fees has been made. (2) REINSPECTION OF EXISTING BUILDINGS AND INSPECTION FOR CERTIFICATE OF COMPLIANCE FEE: (a) Reinspection of existing buildings (by all sections) to determine compliance with the South Florida Building Code, the City of Miami Zoning Ordinance and other applicable ordinances (but not the annual inspection as required by City Code §2-87(c)) and inspection of existing buildings after repairs, alterations or remodeling for a certificate of compliance, when a certificate of occupancy is not required: Each building up to two (2) stories and not exceeding 20,000 square feet ................... ..............$250.00 Additional for each story over two (2) stories................................$150.00 For each floor over 10,000 square feet, additional per 1,000 square feet ............................. .....$10.00 - 3 - 11633 For the processing of every 40 year recertification application under Section 104.9 of the South Florida Building Code...................................$250.00 For the processing of every application for subsequent 10 year intervals following each 40 year recertification ....................$250.00 For the processing. of the initial application for structural glazing recertification and each subsequent application under Sections 104.9 and 3315 of the South Florida Building Code.......................................$250.00 (At 6 month interval for the first year and recertified every 5 vears thereafter) (3) RECERTIFICATION OF PLANS AND REVISED PLANS FEE, AND PERMIT CARD REPLACEMENT: (a) When plans are lost by the owner or contractor, a recertification fee is required to recertify a new set of plans: 30% of original fee Minimum fee for residential uses ...... $50.00 Minimum fee for commercial uses ....... $90.00 (b) Revised plans and shop drawings (after approval of initial plans) per sheet revised and reviewed..........................$17.50 Minimum fee; .......................... $25.00 (c) Review of plans (per discipline) (after second review) .............. $50.00 (d) Joint plan reviews ................. $250.00 (e) Replacement of lost permit card ...... $15.00 (f) Expedited plans review service (per discipline for a maximum of two reviews per discipline)........... $250.00 (4) DRY RUN FEE. Review of preliminary plans prior to application for building permit. Per 100 square feet ........................$2.50 Per $1,000 (where square footage is not applicable)................................$2.50 80% of total amount will be credited to the building permit when issued. No refunds will be allowed. 4 - - 11633 (5) CERTIFICATE OF OCCUPANCY AND CERTIFICATE OF USE (a) Temporary Certificate of Occupancy Single family or duplex (each) ..... $100.00 All others (each)..................$250.00 (b) Extension of Temporary Certificate of Occupancy Single family or duplex (each) ..... $50.00 All others (each).................$100.00 (c) Final Certificate of Occupancy The following fee shall be required for all groups of occupancies as defined in the South Florida Building Code. The Certificate of Occupancy shall remain valid for an unlimited time unless revoked; there is a change in the group of occupancy; an enlargement; alteration or addition to the occupancy or to the structure it occupies. Single Family or Duplex per building................$100.00 All others per building ............ $250.00 (d) Bonds required for unfinished work on certificates of occupancy. (i) Amount is to be established by Chief of Section(s) involved and shall be 100% of estimated cost of required work. Cash Bond will be refunded less $50.00 or other bonds discharged, upon completion of required work by owner. (ii) Methods for placing bonds may be: 1. Surety Company issuance of bond. 2. Cash bond. Payable by cash, or certified cashier's check. A COPY of signed contract with a contractor to do the work is also required. 3. Letter of Credit from a Federally Guaranteed Insured State Certified Bank. The letter shall indicate the purpose of the line of credit. A copy of signed contract with a contractor to do the work is also required. - 5 - 11633 (iii) If Work is done within specified time, the City will proceed to have the work done (1) through the Bonding Company if Method No. 1 was used; (2) through the contractor specified in the contract if Method No. 2 or Method No. 3 was used, using the proceeds from the cash bond or from the Bank Letter of Credit. (e) When a building is occupied prior to obtaining a temporary or .final Certificate of Occupancy, a fee double the permit amount plus $100.00 fine shall be paid. The payment of suchfeeshall not relieve any person, firm or corporation from fully complying with all of the requirements of all applicable regulations and codes, nor shall it relieve them from being subject to any of the penalties therein. (f) Temporary Certificate of Use on partial and/or Temporary Occupancy .......... $50.00. (6) VIOLATION NOTICE: When a violation notice and/or notification letter is sent ordering correction of an existing violation, the following administrative fee is required to be paid, such payment being cumulative and in addition to any fines or penalties which may be imposed as a result of a conviction for said violation. Each violation notice and/or notification letter sent..............................$50.00 (7) APPLICATION FEE (PAYABLE AT THE TIME OF APPLICATION) Application Fee...........................$50.00 ($15.00 credit returned to applicant when permit is issued). All other permit applications.............$35.00 Application fees are not refundable. No credit will be given if after review, a complete new design is submitted for review. (8) Fee for computer printout of property information, permits, inspections, etc. per sheet (all systems)........................$1.00 6 - . 11633 (9) Fee for Building and Zoning information requested in writing (including file search for records of violations)....................$40.00 (10) Omitted item(s) from a permit will require an additional permit at..................Double fee (11) Fee for change of contractor; when original contractor waives right to refund (applies to all permit types: B, E, MA, MB, ME, MG, P, SG, L)........................................$75.00 (12) Fire flow, pump and generator test departmental section involved in test..................$60.00 (13) Minimum permit fee (applicable to building, plumbing, electrical and mechanical permits except where specifically noted otherwise)................................$60.00 (14) Fee for each inspector for tests conducted after normal working hours. (Example: smoke removal system test) (a) Up to four (4) hours minimum for each test.....................................$350.00 (b) After four (4) hours (each inspector) per hour......................................