HomeMy WebLinkAboutR-03-0892J-03-699 07/23/03 RESOLUTION NO. 03 - 8 92 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), ACCEPTING THE BID OF WILLIAMS PAVING COMPANY, INC., FOR THE PROJECT ENTITLED "ROAD REHABILITATION PROJECT, B-4653," IN AN AMOUNT NOT TO EXCEED $709,999.99 FOR CONTRACT COSTS PLUS $92,300 TO COVER EXPENSES AND OTHER COSTS TO BE INCURRED BY THE CITY FOR A TOTAL PROJECT COST OF $802,299.99 AS SET FORTH ON THE FORMAL BID DOCUMENT AND THE DEPARTMENT OF CAPITAL IMPROVEMENTS PROJECT FACT SHEET; ALLOCATING FUNDS FROM CAPITAL IMPROVEMENTS PROJECT NO. 313855; AND AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, FOR SAID PURPOSE. BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The bid of Williams Paving Company, Inc. for the project entitled "ROAD REHABILITATION PROJECT, B-4653," in an amount not to exceed $709,999.99 for contract costs plus $92,300 to cover expenses and other costs incurred by the City for a total cost of $802,299.99 as set forth on the Formal Bid document and the Department of Capital Improvements Project Fact Sheet, attached and incorporated is accepted, with funds allocated from Capital Improvements Project No. 313855. 77 7 CITY COMMISSION MEETING OF im. 2 4 2003 Resolution No. "- 892,x. Section 2. The City Manager is authorizedll to execute an Agreement, in substantially the attached form, for said purpose. Section 3. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.V PASSED AND ADOPTED this 24th day of July , 2003. ATTEST: , PRISCILLA A. THOM SON l' CITY CLERK _ FORM AND CORRECTNESS �'j LLO ITY ATTORNEY W7436:tr:AS �i MANUEL A. DIAZ, OR 1� The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable provisions of the City Charter and Code. If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 2 of 2 P)3— 892 CONTRACT This AGREEMENT, made and entered into this_ day of , A.D., 2003, by and between the City of Miami, Florida, a municipal corporation of the State of Florida, party of the first part, (hereinafter sometimes called the "City"), and WILLIAMS PAVING COMPANY, INC. Party of the second part (hereinafter sometimes called the "Contractor") WITNESSETH: That the parties hereto, for the considerations hereinafter set forth, mutually agree as follows: ARTICLE 1. SCOPE OF THE WORK: The Contractor shall furnish all labor, materials and equipment and perform all the work in the manner and form provided by the Contract Documents, for the project entitled: "Road Rehabilitation Project, B-4653" ARTICLE 2. THE CONTRACT SUM: The City shall pay to the Contractor, for the faithful performance of the Contract, in lawful money of the United States, and subject to additions and deductions and based on unit prices (where applicable), all as provided in the Proposal and other Contract Documents, the sum of ($709,999.99), Seven Hundred and Nine Thousand Nine Hundred and Nine Nine Dollars and Nino -Nine Cents ARTICLE 3. PARTIAL AND FINAL PAYMENTS: In accordance with the provisions fully set forth in the "General Conditions" of the "Specifications," and subject to additions and deductions as provided, the City shall pay the Contractor as follows: (a) On or before the 10th day of each calendar month, the City shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work, performed during the preceding calendar month by the Contractor, less ten (10%) percent of the amount of such estimate, which is to be retained by the City until all work has been performed strictly in accordance with this Agreement and until such work has been accepted by the City. (b) Upon submission by the Contractor of evidence satisfactory to the City that all payrolls, material bills and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, and also, after all guarantees that may be required in the Specifications or by the Contractor have