RESOLUTION NO. 9 9 - 519
A RESOLUTION OF THE MIAMI CITY COMMISSION
ACCEPTING THE BID OF F&L CONSTRUCTION, INC.,
FOR THE PROJECT ENTITLED "CITYWIDE SIDEWALK_
REPLACEMENT PROJECT PHASE XV, B-4616" IN THE
AMOUNT OF $312,108; ALLOCATING FUNDS THEREFOR
FROM PROJECT NO 341170, AS APPROPRIATED BY
FISCAL YEAR 1998-99 CAPITAL IMPROVEMENT AND
APPROPRIATIONS ORDINANCE NO. 11705, AS
AMENDED, IN THE AMOUNT OF $312,108 THE
CONTRACT COST, $28,892 EXPENSES, TOTAL
ESTIMATED COST OF $341,000; AND AUTHORIZING
THE CITY MANAGER TO EXECUTE A CONTRACT, IN A
FORM ACCEPTABLE TO THE CITY ATTORNEY.
WHEREAS, pursuant to public notice Invitation For Bids for
"Citywide Sidewalk Replacement Project Phase XV, B-4616" were
mailed to 190'potential bidders; and
and
WHEREAS, six (6) sealed bids were received June 10, 1999;
WHEREAS, the City Manager and the Director of the Department
of Public Works recommend that the bid from F&L Construction,
Inc., be accepted as the lowest responsible and responsive bid,
and
WHEREAS, funds are available in the Fiscal Year 1998-99
Capital Improvement and Appropriations Ordinance 11705, as
J ! P a_ 2 7 1999
Resolu4ioa No.
99- 519
amended, under Project No. 341170;
NOW THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF
MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
thereto and incorporated herein as if fully set forth in this
Section.
Section 2. The June 10, 1999, bid of F&L Construction,
Inc., in the proposed amount of $312,108 the contract cost and
$28,892 estimated expenses, for the project entitled "Citywide
Sidewalk Replacement Project Phase XV, B-4616" for the total bid
of the proposal, based on lump sum and unit prices, is hereby
accepted, at the bid price stated therein.
Section 3: The total estimated project cost of $341,000,
is hereby allocated from Project No. 341170, as appropriated by
the Fiscal Year 1998-99 Capital Improvement and Appropriations
Ordinance 11705, as amended.
Section 4. The City Manager is hereby authorized!' to
execute an agreement, in a form acceptable to the City Attorney,
with F&L Construction, Inc., for the "Citywide Sidewalk
�i The herein authorization is further subject to compliance with
all requirements that may be imposed by the City Attorney,
including but not limited to those prescribed by applicable City
Charter and Code provisions.
Replacement Project Phase XV B-4616" for the total bid of the
proposal.
Section S. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor./
PASSED AND ADOPTED this 27th day of July , 1999.
JOE CAROLLO, MAYOR
In accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of
this legislation by signing it in the designated place provided, said legislation ;;o",a
becomes effective with the elapse of ten (10) days m the; date of Comrnissicn —tion
regarding same, without the MavotgKercisio n_ /1 k
ATTEST:
Waker J. Foe
n;-7,t-V Clerk
WALTER J. FOEMAN
CITY CLERK
APPZRIIEO D /AS TO ,-FKORi+ AND CORRECTNESS:t-
NW Vn
ATTORNEY
W3609:RCL
If the Mayor does not sign this Resolution, it shall become
effective at the end of ten calendar days from the date it was
passed and adopted. If the Mayor vetoes this Resolution, it
shall become effective immediately upon override of the veto by
the City Commission.
g9 519
.1%
•
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO : The Honorable Mayor and Members
of the Commission
FROM : Donald H. Warshaw
City Manager
RECOMMENDATION:
CA-4
DATE : JUL f 2 1999
FILE : B-4616
SUBJECT : Resolution Awarding Contract
for Citywide Sidewalk Replacement
Project - Phase XV
REFERENCES:
ENCLOSURES : Resolution
It is respectfully recommended that the City Commission adopt the attached
resolution accepting the bid of F&L Construction, Inc., a company located in Miami -
Dade County whose principals are Mr. Delio Trasobares and Mr. Julio Batista, for
"Citywide Sidewalk Replacement Project - Phase XV, B-4616", received June 10,
1999 in the amount of $ 312,108.00, Total Bid; authorizing the City Manager to enter
into a contract on behalf of the City.
No work history with the City of Miami within the past three years.
