Loading...
HomeMy WebLinkAboutR-03-0757J-03-606 07/07/03 RESOLUTION NO. 03— 757 A RESOLUTION OF THE MIAMI CITY COMMISSION WITH ATTACHMENT(S) AUTHORIZING THE CITY MANAGER TO EXECUTE A CONSENT ORDER, FILE NO. OGC 03-0166, IN SUBSTANTIALLY THE ATTACHED FORM, BETWEEN THE CITY OF MIAMI AND THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION CONCERNING THE SETTLEMENT OF CERTAIN MATTERS AT ISSUE BETWEEN SAID PARTIES. WHEREAS, the City of Miami (City") is the owner and is responsible for the operation of a Municipal Separate Storm System ("MS4") that serves the lands located within the City's jurisdiction; and WHEREAS, the City operates its MS4 under the National Pollutant Discharge Elimination System ("NDPES") permit administered by the Florida Department of Environmental Protection ("FDEP"); and WHEREAS, as a result of the FDEP's review of the City's Year Four and Five Annual Reports for the NDPES permits, FDEP issued a letter outlining areas for which the City was not in compliance with the NDPES permit's regulation; and AV N,1211 1. 1 : D CITY COMMISSION MEETING Of 1 7 2003 Resolution No. 03- 757 WHEREAS, the City submitted documents in support of compliance with the regulations for the NDPES permit and has met with FDEP representatives numerous times to demonstrate its compliance with the terms and conditions of the permit; and WHEREAS, the City and FDEP agreed to enter into a Consent Order, in substantially the attached form, subject to the terms and conditions therein, in order to resolve a dispute, without incurring the expense and delay associated with litigation; WHEREAS, the City's execution of the Consent Order shall not be construed by the FDEP as an admission or acknowledgment of guilt or liability by the City regarding any issue regarding the permit; and WHEREAS, by executing the attached Consent Order the City waives its rights to an administrative hearing pursuant to Sections 120.569 and 120.57, Florida Statutes, and its right to appeal the terms of the Consent Order, pursuant to Section 120.68, Florida Statutes. Page 2 of 4 -33— 757 NOW, THEREFORE, BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. The recitals and findings contained in the Preamble to this Resolution are adopted by reference and incorporated as if fully set forth in this Section. Section 2. The City Manager is authorized!' to execute a Consent Order, File No. OGC 03-0166, in substantially the attached form, between the City of Miami and the State of Florida Department of Environmental Protection concerning the settlement of certain matters at issue between said parties. Section 3. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.' �i The herein authorization is further subject to compliance with all requirements that may be imposed by the City Attorney, including but not limited to those prescribed by applicable provisions of the City Charter and Code. If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 3 of 4 03- 757 PASSED AND ADOPTED this 17th day of July 2003. MANUEL A. DIAZ, MAYOR ATTEST: 4�ZT"rTT'- PRISCILLA: A. THtAPSON CITY CLERK APPROVED/'KS, 'did FO ,O`JANDRO VILARELLO ITY ATTORNEY W7362:tr:AS D CORRECTNESS/ Page 4 of 4 _ '757 BEFORE THE STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION, Complainant, vs. CITY OF MIAMI, a Florida Municipal Corporation, Respondent. CONSENT ORDER IN THE OFFICE OF THE DIVISION OF WATER RESOURCE MANAGEMENT OGC FILE NO. 03-0166 This Consent Order is entered into between the State of Florida Department of Environmental Protection ("Department") and the City of Miami ("City") to reach settlement of certain matters at issue between the Department and the City. The Department finds the following: 1. The Department is the administrative agency of the State of Florida having the power and duty to protect Florida's air and water resources and to administer and enforce the provisions of Chapter 403, Florida Statutes, and the rules promulgated thereunder, as codified in Title 62, Florida Administrative Code. The Department has jurisdiction over the matters addressed in this Consent Order. 2. The City is a Florida municipal corporation and a person within the meaning of Section 403.031(5), Florida Statutes. 3. The City is the owner and is responsible for the operation of a Municipal Separate Storm Sewer System ("MS4") that serves the lands located within the City's jurisdiction. The City operates its MS4 ("Facility") under Department National Pollutant NPDES-SW/CO j 03— (5 / Miami MS4 /A40'1- Discharge Elimination System (NPDES) stormwater permit No. FLS000002, which expired on 30 September 2001. The permit has been administratively continued until renewed. 4. The United States Environmental Protection Agency (EPA), as the original permitting authority, issued Permit No. FLS000002 ("Permit") to the City of Miami, on 30 September 1996, and the Permit became effective 1 November 1996. 5. On 1 May 2000, EPA relinquished jurisdiction to issue NPDES stormwater permits in Florida in anticipation of the Department adopting administrative rules to implement an EPA approved state NPDES stormwater program, supplementing the existing Florida NPDES program regulating pre-treatment programs as well as domestic and industrial wastewater. 6. The Department's NPDES stormwater rules became effective 23 October 2000, creating Chapter 62-624, F.A.C., and amending Chapters 62-4, 62-620 and 62- 621, F.A.C., to incorporate a stormwater element into the State's wastewater facilities and activities permitting program. 