R-02-1238
J-02-943 11/06/02 02_1238 RESOLUTION No. A RESOLUTION OF THE MIAMI CITY COMMISSION BY A FOURTH -FIFTHS (4/5THS ) AFFIRMATIVE VOTE OF THE MEMBERS OF THE CITY COMMISSION, AFTER A DULY ADVERTISED PUBLIC HEARING, RATIFYING, APPROVING AND CONFIRMING THE CITY MANAGER'S FINDING THAT COMPETITIVE SEALED BIDDING METHODS ARE NOT PRACTICAL OR ADVANTAGEOUS FOR THE REPAIR OF SIDEWALKS IN THE ALLAPATTAH AREA; WAIVING THE REQUIREMENTS FOR COMPETITIVE SEALED BIDDING METHODS, AND ACCEPTING THE BID OF METRO EXPRESS INC., IN THE AMOUNT OF $97,950, FOR THE PROJECT ENTITLED "ALLAPATTAH SIDEWALK AND CURB REPLACEMENT PROJECT B-4660"; ALLOCATING FUNDS, IN THE AMOUNT OF $97,950, FROM CAPITAL IMPROVEMENT PROJECT NO. 341200, FOR THE CONTRACT COSTS AND $11,357 FOR EXPENSES INCURRED BY THE CITY, FOR AN ESTIMATED TOTAL COST OF $109,307 FURTHER AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT, IN A FORM ACCEPTABLE TO THE CITY ATTORNEY, FOR SAID PURPOSE. BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. By a four-fifths (4/5tns) affirmative vote of the members of the City Commission, after a duly advertised public hearing, the City Manager's finding that competitive sealed bidding methods are not practical or advantageous for the repair of sidewalks in the Allapattah area is ratified, approved 4'Y1`7f C-�� ft$vc 2002 02 r W and confirmed, the requirements for competitive bidding methods are waived and the bid of METRO EXPRESS, INC., in the amount of $97,950, for the project entitled "Allapattah Sidewalk and Curb Replacement Project B-4660", is accepted. Section 2. The City Manager is authorized!' to execute a contract, in a form acceptable to the City Attorney, with Metro Express, Inc., for said purpose. Section 3. The total estimated project cost of $109,307 is allocated from Capital Improvement Project No. 341200 as appropriated by the Capital Improvement Ordinance. Total project costs consist of $97,950 for the contract costs and $11,357 estimated for expenses incurred by the City. Section 4. This Resolution shall become effective immediately upon its adoption and signature of the Mayor Y 1� The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. 2/ If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 2 of 3 02 —1238' PASSED AND ADOPTED this ATTEST: PRISCILLA A. TH PSO CITY CLERK 19th day of November 2002. MANUEL A. DIAZ, APP VED ASfi`O FORM AND CORRECTNESS:t ALEJANDRO VILARELLO 57-K, I ATTORNEY W6681:tr:AS:BSS Page 3 of 3 0-1238 CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM TO: The Honorable Mayor and Members of the City Commission RECOMMENDATION DATE: NOV - 4 2702 22 A SUBJECT: Emergency Ratification — Allapattah Sidewalk and Curb Replacement Project B-4660 REFERENCES: ENCLOSURES: FILE: It is respectfully recommended that the City Commission adopt the attached Resolution ratifying, approving and confirming the City Manager's written finding that a valid emergency exists conceming the condition of the sidewalks on the Allapattah area and waiving formal competitive bidding procedures and authorizing the City Manager to accept the bid of METRO EXPRESS, INC. a Hispanic -minority controlled corporation located at 3594 S.W. 143 Court, Miami, Florida, as the lowest responsive and responsible bid in the amount of $ 97,950 Total Bid. The estimated total cost for this project is $109,307 consisting of $97,950 Total Bid and $11,357 for expenses. JUSTIFICATION Based on my investigation of numerous damaged sidewalks throughout Allapattah neighborhood, I have found that an EMERGENCY exists which justifies the selection of a contractor by informal bids. The Public Works Department has conducted a survey of the condition of sidewalks on the Allapattah area and has identified 14,500 square feet of sidewalk and 5,500 lineal feet of curb as being in poor condition and in need of replacement. Due to their age and condition they represent a potential danger for the pedestrians and therefore should be replaced immediately. FISC PACT: BUDGETED ITEM. CA JHJ/JRA/LJH/crg 'fit /3"412 . 