Loading...
HomeMy WebLinkAboutR-01-1067J--01-936 9/2..5/01 RE.SOLUT TON NO. tl I -' j' �f t, d A RESOLUTION OF' THE M.TAMT CITY COMMISSTON ACCEPTING THE BIDS OF 1V,CO EIVVIRONINFNTAF, INC. (PRIMARY) , AND PROJECT DEVELOPMENT GROUP (SECONDARY), THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDERS PURSUANT TO TNVITA'I'ION FOR BTDS NO. 00-01-100, DATED AUGUST 2.7, 2001, FOR TIiF PROVISION Oi' ASBESTOS RF,MOVAL SERVICES FOR THE DEPARTMENT OF RUTT.,nING, ON AN AS-NEPDED CONTRACT BASIS, FOR A PERIOD OF TWO YEARS, WVI'H THE OPTION TO RENEW FOR TWO ADDITTONAL ONE --YEAR PERIODS, IN AN ANNUAL AGGREGATE AMOUNT NOT TO EXCEED $100,000; ALLOCATING FUNDS FROM COMMUNT:TY DEVELOPN.I?N'P PROJECT NO. 799135. X152609. 6. 310. Bi I` RESOLVED BY THE COMMISSION OF TIHE CITY OF MIAMI, F'1,ORIDA: Section 1. The bids of MCO Environmental Inc. (primary), and Project, Development Group (secondary), the lowest responsive and responsible bidders pursuant to 7nv.i.t:at:ion for Bids No. 00-01-200, dated August. 27, 2001, for the provision of asbe,stos removal sc vices for the Department of Building, On an as -needed contract basis, for a period of Lwo years, with the CITY COMMISSION V1EE !;.%1G or 1 ') ltuuoiu4w� iJu. option to renew foi- two additional one-year periods, in an anneal aggzegate arnounL not :.o exceed $100,000, are accepted, with funds allocated from Community Development Project No. 799135.952609.6.390. Section 2. Th:i.s Resol.uti.on shall become, off-ect.ive immediately upon :LLs adop?:lorl and Si gnatu_'t of 1 -he Mayor . V PASSED AND ADOPTEl) this 11th day of October_ , 1200i. JOE C:AROLLO, MAYOR In rccordence, with Minmi Cndc S^r.. P I,, si+iro the Mayor did not ind-'rMr ^n!trn ^! n( regarding sante, without the Mayor U ';;rci- rl e ATTEST: WALTER J. F01,MAN CITY CLERK APPROV,?< AS ,4l0 FO VILARELLO ,.�er['Y ATTORNEY W5678:LB D CORRECTNESS: Walteryl Fgafian. City Clerk 1' If the: Mayor does not: sign Crlis Resolution, it shall iecome c i'i'i : l.i yr a the end of ten calendar days from Lhe da Le a.L was passed and adopted. f Lhe Hayor veLoco I'h.i s Resol uti.on, i t: :aiIai1. ljeco:nc e± LecL i v e iramediately upon ovor•r.ide oL !:tic: veto by the City Commission. Page 2 of 2 , r 7 • CITY OF MIAMI FLORIDA=7 INTER -OFFICE MEMORANDUM TO: The Honorable Mayor and DATE: OLT - j 1_711 FILE: Members of the City Commission SUBiEC7: proposed Resolution for Asbestos Removal Service FROy�N �7 M REFERENCES: IY Carlos A. Gimenez City Manager ENCLOSURES: RECOMMENDATION It is respectfully recommended that the City Commission adopt the attached Resolution accepting the bids from MCO Environmental, Inc., a Hispanic/Dade County vendor, located at 7350 NW 7d, Street, #102, Miami, Florida 33126, and Project Development Group, Inc., a Non -Minority vendor, located at 4100 Powerline Road, Suite 13, Pompano Beach, Florida 33073, as the lowest bidders for the provision of asbestos removal services for the Building Department, on an as needed basis, for a period of two (2) years with