7. Once the Department's NPDES stormwater permitting program was in place, with the finalization of rulemaking on 23 October 2000, the Department became the permitting authority as to the City's Permit. 8. At the direction of the Department, an inspection of the City's MS4 was performed by a representative of Science Applications International Corporation (SAIL). SAIC serves as contractor to the Department as to various aspects of the Florida NPDES stormwater program. NPDES-SW/CO Miami MS4 2 03— 757 9. During this same time period, SAIC was in the process of reviewing the City's most recent annual reports (Year 4 and 5 Annual Reports) for the MS4 and the Permit. The City requested that the Year 4 Annual Report also be considered its application for the renewal of its MS4 Permit. The on-site inspection of the Miami MS4, as well as a review of the annual reports, resulted in a Non -Compliance Letter from the Department, to the City, dated 13 November 2001. In part, this Non -Compliance Letter outlined deficiencies related to proper implementation of the Construction Site Runoff MS4 permit requirement. 10. On 11 October 2002, the Department issued a Warning Letter to the City to address potential violations of the Permit. 11. In its Warning Letter to the City, the Department asserted that the City may not have effectively implemented the following aspects of its NPDES MS4 Permit: A. Part II, Section A, of the City's Permit entitled Storm Water Management Program (SWMP) Requirements, at paragraph 7, entitled Illicit Discharges and Improper Disposal, requires the permittee(s) to implement an ongoing program to detect and eliminate (or require the discharger to the MS4 to eliminate) illicit discharges and improper disposal into the storm sewer system. These non- stormwater discharges shall be effectively prohibited through the use of inspections, ordinances and enforcement. B. Part II, Section A, entitled Storm Water Management Program (SWMP) Requirements, at paragraph 8, entitled Industrial and High Risk Runoff, requires the permittee(s) to develop and implement a program to identify and control pollutants to the maximum extent practicable (MEP), consistent with State water policy, in stormwater discharges from any municipal landfills, hazardous waste treatment, storage, disposal and recovery facilities, facilities that are subject to EPCRA Title III, Section 313, and any other industrial or commercial discharge which the permittee(s) determine is contributing a substantial pollutant loading to the MS4. To fulfill its obligation under Part II, Section A, paragraph 8, the Permit required the permittee(s), to identify priority sites and implement a schedule of inspections to address, at a minimum, the eleven (11) classes of industrial activities set forth in 40 C.F.R. 122.26(b)(14). Additionally, to fulfill its obligation under Part II, Section A, paragraph 8, the Permit required the permittee(s) to develop and implement a monitoring program for facilities identified. NPDES-SW/CO 3 3 _ ry �'y Miami MS4 C. Part II, Section A, entitled Storm Water Management Program (SWMP) Requirements, at paragraph 9, entitled Construction Site Runoff, requires the permittee(s) to develop and implement a program to reduce the discharge of pollutants from construction sites to the maximum extent practicable (MEP) that is consistent with State water policy. To fulfill its obligation under Part II, Section A, paragraph 9, the Permit required the permittee(s) to require the use and maintenance of structural and non- structural best management practices to reduce pollutants discharged to the MS4 during the time of construction. Additionally, to fulfill its obligation under Part II, Section A, paragraph 9, the Permit required the permittee(s) to develop and implement a program for inspecting construction sites and for enforcing the requirement for control measures. Further, to fulfill its obligation under Part II, Section A, paragraph 9, the Permit required the permittee(s) to conduct appropriate education and training for construction site operators and those associated with the implementation of proper sediment and erosion control measures at construction sites. D. Part II, Paragraph F, entitled Storm Water Management Program Resources, requires each permittee shall provide adequate finances to implement their activities under the Storm Water Management Program. Each permittee shall also have a source of funding for implementing all other requirements included within this NPDES storm water permit. 12. The Department's Warning Letter of 11 October 2002, further asserts: Part II of Permit No.: FLS000002, entitled Storm Water Pollution Prevention & Management Program, states that the Stormwater Management Program (SWMP) shall achieve the "effective prohibition" and "MEP" standards of Section 402(p)(3)(B) of the federal Clean Water Act. Elements of the Stormwater Management Program are specifically included to address the "effective prohibition" standard and reduce pollutants to the maximum extent practicable, the MEP standard, and include, but are not limited to, Part II, Section A, paragraph 7, Illicit Discharges and Improper Disposal; Part II, Section A, paragraph 8, Industrial and High Risk Runoff; and, Part Il, Section A, paragraph 9, Construction Site Runoff. NPDES-SW/CO 4 Y� Miami MS4 0 Consequently, the Department's Warning Letter notes that, to the extent the City may have failed to properly implement the programs as described herein, the City may have failed to meet the "effective prohibition" and "maximum extent practicable" standards. 