Loading...
HomeMy WebLinkAboutR-01-1175J-01--968 10/29/01 RESOLUTION NO. A RESOLUTION OF THE MIAMI CITY COMMISSION ACCEPTING THE BID OF METRO EXPRESS, INC., THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER PURSUANT TO INVITATION FOR BIDS DATED OCTOBER 16, 2001, FOR THE PROJECT ENTITLED "CITYWIDE SIDEWALK REPLACEMENT PROJECT, PHASE XIX, B-4645", IN THE AMOUNT OF $139,200; ALLOCATING FUNDS FROM PROJECT NO. 341183, AS APPROPRIATED BY THE ANNUAL APPROPRIATIONS AND CAPITAL IMPROVEMENT PROJECTS ORDINANCES, AS AMENDED, IN THE AMOUNT OF $139,200 FOR THE CONTRACT COSTS, AND $15,347 FOR EXPENSES, FOR A TOTAL COST OF $154,547; AND AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, FOR SAID PURPOSE. BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The bid of Metro Express, Inc., the lowest responsive and responsible bidder pursuant to Invitations for Bids dated October 16, 2001, in the proposed amount of $139,200, for the project entitled "Citywide Sidewalk Replacement Project, Phase XIX, B-4645", for the total bid of the proposal, based on lump sum and unit prices, is accepted at the price stated herein. Section 2. The total estimated project costs of $154,547 are allocated from Project No. 341183, as appropriated by the Annual. Appropriations and Capital Improvement Projects MEET114C OF NOV 1 5 2001 1 Ordinances, as amended. Total project costs consist of $139,200 for contract costs and $15,347 for estimated expenses incurred by the City. Section 3. The City Manager is authorized" to execute an agreement, in a form acceptable to the City Attorney, with Metro Express, Inc. for the project. Section 4. This Resolution shall become effective immediately upon its adoption and signature of the Mayor./ PASSED AND ADOPTED this 15th day of November , 2001. JOE CAROLLO, MAYOR Ca ,, ' r : s1f "�? 110 i�f7J iP'0`��'iifP, c^x�"^ fe���+ii�;i'��,1 `3Wd("tt�:o Vdti�"i4'J, WEL iu1c:1?ti: ATTEST: WALTER J. FOEMAN CITY CLERiS. ori '' VTL'LLO ITjl TTORNEY W5788:LB 1 The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. 21 If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 2 of 2 �� 0 CITY OF MIAMI, FLORIDA CA -1• INTER -OFFICE MEMORANDUM The Honorable Mayor and Members TO: of the City Commission RECOMMENDATION: DATE : OCT 31 2001 FELE B-4645 Resolution Awarding Contract SUBJECT: for CITYWIDE SIDEWALK REPLACEMENT PROJECT, PHASE XIX, B-4645 REFERENCES: ENCLOSURES: It is respectfully recommended that the City Commission adopt the attached Resolution accepting the bid of Metro Express, Inc., a company located at 3594 S.W. 143 Court, Miami, Florida 33175, whose principal is Delio A. Trasobares, President, for "CITYWIDE SIDEWALK REPLACEMENT PROJECT, PHASE XIX, B-4645", received October 16, 2001 in the amount of $ 139,200 Total Bid; authorizing the City Manager to enter into a contract on behalf of the City. Work History: 1. Citywide Sidewalk Replacement Phase XVIII, B-4638, 2. West end Storm Sewer Outfall, B-5668. BACKGROUND: Amount of Total Bid: $ 139,200. Const. Cost Estimate: $ 180,180. % of Cost Estimate: 77.26% Construction Time: 80 Working Days Source of Funds: Project No. 341183, Annual Appropriations Ordinance, as amended. Minority Representation: 115 invitations mailed to Hispanic, Black and Female -Owned Firms, 10 Contractors picked up specs ( 5 Hispanic, 4 Black, 1 Female) 7 Contractors submitted bid (4 Hispanic, 2 Black, 1 Female) Public Hearings/Notices,: No Discussion: The Department of Public Works has evaluated the bids received on October 16, 2001, and determined