been furnished and are found acceptable by the City, final payment on account of this Agreement shall be made within sixty (60) days after completion by the Contractor of all work covered by this Agreement and acceptance of such work by the City. 1 03- 892 ARTICLE 4. TIME OF COMPLETION: The Contractor shall commence the work to be performed under this Contract within the number of consecutive days after the date of written notice from the Director of the Department of Capital Improvements to begin work as noted in the Proposal, and shall fully complete the Contract in accordance with the Contract Documents within the number of working days as set forth in the Proposal. It is mutually agreed between the parties hereto, that time is the essence of this Contract, and, in the event that construction of the work is not completed within the time herein specified, it is agreed that from the compensation otherwise to be paid to the Contractor, the City may retain for each day thereafter, Sundays and holidays included, that the work remains uncompleted, the sum set forth in the General Conditions of the Specifications, as modified by Division 2 - Special Provisions, which sum represents the actual damage which the City of Miami, Florida, will have sustained per day by failure of the Contractor to complete the work within the time stipulated, and this sum is not a penalty, but will be the liquidated damage that City will have sustained in event of such default by the Contractor. ARTICLE 5. ADDITIONAL BOND: It is further mutually agreed between the parties hereto, that if, at any time after the execution of this Agreement and the Performance Bond hereto attached, when required for its faithful performance, the City shall deem the surety or sureties upon such bond to be unsatisfactory, or if, for any reason, in the opinion of the Engineer; such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within five (5) days after receipt of notice from the Engineer so to do, furnish an additional bond or bonds in such form and amount, and with such surety or sureties as shall be satisfactory to the City. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the City. ARTICLE 6. CONTRACT DOCUMENTS: All of the documents hereinafter listed form the Contract and they are as fully as part of the Contract as if hereto attached, or repeated in this Agreement: ADVERTISEMENT FOR BIDS PROPOSAL BID BOND CONTRACT PERFORMANCE BOND MAINTENANCE PERFORMANCE BOND INSTRUCTIONS TO BIDDERS SPECIFICATIONS ADDENDA PLANS: As prepared by: Department of Capital Improvements Entitled: "Road Rehabilitation Project, B-4653" 2 03- 892 IN WITNESS WHEREOF the parties hereto have executed this Agreement on the day and date first above written in five (5) counterparts, each of which shall, without proof or accounting for the other counterparts, be deemed an original contract*. ATTEST: Priscilla A. Thompson City Clerk WITNESS: (If Corporation, attach Seal and Attest by Secretary) (SEAL) RESOLUTION NO. APPROVED AS ENGINEERING: THE CITY OF MIAMI, FLORIDA Party of the first part WN Joe Arriola City Manager CONTRACTOR: MN Party of the second part (Title) (Employer Tax I.D. Number) APPROVED AS TO INSURANCE REQUIREMENTS: Diane Ericson, Director Risk Management APPROVED AS TO FORM AND CORRECTNESS: Jorge C. Cano, P.E. Alejandro Vilarello Director City Attorney Department of Capital Improvements *IN THE EVENT THAT THE CONTRACTOR IS A CORPORATION, THERE SHALL BE ATTACHED TO EACH COUNTERPART A CERTIFIED COPY OF A RESOLUTION OF THE BOARD OF DIRECTORS OF THE CORPORATION, AUTHORIZING THE OFFICER WHO SIGNS THE CONTRACT TO DO SO IN ITS BEHALF. 