RESOLUTION NO. 00— 7 1
A RESOLUTION OF THE MIAMI CITY COMMISSION BY
A FOUR FIFTHS (4/5 T11 AFFIRMATIVE VOTE
RATIFYING, APPROVING AND CONFIRMING THE CITY
MANAGER'S FINDING OF AN EMERGENCY AND
WAIVING FORMAL COMPETITIVE SEALED BIDDING
PROCEDURES'; AUTHORIZING THE CITY MANAGER TO
ACQUIRE SERVICES, EQUIPMENT AND/OR MATERIALS
REQUIRED FOR THE DEPARTMENT OF PUBLIC WORK'S
PROJECT ENTITLED "CITYWIDE SIDEWALK
REPLACEMENT PROJECT PHASE 16 (SECOND
BIDDING), 13-4624, BIDS "A AND B", FOR
CONSTRUCTION OF NEW SIDEWALKS AND CURBS
THROUGHOUT THE CITY OF MIAMI FROM WIS'S
ENGINEERING, IN THE PROPOSED AMOUNT OF
$198,111.80 (BID "A"), AND F & L
CONSTRUCTION, INC., IN THE PROPOSED AMOUNT
OF $143,625.00 (BID "B"); ALLOCATING FUNDS
THEREFOR FROM CAPITAL IMPROVEMENT PROJECT
NO. 341170 IN THE AMOUNT OF $341,736.80 TO
COVER CONTRACT(S) COSTS IN THE AMOUNT OF
$31,756.32 AND ESTIMATED EXPENSES INCURRED
BY THE CITY, IN AN ESTIMATED AMOUNT OF
$373,493.12; FURTHER AUTHORIZING THE CITY
MANAGER TO EXECUTE,,CONTRACTS, IN A FORM
ACCEPTABLE TO THE CITY ATTORNEY, WITH WIS'S
ENGINEERING AND F & L CONSTRUCTION, INC.,
FOR SAID PROJECT.
WHEREAS, due to the hazardous condition of the sidewalks
and curbs throughout the City of Miami, the City Manager has
made an emergency finding that a valid public emergency exists
CITY COMMISSION
MEETING OF
5 E p 1 4 2000
Resolution No.
0 0 7 -At
and the immediate construction of new sidewalks and curbs is
necessary to protect the safety and welfare of the citizens of
the City; and
WHEREAS, implementation of required procedures and
scheduling requirements for formal advertising, receipt of bids,
award of contract(s) and processing of contract(s) will
needlessly and unwisely delay the construction of new sidewalks
and curbs for the Department of Public Work's project entitled
"Citywide Sidewalk Replacement Project Phase 16 (Second
Bidding), 13-4624, Bids "A and 1311;' and
WHEREAS, due to the urgent need for immediate sidewalk
replacement, the City Manager and the Director of the Department
of Public Works recommended, and deemed it appropriate, that
informal bidding procedures be solicited to acquire the lowest
and most responsive quotes to provide the required sidewalk and
curb replacement; and
WHEREAS, informal quotes were subsequently solicited by the
Department of Public Works and the quotes submitted by Wis's
Engineering and F & L Construction, Inc. were the lowest and
most responsive quotes received for Bid "A" and Bid "B,"
respectively;
NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE
CITY OF MIAMI,_ FLORIDA:
Page 2 of 4 00-
761
Section 1. The recitals and findings contained in the
Preamble to this Resolution are hereby adopted by reference and
incorporated as if fully set forth in this Section.
Section 2. By a four-fifths (4/5tns) affirmative vote of
the members of the City Commission, the City Manager's finding
that a valid public emergency exists and waiving formal
competitive bidding procedures are hereby ratified, approved and
confirmed.
Section 3. The City Manager is hereby authorized to the
acquire services, equipment and/or materials required for the
Department of Public Work's project entitled "Citywide Sidewalk
Replacement Project Phase 16 (Second Bidding), B-4624, Bids "A
and B", for construction of new sidewalks and curbs throughout
the City of Miami from Wis's Engineering, in the proposed amount
of $198,111.80 (Bid "A"), and F & L Construction, Inc., in the
proposed amount of $143,625.00 (Bid "B").
Section 4. The total estimated project costs of
$373,493.12 are hereby allocated from Capital Improvement
Project No. 341170, consisting of contract(s) costs in the
amount of $341,736.80 and estimated project expenses incurred by
the City in the amount of $31,756.32.
Page 3 of 4 �.