that the lowest responsible and responsive bid, in the amount of $ 139,200 is from Metro Express, Inc., a Hispanic - minority controlled corporation. Funds are available to cover the contract cost, and for such incidental items as postage, blueprinting, advertising, reproduction costs, testing, etc. r0ti CAG/FKRIJHJ/JRA/LJH r G • A% Bu getary Impact Analy is 1. Department / C D DivisioCd S/ •� 2. Agenda Item # Cf available) 3. Title and brief description of legislation or attach ordinance/resolution: 2> & 61 1p��z d�=E L=,-" er I 4. Is this item related to revenue? NO: v YES (If yes, skip.to item #7.) 5. Are there sufficient funds in Line Item? YES: _ Index Code Minor Obj. Code Amount $ NO: _ Complete the following questions: 6. Source of funds: Amount budgeted in the Line Item $ Amount needed in the Line Item $ Sufficient funds will be transferred from the following line items: ACTION ACCOUNT NUMBER ACCOUNT NAME TOTAL Index/Minor Object/Project No. From 3,if (33.3)3-30k . 6. 'aiza To 3 1 3. .�' io • 7 c7 roYc l'—v.co 7. Any additional comments? ;a\t Apved by: 8. /o g o if Department DJeewriDesignee, Da FOR is Department of Management and Budget ;,�s ure "'a Data Ya R1 FACT SHEET COPIES: ASSISTANT DIRECTORS, COST ANALYSIS, FILE, ASSOCIATED DEPT, CIP MANAGER 2100 REV. DEPARTMENT OF PUBLIC WORKS DATE: 10 1 18 1 2001 JOB NUMBER: 8-4645 PROJECT NAME: CITYWIDE SIDEWALK REPLACEMENT PROJECT, PHASE XIX CIP NUMBER: 3417$3 LOCATION: CITYWIDE PROJECT MANAGER /EXT. No.: GIOVAIVNI CAMPODONICO/ Ext '1214 OTHER TYPE: FEDERAL (C.D.B.G.): No ASSOCIATED DEPARTMENT: PUBLIC WORKS S.N. P.B. No ASSESSABLE: No EMERGENCY: No COMMISSIONER DISTRICT: ALL BID REQUEST: FORMAL INFORMAL RESOLUTION No,: DESCRIPTION: THIS PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF 55, 000 SQUARE FEET OF CONCRETE SIDEWALK, THE PROPOSED IMPROVEMENT INCLUDES THE CLEARING AND GRADING, PRUNING AND REMOVING ?REE ROOTS AND LIMBS IF NECESSARY, CONSTRUCTING NEW 4 -INCH AND 5 -INCH SIDEWALK INCIDENTAL SURFACE RESTORATION AND ADJUSTING WATER METERS AND UTILITY BOXES AS DIRECTED BY THE ENGINEER. (IF NECESSARY, CONTINUE ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST COST (°% OF CONST. COST) ADVERTISING $ 11000.00 (A) $ (A) OUTSIDE DESIGN $ -- $ -- TESTINGS /SURVEY 1 PIAT $ $ P.W. DESIGN &BID DOCUMENTS $ 3,603.80 (E� $ -- 2 g6 CONSTRUCTION $ -- $ 139, 2DD.00 (BID) CONSTRUCTION ADMINISTRATION $ 9,744.00 (BID) $ -- 7 % OTHER: TESTING $ -- $ 1,000.00 (E} iA1 -ACTUAL 9 % (E)- ESTIMATE TOTAL 154, 547.00 (rorAL ENG. FEE) ESTIMATED CONST. COST $ 160,180-00 CONTRACTOR'S INFORMATION: CLASS: = ME E—sl NON - MINORITY TYPE OF WORK: CONCRETE SIDEWALK MINORITY �B YEARS OF l=S7ABLISHMEN B LICENSE E - 201301 NAME: METRO EXPRESS, INC. TELEPHONE: (306) 469-6288 ADDRESS: 3594 8W 143TH COURTIA CITY, STATE, ZIP: MMI, FLORIDA 33978 CLASS: J - JOINT P � PRIME S - su6 CONTACT PERSON: DELIO A. TRASOBARES, PRESIDENT MINORITY: B =. BLACK H e HISPANIC F =FEMALE SUB -CONTRACTORS: NAMES: TABULATION OF BIDS F❑RJOH N0. CITYWIDE SIDEWALK REPLACEMENT PROJECT - PHASE XIX, B-4645 B-4645 Received by the City Clerk, City of Miami, Florida at 11100 a.rL on October 16, 2001. Bidder METRO EXPRESS, INC MEF CONSTRUCTION, INC. ROYAL ENGINEERING HOMESTEAD COMCRETE L DRARL CONSTRUCTION AFFAIRS REPOR BROTHERS, INC. Address 3594 SW 143 CT 782 N.W. 42 AVE 655 W. FLAGLER ST 209 SW 4 AVE 2651—A NW 20 ST 199 NE 150 ST SUITE 103 MIAMI., FL 33175 SUITE 640, MIAMI, FL 33126 MITL 206, MIAMI, UL 33130 HOMESTEAD, FL 33030 MIAMI, FL 33142 NORTH MIAMI, FL 33181 Located