3 loJ3— 892 G: FORMAL BID MINORITY OWNED (TRIS PROJECT HAS NOT BEEN DESIGNATED AS A SET ASIDE) "ROAD REHABILITATION PROJECT" Project Number: B-4653 ITEM No. DESCRIPTION CIP Number: 313855 Project Manager: Tatiana Acosta TOTAL: BID ITEMS 1 THROUGH 27 Date: 7 22 2003 Person who received the bids: Tatiana Acosta Received at: City Clerk's Office, Miami City Hall Construction Estimate = $ 793,306.00 1-20 BID ITEMS 1 THROUGH 26 Time: 10:00 a.m. BIDDER WILLIAMS PAVING PETRO HYDRO, INC. COMPANY INC ADDRESS 11300 NW South River Drive 10450 NW 31 TERRACE MEDLEY, FLORIDA 33178 MIAMI, FLORIDA 33172 BID BOND AMOUNT 5% BID BOND 5% BID BOND IRREGULARITIES c MINORITY OWNED (TRIS PROJECT HAS NOT BEEN DESIGNATED AS A SET ASIDE) NO YES ITEM No. DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL TOTAL: BID ITEMS 1 THROUGH 27 $709,999.99 $825,614.90 1-20 BID ITEMS 1 THROUGH 26 $629,999.99 $745,614.90 ROAD RESURFACING AND RECONSTRUCTION OF SWALES, DRIVEWAYS AND DRAINAGE IMPROVEMENTS 21 BID ITEM 27 PROVISION FOR SPECIAL ITEMS $80,000.00 $80,000.00 * IRREGULARITIES LEGEND IT HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE A -- No Power - of- Attorney LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM WILLIAMS PAVING COMPANY, INC. B -- No Affidavit as to Capital & Surplus of Bonding Company FOR THE TOTAL AMOUNT OF $709,999.99 C -- Corrected Extensions D -- Proposal Unsigned or Improperly Signed or no Corporate Seal E -- Subcontractor(s) not Identified It the above contractor is not the lowest bidder explain: N/A F -- Non -responsive bid G -- Improper Bid Bond H -- No Certificate of Competency Number PREPARED BY: TATIANA ACOSTA 1 -- No Pirst Source Hiring Compliance Statement REVISED BY: JUAN B. ORDONEZ, P.E. J -- No Minority Compliance Statement DATE: JULY 22, 2003 K -- No Duplicate Bid Proposal L -- No City of Miami or County Occupational License SHEET 1 UP t G` of City of Miami Department of Capital Improvements PROJECT FACT SHEET 7d 4ti0 �CO,Fti� Date: July 22, 2003 Emergency: Project Name: ROAD REHABILITATION PROJECT Project Location: Citywide Commissioner District: 4 Project Number: 8-4653 Initiating Dept.: Public Works Project Manager/Ext. No.: Tatiana Acosta, #1263 Project Budget: Homeland Defense F__1 Account Number: 313855 Amount: Federal (C.D.B.G.) I--] Account Number: S.N.P.B. Account Number: Other: C.I.P. No. 0 Account Number: The proposed wok involves the following areas: Amount: Amount: Amount: W No. 1: SW 47th Court, SW 49th Avenue, SW 5th Street and SW 8th Street; O No.2: NW 4th Street and NW 4th Terrace between SW 40 Court and SW 39 Avenue H No .& SW 13th Street between SW 23th Court and SW 24th Avenue. No* SW 16th Street and SW 16th Terrace between SW 32th Court and SW 37th Avenue. w No.5: Coral Gate Drive between SW 16th Lane and SW 16th Street. 0 The Project consists of the road re -construction and resurfacing, including limited drainage improvements. a The drainage includes new systems with exfiltration drain and structures, as indicated in Specifications and Contract Documents. URS Corporation Southern 7650 Corporate Center Drive, Suite 400 Miami, Florida 33126-1220 Julio Boucle, PE 305-262-7466 Contractor: Williams Paving Company, Inc. Address: 11300 NW South River Drive City, State, Zip: Medley, Florida 33178 Contact Person: Jose and Betty J. Rodriguez Telephone/E-mail: (305)-882-1950 Class: P (J = Joint P = Prime Minority Status: S = Sub) N (B = Black F = Female H = Hispanic N = None) Established: 51 years License Number: 26791 Sub -Contractors: H & J Asphalt G & B Striping Black Creek Nursery PROJECT COSTS N/A N/A Miscellaneous Construction Cost includesan amount of $ 35,500 for concept of Estimate Construction Administration Services to be performed by the Consultant. This fee was not considered in the Original Design Proposal. Construction Contract Amount: $710,000 (BID) CIP Construction Administration: $21,300 (E) " Misc. Construction Costs: $71,000 (E) Construction Phase Total $802,300 s)3— 892