Loading...
HomeMy WebLinkAboutR-01-04770 J-01-388 05/14/01 01— 477 RESOLUTION NO. A RESOLUTION OF THE MIAMI CITY COMMISSION ACCEPTING THE BID OF MORLIC ENGINEERING, CORP. FOR THE PROJECT ENTITLED "ROADS AREA STREET/STORM SEWER IMPROVEMENT ?ROJECT, R-5605" IN THE AMOUNT OF $1,233,569.05; ALLOCATING FUNDS FROM PROJECT NO. 352279, AS APPROPRIATED BY THE ANNUAL APPROPRIATIONS AND CAPITAL IMPROVEMENT PROJECTS ORDINANCES, AS AMENDED, IN THE AMOUNT OF $1,233,564.05 FOR THE CONTRACT COSTS, AND $216,400 FOR EXPENSES, FOR A TOTAL ESTIMATED COST OF $1,449,964.05; AND AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, FOR SAID PURPOSE. WHEREAS, pursuant to public notice, Invitation for Aids No. 00-01-100 for the project Improvement Project, 5-5605", potential bidders; and "Roads Area Street/Storm Sewer was ma 3. led to thirty-seven WHEREAS, seven bids were received on May 1, 2001; and WHEREAS, the City Manager and the Director of the Department of Public Works recommend that the bid from Morlic Engineering, Corp. be accepted as the lowest responsible and responsive bid; and ems= CITY x9=or Co a1 = MAY 2 k 2001 0r- 00 7 WHEREAS, funds are available in tho amount of $1,449,964.05 for the proposed amount of the contract, project expenses, and incidentals under Capital Improvement Project No. 352279, as appropriated by the Annual Appropriations and Capital Improvement Projects Ordinances, as amended; NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The May 01, 2001 bid of Morlic Engineering, Corp., in the proposed amount of $ 1,233,564.05, for the project entitled "Roads Area Street/Storm Sewer Improvement Project, R-5605" for the total bid of the proposal, based on lump sum and unit prices, is accepted at the price stated therein. Section 3. The total estimated project costs of $1,449,964.05 are allocated from Capital Improvement Project No. 352279, as appropriated by the Annual Appropriations and Capital Improvement Projects Ordinances, as amended. Total project costs consist of $1,233,564.05 for contract costs and $216,400 for estimated expenses incurred by the City. 01- 477 Page 2 of 3 • Section 4. The City Manager is authorizedil to execute an agreement, in a form acceptable to the City Attorney, with Morlic Engineerinq, Corp. for said purpose. Section 5. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.2� PASSED AND ADOPTED this . 9,$th_ day of Ham-, 2001. JOE CAROLLO, MAYOR M rttooman o with Miami Code Sec. 2-38, since the Mayor did not indioate approval of this I gislation by signing it in the designated plac provided id Iagialatlrr ATTEST: kuvorms effective with the olapoo of n (1 aysti m the dat of regarding same, without the AAe poo V WALTER J. FOEMAN� _ T INAltr. Fr rn. Cis�rk CITY CLERK APPROV AS OyAND CORRECTNESS: V A'TORNEY 5291:db:LB:BSS 1 The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attornoy, including but not limited to those prescribed by applicable City Charter and Code provisions. 2J If the Mayor docs not sign this Resolution, it shall become effective at the end of t' en calendar days from the date it was passed and adopted. if the Mayor vetoes this Resolution, it shall become affective immediately upon override of the veto by the City Commission. Page 3 of 3 01— 477 0 CITY OF MIAMI. FLORIDA • =6 MEMORANDUM TO : The Honorable Mayor and Members of the City Commission FROM s A. Im ez 5K ity snag RECOMMENDATION.