in the City of Miami NO YES YES NO NO NO Lkawd t Inpred as Per Gtr Cade t Metro ft YES YES YES YES YES YES Bid Bond Amount B.B. 57 B.B. 57 BID BOND VOUCHER BID BOND VOUCHER B.B. 5% B.B. 5% Irregutarities Minority Owned YES, H YES, F YES, R YES, H YES, B YES, B TOTAL BIDJHE TOTAL OF ITEMS 1 THROUGH 13 BASED ON EIGHTY (80) WORKING DAYS COMPLETION TIME, THE SUM OF 139,200.00 $ 162,600.00 $ 187,050.00 $ 198,630.00 $ 211,000.00 $ 229,410.00 Bidder P.N.M. CORP. Adoiress 3780 NW 22 AVE. MIAMI, FL 33142 Located In the City of Miami YES LicmW t lrsred as Per 6ty Cork t Metro Ord YES Bid Bond Amount B.B. 57 Irregularities Minority Owned YES, H TOTAL BID:THE TOTAL OF ITEMS 1 THROUGH 13 BASED ON EIGHT (80) WORKING DAYS COMPLETION TIME, THE SUM OF 272,375.00 IRREGULARITIES LEGEND A — No Power-of-Attarney THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED THAT _ B — No Affidavit as to Capital t Surplus of Bondng Company THE LOWEST RESPONSIBLE AND RESPONSIVE BIDDER IS C — Corrected Extensions D Proposal Unsigned or improperly signed No METRO EXPRESS, INC. IN THE AMOUNT OF $139,200.00 C, or Corporate sent E — Incomplete Extensions (Missing Primary Office Location form) FOR THE TOTAL BID. I F Non-responsive YHd (Missing copy of Certificate of Competency) U 114' k� G — Improper Bid Bond ($ 0 H — Corrected old I — No First Source Nixing Compliance Statement U' J— No Minority Compliance Statement JAB N0. K—No Bupticate Bid Proposal PAGE; 1 OF 1 B-4645 Prep. By- GIOVANNI CAMPUBONIC13 Check or LEN HELMERS • CITY OF MIAMI OF THE CITY CLERK BID SECURITY LIST BID ITEM: CITYWIDE SIDEWALK REPLACEMENT PROJECT, PHASE: xIx, B-4646 BID NO: DATE BID(S) OPENED: O1-02-003 OCTOBER 16, 2001 TIME 11:00 a.m. Person receivingbids received (�) envelops on behalf of .n:c} , PUB LIC WORKS � � ! ca �� (Ci De artment - °n l�Gi Yc}H� ? t Co:' (Date} Deputy City Clerk • TO Walter J. Foeman City Clerk FROM: Tony Prat Departm of Public Works t CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM DATE: FILE September 26, 2001 B-4645 SUBJECT: "Citywide Sidewalk Replacement Project, Phase XIX" REFERENCES: ENCLOSURES: 1 Please note that contractors will submit bids for the following project: "CITYWIDE SIDEWALK REPLACEMENT PROJECT, PHASE XIX, B-4645" on Tuesday, October 16th, 2001 at 11:00 A.M. Any bid submitted after the time listed above, will not be accepted. Please make necessary provisions for this bid opening. The Project Manager Giovanni Campodonico, a representative overseeing the project is going to be present at the time of opening. Should there be cancellation or postponement, we will notify you in writing, prior to the opening date of the bids. If you have any questions, please contact me at 416-2131. TP/tp Encl. c: Albert Dominguez Yvette Smith Project Manager File r.a -� — rr7 � 4... m n rn �, w ��,QV --_Km 6 'l BID NO.01-02-003 ri; ADVERTISEMENT FOR BIDS , 3 xp Sealed bids for "CITYWIDE SIDEWALK REPLACEMENT PROJECT, PHASE XIX, B-4645 %willdm received by the City Clerk of the City of Miami, Florida at 11:00 AM on the 16th day of Oct r, 2001, at the City Clerk's Office, first floor of the Miami City Hall, 3500 Pan American Drive, Dinner Key, %111 ami, Florida, 33133, at which time and place they will be publicly opened and read. Any bid submitted after the above appointed time will not be accepted by the City Clerk. The project consists of the removal and replacement of approximately 45,500 square feet of concrete sidewalk with the removal of deteriorated, damaged, or unsafe concrete sidewalks and