HomeMy WebLinkAboutR-99-0291J-99-376
4/19/99
RESOLUTION NO. 2 9 1
A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH
ATTACHMENT(S), AUTHORIZING THE CITY MANAGER TO
EXECUTE AN AGREEMENT, IN A FORM ACCEPTABLE TO
! THE CITY ATTORNEY, WITH THE STATE OF FLORIDA,
DEPARTMENT OF MANAGEMENT SERVICES BUILDING
CONSTRUCTION, FOR THE PROVISION OF CONSTRUCTION
MANAGEMENT SERVICES FOR THE DESIGN AND
CONSTRUCTION OF THE SAFE NEIGHBORHOOD PARKS
BOND PROJECT ENTITLED "HADLEY PARK COMMUNITY
CENTER", IN AN AMOUNT OF $57,636; ALLOCATING
FUNDS THEREFOR AS APPROPRIATED BY FISCAL YEAR
1998-1999 APPROPRIATION ORDINANCE N0. 11705, AS
AMENDED FROM CAPITAL IMPROVEMENT PROJECT
NO. 331391 ENTITLED "HADLEY PARK COMMUNITY
CENTER"; AND AUTHORIZING THE CITY MANAGER TO
EXECUTE A CONTRACT, IN A FORM ACCEPTABLE TO THE
CITY ATTORNEY.
WHEREAS, the City of Miami, with substantial community
input, has determined that a need exists for the design and
construction of a community center at Hadley Park; and
WHEREAS, approximately $2.4 million in the Capital
Improvement Program is available for the Hadley Park
Community Center Project, of which $1.4 million is
budgeted from Miami -Dade County's Safe Neighborhood Parks
Bond Program and the remaining $1 million from the City's
Special Obligation Series 1995 Bond funds; and
WHEREAS, pursuant to Resolution No. 98-795, the City
expanded its existing professional services agreement with
ATTACHMENT (S)
CONTAINED
Crrr COZYMSSION
MEETING OF
APR 2 7 1999
Resolution No.
99291
Thaddeus Cohen Architects, P.A., to provide planning and design
services for a Community Center at Hadley Park; and
WHEREAS, the City of Miami desires to enter into an
agreement with the State of Florida, Department of Management
Services to oversee the design and construction of the Hadley
Park Community Center project; and
WHEREAS, the City of Miami has negotiated an agreement with
the Department of Management Services BC to provide management
services for the Hadley Park Community Center Project for an
administrative fee of $57,636, based on a twelve month completion
schedule, from the time of approval of the agreement by the City;
and
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference
hereto and incorporated herein as if fully set forth in this
Section.
Section 2. The City Manager is hereby authorized to
enter into an agreement-'/ in a form acceptable to the City
Attorney, with the State of Florida, Department of Management
Services Building Construction, in the amount of $57,636, is
therefore hereby approved for the "Hadley Park Community Center
1� The herein authorization is further subject to compliance with all
requirements that may be imposed by the City Attorney, including but
not limited to those prescribed by applicable City Charter and Code
provisions.
- Z- 99- 291
project;.
Section 4. Funds for the cost of agreement are allocated
from the Capital Improvement Project No. 331391 as appropriated
by Fiscal year 1998-1999 Appropriations Ordinance 11705, as
amended.
Section 5. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.21/
PASSED AND ADOPTED this 27th day of April 1999•
JOB CAROLLO, MAYOR
In accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of
this legislation by signing it in the designated place provided, said legis! t:C'm c:�
becomes effective with the elapse often (10) days fro the date of C^rnrt
ATTEST: regarding same, without the Mayor exercis' o
WALTER J. FOEMAN
CITY CLERK
j
OVEFCORRECTNESS:i
RIL
ATTORNEY
W3417:RCL
If the Mayor does not sign this Resolution, it shall become effective at
the end of ten calendar days from the date it was passed and adopted.
If the Mayor vetoes this Resolution, it shall become effective
immediately upon override of the veto by the City Commission.