- It ECOMMENDATION: DATE. MAY 15 10001 FILE B-5605 suaacT : Resolution Awarding Contract for Roads Area Street/Storm Sewer Improvement Project, B-5605 REFERENCES: ENCLOSURES: Resolution It is respectfully recommended that the City Commission adopt the attached resolution accepting the bid of Morlic Engineering Corp, a company located within Miami- Dade County and not within the City of Miami, whose principal is J. Orlando Mora., President, for "Roads Area Street/Storm sewer Improvement Project, B-5605", received May 01, 2001 in the amount of $ 1,233,564.05, Total Bid; authorizing the City Manager to enter into a contract on behalf of the City. There has not been any previous work performed by Morlic engineering, Corp. with the City of Miami. BACKGROUND: Amount of Total Bid: $ 1,233,564.05 Const, Cost Estimate: $ 1,500,000.00 % of Cost Estimate: 82.3% Construction Time: 240 Working Days Source of Funds: Project No. 352279, Appropriations Ordinance No. 11839, as amended. Minority Representation: 37 invitations mailed to Black, Hispanic, Female- Owned Firms 17 Contractors picked up specs ( 9 Hispanic.6 BlackL. Female) 8 Contractors submitted bid (6 Hispanic, 1 Black,_.1 Female) Public Hearings/Notices: No Discussion: The Department of Public Works has evaluated the bids received on May 01, 2001, and determined that the lowest responsible and responsive bid, in the amount of $ 1,233,564.05 is from Morlic Engineering, Corp., a Hispanic - minority controlled corporation. Funds are available to, cover the contract cost, and for such incidental items as postage, blueprinting, advertising, reproduction costs, testing, etc. E/H 'CAG/FJ 01- 477 �lP 8�'Y ImpactAn is 1. Department il�cS 2. Agenda item # Of auailoblej S. Title and brie description of legislation or attach ordinance/resolution: 4. Is this item related to revenue? NO: j,/ . YES(If yes,,ahip'go item N7.) 5. Are there sufficient funds in Lute Item? , •' YES:., Index Code Minor Obj. Code Amount g NO: — Complete the following questions. 6. Source of funds: Amount budgeted in the Iane Item a Amount needed in the Ione Item $ Sufficient funda will be transferred from the i following line items: f 6N 6l -[ Ui 1 1 C 1,cl0 jc� i i 7r 9 .i w �p 3 20 1/,L40'/3Z-a9-7't ��� so ?. Any additional comments? b ro ed by: D�aetmutt/)Date -�0y, .1 +M +r . • •r �.: lIVl o: 01 _ .. 477 COPIES: ASSISTANT DIRECTORS. COST ANALYSIS. FILE, ASSOCIATED DEPT. CIP MAM"FA mv. It/00 01- 477 FACTsHeEr DEPARTMENT OR PUBLIC WORKS DATE. 5 / 2 / 2001 JOB NUMBER: 5-5605 PROJECT NAME: ROADS AREA lSTREET/STORM QEYVER IMPROVEMENTS B-5605CIP NUMBERS 362279 LOCATION: The area bounded by S.W 3 and 5 Avenue, and S.W. 15 and 23 Roaa OTHERTYPE: PROJECT MANAGER i EM_ No.: Cesar Gonzalez Ext. 1218 FEDERAL (C D.B.G.) ASSOCIATED DEPARTMENT: yl�r Public Works S. N.P.B. A6SESSAOLE: EMERGENCY: COMMISSIONER DISTRICT: _ 3 BID REOUE6T: FORMAL_ INF_� ORMALE RESOLUTION No.: DESCRIPTION:- The project Includes complete construction of new roadways and drainage system._ Construction conelet6 of new pavement, curb and/or gutters, sidewalk and sodding. A new drainage s}!stem will consist of a, combination of exflltratlon drains and storm dralnaBes structures. *rho drainage syalem will -comply wlth all current _— environmental regulations. IIP NS 6aARY. CONTNu[ ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS ol<TaICE cosi COST (% OF CONST. COST) ADVERTISING t� $ 1.300.00 (a) OUTSIDE DESIGN $ $ (MSA)SURVEY/PIAT $ $ 8.260.00 (MSA) P.W. DESIGN 8 BID DOCUMMEN7S $ 120,000.00 (E7)5 