RESOLUTION NO. �� , 10 � �..c 9
A RESOLUTION OF THE MIAMI CITY COMMISSION
AUTHORIZING AN INCREASE IN THE JUNE 6, 2000
CONSTRUCTION CONTRACT WITH MASTER EXCAVATORS,
INC., FOR THE DEPARTMENT OF PUBLIC WORKS FOR
STORMWATER DRAINAGE IN THE CITYWIDE LOCAL
DRAINAGE PROJECT E-75, B-5638, IN AN AMOUNT
NOT TO EXCEED $350,000, FROM $731,350 TO
$1,081,350; ALLOCATING FUNDS THEREFOR FROM
PROJECT NO. 352231, AS APPROPRIATED BY THE
ANNUAL APPROPRIATIONS AND CAPITAL IMPROVEMENT
PROJECTS ORDINANCES.
WHEREAS, many residents of the City of Miami ("City")
suffered stormwater flooding losses during the October 3, 2000
tropical storm and required emergency stormwater pumping by the
Departments of Fire -Rescue and Public Works at numerous locations
to remove accumulated stormwater; and
WHEREAS, an assessment by the Public. Works Department during
and after the storm revealed, that to avoid future flooding,
stormwater drainage improvements are urgently needed at those
locations that required emergency pumping; and
WHEREAS, Resolution No. 00-216, adopted March 9, 2000,
authorized the City Manager to execute a contract with Master
CITY COMMISSION
MEETING OF
NOV 1 6 2000
kesolution Xo.
Excavators, Inc. for the Citywide Local Drainage Project E-75,
B-5638; and
WHEREAS, due to the urgency of the stormwater drainage
improvements in the most critically flooded areas of the City, it
would be in the best interests, health, safety and welfare of the
citizens and the public to increase the existing construction
contract with Master Excavators, Inc. to include those locations
in the project currently under construction; and
WHEREAS, the City Manager and the Director of the Department
of Public Works recommend that an increase in the contract with
Master Excavators, Inc. be approved; and
WHEREAS, funds are available from Project No. 352231, as
appropriated by the Annual Appropriations and Capital Improvement
Projects Ordinances for said purpose;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY
OF MIAMI, FLORIDA:
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference and
incorporated as.if fully set forth in this Section.
Section 2. An increase in the June 6, 2000 construction
contract with Master Excavators, Inc., for the Department of
Public Works for stormwater drainage in the Citywide Local
Drainage Project E-75, B-5638, in an amount not to exceed
$350,000, from $731,350 TO $1,.081,350, is hereby authorized, with
funds therefor hereby allocated from Project No. 352231, as
Page 2 of 3 - 10
appropriated by the Annual Appropriations and Capital Improvement
Projects Ordinances.
Section 3. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.!'
PASSED AND ADOPTED this 16th day of .-November 2000.
JOE CAROLLO,,MAYOR
in accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of
this [agislation by signing it in the desigm-Med place provided, said 10-gisloatir, ..7
, , i
becomes effective with the elapse of ten (10 day:,' om tha', date: `omm�ssi —on
of
(( iz
regarding same, without the May cercisi a o.
.
ATTEST: Walt n,
WALTER J. FOEMAN
CITY CLERK
APPROVED' AS RM ZM CORRECTNESS:
Z
Z 7LE40�ILMZEIC
C C
Y TTORNEY
W 8 35-:LB:BSS
If the Mayor does not sign this Resolution, it shall become effective at
the end of ten calendar days from the date it was passed and adopted.
If the Mayor vetoes this Resolution, it shall become effective
immediately upon override of the veto by the City Commission. .
Page 3 of 3
• •
CITY OF MIAMI, FLORIDA 24
INTER -OFFICE MEMORANDUM
TO : The Honorable Mayor and DATE: NOV 2 - 2C09 FILE:
Members of the City Commission
.,�
SUBJECT: RESOLUTION to increase the
construction contract with
Master Excavators, Inc., for
drainage improvements
FROM: imene REFERENCES:
City Manage
ENCLOSURES:
RECOMMENDATION:
It is respectfully recommended that the City Commission adopt the attached Resolution
authorizing an increase in the construction contract between the City of Miami and
Master Excavators, Inc., in the amount of $350,000 for stormwater drainage facilities in
the Citywide Local Drainage Project E-75, B-5638. The contract sum will increase from
$731,350 to $1,081,350 with funds appropriated by Ordinance No. 11705„ as amended,
and Ordinance No. 11839.
BACKGROUND
Many City residents suffered stormwater flooding losses during the October 3, 2000,
tropical storm that moved across the City. The Flagami neighborhood, as well as
several other locations, was the most impacted where 17 inches of rainfall caused
extensive flooding and property damage. Emergency pumping by the City's Fire -Rescue
Department and Public Works Department was required to eventually remove
accumulated stormwater at several locations.
An assessment by the Public Works Department during and after the storm revealed that
storm drainage improvements are most urgently needed at the following locations to
avoid future flooding:
• SW 48 Avenue between SW 5 Terrace and SW 8 Street
• SW 16 Street between SW 34 Avenue and SW 37 Avenue
• SW 64 Court outfall pipe between SW 8 Street and Tamiami Canal
• SW 60 Court, SW 61 Avenue and SW 62 Avenue south of West Flagler Street
• SW 16 Terrace at Coral Gate Drive (SW 34 Avenue)
• NW Miami Court between NW 18 Street and NW 19 Street
• NW 40 Court between West Flagler Street and NW 2 Street
• SW 9 Street at SW 6 Avenue
• SW 13 Street at SW 23 Avenue
• NW 15 Street between NW 29 Court and NW 30 Avenue
• NW 1 Street at NW 18 Avenue
• NW 2 Terrace between NW 36 Avenue and NW 36 Court
Drainagel mprovements-MEMO
00-1009
The Honorable Mayor and Members of the City Commission
Resolution To Increase Construction Contract With Master Excavators, Inc.
Page No. 2
The design of the improvements at many of these locations is nearly complete. Due to
the urgency to complete these locations, the most expeditious method to accomplish the
construction of the improvements is to increase the existing construction contract with
Master Excavators, Inc.' and include these locations in the Citywide Local Drainage
Project E-75 currently under construction.
Another critically flooded neighborhood, in the area of SW 33 Avenue and SW 27 Street,
will be addressed separately under the Coconut Grove Storm Sewer/Impact Fee Project
scheduled for this fiscal year.
N
CAG/FKR/JHJ/LJH
t�z
�104
Drainagelmprovements-MEMO 0 0— 1 U U
Impact Analysis
1. Department 1] A�) L % e on
2. Agenda item # ("if available)
3. Title and brief description of legislation or attach ordinance/resolution:
4. Is this item related to revenue? NO: YES of yes,,skip.to item #7.)
5. Are theri sufficient funds in Line I m?
YES: Index Code - Minor Obj. Code Amount $
NO: • _ Complete the following questions.
6 . Source of funds: Amount budgeted in the Line Item $
Amount needed in the Line Item $
Sufficient funds will be transferred from the following line items:
ACTION
ACCOUNT NUMBER
ACCOUNT NAME
TOTAL'
Index/Minor Object/Project No.
From
$
To
$
7.
ved by:
8.
/c 2. o 0
Department sieaee Da
Department of Management and Budget DiredorMesignee
Date
Verified by:
OO
Ir�,
e