$60.00 (15) Notarization of documents not required for permitting process..............................$4.00 (16) Sending and/or receiving faxes(not related to the permitting process): Local (per page)................................$1.00 Long Distance(per page).........................$1.50 C. REFUNDS, TIME LIMITATION, REVOCATION, ETC. The fees charged pursuant to this ordinance, provided the same are for a permit required by Section 301.1 of the South Florida Building Code, may be refunded by the Director of the Building and Zoning Department, subject to the following: (1) No refunds shall be made where any work, has commenced except where duplicate permits are issued for the same work, in which case a refund in accordance with paragraph (4) of subsection (c) hereof may be granted to the original permit holder providing that the duplicate permits were issued within ninety (90) days of each other and - 7 - - 11633 request for refund is received within ninety (90) days of the issuance of the latter permit. (2) No refunds shall be made where permit have become void as provided by paragraph 304.3(a) of the South Florida Building Code. (3) No refunds shall be made on permit fees of $100.00 or less. (4) Refunds on permits or any item thereon, where fees are over $100.00 will be refundable on a basis of (500) of the balance over $100.00 such refunds be made to the closest dollar. (5) Full refunds may be granted to a permit holder whose permit is canceled by owner authorization where work has commenced and such owner selects a second contractor to complete the work. The second contractor shall pay a full fee to complete the work unless the first contractor waives his/her opportunity to refund in writing, or if the property owner can provide proof that the first permit holder was reimbursed for the permit fee, in which case the second contractor is entitled to a permit to cover the same work on a 'no charge' basis. If the first payment is expired the second contractor shall pay a full permit fee on unstarted work or a completion permit fee in accordance with subparagraph (b) of paragraph (16) of subsection (d) hereof. (6) A full refund may be granted to a permit holder who takes out a permit covering work outside the jurisdictional inspection area, or if permit is canceled by the Department within ninety (90) days with no work being done. d. BUILDING PERMIT FEES: (Fees listed do not include plumbing, electrical, or mechanical installations, or use and occupancy fees) (1) NEW BUILDING AND/OR ADDITIONS: For each one (1) square foot of floor area: (a) Single Family and Duplex.............$0.15 (b) Multifamily ..........................$0.20 (c) Commercial...........................$0.25 (d) Institutional ................ ........ $0.25 (e) Theater, auditorium, atrium, etc ..... $0.28 (f) Storage and Industrial use of Group E and F Occupancies ........................$0.17 - 11633 0 - 0 (g) Greenhouses and buildings for agricultural uses (nonresidential), screen enclosures, trailer additions, for each one (1) sq. ft. of floor area....................$0.27 (h) Interior completion of space in new building while still under prime contractor for first $1,000 of cost.$50.00 For each additional $1,000 of cost..$10.00 (2) NEW CONSTRUCTION OTHER THAN AS SPECIFIED HEREIN: (a) Water tower, pylons, bulk storage tank foundations, sea walls, bulkheads, unusual limited -use buildings, freestanding rigid canopies, marquees, special foundations and similar construction: For each $1,000 of estimated cost or fractional part......................$9.00 (b) Metal, wood or other storage sheds (including prefab): First 100 sq. ft....................$15.00 For each additional 100 sq. ft. or fraction thereof ..................... $10.00 (Except for each service station underground storage tank and each approved fallout shelter which conforms to specifications established by Civil Defense and Mobilization Agency and South Florida Building Code) each ......... $20.00 (3) ALTERATIONS, REMODELING AND REPAIRS TO BUILDINGS AND OTHER STRUCTURES, INCLUDING SANDBLASTING & GUNITING: Up to $1,000 of estimated cost or fraction part......................................$30.00 For each additional $1,000 of estimated cost or fractional part...........................$15.00 Fire damage - Commercial - Minimum ....... $225.00 (4) INSTALLATION OF EXTERIOR OPERABLE WINDOWS AND EXTERIOR .SLIDING GLASS DOORS IN NEW BUILDINGS OR ADDITIONS EXCEEDING TWO (2) STORIES IN HEIGHT AND THE INSTALLATION, ALTERATIONS AND REPAIR OF SUCH. WINDOWS AND DOORS IN EXISTING BUILDINGS OF ANY HEIGHT, AS FOLLOWS: New installation or replacement for each window or door. Unit* (per sq. ft.)...............$0.05 For each unit* minimum ....................$35.00 - 9 11633 *Unit is the opening between structural columns. (5) INSTALLATIONS OF CURTAIN WALLS, INCLUDING WINDOWS AND DOORS THEREIN AND THE ALTERATION, REPAIR OR REPLACEMENT OF STORE FRONTS AND SIMILAR FIXED GLASS: For each 100 sq. ft........................$7.25 (6) MOVING BUILDINGS OR OTHER STRUCTURES: Per building or structure (minimum) ....... $75.00 For each one (1) sq. ft. (does not include cost of new foundation or repairs to building or repairs to building or structure) .......... $0.11 (7) CONCRETE SLABS: (OTHER THAN PAVING) (Where separate installation not covered by prior permit). For first 100 sq. ft. or fractional part thereof...................................$12.00 For each additional 100 sq. ft. or fractional part thereof...............................$5.50 (8) PAVING: APPLICABLE PERMIT FEES ARE SET FORTH IN PARAGRAPH (13) OF SUBSECTION (f) HEREOF. (9) ROOFING (INCLUDING REROOFING) AND REPAIRS: Single Family and Duplex For the first 600 sq. ft. (6 squares) per square foot.......................................$0.07 For each additional square foot over 600 sq. ft. (6.01 squares and over)....................$0.05 Multi -Family and Commercial For the first 500 sq. ft. (5 squares) per square foot.....................................$0.07 From 501 sq. ft. to 1,000 sq. ft. (5.01 to 10.00 squares) per square foot...................$0.06 For each additional square foot over 1,000 sq. ft. (10.01 squares and over)...............$0.05 If required inspections are not called for prior to completion of work, a new permit shall be applied for at a quadruple fee and part or all of roof covering will have to be removed to allow necessary inspections by Building and Zoning inspector. - 10 - 11633 (10) FENCES AND/OR WALLS: For first 100 lineal feet or fractional part......................................$30.00 For each additional 100 ft. or fractional part......................................$12.00 (11) AWNINGS AND CANOPIES First $1,000 of estimated cost ............ $15.00 For each additional $1,000 or fractional part thereof....................................