A RESOLUTION OF THE MIAMI CITY COMMISSION,
BY A FOURTH -FIFTHS (4/5TIS ) AFFIRMATIVE VOTE,
AFTER A DULY ADVERTISED PUBLIC HEARING,
RATIFYING, APPROVING AND CONFIRMING THE CITY
MANAGER'S FINDING OF AN EMERGENCY, WAIVING
THE REQUIREMENTS FOR COMPETITIVE SEALED
BIDDING PROCEDURES, AND ACCEPTING THE BID OF
HARD J. CONSTRUCTION CORPORATION, THE LOWEST
RESPONSIVE AND RESPONSIBLE BIDDER, PURSUANT
TO INVITATION FOR INFORMAL BIDS, DATED
JUNE 7, 2002, FOR THE PROJECT ENTITLED
"CITYWIDE LOCAL DRAINAGE PROJECT E-77,
B-5648", IN THE AMOUNT OF $673,250;
ALLOCATING FUNDS FROM PROJECT NO. 352216, AS
APPROPRIATED BY THE ANNUAL APPROPRIATIONS
AND CAPITAL IMPROVEMENTS ORDINANCES, AS
AMENDED, IN THE AMOUNT OF $673,250 FOR THE
CONTRACT COSTS AND $88,750 FOR EXPENSES, FOR
A TOTAL ESTIMATED COST OF $762,000;
AUTHORIZING THE CITY MANAGER TO EXECUTE AN
AGREEMENT, IN A FORM ACCEPTABLE TO THE CITY
ATTORNEY, FOR SAID PURPOSE.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA
Section 1. By a four -fifth (4/Stns) affirmative vote of
the City Commission, after a duly advertised public hearing, the
City Manager's finding of an emergency is ratified, approved and
confirmed, the requirements for competitive sealed bidding
CITY CoMasSION
KEETUfG 6F
J U[. 2 5 2002
Aa$atution r$o.
02- 894
procedures are waived and the bid of Hard J. Construction
Corporation, the lowest responsive and responsible bidder, dated
June 7, 2002, for the project entitled "Citywide Local Drainage
Project E-77, B-5648", in the amount of $673,250, for the total
bid of the proposal, is accepted at the price stated herein.
Section 2. The total estimated project costs of
$762,000 are allocated from Project No. 352216, as appropriated
by the Annual Appropriations and Capital Improvements
Ordinances, as amended. The total project costs consist of
$673,250 for contract costs and $88,750 for estimated expenses
incurred by the City.
Section 3. The City Manager is authorizedll to execute
an agreement, in a form acceptable to the City Attorney, with
Hard J. Construction Corporation for the project.
Section 4. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.21
1� The herein authorization is further subject to compliance with all
requirements that may be imposed by the City Attorney, including but
not limited to those prescribed by applicable City Charter and Code
provisions.
If the Mayor does not sign this Resolution, it shall become effective
at the end of ten calendar days from the date it was passed and
adopted. If the Mayor vetoes this Resolution, it shall become
effective immediately upon override of the veto by the City Commission.
Page 2 of 3
02- 894
PASSED AND ADOPTED this 25th day of July , 2002.
ATTEST:
PRI ILLA A. THOMPSON
CIT CLERK
W6435:tr:LB
q�leu�a("
MANUEL A. DIAZ, MA
NESS :/
Page 3 of 3
02- 894
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
The Honorable Mayor and JUL 12 2002
TO: Members of the City Commission DATE: FILE
Emergency Project —
SUBJECT: Citywide Local Drainage Project E-77,
B-5648
' enez
City Manage REFERENCES:
FROM:
ENCLOSURES:
RECOMMENDATION
It is respectfully recommended that the City Commission adopt the attached Resolution ratifying
the City Manager's written finding that a valid emergency exists regarding stormwater flooding
at different sites throughout the City, and waiving formal competitive bidding procedures and
authorizing the City Manager to accept the bid of Hard J. Construction Corporation, a non -local
Black minority firm located at 99 N.W. 183 Street, Suite 108, Miami, Florida, as the lowest
responsive and responsible bid in the amount of $673,250 Total Bid. The total cost of for this
project is $762,000, consisting of $673,250 Total Bid and $88,750 for the City's portion.