the option to extend for two (2) additional one (1) year periods, at a total proposed annual amount of $100,000. Funds are available from the Community Development Block Grant, Account Code No. 799135.452609.6.340. BACKGROUND The City of Miami has quite a few buildings or structures that are considered unsafe. These structures present safety and health problems, as well as eyesores of our community. Many unsafe structures are open, abandoned and a haven for illegal activities such as drug and prostitution. Resolving the safety hazard that these properties pose is our main concern, but indirectly we also eliminate other problems associated with them. The Building Department enforces the South Florida Building Code in order to have these properties repaired or demolished. The cases prepared by the department are presented before the Unsafe Structures Board of Miami -bade County. When the board rules that a property must be demolished, Florida Statutes mandate that asbestos be removed, if deemed necessary, by a. testing laboratory. Removal of asbestos must be done by certified contractors in order to be done properly and protect lives. Funds for this service are available from the Community Development Block Grant, Project No. 799135, in a proposed annual amount of $100,000.00 4 .40,910`. CAG/DB/HL/RB c �._10G7 TO: Carlos A. Gimenez City Manager FROM: He�Linna.rector Building Department CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM DATE : September 5, 2001 FILE SUBJECT: Accepting Bids for Asbestos Removal Services Bid #! 00-01-200 REFERENCES: E14CLOSURES: The Building Department has verified that Rinds are Available with the Department of Budget & Management Analysis for asbestos removal services, for a total amount of $100,000.00. Funds are available from Community Development Block Grant, Project 799135.452609.6.340. BUDGETARY REVIEW & APPROVED BY: �. Linda Haskins, Director Department of Budget &. Management Analysis CAG/DB/HL/rb Date:_�c��— BID NUMBER: 00-01--200 BID AWARD RECOMMENDATION FORM COMMODITY/SERVICE: Asbestos Removal services DEPARTMENT / DIVISION: Building and Zoning TERM OF CONTRACT: Two years with OTR for 2 additional one year periods NUMBER OF BIDS DISTRIBUTED: _ 52 NUMBER OF BIDS RECEIVED: 10 METHOD OF AWARD: Tn the 2 lowest responsible and responsive bidders, with the lowest deemed the_primary, vendors and the next lowest the secondary vendor. RECOMMENDED VENDOR(S): STATUS: CONTRACT VALUE: #1 MCO Environmental Inc. #2 Project Development Group TOTAL: $100,000.00 THE FOLLOWING TO BE COMPLETED BY USER DEPARTMENT: JUSTIFICATION: The Building Department enforces the South Florida Building Code in order to have open, vacant and abandoned properties repaired or demolished. The cases are presented before the Unsafe Structures Board of Miami -Dade County. When the Board rules that a property must be demolished, Florida Statutes mandates that asbestos be removed, if deemed necessary, by a testing laboratory. Removal of asbestos must be done