HomeMy WebLinkAboutR-00-0761J-00-747 9/14/00 RESOLUTION NO. 00— 7 1 A RESOLUTION OF THE MIAMI CITY COMMISSION BY A FOUR FIFTHS (4/5 T11 AFFIRMATIVE VOTE RATIFYING, APPROVING AND CONFIRMING THE CITY MANAGER'S FINDING OF AN EMERGENCY AND WAIVING FORMAL COMPETITIVE SEALED BIDDING PROCEDURES'; AUTHORIZING THE CITY MANAGER TO ACQUIRE SERVICES, EQUIPMENT AND/OR MATERIALS REQUIRED FOR THE DEPARTMENT OF PUBLIC WORK'S PROJECT ENTITLED "CITYWIDE SIDEWALK REPLACEMENT PROJECT PHASE 16 (SECOND BIDDING), 13-4624, BIDS "A AND B", FOR CONSTRUCTION OF NEW SIDEWALKS AND CURBS THROUGHOUT THE CITY OF MIAMI FROM WIS'S ENGINEERING, IN THE PROPOSED AMOUNT OF $198,111.80 (BID "A"), AND F & L CONSTRUCTION, INC., IN THE PROPOSED AMOUNT OF $143,625.00 (BID "B"); ALLOCATING FUNDS THEREFOR FROM CAPITAL IMPROVEMENT PROJECT NO. 341170 IN THE AMOUNT OF $341,736.80 TO COVER CONTRACT(S) COSTS IN THE AMOUNT OF $31,756.32 AND ESTIMATED EXPENSES INCURRED BY THE CITY, IN AN ESTIMATED AMOUNT OF $373,493.12; FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE,,CONTRACTS, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, WITH WIS'S ENGINEERING AND F & L CONSTRUCTION, INC., FOR SAID PROJECT. WHEREAS, due to the hazardous condition of the sidewalks and curbs throughout the City of Miami, the City Manager has made an emergency finding that a valid public emergency exists CITY COMMISSION MEETING OF 5 E p 1 4 2000 Resolution No. 0 0 7 -At and the immediate construction of new sidewalks and curbs is necessary to protect the safety and welfare of the citizens of the City; and WHEREAS, implementation of required procedures and scheduling requirements for formal advertising, receipt of bids, award of contract(s) and processing of contract(s) will needlessly and unwisely delay the construction of new sidewalks and curbs for the Department of Public Work's project entitled "Citywide Sidewalk Replacement Project Phase 16 (Second Bidding), 13-4624, Bids "A and 1311;' and WHEREAS, due to the urgent need for immediate sidewalk replacement, the City Manager and the Director of the Department of Public Works recommended, and deemed it appropriate, that informal bidding procedures be solicited to acquire the lowest and most responsive quotes to provide the required sidewalk and curb replacement; and WHEREAS, informal quotes were subsequently solicited by the Department of Public Works and the quotes submitted by Wis's Engineering and F & L Construction, Inc. were the lowest and most responsive quotes received for Bid "A" and Bid "B," respectively; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,_ FLORIDA: Page 2 of 4 00- 761 Section 1. The recitals and findings contained in the Preamble to this Resolution are hereby adopted by reference and incorporated as if fully set forth in this Section. Section 2. By a four-fifths (4/5tns) affirmative vote of the members of the City Commission, the City Manager's finding that a valid public emergency exists and waiving formal competitive bidding procedures are hereby ratified, approved and confirmed. Section 3. The City Manager is hereby authorized to the acquire services, equipment and/or materials required for the Department of Public Work's project entitled "Citywide Sidewalk Replacement Project Phase 16 (Second Bidding), B-4624, Bids "A and B", for construction of new sidewalks and curbs throughout the City of Miami from Wis's Engineering, in the proposed amount of $198,111.80 (Bid "A"), and F & L Construction, Inc., in the proposed amount of $143,625.00 (Bid "B"). Section 4. The total estimated project costs of $373,493.12 are hereby allocated from Capital Improvement Project No. 341170, consisting of contract(s) costs in the amount