JUSTIFICATION
As a result of several severe rainstorms, the City has experienced stormwater flooding at
different localized sites. The magnitude of the work exceeds the construction capability of the
Public Works Operations Division and the services of a private contractor are needed. The
construction work must begin immediately to address the current rainy. season. In order to
initiate this drainage construction as soon as possible, formal competitive sealed bid procedures
shall be waived for the procurement of contracting services required for said EMERGENCY
pursuant to Sections 18-83 and 18-84 of the City Code. Informal bids were obtained and a
contract will be awarded to the lowest responsive and qualified bidder. All costs of this project
will be funded from CIP Project No. 352216.
FISCAL IMPACT None — Budgeted Item.
Vk
CAG/00-
J J/J RA/LJ H/EE
6, 10 L
02- 894
udgetary Impact Analysis
I. Department & / ale/t/<S Division i6
2. Agenda Item # (if available)
3
Title and brief description of legislation or attach ordinance/resolution:
4. Is this item related to revenue? NO: V� YES (7fyes, skip to item #7.)
5. Are there dent funds in Line Item?
YES: Index Code Minor Obj. Code Amount
NO: _ Complete the following questions:
M
7.
Source
of funds: Amount budgeted in the Line Item $,
Balance in Line Item $
Amount needed in the Line Item $
Al lin,- ;t6 -mc,
ACTION ACCOUNT NUMBER
ACCOUNT NAME TOTAL
Index/Minor Object/Project No.
Transfer done by:
From
$
From
$
From
$
To
$
Any additional comments?
FOJLDfkPARTMENT OF MANAGEMENT AND BUDGET USE ONLY
Verified by:
Verified by:
Transfer done by:
Department of Managementd Budget
Director/Designee
Budget Analyst
Budget Analyst
V2— s94
To Carlos A. Gimenez
City Manager
FROM: i
John H. Jacks n, Director
Public Works Department
CITY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
CITY MANAGERS OFFICE
March 18, 21=, . ! ►�
DATE �` �',' ,., : t;: t; 15-5648
FI
SUBJECT : Emergency Finding Waiver of
Formal Bids for Citywide Local
Drainage Project E-77, B-5648
REFERENCES:
ENCLOSURES: List of Complaints for E-77
Based on my investigation of numerous stormwater flooding complaints throughout the
City, I have found that an EMERGENCY exists which justifies the selection of a
contractor by informal bids.
As a result of severe rainstorms, the City has experienced stormwater flooding at
different localized sites. The magnitude of the work exceeds the construction capability
of the Public Works Operations Division and the services of a private contractor are
needed. The construction work must begin immediately at the locations listed in the
Attachment to address the current rainy season.
Because of the severe flooding at these locations, there is a need for extraordinary
measures to expedite the installation of adequate stormwater drainage systems. In order
to initiate the construction of the new stormwater drainage systems as soon as possible,
formal competitive sealed bid procedures shall be waived for the procurement of
contracting services required for said EMERGENCY pursuant to sections 18-83 and 18-
84 of the City Code. Informal bids shall be obtained and a contract shall be awarded to
the lowest responsive and qualified bidder. All costs of this project will be funded from
the CiP No. 352216. Estimated total cost for the project is $500,000.00. This action shall
be ratified at the next available City Commission meeting.
Approved:
Marcelo Penha, Acting Directo
Management & Budget
Approved:-
-_/GarlwA.—Gkmenez
J � City ManagOr
FKR/JHJ/JRA/LJH/EE
Date: v i
Date:
i
c: Frank K. Rollason, Assistant City Manager
Judy S. Carter, Chief Procurement Officer, Purchasing Department
Jorge R. Avino, Assistant Director, Public Works Department
Leonard J. Helmers, Chief Civil Engineer, Public Works Department
02— 894
FACT SHEET
DEPARTMENT OF PUBLIC WORKS
SHEET i OF f DATE: 6 / 7 / 2002
JOB NUMBER: B-5648
PROJECT NAME: CITYWIDE LOCAL DRAINAGE PROJECT E-77
LOCATION: Citywide
CIP NUMBER: 352216
PROJECT MANAGER/ EXT. No.: L. Helmers / E. Estevez 1217 E
OTHER TYPE:
FEDERAL (C.D.B.G.): -
ASSOCIATED DEPARTMENT: Public Works
S.N.P.B. 0
ASSESSABLE:
EMERGENCY: ®
COMMISSIONER DISTRICT ALL
BID REQUEST: FORMAL;= INFORMAL=
RESOLUTION No.:
DESCRIPTION: This project consists of the design and construction of exfiltration stormwater drainage systems (french drains) with
their corresponding cross drains, catch basins manholes and surface restorations at locations citywide within the street right of way.