- 3 -
99- 291
STATE OF FLORIDA
DEPARTMENT OF MANAGEMENT SERVICES
BUILDING CONSTRUCTION (BC)
BUILDING 4030, SUITE 315
4050 ESPLANADE WAY
TALLAHASSEE, FLORIDA 32399-0950
FORM OF AGREEMENT BETWEEN
CLIENT AND AGENT
BC PROJECT NUMBER: COM-98064000
PROJECT NAME AND LOCATION: CITY OF MIAMI, PUBLIC WORKS DEPARTMENT,
DESIGN AND CONSTRUCTION OF A CULTURAL
CENTER UNDER A CONSTRUCTION MANAGER
AT RISK PROCESS,
MIAMI, FLORIDA
CLIENT: CITY OF MIAMI
PUBLIC WORKS DEPARTMENT
RIVERSIDE CENTER, 8TH FLOOR
4-14 SW ?ND AVENUE
NIIAMI. FLORIDA 33130
Jeb Bush
Governor
Tom McGurk
Secretary
cityofmaimica
,I.:
9J- 291
-f
-
r'
AGREEMENT FOR SERVICES
THIS AGREEMENT
made this 23rd day of March in the year Nineteen Hundred and Ninety Nine
BY AND BETWEEN BUILDING CONSTRUCTION (BC), DEPARTMENT OF MANAGEMENT SERVICES,
STATE OF FLORIDA, hereinafter called the AGENT or BC, and
s
CITY OF MIAMI
PUBLIC WORKS DEPARTMENT
RIVERSIDE CENTER, 8TH FLOOR
444 SW 2ND AVENUE
MIAMI, FLORIDA 33130
herinafter called the CLIENT or OWNER.
WITNESSETH, that whereas the CLIENT wishes to retain the services of BC, as permitted by Chapter 255.31,
Florida Statutes, for providing certain program management services for the Project described on the cover page of
this Agreement.
NOW THEREFORE, BC and the CLIENT, for the considerations hereinafter set forth, agree as follows:
Article 1. BC agrees to furnish those Program Management Services described in the attached Exhibit I. which
Exhibit I by reference and attachment hereto forms a part of this Agreement.
Article 2. The Project Budget is as shown in the attached Exhibit II, which Exhibit II by reference and attachment
hereto forms a part of this Agreement.
Article 3. The proposed schedule is as shown in the attached Exhibit III, which Exhibit III by reference and
attachment hereto forms a part of this Agreement.
Article 4. BC is authorized and requested to enter into agreement or assignment with architects, engineers,
contractors, etc., using BC forms and procedures, for the design, bidding and construction of those parts of the
Project. The CLIENT understands and agrees that those agreements will designate BC as the AGENT for the
OWNER and will contain a provision substantially as follows:
The entity that will occupy, use and own the Project upon substantial completion is City of Miami, Parks
and Recreation Department, Miami, Florida. The funds with which the compensation of the architects,
engineers, contractors, etc., will be paid are under the control of City of Miami, Parks and Recreation and
Public Works Departments, Miami, Florida. Payments under this contract, as prescribed hereinabove, will
be made by either City of Miami, Public Works Department or the Parks and Recreation Department,
Miami, Florida, based on approval of each payment by BC, Department of Management Services, State of
Florida.
CLIENT agrees that, although it will not execute those agreements, the agreements shall be deemed to be the
agreements of the CLIENT in view of the fact that the funds are under the control of the CLIENT and BC will not
have responsibility to make payments on the agreements.
Article 5. CLIENT agrees to designate a representative for the Project to be solely responsible for all CLIENT
actions under this agreement. and who will receive. review and respond in a timely manner to all questions and
requests from BC; and to pay. within thirty 130) calendar days, all invoices approved by BC and transmitted to the
CLIENT for payment, not exceeding the portions of the budget shown on the attached Exhibit II which have been
activated in writing by a letter from the CLIENT's representative to BC.
99-- 291
Article 6. BC does not guarantee the Project can be completed within the budget shown in the attached Exhibit II,
but does agree not to commit funds in excess of this budget without mutual agreement and an Amendment to this
agreement authorizing such increase.