8 k CONSTRUCTION $ $ 1,233,E64.0E (8113)CONSTRUCTION ADMINISTRATION $ 88,960.00 -(BID) $ 7 K OTHER: teetlnp $ $ 2,600.00 (E) (a) actual Dost 15 % IEI T1N1 - EeATE TOTAL t 1.440.984.06 (TOTAL ENG. FEE) ESTiMATEO CONST. COST $ t.W0,00000 N COTRACTOR'S INFORMATION: CLASS. =J ©� a � NON -MINORITY TYPE OF WORK- Ort weral HnqIReisrinQ_ MINORITY �B =FVGARS OT ESTABLISHMENT: IJCENSE E -132E NAME: MOIIIO EngI1NefIr19■ Corp. TELEPHONE: (308) 287-/907 ADDRESS 7E71 N.W. 7 Street _ CITY, STATE, ZIP Miami, Florida 3312E Se1.A5.8: J - JOINT P - PRIME S - Sue CONTACT PERSON Orlarlrlo More MINORITY: B - BLACK H - HISPANIC F - FEMALE rn sus•ooNwoTORs: NAMES General Asphalt Barreiro Concrete Qars top COPIES: ASSISTANT DIRECTORS. COST ANALYSIS. FILE, ASSOCIATED DEPT. CIP MAM"FA mv. It/00 01- 477 FACTsHeEr DEPARTMENT OR PUBLIC WORKS DATE. 5 / 2 / 2001 JOB NUMBER: 5-5605 PROJECT NAME: ROADS AREA lSTREET/STORM QEYVER IMPROVEMENTS B-5605CIP NUMBERS 362279 LOCATION: The area bounded by S.W 3 and 5 Avenue, and S.W. 15 and 23 Roaa OTHERTYPE: PROJECT MANAGER i EM_ No.: Cesar Gonzalez Ext. 1218 FEDERAL (C D.B.G.) ASSOCIATED DEPARTMENT: yl�r Public Works S. N.P.B. A6SESSAOLE: EMERGENCY: COMMISSIONER DISTRICT: _ 3 BID REOUE6T: FORMAL_ INF_� ORMALE RESOLUTION No.: DESCRIPTION:- The project Includes complete construction of new roadways and drainage system._ Construction conelet6 of new pavement, curb and/or gutters, sidewalk and sodding. A new drainage s}!stem will consist of a, combination of exflltratlon drains and storm dralnaBes structures. *rho drainage syalem will -comply wlth all current _— environmental regulations. IIP NS 6aARY. CONTNu[ ON THE BACK) SCOPE OF SERVICES: PUBLIC WORKS ol<TaICE cosi COST (% OF CONST. COST) ADVERTISING t� $ 1.300.00 (a) OUTSIDE DESIGN $ $ (MSA)SURVEY/PIAT $ $ 8.260.00 (MSA) P.W. DESIGN 8 BID DOCUMMEN7S $ 120,000.00 (E7)5 8 k CONSTRUCTION $ $ 1,233,E64.0E (8113)CONSTRUCTION ADMINISTRATION $ 88,960.00 -(BID) $ 7 K OTHER: teetlnp $ $ 2,600.00 (E) (a) actual Dost 15 % IEI T1N1 - EeATE TOTAL t 1.440.984.06 (TOTAL ENG. FEE) ESTiMATEO CONST. COST $ t.W0,00000 N COTRACTOR'S INFORMATION: CLASS. =J ©� a � NON -MINORITY TYPE OF WORK- Ort weral HnqIReisrinQ_ MINORITY �B =FVGARS OT ESTABLISHMENT: IJCENSE E -132E NAME: MOIIIO EngI1NefIr19■ Corp. TELEPHONE: (308) 287-/907 ADDRESS 7E71 N.W. 7 Street _ CITY, STATE, ZIP Miami, Florida 3312E Se1.A5.8: J - JOINT P - PRIME S - Sue CONTACT PERSON Orlarlrlo More MINORITY: B - BLACK H - HISPANIC F - FEMALE rn sus•ooNwoTORs: NAMES General Asphalt Barreiro Concrete Qars C N FP TABULATION CIF BIDS FOR '°8 la. "ROADS AREA STREET/STORM SEWER IMPROVEMENTS PROJECT" D-5605 tltcelvad by tht Gtr Cora, Oty of NW. FW oa It iW RM on my it . eal Egger MAX OREM C11. Nw bal Cmtrtctws W PHM CORP onEmmmiaMMM SOLA M NSKiJCM COP T.J. PA11EN£NT CORP K VILA f ASSOC. CC NEF CIMMCTION INC Add-. 7571 MV. 7 STRQt 8175 Y. 32 Ave, Sate #I 3780 N.V. 22 Ave. L2n4 KY. 98 AVL 15251 NE. 18 AVE. 10741 S.W 30 ST. 12097 N.V. 96 AVE. 782 KV. 42 AVE. KM — l(w-, R 3]126 Hh mh. fL 33018 KNL R XR42 IIMFIM T1MM. R 31010 K IiN11 OUCH. FL 33W 19AMi. R 33165 K%W fAt M ft 31111 MIME, fL 33116 NC NEI YES NO N1] NO Nu YES c art mrodat M. oq cat, t or" •a YES Y S YES YES YES YES YES YES ON IWO bent B.B. 54 B.B. 5% B.D. 5% B.B. 5y 21 5% B"D. 57 B.B. 5y ' H H 1 H YES, H YES, H YES, H YES, H YES, B H fES, H H YES, H }{ YES, F TOTAL DIDtTuE TDTAL SU4 OF - — B '' AND BID 'Ir BA711 CNA - TVO MOD AND FUTY 240) WOM DAYS CDIPUTON