Loading...
HomeMy WebLinkAboutR-99-0519J-99-619 7/20/99 RESOLUTION NO. 9 9 - 519 A RESOLUTION OF THE MIAMI CITY COMMISSION ACCEPTING THE BID OF F&L CONSTRUCTION, INC., FOR THE PROJECT ENTITLED "CITYWIDE SIDEWALK_ REPLACEMENT PROJECT PHASE XV, B-4616" IN THE AMOUNT OF $312,108; ALLOCATING FUNDS THEREFOR FROM PROJECT NO 341170, AS APPROPRIATED BY FISCAL YEAR 1998-99 CAPITAL IMPROVEMENT AND APPROPRIATIONS ORDINANCE NO. 11705, AS AMENDED, IN THE AMOUNT OF $312,108 THE CONTRACT COST, $28,892 EXPENSES, TOTAL ESTIMATED COST OF $341,000; AND AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY. WHEREAS, pursuant to public notice Invitation For Bids for "Citywide Sidewalk Replacement Project Phase XV, B-4616" were mailed to 190'potential bidders; and and WHEREAS, six (6) sealed bids were received June 10, 1999; WHEREAS, the City Manager and the Director of the Department of Public Works recommend that the bid from F&L Construction, Inc., be accepted as the lowest responsible and responsive bid, and WHEREAS, funds are available in the Fiscal Year 1998-99 Capital Improvement and Appropriations Ordinance 11705, as J ! P a_ 2 7 1999 Resolu4ioa No. 99- 519 amended, under Project No. 341170; NOW THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. The June 10, 1999, bid of F&L Construction, Inc., in the proposed amount of $312,108 the contract cost and $28,892 estimated expenses, for the project entitled "Citywide Sidewalk Replacement Project Phase XV, B-4616" for the total bid of the proposal, based on lump sum and unit prices, is hereby accepted, at the bid price stated therein. Section 3: The total estimated project cost of $341,000, is hereby allocated from Project No. 341170, as appropriated by the Fiscal Year 1998-99 Capital Improvement and Appropriations Ordinance 11705, as amended. Section 4. The City Manager is hereby authorized!' to execute an agreement, in a form acceptable to the City Attorney, with F&L Construction, Inc., for the "Citywide Sidewalk �i The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. Replacement Project Phase XV B-4616" for the total bid of the proposal. Section S. This Resolution shall become effective immediately upon its adoption and signature of the Mayor./ PASSED AND ADOPTED this 27th day of July , 1999. JOE CAROLLO, MAYOR In accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of this legislation by signing it in the designated place provided, said legislation ;;o",a becomes effective with the elapse of ten (10) days m the; date of Comrnissicn —tion regarding same, without the MavotgKercisio n_ /1 k ATTEST: Waker J. Foe n;-7,t-V Clerk WALTER J. FOEMAN CITY CLERK APPZRIIEO D /AS TO ,-FKORi+ AND CORRECTNESS:t- NW Vn ATTORNEY W3609:RCL If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. g9 519 .1% • CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO : The Honorable Mayor and Members of the Commission FROM : Donald H. Warshaw City Manager RECOMMENDATION: CA-4 DATE : JUL f 2 1999 FILE : B-4616 SUBJECT : Resolution Awarding Contract for Citywide Sidewalk Replacement Project - Phase XV REFERENCES: ENCLOSURES : Resolution It is respectfully recommended that the City Commission adopt the attached resolution accepting the bid of F&L Construction, Inc., a company located in Miami - Dade County whose principals are Mr. Delio Trasobares and Mr. Julio Batista, for "Citywide Sidewalk Replacement Project - Phase XV, B-4616", received June 10, 1999 in the amount of $ 312,108.00, Total Bid; authorizing the City Manager to enter into a contract on behalf of the City. No work history with the City of Miami within the past three years. BACKGROUND: Amount of Total Bid: $312,108.00 Cost Estimate: $ 397,920.00 % of Cost Estimate: 