13. A meeting was held 6 November 2002, to discuss resolution of the issues raised in the warning letter, resulting in the City providing additional materials in response to the Department's concerns, on 25 November 2002. A teleconference was held on 11 February 2003 to discuss issues raised in the City's 25 November 2002 response. The City submitted additional information on 22 February 2003. A meeting was held at the City's Public Works Office on 14 March 2003 to obtain additional information. 14. Having reviewed the materials provided by the City, and in light of the City's responses to the Department's various requests for information and documentation, the Department has reached the conclusions set forth in Paragraphs 15 — 20, below. Construction Site Runoff 15. The City, as permittee, is responsible for implementing Part II, Section A, entitled Storm Water Management Program (SWMP) Requirements, and specifically paragraph 9, entitled Construction Site Runoff, which requires the permittee(s) to develop and implement a program to reduce the discharge of pollutants from construction sites to the maximum extent practicable (MEP) that is consistent with State water policy. 16. After reviewing the response to the requests for information, and after having reviewed the information provided related to the City's construction inspections, the Department concludes that the City's sedimentation and erosion control program NPDES-SW/CO 5 Miami MS4 03- 757 does not fully satisfy the requirements established by the Permit, and applicable state and federal law. While City records reflect numerous types of inspections at construction sites, the records do not fully describe the actions taken by the City to control construction site stormwater runoff. It also appears that the City's Construction Site Runoff program has not fully implemented an inspection program that includes a cursory stormwater pollution prevention review as part of the normal inspection process. This information should be used to help prioritize additional and/or more detailed inspections for those construction sites that demonstrate a lack of preventative sediment/erosion control. Further, there appears to be no internal log system to document the inspection conducted. Maximum Extent Practicable Standard And Effective Prohibition 17. Part II of Permit No.: FLS000002, entitled Storm Water Pollution Prevention & Management Program, states that the Stormwater Management Program (SWMP) shall achieve the "effective prohibition" and "MEP" standards of Section 402(p)(3)(B) of the federal Clean Water Act. 18. Section 402(p)(3)(B) of the Clean Water Act requires that MS4 permits include "controls to reduced the discharge of pollutants to the maximum extent practicable, including management practices, control techniques and system, design and engineering methods, and such other provision as the Administrator or the State determines appropriate for the control of such pollutants." 19. Elements of the Stormwater Management Program are specifically included to address the "effective prohibition" standard and reduce pollutants to the maximum NPDES-SW/CO ( 03— (5 Miami MS4 extent practicable (i.e., the MEP standard), and include, but are not limited to, Part II, Section A, paragraph 9, Construction Site Runoff. 20. The Department finds that the City has not demonstrated that it has satisfactorily implemented a proper construction site runoff program and, consequently, the City has not demonstrated that it has reduced the discharge of pollutants to the maximum extent practicable. Having reached a resolution of this matter, the Department and the City mutually agree and it is ORDERED: 21. The City shall comply with the following corrective actions within the stated time periods: A. The City shall initiate and comply with all aspects, which includes but is not limited to time periods, procedures, sequencing and actions, of the City of Miami 2003 NPDES Compliance Strategy submitted to the Department on November 21, 2002, Exhibit I, attached hereto and incorporated herein. B. The City must discharge its duties as permittee under Paragraph 9, entitled Construction Site Runoff, as set out in Part II, Section A, of Permit FLS000002, entitled Storm Water Management Program (SWMP) Requirements. To help ensure that the City's records are complete, the City must provide to the Department a detailed written description of the City's program for controlling runoff from construction sites. The City must describe: (1) the number of inspections anticipated per quarter during each fiscal year; (2) the procedure whereby the City shall take enforcement action and stop work, impose fines or penalties, and order corrective measures; and (3) the means 03— 757 NPDES-SW/CO 7 Miami MS4 by which the City will document and maintain records of the number of inspections performed, the number of violations discovered, the action taken by the City, and the results of follow-up compliance inspections (inspection log). If the City is relying upon an existing ordinance as the basis for implementing its program, a description of how that ordinance shall be applied to fulfill the City's obligation under the permit shall be included in the description of its