Loading...
HomeMy WebLinkAboutR-03-0829J-03-775 7/17/03 RESOLUTION NO. 93— 829 A RESOLUTION OF THE MIAMI CITY COMMISSION, BY A FOUR-FIFTHS (4/STI) AFFIRMATIVE VOTE, WITH ATTACHMENT(S), RATIFYING, APPROVING AND CONFIRMING THE CITY MANAGER'S FINDING OF AN EMERGENCY, WAIVING COMPETITIVE BIDDING PROCEDURES, AND ACCEPTING THE BID OF PROFESSIONAL GENERAL CONTRACTORS, INC., FOR THE PROJECT ENTITLED "ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS (SECOND BIDDING), B-3297," IN THE AMOUNT OF $1.,949,031.00; ALLOCATING FUNDS FROM CAPITAL IMPROVEMENTS PROJECT NO. 324002, IN THE AMOUNT OF $1,949,031.00 FOR CONTRACT COSTS, AND $113,000.00 FOR EXPENSES TO BE INCURRED BY THE CITY, FOR TOTAL PROJECT COSTS NOT TO EXCEED $2,062,031.00; AND AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT, IN SUBSTANTIALLY THE ATTACHED FORM, FOR SAID PURPOSE. BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. By a four-fifths (4/5th,) affirmative vote, the City Manager's finding of an emergency, waiving competitive bidding procedures, and accepting the bid of PROFESSIONAL GENERAL CONTRACTORS, INC., for the project entitled RBSCMDED REPEALED AMM:11DED 6Y&L j -0117 R-d�rdc�2� CITY COMMISSION MEETING OF JUL 1 7 ?003 Resolution No. 03- 829 "Orange Bowl Stadium 2003 Structural Repairs (Second Bidding), B-3297," in the amount of $1,949,031.00, is ratified, approved, and confirmed, with funds allocated from Capital Improvements Project No. 324002, in the amount of $1,949,031.00 for contract costs and $113,000.00 for expenses to be incurred by the City, for total project costs in the amount of $2,062,031.00. Section 3. The City Manager is authorized!' to execute an agreement, in substantially the attached form, for said purpose. Section 4. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.V 1/ The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable City Charter and Code provisions. a/ If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 2 of 3 93- 829 PASSED AND ADOPTED this 17th day of July 2003. 7 A• 4ANU EL A. DIAZ, MAYOR EST: ` 4 PRISCILLA A. THOMPSON CITY CLERK ZO FORM CORRECTNESS:�j ARELLO ATTORNEY W7493:BSS Page 3 of 3 03- 829 CONTRACT This AGREEMENT, made and entered into this day of , A.D., 2003, by and between the City of Miami, Florida, a municipal corporation of the State of Florida, party of the first part, (hereinafter sometimes called the "City"), and PROFESSIONAL GENERAL CONTRACTORS. INC. Party of the second part (hereinafter sometimes called the "Contractor") WITNESSETH: That the parties hereto, for the considerations hereinafter set forth, mutually agree as follows: ARTICLE 1. SCOPE OF THE WORK: The Contractor shall furnish all labor, materials and equipment and perform all the work in the manner and form provided by the Contract Documents, for the project entitled: ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS (SECOND BIDDING). B-3297. ARTICLE 2. THE CONTRACT SUM: The City shall pay to the Contractor, for the faithful performance of the Contract, in lawful money of the United States, and subject to additions and deductions and based on unit prices (where applicable), all as provided in the Proposal and other Contract Documents, the sum of (S 1.949.031.00 1. One Million Nine Hundred Forty Nine Thousand Thirty One Dollars and NO Cents. ARTICLE 3. PARTIAL AND FINAL PAYMENTS: In accordance with the provisions fully set forth in the "General Conditions" of the "Specifications," and subject to additions and deductions as provided, the City shall pay the Contractor as follows: (a) On or before the 101h day of each calendar month, the City shall make partial payments to the Contractor on the basis of a duly certified and approved estimate of work, performed during the preceding calendar month by the Contractor, less ten (10%) percent of the amount of such estimate, which is to be retained by the City until all work has been performed strictly in accordance with this Agreement and until such work has been accepted by the City. (b) Upon submission by the Contractor of evidence satisfactory to the City that all payrolls, material bills and other costs incurred by the Contractor in connection with the construction of the work have been paid in full, and also, after all guarantees that may be required in the Specifications or by the Contractor have been