78.4 % Source of Funds: Project No. 341170 , as appropriated by Fiscal Fear 1998-99 Appropriations Ordinance 11705, as amended Minority Representation: 190 invitations mailed 10 contractors picked up specs (4 Hispanic, 2 Black, 2 Female) 6 contractors submitted bid (3 Hispanic, 2 Black, 1 Female) Public Hearings/Notices: No Discussion: The Department of Public Works has evaluated the bids received on June 10, 1999, and determined that the lowest responsible and responsive bid, in the amount of $ 312,108.00 is from F&L Construction, Inc., a Hispanic- minority controlled corporation. Funds are available to cover the contract cost, and for such incid tal items as postage, blueprinting, advertising, and reproduction costs. DHW//J�l� ee (r> 99- 519 ON 1. Department 0 (Y of O nuv nm is n Oc O�'CQ. Fy0 Budgetary Impact Analysis �i„O�lc. lc—ks 2. Agenda Item # (if available) Division P 1 J IAU.3" s 3. Title and brief description of legislation or attach ordinance/resolution: Pka-se XV . (3-461(., 4. 5. 10 Is this item related to revenue? NO: `� YES (If yes, skip.to item #7.) Are there sufficient funds in Line Item? YES: _ Index Code Minor Obj. Code Amount $ NO: ►Complete the following questions: Source of funds: Amount budgeted in the Line Item Amount needed in the Line Item $ Sufficient funds will be transferred from the following line items: ACTION ACCOUNT NUMBER ACCOUNT NAME TOTAL Index/Minor Object/Project No. From 3l q 3 2511 11 -7 G ✓t5 h t rc r�S S $ 2S '197 To $ r 39 _, TO 3iG3ct I '74Z % 3u'2H/Ll ` 7. Any additional comments? �rQ✓S eaS ire. C'FJ2� r7r6 Qe1S a -�tL �l� ( IZ( cie Sfdtt, cJk R�Zt�(d,UvAE,1-4 i�i��ed (�krck ll61S RoGdS r-�rzcl v-k9-d'kG.V\ Flo Ckrner�� d by: cif v7141- 401W a FOR WPARTMIENT OF MANAGEMENT AND BUDGET USE ONLY . Verified by: L' Verified by: Dir �esignee Department of Mmagement and Budget T Date 7// `JJ� T' Budget Analyst Date • FACT SHEET PUBLIC WORKS DEPARTMENT DATE 6/15/1999 JOB No.: B-4616 CIP No.: 341170 PROJECT NAME: CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XV TYPE: LOCATION: Locations citywide FEDERAL PARTICIPATION: PROJECT MANAGER: E. Estevez ASSESSABLE: 71 ASSOCIATED DEPARTMENT: PUBLIC WORKS EMERGENCY: RESOLUTION No.: BID REQUEST: FORMAL: Im INFORMAL: DESCRIPTION: The project consists of removal and replacement of deteriorated, damaged, or unsafe concrete sidewalk at locations citywide. Work will include reinstallation of water meter boxes or similar utility structures located in the sidewalk area, and trimming and removal of tree roots as necessary to construct the new sidewalk and prevent future damage. Also, construction of new curb and C&G, flexible pavement restoration or construction. (IF NECESSARY,CONTINUE ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS COST OUTSIDE COST AMOUNT (%OF CONSTRUC. COST) SURVEY/PLAT (E) SITE INVESTIGATION PLANING AND STUDY % DESIGN $6,242.00 2 % ADVERTISEMENT $802.00 (Actual) % CONSTRUCTION Q $312,108.00 CONST. INSP. & MANAGEMENT $21,848.00 7 % OTHER: Testing SUBTOTAL $341,000.00 9 % (ENG.FEE) ESTIMATED CONSTRUCTION COST= $397,920.00 TOTAL $341,000.00 CONTRACTOR'S INFORMATION: CLASS: 0 TYPE OF WORK: General Eng. YEARS OF ESTABLISHMENT: NOW MINORITY: NAME: F&L Construction, Inc. MINORITY: I B F ADDRESS: 8095 W. 21 Lane Hialeah, Florida 33016 LICENSE: E-601 CONTACT PERSON: Delio Trasobares / Julio Batista TELEPHONE (305) 362-7277 (305) 986- 1832 SUB -CONTRACTORS INFORMATION: NAMES: Self CLASS: J=JOINT P=PRIME S=SUB MINORITY` B=BLACK H=HISPANIC F=FEMALE COPIES: ASSISTANT DIRECTORS, COST ANALYSIS, FILE, ASSOCIATED DEPT. I(A JQB NO, TABULAT ION OF BIDS FOR B-4616 CITYWIDE SIDEWALK REPLACEMEN PROJECT - PHASE XV Recelved by the City Clerk, City of Miami. Florida of 1100 A.M. on June 10. 