Section 5. The City Manager is hereby authorized to
enter into a contract, in a form acceptable to the City
Attorney, with WisIs Engineering and F & L :Construction, Inc.
for said purpose.
Section 6. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor 2/
PASSED AND ADOPTED this 14th day of September 2000.
JOE CAROLLO, MAYOR
In accordance with Miami Code Sec. 2-36, since the Meyer dId not IndlCM approV , of
this legislation by signing it in the designated dace provided, said legislation 1,01-1
becomes effective with the elapse/,of 'n (10) days r m the dt of ommis yt
regarding same, without the Ma or xerci
ATTEST:
Wait J. Fo an, Clerk
WALTER J.
ATTORNEY
4631 :BSS
CITY CLERK
F
RRECTNESS:&
1� The herein authorization is further subject to compliance with all
requirements that may be imposed by the City Attorney, including but
not limited to those prescribed by applicable City Charter and Code
provisions.
If the Mayor does not sign this Resolution, it shall become effective
at the end of ten calendar days from the date it was passed and
adopted. If the Mayor vetoes this Resolution, it shall become
effective immediately upon override of the veto by the City Commission.
Page 4 of 4 A4-- 0
0.
CITY OF MIAMI, FLORIDA 0 `13
INTER -OFFICE MEMORANDUM
TO: The Honorable Mayor and
Members of the City Commission
FROM:Gimenez
ManagerCity
RECOMMENDATION
DATE: AU: ' - 9 `77�..' '.. FILE
SUBJECT: Emergency Project —
Citywide Sidewalk Replacement
Project 16 Phase(Second Bidding)
REFERENCES:
ENCLOSURES:
It is respectfully recommended that the City Commission adopt the attached Resolution
ratifying the City Manager's written finding that a valid emergency exists concerning the
condition of the sidewalks throughout the City, and waiving formal competitive bidding
procedures and authorizing the City Manager to accept the bid of Wis's Engineering as
the lowest responsive and responsible bid in the amount of $198,111.80 for Bid "A" and
to accept the bid of F & L Construction, Inc., as the lowest responsive and responsible
bid in the amount of $143,625.00for Bid "B".
BACKGROUND
On June 8, 2000, the City Commission rejected the bid of M.E.F. Construction for the
project entitled "Citywide Sidewalk Replacement Project — Phase 16, B-4624". The City
Commission passed a motion to divide the project into smaller components in order to
provide ample opportunity for competitive bidding and waiver of the formal bidding
process. The reason behind this is to allow other competitive bidders to submit bid bond
vouchers which are applicable to bids under $200,000.00.
Based on my investigation of the citywide condition of the sidewalks and curbs, I believe
that an EMERGENCY exists to replace hazardous sidewalks which justifies the selection
of Contractors by informal bids. Due to the condition of the sidewalks and curbs, there is
an urgent need to have the replacements done. Further, considering that the City
Commission passed a motion to divide this project into smaller components, the project
was divided into two parts allowing more opportunity for bidders with two contracts
under $200,000.00 each.
Because of the sidewalk and curb conditions there is a need for extraordinary measures
to protect the health, safety and welfare of the community. In order to initiate the
construction of the sidewalk and curb in locations citywide as soon as possible, formal
competitive sealed bid procedures shall be waived for the procurement of contracting
services required for said EMERGENCY pursuant to Sections 18-83 and 18-84 of the
City Code. Informal bids for parts "A" and "B" were obtained and two separate contracts
will be awarded to the lowest responsive and qualified bidders. All costs of these two
projects'will be funded from CIP Project No. 341170.
�/-
wa- 0 40"
CAG/FKR/JHJ/mm
CitywideSidewalk-2ndbid-64624-MEMO ;
Bud etary Impact An 's
AUG 1 62000
CIP DIVISION
1. Department e) 64-1 Divisioa� SSS/ 6
2. Agenda Item # (-tf available)
3. Title and brief description
ofe on or attach o�rdin solution:
J
2,
4. Is this item related to revenue? NO: -L,---YES of yes,!skip.to item #7.)
5. Are there sufficient funds in Line Item?
YES: _ Index Code Minor Obj. Code Amount $
NO: _ Complete the following questions.
6. Source of funds: Amount budgeted in the Line Item $
Amount needed in the Line Item $
Sufficient funds will be transferred from the following line items:
ACTION ACCOUNT NUMBER ACCOUNT NAME TOTAL
IndexfMinor Ob'ectlPro'ect No.