Construction Site Runoff program as required herein. The program must meet all of the requirements of 40 CFR 122.26(d)(2)(iv) as incorporated by reference in Rule 62-624.500, F.A.C. The City must submit its complete program description to the Department's NPDES Stormwater Section, 2600 Blair Stone Road, MS 2500, Tallahassee, Florida 32399-2400, within 90 days of this Consent Order becoming effective. This program must be fully implemented within 90 days of receiving written approval from the Department. C. Within 60 days of execution of this Consent Order, the City shall pay the Department $ 6,398 in settlement of the matters addressed in this Consent Order, in addition to $2,000 for costs and expenses incurred by the Department during the investigation of this matter and the preparation and tracking of this Consent Order. If the City chooses to pursue an in-kind project in accordance with Paragraph D, below, then within 60 days of the execution of this Consent Order, the City shall pay the Department $ 2,000 for the Department's costs and expenses. Payment shall be made by cashier's check or money order. The instrument shall be made payable to the "Department of Environmental Protection" and shall include thereon the OGC number assigned to this Consent Order and the notation "Ecosystem Management and Restoration Trust Fund. NPDES-SW/CO 8 03— 757 Miami MS4 D. In lieu of making cash payments of $6,398 pursuant to Paragraph C, above, the City may implement an in-kind project with a total value of at least $ 9,597 (6,398 x 1.5). If the City wishes to pursue an in-kind project, the City shall comply with the following requirements and deadlines. Within 45 days of the execution of this Consent Order, the City must propose an appropriate, attached in-kind penalty project to the Department, pursuant to Department Directive 923, Exhibit II, attached hereto and incorporated herein. If an acceptable in-kind penalty project can not be agreed upon by the Department and the City within 60 days of the execution of this Consent Order, then the City must revert back to the penalty requirements of paragraph 21 C. 22. Respondent agrees to pay the Department stipulated penalties in the amount of $100.00 per day for each and every day Respondent fails to timely comply with any of the requirements of Paragraphs 21 A. thru 21 C. of this Consent Order. A separate stipulated penalty shall be assessed for each violation of this Consent Order. Within 30 days of written demand from the Department, Respondent shall make payment of the appropriate stipulated penalties to "The Department of Environmental Protection" by cashier's check or money order and shall include thereon the OGC number assigned to this Consent Order and the notation " Ecosystem Management and Restoration Trust Fund." Payment shall be sent to the Department of Environmental Protection, NPDES Stormwater Section, 2600 Blair Stone Road, M.S. 2500, Tallahassee, Florida 32399-2400. The Department may make demands for payment at any time after violations occur. Nothing in this Paragraph shall prevent the Department from filing suit to specifically enforce any terms of this Consent Order. Any penalties assessed under this Paragraph shall be in addition to the settlement sum agreed to in NPDES-SW/CO 9 0 3 Miami MS4 Paragraph 21 C. of this Consent Order. If the Department is required to file a lawsuit to recover stipulated penalties under this Paragraph, the Department will not be foreclosed from seeking civil penalties for violations of this Consent Order in an amount greater than the stipulated penalties due under this Paragraph. 23. The City shall publish the following notice in a newspaper of daily circulation in Miami -Dade County, Florida. The notice shall be published one time only within 14 days after the effective date of the Consent Order. The City shall provide proof of publication to the Department within 7 days of publishing the notice. STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION NOTICE OF CONSENT ORDER The Department of Environmental Protection gives notice of agency action of entering into a Consent Order with the City of Miami pursuant to Section 120.57(4), Florida Statutes. The Consent Order addresses alleged permit violations associated with the City's National Pollutant Discharge Elimination System, Municipal Separate Storm Sewer System Permit (MS4), permit No. FLS000002. Specifically, the Consent Order addresses Part II, Section A of the MS4 permit and whether the City's Stormwater Management Program fully developed and implemented the following element to identify and control pollutants to the maximum extent practicable (MEP): 1. Construction Site Runoff. The Consent Order is available for public inspection during normal business hours, 8:00 a.m. to 5:00 p.m., Monday through Friday, except legal holidays, at the Department of Environmental Protection, 2600 Blair Stone Road, Suite 671, Tallahassee, Florida, 32399. Persons whose substantial interests are affected by this Consent Order have a right to petition for an administrative hearing on the Consent Order. The Petition must NPDES-SW/CO 10 03— (5 Miami MS4 contain the information set forth below and must be filed (received) in the Department's Office of General Counsel, 3900 Commonwealth Boulevard, MS# 35, Tallahassee, Florida 32399-3000, within 21 days of receipt of this notice. A copy of the Petition must also be mailed at the time of filing to the