1999 Bidder BWEMAN LANDSCAPING, INC FEL CONSTRUCTION, INC. MEF CONSTRUCTION, INC. IgIE51F1ACDMAND 16bIWE WIS'S ENGINEERING MIGUEL LOPEX JR., INC. Address 901 NW 143 ST 8095 W 21 LANE 5040 N.W. 7 ST 209 SDI 4 AVE 174 NE 78 ST 7711 NW 74 AVE MIAMI, FL 33166 HIALEAH, FL 33016 SUITE 410 MIAMI. FL 33126 HDESW. FL 33030 MIAMI, FL 33138 ►ECLEY, FL 33166 Located In the city of Meal NO NO YES NO YES NO 1.1cmaW i Inured a Per Iffy Cate 9lbtro Ord. YES YES YES YES YES YES Bid Bond Amount B.B. VOUCHER B.B. 5% B.B. 5% B.S. VOUCHER B.B. VOUCHER B.13. 52,500.00 Irregularities G, H G G H Minority Caned YES, F YES. H YES, B YES, H TOTAL DID:THE TOTAL OF ITEMS 1 THROUGH 12 BASED ON A ONE HUNDRED AND FORTY 0 40) WORKING DAY COMPLETION TIME, THE SUM OF $306,565.00 $312,108.00 $ 368.750.00 $431 , 425.00 449 , 783.80 1 , 047 , 355.00 IRREGULARITIES LEGEND A - No Pnaer-of-Attorney ACCORDING WITH RESOLUTION No. 86-983 , BID BOND VOUCHER WILL B — No Affidavit as to Capital rt surplus of Bonding Company NOT BE ACCEPTABLE FOR BID ESTIMATES IN EXCESS OF $200 , 000 . 00 r C — Corrected Extensions THEREFORE, THE DEPARTMENT OF PUBLIC WORI<S HAS DETERMINED THAT D — Proposal Unsigned or Improperly Signed or No Corporate Seat THE L01gEST RESPONSIBLE AND RESPONSIVE BIDDER IS E — Incomplete Extensions (Missing Primary Office Location Form) F&L CONSTRUCT I ON, I NC . IN THE AMOUNT OF $312 , 108.00 F — Non-reeponeive bid (Missing copy of Certificate of Competency) G — Improper Bid Bond FOR THE TOTAL BID. H - Corrected Bid BID 98-99-121 S n I — No First Source Hiring Compliant$ Statement .J — No Minority Compliance Statement v K — No Duplicate Bid Proposal PAGE: 1 OF 1 �� 6�114 a-4616 Prep. By,Eetevez Check Bye CITY OF MIAMI OF THE CITY CLERK BID SECURITY LIST BID ITEM: CITYWIDE SIDEWALK REPLACEMENT PROJECT PHASE X\;P-4616 ee- BID NO: DATE BID(S) OPENED: 98-99-121 JUNE 10, 1999 TIME 11:00 a.m. BIDDER TOTAL BID AMOUNT BID BOND (ER) CASHIER'S CHECK BANNERMAN LANDSCAPING, INC. $ 306,115.00 B.B. VOUCHER F. & L. CONSTRUCTION, INC. 312,108.00 B.B. 5% MEF CONSTRUCTION, INC. 368,750.00 B.B. 5% WISS ENGINEERING 4,28.430-.33...-B.B. VOUCHER HOMESTEAD CONCRETE DRAINAGE 431,425.00 B.B. VOUCHER MIGUEL LOPEZ JR., INC. 1,047,355.00 B.B. $ 52,500.00 rn IMAM ..!he rzcnt."),-'s received Hama l.y of al)ove. o�,on7i-., -0—n date and. tz oilers le. All ♦+a``s other \✓? _7 u.�?I3IF'o-wd in b rySwn,.l1o, n.30 3o €.1172, in are hereby rejected as late." zoikL.lation, If any, received () envelops on behalf of Pers n receiving bid(s) ,_._PULLIC. WORKS DEPARTn1ENT on (City Department) SIGNED: Deputy City C rk 5" I o q 9 (Date) SENT BY: 6- 9-93 ;10:37AM ; PUBLIC WORKS/ADMIN.- 3058581610;# l/ 2 CITY OF MIAMf, FLORIDA 0. INTER -OFFICE MEMORANDUM Walter J. Foeman OATS May 20, 1999 f1LE B-4616 To ` City Clerk SUSJr:cT : "CITYWIDE SIDEWALK �---'" REPLACEMENT PROJECT ' PHASE XV y � ,FROM: Tony Pr REFERENCES Dep t of Public Works ,ENCLOSURES: Please note that contractors will submit bids for the following project: "(1'fYWIDE. SIDEWALK REPLACEMENT PROJECT PRASE XV, B 4616" on Thurs&y, June IOP, 1999 at 11:00 A.M. Any bid submitted after the time listed above, will not be accepted. Please make necessary provisions for this bid opening. The Project Manager, Elyrosa Estevez, P.E. a representative overseeing the project is going to be present at the time of opening. Should there be cancellation or postponement, we will notify you in writing, prior to the opening date of the bids. If you have any questions, please contact me at 416-21 3 1. TPhp Encl. c: John Jackson Yvette Smith Project Manager File SENT BY: 6- 9-99 ;1 Q : 58AM ; PUBLIC WORKS/ADMIN.