TBE, THE SM IF $1,233,564.05 $1,423,496.15 $1,518,591.00 $1,577,982.15 s1,633,484.00 $1,641,943.80 41,644,867.35 $1,786,631.85 BID 'A'! THE TOTAL DF ITEMS --- 1 THR1>ITGH 31 BASED A [IN[ HUNDRED AND FDURTT (140) WMI G DAYS 04PlFTI01 TIME, THE SUN OF $769,944.40 $894,141.05 $951,254.65 $992,136.25 51,020,732.00 $1,034,925.25 51,039,378.95 11,]18,791.30 BIB 'B'- THE TDTAL DF ITEMS -- - --- GH 61 BASED INA W 5463,619.65 $529,355.10 $567,336.35 5585,845.90 $612,752.00 $607,018.55 $605,488.40 $667,84055 HUNDRED (100) Y DAYS c1RPLETIGN TTN$, THE S1N ff -- IRREGULARITIES LEGEND A -Na reaa.-ar-*"t y B -NO 11ffNa.St N to Caoltal t Srrptua of tLnA.q Cvpany C t—wtod ['tt"°"` THE DEPARTMENT OF D -"o" wap -A ar'rprapayy s1wwd er No CaVp Lal PUBLIC WORKS HAS DETERMINED THAT to THE LOWEST RESP E -lett s.tP-sb4, nwq Wfk,tm stun fett L AN N V M RLIC ENG NG E-NanTaapond.t ttd nytip t49Y of Ge.illketr of Gswetnrvl coy or c t CO P. _N THE AMOUNT QF 51,233,564.135 !d Bow FOR THE TOTAL BID. - Ca."ractad Rd4��4 9 I - Na fu -at Sawa � cftmxa * S mt...et BID oo - o1 f o0 No lbkWty CeipLbwo Stetr�tnt 5' 31 I p 1 JOB kvu°a a" ^'°o°"' PAGE' 1 OF 1 B-5605 l*w `r Mantesros Chtae By, Crux. Gonznle: FP • 9 CITY OF MIAMI OF THE CIT1' CLERK BED SECURITY LIST BID ITEM: ROADS AREA STREET/STORK SEWCk IMPROVEMENT PROJECT B -560o BID NO: 00-01-100 DATE BID(S)OPENED:— MAY 1, 2001 TIME 10:00 a.m. BIDDER TOTAL BID AMOUNT 131D BOND (ER) C 1 'S CHF( -K MOkLIC ENGINEERING CORP. S 1,233,564.0 B.B. 51, HORIX014 CONTRACTORS, INC. 1,421,295. 5 B.B. u� P.N.M. CORP. 1,521,201. " SOOUTHEASTERN ENGINEERING CONTRACTORS, INC. 1,577,982. 15 " SOLO CONSTRUCTION INC. ' 1,634,599.0 " ASSOCIATES 1.643,667-:5 " T. J. PAVEMENT CORP. 1,646,803. U " MEF CONSTRUCTION, INC. 1,786,33I.J5 " vrnft-.3 M5106 hey received timely as of the cUcvo owe. -'n dale and Hire,. All other offers submitted In mz:% .zse to tisso icitatian, i any, e ... ...Uft—'__ :. received PUBLIC WORKS on (City Department) SIGNE Deputy City I1I61110 m r) envelops on behalf of (Date / • CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO : Walter J. Foeman City Clerk FROM: ony Prat Departme f Public Works DATE April 9, 2001 FRE B-5605 SUBJECT: "Roads Area Street/Storm Sewer Improvement Project" REFERENCES ENGLOSURLS Please note that contractors will submit bids for the i'ollowing project: "ROADS AREA S'IREE17STORM SEWER IMPROVEMENT PROJECT, A-5605" on Tuesday. May 1", 2001 at 10:00 A.M. Any bid submitted after the time listed above, will not be accepted. Please make necessary provisions for this bid opening. The Project Manager Cesar Gonzalez, Engineer I, a representative overseeing the project is going to he present at the time of opening. Should there be cancellation or postponement, we will notify you in writing, prior to the opening date of the bids. If you have any questions, please contact me at 416-2131. TPAp Fncl. c: Albert Dominguez Yvette Smith Project Manager File ' • BID NO. 00.01. 