From $
To $
7. Any additional comments?
Approved by:
8.
i
Departmen ee
/,SGb
Date
00- 7
i
Department of M:.: and Budpt 1 .r l . d v, =
, . :
I
Date /
00- 7
•
•
FACT SHEET
DEPARTMENT OF PUBLIC WORKS
DATE: 8 / 11 / 2000
JOB NUMBER: B -4624A
PROJECT NAME: Citywide Sidewalk Replacement Project - Phase XVI
CIP NUMBER: 341170
LOCATION: Citywide
PROJECT MANAGER / EXT. No.: L. Helmers / E. Estevez
OTHER TYPE:
FEDERAL (C.D.B.G.):
ASSOCIATED DEPARTMENT: Public Works
S.N.P.B. 0
ASSESSABLE: 0
EMERGENCY:
COMMISSIONER DISTRICT All
BID REQUEST: FORMAL INFORMAL
RESOLUTION No.:
DESCRIPTION: This proj4ct consists of the removal and replacement of approximatelly 42,500 square feet of concrete
sidewalk. The proposed improvements include the clearing and grading, pruningand removing tree roots and limbs,
constructing new 4" and 6" concrete sidewalk, incidental surface restoration and adjusting water meters and utility boxes as
directed by the Engineer.
(IF NECESSARY. CONTINUE ON THE BACK)
SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST
COST (% OF CONST. COST)
ADVERTISING $ -- (E) $ 500.00 (a)
OUTSIDE DESIGN $ -- $ --
TESTINGS / SURVEY / PLAT $ -- $ -- (E)
P.W. DESIGN & BID DOCUMMENTS $ 3,962.24 (E) $ -- 2 %
CONSTRUCTION $ -- $ 198,111.80 (BID)
CONSTRUCTION ADMINISTRATION $ 13,867.83 (BID) $ -- 7 %
OTHER: $ -- $ --
9 %
(E) - ESTIMATE TOTAL $ 216,441.87 (TOTAL ENG. FEE)
ESTIMATED CONST. COST $ 183,000
CONTRACTOR'S INFORMATION:
CLASS: O Ru Fs__l NON - MINORITY
TYPE OF WORK: General Engineering MINORITY 0 0
YEARS OF ESTABLISHMENT: 4 LICENSE 369292-9
NAME: Wis's Engineering TELEPHONE: (305) 758-4482
ADDRESS: 174 N.E. 78 ST
CITY, STATE, ZIP: Miami, Florida 33138 CLASS: J = JOINT P = PRIME S = SUB
MINORITY: B = BLACK H = HISPANIC F = FEMALE
CONTACT PERSON:V1/isconsin Mc. Lachlan, Owner
SUB -CONTRACTORS:
NAMES:
UUPIES: ASSISTAVIP-
N^TA _
DAIRR
EUTUS, GUST ANALYSIS, FILE, ASSOCIATED DEPT, CIP MANAGER REV. 2/00
V ' + 6
TABULATION OF BIDS FOR JOB NO.
CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XVI, B4624A (INFORMAL), B-4624A
Received by the City Clerk, City of Miami, Florida at 11j00 a.m. on July 5, 2000.
Bidder WIS'S ENGINEERING
Address 174 NE 78 ST
MIAMI, FL 33138
Located In the City of Miami YES
lkensed & kar d is Per City code & Metro Ov! YES
Bid Bond Amount B.B. VOUCHER
Irregularities B, H
Minority Owned YES
TOTAL BID,THE TOTAL OF ITEMS
1 THROUGH 13 BASED ON A
SEVENTY (70) WORKING DAYS COM—
PLETION TIME, THE SUM OF 198,111.80
i
IRREGULARITIES LEGEND
_.No Power-of-Attorney THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED THAT
B--No Affidavit as to Capital & Surplus of Bonding Company THE LOWEST RESPONSIBLE AND RESPONSIVE BIDDER IS
C —Corrected Extensions WIS'S ENGINEERING IN THE AMOUNT OF $198,111.80
D —Proposal Unsigned or Improperly Signed or No Corporate Seal FOR THE TOTAL BID.
E —Incomplete Extensions (Missing Primary Office Location Form)
F —hon-responsive bid (Missing copy of Certificate of Competency) tj'
G — Improper Bid Bond V5
H — Corrected Bid
w I — No First Source Hiring Compliance Statement
J — No Minority Compliance Statement JOB NO.