of $341,736.80 and estimated project expenses incurred by the City in the amount of $31,756.32. Page 3 of 4 �. Section 5. The City Manager is hereby authorized to enter into a contract, in a form acceptable to the City Attorney, with WisIs Engineering and F & L :Construction, Inc. for said purpose. Section 6. This Resolution shall become effective immediately upon its adoption and signature of the Mayor 2/ PASSED AND ADOPTED this 14th day of September 2000. JOE CAROLLO, MAYOR In accordance with Miami Code Sec. 2-36, since the Meyer dId not IndlCM approV , of this legislation by signing it in the designated dace provided, said legislation 1,01-1 becomes effective with the elapse/,of 'n (10) days r m the dt of ommis yt regarding same, without the Ma or xerci ATTEST: Wait J. Fo an, Clerk WALTER J. ATTORNEY 4631 :BSS CITY CLERK F RRECTNESS:& 1� The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 4 of 4 A4-- 0 0. CITY OF MIAMI, FLORIDA 0 `13 INTER -OFFICE MEMORANDUM TO: The Honorable Mayor and Members of the City Commission FROM:Gimenez ManagerCity RECOMMENDATION DATE: AU: ' - 9 `77�..' '.. FILE SUBJECT: Emergency Project — Citywide Sidewalk Replacement Project 16 Phase(Second Bidding) REFERENCES: ENCLOSURES: It is respectfully recommended that the City Commission adopt the attached Resolution ratifying the City Manager's written finding that a valid emergency exists concerning the condition of the sidewalks throughout the City, and waiving formal competitive bidding procedures and authorizing the City Manager to accept the bid of Wis's Engineering as the lowest responsive and responsible bid in the amount of $198,111.80 for Bid "A" and to accept the bid of F & L Construction, Inc., as the lowest responsive and responsible bid in the amount of $143,625.00for Bid "B". BACKGROUND On June 8, 2000, the City Commission rejected the bid of M.E.F. Construction for the project entitled "Citywide Sidewalk Replacement Project — Phase 16, B-4624". The City Commission passed a motion to divide the project into smaller components in order to provide ample opportunity for competitive bidding and waiver of the formal bidding process. The reason behind this is to allow other competitive bidders to submit bid bond vouchers which are applicable to bids under $200,000.00. Based on my investigation of the citywide condition of the sidewalks and curbs, I believe that an EMERGENCY exists to replace hazardous sidewalks which justifies the selection of Contractors by informal bids. Due to the condition of the sidewalks and curbs, there is an urgent need to have the replacements done. Further, considering that the City Commission passed a motion to divide this project into smaller components, the project was divided into two parts allowing more opportunity for bidders with two contracts under $200,000.00 each. Because of the sidewalk and curb conditions there is a need for extraordinary measures to protect the health, safety and welfare of the community. In order to initiate the construction of the sidewalk and curb in locations citywide as soon as possible, formal competitive sealed bid procedures shall be waived for the procurement of contracting services required for said EMERGENCY pursuant to Sections 18-83 and 18-84 of the City Code. Informal bids for parts "A" and "B" were obtained and two separate contracts will be awarded to the lowest responsive and qualified bidders. All costs of these two projects'will be funded from CIP Project No. 341170. �/- wa- 0 40" CAG/FKR/JHJ/mm CitywideSidewalk-2ndbid-64624-MEMO ; Bud etary Impact An 's AUG 1 62000 CIP DIVISION 1. Department e) 64-1 Divisioa� SSS/ 6 2. Agenda Item # (-tf available) 3. Title and brief description ofe on or attach o�rdin solution: J 2, 4. Is this item related to revenue? NO: -L,---YES of yes,!skip.to item #7.) 