(IF NECESSARY, CONnNUE ON THE BACK)
SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST
COST (% OF CONST. COST)
ADVERTISING $ 1,222.00 (a) $ --
OUTSIDE DESIGN $ -- $ --
SURVEY / PLAT $ -- $ -'
P.W. DESIGN & BID DOCUMENTS $ 38,400.00 (E) $ -- 6 %
CONSTRUCTION $ -- $ 673,250.00 (BID)
CONSTRUCTION ADMINISTRATION $ 47,128.00 (BID) S -- 7 %
OTHER: TESTING $ -- (E) $ 2,000.00 (E)
(a) - actual cost
13 %
(E) - ESTIMATE TOTAL $ 762,000.00 (TOTAL ENG. FEE)
ESTIMATED CONST. COST $ 640,000
CONTRACTOR'S INFORMATION:
CLASS: = =P = NON - MINORITY
TYPE OF WORK: RoadWay / Drainage MINORITY QB
YEARS OF ESTABLISHMENT: 14Years LICENSE E-865
NAME: HARD J. CONSTRUCTION CORP. TELEPHONE: (305) 652-2098
ADDRESS: 99 N.W. 183 ST Suite 108
CITY, STATE, ZIP: Miami, Florida 33169 CLASS: J = JOINT P = PRIME S = SUB
CONTACT PERSON: MacDonald Jumbo, President MINORITY: B = BLACK H = HISPANIC F = FEMALE
SUB -CONTRACTORS:
NAMES: SELF
COPIES: ASSISTANT DIRECTORS, COSTANALY515, FILE. A5S0GIATE0oEPI, GIP MANAGtf1l n=v. c1-
0, _. 8:94
TABULATION ❑F BIDS FOR
UIJ NU.!
CITYWIDE LOCAL DRAINAGE
PROJECT E-77
INFORMAL
Received by the Public Works Department, City of Mloml, Florida at 11,30 A.M. on June 7, 2002
Bidder HARD J. CONSTRUCTION
T.J. PAVEMENT CORP. APAC GROUP, INC.
METRO EXPRESS, INC.
Address 99 NW 183 ST 0108
10741 S.W. 30 ST 20030 E. OAKMONT DR
3544 S.W. 143 COURT
MIAMI, FL 33169
MIAMI, FL 33165 MIAMI, FL 33015
MIAMI, FL 33175
Located in the City of Word N❑
N❑ N❑
NO
Licensed t Insured as Per City Code t Metro Ord YES
YES YES
Y E S
Bid Bond Amount B.B. 5%
B.B. 57 B.B. 5%
B.B. 57
` -egularities
C, H
C, H
city Owned YES, B
YES, H YES, B
YES, H
TOTAL BID: THE TOTAL OF
ITEMS 1 THROUGH 39 BASED ON
A ONE HUNDRED AND EIGHTY (180)
WORKING DAYS COMPLETION TIME,
THE SUM OF $673,250,00
$694,580.00 $824,250.00
$895,100.00
IRREGULARITIES LEGEND
A No Power -of -Attorney
B — No Affidavit as to Capitol 6 Surplus of Bonding Company
C —Corrected Extensions
—Proposal
THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED
THAT
ED Unsigned or improperly Signed or No Corporate Seal
— Incomplete Extensions (Missing Primary Office Location Form)
THE LOWEST RESPONSIBLE AND RESPONSIVE BIDDER
IS
F — Non-responsive bid (Missing copy of Certificate of Competency)
HARD J. CONSTRUCTI❑N
CORP. IN THE AMOUNT OF $
673,250.00
G — Improper Bid Bond
FOR THE TOTAL BID,
1
H — Corrected Bid
I No First Source Hiring Compliance Statement
/
xa~ J — No Minority Compliance Statement
x K— No Duplicate Bid Proposal
PAGES 1 [IF I
B-5648
Prep. By- Estevez Check By -
INFORMAL
LOCATIONS FOR CITYWIDE LOCAL DRAINAGE PROJECT E-77, B-5648.