K— No Duplicate Bid Proposal PAGE, 1 OF 1 8-4624A
Prep. By, MARIA LOPEZ Check By, CESAR GONZALEZ
J
11
c:
FACT SHEET
DEPARTMENT OF PUBLIC WORKS
DATE: 8 / 11 / 2000
JOB NUMBER: B -4624B
PROJECT NAME: Citywide Sidewalk Replacement Project - Phase XVI
CIP NUMBER: 341170
LOCATION: Citywide
PROJECT MANAGER / EXT. No.: L. Heimers / E. Estevez
OTHER TYPE:
FEDERAL (C.D.B.G.): 0
ASSOCIATED DEPARTMENT: Public Works
S.N.P.B.
ASSESSABLE: 0
EMERGENCY:
COMMISSIONER DISTRICT All
BID REQUEST: FORMAL INFORMAL
RESOLUTION No.:
DESCRIPTION: This projdct consists of the removal and replacement of approximatelly 42,500 square feet of concrete
sidewalk. The proposed improvements include the cleaning and grading, pruningand removing tree roots and limbs,
constructing new 4" and 6" concrete sidewalk, incidental surface restoration and adjusting water meters and utility boxes as
directed by the Engineer.
(IF NECESSARY, CONTINUE ON THE BACK)
SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST
COST (% OF CONST. COST)
ADVERTISING $ -- (E) $ 500.00 (a)
OUTSIDE DESIGN $ -- $ --
TESTINGS / SURVEY / PLAT $ -- $ -- (E)
P.W. DESIGN & BID DOCUMMENTS $ 2,872.50 (E) $ -- 2 %
CONSTRUCTION $ -- $ 143,625.00 (BID)
CONSTRUCTION ADMINISTRATION $ 10,053.75 (BID) $ -- 7 %
OTHER: $ -- $ --
9 %
(E) - ESTIMATE TOTAL $ 157,051.25 (TOTAL ENG. FEE)
ESTIMATED CONST. COST $ 183,000
CONTRACTOR'S INFORMATION:
CLASS: = Riw = NON - MINORITY
TYPE OF WORK: General Engineering MINORITY Eil IN
YEARS OF ESTABLISHMENT: 4 LICENSE 065430
NAME: F & L Construction Inc. TELEPHONE: (305) 362-7277
ADDRESS: 8095 W 21 Lane
CITY, STATE, ZIP: Miami, Florida 33016 CLASS: J = JOINT P = PRIME S = SUB
CONTACT PERSON:Dello A. Trasobares, Vice -President MINORITY: B = BLACK H = HISPANIC F = FEMALE
SUB -CONTRACTORS:
NAMES:
a.VF'IC.7: A.7.71.7IAItl 1 YIFiEV 1 %JnCo, frU.11 AIVALT.tii.Zl, TILE, AUt5UUTATED DEPT, GIP MANAGER REV. 2/00
�� 761
TABULATION OF BIDS FOR
CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XVI,
Received by the City Clerk, City of Miami, Florida at 11,30 a.m. on July 5, 2000.
JOB NO.
B4624B (INENRMAL), B-4624B
[:
Bidder F & L CONSTRUCTION
MEF CONSTRUCTION, INC. EDFM CORPORATION
Address 8095 W. 21 LANE
5040 N.W. 7 ST 1022 N.W. 54 ST
HIALEAH, FL. 33016
SUITE 410 MIAMI, FL 33126 MIAMI, FL 33127
Located In the City of Miami N
YES NO
lkensed & Gmred as Per City Code t Metro D4 YES
YES YES
Bid Bond Amount B.B. 5%
B.B. 5% B.B. 5%
Irregularities
Minority Owned YES
YES YES
TOTAL BIDTHE TOTAL OF ITEMS
1 THROUGH 13 BASED ON A
SEVENTY (70) WORKING DAYS COM-
PLETION TIME, THE SUM OF $ 143,625.00
169,450.00 219,835.00
IRREGULARITIES LEGEND
A -No Power-of-Attorney THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED THAT
B -No Affidavit as to Capital & Surplus of Bonding Company THE LOWEST RESPONSIBLE AND RESPONSIVE BIDDER IS-
C - Corrected Extensions F & L CONSTRUCTION, INC, IN THE AMOUNT OF $143,625.00
D —Proposal Unsigned or Improperly Signed or No Corporate Seal FOR THE TOTAL BID.
E — Incomplete Extensions (Missing Primary Office Location Form)
F — Non-responsive bid (Missing copy of Certificate of Competency)
G — Improper Bid Bond f 5 oO
H — Corrected Bid
„ I — No First Source Hiring Compliance Statement
J — No Minority Compliance Statement JOB NO.