$7.50 Minimum Fee...............................$60.00 (12) SWIMMING POOLS (INCLUDING WHIRLPOOLS, HOT TUBS, ETC.) For the first 5,000 gallon capacity or fractional part thereof ...................$60.00 For pool over 5,000 gallon to 20,000 gallon capacity or fractional part..............$120.00 For each additional 1,000 gallon capacity or fractional part...........................$10.00 (13) TEMPORARY PLATFORMS AND TEMPORARY BLEACHERS TO BE USED FOR PUBLIC ASSEMBLY: BLEACHERS -LENGTH OF ROWS X NUMBER OF ROWS FOR TOTAL: For each 100 sq. ft. or fractional part of platform area.............................$15.00 For 100 lineal feet or fractional part of seats......................................$7.50 (14) DEMOLITION OF BUILDINGS: For the first 1,000 sq. ft. or fractional part of floor area.............................$75.00 For each additional 1,000 sq. ft. or fractional part of floor area ........................$25.00 (15) DEMOLITIONS OF SIGNS, FENCES, AND/OR WALLS AND STRUCTURES OTHER THAN ABOVE: For each $100.00 or fractional part of estimated cost up to$1,000 .........................$10.00 For each additional $100.00 or fractional part of estimated cost ..........................$5.00 (16) EXTENSION/COMPLETION OF PERMITS. (a) EXTENSION OF TIME PERMIT: 100 of original permit fee or a minimum of ............................. $55.00 - 11 - 11633 (b) COMPLETION PERMIT FEES. (This applies to all permit types: B, E, MA, ME, MG, MB, P, L, SG). For first $1,000.00 of cost...............$30.00 For each additional $1,000.00.............. $15.00 (17) TENTS, TRAILERS, TEMPORARY PERMIT ONLY: For each tent up to and including 20,000 sq. ft. in area...................................$50.00 For each additional 1,000 sq. ft. or fraction thereof....................................$7.50 Tie down of temporary trailers ............ $75.00 (All tent permits shall be issued for a 30-day period only and fees are not proratable). (18) PAINTING: Over $100 up to $500.00 of estimated cost or fractional part...........................$20.00 For each additional $500.00...............$10.00 (19) TREES: LANDSCAPING: Each tree (new, removal or transplant) .... $10.00 Hedges per 100 lineal feet or fraction .... $25.00 Ground cover per 1,000 sq. ft........ ...$20.00 (20) SIGNS: OWNER IDENTIFICATION: Single -faced, including channel -letter signs, per sq. ft.................................$0.60 Double-faced, including channel -letter signs, per sq. ft.................................$0.90 Painted wall lettering, per sq. ft......... $0.50 Sign repairs..............................$25.00 Promotional and Special Events Signs ...... $55.00 Temporary banners, flags, balloons, etc ... $55.00 Footing (each)............................$55.00 GENERAL ADVERTISING: New Construction, per sq. ft...............$0.60 Sign repairs..............................$25.00 Embellishment (initial), per sq. ft........ $0.60 Yearly Reinspection Fee (a) Small sign up to 100 sq. ft........... $35.00 (b) Medium sign 101 - 300 sq. ft.......... $60.00 (c) Large sign 301 sq. ft. and greater ... $100.00 Footing (each)............................$55.00 - 12 - 11633 Square footage is to be computed in this paragraph in accordance with the smallest calculable geometric figure. (21) PARKING AREA LIGHTING: Each footing and pole......................$7.50 (22) ENERGY CONSERVATION PLAN REVIEW AND FIELD INSPECTIONS: For each square foot of floor area ......... $0.10 (23) RECREATIONAL COURTS (TENNIS, BASKETBALL, ETC.) For each 100 sq. ft.......................$11.00 For each $100 (where square footage is not applicable................................$11.00 For each footing for posts other fence ..... $7.50 (24) HANDRAILS/STAIR RAILS (PER LINEAL FT.) ..... $0.90 (25) OVERHEAD DOORS (EACH)......................$6.50 (26) PREMISE PERMIT ANNUAL PERMIT AS PER SECTION 301.3(a) AND CHAPTER 10 OF DADE COUNTY: $45 per maintenance personnel, helpers and trainees. Minimum fee...................$900.00 e. PRODUCTS CONTROL (City permit fees are no longer applicable) f. PLUMBING PERMIT FEES: MINIMUM PLUMBING AND PAVING PERMIT FEE ......... $60.00 (1) (a) ROUGHING IN OR CAPPED -OFF OUTLETS FOR ALL PLUMBING FIXTURES: For first roughing -in or capped off outlet...............................$6.00 Each additional roughing -in or capped -off outlet...............................$6.00 Replacement of old roughing -in ....... $6.00 (b) FIXTURES SET ON NEW ROUGHING -IN OR ON OLD ROUGHING -IN: First fixture ........................$6.00 Each additional fixture..............$6.00 - 13 - 11633 (2) (3) H ALL OTHER FIXTURES, APPURTENANCES OF APPLIANCES NONCLASSIFIED AS PLUMBING FIXTURE BUT HAVING WATER SUPPLY OR WASTE OUTLET OR BOTH: (a) First roughing -in for waste outlet or connection...........................$6.00 Each additional roughing -in for waste outlet or connection .................$6.00 (b) First fixture, appurtenance or appliance set..................................$6.00 Each additional fixture, appurtenance or appliance set ........................$6.00 (a) Interceptors and separators (septic tanks, settling tanks, etc., including drainfield for same): Up to 750 gallons.. Each additional 150 (b) Drainfield Relay: .................$35.00 gallons .......... $6.00 Up to 100 sq. ft....................$16.00 Each 100 sq. ft. or fraction ......... $6.00 Type D manhole for interceptors and separators..........................$16.00 Interceptors and separators (being abandoned)..........................$25.00 SEWERS: (a) SANITARY SEWERS: Each building sewer where connection is made to a septic tank, to a private sewer connection system, to a building drain outside a building or to the city sewer, to an interceptor: Each connection (Residential) ....... $45.00 Each connection (Commercial) ........ $60.00 Sanitary sewer collector system inside private property: Each 50 feet ........................$30.00 Type A, each manhole................$30.00 Repair to sewer or any other waste line up to$100.00..........................$12.00 Each additional $100.00..............$4.00 Sewer capping .......................$45.00 Sump pump(ejection)................$45.00 Sewage treatment plant.............$150.00 - 14 - 11633 (b) STORM SEWERS: Minimum permit fee .. .....................$60.00 Roof drain inlet (each)....................$6.00 Roughing -in for each roof drain ............ $6.00 Catch basin on area basin .................$12.00 Each catch basin inlet....................$12.00 Soakage pit, trench or french drain first 50 lineal feet...............................$25.00 Each additional 50 lineal ft..............$12.00 Each soakage pit inlet....................$12.00 Each soakage pit manhole..................$25.00 Storm sewer collection system inside private property each 50 feet.....................