RESOLUTION NO. 02— 723
A RESOLUTION OF THE MIAMI CITY COMMISSION
ACCEPTING THE BID OF REPOR BROTHERS, INC.,
THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER
PURSUANT TO INVITATION FOR BIDS, DATED
APRIL 9, 2002, FOR THE PROJECT ENTITLED
"FLAGAMI STREET REBUILDING/EDISON STORM
SEWERS IMPACT FEE, PHASE II, PROJECTS B-4649
AND B-5666"; ALLOCATING FUNDS FROM CAPITAL
IMPROVEMENTS PROJECT NO. 341199, IN THE
AMOUNT OF $196,591.08, AND PROJECT
NO. 352212 IN THE AMOUNT OF $18,700, AS
APPROPRIATED BY THE ANNUAL APPROPRIATIONS
AND CAPITAL IMPROVEMENT PROJECTS ORDINANCES,
AS AMENDED, IN THE AMOUNT OF $196,279.08 FOR
THE CONTRACT COSTS, AND $19,012 FOR
EXPENSES, FOR A TOTAL ESTIMATED COST OF
$215,291.08; AND AUTHORIZING THE CITY
MANAGER TO EXECUTE AN AGREEMENT, IN A FORM
ACCEPTABLE TO THE CITY ATTORNEY, FOR SAID
PURPOSE.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The bid of Repor Brothers, Inc., the lowest
responsive and responsible bidder pursuant to Invitation for
Bids, dated April 9, 2002, in the proposed amount of
CITY CON= SI N
METI
J U N 2 7 2002
ri.iSo ution No.
(�
V2- 723
$196,279.08, for
the project entitled "Flagami Street
Rebuilding/Edison Storm Sewers Impact Fee, Phase II, Projects
B-4649 and B-566611,
for the total bid of the proposal, based on
lump sum and unit
prices, is accepted at the price stated
herein.
Section 2.
The total estimated project costs of
$196,279.08 are allocated from Capital Improvements Project
No. 341199, in the
amount of $196,591.08, and Project No. 352212
in the amount of
$18,700, as appropriated by the Annual
Appropriations and
Capital Improvement Projects Ordinances, as
amended. Total
project costs consist of $196,279.08 for
contract costs and
$19,012 for estimated expenses incurred by
the City.
Section 3.
The City Manager is authorized'I to execute
an agreement, in a
form acceptable to the City Attorney, with
Repor Brothers, Inc., for the project.
Section 4.
This Resolution shall become effective
immediately upon its adoption and signature of the Mayor Y
1� The herein authorization is further subject to compliance with all
requirements that may be imposed by the City Attorney, including but
not limited to those prescribed by applicable City Charter and Code
provisions.
If the Mayor does not sign this Resolution, it shall become effective
at the end of ten calendar days from the date it was passed and
adopted. If the Mayor vetoes this Resolution, it shall become effective
immediately upon override of the veto by the City Commission.
Page 2 of 3
02- 723
PASSED AND ADOPTED this 27th
ATTEST:
P4�� -�& a. Aea�t��
PRISCILLA A. HOMPSON
CITY CLERK
APPROVED ,Af " FORM
17DRO VILARELLO
ATTORNEY
W6284:tr:LB
day of June , 2002.
ay.. 0 P4 a. ?. f
r—MANUEL A. DIAZ, tR
CORRECTNESS:
Page 3 of 3
02-~ 723
CITY OF MIAMI, FLORIDA
INTER -OFFICE MEMORANDUM
TO: The Honorable Mayor and Members
of the City Commission
FROM: Carlos A. Gimenez
City Manager
RECOMMENDATION:
DATE
CA=1
JUN 18 2002 FILE: B-4649
& B-5666
SUBJECT: Resolution Awarding Contract
for Flagami Street Rebuilding / Edison Storm
Sewers, Impact Fee, Project
REFERENCES:
ENCLOSURES: Resolution
It is respectfully recommended that the City Commission adopt the attached resolution
accepting the bid of Repor Brothers, Inc., a Black -minority, Non -local; corporation, whose
President is Michael Roper; located at 1999 NE 150 Street # 103, North Miami, Florida
33181, for the project entitled "Flagami Street Rebuilding / Edison Storm Sewers, Impact
Fee, Project B-4649 & B-5666", received on April 9, 2002 in the amount of $ 196,279.08 Total
Bid, authorizing the City Manager to enter into a contract on behalf of the City.