by a certified contractor in order to be done properly and protect lives. ACCOUNT CODE(S): 799135.452609 — DEPARTMENT APPROVAL: BUDGET REVIEW APPROVAL: (See Budget Memo) Department Director/ Linda M. Haskins Designee Director OTHER FUNDING APPROVALS, IF APPLICABLE: PAGE 2 OF 2 PURCHASING APPROVAL: ky S. Carter Director TITLE: " Primary V r t* Secondary Vendor APPROVED BY•�' i '/ Approved by: Judy S. Carter -�Director/ Designee hief Procurement Office, Date: �t/6 %/ `/ / Date: l'leparcd by: Pamela Bums, 8.!2712001 BID TABULAWN ' ASBESTOS REAfOERVICES Page 9 1 BID 00-01-200 MCO Enviornmental Inc., ri Project Development Group ;; Sat's Abatement Asbestos Certified 7350 N.W. 7th St., #102 1941 NW 40 Court .` -; 301 NW 36 Si 'Technicians, Inc. (ACT) >: Miami, Fla. 33126 Pompano Beach, Ft 33064 Miami, FI. 33127 i. 6409 Land O Lakes Blvd. , Dade Co. /Hispanic Non Local/Non Minority Miami Dade C.o/Fomale Land O Lakes, Fl. 34639 Non-LocaltNon-Minority ITEM 11 DESCRIPTION COST COST COST COST FLOORS (single or multiple layers) a) 'rile I) Concrete substrate ". $ 1.00 sq.fl,$ 1.25 sq.ft. S 2.50 sq.ft. $ 2.50 sq.ft 2) Wood or plywood substrate S 1.25 sq.n. $ 1.65 sy.ft. S 3,50 sq.ft. S 3.00 sq.ft b) Linoleum 1) Concrete substrate S 2.00 sq.ft. $ 1.75 sq.ft. 3; S 3.50 sq.ft. $ 3.00 sq.ft 2) Wood or plywood substrate S 2.25 sq.fl. S 2.25 sq.ft. S 4.50 Sq.ft. S 3.50 sq.ft 2 WALLS a) Wallboard or Drywall $ 1.50 sq.fl.$ 1.50 sq.ft, S 2.50 sq.ft. S 1.25 sq•ft. b) Plaster S 3.00 sq.11. $ 3.25 sq.ft. S 3.80 sq.ft. " S 4.00 sq.ft. c) Tmnsitc >' S 4.00 sq.ft. $ 1.75 sq.ft. ; ; S 2.75 sq.fl. S I.50 sq.ft 3 CEILINGS a) Spray on fireproofing ' $ 5.00 sq.n. $ 10.00 sq.ft. $ 6.00 sq.ft. : ; $ 15.00 sq,n b) Trowel on material $ 5.00 sq.fl, $ 7.00 sq.ft. 1 $ 6,50 sq.ft. S 10.00 sq.ft c) Acoustic cciling'popcom' $ 4.00 sq.11, $ 3.50 sq.ft. $ 6.00 sgJ1, $ 3.00 sq.ft. d) Ceiling tilt 1) 2'0'suspended(incl.susp.sys) ". S 1.00 sq.ft. ,;• S 1.50 sq.11. S 4.00 sq.11. .' $ 1.00 sq.11 2) I'xl" or less S 1.00 sq.11. " $ 1.25 sq.ft, ,': S 4.00 sq.ft. $ 1.00 sq.ft. 4 PIPES (diameter size incl, asbestos insulation a) Less than 4" in diameter S 4.00 in.ft. '. S 4.00 in.n. '; S 5.50 in.ft. S 6,00 !n.ft. b) 4" tog" b 4.00 in.ft. $ 4.50 in.11. S 10.00 in.n. $ 7.00 :n.11. c) 8" to 12" S 4.00 in•11. $ 5 25 in.ft: $ 12.00 inM. S 10.00 in.n. d) Over 12" $ 7.00 in•n. $ 6.50 in.ft. S 12.00 in. n. S 15.00 in.fl• $ BOILER & TANK INSULATION $ 6.OD sq.ft. $ 9•50 sq.ft. S 12.00 sq.ft. S 10.00 sq.ft. 6 ROOF a) Flashing and parapets material S 2.00 sq,ft, S 2.50 sq.fl. S 2.75 sq.ft. S 3.00 sq.ft. 1, b) Membrana deck material $ 1.50 sq.fl. $ 3.50 sq.fl. S 2.25 sq.ft. S 3:00 sq.ft. " Award basad on above items 'total nl'nbove, Items 1-6 $ 59.50 $ 72.40 S 119.05 S 102.75 Optional Items below: 7 Bulk Sample Analysis, eta S 25.00 ea $ 9.00 ca S 13.00 ca $ 30.00 ea R ASBESTOS SURVEYS: Single Family Residential $ 500.00 ea S 750.00 ea ' S 720.00 ca S 1,000.00 ea Commercial I-1,000 sq. ft. S 600.00 ca • depends on size S 640.00 ca Commercial: 1001 - 5,000 sq. ft. $ 1,000.00 ea S 800,00 ea Commercial: 5,001 - 10,000 sq, ft. $ 1,500.00 ea S 11040.00 ea 1324Commerciab over 10, 000 sq n S 3,000.00 ca S 1,600.00 ea 9 Prof. Asbestos Consulting Svcs 20% mkup 10% mkup 20% mkup `.' 