$45.00 Storm sewer capping .......................$30.00 (5) CONDENSATE DRAIN: All types of air conditioner drains per unit......................................$12.00 (6) WATER PIPING: Water Service Connection Each service from meter...................$25.00 Water service connection to each additional building..................................$12.00 Water connection to any water -operated device or equipment requiring water to operate, but not a plumbing fixture..........................$12.00 Solar water heater installations or repairs...................................$50.00 Solar water heater booster connection or replacement...............................$10.00 Re -piping or repairs to water piping up to $100.00..................................$20.00 Each additional$100.00....................$4.00 Water main extension each 50 ft........... $12.00 Backflow preventer (domestic water 1 line 2" or less).....................................$45.00 Greater than 2.............................. $55.00 (7) LAWN SPRINKLER: Each system...............................$60.00 (8) FIRE PROTECTION: Jockey pump...............................$30.00 Water supply to fire sprinkler system ..... $30.00 Fire pump or domestic pump (new or replacement)..............................$35.00 Each standpipe............................$30.00 - 15 - 11633 Each hose rack or Fire dept. outlet ....... $10.00 Each Siamese or roof manifold.............$25.00 Each sprinkler head ........................$1.00 Each fire flow test .......................$40.00 Each fire hydrant (Miami std. only) ....... $40.00 Minimum fire sprinkler permit fee $60.00 Backflow preventer (fireline).............$60.00 (9) SWIMMING POOLS: Swimming pool piping Installations (residential).............................$60.00 (Commercial)..............................$90.00 Swimming pool piping replacement or repair work......................................$45.00 Water connection to pool..................$12.00 Filter replacement ........................$20.00 Pool Heater (gas or electric).............$50.00 (10) WELLS: All wells each............................$45.00 Connection to or from wells per linear foot......................................$12.00 (11) WATER TREATMENT PLANT, PUMPING STATION SEWAGE TREATMENT PLANT AND LIFT STATION: Water or sewer treatment plant interior plant piping ....................$210.00 Lift station.............................$210.00 (12) TEMPORARY TOILETS: Water borne or chemical for first installation at jobsite................................$45.00 Each additional installation per jobsite..$10.00 (13) PAVING AND/OR RESURFACING: First 500 sq. ft..........................$35.00 Each additional 500 sq. ft. (or part thereof)..................................$12.00 (14) MISCELLANEOUS: Siphon -breakers on old installations required when repair or unapproved closet is made, each.......................................$7.00 Hosebib...................................$7.00 (15) ROUGH INSPECTION FOR BUILDINGS OVER 10 STORIES: Fee for each story over loth...............$25.00 - 16 - 11633 g. ELECTRICAL PERMIT FEES: Minimum fee, each permit .......................$60.00 Special request inspection (each request with permit).......................................$20.00 After second request..........................$50.00 (1) ROUGH WIRING OUTLETS (LIGHT, RECEPTACLE, SWITCH, SIGN AND ALSO TELEPHONE AND OTHER LOW -VOLTAGE OUTLETS): 1 through 10 outlets .....................$20.00 Each additional outlet ...................$ 1.00 Plug, mold, and strip light power rail ... $ 8.00 (2) SERVICES: (THE FOLLOWING FEES SHALL BE CHARGED FOR EACH SERVICE AND SUBFEED [FEED RAIL]). (a) 100 amps and under ..................$ 7.00 101 amps thru 200 amps ..............$ 9.00 201 amps thru 400 amps..............$10.00 401 amps thru 600 amps..............$12.00 601 amps thru 800 amps..............$13.00 For each 100 amps over 800.......... $ 5.00 (b) Temporary for construction ............$120.00 (plus fee listed above for 101 amps and over) (c) Service repair and/or meter -change (adding 3rd phase, combining meters) . . . . . . . . . $50.00 (d) Temporary for testing, (for a period of 30 days)...............................$90.00 Renewal (for additional 30 days) .... $30.00 (3) SWITCHBOARDS: Fees are the same as "SERVICES", computed on amps, as set forth in paragraph (2) of subsection (g) hereof. (4) EQUIPMENT OUTLETS OR PERMANENT CONNECTIONS: Compactor................................$8.00 Deep Freezer.............................$8.00 Dishwasher...............................$8.00 Dryer....................................$8.00 Fan (Exhaust/Bathroom)...................$8.00 Fan (Paddle/Ceiling).....................$8.00 Garbage Disposal .........................$8.00 Oven.....................................$8.00 - 17 - 11633 Photoelectric Switch .....................$8.00 Range... ... ........I..................$8.00 Range Top................................$8.00 Refrigerator.(domestic)..................$8.00 Refrigerator (commercial) per H.P. see Motor Schedule.................................$8.00 Space Heater.............................$8.00 Time Clock...............................$8.00 Washing Machine ..........................$8.00 Water Heater -Boiler (electrical) ......... $8.00 Air Conditioners, Window and through -wall units, wall units, each outlet..................$8.00 Air Conditioner, per ton, central ........ $6.00 Fire Damage listed on permit (minimum)..$50.00 Clear violations inspection (minimum) ... $50.00 Rehabilitation -Total (Apts) each unit ... $60.00 Replacement of Equipment (a) If replacement size is same as existing, fee 50% of new fee. (b) If replacement size is larger than existing, fee is same as new fee. MOTORS: (Including Fire Pumps) Each motor less than 2 H.P..............$6.00 Each motor 2 H.P. to 10 H.P ............ $30.00 Each H.P. over 10 H.P. additional ....... $2.00 (5) MACHINE OUTLETS OR TREATMENT CONNECTIONS: X-Ray - Portable ........................$15.00 X-Ray - Stationary ......................$20.00 Diathermic..............................$15.00 Isolation Units (L I M).................$50.00 Linear Acceleration .....................$75.00 Magnetic Imaging ........................$75.00 Diagnostic & Operating Tables ........... $75.00 Any equipment not specified above ....... $75.00 (6) GENERATORS AND TRANSFORMERS, COMMERCIAL AND RESIDENTIAL HEATING EQUIPMENT AND STRIP HEATERS, RECTIFIERS: Each up to and including 5 KVA or KW ..... $6.00 Each generator or transformer over 6 KVA or KW thru 10 KVA or KW.......................$12.00 Each generator or transformer over 11 KVA or KW thru 15 KVA or KW.......................$15.00 16 KVA or KW thru 20 KVA or KW .......... $20.00 Each generator or transformer over 21 KVA or KW thru 25 KVA or KW.......................