BACKGROUND:
Amount of Total Bid: $312,108.00
Cost Estimate: $ 397,920.00
% of Cost Estimate: 78.4 %
Source of Funds: Project No. 341170 , as appropriated by Fiscal Fear 1998-99
Appropriations Ordinance 11705, as amended
Minority Representation: 190 invitations mailed
10 contractors picked up specs
(4 Hispanic, 2 Black, 2 Female)
6 contractors submitted bid
(3 Hispanic, 2 Black, 1 Female)
Public Hearings/Notices: No
Discussion: The Department of Public Works has evaluated the bids received on
June 10, 1999, and determined that the lowest responsible and responsive bid, in the
amount of $ 312,108.00 is from F&L Construction, Inc., a Hispanic- minority
controlled corporation. Funds are available to cover the contract cost, and for such
incid tal items as postage, blueprinting, advertising, and reproduction costs.
DHW//J�l� ee
(r>
99- 519
ON
1. Department
0
(Y of
O nuv nm
is n Oc
O�'CQ. Fy0
Budgetary Impact Analysis
�i„O�lc. lc—ks
2. Agenda Item # (if available)
Division P 1 J IAU.3" s
3. Title and brief description of legislation or attach ordinance/resolution:
Pka-se XV . (3-461(.,
4.
5.
10
Is this item related to revenue? NO: `� YES (If yes, skip.to item #7.)
Are there sufficient funds in Line Item?
YES: _ Index Code Minor Obj. Code Amount $
NO: ►Complete the following questions:
Source of funds: Amount budgeted in the Line Item
Amount needed in the Line Item $
Sufficient funds will be transferred from the following line items:
ACTION
ACCOUNT NUMBER
ACCOUNT NAME
TOTAL
Index/Minor Object/Project No.
From
3l q 3 2511 11 -7 G
✓t5 h t rc r�S S
$ 2S '197
To
$ r 39 _,
TO 3iG3ct I '74Z % 3u'2H/Ll `
7. Any additional comments?
�rQ✓S eaS ire. C'FJ2� r7r6 Qe1S a -�tL �l� ( IZ( cie Sfdtt, cJk R�Zt�(d,UvAE,1-4 i�i��ed
(�krck ll61S RoGdS r-�rzcl v-k9-d'kG.V\ Flo Ckrner��
d by:
cif v7141-
401W a
FOR WPARTMIENT OF MANAGEMENT AND BUDGET USE ONLY .
Verified by:
L'
Verified by:
Dir �esignee
Department of Mmagement and Budget T
Date 7// `JJ�
T'
Budget Analyst
Date
•
FACT SHEET
PUBLIC WORKS DEPARTMENT DATE 6/15/1999
JOB No.: B-4616
CIP No.: 341170
PROJECT NAME: CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XV
TYPE:
LOCATION: Locations citywide
FEDERAL PARTICIPATION:
PROJECT MANAGER: E. Estevez
ASSESSABLE: 71
ASSOCIATED DEPARTMENT: PUBLIC WORKS
EMERGENCY:
RESOLUTION No.:
BID REQUEST: FORMAL: Im INFORMAL:
DESCRIPTION: The project consists of removal and replacement of deteriorated, damaged, or unsafe concrete
sidewalk at locations citywide. Work will include reinstallation of water meter boxes or similar utility structures located in the sidewalk
area, and trimming and removal of tree roots as necessary to construct the new sidewalk and prevent future damage. Also, construction of
new curb and C&G, flexible pavement restoration or construction.
(IF NECESSARY,CONTINUE ON THE BACK)
SCOPE OF SERVICES: PUBLIC WORKS COST OUTSIDE COST AMOUNT (%OF CONSTRUC. COST)
SURVEY/PLAT (E)
SITE INVESTIGATION
PLANING AND STUDY %
DESIGN $6,242.00 2 %
ADVERTISEMENT $802.00 (Actual) %
CONSTRUCTION Q $312,108.00
CONST. INSP. & MANAGEMENT $21,848.00 7 %
OTHER: Testing
SUBTOTAL $341,000.00 9 %
(ENG.FEE)
ESTIMATED CONSTRUCTION COST= $397,920.00 TOTAL $341,000.00
CONTRACTOR'S INFORMATION:
CLASS: 0 TYPE OF WORK: General Eng.
YEARS OF ESTABLISHMENT: NOW MINORITY:
NAME: F&L Construction, Inc. MINORITY: I B F
ADDRESS: 8095 W. 21 Lane Hialeah, Florida 33016 LICENSE: E-601
CONTACT PERSON: Delio Trasobares / Julio Batista TELEPHONE (305) 362-7277
(305) 986- 1832
SUB -CONTRACTORS INFORMATION:
NAMES: Self
CLASS: J=JOINT P=PRIME S=SUB
MINORITY` B=BLACK H=HISPANIC F=FEMALE
COPIES: ASSISTANT DIRECTORS, COST ANALYSIS, FILE, ASSOCIATED DEPT. I(A
JQB NO,
TABULAT ION OF BIDS FOR B-4616
CITYWIDE SIDEWALK REPLACEMEN PROJECT - PHASE XV
Recelved by the City Clerk, City of Miami. Florida of 1100 A.M. on June 10. 1999
Bidder BWEMAN LANDSCAPING, INC FEL CONSTRUCTION, INC. MEF CONSTRUCTION, INC. IgIE51F1ACDMAND 16bIWE WIS'S ENGINEERING MIGUEL LOPEX JR., INC.