JUSTIFICATION: Asphalt pavement reconstruction of various streets; curb & gutter
replacement; sidewalk replacement and new sidewalk construction.
BACKGROUND:
Amount of Total Bid: $ 196,279.08
Cost Estimate: $ 206,526.00
95.04 % of Cost Estimate
Duration: 150 Working Days
Source of Funds: Project Nos. 341199 ($196,591.08) & 352212, ($18,700) Annual
Appropriation and Capital Improvement Projects Ordinances, as
amended.
Minority Representation: 22 invitations mailed to Hispanic, Female and Black - Owned Firms
10 Contractors picked up specs
( 7 Hispanic, 3 Black, 0 Female)
8 Contractors submitted bid
( 5 Hispanic, 3 Black, 0 Female)
Public Hearings/Notices: No public hearing/Bid Notice published
Assessable Project: (No)
Discussion: The Department of Public Works has evaluated the bids received on April 9,
2002, and determined that the lowest responsible and responsive bid, in the
amount of $ 196,279.08 is from Repor Brothers, Inc., a Black - minority
controlled corporation. Funds are available to cover the contract cost, and for
such incidental items as postage, blueprinting, advertising, reproduction costs,
testing, etc.
FISC��AJJL IMPACT: NONE BUDGETED ITEM
CAG/FLtR/94 f �
4/0y 02- 723
Budgetary Impact Analysis
?41W4 I . Department e �k Division �7—S / cm. 'J
2. Agenda Item # (if available)
3. Titl ane brief description of legislation or attach ordi ante/resolution:
/S c� cs /1iry .S�ctJE2
4. Is this item related to revenue? NO: ✓ YES (If yes, skip to item #7.)
5. Are there sufficient funds in Line Item?
YES: Index Code Minor Obj. Code Amount
NO: — Complete the following questions:
B -464A `
a - S -w,
Source of funds: Amount budgeted in the Line Item $
Balance in Line Item $
Amount needed in the Line Item $
Sufficient funds will be transferred from the fnllnwina line items -
ACTION
ACCOUNT NUMBER
ACCOUNT NAME
TOTAL
Index/Minor Object/Project No.
From
3(R3.:I 1 1%30
3tek
$ -76 6-17. o$'
!o
ct 36.1 3 i 4
C'onsh- T..-1 ?ro ,ras$
$ -76 5, -7 • or
E: From
31g3cl qz/
En C-1 c, - P.
$ ? '2
TO
3 3 a
'( p.�s1^r ► n -' ryC mss
$ 2 Z7
To 3143011',ts?1 3sa�� �- �duer hs��S 77
7. AnJy additional comments? L ! P
,.