100 • ADVERTISEMENT FOR BIDS Sealed bids for "ROADS AREA STREET/STORM SEWER IMPROVEMENT PROJECT, 0.5605" will be received by the City Clerk of the City of Miami. Florida at 10:00 AM on the 1st day of May, 2001, at the City Clerk's Office, first floor of the Miami City Hall, 3500 Pan American Drive, Dinner Key, Miami, Florida, 33133, at which time and place they will be public'y opened and read Any bid submitted after the above appointed time will not be accepted by the City Clerk. The project consists of complete street reconstruction of the area bounded by S W 3 Avenue.S.W. 5 Avenue, S W 15 Road and S W 23 Road. Construction consists of new pavement curb and/or gutter. sidewalk, sodding and new stormwater drainage system consisting of a combination of exfltration drains and storm drainage structures. Bidders will furnish performance and bid bonds in accordance with Resolutions No. 66-983 and No. 87-915. For technical questions or clarifications regarding. plans specifications, or City requirements; please_ subil written requests_ to Mr. John H Jackson, P E. Director,_ Department of Publicrks, _Wo444 S.W 2 Avenue, 8"' Floor Mal% Florida 33130 The writter request_may-f g faxed to (305) 416- 2153 followed by mailina or hand_ deliverirg_the written copy, Under Miami-Dade County_ Ordinances. Nos 98-106_and _99-1,_there _will be a "Cone of Silence" during the bid period and the City's responses_to questions-must be in writing only_ Prospective bidders must have a current certified Contractor's License from the State of Florida Construction Industry License Board for the class of work to be performed, or the appropriate Certificate of Competency or the State Contractor's Certificate of Registration as issued by Mtami- Dade County Code, which authorizes the Bidder to perform the proposed work. A_ _General Engineerinspont-r-actor (GEC) License shall be_required_tor this project. All bids shall be submitted in accordance with the Instructions to Bidders and Spec fications. New City regulations will require each bidder to submit proposals in duplicate__ origin ala. Plans may be obtained at the Department of Public Works, 444 S.W 2'° Avenue, 81" Floor, Miami, Florida 33130 on or - after April 11, 2001 Specifications may be obtained on or after March 7, 200'. There will be a $20 deposit required for the first set of specifications Specs can also be mailed to bidders upon written request to the Public Works Department including a separate check in the amount of $8 Additional sets may be purchased for a non-refundable fee of $20. Deposits will be refunded only upon return of one set of specifications to the Department of Public Works. unmarked and in good condition within two (2) weeks after the opening of the bids. Bidders are alerted to the provisions of Ordinance Nos. 10062, 10538 and 10332 regarding allocations of contracts to minority vendors contractors and sub-contractors. THIS PROJECT HAS BEEN DESIGNATED AS A SET-ASIDE FOR CITY OF MIAMI CERTIFIED FEMALE, BLACK AND HISPANIC. OWNED FIRMS. DETAILS ARE CONTAINED IN BID SPECIFICATIONS. ALL BIDDERS WILL BE REQUIRED TO SUBMIT THEIR CURRENT M/WBE CERTIFICATION, UPON REQUEST. (Ordinance is contained in bid specifications) The City of Miami has adopted Ordinance No. 10032, which implements the "First Source Hiring Agreement". The object of this Ordinance is to provide employment opportunities to City of Miami residents on contracts resulting in the creation of new permanent jobs Contractors may be eligible for wage reimbursement under this program For further information contact the Department of Public Works, City of Miami, at (305) 416-1200. Proposal includes the time of performance, and specifications contain provisions for liquidated damages for failure to complete the work on time. The City Commission reserves the right to waive any informality in any bid, and the City Manager may reject any of all bids, and readvertise. (B-5605, Req. 05493). Carlos A. Gimenez City Manager rIr7r�.