furnished and are found acceptable by the City, final payment on account of this Agreement shall be made within sixty (60) days after completion by the Contractor of all work covered by this Agreement and acceptance of such work by the City. r)3- 829 ARTI I;F'4. TIl OF COMPLETION: The Cont or shall commence the work to be performed under this Contract within the number of consecutive days after the date of written notice from the Director of the Department of Capital Improvements to begin work as noted in the Proposal, and shall fully complete the Contract in accordance with the Contract Documents within the number of working days as set forth in thje Proposal. It is mutually agreed between the parties hereto, that time is the essence of this Contract, and, in the event that construction of the work is not completed within the time herein specified, it is agreed that from the compensation otherwise to be paid to the Contractor, the City may retain for each day thereafter, Sundays and holidays included, that the work remains uncompleted, the sum set forth in the General Conditions of the Specifications, as modified by Division 2 - Special Provisions, which sum represents the actual damage which the City of Miami, Florida, will have sustained per day by failure of the Contractor to complete the work within the time stipulated, and this sum is not a penalty, but will be the liquidated damage that City will have sustained in event of such default by the Contractor. ARTICLE 5. ADDITIONAL BOND: It is further mutually agreed between the parties hereto, that if, at any time after the execution of this Agreement and the Performance Bond hereto attached, when required for its faithful performance, the City shall deem the surety or sureties upon such bond to be unsatisfactory, or if, for any reason, in the opinion of the Engineer; such bond ceases to be adequate to cover the performance of the work, the Contractor shall, at his expense, within five (5) days after receipt of notice from the Engineer so to do, furnish an additional bond or bonds in such form and amount, and with such surety or sureties as shall be satisfactory to the City. In such event, no further payment to the Contractor shall be deemed to be due under this Agreement until such new or additional security for the faithful performance of the work shall be furnished in manner and form satisfactory to the City. ARTICLE 6. CONTRACT DOCUMENTS: All of the documents hereinafter listed form the Contract and they are as fully as part of the Contract as if hereto attached, or repeated in this Agreement: ADVERTISEMENT FOR BIDS PROPOSAL BID BOND CONTRACT PERFORMANCE BOND MAINTENANCE PERFORMANCE BOND INSTRUCTIONS TO BIDDERS SPECIFICATIONS ADDENDA PLANS: As prepared by: Department of Capital Improvements Entitled: Orange Bowl Stadium 2003 Structural Repairs, B-3297 2 ';3- 829 ' IN WITNESS WHEF )F the parties hereto have executed thi: ,,reement on the day and date first above written in five (5) counterparts, each of which shall, without proof or accounting for the other counterparts, be deemed an original contract. (SEAT,) THE CITY OF MIAMI, FLORIDA Party of the first part ATTEST: Priscilla A. Thompson City Clerk WITNESS: (If Corporation, attach Seal and Attest by Secretary) RESOLUTION NO. APPROVED AS TO ENGINEERING: Jorge C. Cano, P.E. Director Department of Capital Improvements :. Joe Arriola City Manager CONTRACTOR: 3 Party of the second part ON (Title) (Employer Tax I.D. Number) APPROVED AS TO INSURANCE REQUIREMENTS: Diane Ericson, Director, Director Risk Management APPROVED AS TO FORM AND CORRECTNESS: Alejandro Vilarello City Attorney 03- 829 t: ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS (SECOND BIDDING) - INFORMAL BID Project Number: B-3297 UNIT PRICE CIP Number: 324002 Project Manager: JUAN B. ORDONEZ Date: 07.14.03 Person who received the bids: SANDRA VEGA & TATIANA ACOSTA Received at: MRC BUILDING 8TH FLOOR Construction Estimate = $ $2,000,000.00 Time: 10:30 A.M. BIDDER PROFESSIONAL G C, INC AVENTURA ENG. CORP. CONSTRUCTION AFFAIRS,INC ADDRESS 454 NW 22 AVE #200 266 NW 26TH STREET 2651 A NW 20th Street 3 MIAMI, FL 33125 Miami, Florida 33127 Miami, Florida 33142 BID BOND AMOUNT 5% -BB 5% -BB 30 SUPPORTS - AXIS "M" - CASE IV IRREGULARITIES E N/A $141,120.00 MINORITY OWNED YES — — _ YES - $379,500.00 MILES C. JENNINGS CONSTR. 