5. Are there sufficient funds in Line Item? YES: _ Index Code Minor Obj. Code Amount $ NO: _ Complete the following questions. 6. Source of funds: Amount budgeted in the Line Item $ Amount needed in the Line Item $ Sufficient funds will be transferred from the following line items: ACTION ACCOUNT NUMBER ACCOUNT NAME TOTAL IndexfMinor Ob'ectlPro'ect No. From $ To $ 7. Any additional comments? Approved by: 8. i Departmen ee /,SGb Date 00- 7 i Department of M:.: and Budpt 1 .r l . d v, = , . : I Date / 00- 7 • • FACT SHEET DEPARTMENT OF PUBLIC WORKS DATE: 8 / 11 / 2000 JOB NUMBER: B -4624A PROJECT NAME: Citywide Sidewalk Replacement Project - Phase XVI CIP NUMBER: 341170 LOCATION: Citywide PROJECT MANAGER / EXT. No.: L. Helmers / E. Estevez OTHER TYPE: FEDERAL (C.D.B.G.): ASSOCIATED DEPARTMENT: Public Works S.N.P.B. 0 ASSESSABLE: 0 EMERGENCY: COMMISSIONER DISTRICT All BID REQUEST: FORMAL INFORMAL RESOLUTION No.: DESCRIPTION: This proj4ct consists of the removal and replacement of approximatelly 42,500 square feet of concrete sidewalk. The proposed improvements include the clearing and grading, pruningand removing tree roots and limbs, constructing new 4" and 6" concrete sidewalk, incidental surface restoration and adjusting water meters and utility boxes as directed by the Engineer. (IF NECESSARY. CONTINUE ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST COST (% OF CONST. COST) ADVERTISING $ -- (E) $ 500.00 (a) OUTSIDE DESIGN $ -- $ -- TESTINGS / SURVEY / PLAT $ -- $ -- (E) P.W. DESIGN & BID DOCUMMENTS $ 3,962.24 (E) $ -- 2 % CONSTRUCTION $ -- $ 198,111.80 (BID) CONSTRUCTION ADMINISTRATION $ 13,867.83 (BID) $ -- 7 % OTHER: $ -- $ -- 9 % (E) - ESTIMATE TOTAL $ 216,441.87 (TOTAL ENG. FEE) ESTIMATED CONST. COST $ 183,000 CONTRACTOR'S INFORMATION: CLASS: O Ru Fs__l NON - MINORITY TYPE OF WORK: General Engineering MINORITY 0 0 YEARS OF ESTABLISHMENT: 4 LICENSE 369292-9 NAME: Wis's Engineering TELEPHONE: (305) 758-4482 ADDRESS: 174 N.E. 78 ST CITY, STATE, ZIP: Miami, Florida 33138 CLASS: J = JOINT P = PRIME S = SUB MINORITY: B = BLACK H = HISPANIC F = FEMALE CONTACT PERSON:V1/isconsin Mc. Lachlan, Owner SUB -CONTRACTORS: NAMES: UUPIES: ASSISTAVIP- N^TA _ DAIRR EUTUS, GUST ANALYSIS, FILE, ASSOCIATED DEPT, CIP MANAGER REV. 2/00 V ' + 6 TABULATION OF BIDS FOR JOB NO. CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XVI, B4624A (INFORMAL), B-4624A Received by the City Clerk, City of Miami, Florida at 11j00 a.m. on July 5, 2000. Bidder WIS'S ENGINEERING Address 174 NE 78 ST MIAMI, FL 33138 Located In the City of Miami YES lkensed & kar d is Per City code & Metro Ov! YES Bid Bond Amount B.B. VOUCHER Irregularities B, H Minority Owned YES TOTAL BID,THE TOTAL OF ITEMS 1 THROUGH 13 BASED ON A SEVENTY (70) WORKING DAYS COM— PLETION TIME, THE SUM OF 198,111.80 i IRREGULARITIES LEGEND _.No Power-of-Attorney THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED THAT B--No Affidavit as to Capital & Surplus of Bonding Company THE LOWEST RESPONSIBLE AND RESPONSIVE BIDDER IS C —Corrected Extensions WIS'S ENGINEERING IN THE AMOUNT OF $198,111.80 D —Proposal Unsigned or Improperly Signed or No Corporate Seal FOR THE TOTAL BID. E —Incomplete Extensions (Missing Primary Office Location Form) F —hon-responsive bid (Missing copy of Certificate of Competency) tj' G — Improper Bid Bond V5 H — Corrected Bid w I — No First Source Hiring Compliance Statement J — No Minority Compliance Statement JOB NO. K— No Duplicate Bid Proposal PAGE, 1 OF 1 8-4624A Prep. By, MARIA LOPEZ Check By, CESAR GONZALEZ J 11 c: FACT SHEET DEPARTMENT OF PUBLIC