$30.00 - 18 - 11633 Each generator or transformer over 26 KVA or KW thru 50 KVA or KW.......................$60.00 51 KVA or KW or over....................$60.00 Plus for each KVA or KW over 50.......... $0.75 (7) WELDING - MACHINE OUTLETS: Up to 25 amps............................$8.00 For each additional 25 amps or fractional part thereof .................................$ 8.00 (8) SPECIAL PURPOSE OUTLETS, VIDEO GAMES: (COMMERCIAL) Popcorn, doughnut, drink machines, coin music machines, toasters, coffee urn, expresso, deep fryer, telephone booths, refrigerator display cases, etc. each .........................$ 8.00 Painting - bake ovens, each..............$35.00 (9) SIGNS: First 100 bulbs, including ballast ...... $20.00 (NOTE: Minimum fee for electrical sign).$20.00 Each additional ten (10) bulbs or fraction thereof .................................$ 4.00 Transformers (neon or ballast) for first ... $9.00 Each additional transformer or ballast ..... $4.00 Pre -manufactured signs; plug in type up to 4 square feet .......................$20.00 Larger than 4 square feet.................$40.00 Neon strip each (up to.5 linear ft.)....... $2.50 Additional 5 linear feet or fractional part thereof...............................$2.50 Flasher or control .........................$9.00 Time clock or photo electric switch....... $6.00 Sign repairs, connection and reconnection..............................$25.00 (10) FIXTURES: Lights - 1 thru 10 sockets.................$7.00 1 thru 10 fluorescent tubes ....... $7.00 1 thru 10 low voltage lights ...... $7.00 Low voltage lighting transformers .......... $9.00 Each additional.................... ......$1.00 Lighting fixture "heads", each.............$7.00 Flood lights or light standards, each ...... $7.00 Parking lot lights, mercury vapor or quartz, charge per light...........................$7.00 (11) (Reserved for future use) - 19 - 11633 (12) ROUGH INSPECTION FOR BUILDINGS OVER 5 STORIES: Fee for each story over 5..................$25.00 (13) PLUGMOLD AND STRIP LIGHTING: First 10 feet.............................$20.00 Each foot thereafter .......................$1.50 (14) TEMPORARY WORK ON CIRCUSES, CARNIVALS, TENTS, SHOWS, ETC.: Equipment ground, each.....................$8.00 Service* Outlets** First temporary for special events ....... $150.00 Each additional temporary for special events............................$75.00 *This fee is the same as set forth in paragraph (2) of subsection g hereof. **These fees are the same as set forth in paragraphs (1) and (13) of subsection g hereof. (15) MINIMUM PERMIT FEE INCLUDING REPAIR WORK NOT ELSEWHERE CLASSIFIED ................$60.00 (16) BURGLAR ALARM, FIRE DETECTION SYSTEM, LIFE SAFETY SYSTEMS, INTERCOM, COMPUTERS; ENERGY MANAGEMENT SYSTEM; LOW VOLTAGE CONTROL PANEL SYSTEM Installation, central system, control panel...................................$90.00 Wiring of burglar alarms only ........... $45.00 Heads or target area, each...............$1.00 Smoke detector; each......................$1.00 Speaker, each.............................$1.00 Bell - Alarm Station, each...............$1.00 Proximity Station, each..................$1.00 Sensor thermostats .......................$1.00 Reinspection fee, semi-annually ......... $20.00 Installation of Master Control .......... $30.00 Each new outlet ..........................$2.00 Fire alarm and/or Fire pump test per hour...........................$50.00 Cable risers (each).....................$40.00 Each Additional Floor ................... $5.00 Computer Terminal ........................$2.00 (Computer, Cable TVC, Fiber Optics, Telephone) (17) MASTER TELEVISION AND RADIO RECEIVING ANTENNAE: TV and radio antenna devices, wall outlets, suppressers, splitters, lighting arrestors, - 20 - 11633 receivers, input devices, audio amplifiers, ground connections, etc. 1 thru 5 devices ... .....................$20.00 Each additional device ................. .$1.00 Dish (Satellite)........................$20.00 (18) PARTIAL DEMOLITIONS: Removal of Electric Circuits lst Circuit ...................... ......$30.00 Each additional circuit..................$3.00 (19) SWIMMING POOLS, SPAS & HOT TUBS ......... $90.00 (Light, Pump, Timer and Bonding) Swimming pool combination with spa new or repair..........................$150.00 (20) U.P.S. SYSTEM (Uninterrupted Power Supply) ............ $75.00 h. MECHANICAL PERMIT FEES: Miscellaneous. fee (not specified anywhere else) first $1,000 cost (labor and materials) ............ $30.00 Each additional ,$1,000 cost (labor and materials).......................$10.00 (1) AIR CONDITIONING AND REFRIGERATION: Mechanical Air Permit (minimum fee) .... $60.00 (Includes all component parts of the system; however, the fee for water, electric and gas lines and connections is a separate fee and such fees appear elsewhere in this ordinance). (Chiller fee per ton where BTU rating is not known, Substitute one horsepower for one ton). Temporary A/C installation (per ton or fraction thereof) ............................... $15.00 Each ton capacity or fractional part hereof..................................$15.00 Minimum Fee (except window air conditioning units) for each individual system ....... $60.00 Window air conditioning unit, for each unit...............................$25.00 ROUGH INSPECTION FOR BUILDINGS OVER 10 STORIES: Fee for each story over loth.............$20.00 Cooling tower, first $1,000 value or fraction thereof.................................$40.00 Each additional $1,000 value or fraction - 21 - 11633 thereof.................................$10.00 (2) FURNACES AND HEATING EQUIPMENT, INCLUDING COMMERCIAL DRYERS, OVENS AND OTHER FIRED OBJECTS NOT ELSEWHERE CLASSIFIED (Includes all component parts of the system except fuel and electrical lines as noted in paragraph (1) of subsection h hereof) . Per K.W. (or 3413 per BTU)...............$3.00 Minimum fee.............................$45.00 For unvented space heaters and vented wall. heaters (no duct work) First such unit .........................$10.00 For each such additional unit ............ $5.00 (3) YEARLY INSPECTION FEE FOR ELEVATORS ESCALATORS AND OTHER LIFTING APPARATUS: Mechanical Elevator Permit (minimum fee)...............................$60.00 (a) Inspection fees - Elevators: New elevator traction each ........ $600.00 First two (2) floors...............$45.00 Plus each additional two (2) floors..............................$7.00 Transporting assembly..............$60.00 Sidewalk lift (no floor limits) .... $50.00 Stage lift (no floor limits) ....... $70.00 Auto Park Lift (no floor limit3)..$100.00 Man lift (no floor limits) ........ $300.00 Boat lift (no floor limits) ........ $60.00 Dumbwaiters .......................$150.00 Escalators ........................