10% mkup 10 Special Jobs 20% mkup 10% mkup 20% mkup 1S°u mkup 1 Temp Water & Electric 20% mkup 10% mkup i 20% mkup •= 6% mkup 12 Landfill waste disposal 20% mkup 10% mkup 20% mkup 10% mkup " Primary V r t* Secondary Vendor APPROVED BY•�' i '/ Approved by: Judy S. Carter -�Director/ Designee hief Procurement Office, Date: �t/6 %/ `/ / Date: l'leparcd by: Pamela Bums, 8.!2712001 APPROVED BY' udy S. Carter hief Procurement Officer Date: Prepared by: Pamela Sums, 8/27/2001 }I -1.0G7 BID TABULATION ASBESTOS REMOVAL SERVO PagelY 2 BID 00-01-200 7 American Environmenta EcoTeeh Environmental '. t + ppC General Contractors, Ine.� = Wortech Associates, Inc. Contractors, lr1c. ;ta Contractors, Inc. r:: 1860 NW 21 Terrace i< 3337 W. Atlantic Blvd, 022 900 Stillwater Dr. . 1327 NE 166 St. ; Miami, Fla. 33142 Pompano Bch., Fla. 33069 >; Miami Beach, Fl. 33141: •! N. Miami Bch, Fl. 33162 Miami Dade Co/NonMinority f; Non -Locate Non -Minority Miami Dade Co/NonMinority,', ITEM 0 DESCRIPTION i~1 COST '' COST COST COST I FLOORS (single or multiple layers) " ": a) Tile t t 1)Concrete substrate ':. S 5.00 sq.R.S1.65 sq.ft' S1.80 sq.ft. S 1.22 sq.A• 2) Wood or plywood substrate k S 5.00 sq.fl. f' .' S 2.50 sq.ft. ." S 2.10 sq.ft. 5 L37 sq.R. b) Linoleum 1) Concrete substrate j „ S 5.00 sq.fl. f: 1 S 3.00 sq.ft. } S 3.25 sq.ft. ' ' S 1.42 sq.fl. 2) Wood or plywood substrate S 5.00 sq•R.j'`? S 4.00 sq.ft. ; ; S 3.50 sq.fl. S 1.57 sq.R. 2 WALLS .` a) Wallboard or Drywall : ; S 4.00 sq.ft. 1;: S 2.50 sq.ft. ;+ $ 2.50 sq.fl. S 2.08 sq. R. b) Plaster $ 4.00 sq.ft. 2.50 sq.fl. , 5 3.00 sq.ft. S 3.12 sq.ft. c) Transits ' S 4.00 !-i $ 3.50 ; ` S 3.50 S 2.10 sq.ft.`? 3 CEILINGS a) Spray on fireproofing , S 8.00 sq ft.�,r? S 5,00 sq.R, ''! S 4.50 sq.ft. S 5.30 sq.fl: b) Trowel on material 1; S 8.00 sq.fl. #;' $ 5.00 sq.fl. S 4.50 sq.fl. S 6.30 sq•tl. C) Acousticcciling'popcorn' i;; ^ : S 8.00 sq.ft, ;: 1 S 5.00 sq.fl. S 3.00 sq.R. ':-: $ 2.80 sq•fl. d) Ceiling the { i 1) TO' suspended (incl. susp.sys.)F 3 S 3.00 N.1t..;t, S 2.25 sq.ft. S 1.75 sq. fl S 2.37 sq.11. 2) I'xl" or less •r S 3.00 sq.0. 4':1 S 2.00 sq.fl. S 1.75 sq,R. % ! S 2.60 sq. R. 4 PIPES (diameter size incl. asbestos insulation) a) Less than 4" in diameter �`'.: S IOAU in.fl. 1' •' S 5.00 in.R. S 5.50 in.ft• S 6.00 in.fl. b) 4" to R" $ 10.00 in.fl. : S 7.00 in.fl. S 6.75 in.fl, S 6.00 in.ft. c 8" to 12" 1 $ 15,00 in.fl. ; ' S 5.00 in.R. �'; 5 8.00 in.fl. S 8.00 in.fi. d) Over 12" ; $ 20.00 in.fl. :. S 5.00 in.R. $ 12.00 in.fl. S 14.00 in.R. 5 BOILER & TANK INSULATION S 20.00 %ft. S 7.00 sq.fl. ` . S 8.50 sq.fl. $ 8.30 sq.ft. 6 ROOF a) Flashing and parapets material r '1 S 8.00 sq.ft. S 1.00 sq.R. T• $ 4.50 sq. 11. S 2.70 sq.ft. b) Membrane deck material $ 5.00 sq.fl. i'.: S 