Article 7. BC's administrative fees for the various program management services are based on services as shown in
Exhibit I and shall be as follows:
FIFTY SEVEN THOUSAND, SIX HUNDRED THIRTY SIX DOLLARS ($57,636.00)
If the Project Budget is increased in excess of $250,000.00 or if the Construction Schedule exceeds 12 months then
BC fee shall be increased by 2.2% of the revised budget in excess of $2,750,000.00. If the Construction Schedule
can be reduced BC's fee shall be reduced by $4,803.00 per month or a prorated portion thereof. If the Construction
extends beyond 12 months due to no fault of BC, the fee will be $4,803.00 per month or a prorated portion thereof.
Article 8. BC's administrative fees prescribed in Article 7 hereinabove, will be invoiced once for the total amount
due and payments are to be made in 12 consecutive monthly payments against the invoice based on an 12 month
final completion date.
$57,636.00 _ 12 months = $4,803.00 12 Equal Monthly Payments of $4,803.00
Article 9. Additional Services will be performed for a separate fee to be negotiated and authorized later. Such
services may include, but are not limited to the following:
Special Board meetings or workshops
Article 10. This Agreement may be terminated by either party upon seven (7) days' notice by mutual agreement, or
should one party fail substantially to perform in accordance with its terms through no fault of the other. In case of
termination, BC, its Contractors and Architect -Engineer's shall be paid for services performed up to the date of
termination and any reasonable additional costs that BC, it's Contractors and Architect -Engineers may incur as a
result of terminating this agreement.
2
'4'
99— 291
IN WITNESS WHEREOF, the parties hereto have executed this Agreement the aay and year first written above.
Attest:
By:
Walter J. Foreman, City Clerk
Approved as to Insurance Requirements:
By:
Mario Soldevilla, Risk Management Dept.
CLIENT
CITY OF MIAMI, A MUNICIPAL
CORPORATION OF THE STATE
OF FLORIDA
By:
Donald H. Warshaw, City Manager
Approved as to Form and Correctness:
By:
Alejandro Vilarello, City Attorney
AGENT
BUILDING CONSTRUCTION,
DEPARTMENT OF MANAGEMENT
SERVICES,
STATE OF FLORIDA
As Witnessed: Approved:
By: By:
H.R. Hough
Contracts Administrator
Approved As To Form And Legality:
By:
Office of General Counsel.
Department of Management Services
State of Florida
99- 291
L- -
1
4r
EXHIBIT I
SCOPE OF SERVICES
Building Construction, Department of Management Services, State of Florida, hereinafter referred to as "BC", —
proposes to provide the following program management services for the projects identified on the face of this
Agreement:
1. A/E's Design Development Phase Services
BC WILL;
Accept Assignment Of A/E's Contract With The City Of Maimi, Public Works Department
Provide Direction/Consultation To The A/E As Required Regarding Scope, Additional
Services, Procedures , etc.
Provide Information To The A/E Regarding Permitting Agencies and Codes to Use
Provide Budgetary Direction To The A/E
Participate In Value Engineering Analysis To Provide The Best Project Within Budget
Review Plans For Architectural, Mechanical, Electrical And Civil And Provide
Comments To The A/E
Reviews A/E Responses And/Or Revisions Due To DBC (And Other Reviewing Agencies) Comments
Monitor The Schedule For Submittals And Establish Dates For Reviews
Reviews A/E Requests For Additional Services For Scope, Completeness, Fairness