8. / Ap ov b VA
S l Department DirecVVUesignee to Date
F ARTMENT OF NT AND BUDGET USE ONLY
Verified by: rifled by: Transfer done by:
Detaftm6at o anagement d Budgetf Budget Analyst Budget Analyst
Director/Designee
Date
Date
Date
02- 723
FACT SHEET
DEPARTMENT OF PUBLIC WORKS
DATE: 4 / 22 / 2002
JOB NUMBER: B-4649
PROJECT NAME: FLAGAMI STREET REBUILDING/IMPACT FEE
CIP NUMBER: 341199
LOCATION: FLAGAMI IMPACT FEE DISTRICT
OTHER TYPE:
PROJECT MANAGER / EXT. No.: GIOVANNI CAMPODONICO/ Ext 1214
FEDERAL (C.D.B.G.): No
ASSOCIATED DEPARTMENT: PUBLIC WORKS
S.N.P.B. No
ASSESSABLE: No
EMERGENCY: No
COMMISSIONER DISTRICT: 1,4
BID REQUEST: FORMAL INFORMAL
RESOLUTION No.:
DESCRIPTION: The project involves the reconstruction of various streets see attached sheet within the Fla ami Impact Fee
District. The proposed improvements include asphalt pavement reconstruction, concrete curb & guffer replacement,
4 -inch and 6 -inch concrete sidewalk replacement and new sidewalk construction, and adjustments of
water meters and utility boxes, as directed by the City Engineer.
(IF NECESSARY, CONTINUE ON THE BACK)
SCOPE OF SERVICES: PUBLIC WORKS OUTSIDE COST
COST (% OF CONST. COST)
ADVERTISING $ (A) $ (A)
OUTSIDE DESIGN $ -- $ --
TESTINGS / SURVEY / PLAT $ $ -- (E)
P.W. DESIGN & BID DOCUMENTS $ 3,816.00 (E) $ -- 2 %
CONSTRUCTION $ -- $ 179, 229.08 (BID)
CONSTRUCTION ADMINISTRATION $ 12,546.00 (BID) $ -- 7 %
OTHER: TESTING $ -- $ 11000.00 (E)
(A) - ACTUAL
9 %
(E) - ESTIMATE TOTAL 196, 591 .08 (TOTAL ENG. FEE)
ESTIMATED CONST. COST $ 190, 826.00
CONTRACTOR'S INFORMATION:
CLASS: F—S] NON - MINORITY
TYPE OF WORK: ASPHALT PAVEMENT, CONCRETE SIDEWALK AND CAG MINORITY O
YEARS OF ESTABLISHMEN 5 LICENSE E - 981800
NAME REPOR BROTHERS INC. TELEPHONE: (305) 940-5300
ADDRESS: 1999 NE 150 STREET # 103
CITY, STATE, ZIP: NORTH MIAMI, FLORIDA 33181 CLASS: J - JOINT P = PRIME S = SUB
MINORITY: B = BLACK H = HISPANIC F = FEMALE
CONTACT PERSON: MICHAEL ROPER. PRESIDENT
SUB -CONTRACTORS:
NAMES:
a wegw: waasaswv, usnEa:svna, UiJa/ ANALTa1a, FILE, ASa%XL:IATED DEPT, GIP MANAGER REV. 2/00
02- 723
FACT SHEET
DEPARTMENT OF PUBLIC WORKS
DATE: 4 / 22 / 2002
JOB NUMBER: B-5666 PROJECT NAME: EDISON STORM SEWERS/ IMPACT FEE,PHASE 11, B-5666
CIP NUMBER: 352212 LOCATION: Along NE 70th Street on the east side of Biscayne BOUI ar
OTHER TYPE: PROJECT MANAGER / EXT. No.: GIOVANNI CAMPODONICO/ Ext 1214;LXdQ Z1j
FEDERAL (C.D.B.G.): FN_01 ASSOCIATED DEPARTMENT: PUBLIC WORKS
S.N.P.B. No
ASSESSABLE: No
EMERGENCY: No COMMISSIONER DISTRICT: 2 BID REQUEST: FORMAL= INFORMAL=
RESOLUTION No.:
DESCRIPTION: THIS PROJECT INVOLVES THE CONSTRUCTION OF AN EXFILTRATION STORM WATER DRAINAGE
SYSTEM FOR THE LOCATION IDENTIFIED ABOVE. THE SYSTEM WILL INCLUDE THE CONSTRUCTION OF EXFILTRATION
DRAINS, WITH CROSS DRAINS, CURB & GUTTER AND RELATED DRAINAGE STRUCTURES THROUGHOUT THIS AREA
TO ELIMINATE STORM WATER FLOODING PROBLEMS.