1.00 sq. ft. S 2.00 sq.R. S 1.80 sq,ft. Award based on above items Total of above, Items 1-6 S 150.00 <' S 72.90 '. $ 82.40 S 80.05 Wtional Items below: ' 7 Bulk Sample Analysis, etc. -' S 55.00 ea S 5.00 ea ". S 25.00 ea S 7.00 ea 8 ASBESTOS SURVEYS: I Single Family Residential ; S 850.00 ca , ; S 300.00 ea S 450.00 ea S 275.00 ea Commercial 1.1,000 sq. Fl. S 1,000.00 ea S 300.00 ea ! S 450.00 ea p Commercial: 1001 - 5,000.q. fl. S1,000.00 ea S �'' 300.00 ea S 1600.00 ea ea Commercial: 5,001 - 10,000sq• R. r: i $ 1,500.00 ea I'S 300.00 ea 1 5 900.00 ca ca Commercial: over 10, 000 sq. R. S 2,000.00 ea S 450.00 ea ! S 1,500.00 ea ca 9 Prof. Asbestos Consulting Svcs 1 ` 30% mkupt -i 10% mkup 15% mkup 01% mkup 10 Special Jobs 30% mkup; ` 15% mkup 15% mkup mkup Il Temp Water&Electric r 30% mkup'' 15°'o mkup 15% mkup _ 21% rnkup 12 Landfill waste disposal 30% mkup:,:.! 15% mkup 15% mkup : 04% mkup APPROVED BY' udy S. Carter hief Procurement Officer Date: Prepared by: Pamela Sums, 8/27/2001 }I -1.0G7 Paige # 3 *1DD TABULATION AS8REMOVAL SERVICES NO. 00-01-200 Date: Prepared by- 1'amcla hums, 927Q001 • Decon Environmental & +;. Quality Specialties, Inc. Engineering, Inc. 501 Westover Ave. 2652 NW 31 Ave Hopewell, Va. 23860 Ft. Lauderdale, Fla. 333 11;Non Local/Non Minority Non Local/Non Alinority ITEM 0 DESCRIPTION COST COST I FLOORS (single or multiple layers) a) Tile 1) Concrete substrate S 6.00 sq.ft. S 2.00 sq.R. 2) Wood or plywood substrate S 6.50 sq.ft. ,: S 2.25 sq.ft. b) Linoleum 1) Concrete substrate S 7.00 sq.ft. _ S 2.25 sq.ft. 2) Wood or plywood substrate $ 7.50 sq.R, S 2.50 sq.ft. 2 WALLS a) Wallboard or Drywall S 6.00 sq.ft. 5 6.00 sq.ft. b) Plaster S 8.00 sq.ft. S 6.00 sq.ft. c) Transite S 6.00 i•; S 1.50 3 CEILINGS a) Spray on fire proofing S 9.50 sq.R. '. S 5.50 sq, ft. b) Trowel on material $ 9.50 sq.R, .`: S 6.00 sq.ft. c) Acoustic ceiling 'popcorn' ••' sq.ft, .", S 5.50 sq. ft. •'` d) Cciling tilc 1) 2'x4' suspended (incl. susp.sys.) S 4.00 sq.ft. ; ` S 2.75 sq.11. 2) 1'x l" or less S 3.50 sq.ft. ' 4 3.00 sq.ft. 4 PIPES (diameter size incl. asbestos insulation ) n) Less than 4" in diameter S 8.75 in.ft. S 8.00 in.ft. b) 4" tog" $ 8.75 in.ft. :: $ 8.50 inA. C) 8" to 12" S 11.50 inSt. ; `: S 10.00 in.ft. d) Over 12" S 12.00 in.ft. S 14.00 in.ft. 5 BOILER & TANK INSULATION S 15.00 sq.ft. S 7.00 sq. 11. 6 ROOF a) Flasbing and parapets material $ 4.00 sq.ft, .. S 7.00 sq.fl. b) Membrane deck material S 3.75 sq.ft. =' S 4.00 sq.ft. Award based on above items Total of above, Items 1.6 S 137.25 $ 103.75 QgtiiMB M s below: 7 Bulk Sample Analysis, etc. S 55.00 ca S 12.00 ea 8 ASBESTOS SURVEYS: Single Family Residential $ 850.00 ea S 2,000.00 ca Commercial 1.1,000 sq. ft. $ 1.000.00 ua Commercial: 1001 - 5,000 sq. ft. 5 1,000.00 ea Commercial: 5,00t - 10,000 sq. ft. S 1.500.00 ea 324Commcrcial: over 10, 000 sq. ft. S 2,000.00 ea H Prof. Asbestos Consulting Svcs $ 0.30 mkup 5 5% mkup 10 Special Jobs S 0.30 mkup r'' 15% mkup I 1 'Temp Water B: Electric $ 0.30 