construction of new concrete sidewalks in locations citywide. The work will also include reinstallation of water meter boxes or similar utility structures located in the sidewalk area, curb and gutter construction, and trimming and removal of tree roots, as necessary, in order to prevent future damage to the new concrete sidewalk. A 100% performance bond is required for this project. Bidders will furnish performance and bid bonds in accordance with Resolutions No. 86-983 and No. 87-915. For technical questions or clarifications regarding lans specifications, or Cityreguirements, please _submit written requests to Mr. Jorge R. Avifi6, P.E.. Assistant Director. Department of Public Works, 444 S.W. 2"0 Avenue, 81AFloor, Miami FL 33130. The written request may be faxed to (305) 416-2153, followed by mailing„ or hand delivering the written copy. Under Miami -Dade County Ordinances # 98-106 and 99-1, there will be a "Cone of Silence" during the bid period and the City's responses to Questions must be in writing only to all bidders. Prospective bidders must have a current certified Contractor's License from the State of Florida Construction Industry License Board for the class of work to be performed, or the appropriate Certificate of Competency or the State Contractor's Certificate of Registration as issued by Miami- Dade County Code, which authorizes the Bidder to perform the proposed work. A General Engineering contractor GEC License shall be required for this prollect. All bids shall be submitted in accordance with the Instructions to Bidders and Specifications. New City regulations will require each bidder to submit proposals in delicate originals. Plans and specifications may be obtained at the Department of Public Works, 444 S.W. 2"— Avenue, 8,n Floor, Miami, Florida 33130, on or after September 28, 2001. There will be a ILO deposit required for the first set of specifications. Specs can also be mailed to bidders upon written request to the Public Works Department including a separate check in the amount of f. Additional sets may be purchased for a non-refundable fee of JL0. Deposits will be refunded only upon return of one set of specifications to the Department of Public Works, unmarked and in good condition within two (2) weeks after the opening of the bids. Bidders are alerted to the provisions of Ordinance Nos. 10062, 10538 and 10332 regarding allocations of contracts to minority vendors, contractors and sub -contractors. THIS PROJECT HAS BEEN DESIGNATED AS A SET- ASIDE FOR CITY OF MIAMI CERTIFIED FEMALE, HISPANIC, OR BLACK -OWNED FIRMS. DETAILS ARE CONTAINED IN BID SPECIFICATIONS. ALL BIDDERS WILL BE REQUIRED TO SUBMIT THEIR CURRENT MIWBE CERTIFICATION, UPON REQUEST. (Ordinance is contained in bid specifications). The City of Miami has adopted Ordinance No. 10032, which implements the "First Source Hiring Agreement", The object of this Ordinance is to provide employment opportunities to City of Miami residents on contracts resulting in the creation of new permanent jobs. Contractors may be eligible for wage reimbursement under this program. For further information contact the Department of Public Works, City of Miami, at (305) 416- 1200. Proposal includes the time of performance, and specifications contain provisions for liquidated damages for failure to complete the work on time. The City Commission reserves the right to waive any informality in any bid, and the City Manager may reject any of all bids, and readvertise. (B-4645.05616) Carlos A. Gimenez City Manager 4