Issue A/E Additional Services Authorizations Agreed Upon
Receive, Review And Approve A/E Invoices For Services Rendered Versus Contract
Conditions
Process A/E Invoices To Proper Accounting Office For Vouchering
Review And Analyze Cost Estimates
Review Specifications
Assure Meetings Are Documented And Minutes Distributed To All Parties
Assure All Decisions Required For That Particular Design Phase Are Made
Issue Approval To A/E To Proceed Into Next Phase
THE FOLLOWING WILL BE PROVIDED BY THE A/E UNDER CONTRACT TO BC
Conferences With Client & Others
Site - Informational Data
Master Plan
Environmental Considerations
Grading & Site Development
Site Construction
Roads, Walks, Paths & Parking
Utility Services
Fencing
Landscaping
Lateral & Transverse Site Sections
Special Site Considerations
Buildines - Architectural:
Floor Plans
Area Recap
Elevations
Buildins Sections
Typical Wall Sections
Finish & Equipment Schedules
Color Pallet & Schedule
Code Classifications
Complex Area Plans
List Of Safety Equipment
Design Concept Sketch
4
may- 291
r"
k"
Materials List
Other Information
Buildings - Structural:
Describe Foundation Conditions
Describe Structure Selected
Preliminary Framing Plan
Describe Roof Structure
Structural Building Sections
Identify Building Loads
Design Calculations & Criteria
Special Conditions
Buildings - HVAC:
Single Line Layout With Equipment
Sections Showing Equipment
Fleet Forms
Describe Auto Management System
Describe Criteria For Heating System
Describe Ventilation System
Describe AC Criteria & System
Describe Evaporative Cooling System
Buildings - Refrigeration:
Areas To Be Refrigerated
Outside Design Temperatures
Type Refrigeration Equipment
Type/Thickness Insulation
Buildings - Electrical:
Describe Electrical Service Entrance
Describe Electrical Characteristics
Identify Panel Locations
Describe Wiring Systems
Describe Conductors
Locate Lights, Outlets & Switches
Describe Standards Of Design
Describe Short -Circuit Duty
Describe Emergency Electrical Systems
Coordinate Building & Site Electrical
Other
Buildings - Communication:
Describe Systems
Describe Materials
Describe Locations
Describe Radio Paths
Describe Antenna Requirements
Describe Antenna Transmission
Describe Bonding & Grounding
Describe Cable/Radio Links
Describe Test Equipment
Describe Equipment Arrangement
Describe Wiring/Cable Requirements
Describe Lighting/Power Requirements
Describe AC Requirements
Describe Interference/Clearance
Buildin,*s - Plumbing:
Preliminary Layout Of Lines
Preliminary Plan Locations
Preliminary Section With Risers
Identify Number Of Fixtures
5
g�- 291
lw
Identify Water Pressure
Identify Hot Water System
Other
Buildings - Fire Protection:
Identify Hydrant
Identify Riser/Hose Cabinets
Identify Sprinkler Criteria
Insurance Design Criteria
Sprinkler Head Layout
Buildings - Special Equipment:
Kitchen Equipment
Auditorium Seating
Stage Curtain And Equipment
Gym Layout And Equipment
Window Coverings
Hospital Equipment
Lawn Sprinkler Equipment
Vacuum Cleaning Systems
Material Handling Equipment
Telephone Systems
Other Systems
Checklist
Bid Packages/Sequences:Base Bid & Alternates
Probable Construction cost
Area Analysis
Telephone Site Plan
Distribution Of Review Packages
BC Review
A/E's Response To Review Comments
2 A/E's Construction Documents Phase Services
BC WILL;
Provide Direction/Consultadon To The A/E As Required Regarding Scope, Additional
Services, Procedures , etc.