rnkup ;. ' 15019 mkup 12 landfill waste disposal S 0.30 mkup 15% mkup Com` e APPROVED BYt udy S. Carter , Chef Procurement Officer Date: Prepared by- 1'amcla hums, 927Q001 • • i CIT)' OF MIAMI OF THE CITY CLERK B1DSECMT_ N' LIST BID ITEM: ASBESTOS REMOVAL SERVICES BID NO: 00-01-200 DATE HID(S) OPENED:. AUGUST ?0, 2001 TIME 10:00 a.m. BIDDER TOTAL BID AMOUN BID BOND (ER) CASHIER'S CHECK RECON ENVIRONMENTAL & ENG. See attached bid WORTECII ASSOCIATES, INC. QUALITY SPECIALTIES, INC. It It DPC GENERAL CONTRACTORS, INC. ECOTECH ENVIRONMENTAL INC. " 41ERICAN ENVIRONMENTAL CONTRACTORS, INC. " SAL'S ABATEMENT CORP. PROJECT DEVELOPMENT GRAUP. " to MCO ENVIRONMENTAL, INC. it " ASBESTOS CERTIFIES TECHNICIANS, INC. We receive only one coy of the NO BID J J SOSA & ASSOCIATES, INC. R. L. SOUM CONSTRUCTION EVANS ENVIRONMENTAL ENVIRQ6MENTAL CONTRACTORS, INC. "Offers from the v;:I; 1--hrd het,!n re the o,11 pert receivedime y as III i r►�^�•f� 0;�en`aq other offers subm'1 M . • drt ,, lttr e r , A l En behalf of G PWon receiving bid(s) PROCUREMENT DEPARTMENT an (City Department) SIGNED` Deputy City CI rk CITY OF MIAMI ADVERTISEMENT FOR BIDS Sealed bids will be received by the City of Miami City Clerk at his office located at City Hall, 3500 Pan American Drive, Miami, FL 33133 for the following: BID NO. 00-01-200 ASBESTOS REMOVAL SERVICES OPENING DATE: 10:00 A.M. MONDAY, AUGUST 20, 2001 (Deadline for Request for additional information/clarification: August 13, 2001) VOLUNTARY pre-bid conference will be held at the Miami Riverside Center Bid . 444 SW 2 nd Ave., Miami, Florida, (meet at the conference room on the 6!floor) August 9, 2001, at 10:00 a.m. Detailed specifications for this Bid are available upon request at the City of Miami, Purchasing Department, 444 SW 2nd Avenue, Sixth Floor, Miami, FL 33130 or download from City's website at www.ei.miami.Mus. Telephone No. 416-1906. THIS BID SOLICITATION IS SUBJECT TO THE "CONE OF SILENCE" IN ACCORDANCE WITH MIAMI-DADE COUNTY CODE SECTION 2-11.1., AS AMENDED (PLEASE PRINT THIS SECTION IN BOLD PRINT). Carlos A. Gimenez CITY OF MIAMI City Manager LOGO AD NO. 7198 07198 City of Miami This number Must appear in the REQUISITION FOR ADVERTISEMENT advertisement. INSTRUCTIONS: P1:•,i,! tvL)e,and attach a cony of the advertw nt with this reaulaitwon. 1. Department: 2. Division: Inspections/Unsafe: structtire 3 is a confirmation: 5. Prepared by: , v()IIY Dosqvw Yes No 6. Size of advertisement: 7. Starting date: 8. Telephone number. 9. Number of times this advertisement is to be 10. Type of advertisement: publi hed- ONCY',' Legal LJ Classified Display 11. Remarks; ASBP,'S'f0,9 REMOVAL SE.14VTCES 1111) NO. 00-01-200 12 Publication Date(s) of Invoice NO. Amount r I -Advertisement ?AfAkil' 'r"IMI.-M 13. Approved Disapproved Department Director/Designee Date Approved for Payment Date C=CjSiR6 503 Rev. 12/89Routing: '. FOZrd White and Canary to G.S.A. (Procurement Management) and retain Pink copy. DISTRIBUTION: WhIle - G.S.A.; Canary - Department