Department, Suite 671, at the address indicated above. Failure to file a petition within the 21 days constitutes a waiver of any right such person has to an administrative hearing pursuant to Sections 120.569 and 120.57, Florida Statutes. The petition shall contain the following information: (a) The name, address, and telephone number of each petitioner; the Department's identification number for the Consent Order and the county in which the subject matter or activity is located; (b) A statement of how and when each petitioner received notice of the Consent Order; (c) A statement of how each petitioner's substantial interests are affected by the Consent Order; (d) A statement of the material facts disputed by petitioner, if any; (e) A statement of facts which petitioner contends warrant reversal or modification of the Consent Order; (f) A statement of which rules or statutes petitioner contends require reversal or modification of the Consent Order; (g) A statement of the relief sought by petitioner, stating precisely the action petitioner wants the Department to take with respect to the Consent Order. If a petition is filed, the administrative hearing process is designed to formulate agency action. Accordingly, the Department's final action may be different from the position taken by it in this Notice. Persons whose substantial interests will be affected by any decision of the Department with regard to the subject Consent Order have the right to petition to become a party to the proceeding. The petition must conform to the NPDES-SWICO 11 757 Miami MS4 requirements specified above and be filed (received) within 21 days of receipt of this notice in the Office of General Counsel at the above address of the Department. Failure to petition within the allowed time frame constitutes a waiver of any right such person has to request a hearing under Sections 120.569 and 120.57, Florida Statutes, and to participate as a party to this proceeding. Any subsequent intervention will only be at the approval of the presiding officer upon motion filed pursuant to Rule 28- 106.205, Florida Administrative Code. A person whose substantial interests are affected by the Consent Order may file a timely petition for an administrative hearing under Sections 120.569 and 120.57, Florida Statutes, or may choose to pursue mediation as an alternative remedy under Section 120.573, Florida Statutes, before the deadline for filing a petition. Choosing mediation will not adversely affect the right to a hearing if mediation does not result in a settlement. The procedures for pursuing mediation are set forth below. Mediation may only take place if the Department and all the parties to the proceeding agree that mediation is appropriate. A person may pursue mediation by reaching a mediation agreement with all parties to the proceeding (which include the City, the Department, and any person who has filed a timely and sufficient petition for a hearing) and by showing how the substantial interests of each mediating party are affected by the Consent Order. The agreement must be filed in (received by) the Office of General Counsel of the Department at 3900 Commonwealth Boulevard, MS #35, Tallahassee, Florida 32399-3000, within 10 days after the deadline as set forth above for the filing of a petition. The agreement to mediate must include the following: NPDES-SW/CO 12 3- '75'7 Miami MS4 (a) The names, addresses, and telephone numbers of any persons who may attend the mediation; (b) The name, address, and telephone number of the mediator selected by the parties, or a provision for selecting a mediator within a specified time; (c) The agreed allocation of the costs and fees associated with the mediation; (d) The agreement of the parties on the confidentiality of discussions and documents introduced during mediation; (e) The date, time, and place of the first mediation session, or a deadline for holding the first session, if no mediator has yet been chosen; (f) The name of each party's representative who shall have authority to settle or recommend settlement; and (g) Either an explanation of how the substantial interests of each mediating party will be affected by the action or proposed action addressed in this notice of intent or a statement clearly identifying the petition for hearing that each party has already filed, and incorporating it by reference. (h) The signatures of all parties or their authorized representatives. As provided in Section 120.573, Florida Statutes, the timely agreement of all parties to mediate will toll the time limitations imposed by Sections 120.569 and 120.57, Florida Statutes, for requesting and holding an administrative hearing. Unless otherwise agreed by the parties, the mediation must be concluded within sixty days of the execution of the agreement. If mediation results in settlement of the administrative dispute, the Department must enter a final order incorporating the agreement of the parties. Persons whose substantial interests will be affected by such a modified final NPDES-SW/CO 13 03- `"• Miami MS4 decision of the Department have a right to petition for a hearing only in accordance with the requirements for such petitions set forth above, and must therefore file their petitions within 21 days of receipt of this notice. If mediation terminates without settlement of the dispute, the Department shall notify all parties in writing that the administrative hearing processes under Sections 120.569 and 120.57, Florida Statutes, remain available for disposition of the dispute, and the notice will specify the deadlines that then will apply for challenging the agency action and electing remedies under those two statutes. 