02-1238 udgetary Impact Analysis 1. Department \e Division c� SI6 2. Agenda Item # (tfavailable) '�- 3. Title and brief description of legislatior attach ordinance/resolution: 4. Is this item related to revenue? NO: S (Ifyes, skip to item #7.) 5. Are there sufficient funds in Line Item? YES: Index Code Minor Obj. Code Amount NO: _ Complete the following questions: 6. 7 Source of funds: Amount budgeted in the Line Item $ Balance in Line Item $ Amount needed in the Line Item $ %iffiinient fim& will he transferred f nm the following line items - ACTION ACCOUNT NUMBER ACCOUNT NAME TOTAL Index/Minor Ob'ect/Promt No. Verified by: From $ From $ From $ To $ Any additional comments? 8. to Approved�2, JFQR REPARTWNT OF MANAGEMENT AND BUDGET USE ONLY Verified by: Verified by: Transfer done by. e' ent Budget Bu st Budget Anaiyst Director/Designee 0w- iA.+" File: \\DATASERVER2 5\BLDIST\PUB_WORK\0326457.REQ PGM ID: FN/SC/PO/RPT10 C I T Y O F M I A M I PAGE 10- 1606 RUN DATE: 09/28/2002 DETAILED REVENUE AND EXPENDITURES BY PROJECT RPT RFC:REPORT 10 12 FISCAL MONTH AS OF 09/28/2002 FUND 341 STREETS & SIDEWALKS PROJECT 341200 ALLAPATTAH STREET REBUILDING/IMPACT FEE ENTITLEMENT PERIOD 05/24/93 TO 12/31/55 PORTION EXPIRED 14.9 % STATUS ACTIVE INDEX MIN % OF REVISED * * * REVENUES / EXPENDITURES * * * OUTSTANDING REMAINING CODE OBJ DESCRIPTION BUDGET TOTAL BUDGET CURR MONTH CURR Y -T -D TOTAL T -D ENCUMBRANCE BALANCE R E V E N U E S * * * * 026132 REV. CAP. PROJ.- FD. 32 - PROJ 473 LOCAL OPTION GAS TAX 100.0 59,300 59,300 964 IMPACT FEES 56.0 .389,200 218,092 171,107 967 INTEREST ON IMPACT FEES 43,900 43,900 INDEX CODE 026132 56.3 492,400 277,392 215,007 TOTAL REVENUES 56.3 492,400 277,392 215,007 E X P E N D I T U R E S**** 319201 DESIGN/ARCH ORIJ. NO. REQUIRED 240 PROFESSIONAL SERVICES - ENGINE 99.9 25,113 25,112 287 ADVERTISING 49.3 1,390 686 703 533 POSTAGE 94.6 80 75 4 792 ENGINEERING - PUBLIC WORKS 33.7 13,790 4,661 9,129 INDEX CODE 319201 75.6 40,373 30,535 9,837 319301 CONSTRUCTION PROJ. NO. REQUIRE 776 INDIRECT COST ALLOCATION 95.7 70 67 3. 792 ENGINEERING - PUBLIC WORKS 50.4 27,360 13,790 13,570 830 IMPROVEMENTS OTHER THAN BUILDI 77.2 255,000 196,999 58,000 860 CONSTRUCTION IN PROGRESS 21.2 169,597 36,000 133,597 Olt_ INDEX CODE 319301 54.6 452,027 246,856 205,170 TOTAL EXPENDITURES 56.3 492,400 277,392 215,007 RECAP: REVENUES LESS EXPENDITURES N rri IN: Page: 1 TO: Carlos A. Gimenez City Manager John H. Jac on, Director Public Works Department Ci ; Y OF IMIAMI, FLORIDA CER -OFFICE MEMORANDUM DATE: August 15, 2002 FILE: SUBJECT: EMERGENCY FINDING waiver of Formal Bids for Allapattah Sidewalk And Curb Replacement Project, B-4660 REFERENCES: ENCLOSURES: Based on my investigation of numerous damaged sidewalk and curbs throughout Allapattah neighborhood, I have found that an EMERGENCY exists which justifies the selection of a contractor by informal bids. The Public Works Department has conducted a survey of the condition of sidewalk and curbs on the Allapattah area and has identified 14,500 square feet of sidewalk and 5,500 lineal feet of curb as being in poor condition and in need of replacement. In addition, due to their age and condition they do not present a good appearance and moreover, represent a potential hazard for the pedestrians and therefore should be replaced immediately. The total cost estimate, including construction, design, project management, inspection and city expenses, is $150,000. This project is scheduled to be funded from the Impact Fees. Such conditions indicate the need for extraordinary measures to protect the health, safety and welfare of the community and the tenants and customers of the local business and residential areas throughout the Allapattah neighborhood. In order to initiate the construction of the sidewalk and curbs as soon as possible, formal competitive sealed bid procedures shall be waived for the procurement of contracting services required for said emergency pursuant to sections 18-83' and 18-84 of the city code. Informal bids shall be obtained