Provide Information To The A/E Regarding Permitting Agencies and Codes to Use
Provide Budgetary Direction To The A/E
Participate In Value Engineering Analysis To Provide The Best Project Within Budget
Review Plans For Architectural, Mechanical, Electrical And Civil And Provide Comments To
The A/E
Reviews A/E Responses And/Or Revisions Due To BC (And Other Reviewing Agencies) Comments
Monitor The Schedule For Submittals And Establish Dates For Reviews
Reviews A/E Requests For Additional Services For Scope, Completeness, Fairness
Issue A/E Additional Services Authorizations Agreed Upon
Receive, Review And Approve A/E Invoices For Services Rendered Versus Contract Conditions
Process A/E Invoices To Proper Accounting Office For Vouchering
Review And Analyze Cost Estimates
Review Specifications
Assure Meetings Are Documented And Minutes Distributed To All Parties
Assure All Decisions Required For That Particular Design Phase Are Made
Issue Approval To A/E To Proceed Into Next Phase
THE FOLLOWING WILL BE PROVIDED BY THE A/E UNDER CONTRACT TO BC
Conferences With CLIENT
;Oqc Documents Review
Non -Technical Specifications
Fleet/Solar Energy
Codes Certification
6
99- 291
L
Check List
Cost Estimates
Area Analysis
Color Schedules
Handicapped Check List
Drawings
Technical Specifications
Bid Packages
Alternates
Mechanical Test And Balance
100% Documents Review
100% Review Response
3. A/E's Bidding Phase Services (If Applicable)
BC WILL;
Prepare Sample Advertisement For A/E To Use In Newspapers
Issue State MBE Directory To The A/E To Be Made Available To Contractors (As Required
To Meet Project Goals)
Monitor Addenda For Scope And Clarity
Participate In Bid Openings
Review Contracts Financial Qualifications And Experience
Make Recommendations For Bid Award
THE FOLLOWING WILL BE PROVIDED BY THE A/E UNDER CONTRACT TO BC
Prepare Camera Ready Copy Of Documents For Each Bid
Package
Prepare & Issue Addenda
Attend Bid Openings
Award Recommendations
4. A/E's Construction Phase Services
BC WILL;
Prepare And Issue The Notice To Proceed
Participate With The A/E And Contractor In The Initial Construction Conference
Review The Contractor's Schedule For The Project
Participate In All Monthly (Or Bi-Weekly) Team Meetings
Assure All Team Meetings Are Documented And Minutes Sent To All Parties
Review Contractors List Of Subcontractors
Review Monthly RFI, ASI, Submittal, Shop Drawings And Other Logs For Timeliness
Review Contractor's Progress Against The Schedule On A Monthly (Or Bi-Weekly) Basis
Analyze Change Order Proposals For Scope, Need, Completeness, Fairness
Recommend Change Orders As Required
Review Contractor's Pay Requests
Process Pay Requests To The Appropriate Accounting Office For Vouchering
Participate In Monthly Inspections With The A/E
Participate In Substantial Completion Inspections
Participate In Final Completion Inspections
Review And Sign Affidavits Of Completion
THE FOLLOWING WILL BE PROVIDED BY THE A/E UNDER CONTRACT TO BC
Initial Construction Conferences
Project Sien Design
Monthly Construction Conferences
Review Contractor's Progress Schedule
Review Contractor's List Of Subcontractors
Review Contractor's Shop Drawings
Transmit Payroll Records Required By Federal Grants
7
99- 291
Review As -Built Drawings
Clarification Documents
Monthly Status Report
Site Visits And Reports
Monthly Contractor Payment Reviews
Review Testing Invoices
Change Orders
Claim Reviews And Correspondence
Substantial Completion Inspection
Final Completion Punchlist
Final Inspection
Review Contractor's Affidavits Of Completion
Review Contractor's Guarantees And Operating Manuals
Review Contractor's As -Built Drawings
5. Contractor Selection
BC WILL;
Establish Contractor Selection Team Consisting Of BC, A/E &
CLIENT Personnel
Advertise For Qualified Contractors
Prepare Project Scope Information For Contractors
Answer Contractor's Questions