�f n 0 -IMPORTANT ADDENDUM - CITY OF MIAMI, FLORIDA ADDENDUM leo. 1 ISSURI) APRTT, 25, 2001 0 ROADS AREA STREET / STORM SEINER IMPROVEMENT PROJECT 8-5605 4 F*•**♦ F 4* 4 4* 4 4* 4* 4 4* 4* 4 4 4 M 4 4 4 4 4 4 4 4 4 4 4 4 W*•** 4*** ALL BIDDERS ARE HEREBY NOTIFIED AS FOLLOWS: CHANGE 1 OF 2: Remove PROPOSAL Page 2c mid replace with new PROPOSAL Page 2e (REVISED). Proposal Bid Item number 12 is for 10,387 square ieet, more or less, of St. Augustine Floratam Solid Sod, including 4 -inches of planting soil and top dressing. CHANGE, 2 OF 2: Removc PROPOSAL Page 2k and replace with new PROPOSAL Page 2k (REVISED). Proposal Bid Item number 43 is for 7,343 square feet, more or less, of St. Augustine Floratam Solid Sod, including 4 -inches of planting soil and top dressing. * * * * * * * * * * 4 * * 4 4 4 4 4 4 4 4 * * * 4 * r 4 * * * 4 * * * * * * * * * * w * 4 4 4 * THIS ADDENDUM IS AN ESSENTIAL PART OF THE CONTRACT DOCUMENTS AND SHALL BE MADE A PART THEREOF. J n H. Jackson, 04., Director Department ol'Puhlic Works • • PROPOSAL Page 2e REVISED B-5005 ROADS AREA STREETISTORM SEWER IMPROVEMENTS PROJECT BID "A" ITEM 11: 20,895 sq, yd. of 8- inch thick compacted I merock lase with primer oil surface, including necessary clearing and grading, the unit price of Dollars and Cents (S ) X 20,895 = $ per square yard ITEM 11 ITEM 12: Provide and plant 10,387 square feet, more or less, of St. Augustine Floratam Solid Sod, including 4- inches of planting soil and top dressing, the unit price of Dollars and Cents (s_ ) X 10,387 = $ per square foot ITEM 112 ITEM 13: Install 320 lin. ft„ more or less, of 4 -inch wide yellow Thermoplastic Paint Striping (AASHTO M 249-79), the unit price of Dollars and Cents (S ) X 320 $ per linear foot ITEM 13 ITEM 14: Install 200 lin. ft., more or less, of 24 -inch wide white Thermoplastic Paint Striping (AASHTO M 249.79), the unit price of Dollars and Cents (S ) X 200 = $ per linoor foot ITEM 14 ITEM 15: Relocate six (6) exisiting trees, as shown in the plans, any size, if necessary, the unit price of Dollars and Cents ($__ J X 6 S each ITEM 15 ITEM 16: 787 lin ft. of 15 -inch reinforced concrete sewer pipe, at 0/6 foot cut, the unit price of Dollars and Cents 1$ ) X 787= S per linear foot ITEM 16 PROPOSAL Page 2k REVISED 8-5605 ROADS AREA STREETISTORM SEWER IMPROVEMENTS PROJECT 0113 "1311 ITEM 42: 12,718 sq. yd. of 8- inch thick compacted limerock base with primer o;l surface, Including necessary clearing and grading, the unit price of Dollars and Cents ($ ) X 12,718 = $ per square yard ITEM 42 ITEM 43: Provide and plant 7,543 square feet, more or less, of Augustine Floratem Solid Sod, including 4- inches of planting soil and top dressing, the unit pace of Dollars and Cents ($ ) X 5,543 per square foot ITEM 43 ITEM 44: Install 100 lin. ft., more or less, of 4 -inch wide yellow Thermoplastic Point Striping (AASHTO M 249.79), the unit price of Dollars and Cents (S ) X 100 = $_ per linear foot ITEM 44 ITEM 45: Install 80 tin. ft, more or less, of 24 -inch wide white Thermoplastic Paint Striping (AASHTO M 249-79), the unit pace of Dollars and Cents ($ ) X 80 per linear foot ITEM 45 ITEM 46: Relocate five (5) exisiting trees, as shown in the plans, any size. if necessary, the unit price of Dollars and Cents ($ )X5 = $ each ITEM 46 ITEM 47: 467 lin. ft. of 15 -inch reinforced concrete sewer pipe, at 0/6 foot cut, the unit price of Dollars and Cents ($ ) X 467= $ per linear foot ITEM 47