Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R-99-0004
1 1 s i ';t J-99-19 12/28i98 RESOLUTION No. °1 * _ A RESOLUTION ACCEPTING THE BID OF AERO COOLING SYSTEMS, INC., IN THE PROPOSED AMOUNT OF $267,020.00, FOR THE PROJECT ENTITLED "COCONUT GROVE CONVENTION CENTER AIR CONDITIONING REPLACEMENT PROJECT, B-6309"; ALLOCATING FUNDS THEREFOR FROM PROJECT NO. 325006, AS APPROPRIATED BY THE FISCAL YEAR 198-99 APPROPRIATIONS/CAPITAL IMPROVEMENT ORDINANCE NO. 11705, AS AMENDED, IN THE AMOUNT OF $267,020.00 TO COVER THE CONTRACT COST AND $16,979.11 TO COVER THE ESTIMATED EXPENSES, FOR AN ESTIMATED TOTAL COST OF $283,999.11; AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH SAID FIRM FOR THE CITED PROJECT. WHEREAS, the air conditioning system at the Coconut Grove Convention Center no longer effectively cools the building and requires replacement; and WHEREAS, pursuant to public notice, invitations to bid to replace the air conditioning system at the Coconut Grove Convention Center were distributed to 137 contractors; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend that the bid from Aero Cooling Systems, Inc., be accepted as the lowest responsible and responsive bid; and WHEREAS, the Fiscal Year 1998-1999 Appropriations/Capital CITY CO1ul USSYON MEETLNG OF JAM 9 2 V99 R000lution No. a a Improvements Ordinance, No. 11705, as amended, appropriated monies for the proposed amount of the contract, project expenses, and incidentals under Project No.325006; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference thereto and incorporated herein as if fully set forth in this Section. Section 2. The November 19, 1998, bid of Aero Cooling Systems, Inc., in the proposed amount of $267,020.00, for the project entitled "Coconut Grove Convention Center Air Conditioning Replacement, Project No. B-630911, based upon lump sum and unit prices, is hereby accepted at the price stated therein. Section 3. The total estimated project cost of $283,999.11 is hereby allocated from Project No. 325006, as appropriated by the Fiscal Year 1998-1999 Appropriations/Capital Improvement Ordinance No. 11705, as amended. Said total project cost consists of the $267,020.00 contract cost and $16,979.11 estimated expenses incurred by the City. Section 4. The City Manager is hereby authorizedY to enter into a contract, in a form acceptable to the City Attorney, on behalf of the City of Miami with Aero Cooling Systems, Inc., for './The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. -z- 99-- 4 ,. .;-.. :r. --k 44 a- "Coconut Grove Convention Center Air Conditioning Replacement, Project No. B-6309". Section S. This Resolution shall become effective iinmediately upon its adoption and signature of the Mayor PASSED AND ADOPTED this 12th_ day of January_, 1999. JOE CAROLLO, MAYOR In accordance with Miami Code Sec. 2-36, since (-;!;d not indicate, approval of this legislation by signing it in the designa-tec, 'ati i2tion now ploc-� prnv;cJ.