$240.00 Roof Window Cleaning Machine ....... $70.00 Certificate Issuance Fee for an Elevator, Escalator or Dumbwaiter ............ $10.00 Duplicate Certificate..............$15.00 TEMPORARY ELEVATORS USED IN CONSTRUCTION: The elevator shall be inspected every thirty (30) days and a Certificate Fee collected in accordance with the number of landings the elevator serves. The Certificate in the car shall be updated to reflect the latest inspection date. (b) ELEVATOR AND ESCALATOR PERMIT FEES: To install or move each - 22 - 11633 elevator or escalator (residential)............ 4........ $360.00 Non-residential fees: To install or move freight elevator..........................$600.00 To install or move a hydraulic elevator..........................$450.00 To install or move escalators ..... $240.00 To install or move dumbwaiters .... $150.00 Key box for each Fire Division ..... $50.00 (all other devices, per value basis plus yearly inspection fee: See 3(a) above). (c) Installation of lifting apparatus and transporting assemblies, including cargo lifts, and wheelchair lifts (all other devices, per value basis plus yearly inspection fee) For estimated cost up to $1,000.... $30.00 For each additional $1,000 or fractional part thereof ............ $10.00 Minimum Fee .......................$100.00 Refinish cab interior (no electric work)................$150.00 Estimated cost up to $1,000 or fractional part thereof ............ $30.00 Each additional $1,000 or fractional part thereof ............ $10.00 Minimum fee .......................$150.00 Reinspection fee(applies where violation notice was served).................$28.00 Smaller Annual Elevator Repair Permit Fee (Repairs other than major repairs) (From October to September) ..... $400.00 Casing for Hydro Elevator Permit Fee per Foot ........................$2.00 Minimum Casings Fee................$25.00 Major Repair, Alteration, and Modernization for an elevator: First two (2) landings ............ $100.00 Each landing thereafter ............ $20.00 Alteration and modernization of elevators and other transporting apparatus (Major Repairs): Manlift...........................$300.00 (d) ELEVATOR HOISTWAY CONSTRUCTION PERMIT FEES 1 - 5 Floors ......................$350.00 Each additional (5) floors or fraction thereof................$75.00 Elevator for construction - 23 - 11633 use only..........................$150.00 (Up to 30 floors, valid for 30 days only) Each additional floor..............$10.00 (4) AMUSEMENT RIDES AND DEVICES: For each portable unit or temporary unit..........................$95.00 For each permanent unit installed or altered................................$150.00 Semiannual inspection (permanent installation only) For each ride or device at any one (1) location ........................$75.00 (5) BOILERS AND PRESSURE VESSELS AND POOL HEATERS: Mechanical Boiler Permit (minimum fee)..................................$60.00 Installation permit fees (Does not include installation or connection of fuel and water lines) . Steam Boilers, Hot Water Boilers, Water Heaters, Storage Tanks and Heat Exchangers (as defined in the ASME Boiler and Pressure Vessel Code). Each Steam Boiler ....................$125.00 Steam -driven prime movers, each ...... $100.00 Steam -utilizing equipment, each ....... $40.00 Unfired pressure vessels (operating at pressures in excess of 60 psi and having a volume of more than 5 cu. Ft .......... $75.00 Boiler repairs requiring inspection, welding retubing, etc., (includes internal and hydrostatic inspection). Minimum fee for estimated cost up to $1,000.... ............................ $60.00 For each additional $1,000 or fractional part thereof...............................$10.00 FEES FOR PERIODIC REINSPECTIONS: Steam Boilers (semi-annual), Hot Water Boilers, including Water Heaters classified by code as Low Pressure Boilers (Annual) External Inspections Only........ $125.00 Internal inspection, hydrostatic test and external inspection .................$60.00 Internal inspection and - 24 - 11633 external inspection .................$50.00 Hydrostatic test only...............$50.00 Unfired pressure vessels (annual) Over 60 psi or 5 cubic feet ......... $75.00 Certificate Fee.....................$10.00 Duplicate Certificate ................$5.00 Shop inspection of boiler or pressure vessel, per completed vessel ........ $80.00 Passenger elevator (annual inspection per code)(per device up to 30 floors) ............ $150.00 Additional each additional floor.............................$10.00 Freight elevators, (annual inspection per code)(each)......... $150.00 Escalators (each)...................$75.00 Dumbwaiters, wheelchair lifts and all other lifting and transporting apparatus vertical conveyors (annual inspection per code)(each).....................$75.00 (6) FIRE SUPPRESSION SYSTEMS CO2, Halon and Dry Powder Systems and other piped fire extinguishing systems, including reinstallation, modification, or alteration,(full installation including discharge test $105.00. Minimum Fee ...................... $105.00 (7) STORAGE TANKS FOR FLAMMABLE LIQUIDS: NOTE: Regulatory control over installation of this item is exercised by the Fire Prevention, Bureau of the Fire, Rescue and Inspection Services Department. (8) INTERNAL COMBUSTION ENGINES: Stationary..............................$50.00 FULL LOAD EMERGENCY GENERATOR TESTS .... $125.00 (9) OTHER FEES: Pressure and process piping, and other mechanical piping work: For estimated cost up to $1,000......... $30.00 For each additional $1,000 or fractional part thereof.................................$10.00 Sheetmetal work, duct work, and component part replacement: For estimated cost up to $1,000......... $30.00 For each additional $1,000 or fractional part thereof.................................$10.00 - 25 - 11633 Commercial kitchen hood................$125.00 Ductless fan...........................$30.00 Venting systems of any kind up to $1,000 in value ... ...... .......................$40.00 For values in excess of $1,000.......... $10.00 (10) NATURAL GAS AND LIQUEFIED PETROLEUM: Minimum Gas Permit Fee (residential) .... $45.00 Minimum Gas Permit Fee (commercial) ..... $60.00 Each rough outlet (running lines) ........ $8.00 Each set appliance (connections) ......... $8.00 Service (includes cylinder, regulator and/or one meter................................$8.00 Change of company (no additional outlets or appliances..............................$10.00 Major repairs to piping First $1,000 cost .......................$20.00 Each additional $1,000 or fractional part of cost..................$7.00 Additional meters considered as services.$7.00 Gas main: on private property (each 50 lin. Ft.).......................$7.00 Underground LP gas tank.................$35.00 Change from master meter to individual meter (per meter of service)...................