K-No Duplicate Bid Proposal PAGE: 1 ❑F 1 B-4624B
Prep, By- MARIA LOPEZ Check By- CESAR GONZALEZ
r�
TO: Carlos A. Gimenez
City Manager
FROM:
John H. Jac on, Director
Public Works Department
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
DATE : June 14, 2000 FELE: B-4624
SUBJECT: Emergency Finding Waiver of
Formal Bids for Citywide Sidewalk
Replacement Phase XVI
REFERENCES:
ENCLOSURES:
On June 8, 2000, the City Commission rejected the bid of M.E.F. Construction for the
project entitled "Citywide Sidewalk Replacement Project — Phase XVI, B-4624". The City
Commission passed a motion to divide the project into smaller components in order to
provide ample opportunity for competitive bidding and waiver of the formal bidding
process. The reason behind this is to allow other competitive bidders to submit bid bond
vouchers which are applicable to bids under $200,000.00. `
Based on my investigation of the citywide condition of the sidewalks and curbs, I believe
that an EMERGENCY exists to replace hazardous sidewalks which justifies the selection
of Contractors by informal bids. Due to the condition of the sidewalks and curbs, there is
an urgent need to have the replacements done. Further, considering that the City
Commission passed a motion to divide this project into smaller components, I
recommend that this project be divided into two parts allowing competitive bidding with
two contracts under $200,000.00 each.
Because of the sidewalk and curb conditions there is a need for extraordinary measures
to protect the health, safety and welfare of the community. In order to initiate the
construction of the sidewalk and curb in locations citywide as soon as possible, formal
competitive sealed bid procedures shall be waived for the procurement of contracting
services required for said EMERGENCY pursuant to sections 18-83 and 18-84 of the
City Code. Informal bids for parts "A" and "B" shall be obtained and two separate
contracts will be awarded to the lowest responsive and qualified bidders. All costs of
these two projects will be funded from the CIP No. 341170. This action shall be ratified
at the next available City Commission meeting.
4
Approved: Date: ` vU
vz. A. imenez
ity Manage
FKR/J J/LJH/ee
c: Frank K. Rollason, Assistant City Manager
Judy S. Carter, Chief Procurement Officer, Purchasing Department
Albert Dominguez, Assistant Director, Public Works Department
Leonard J. Helmers, Chief Civil Engineer, Public Works Department
00�' 1l�JL
CITY OF MIAMI, FLORIDA Is
INTER -OFFICE MEMORANDUM
TO: Walter J. Foeman DATE: August 15, 2000 FILE
City Clerk
SUBJECT: Request to publish Notice of
Public Hearing for Waiving Formal
\ Competitive Bid Procedures for
Citywide Sidewalk Replacement
FROM: Eo -John H. Jackson, Director REFERENCES: Project Phase 16(Second Bidding)
Public Works Department ENCLOSURES:
Please make arrangements to publish a Notice of Public Hearing for discussions
pertaining to the waiving of formal competitive sealed bid procedures for the project
entitled Citywide Sidewalk Replacement Project Phase 16 (Second Bidding), B-4624,
Bids "A" and "B"
The public hearing has been scheduled for September 14, 2000.
Please charge to Index Code 319201-287.
APPROVED.
Elvi G. Alonso
Agenda Coordinator
DATE: 3o 4 d
JHJ/LH/mm
c: Cost Analysis
Len Helmers
Central
CitywideSidewalk-2ndbid-84624-MEMO
7431
CITY OF MIAMI, FLORIDA
NOTICE OF PUBLIC HEARING
A public hearing will be held by the Commission of the City of Miami, Florida, on
September 14, 2000, at a.m., in the City Commission Chambers at City Hall,
3500 Pan American Drive, Miami, Florida, for the purpose of hearing objections from any
interested parties to the waiving of formal competitive sealed bid procedures for the
project entitled CITYWIDE SIDEWALK REPLACEMENT PROJECT PHASE 16
(SECOND BIDDING), B-4624, BIDS WAND'S'.
All interested persons are invited to appear and may be heard concerning the proposed
sidewalk and curb improvements. Should any person desire to appeal any decision of
the City Commission with respect to any matter considered at this hearing, that person
shall ensure that a verbatim record of the proceedings is made including all testimony
and evidence upon which any appeal may be based.
Walter J. Foeman
City Clerk
Miami, Florida