WORKS DATE: 8 / 11 / 2000 JOB NUMBER: B -4624B PROJECT NAME: Citywide Sidewalk Replacement Project - Phase XVI CIP NUMBER: 341170 LOCATION: Citywide PROJECT MANAGER / EXT. No.: L. Heimers / E. Estevez OTHER TYPE: FEDERAL (C.D.B.G.): 0 ASSOCIATED DEPARTMENT: Public Works S.N.P.B. ASSESSABLE: 0 EMERGENCY: COMMISSIONER DISTRICT All BID REQUEST: FORMAL INFORMAL RESOLUTION No.: DESCRIPTION: This projdct consists of the removal and replacement of approximatelly 42,500 square feet of concrete sidewalk. The proposed improvements include the cleaning and grading, pruningand removing tree roots and limbs, constructing new 4" and 6" concrete sidewalk, incidental surface restoration and adjusting water meters and utility boxes as directed by the Engineer. (IF NECESSARY, CONTINUE ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST COST (% OF CONST. COST) ADVERTISING $ -- (E) $ 500.00 (a) OUTSIDE DESIGN $ -- $ -- TESTINGS / SURVEY / PLAT $ -- $ -- (E) P.W. DESIGN & BID DOCUMMENTS $ 2,872.50 (E) $ -- 2 % CONSTRUCTION $ -- $ 143,625.00 (BID) CONSTRUCTION ADMINISTRATION $ 10,053.75 (BID) $ -- 7 % OTHER: $ -- $ -- 9 % (E) - ESTIMATE TOTAL $ 157,051.25 (TOTAL ENG. FEE) ESTIMATED CONST. COST $ 183,000 CONTRACTOR'S INFORMATION: CLASS: = Riw = NON - MINORITY TYPE OF WORK: General Engineering MINORITY Eil IN YEARS OF ESTABLISHMENT: 4 LICENSE 065430 NAME: F & L Construction Inc. TELEPHONE: (305) 362-7277 ADDRESS: 8095 W 21 Lane CITY, STATE, ZIP: Miami, Florida 33016 CLASS: J = JOINT P = PRIME S = SUB CONTACT PERSON:Dello A. Trasobares, Vice -President MINORITY: B = BLACK H = HISPANIC F = FEMALE SUB -CONTRACTORS: NAMES: a.VF'IC.7: A.7.71.7IAItl 1 YIFiEV 1 %JnCo, frU.11 AIVALT.tii.Zl, TILE, AUt5UUTATED DEPT, GIP MANAGER REV. 2/00 �� 761 TABULATION OF BIDS FOR CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XVI, Received by the City Clerk, City of Miami, Florida at 11,30 a.m. on July 5, 2000. JOB NO. B4624B (INENRMAL), B-4624B [: Bidder F & L CONSTRUCTION MEF CONSTRUCTION, INC. EDFM CORPORATION Address 8095 W. 21 LANE 5040 N.W. 7 ST 1022 N.W. 54 ST HIALEAH, FL. 33016 SUITE 410 MIAMI, FL 33126 MIAMI, FL 33127 Located In the City of Miami N YES NO lkensed & Gmred as Per City Code t Metro D4 YES YES YES Bid Bond Amount B.B. 5% B.B. 5% B.B. 5% Irregularities Minority Owned YES YES YES TOTAL BIDTHE TOTAL OF ITEMS 1 THROUGH 13 BASED ON A SEVENTY (70) WORKING DAYS COM- PLETION TIME, THE SUM OF $ 143,625.00 169,450.00 219,835.00 IRREGULARITIES LEGEND A -No Power-of-Attorney THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED THAT B -No Affidavit as to Capital & Surplus of Bonding Company THE LOWEST RESPONSIBLE AND RESPONSIVE BIDDER IS- C - Corrected Extensions F & L CONSTRUCTION, INC, IN THE AMOUNT OF $143,625.00 D —Proposal Unsigned or Improperly Signed or No Corporate Seal FOR THE TOTAL BID. E — Incomplete Extensions (Missing Primary Office Location Form) F — Non-responsive bid (Missing copy of Certificate of Competency) G — Improper Bid Bond f 5 oO H — Corrected Bid „ I — No First Source Hiring Compliance Statement J — No Minority Compliance Statement JOB NO. K-No Duplicate Bid Proposal PAGE: 1 ❑F 1 B-4624B Prep, By- MARIA LOPEZ Check By- CESAR GONZALEZ r� TO: Carlos A. Gimenez City Manager FROM: John H. Jac on, Director Public Works Department CITY OF MIAMI. FLORIDA INTER -OFFICE MEMORANDUM DATE : June 14, 2000 FELE: B-4624 SUBJECT: Emergency Finding Waiver of Formal Bids for Citywide Sidewalk Replacement Phase XVI REFERENCES: ENCLOSURES: On June 8, 2000, the City Commission rejected the bid of M.E.F. Construction for the project entitled "Citywide Sidewalk Replacement Project — Phase XVI, B-4624". The City Commission passed a motion to divide