$7.00 Additional tanks added to existing services, each.....................................$7.00 Addition of gas fire safety shutoff valve, each.....................................$7.00 Natural and/or LP gas dispensing unit, including compressor or pump and related installations.............................$50.00 AIR OXYGEN CO2 AND DRY NITROGEN STORAGE TANKS (First tank)........................$40.00 Any additional tanks ......................$10.00 Medical Gas Piping, for first $1,000...... $30.00 For each fractional $1,000 or fractional part thereof..............................$10.00 Minimum Mechanical fees...................$60.00 (11) MECHANICAL INVOICES: Administrative fee .........................$3.00 Whenever any owner or user of an elevator/boiler, escalator or any other lifting apparatus subject to this ordinance fails to pay for any Mechanical Invoice, there will be a delinquent fee in addition to the fees charged: Over (30) days past due...................$10.00 Over (60) days past due...................$30.00 Over (90) days past due...................$50.00 - 26 - 11633 (b ) If annual test is not conducted, a fee of $1.00 per 1,000 sq. ft. of building will be charged for each day past one year from date of previous test. Section 3. All ordinances or parts of ordinances insofar as they are inconsistent or in conflict with the provisions of this Ordinance are hereby repealed. Section 4. If any section, part of section, paragraph, clause, phrase or word of this ordinance is declared invalid, the remaining provisions of this Ordinance shall not be affected. Section 5. This Ordinance is hereby declared to be an emergency measure on the .grounds of urgent public need for the preservation of peace, health, safety, and property of the City of Miami. Section 6. The requirement of reading this Ordinance on two separate days is hereby dispensed with by an affirmative vote of not less than four -fifths of the members of the Commission. Section 7. It is the intention of the City Commission that the provisions of this Ordinance shall become and be made a part of the Code of the City of Miami, Florida, as amended. Section 10. This Ordinance shall become effective immediately upon its adoption. - 27 - 11633 PASSED AND ADOPTED BY TITLE ONLY this 31st day of March 1998. JOE CAROLLO, MAYOR ATTEST: WALTER J. FOEMAN, CITY CLERK PREPARED PA/14PROVED BY: YAMILE R REHY INTER IEF SSISTANT CITY ATTORNEY W463:YMT•BSS:d 1:csk APPROVED AS TO FORM AND CiTERIM C ES 'J EDWARD MAXy ELL I CITY TORNEY In accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of this legislation by signing it in the designated place provided, said legislation now becomes effective with the elapse of ten (10) days from the date of C mission action regarding same, without the Mayor exercisin a Wa r J man, City Clerk - 28 - 11633 INTER -OFFICE AilEiIACRANDUM The Honorable Mayor and Members of the City Commission Proposed Emergency Ordinance Amending Section 5 of Ordinance 6145 Jose Garcia-Pedrosa=�E?icEs City Manager ENCLOSURES RECOMMENDATION It is respectfully recommended that the City Commission adopt the attached . emergency Ordinance amending Section 5 of Ordinance No. 6145, adding and increasing required fees to cover the enforcement of the South Florida Building Code. BACKGROUND The adoption of the attached emergency ordinance is required in order for the City of Miami to continue to provide the level of service the citizens of Miami deserve, as well as protect lives. The cost of properly enforcing the South Florida Building Code continues to increase, and it has become necessary to increase some fees to reflect the true cost of providing the service. The urgency of the increase is to cover the costs as quickly as possible for the remaining of the fiscal year. The Building and Zoning Department is where all major construction projects begin and end, starting with the plans reviewed, the permits issued and the projects inspected and finalized. The expediting of the review process gets the projects off the ground quicker, finalized sooner and on the tax rolls. The fee being added for expediting plans review entails subcontracting out for the service, without cost to the City, and.thus encouraging the development to occur at an accelerated pace. The City would subcontract two (2) reviewers for each discipline: Structural, Building, Electrical, Mechanical, and Plumbing. A $250.00 fee would be charged per discipline totaling $1,250 per plan, in addition to the normal costs of the permit. The 40/50 yearcertification application fee is being increased to cover the costs involved. The follow up involves mass mailings, inspections, review of reports, and monitoring permits, as needed. The new fee will match the fees presently being charged by Miami -Dade County. The annual master premise permit is issued to any firm which performs its own maintenance with licensed, certified maintenance personnel, as well as helpers. The permit is issued yearly in lieu of any other permit for the erection, repair or relocation of non -bearing interior partitions, painting, patching or stucco and plaster, the repair of floors of all types, the repairs of awnings and canopies, the repair of wall and floor tile. The one time permit makes it easier for the firm to pull one master permit and assures the City the minor repairs are done by licensed personnel. 11633 The City of Miami is adding a Construction Debris Removal Fee. This fee is necessary to remove an enormous amount of debris generated from various types of f4 construction activities such as building, demolition, electrical, plumbing, mechanical, and remodeling of existing properties from back alleys and rights of ways. City of Miami states that the City Commission finds it in the public interest to ensure that all areas within the City limits be adequately provided with high -quality waste collection and disposal service; that it retains regulatory authority as permitted by law over waste collection and disposal in the interest of public health, safety, welfare and ecological considerations associated with the provision of this service; and retains control over the use of public rights of ways to ensure against interference with the public's convenience, and to protect the public investment in rights of way property. The addition of a "Construction Debris Removal Fee" to help offset the enormous costs related to the collection and disposal of illegally dumped construction related debris within the City of Miami is the best means of assuring that the above described interest of the City are protected. The Construction Debris Removal Fee is charged on all building, electrical, plumbing, mechanical and demolition permits. The fee is based upon a 0.20% projected cost of the project for which the