HomeMy WebLinkAboutR-02-0266J-02-170
3/4/02
RESOLUTION NO. 02— 266
A RESOLUTION OF THE MIAMI CITY COMMISSION
ACCEPTING THE BID OF MCO CONSTRUCTION &
SERVICES, INC., THE LOWEST RESPONSIVE AND
RESPONSIBLE BIDDER PURSUANT TO INVITATION
FOR BIDS, DATED DECEMBER 18, 2001, FOR THE
PROJECT ENTITLED "MIAMI POLICE UPPER
EASTSIDE SUB -STATION -- ROOF REPLACEMENT,
B-6369", IN THE AMOUNT OF $19,500;
ALLOCATING FUNDS FROM CAPITAL IMPROVEMENTS
PROJECT NO. 312025, AS APPROPRIATED BY THE
ANNUAL APPROPRIATIONS AND CAPITAL
IMPROVEMENT ORDINANCES, AS AMENDED, IN THE
AMOUNT OF $19,500 FOR THE CONTRACT COSTS,
AND $3,485.50 FOR EXPENSES, FOR A TOTAL
ESTIMATED COST OF $22,985.50; AND
AUTHORIZING THE CITY MANAGER TO EXECUTE AN
AGREEMENT, IN A FORM ACCEPTABLE TO THE CITY
ATTORNEY, FOR SAID PURPOSE.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The bid of MCO Construction & Services,
Inc., the lowest responsive and responsible bidder pursuant to
Invitation for Bids, dated December 18, 2001, in the proposed
amount of $19,500, for the project entitled "Miami Police Upper
CITY C%0V=S$J0 '
rgzF. � -a ,W,
h .R 2002
�3a�a9uliai�, .
4" 1 4K, 0 0
Eastside Sub -Station Roof Replacement, B-6369", for the total
bid of the proposal, based on lump sum and unit prices, :is
accepted at the price stated herein.
Section 2. The total estimated project costs of $19,500
are allocated from Capital Improvements Project No. 312025, as
appropriated by the Annual Appropriations and Capital
Improvements Ordinances, as amended. Total project costs
consist of $19,500 for contract costs and $3,485.50 for
estimated expenses incurred by the City.
Section 3. The City Manager is authorizedl� to execute
an agreement, in a form acceptable to the City Attorney, with
MCO Construction & Services, Inc. for the project.
Section 4. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor .2/
The herein authorization is further subject to compliance with all
requirements that may be imposed by the City Attorney, including but
not limited to those prescribed by applicable City Charter and Code
provisions.
z.i :If the Mayor does not sign this Resolution, it shall become effective
at the end of ten calendar days from the date it was passed and
adopted, If the Mayor vetoes this Resolution, it shall become
effective immediately upon override of the veto by the City Commission,
Page 2 of 3
02- 266
PASSED AND ADOPTED this 14th day of March , 2002.
ATTEST:
9.
eO'L A- �)'. 61&�
PRISCILLA A. TPOi,iPSON
CITY CLERK
APPROV S '�0 F AND CORRECTNESS
OWNDR7-7-ILARELLO
Y ATTORNEY
W6021:tr:LB
MANUEL A. DIAZ , 9""µ
Page 3 of 3 02— 2V6
,"A
CITY OF MIAMI, FLORIDA CA=2 MEMORANDUM
TO: The Honorable Mayor and
Members of the City Commission
FROM:
Carlos A. Gtmenez
City Manager
DATE: FILE
FEB 2 6 M2
SUBJECT:
RESOLUTION awarding contract
for Miami Police Upper Eastside
REFERENCES: Sub -Station — Roof Replacement
B-6369
ENCLOSURES:
RECOMMENDATION '
It is respectfully recommended that the City Commission adopt the attached Resolution accepting
the low bid of MCO CONSTRUCTION & SERVICES, INC., a company located at 6600 NW
27ch Avenue, Suite 202, Miami, Florida 33147, whose principal is Ann McNeill, President, for the
project entitled MIAMI POLICE UPPER EASTSIDE SUB_STATION-ROOF REPLACEMENT,
B-6369, received on January 8, 2002, in the amount of $19,500 total, authorizing the City Manager
to enter into a contract on behalf of the City.