24. The City shall allow all authorized representatives of the Department access to the property and MS4 at reasonable times for the purpose of determining compliance with the terms of this Consent Order and the rules and statutes of the Department. 25. All submittals and payments required by this Consent Order to be submitted to the Department shall be sent to the Florida Department of Environmental Protection, NPDES Stormwater Section, 2600 Blair Stone Road, M.S. 2500, Tallahassee, Florida 32399-2400 26. This Consent Order is a settlement of the Department's civil and administrative authority arising under Florida law to resolve the matters addressed herein. This Consent Order is not a settlement of any criminal liabilities which may arise under Florida law, nor is it a settlement of any violation which may be prosecuted criminally or civilly under federal law. 27. The Department hereby expressly reserves the right to initiate appropriate legal action to prevent or prohibit any violations of applicable statutes, or the rules NPDES-SW/CO Miami MS4 14 03— promulgated thereunder that are not specifically addressed by the terms of this Consent Order. 28. The terms and conditions set forth in this Consent Order may be enforced in a court of competent jurisdiction pursuant to Sections 120.69 and 403.121, Florida Statutes. Failure to comply with the terms of this Consent Order shall constitute a violation of Section 403.161(1)(b), Florida Statutes. 29. The Department, for and in consideration of the complete and timely performance by the City of the obligations agreed to in this Consent Order, hereby waives its right to seek judicial imposition of damages or civil penalties for any alleged violations of the Permit through the date of the filing of this Consent Order. 30. The City is fully aware that a violation of the terms of this Consent Order may subject the City to judicial imposition of damages, civil penalties up to $10,000.00 per day per violation, and criminal penalties. 31. Entry of this Consent Order does not relieve the City of the need to comply with applicable federal, state or local laws, regulations or ordinances. 32. No modifications of the terms of this Consent Order shall be effective until reduced to writing and executed by both the City and the Department. 33. The City acknowledges and waives its right to an administrative hearing pursuant to Sections 120.569 and 120.57, Florida Statutes, concerning the terms of this Consent Order. The City acknowledges its right to appeal the terms of this Consent Order pursuant to Section 120.68, Florida Statutes, and waives that right upon signing this Consent Order. However, the City does not waive its right to contest any future agency action concerning the interpretation or implementation of this Consent Order, NPDES-SW/CO 15 3 — (5 Miami MS4 including but not limited to agency decisions as to whether the City has complied with the requirements of this Consent Order. 34. The Department and the City have entered into this Consent Order to resolve a dispute, without incurring the expense and delay associated with litigation. The City's execution of this Consent Order, and the City's performance of the requirements contained in this Consent Order, shall not be construed by the Department as an admission or acknowledgment of guilt or liability by the City regarding any issue. 35. This Consent Order is a final order of the Department pursuant to Section 120.52(7), Florida Statutes, and it is final and effective on the date filed with the Clerk of the Department unless a Petition for Administrative Hearing is filed in accordance with Chapter 120, Florida Statutes. Upon the timely filing of a petition this Consent Order will not be effective until further order of the Department. EXECUTED ON BEHALF OF THE CITY OF MIAMI this day of 2003, Title DONE AND ORDERED this day of in , Florida. ,200 , STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Mimi Drew, Director Division of Water Resource Management NPDES-SW/CO 16 r� �7 Miami MS4 _ t FILING AND ACKNOWLEDGEMENT FILED, on this date, pursuant to §120.52 Florida Statutes, with the designated Department Clerk, receipt of which is hereby acknowledged. Clerk Copies furnished to: Date Eric Livingston, Chief, Bureau of Watershed Management Alejandro Vilarello, City Attorney Albert Dominguez, Public Works Director Michael Bateman, P.E. NPDES Stormwater Administrator Geoffrey Rabinowitz, Compliance & Enforcement Manager Rachel Siebert, NPDES Stormwater Attorney File NPDES-SW/CO 17 03— •57 Miami MS4 � � i. ',, ,�+,� .� •'k _ 'tel a 1�� :� l i�r '1{ I,.'- , • — vacs' �,y u� .. ce ��ra e 1 y • / '// .►sa+�.�� ��:..a,'r' - - d, ...�=is-��'.