Verify Contractor Prequalification Criteria
County & State Lice nsure/Certification/Corporation
Analyze Previous Experience On Similar Projects
Analyze Management Staff & Experience
Analyze Site Management Capability
Analyze Present Workload
Schedule/Arrange Contractor Selection Meetings
Conduct Preliminary Selections, Reducing Applicants To 5
Contractors
Publish Shortlist Results Of Contractor Selections
Debrief Unsuccessful Contractors
Brief Successful Contractors
Conduct Interviews With Remaining 5 Contractors
Finalize Selection, Reducing To 3 Contractors In Order Of
Preference
Debrief Ranked Contractors
6. Contractor Fee Negotiations
BC WILL;
Establish Contractor Negotiation Team Consisting Of BC,
A/E & CLIENT Personnel
Prepare & Publish Detailed Scope For Contractors
Notify Number 1 Contractor Of Negotiation & Proposal
Requirements
Answer Number I Contractor's Questions
Receive & Analyze Proposal From Number I Contractor
Conduct Pre -Negotiation Conference With Negotiation Team
Conduct Negotiations of Contractor's Fee With Number l Contractor
Establish On -Site Design Personnel Requirements
Establish Off -Site Design Personnel Requirements
Establish On -Site Construction Personnel Requirements
Establish Off -Site Construction Personnel Requirements
Establish General Conditions Requirements
Establish Design & Construction Phase Fee
Establish Overhead & Profit Fee
S
ti-
99- 291
Establish Preliminary Schedule Requirements
Establish Construction Team, Consisting Of BC, CLIENT,
A/E & Contractor Personnel
Coordinate With CLIENT
Distribute Results Of Negotiation
Obtain CLIENT Approval
7. Contractor Contract Preparation/Execution
BC WILL;
Prepare Contract On BC's Form For Contractor & BC
Execution
Prepare Performance Bond On BC's Form In Budget Amount
Prepare Labor & Material Payment Bond On BC's Form In
Budget Amount
Prepare Certificate Of Insurance On BC's Form
Prepare Assignment Of Contractor's Antitrust Rights To CLIENT
On BC's Form
Process Contract Documents To Contractor For Execution
Receive Executed Documents Back From Contractor &
Thoroughly Check For Proper Execution
Execute Documents On Behalf Of CLIENT
Give Contractor Notice -To -Proceed With Design Phase Services
8. Contractor's Design Phase Services
BC WILL;
Participate With The A/E And Contractor/CM In Plan Reviews At Each Submittal Phase
Participate With The A/E And Contractor/CM In Value Engineering Alternative
Design/Construction Approaches
Review All Contractor/CM Estimates
Review Contractor/CM GMP With The Team And Recommend For Contracting
Explore Tax Savings And Implement Procedures As Necessary
THE FOLLOWING WILL BE PROVIDED BY THE CONTRACTOR/CM UNDER CONTRACT TO
BC (WITHOUT ASSUMING DESIGN RESPONSIBILITIES)
Distribute Document Package
Schedule Familiarization Meeting
Conduct Familiarization Meeting
Manage Requests For Information
Pricing & Value Engineering (VE)
Review & VE Site Civil
Review & VE Mechanical -Electrical Systems
Review & VE Structural Systems
Review & VE Roof & Exterior
Review & VE ADA Compliance
Review & VE Detail Coordination
Evaluate Construction Phasing
Evaluate Construetability
Propose Guaranteed Maximum Price (GMP)
Negotiate Final GhIP & Conditions
Document Final GINIP & Conditions
Review Final GMP & Conditions With CLIENT Team
Obtain CLIENT Team Approval Of Final GMP & Conditions
Amend Contractor's Contract To Reflect Final GMP/Conditions
Prepare GMP Amendment To Construction Contract
Process GRIP Amendment To Contractor For Execution
Receive Executed Amendment Back From Contractor &
Thoroughly Check For Proper Execution
9
99- 291
14'
l
Execute GNtr Amendment On Behalf Of CLIENT
Process Executed GMP Amendment To Contractor
9. Contractor's Construction Phase Services
BC WILL;
Prepare And Issue The Notice -To -Proceed
Participate With The A/E And Contractor In The Initial Construction Conference
Review The Contractor's Schedule For The Project