(IF NECESSARY, CONTINUE ON THE BACK)
SCOPE•OF SERVICES: PUBLIC WORKS OUTSIDE COST
COST (% OF CONST. COST)
ADVERTISING $ 636.80 (A) $ (A)
OUTSIDE DESIGN $ -- -- $ --
TESTINGS / SURVEY / PLAT $ $ - (E)
P.W. DESIGN & BID DOCUMENTS $ 313.20 (E) $ -- 2 %
CONSTRUCTION $ -- $ 17,050.00 (BID)
CONSTRUCTION ADMINISTRATION $ 700.00 (BID) $ -- 4 %
OTHER: $ -- $ (E)
(A) - ACTUAL
6 %
(E) - ESTIMATE TOTAL $18,700.00 (TOTAL ENG. FEE)
ESTIMATED CONST. COST $ 1 S, 700.00
CONTRACTOR'S INFORMATION:
CLASS: = Im 0 NON - MINORITY C�
TYPE OF WORK: DRAINAGE MINORITY �B Q
YEARS OF ESTABLISHMEN 5 LICENSE E - 981800
NAME: REPOR BROTHERS INC. TELEPHONE: (305) 940-5300
ADDRESS: 1999 NE 150 STREET # 103
CITY, STATE, ZIP: MIAMI, FLORIDA 33181 CLASS: J = JOINT P = PRIME S = SUB
CONTACT PERSON: MICHAEL ROPER MINORITY: B - BLACK H = HISPANIC F = FEMALE
SUB -CONTRACTORS:
NAMES:
a wvnc�: Aaa,a�An� ulnca:Ivrta, Liva1 ANALTaIa, FILL, AaaC7L:V17ED DEPT, GIP MANAGER REV. 2/00
02- 723
TABULATION OF BIDS FOR
FLAGAMI STREET REBUILDING/EDISON STORM SEWERS/IMPACT FEE,
Received by the City Clerk, City of Miami, Florida at I1:00 A.M.
PHASE II, PROJECT,
on Apra 9, 2002
B-4649 & B-5666
B-4649
B-5666
Bidder REPOR BROTHERS, INC.
APAC GROUP INC, HARD 1 CONST. CORP.
HORIZON CON1RAIORS,INC. MORLIC ENGINEERING CORP.
METRO EXPKSS INC.
Address 999 NE.I50th STREET STE. 103
20030 E OAKMONT DRIVE 99 KV. 183 STREET SUITE 108 8175 VEST 32 AVENUE Ste, 1
7571 N.V. 7 STREET
3594 S.V. 443rd COURT
NORTH MIAMI, FL 33181
MIAMI, FL 33015 MIAMI, FL 33169
HIALEAH, FLORIDA 33018
MIAMI, FL 33126
MIAMI, FL 33175
Loceta in tie City or Men! NO
NO NO
NO
YES
NO
dtwset a IwAra as Per Oty code L ibtra Bra YES
YES YES
YES
YES
YES
Bid Bond Amount B.B. 15, 000.06
B.B. 15, 000.00 B.B. 20, 000.00
B.B. 5%
B.B. 5%
B.B. 5'J,
irregularities C
H H
C, E, H
Minority owned YES, B
YES, B YES, B
YES, H
YES, H
YES, H
BID 'A':TRE TOTAL OF ITEMS 1 THROUGH 15 $ 179, 229.08
E 192, 178.30 S 196, 046.25
S 199, 683.50
4 216, 062.00
E 228, 957.00
BID'B':TRE TOTAL OF ITEMS 16 TRDtDI1G1R 23 S 17, 050.00
$ 18, 385.00 $ 17, 914.00
S 14, 790.00
$ 25, 000.00
S 44, 200.00
TOTAL BIDTRE TOTAL OF ITEMS I TRRp1GRl
23 BASED ON ONE HUNDRED FIFTY (150)
CALENDAR DAY COMPLETION
TIME, THE SUM OF $ 196, 279.08
$ 210, 563.30 $ 213, 960.25
$ 214, 473.50
$ 241, 062,00
E 273, 157.00
Bidder MIRI CONSTRUCTION INC.