BACKGROUND
No previous work history with City.
Amount of Bid: $19,500 % of Cost Estimate. 108.3
Cost Estimate: $18,000 Duration: 30 calendar days
Source of Funds: Annual Appropriations Ordinance, as amended
CIP Project 312025
Minority Representation: 15 Contractors invited
4 contractors picked up plans and specs
I Female -Hispanic, I Female -Black, 1 Hispanic
2 contractors submitted bids
1 Female -Hispanic, 1 Female -Black
Public Hearings/Notices: Bid Notice published
Assessable Project: No
Discussion: The Department of Public Works has evaluated the bids received on January 8,
2002, and determined that the lowest responsive and responsible bid, in the amount of $19,500 is
from MCO Construction & Services, Inc., a Female -Black controlled corporation located outside
of the City of Miami. Funds are available to cover the contract cost and for such incidental items
as postage, blueprinting, advertising and reproduction costs.
CAG FK/GR/JRA/m?.*
MV/mm
�+
Miami Police Upper Eastside Sub Station -86369 02- 2 6 6
•
Bud,etary Impact Analysi
f. Department]C Divisin,,,.,,GS
- --
2. Agenda Item # (if available)
3. Ti"d brief description of legislation or attach ordinance/resolution:
1l�/y!/ o �•-l�c ���� �i�ST�„d C
4. Is this item related to revenue? NO: YES (If yes, skip.to item #7.)
5. Are there sufficient funds in Lane item?
YES: _ Index Code Minor ON. Code Amount $
NO: — Complete the following questions.-
6.
uestions.6. Source of funds: Amount budgeted in the Lane Item $
Amount needed in the Line Item $
Sufficient funds will be transferred from the following line items:
ACTION ACCOUNT NUMBER ACCOUNT NAME TOTAL
Index/Minor Object/Project No.
FromVj0 3 3►.2c23` / s � °� 2S
To .3 r 3e .M11;31 S ' `� SO
-70 3+�}�er�7i2 �3� �:zS r���rr7t2.rrrtic, �ul�l c L�'• v y 5
7. Any additional comments?
E-1
LeoJI-0 Z
Dde
FOR"DEPARTME MANAGtrH=NT AND BUDORT, U5E ONLY
Verified by:
Verified by:
Date
Department of Management and Budget
Date
02- 266
FORMAL BID
MIAMI POLICE UPPER EAST SIDE SUB -STATION - ROOF REPLACEMENT
Project Number: 11-6369
CIP Nurnber: 312025.299301.6.830
Project Manager: Allan !'orris / Manny Vega
Date: 1 / 8 / 2002
Person who received the bids: Manny Vega
Received at: CITY CLERK'S OFFICI:,
MIAMI CITY I[ALL
Construction Estimate = $ 18,000.00 with cash a]lowance.
Time: 11:00 a.m.
BIDDER
MCOConsirucuou & Services
MW Corp
ADDRESS
6600 NW 27111 Ave
103 W2 N54th Street
Miami, Florida 33147
Miami, Florida 33127
BID BONN AMOUNT
VaucherNo. n1102.01
Voucher No. 61302-07
IRREGULARITIES
K
MINORITY OWNED
YI:s
YES
ITFM No. DESCRIPTION
UNIT
PRICI{ TOTAL
UNIT UN1"f UNIT
I'IZIC'li TOTAL PRICH TO•i Al. PRICE TOTALT(rrAL
BASE trio: I TUROUGH 5 ITEMS
$ 19,500.00
$ 23,600.110
1 IZernove existing roof and install a new SITS modified
$ 6,000.00
S 15,080.00
billlrtelr roof system over insulation board.
2 Remove and then restore all deteriorated sheathing
$ 14.06 $ 4.510.00
S725 $ 2,320.00
approximalely 320.00 Sq. H.