Participate In All Monthly (Or Bi-Weekly) Team Meetings
Assure All Team Meetings Are Documented And Minutes Sent To All Parties
Review Contractor's List Of Subcontractors
Review Monthly RFI, ASI, Submittal, Shop Drawings And Other Logs For Timeliness
Review Contractor's Progress Against The Schedule On A Monthly (Or Bi-Weekly) Basis
Analyze Change Order Proposals For Scope, Need, Completeness, Fairness
Recommend Change Orders As Required
Review Contractor's Pay Requests
Process Pay Requests To The Appropriate Accounting Office For Vouchering
Participate In Monthly Inspections With The A/E
Participate In Substantial Completion Inspections
Participate In Final Completion Inspections
Review And Sign Affidavits Of Completion
THE FOLLOWING WILL BE PROVIDED BY THE CONTRACTOR/CM UNDER CONTRACT TO
BC (WITHOUT ASSUMING DESIGN RESPONSIBILITIES)
Coordinate Contractors Project Promotion & Advertisement
Contact Qualified Sub -Contractors
Promote Through Associations & Exchanges
Promote MBE participation To Make Good Faith Effort
Toward Meeting District Board Of Trustees Requirements
Use BC & CLIENT Databases Of Interested Contractors
BC & CLIENT To Participate In Pre -Bid Meetings & Bid
Openings
Coordinate Contractor's Review Of 100% Construction
Documents
Give Contractor Notice -To -Proceed With Construction
Coordinate Contractor's Project Information Management
Key Personnel Contacts
Bud -et & Financial Data
Project Construction Scheduling
Construction Progress Conference Scheduling
Interface With Construction Management Systems
Initial Team Construction Conference
Maintain Constructive Aeenda
Document Potential Areas Of Concern
Develop Subcontractor Coordination Plan
Review Construction Critical Path
Confirm Communications Network
Weekly Team Nleetines
Monthly Team Meetings
Prepare For Lleetinzs
Attend Meeuntzs
Prepare :Monthly Report
Review Submittal Schedule
Identify Lone -Lead Submittals
Coordinate Review Periods N''ith Construction Schedule
Review Budeet Status
Review Value analysis Reports
10
99- 291
Perform Quality Control Observations
Review Construction Schedule
Review Change Proposals. Reviews And Implementation Are
To Be By The Construction Team On Changes To The GMP
That Are Less Than $100,000. Those Changes Equal To
Or Greater Than $100,000 Will Require CLIENT Approval.
Review MBE Participation Reports
Review Testing Reports
Review Building Code Inspection Reports
Review Requests For Payment & Transmit To CLIENT For Review
& Payment
Establish Transition Team
Monitor As -Built Development
Substantial Completion Inspection
Review A/E Certifications
Expedite & Verify Punchlist Corrections
Review Warranties & Submittals
Final Inspection & DOE Certification
10. Occupancy Services (Additional Service to Owner)
BC WILL;
Assure Staff Training Occurs For Equipment
THE FOLLOWING WILL BE PROVIDED BY THE CONTRACTOR/CM UNDER CONTRACT TO BC
(WITHOUT ASSUMING DESIGN RESPONSIBILITIES)
Review Occupancy Requirements
Coordinate Maintenance & Operational Training
Review Systems Testing & Certifications
t _ 291
.I
Total Project Budget
EXHIBIT II
PROJECT BUDGET
1'_
$2,500,000.00
99- 291
t✓
bra
ID ITask Name
1 DMS Selected by Board
2 A/E Conlracting Phase
3 A/E Assignumnl Prepandron/Execulion
4 A/E Design Phase
5 A/E Site Development Putni lling —
6 A/E Design Development Phase Services
7 A/E Cunstnrchun Do umenls Phase Services
8 A/E Construction Phase Services
9 A/E CO11SRUC110r1 Administration & Site Visits
10 CM Selection Phase
11 Advertise for Construction Manager
12 Selection Team Reviews Proposals Individually
13 Selection Team Meets, Produces Short List
14 Shull Listed C/M Prepare to Oral Presentation
15 Oral Presunlahutns 8 Grading by Tearn
16 Notification and Advertisement of the Results
17 CM Contracting Phase
18 CM Nugolraliuns
19 CM Conlydcl PrepurulrulVExucadiun
20 CM Design Phase
21 Dusgpr Iruvulnlnmml I slunalu