-0, snkl 1 1 becomes effective with the elapse of ten (10) dav rom tnEe',- to of c3c, acItion regarding same, without the Mayor al, rd ATTEST: Waltei, oernnn, City Clorlt WALTER J. FOEMAN CITY CLERK CORRECTNESS.t W3 14 7: CSK 2-/If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. -3- 99- INTER -OFFICE MEMORANDUM I TO : Honorable Mayor and Members GATE : JAN 4 1999 FILE of the City Commission SUBJECT: Resolution Awarding Contract for Coconut Grove Convention Center ! A/C Replacement Project, B-6309 FROM REFERENCES: d arshaw ENCLOSURES: Resolution City, Manager i` RECOMMENDATION It is respectfully recommended that the City Commission adopt the attached resolution accepting the low bid of Aero Cooling Systems, Inc., whose principal is Paul D. Morrissette, President; a company located in Miramar, Florida, for the project entitled COCONUT GROVE CONVENTION CENTER A/C REPLACEMENT PROJECT, B-6309, received on November 19, 1998, in the amount of $267,020.00 total bid, authorizing the City Manager to enter into a contract on behalf of the E City. BACKGROUND No history of involvement in City projects. Y. Amount of Bid: $267,020.00 % of Cost Estimate: 69.99 Cost Estimate: $381,500.00 Source of Funds: Fiscal Year 1998-1999,. CIP. Ordinance 11705, Project No. 325006 ,. Minority Representation: 137 Invitations mailed 8 Contractors picked up plans and specs' ( 4 Hispanic, 0 Black, 0 Female) 3 Contractors submitted bids ( 2 Hispanic, 0 Black, 0 Female) Public Hearings Notices: No public hearing/Bid Notice published. Assessable Project: No Discussion: The Department of Public Works has evaluated the bids received on November 19, 1998, and determined that the lowest responsible and responsive bid, in the amount of $267,020.00, is from Aero Cooling Systems, Inc., a non -minority controlled corporation. Funds are available to cover the contract cost and for such incidental items as postage, blueprinting, advertising and reproduction costs. DHW/ J K w 99- 4 {�..,,�'�a ,� �i � z.� �I_v' rek�°�tr �s tY f•r•`' � ,�� .. � �,� CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM `I — i TO : Donald H. Warshaw* DATE : December 4, 1998 FILE City Manager SUBJECT : Resolution Awarding Contract for Coconut Grove Convention Center A/C Replacement Project, B-6309 FROM ;;ae � d � REFERENCESs J. Kay, rector ENCLOSURES : Resolution artment o Public Works The Public Works Department has verified with the Department of Management and Budget that funds are available for the award of a contract in the amount of $267,020.00 from Fiscal Year 1998-1999, Capital Improvement Ordinance 11705, as amended, Project No. 325006. BUDGETARY REVIEW �a Dipak M. Par kh, Director Dept. of Management & Budget JJK/ RIJI ab c: Raul Martinez, Assistant City Manager ADDITIONAL APPROVALS filar Saenz-Butler Administrator, CIP F City of Miami Department of Management & Budget Budgetary Impact Form RESOLUTION AWARDING CONTRACT FOR "COCONUT GROVE Legislation: CONVENTION CENTER A/C REPLACEMENT PROJECT, B-6309" ESTIMATED COSTS: Startup Cost A Total Non -Recurring Startup Cost: Recurring Direct Cost: i' B Sub Total Recurring Direct Cost: Recurring Indirect Costs. $ 283— 1 First Year Per Year C Sub -Total Recurring Indirect Costs: Per Year tee.. D Total Estimated Recurring Cost (B + C): Per Year E Grand Total Estimated Cost -First Year (A + D):$ 283 , 999.1 1 First Year F Decommissioning I Demobilization Cost: Last Year G Other Cost Exposures: Approved by: Date: /Z y partment irector * Funding Amount Available this Fiscal Year. $ Q'@6 Available In account number. 