Location 1:
N.W. 5 Street between N.W. 22 and 23 Avenue
-2210 N.W. 5 Street
Location 2:
S.E. 14 Street East of Brickell Avenue
Location 3:
S.W. 25 Road between S.W. 4 and 5 Avenue
- 405 S.W. 25 Road
Location 4:
S.W. 5 Terrace between S.W. 48 and 49 Avenue
- 4870 S.W. 5 Terrace
Location 5:
S.W. 27 Street between S.W. 31 and 32 Avenue
- 3170 S.W. 27 Street
Location 6:
S.W. 5 Street between S.W. 14 and 15 Avenue
- 1400 S.W. 5 Street
Location 7:
N.E. 29 Street between N.E. 2 Avenue and Miami
Avenue — 35 N.E. 29 Street
Location 8:
S.W. 21 Street between S.W. 29 and 30 Avenue
- 2961 S.W. 21 Street
Location 9:
3500 Avocado Avenue
Location 10:
S.W. 1 Street between S.W. 25 and 26 Avenue
- 2517-19 S.W. 1 Street
Location 11:
N.W. 3 Street between N.W. 22 and 23 Avenue -
2233 N.W. 3 Street TK#5624
Location 12:
N.W. 35 Street between N.W. 8 Ave. and 8 Court
- 798 N.W. 35 Street
Location 13:
S.W. 25 Terrace between S.W. 28 and 29 Avenue - 2828 S.W. 25 Terrace
Location 14:
N.W. 15 Street between N.W. 23 and 24 Avenue
- 2330 N.W. 15 Street
Location 15:
S.W. 16 Terrace between S.W. 30 Avenue and S.W.
32 Avenue
Location 16:
S.W. 36 Avenue between S.W. 29 and 30 Street -
2919 S.W. 36 Avenue
Location 17:
N.W. 17 Street between N.W. 27 and 28 Avenue — 2744 N.W. 17 Street
DAMy Documents\Drainage Complaints\E-77LOCATIONS.doc
02- 894
TO Priscilla A. Thompson
City Clerk
FROM: W�)v'0-6/
John H. Jac on, Director
Public Works Department
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
DATE: June 7, 2002 FILE:
SUBJECT: Request to publish Notice of
Public Hearing for Waiving Formal
Competitive Bid Procedures for
REFERENCES: Citywide Local Drainage Project E-77,
B-5648
ENCLOSURES:
Please make arrangements to publish a Notice of Public Hearing for discussions
pertaining to the waiving of formal competitive sealed bid procedures for the project
entitled Citywide Local Drainage Project E-77, B-5648.
The public hearing has been scheduled for July 25, 2002.
Please charge to Index Code 319201-287.
APPROVED:4�9 16�_�
Elvi G. Alonso
Agenda Coordinator
DATE: :2 -1 2 -) Z
JHJ/LH/mm
c: Cost Analysis
Len Heimers
Central
informalpackageB5648.doc
004— 89 4
CITY OF MIAMI, FLORIDA
NOTICE OF PUBLIC HEARING
A public hearing will be held by the Commission of the City of Miami, Florida, on July 25
2002, at 2 a.m., in the City Commission Chambers at City Hall, 3500 Pan American
Drive, Miami, Florida, for the purpose of hearing objections from any interested parties to
the waiving of formal competitive sealed bid procedures for the project entitled
CITYWIDE LOCAL DRAINAGE PROJECT E-77, B-5648.
All interested persons are invited to appear and may be heard concerning the proposed
sidewalk and curb improvements. Should any person desire to appeal any decision of
the City Commission with respect to any matter considered at this hearing, that person
shall ensure that a verbatim record of the proceedings is made including all testimony
and evidence upon which any appeal may be based.
Priscilla A. Thompson
City Clerk
Miami, Florida