22 Cunslruceun Dueuments/GMP Estimate
23 CM Construction Phase Services
24 Conslructlun
25 — Substantial Compleliun —
26 Filial - — —
EXHIBIT III PROPOSED SCHEDULE, CITY OF MIAMI
Duration
Start
_Finish
M I A M
0 days
Tue 3/23199
Toe 3/23199
/23
L
f li
7 days
Tue 3123/99
Mon 3129199
7 days
Tue 323199
Mon 3/29/99
120 days
Tue 3/30/99
Tue 727/99
90 days
Tue 3/30/99
Sun 6/27/99
60 days
Tue 3/30/99
Fri 5/28/99
60 days
Sal 529/99
Tue 727/99
240 days
Wed 728/99
Thu 323/00
240 days
Wed 7/28199
Thu 3/23/00
52 days
Wed 324199
Fri 5/14/99
30 days
Wed 3/24/99
Thu 422/99
5 days
Fri 423r99
Tue 427/99
1 day
Wed 4128/99
Wed 428199
14 days
Thu 429199
Wed 5/12/99
1 day
Thu 5113/99
Thu 5113/99
1 day
Fri 5114/99
Fri 5114199
28 days
Sat 5/15199
Fri 6/11/99
14 days
Sat 5115/99
Fri 5/28/99
14 days
Sat 529/99
Fri 6/11/99
90 days
30 days
60 days
Sat 6/12199
Sat 6/12/99
Thu 919/99
Sun 7111/99
Mon 7/12/99
Thu 9/9/99
240 days
Wed 728/99
Fri 324/00
240 days
Wed 7/28199
Thu 323100
30 days
Wed 223/00
Thu 323/00
0 days
Fri 3/24/00
Fri 3/24100
e 3/24
Task Summary ^ Rolled Up Progress � Split
Protect City ulMcmu Ihorress ,",,,,","„
Dille lilt: ,/23199 J Rolled Up Task External Tasks u . ;, ,- r-i Rolled Up Split
Milestone ♦ Rolled Up Milestone Q Project Summary WENNNOMW
1W
I
ti.
Z-1
CITY OF MIAMI, FLORIDA 46
INTER -OFFICE MEMORANDUM
TO: The Honorable Mayor and DATE FILE
Members of the City Commission
SUBJECT: RESOLUTION Authorizing the
City Manager to execute an
Agreement for Construction
ram— Management Services for the
FROM : Donald H. Warshaw REFERENCES Hadley Park Community Center
City Manager
ENCLOSURES:
I
RECOMMENDATION
It is respectfully recommended that the City Commission adopt the
attached Resolution authorizing the City Manager to execute the
negotiated agreement, in a form acceptable to the City Attorney, with
the State of Florida Department of Management Services to manage the
design and construction of the project entitled "Hadley Park Community
Center" under a construction manager -at -risk process for a fee of
$57,636.00.
BACKGROUND
The City of Miami, with substantial local community input, has
committed to have a Community Center designed and built at Hadley Park
with major funding from the Safe Neighborhood Parks Bond (SNPB) program
and from City Special Obligation Bonds. By Resolution No. 98-785, the
City Commission expanded the existing professional services agreement
with Thaddeus Cohen Architects, P.A., to plan and design the Community
Center facility and authorized the City Manager to procure services of a
construction manager -at -risk to implement the project.
The management services shall include accepting assignment of the
architect's agreement with the City to oversee the preparation of
construction documents and the procurement of a professional
construction manager who shall guarantee and construct the project
within the available budget. The funding for the construction
management services under this agreement is from Capital Improvement
Project No. 331391
DHW/ /J /mm
HadleyPkMEMO.doc
Budgetary Impact Analysis
1. Department fdf LZ, U & Division_ MZA
2. Agenda Item # (if available)
3. Title and brief description of legislation or attach ordinance/resolution:
4. Is this item related to revenue? NO: YES
5. Are the sufficient funds in Line Item? (If yes, skip.to item #7.)
YES: V Index Code Minor Obj. Code Amount $ r,7, f0.:56
NO: _ Complete the following questions:
6. Source of funds: Amount budgeted in the Line Item $
Amount needed in the Line Item $
Sufficient funds will be transferred from the following line items:
ACTION
ACCOUNT NUMBER
ACCOUNT NAME
TOTAL
Index/Minor Ob'ect/Pro'ect No.
From
$
To
$
7. Any additional comments?
Department
FORD PARTMENT OF MANAGEMENT AND BUDGET USE ONLY
Verified by: Verified by:
Department of Manage ent and Budget Director/Designee Budget Analyst
Date �i P Date
99- 291