325006 Date: Time: S ( M) Verified by: , Management and Budget Note: wool N !"m FORMAL BID COCONUT GROVE CONVENTION CENTER A/C REPLACEMENT PROJECT Project Number: 13-6309 CII' Number: 325006 Project Manager: Andre Bryan ---- -- bate: I I / 19 / 1999 Person who received the bids: Andre Bryan Received at: City Clerk's Office, Miand City Hall Construction Estimate = $ 381,500.00 ---- Time: 10:00-- BIDDER AFRO COOLING SYSI ENIS rOTAI, Alit SERVICE'S \', EA'THEAVI'ROL MAINT. — — ADDRESS 2705 N C'UAIAII:RE. F rARKWAi WRANIAR, 1'1.0RIDA 33025 14376 SN' 119 C0tIR'r, RA%' 10 WAKII, ITORIOA 33I86 7250 NI: 4 AVENUE AIIANII, PLURIDA 33138 BID 130ND AMOUNT 516 lift) HOND CK No 1699550, 1699496, WY1847 51; 1111) RUNT) IRREGULARITIES MINORITY OWNED NO YES YES ITEM No. DFSC MI' VION UNIT PRICE TOTAL IINIT I'Mcl., TOTA1, UNIT PRICfi TOTAL UNIT PRICIi 'I OTA1. BASE BID: ITEMS I THROUGH 7 $246,170.00 $264,658.00 $289,990.00 1 REPLACEMENT OF EIGHT (8) 40 TON COND. UNITS (CU-1A, 1©. 2A, 2B, 3A, 3B, 4A AND 49) ON MAIN HALL ROOF. $153,300.00 $153,960.00 $180,690.00 2 REPLACEMENT OF TWO (2) 25 T-ON CONDENSING UNITS (CU-7A AND 7B) ON MAIN HALL ROOF. $23,850.00 $32,190.00 $28,233.00 3 REPLACEMENT OF THREE (3) 25 TON COND. UNITS (CU-8, 9 AND 10) ON MAIN HALL ROOF. $6,095.00 $6,430.00 �$8,470.00 4 REPLACEMENT OF ONE (1) 2 TON CONDENSING UNIT (CU-'11) ON MAIN HALL ROOF. $1,260.00 $1,105.00 $1,130.00 5 REPLACEMENT OF ONE (1) 50 TON CONDENSING UNIT (CU-5) ON OFFICE ROOF. $23,490.00 $27,750.00 $28,233.00 6 REPLACEMENT OF ONE (1) 50 TON CONDENSING UNIT (CU-6) ON RESTAURANT ROOF. $23,175.00 $28,223.00 $28,233.00 7 PROVISION FOR SPECIAL ITEMS $15,000.00 $15,000.00 $15,000.00 IRREGULARITIES LEGEND IT HAS 13EEN D1 17?RMINED BY 'I'111; DI:11ARTMl?N'r of I'Um.x WORKS 131ATTIl1'. A -- No Power - o1 - AOorneF LOWEST RESPONSIBLE AND RESI'ONSIVI? 131D IS FROM _ AERO COOLING 13 -- No Affidavit as to Capital 8_ Surplus of Bonding Company SYSTEMS, INC. FOR 'nii, 'f0'I'AI. AMOUNT OF $287,020.00 '• C Corrected Extensions D •- Proposal Unsigned or Improperly Signed or no Corporate Sea) 1'. -• Sub -contractors) not Identified If the above contractor is not the lowest bidder explain: F •- Non - reSp nsive bid G -- Improper Bid Mond •• $287,020.00 = BASE BID (ITEMS 1 - 7) + REPLACEMENT OF ONE (1) 25 TON PACKAGED A/C I I •- No Certificate of C'ompelency Number Q UNIT (AC-1) ON THE WEST COURTYARD ROOF (FROM ADD. ALT. ITEM B-2) I -- No First Source Hiring Compliance Statement "��`��`�' + ADDITIVE STEM C: 3 -• No Minority Compliance Statement K -- No Duplicate [lid Proposal 1. -• No City of Miami or County (Occupational License SMT]' 1 OF 2 Q� FORMAL BID , COCONUT GROVE CONVENTION CENTER A/C REPLACEMENT PROJECT Project Number: 11-6309 CIP Number: 325006 Project Manager: Andre Bryan Date: If / 19 / 1998 Person who received the bids: Andre Bryan Received at: City Clerk's Office, Miami City Hatl Construction Estimate = $ 381,500.00 -Time: 10:00 n.n1. BIDDER HERO COOLING SYSTEMS TOTAL Alit SERVICES WLAT IIERT1101. MAINT. ADDRESS 2705 N CONINIFRCE PARKWAY NIMAN1AR, FLORIDA 11025 14376 SW 119 COUR-1, RAY In RIIANf I. FLORIDA 33186 7250 NE 4 AVENUE NIIANII, FLORIDA 33138 BID BOND AMOUNT 55: BID I)OND CK No 1699550, 1699.196, 1699847 5% (nD ROM) IRREGULARITIES MINORITY OWNED NO YES YES ITEM No. DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE rO•I'AL UNIT PRICE TOTA1. ADDITIVE ALTERNATES ITEMS A-1 REPAIR (ON PER UNIT BASIS) OF SIX (6) 20 TON PACKAGED A/C UNITS ON W. COURTYARD ROOF. $2,335./Unit $14,010.00 $2,284./Unit $13,704.00 $5,800./Unit $34,800.00 B-1 REPAIR (ON PER UNIT BASIS) OF FOUR (4) 25 TON PACKAGED A/C UNITS ON W. COURTYARD ROOF. $2,250./Unit $9,000.00 $4,950JUnil $19,800.00 $6,800./Unit $27,200.00 A-2 REPLACEMENT (ON PER UNIT BASIS) OF SIX (5) 20 TON PACKAGED A/C UNITS ON WEST COURTYARD ROOF. $16,445/Unil $99,670.00 $16,584/Uni $99,504.00 $ /Unit $113,695.00 6-2 REPLACEMENT (ON A PER UNIT BASIS) OF FOUR (4) 25 TON PACKAGED A/C UNITS ON WEST COURTYARD ROOF. $16,850/Unit $67,400.00 $18,770/Unil $75,080.00 $ /Unit $85,783.00 ADDITIVE ITEM C REMOVE ALL RUST AND PAINT EXPOSED CONDENSING WATER PIPING LOCATED ON THE NORTH HALL ROOF. $4,000.00 $5,600.00 $1,500.00 IRREGULARIJILS LEGEND IT HAS BEEN DETERMINED BY 111E DEPARTMENT OF PUBLIC WORKS 'MAT Ilili A -• No Pottier - of - Auorocy LOWEST RESPONSIB1.E AND RESPONSIVE BID IS FROM HERO COOLING n -- No Affidavit as to Capital & Surplus of Bonding Company SYSTEMS, INC. FOR TIIE TOTAL. AMOUNT 01: $287,020.00 •• C -• Corrected Extensions D -• Proposal Unsigned or Improperly Signed or no Corporate Seal F. •- Sub-contraclo(s) not Identified If the above contractor is not the lowest bidder explain: r -- Non • resp•.,nsive bid — G -• Improper Bid Bond •• $267,020.00 = BASE BID (ITEMS 1 - 7) + REPLACEMENT OF ONE (1) 25 TON PACKAGED A/C It •- No Certificate of Competency Number UNIT (AC-1) ON THE WEST COURTYARD ROOF (FROM ADD. ALT. ITEM 0-2) 1 •• No First Source Luring Compliance Statement + ADDITIVE ITEM C � 1 -• No Minority Compliance Statement �,9. "—,, d K -• No Duplicate Bid Proposal 0 21B / S I. •• No City of Miami or Comity Occupational License / SlIFF"A' 2 01' 2 (D I .a-�,_.,...w.. .. .....:. .:.. .::. ... .. :.::.r ..,.. - 'g'rcnr"rl'7r'ii�'�x'S"�'4, ;.,. I FACE' SHEET DEPARTMENT OF PUBLIC WORKS DATE 12 / 4 / 1993 _ COCONUT GROVE CONVENTION CENTER JOB NUMBER: B-6309 PROJECT NAME: A/C REPLACEMENT PROJECT CIP NUMBER: 325006 LOCATION: 2700 South Bayshore Drive, Miarni, Florida PROJECT MANAGER / EXT. No.: Andre Bryan / 416-121 1 OTHER TYPE: FEDERAL (C.D.B.G.): ASSOCIATED DEPARTMENT: Conferences, Conventions and Public Facilities — r� S.N P.B. �J ASSESSABLE: 0 EMERGENCY: 0 COMMISSIONER DISTRICT: _ 2 BID REQUEST: FORMAL = INFORMAL RESOLUTION No.: DESCRIPTION: The project consists of the famishing of all labor, materials and equipment for the following: 1. The replacement of the rooftop A/C condensing units that principally serve the Main Exhibition Hall, the Mezzanine and West Exhibit Areas. 2. The replacement of one (1) 25 ton rooftop A/C packaged unit, located on the roof of the West Courtyard Exhibition Hall._ 3. The cleaning and painting of the exposed condensing water piping, located at the North Hall Cooling tower. The project also includes related electrical and mechanical work. (IF NECESSARY, CONTINUE ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST COST (% OF CONST. COST) ADVERTISING S 479.11 (A) OUTSIDE DESIGN S 4,500.00 (A) TESTINGS / SURVEY / PLAT S (E) S (E) P.W. DESIGN & BID DOCUMENTS $ 2,000.00 0.75 % CONSTRUCTION S 267,020.00 (BID) CONSTRUCTION ADMINISTRATION S 10,000.00 3.75 % OTHER: $ (E) S (E) (A) - ACTUAL AMT. 4.5 % (E) - ESTIMATE TOTAL $ 283,999.11 (TOTAL ENG. FEE) e ESTIMATED CONST. COST $ 300,000.00 CONTRACTOR'S INFORMATION: CLASS: O L rJ 0 NON - MINORITY TYPE OF WORK: Air Conditioning MINORITY F F YEARS OF ESTABLISHMENT: 5 years LICENSE CA-0O25417 NAME: Aero Cooling Systems, Inc. TELEPHONE: (954) 437-4200 ADDRESS: 2705 North Commerce Parkway CITY, STATE, ZIP: Miramar, Florida 33025 CLASS: J = JOINT P = PRIME S = SUB CONTACT PERSON: Paul D. Morrissette, President MINORITY: B = BLACK H = HISPANIC F = FEMALE SUB -CONTRACTORS: NAMES: None uup,Mb: A55ISTANT U[Kt:L; IUMS; C:USI AIVALT.W:I , f-IL=, A.7.SU{rlAl=U U=Fil, UH' MAIYAG=H RSV. alBe �.yya i .'/1A