Address
901 NW 143 ST
8095 W 21 LANE
5040 N.W. 7 ST
209 SDI 4 AVE
174 NE 78 ST
7711 NW 74 AVE
MIAMI, FL 33166
HIALEAH, FL 33016
SUITE 410 MIAMI. FL 33126
HDESW. FL 33030
MIAMI, FL 33138
►ECLEY, FL 33166
Located In the city of Meal
NO
NO
YES
NO
YES
NO
1.1cmaW i Inured a Per Iffy Cate 9lbtro Ord.
YES
YES
YES
YES
YES
YES
Bid Bond Amount
B.B. VOUCHER
B.B. 5%
B.B. 5%
B.S. VOUCHER
B.B. VOUCHER
B.13. 52,500.00
Irregularities
G, H
G
G H
Minority Caned
YES, F
YES. H
YES, B
YES, H
TOTAL DID:THE TOTAL OF ITEMS
1 THROUGH 12 BASED ON A ONE
HUNDRED AND FORTY 0 40) WORKING
DAY COMPLETION TIME, THE SUM OF
$306,565.00
$312,108.00
$ 368.750.00
$431 , 425.00
449 , 783.80
1 , 047 , 355.00
IRREGULARITIES LEGEND
A - No Pnaer-of-Attorney ACCORDING WITH RESOLUTION No. 86-983 , BID BOND VOUCHER WILL
B — No Affidavit as to Capital rt surplus of Bonding Company NOT BE ACCEPTABLE FOR BID ESTIMATES IN EXCESS OF $200 , 000 . 00 r
C — Corrected Extensions THEREFORE, THE DEPARTMENT OF PUBLIC WORI<S HAS DETERMINED THAT
D — Proposal Unsigned or Improperly Signed or No Corporate Seat THE L01gEST RESPONSIBLE AND RESPONSIVE BIDDER IS
E — Incomplete Extensions (Missing Primary Office Location Form) F&L CONSTRUCT I ON, I NC . IN THE AMOUNT OF $312 , 108.00
F — Non-reeponeive bid (Missing copy of Certificate of Competency)
G — Improper Bid Bond FOR THE TOTAL BID.
H - Corrected Bid BID 98-99-121
S n I — No First Source Hiring Compliant$ Statement
.J — No Minority Compliance Statement
v K — No Duplicate Bid Proposal PAGE: 1 OF 1 �� 6�114 a-4616
Prep. By,Eetevez Check Bye
CITY OF MIAMI OF THE CITY CLERK
BID SECURITY LIST
BID ITEM: CITYWIDE SIDEWALK REPLACEMENT PROJECT PHASE X\;P-4616 ee-
BID NO:
DATE BID(S) OPENED:
98-99-121
JUNE 10, 1999
TIME 11:00 a.m.
BIDDER
TOTAL BID
AMOUNT
BID BOND (ER)
CASHIER'S CHECK
BANNERMAN LANDSCAPING, INC.
$ 306,115.00
B.B. VOUCHER
F. & L. CONSTRUCTION, INC.
312,108.00
B.B. 5%
MEF CONSTRUCTION, INC.
368,750.00
B.B. 5%
WISS ENGINEERING
4,28.430-.33...-B.B.
VOUCHER
HOMESTEAD CONCRETE DRAINAGE
431,425.00
B.B. VOUCHER
MIGUEL LOPEZ JR., INC.
1,047,355.00
B.B. $ 52,500.00
rn IMAM
..!he rzcnt."),-'s
received Hama l.y of al)ove. o�,on7i-.,
-0—n
date and. tz
oilers
le. All
♦+a``s
other \✓? _7 u.�?I3IF'o-wd in b rySwn,.l1o, n.30 3o €.1172,
in
are hereby rejected as late."
zoikL.lation,
If any,
received () envelops on behalf of
Pers n receiving bid(s)
,_._PULLIC. WORKS DEPARTn1ENT on
(City Department)
SIGNED:
Deputy City C rk
5" I o q 9
(Date)
SENT BY: 6- 9-93 ;10:37AM ; PUBLIC WORKS/ADMIN.- 3058581610;# l/ 2
CITY OF MIAMf, FLORIDA
0.