permit is being applied, with a minimum fee of $20 and a maximum fee of $2,500. The rate for the Construction Debris Removal Fee would generate approximately $1.4 million annually which helps offset the costs presently borne by the City related to the collection and disposal of construction related debris illegally dumped in the City of Miami and is therefore in the best interests of the City. JGP/SJV:rb It 11633 4kitij of 'ffliamp WALTER J. FOEMAN City Clerk May 26, 1998 Evelyn Jefferson Municipal Code Corp. P.O. Box 2235 Tallahassee, FL 32316 Dear Ms. Jefferson JOSE GARCIA-PEDROSA City Manager Enclosed herewith please find a copy of the following Ordinances which amend the Code of the City of Miami, Florida: 11619 11621 11622 11624 11625 11626 11627 11628 11629 11630 11631 11632 M1633' 11634 11640 11642 11645 11650 11651 If I can be of any further assistance, please do not hesitate to call. Yours truly, allastegui-Alonso Deputy City Clerk Enc. OFFICE OF THE CITY CLERIC/ 3500 Pan American Drive/P.O. Box 330708/Miami, FL 33233/(305) 250-5360/FAX: (305) 858-1610 WALTER (. FOEMAN City Clerk May 26, 1998 Isel Fernandez Maldonado Court Operations Officer 1351 Northwest 12" Street Room 8100 (8`h Floor) Miami, FL 33125 Dear Ms. Maldonado: of �t�tnti� n�ur nine JOSE GARCIA-PEDROSA City Manager Enclosed herewith please find a copy of the following Ordinances which amend the Code of the City of Miami, Florida: 11619 11621 11622 11624 11625 11626 11627 11628 11629 11630 11631 11632 -116 3 11634 11640 11642 11645 11650 11651 Please acknowledge receipt of same by affixing your signature to the enclosed copy of this letter, and returning it to this office for our files. Thank you. Very truly yours, Walter J. Foeman City Cl By Deputy City Clerk RECEIVED BY: DATE: Enc. OFFICE OF THE CITY CLERK/ 3500 Pan American Drive/P.O. Box 330708/Miami, FL 33233/(305) 250-5360/FAX: (305) 858-1610 41itij of taxxnf WALTER J. FOEMAN City Clerk May 26, 1998 Rosemary Ricotta . Office of the State Attorney 1351 Northwest 12`h Avenue Miami, FL 33136-2111 Dear Ms. Ricotta: * now unu n n llQ- JOSE GARCIA-PEDROSA City Manager Enclosed herewith please find a copy of the following Ordinances which amend the Code of the City of Miami, Florida: 11619 11621 11622 11624 11625 11626 11627 11628 11629 11630 11631 11632 14.63' 11634 11640 11642 11645 11650 11651 Please acknowledge receipt of same by affixing your signature to the enclosed copy of this letter, and returning it to this office for our files. Thank you. Very truly yours, Walter J. Foeman City Clerk Deputy City Clerk RECEIVED BY: DATE: Enc. OFFICE OF THE CITY CLERK/ 3500 Pan American Drive/P.O. Box 330708/Miami, FL 33233/(305) 250-5360/FAX: (305) 858-1610 v■ ■ i yr mrawm■q r......a.. MIAMI DAILY BUSINESS REVIEW LEGAL; N®TICE 1 Published Daily except Saturday, Sunday and All interested persons will take notice that on the 31 st day of March, Legal Holidays 1998, the City Commission of Miami, Florida, adopted the following Miami, Dade County, Florida. titled ordinances: STATE OF FLORIDA ORDINANCE NO. 11631 COUNTY OF DADE: AN EMERGENCY ORDINANCE AMENDING SECTION 22- Before the undersigned authority personally appeared 12 OF THE CODE OF THE CITY OF MIAMI, FLORIDA, AS Octelma V. Ferbeyre, who on oath says that she is the AMENDED, THEREBY INCREASING THE SOLID WASTE Supervisor, Legal Notices of the Miami Daily Business FEE TO $188.00 ANNUALLY. AND BY DELETING ALL Review f/k/a Miami Review; a daily (except Saturday, Sunday REFERENCE TO SCALE FEES, -CONTAINING A'.REPEA-- and Legal Holidays) newspaper, published at Miami in Dade LER' PROVISION.AND A SEVERABILITY CLAUSE; PRO County, Florida; that the attached copy of advertisement, VIDING FOR AN'EFFECTIVE-DATE. being a Legal Advertisement of Notice In the matter of _, ORDINANCE N0. 11632 CITY OF MIAMI ,.AN EMERGENCY ORDINANCE AMENDING CHAPTER 22, -ARTICLE I, SECTION 22-12 OF THE CODE OF THE CITY. OF MIAMI, FLORIDA, AS AMENDED, ENTITLED "WASTE . ORDINANCE NO. 11633 FEES,' BY SETTING FORTH SUPPLEMENTAL WASTE FEES. TO BE.. ASSESSED .UPON COMMERCIAL ,ES TABLISHMENTS,AS SPECIFIED HEREIN; CONTAINING A REPEALER .PROVISION AND A SEVERABILITY CLAUSE;, . in the ...................... XXXXX....................................... Court, PROVIDING FOR AN EFFECTIVE DATE. was published in said newspaper in the issues of ORDINANCE NO. Apr 8, 1998 AN EMERGENCY ORDINANCE NDING SECTION 5 OF ORDINANCE NO.:0145, ADOPTED MARCH 19, 1958, AS, , AMENDED, WHICH; ESTABLISHED FEES FOR, BUILDING, PLUMBING, . ELECTRICAL, ; MECHANICAL,.-- INCLUDING BOILER AND ELEVATOR, INSPECTION .PERMIT .AND -. Affiant further says that the said Miami Daily Business -CERTIFICATE FEES. (THE -"BUILDING PERMIT- FEES"), Review is a newspaper published at Miami in said Dade THEREBY ADDING AND INCREASING REQUIRED FEES County, Florida, and that the said newspaper has heretofore TO COVER COSTS • F.OR THE ENFORCEMENT OF THE been continuously published in said Dade County, Florida, SOUTH, FLORIDA BUILDING CODE; FURTHER AMENDING each day (except Saturday, Sunday and Legal Holidays) and THE CODE OF THE CITY OF MIAMI, FLORIDA, AS has been entered as second class mail matter at the post AMENDED,. BY PROVIDING FOR CODIFICATION OF SAID - office in Miami in said Dade County, Florida, for a period of BUILDING, PERMIT FEES AS SECTION 10-4 ' OF SAID one year next preceding the first publication of the attached CODE; CONTAINING A REPEALER PROVISION, SEVER- copy of.advertisement; and affiant further says that she has ABILITY CLAUSE, AND PROVIDING FOR AN EFFECTIVE neither paid nor promised any perso corporation DATE; AND _PROVIDING FOR INCLUSIONAN THE CITY any disco ,rebate, commissio and for he purpose CODE. of sec ng 's advertisem ublicatio in the said new ape . ORDINANCE N0.11634 AN EMERGENCY ORDINANCE AMENDING_ SECTION 22- 56 OF THE CODE OF THE CITY OF. MIAMI,,FLORIDA, AS ••• ..................••• ••••• •� AMENDED, THEREBY INCREASING THE REGULATORY PERMIT FROM. FIFTEEN PERCENT (15%) TO TWENTY Sworn to and subscribed before me this PERCENT (20%) OF GROSS RECEIPTS GENERATED 8 April 98 ANNUALLY .BY PRIVATE SOLID WASTE,. HAULERS; CONTAINING A REPEALER- PROVISION AND A SEVER- ........ day of............................................................. A.D.19...... ABILITYCLAUSE; PROVIDING FOR AN EFFECTIVE DATE.4r �7. P` ....�!lllat ?teh�.r.......... Said ordinances may be inspected by the public at the Officq%tp 14, City. Cierk,'3500 Pan American Drive,'Miami, Florida, Mon a t r��N „�j• (SEAL) RY P OFFICIAL NARY SEAL Friday, excluding holidays, between the hours of 8 a.m. an, . OAP ;f/B�� CHERYL H MARMER '�� ` Octelma V. Ferbe rapV011- CITYcL-ERkfn i0owncto SIGN NUMBER of t .�,�_ a N Q CC545384 w WALTER.J.:FOEMA_ ` r� O _ ;`�i g �- MY COMNSS1ON EXPIRES o -«" „ �, I +•✓ '>� ^ OF FVO APR. 12,2000 ,'. F A - (#4786) I 4/98 4 0�40836M r