2MIONOOM 030IR[IXK
Address 7340 SV 121 STREET
12054 N.V. 98th AVENUE,
MIAMI, FL 33156
HIALEAI GARDENS, FLORIDA 33018
L«eta In dee City at M.,. NO
NO
uc«wd t k4wed as Far Oil cad L MNn ad YES
YES
Bid Bond Amount B.B. 5%
B.B. 5%
Irregularities H
Minority. Owned YES, H
YES, H
BID 'A':THE TOTAL OF ITEMS I TRDtQ!<FI 15 3 342, 104.95
S 355, 967.00
BID 'r-THE TOTAL OF ITEMS 16 IMM 23 S 26, 110.00
$ 15, 669.00
10TAL BIDTRE TOTAL OF ITEMS I TRDIW
23 BASED ON ONE HWDREO FIFTY (150)
CALENDAR DAY COMPLETION
TIME, THE SUM OF S 368, 214.95
z 371, 636.00
IRREGULARITIES LEGEND
A — No Power-of-Attorney
B — No Affidavit as to Capital L Surplus of Bonding Company
C— Corrected Extensions THE DEPARTMENT OF PUBLIC WORKS HAS DETERMINED THAT
D —Proposal Unsigned or Improperly Signed or No Corporate Teal THE LOWEST RESPONSIBLE AND RESPONSIVEBIDDER IS
E — IncomRon-r spo sWer-Atbi ons REP❑R BROTHERS INC. IN THE AMOUNT OF $ 196, 279.08
F —Non-respanswe bid classing copy of Certificate of Competency)
" G —Improper Bid Bond FOR THE TOTAL BID.
Corrected Bid
I NFirsis BID 01-02-109
— No First SourHiring Compliance Statement
J — No Minority Compliance Statement
K— No BKWcote B1d Proposal PAGE: 1 OF 1 — &
Prep. By- GIOVANNI CAMPODONICO Check By; LEN HELMERS 3 -5666
FLAGANU STREET IMPROVEMENT, B4649
LIST OF LOCATIONS
• NW 43 Av. between NW 9 St. and NW 11 St.
• NW 43 P1. between NW 7 St. and Flagler St.
• NW 44 Av. between NW 9 St. and NW 11 St.
• NW 44 Av. between NW 7 St. and Flagler St
• NW 14 St. between NW 42 Av. and NW 42 Ct.
• NW 42 Ct. between NW 14 St. and NW 18 St
• NW 44 Av. between NW 7 St. and Flagler St.
• NW 5 St. between NW 43 Pl.and NW 43 Av.
• NW 43 Av. and NW 4 St.
• NW 2 St. between NW 43 Av. and NW 46 St.
• NW 2 Terr. and NW 4 Av.
• NW 46 Av. and NW 3 St
• NW 3 St. between NW 44 Av. and NW 49 Av.
• NW 48 Ct. and NW 4 St.
• NW 52 Av. and NW 4 St
• NW 53 Av. and NW 3 St.
• NW 58 Ct. and NW 3 St.
• NW 59 Ct. between NW 2 St. and Flagler St.
• SW 4 St. between SW 56 Av. and SW 57 Av.
• SW 7 St. between SW 54 Av. and SW 56 Av.
• SW 55 Av. between SW 7 St. and SW 8 St.
Among others.
EDISON STORM SEWERS/IMPACT FEE, PHASE II, B-5666
. Along NE 70 Street / East side of Biscayne Boulevard
02- 723