the project into smaller components in order to provide ample opportunity for competitive bidding and waiver of the formal bidding process. The reason behind this is to allow other competitive bidders to submit bid bond vouchers which are applicable to bids under $200,000.00. ` Based on my investigation of the citywide condition of the sidewalks and curbs, I believe that an EMERGENCY exists to replace hazardous sidewalks which justifies the selection of Contractors by informal bids. Due to the condition of the sidewalks and curbs, there is an urgent need to have the replacements done. Further, considering that the City Commission passed a motion to divide this project into smaller components, I recommend that this project be divided into two parts allowing competitive bidding with two contracts under $200,000.00 each. Because of the sidewalk and curb conditions there is a need for extraordinary measures to protect the health, safety and welfare of the community. In order to initiate the construction of the sidewalk and curb in locations citywide as soon as possible, formal competitive sealed bid procedures shall be waived for the procurement of contracting services required for said EMERGENCY pursuant to sections 18-83 and 18-84 of the City Code. Informal bids for parts "A" and "B" shall be obtained and two separate contracts will be awarded to the lowest responsive and qualified bidders. All costs of these two projects will be funded from the CIP No. 341170. This action shall be ratified at the next available City Commission meeting. 4 Approved: Date: ` vU vz. A. imenez ity Manage FKR/J J/LJH/ee c: Frank K. Rollason, Assistant City Manager Judy S. Carter, Chief Procurement Officer, Purchasing Department Albert Dominguez, Assistant Director, Public Works Department Leonard J. Helmers, Chief Civil Engineer, Public Works Department 00�' 1l�JL CITY OF MIAMI, FLORIDA Is INTER -OFFICE MEMORANDUM TO: Walter J. Foeman DATE: August 15, 2000 FILE City Clerk SUBJECT: Request to publish Notice of Public Hearing for Waiving Formal \ Competitive Bid Procedures for Citywide Sidewalk Replacement FROM: Eo -John H. Jackson, Director REFERENCES: Project Phase 16(Second Bidding) Public Works Department ENCLOSURES: Please make arrangements to publish a Notice of Public Hearing for discussions pertaining to the waiving of formal competitive sealed bid procedures for the project entitled Citywide Sidewalk Replacement Project Phase 16 (Second Bidding), B-4624, Bids "A" and "B" The public hearing has been scheduled for September 14, 2000. Please charge to Index Code 319201-287. APPROVED. Elvi G. Alonso Agenda Coordinator DATE: 3o 4 d JHJ/LH/mm c: Cost Analysis Len Helmers Central CitywideSidewalk-2ndbid-84624-MEMO 7431 CITY OF MIAMI, FLORIDA NOTICE OF PUBLIC HEARING A public hearing will be held by the Commission of the City of Miami, Florida, on September 14, 2000, at a.m., in the City Commission Chambers at City Hall, 3500 Pan American Drive, Miami, Florida, for the purpose of hearing objections from any interested parties to the waiving of formal competitive sealed bid procedures for the project entitled CITYWIDE SIDEWALK REPLACEMENT PROJECT PHASE 16 (SECOND BIDDING), B-4624, BIDS WAND'S'. All interested persons are invited to appear and may be heard concerning the proposed sidewalk and curb improvements. Should any person desire to appeal any decision of the City Commission with respect to any matter considered at this hearing, that person shall ensure that a verbatim record of the proceedings is made including all testimony and evidence upon which any appeal may be based. Walter J. Foeman City Clerk Miami, Florida C"deSidewalk-2ndbid-84624-MEMO' s r` `