and a contract shall be awarded by the city manager to the lowest responsive and qualified bidder. All costs of this project will be funded from CIP Project No. 341200. Estimated total cost for the project is $ 150,000. This action shall be ratifidd at the next available City Commission Meeting. Approved: 2-A Date: �Z/ �c.1VI � 1 . Pe Ac ' irector Dept. of Management & Budget -j9-0L j1* FKR/JHJ/JRA/L CD G 8(IS y c: Frank K. Rollason, Assistant City Manager Judy S. Carter, Chief Procurement Officer, Purchasing Department Jorge R. Avino, Assistant Director, Public Works Department Leonard J. Helmers, Chief Civil Engineering, Public Works Department 02-1238 02-1238 FACT SHEET DEPARTMENT OF PUBLIC WORKS DATE: 9 / 26 / 2002 JOB NUMBER: B-4660 PROJECT NAME: ALLAPATTAH SIDEWALK AND CURB REPLACEMENT PROJECT CIP NUMBER: 341200 LOCATION: ALLAPATTAH NEIGHBORHOOD OTHER TYPE: PROJECT MANAGER / EXT. No.: CESAR R. GONZALEZ (305) 416-1219 , '� Z" FEDERAL (C.D.B.G.): N o7 ASSOCIATED DEPARTMENT: PUBLIC WORKS S. N. P. B. fN0 ASSESSABLE: No EMERGENCY: FY—es-1 COMMISSIONER DISTRICT: i BID REQUEST: FORMAL= INFORMAL= RESOLUTION No.: DESCRIPTION: THE PROJECT CONSISTS OF THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 14,500 SQUARE FEET OF CONCRETE SIDEWALK AND 5,500 LINEAL FEET OF CONCRETE CURB. THE PROPOSED IMPROVEMENT INCLUDES THE CLEARING AND GRADING PRUNING AND REMOVING THE TREE ROOTS AND LIMBS, IF NECESSARY CONSTRUCTING NEW 4 -INCH AND 6 -INCH CONCRETE SIDEWALK 6 -INCH CONCRETE CURB INCIDENTAL SURFACE RESTORATION, AND ADJUSTING WATER METERS AND UTILITY BOXES, AS DIRECTED BY THE CITY ENGINEER. (IF NECESSARY, CONIINUE ON THE BACI9 SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST COST (% OF CONST. COST) ADVERTISING (A) $ (A) OUTSIDE DESIGN $ -- $ -- TESTINGS / SURVEY / PLAT $ P.W. DESIGN & BID DOCUMENTS $ 4,500.00 (E) $ -- 3 % CONSTRUCTION $ -- $ 97,950.00 (BID) CONSTRUCTION ADMINISTRATION $ 6,857.00 (BID) $ -- 7 % OTHER: TESTING $ -- $ - (E (A) - ACTUAL 10 % (E) - ESTIMATE TOTAL $ 109,307.00 (TOTAL ENG. FEE) ESTIMATED CONST. COST $ 150,000.00 CONTRACTOR'S INFORMATION: CLASS: O m 0 NON - MINORITY TYPE OF WORK: CONCRETE SIDEWALK AND CURB MINORITY © ® D YEARS OF ESTABLISHMENT: 6 LICENSE E - 201301 NAME: METRO EXPRESS INC. TELEPHONE: (305) 459-8286 ADDRESS: 3594 S.W. 143 COURT CITY, STATE, ZIP: MIAMI, FLORIDA 33175 CLASS: J = JOINT P - PRIME S = SUB CONTACT PERSON: DELLO TRASOBARES, PRESIDENT MINORITY, B = BLACK H = HISPANIC F = FEMALE SUB -CONTRACTORS: NAMES: SELF COPIES: ASSISTANT DIRECTORS, COST ANALYSIS, FlLE, ASSOCIATED DEPT. VIP MANAGER Rev. z/W 41 42-123C7 TOTAL BID:THE TOTAL OF ITEMS TABULATION OF BIDS FOR ALLAPATTAH SIDEWALK AND CURB REPLACEMENT PROJECT B-4660 Received by the Department of Public Works City of Miami, Florida at 1100 a.m. on September 24, 2002. JOB NO. B-4660 INFORMAL BID Bidder METRO EXPRESS, INC APAC GROUP, INC. Address 3594 SW 143 CT 5190 NW 167 ST N 201 COMPLETION TIME, THE SUM OF $ 97,950.00 MIAMI, FL 33175 MIAMI, FL 33015 Located in the City of Miami NO NO Lk"rA t Imand os Per City Code t Netro iyd. YES YES Bid Bond Amount B.B. 57 B.B. 5% Irregularities Minority Owned YES, H YES, B TOTAL BID:THE TOTAL OF ITEMS I THROUGH 13 BASED ON SIXTY (60) VORKING DAYS COMPLETION TIME, THE SUM OF $ 97,950.00 $ 101,600.00 IRREGULARITIES LEGEND A — No Power -of -Attorney THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED THAT 13NoAFFidavit as to Capital 6 Surplus of Bonding Company THE LOWEST RESPONSIBLE AND RESPONSIVE BIDDER IS C — Corrected Extensions METRO EXPRESS, INC. IN THE AMOUNT OF � 97,950.00 D —Proposal Unsigned or improperly Signed or No Corporate Seal FOR THE TOTAL BID. E — Incomplete Extensions (Missing Primary Office Location Form) F — Non-responsive bid (Missing copy of Certificate of Competency) G — Improper Bid Bond UL H — Corrected Bid INFORMAL I — No First Source Hiring Compliance Statement BID J — No Minority Compliance Statement JOB NO. K— No Duplicate Bid Proposal PAGE: I OF I B-4660 Prep. By: CESAR R. GONZALEZ Check By: MARIA E. LOPEZ