Loading...
HomeMy WebLinkAboutItem #25 - Discussion ItemCITY OF MIAMI, FLORIDA 23 INTER -OFFICE MEMORANDUM TO: The Honorable Mayor and DATE: IMARI SCC FILE: _ 9 Members of the City Commission SUBJECT: Discussion Item for March 22, 2001 City FROM: REFERENCES: Commission Meeting - ( los -A:`Gi eZ ENCLOSURES: City Manager A report on the drainage and street project for Ms. Barbara Rey, 2997 SW 4 Street. GAGAJ� I -!/a CITY OF MIAMI, FLORIDA ITEM 23 INTER-OFFICE MEMORANDUM TO The Honorable Mayor and DATE March 28, 2001 FILE Members of the City Commission SUBJECT. REPORT ON THE DRAINAGE AND STREET REBUILDING PROJECT AT 2997 SW 4 STREET FROM REFERENCES: REFERENCE: MS. BARBARA REY az tsA. Gimenez ENCLOSURES. City Manager At a Commission meeting in January 2001, Ms. Barbara Rey, 2997 SW 4 Street, addressed the Commission on the condition of SW 30 Avenue at SW 4 Street. SW 30 Avenue extending approximately 150 feet to the north of SW 4 Street was an unimproved roadway and lacked stormwater drainage structures. SW 30 Avenue sloping to the north from SW 4 Street would flood during a rain storm. The Commission directed the Manager and Public Works to construct stormwater drainage facilities and to rebuild (pave) SW 30 Avenue and to report back to the Commission in March on what had been accomplished at this location. Public Works designed and directed a local drainage contractor, under contract with the City, to construct new drainage facilities and to construct paving at the site. In summary, the following work was done: 210 linear feet of 24 -inch french drain, 192 linear feet of 6 -inch curb, 114 square feet of concrete sidewalk, 800 square feet of sod, 300 square yards of 8 -inch limerock base and 1 inch of asphalt. The total cost of the improvements on SW 30 Avenue and SW 4 Street was $67,408.51. Attached are photos of the site: (1) before construction; (2) during construction; and (3) after construction of the work. CAGIF'2 s/ KR/�JW/rjf fz c: John H. Jackson, Director, Public Works Department D % 'n & st &w^J 15 CAMy DocumentsUM-2997 SW 4 ST-REY.doc S.W. 30 AVENUE AND S.W. 4 STREET S.W. 30 AVENUE AND S.W. 4 STREET Is (1) BEFORE CONSTRUCTION Page 2 of 2 3:37 PN S.W. 30 AVENUE AMP S.W. 4 STREET (2) DURING CONSTRUCTION Page 2 of 3 S.W. 3e AVFNt1F ANn " W A CTR=I=T I'M 111101klr f"t"A1CT011I'_Tlnki PanoAnf3 13 3:36 PM S.W. 30 AVENUE AND S.W. 4 STREET (3) AFTER CONSTRUCTION Page 1 of 2 S.W. 30 AVENUE AND S.W. 4 STREET (3) AFTER CONSTRUCTION Page 2 of 2