- 3058581 tit u ;; 21 z BID NO.98-99-121 ADVERTISEMENT FOR BIDS Sealed bids for "CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XV, 13461611 will be received by the City Clerk of the City of Miami, Florida at 11:00 AM on thell)" day of June,1999, at the City Clerk's Office, first floor of the Miami City Hall, 3500 Pan American Drive, Dinner Key, Miami, Florida, 33133, at which time and place they will be publicly opened and read. Any bid submitted after the above appointed time will not be accepted by the City Clerk. The project consists of the removal and replacement of approximately 139,000 square feet of concrete sidewalk in locations citywide. Construction includes the following: clearing- and grading, pruning and removing tree roots and limbs, if necessary, constructing new curb and curb & gutter, constructing new 4" and 6° concrete sidewalk, flexible pavement restoration or construction, and reinstallation of water meter boxes or similar utility structures located in the sidewalk area. Bidders w!!i furnish performance and bid bonds in accordance with Resolutions No. SS-983 and No. 87-915. For technical questions regarding plans and specifications, please contact Elyrosa Estevez, P.E. at (305) 416-1217_ Prospective bidders must have a current certified Contractor's License from the State of Florida Construction Industry License Board for the class of work to be performed, or the appropriate Certificate of Competency or the State Contractor's Certificate of Registration as issued by Miami- Dade County Code, which authorizes the Bidder to perform the proposed work. All bids shall be submitted in accordance with the instructions to Bidders and Specifications. New City regulations will require each bidder to submit proposals induplicate original$. Plans and specifications may be obtained at the Department of Public Works, 444 S.W. 2"° Avenue, a Floor, Miami, Florida 33130, on or afterMav 24 1999. There will be a $20 deposit required for the first set of specifications. Specs can also be mailed to bidders upon written request to the Public Works Department including a separate check in the amount of $8. Additional sets may be purchased for a non-refundable fee of $20. Deposits will be refunded only upon return of one set of specifications to the Department of Public Works, unmarked and in good condition within two (2) weeks after the opening of the bids. Bidders are alerted to the provisions of Ordinance No. 10062 and 10538 regarding allocations of contracts to minority vendors, contractors and sub -contractors. This project has been designated as a Set -Aside for Black, Hispanic or Female Businesses/Sole proprietors. Details are contained In Bid Specifications. All Bidders must submit an Affirmative Action Plan with the bid. (Ordinance is contained in bid specifications). The City of Miami has adopted Ordinance No. 10032, which implements the"First Source Hiring Agreement". The object of this Ordinance is to providr: employment opportunities to City of Miami residents on contracts resulting in the creation of new permanent jobs. Contractors may be eligible for wage reimbursement under this program. For further information contact the Department of Public Works, City of Miami, at (305) 416-1200. ; Proposal includes the time of performance, and specifications contain provisions for liquidated damages for failure to complete the work on time. The City Commission reserves the right to waive any informality in any bid, and the City Manager may reject any of all bids, and readvertise. (84616, Req. 05437). Donald H. Warshaw City Manager CITY CLERK TEL:3058581610 Transmit Confirmation Report Jun 09'99 12:14 No . Receiver Transmitter Date Time Mode Pages Result 005 3054161801 CITY CLERK Jun 09'99 01'49 Norm 04 OK 12:14