` - _ kv Submitted to. � r The State of Florida Department of.'Environmental Protection , 2002 November 21 Cit#ia of taxttt CARLOS A. GIMENEZ CITY MANAGER November 21, 2002 Ms. Mimi Drew, Director Division of Water Resource Management Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399 P.O. BOX 330708 MIAMI. FLORIDA 33233.0708 (305)416-1025 FAX (305) 400-5043 (D (a r�o � � ��c�rvED RE: Warning Letter #NPDES-SW-13-00099, Permit #FLS000002 NPOES City of Miami Municipal Separate Storm Sewer System (MS4) P M R IAWATE R SECTION Dear Ms. Drew: This letter is to serve as the cover for our formal reply to the above subject Warning Letter. Please be advised that I, along with the City Attorney, the Assistant City Manager for Operations, and the Director of our Public Works Department met in Tallahassee with Mr. Michael Bateman and his staff on November 6, 2002, to discuss the deficiencies and develop a plan to resolve those deficiencies. We found this meeting to be productive and helpful in getting us back on track. Your staff was concise in their analysis and constructive in their suggestions rather than punitive in nature. We are thankful for their support and attitude. Please note that the text of our response is formatted to follow the draft MS4 Stormwater Inspection Report provided to us at the Tallahassee meeting of November 6th. This response, which includes a dedicated budget for personnel, equipment, training, and consulting services, reflects the strong commitment of the City of Miami to bring our NPDES Storm Water Program into compliance. In fact, you will find that the City annually supplements the storm water funding out of our General Fund in excess of $4 million. I am confident that the implementation of this program, which is immediate, will place the City of Miami in a more favorable light come the next site visit and will result in a cleaner environment — the ultimate goal of the NPDES Storm Water Program. Again, thanks to you and your staff for all the support. '-i CAG/FKR/sg 03- '75"7 c: Alejandro Vilarello, City Attorney Frank K. Rollason, Assistant City Manager, Operations • 11 _. T_ . ____- A _._._ _ T' _ _�_� T-.__.1._-.�� -C T__t l'_ [i 7___1__ MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) TABLE OF CONTENTS Page # APPROVED NPDES FUNDING FOR FY'03...............................................................................1 STRUCTURAL CONTROLS — MARGINAL.................................................................................3 Required Program Compliance..............................................................................................3 Actions Taken Toward Compliance for Year 5......................................................................... 3 Proposed Compliance Improvements Beginning Year 7 ........................................................... 3 CONSTRUCTION SITE CONTROLS — UNSATISFACTORY.......................................................4 Required Program Compliance..............................................................................................4 Actions Taken Toward Compliance for Year 5.........................................................................4 Proposed Compliance Improvements Beginning Year 7 ...........................................................5 MUNICIPAL WASTE FACILITIES — UNSATISFACTORY........................................................... 6 Required Program Compliance..............................................................................................6 Actions Taken Toward Compliance for Year 5......................................................................... 6 Proposed Compliance Improvements Beginning Year 7 ...........................................................6 ILLICIT DISCHARGE CONTROLS — MARGINAL.......................................................................7 Required Program Compliance..............................................................................................7 Actions Taken Toward Compliance for Year 5......................................................................... 8 Proposed Compliance Improvements Beginning Year 7 ........................................................... 9 HIGH RISK AND INDUSTRIAL FACILITY CONTROLS — UNSATISFACTORY ..........................10 RequiredProgram Compliance..............................................................................................10 Actions Taken Toward Compliance for Year 5.........................................................................10 Proposed Compliance Improvements Beginning Year 7...........................................................11 PEST, HERB, AND FERTILIZER APPLICATION — SATISFACTORY.........................................12 Required Program Compliance..............................................................................................12 Actions Taken Toward Compliance for Year 5.........................................................................12 Proposed Compliance Improvements Beginning Year 7...........................................................12 MONITORING RECORDS — SATISFACTORY.............................................................................12 Required Program Compliance..............................................................................................12 Actions Taken Toward Compliance for Year 5.........................................................................12 Proposed Compliance Improvements Beginning Year 7...........................................................12 ROADWAYS — SATISFACTORY................................................................................................ 13 Required Program Compliance..............................................................................................13 Actions Taken Toward Compliance for Year 5.........................................................................13 Proposed Compliance Improvements Beginning Year 7...........................................................14 Exhibit # 1: Department of Public Works Bulleting Nos. 25 (4 pages) and 26 (1 page) and Engineering Specifications Misc. 35-89-6 (4 pages) ...................... 