3125 Mundy Street Miami, Florida 33133 ITEM No. DESCRIPTION UNIT PRICE TOTAL UNIT PRICE TOTAL BASE BIDJTEMS 1 THRU 18 $1,949,031.00 $2,588,000.00 $0.00 1 10 SUPPORTS - AXIS "K"- CASE I $18,490.00 $189,900.00 $9,120.00 $91,200.00 2 30 SUPPORTS - AXIS "K" - CASE II $3,550.00 $106,500.00 $3,792.00 $113,760.00 3 10 SUPPORTS - AXIS "M" - CASE III $5,120.00 $51,200.00 $5,040.00 $50,400.00 4 30 SUPPORTS - AXIS "M" - CASE IV $2,770.00 $83,100.00 $4,704.00 $141,120.00 5 REPLACEMENT DECK - 5,500 S.F. $69.00 $379,500.00 $114.30 $628,650.00 6 15 - C 8X18.75X20 FT. $3,535.00 $53,025.00 $3,750.00 $56,250.00 7 30 - C 12X20.7X20 FT. I $3,633.00 $108,990.00 $2,610.00 $78,300.00 8 I REPLACEMENT 2,000 ST REINF. CONC. $19.00 $38,000.00 $37.00 $74,000.00 9 li 16- W 14X23X20 FT $6,092.00 $97,472.00 $4,032.00 $64,512.00 10 120 - W 12X35X20 FT. $2,970.00 $59,400.00 $4,572.00 $91,440.00 15-WIO ' .00 ' 14,250.00 ,200.00 $31,280.00 12 40 NEW END SUPPORTS $3,129.00 $$25,160.00 $3,282.00 $.00 13 124 - STEEL COLUMNS - AXIS "M" DTLI I $6,216.00 I $149,184.00 $5,280.00 $126,720.00 14 ( 4 - STEEL COLUMNS - AXIS "M" DTL2 I $3,200.00 I $12,800.00 $6,960.00 $27,840.00 15 110 -NEW CONNECT AXIS "E" (RAKER BM) I $5,780.00 I $57,800.00 $3,540.00 $35,400.00 16 170 -COLUMNS BASIS $325.00 I $22,750.00 $1,490.00 $104,300.00 17 DIVISION 6- REMOVAL OF PAINT I I $50,000.00 $403,628.00 18 SPECIAL PROVISIONS $350,000.00 $350,000.00 • IRREGULARITIES LEGEND A — No Power - of - Attorney B — No Affidavit as to Capital & Surplus of Bonding Company C — Incorrected Summation of Base Bid Total D — Proposal Unsigned or Improperly Signed or no Corporate Seal IT HAS BEEN DETERMINED BY THE DEPARTMENT OF CAPITAL IMPROVEMENTS THAT THE E — Incorrect Extensions LOWEST RESPONSIBLE AND RESPONSIVE BID IS FROM PROFESSIONAL GENERAL CONT. INC F — No Bid Proposal FOR THE TOTAL AMOUNT OF $1,949,031.00 G — Improper Bid Bond H – No Certificate of Competency Number IF THE ABOVE CONTRACTOR IS NOT THE LOWEST BIDDER, EXPLAIN: I – No First Source Hiring Compliance Statement J – No Minority Compliance Statement d K – No Duplicate Bid Proposal /� t �. L – No City Occupational License /�� ��. 1 OF 1 $0.00 0. _ City of Miami Date: July 15, 2003 s� Department of Capital Improvements F # ""°I lM"' PROJECT FACT SHEET Emergency: ,a ---- Project Name: ORANGE BOWL STADIUM 2003 STRUCTURAL REPAIRS (SECOND BIDDING) Project Location: 1501 NW 3RD STREET MIAMI, FL 33125 Commissioner District: 3 Project Number: 8-3297 Initiating Dept.: Conventions & Public Facilities Project Manager/Ext. No.: Juan B Ordonez, #1241 Project Budget: $2,100,000.00 Homeland Defense 1 y ! Account Number: 324002 Amount: ~' $2,062,03_1.0.0__ Federal (C.D.B.G.) Account Number: Amount: S.N.P.B. r Account Number: Amount: Other: _ Account Number: Amount: The project consists of the furnishing of all labor, materials and equipment for the the demolition, supply and w installation of structural supports for upper trusses in grid lines "k" and "M", 5,5000 sq.ft. of safety deck, 0. 0steel beams, columns. Also, the installation of new connections along "E" grid, columns basis and paint U)removal. A/E Firm: Bliss & Nyitray, Inc Address: 51 SW Le Jeune Road W City, State, Zip: Miami, Florida 33134 rn = Contact Person: Ronal Milmend a. Telephone/E-Mail: mail0,13Nlenaineers.com Z Type of Work: Structural Repairs rn Comments: W Contractor: Professional General Contractors, Inc Address: 454 NW 22 Avenue #200 City, State, Zip: Miami, Florida 33125 Contact Person: Carlos Ramos Lu Telephone/E-mail: 305.644.4194 a a Class: P_ Z (J = Joint P = Prime S = Sub) 0 Minority Status: H U M (B = Black F = Female H = Hispanic N = None) Established: 1 years Z License Number: O CCN000019247 Sub -Contractors: Electrical Industrial Control & Maint. 491260-7 A/E Firm Fees: Additional Design Services: In -House Design Cost: Miscellaneous Services: CIP Design Administration: Design Phase Total: Construction Contract Amount: CVP Construction Administration: Misc. Construction Costs: Construction Phase Total Co ies to: CIP Senior Accountant, CIP Administrator, File, Initiating Department Total Project Cost: PROJECT COSTS (A) - Actual (E) - Estimate $15,000.00 (A) N/A (A) N/A (A) N/A (A) $49,000.0_0 (A) $64,000.00 $1,949,031.00 (BID) $49,000.00 (E) N/A (E) $1,998,031.00 $2,062,031.00 03- 819