INTER -OFFICE MEMORANDUM
Walter J. Foeman OATS May 20, 1999 f1LE B-4616
To ` City Clerk
SUSJr:cT : "CITYWIDE SIDEWALK
�---'" REPLACEMENT PROJECT
' PHASE XV y
�
,FROM: Tony Pr REFERENCES
Dep t of Public Works
,ENCLOSURES:
Please note that contractors will submit bids for the following project:
"(1'fYWIDE. SIDEWALK REPLACEMENT PROJECT PRASE XV, B 4616" on Thurs&y,
June IOP, 1999 at 11:00 A.M.
Any bid submitted after the time listed above, will not be accepted. Please make necessary
provisions for this bid opening.
The Project Manager, Elyrosa Estevez, P.E. a representative overseeing the project is going to be
present at the time of opening. Should there be cancellation or postponement, we will notify you
in writing, prior to the opening date of the bids.
If you have any questions, please contact me at 416-21 3 1.
TPhp
Encl.
c: John Jackson
Yvette Smith
Project Manager
File
SENT BY: 6- 9-99 ;1 Q : 58AM ; PUBLIC WORKS/ADMIN.- 3058581 tit u ;; 21 z
BID NO.98-99-121
ADVERTISEMENT FOR BIDS
Sealed bids for "CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XV, 13461611
will be received by the City Clerk of the City of Miami, Florida at 11:00 AM on thell)" day of
June,1999, at the City Clerk's Office, first floor of the Miami City Hall, 3500 Pan American Drive,
Dinner Key, Miami, Florida, 33133, at which time and place they will be publicly opened and
read. Any bid submitted after the above appointed time will not be accepted by the City
Clerk.
The project consists of the removal and replacement of approximately 139,000 square feet of
concrete sidewalk in locations citywide. Construction includes the following: clearing- and
grading, pruning and removing tree roots and limbs, if necessary, constructing new curb and
curb & gutter, constructing new 4" and 6° concrete sidewalk, flexible pavement restoration or
construction, and reinstallation of water meter boxes or similar utility structures located in the
sidewalk area. Bidders w!!i furnish performance and bid bonds in accordance with
Resolutions No. SS-983 and No. 87-915. For technical questions regarding plans and
specifications, please contact Elyrosa Estevez, P.E. at (305) 416-1217_ Prospective bidders
must have a current certified Contractor's License from the State of Florida Construction
Industry License Board for the class of work to be performed, or the appropriate
Certificate of Competency or the State Contractor's Certificate of Registration as issued
by Miami- Dade County Code, which authorizes the Bidder to perform the proposed work.
All bids shall be submitted in accordance with the instructions to Bidders and Specifications.
New City regulations will require each bidder to submit proposals induplicate original$.
Plans and specifications may be obtained at the Department of Public Works, 444 S.W. 2"°
Avenue, a Floor, Miami, Florida 33130, on or afterMav 24 1999. There will be a $20 deposit
required for the first set of specifications. Specs can also be mailed to bidders upon written
request to the Public Works Department including a separate check in the amount of $8.
Additional sets may be purchased for a non-refundable fee of $20. Deposits will be refunded
only upon return of one set of specifications to the Department of Public Works, unmarked and
in good condition within two (2) weeks after the opening of the bids.
Bidders are alerted to the provisions of Ordinance No. 10062 and 10538 regarding allocations of
contracts to minority vendors, contractors and sub -contractors. This project has been
designated as a Set -Aside for Black, Hispanic or Female Businesses/Sole proprietors.
Details are contained In Bid Specifications. All Bidders must submit an Affirmative Action
Plan with the bid. (Ordinance is contained in bid specifications).
The City of Miami has adopted Ordinance No. 10032, which implements the"First Source Hiring
Agreement". The object of this Ordinance is to providr: employment opportunities to City of
Miami residents on contracts resulting in the creation of new permanent jobs. Contractors may
be eligible for wage reimbursement under this program. For further information contact the
Department of Public Works, City of Miami, at (305) 416-1200. ;
Proposal includes the time of performance, and specifications contain provisions for liquidated
damages for failure to complete the work on time. The City Commission reserves the right to
waive any informality in any bid, and the City Manager may reject any of all bids, and
readvertise. (84616, Req. 05437).
Donald H. Warshaw
City Manager
CITY CLERK TEL:3058581610
Transmit Confirmation Report
Jun 09'99 12:14
No .
Receiver
Transmitter
Date
Time
Mode
Pages
Result
005
3054161801
CITY CLERK
Jun 09'99
01'49
Norm
04
OK
12:14