3 Install new downspouts.
$ 3.000.00
$ 1.600.00
4 Waterproof and flash parapet walls.
$ 3,00(1.0{3 Y
$ 1,600.00
5 Cash Allowance
$ 3,000 00
$ 3,000.00
• IRREGULARITIES LEGEND
1-C HAS RI:I:N DETERMINED BY "1"111: DEiPARTMi:NT 01= PUBLIC
WORKS "IIIA-1'THE
A -- No Power-ol'-Attorney
LOWLST RESPONSIBLE ANI) RI:SPONSIVI: I31[) IS FROM
MCO Construction & Services
11 -- Na Aliidavil as to Capital & Surplus of Bonding Company
C
FOR 111G TOTAL AMOUNT OF
$ 19,500,00'1
-- Corrected ENtensions
t) -- Proposal Unsigned or improperly Signed or no Corporate Seal
F -- Ineolnplete Extensions
1: -- Non - respunsive bid
11 the above
contractor 1s not the latvcst bidder ex�rialn:
1-1 -- Improper lard Ilona
11 -- No C'erullcale of t-'ompetrnry Numher
1 /0 ��`� z
I -- No 1-1rst 5uurec lilting Cornpllance stalelucal
i -- No ,Minora y l"umplranre Stalemcnt
K -- No Duplicate lied Proposal
1. -- No( n}-(kcnpahonall.lcensc
SIt9:LE I UP 3
0
i
FACT SHEET
DEPARTMENT OF PUBLIC WORKS
DATE: 1 1 25 1 2002
JOB NUMBER: B-6369 PROJECT NAME: MIAMI POLICE UPPER EAST SIDE SUB -STATION - ROOF REPLACEMENT
CIP NUMBER: 312025.299301.6.930 LOCATION: 6565 BISCAYNE BLVD.
OTHER TYPE: PROJECT MANAGER 1 EXT. No.: ALLAN POMS - 12451 MANNY VEGA - 1213
FEDERAL (C.D.B.G.): ASSOCIATED DEPARTMENT: MIAMI POLICE DEPARTMENT
S,N.P.B.
ASSESSABLE:
EMERGENCY: COMMISSIONER DISTRICT: 5 BID REQUEST: FORMAL = INFORMAL
RESOLUTION No.:
DESCRIPTION: The work consists Of furnishing all labor, materials, equipment, and supervision necessa to replace the existing built-up roofs stem
over a wood deck on the Upper East Side Police Station with a new modified bitumen roofin s stem, insailt new downspouts, waterproof and flash Parapet walls
and all related work.
SCOPE OF SERVICES:
PUBLIC WORKS COST
OUTSIDE COST
(% OF CONST. COST)
ADVERTISING
$ 560.50 (E)
OUTSIDE DESIGN
$
TESTINGS ! SURVEY 1 PLAT
$
(E)
$ (E)
P.W. DESIGN & BID DOCUMENTS
$
1,560.00
8.00 %
CONSTRUCTION
$ 19.50D,00 (elD)
CONSTRUCTION ADMINISTRATION
$
1,365,00
TOO %
OTHER:
$
(E)
$ (E)
15-00 %
(E) - ESTIMATE
TOTAL $ 22.986.50
(TOTAL ENG. FEE)
ESTIMATED CONST. COST $ 18,000.00
CONTRACTOR'S INFORMATION:
CLASS: = m = NON - MINORITY u
TYPE OF WORK: Roof Replacement MINORITY
YEARS OF ESTABLISHMENT: 9 Years LICENSE CGC 060578
NAME: MCO Construction& Services, Inc. TELEPHONE: 305- 693-4344
ADDRESS: 6600 NW 27th Ave. , Suite # 202
CITY, STATE, ZIP: Miami, FI 33147 CLASS.. J = JOINT P - PRIME S = SUB
CONTACT PERSON: Ann Mc Neill, President MINORITY: B = BLACK H = HISPANIC F = FEMALE
SUB -CONTRACTORS:
NAMES:
COSTANALYSIS, FILE, ASSOCIATED DEPT, CIP MANAGER REV, 10108
02,0