15 Exhibit #2: Violation of Permit Notice and Dewatering Permit (2 pages) .................................... 24 - '7 5 i Exhibit # 3: Qualified Stormwater Management Inspector (5 pages) ...................................... 327 MS4 STORMWATER INSPECTION REPORT —YEAR 5 (SUMMARY} TABLE OF CONTENTS (CONTINUED) Page # Exhibit # 4: "Red Stamp" and Additional "Red Stamp.. ............................................................... 32 Exhibit # 5: Section 400-6 Discharge of Construction Excavation Waste Water (2 pages)......... 34 Exhibit # 6: Erosion and Sediment Control Inspection Form ...................................................... 36 Exhibit # 7: GSA Waste Disposal Records Year 5......................................................................37 Exhibit # 8: Industrial Inspection Form (2 pages)........................................................................38 Exhibit # 9: Section 4.9 — Narrative Report for Spill Response (2 pages)...................................40 Exhibit # 10: Pamphlets and Brochures....................................:.................................................42 Exhibit # 11: High Risk/ Industrial Facilities.............................................................................. 43 Exhibit # 12: Top 9 Critical Industrial Sites..................................................................................44 Exhibit # 13: Industrial Sites with Overflow Discharge to the MS4..............................................45 03- 757 Approved NPDES Funding for FY `03 Salaries (including overhead and fringes) Recurring Non-Recurrin Professional Engineer III $ 112,000 Professional Engineer II $ 100,000 Engineer I $ 80,000 Engineer Technician III (4) $ 256,000 GIS Technician $ 96,000 Senior Accountant $ 80,000 Typist Clerk III $ 40,000 Total $ 764,000 Expenses Training, travel and per diem $ 15,000 Office supplies and printing $ 8,500 Chemical testing equipment and kits $ 2,500 Communication $ 2,500 Books, Publications, Memberships $ 1,500 Total $ 30,000 Capital Outlay Office Equipment $ 30,000 Field equipment (Radios, Sewer inspect. cameras, Laptops, etc.) $ 28,000 Vehicles (4) $ 65,000 Total $ 123,000 Consultant Services Professional Services Services Include: Laboratory testing, Sampling, and technical Total $ 350,000 Contractual Services System cleaning contract $ 750,000 Canal and water front cleaning $ 330,000 Total $1,105,000 Sub -Total $2,249,000 $ 123,000 Program Total $ 2,388,000 o3— 75�i 1 City of Miami Stormwater Utility Trust Fund FY `03 Revenues: $ 8,962,242 Expenditures: Stormwater-related Costs in Fire, Solid Waste and Public Works NPDES Permit Program Capital Projects Total $ 2 FY 2003 FY 2003 General Fd. Allocation Full Cost Subsidy 4,125,000 8,517,220 (4,392,220) 2,388,000 2,388,000 - 2,449,242 2,449,242 - 8,962,242 13,354,462 (4,392,220) U3- 757 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) STRUCTURAL CONTROLS - MARGINAL Required Program Compliance: • Storm Water Treatment Ponds: None within the City of Miami. • 4 Pump Stations : • Inspection frequency Semi-annually. • Maintenance frequency as -needed basis. • Exfiltration Trench: • Inspection frequency Semi-annually. • Maintenance frequency as needed basis. • Pollution Control Boxes: • Inspection frequency annually. • Maintenance frequency as needed. Actions Taken Toward Compliance for Year 5: • Storm Water Treatment Ponds: None within the City of Miami. • 4 Pump Stations: • Inspection frequency Weekly by Condo Electric, Inc. • Maintenance frequency Weekly by Condo Electric, Inc. • Exfiltration Trench: • Inspections were performed during the pollution control box site visits. • Maintenance by Public Works included cleaning of 86,713 linear feet of pipe, and 114 drainage wells. • Maintenance by a private contract, funded by FEMA included cleaning of 168,188 lin. ft. of pipe citywide. • Pollution Control Boxes: • Inspections were performed at 957 complaint locations. • Maintenance included the cleaning of Fairlawn Outfall and West End Outfall pipes. • Inspection included the TV survey Wagner Creek Culvert for illicit connections. • Maintenance by Public Works included cleaning of 2,674 inlets and 304 manholes. • Maintenance by private contract funded by FEMA included the cleaning of 2,110 structures citywide. Proposed Compliance Improvements Beginning Year 7: 4 Pump Stations: • Inspection frequency Weekly by private contractor. • Maintenance frequency Weekly by private contractor. Exfiltration Trench: • Inspection frequency semi-annually, performed by four (4) trained field inspectors assigned to each quadrant of the City based on a prescribed schedule in addition to complaints. A summary of inspections will be included in annual reports. • Maintenance frequency as needed basis, summarized in annual reports. Pollution Control Boxes: Inspection frequency annually, performed by four (4) trained field inspectors assigned to each quadrant of the City based on a prescribed schedule in addition to complaints. A summary of inspections will be included in annual reports. Maintenance frequency as needed summarized in annual reports. 03- 75'7 3 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY] CONSTRUCTION SITE CONTROLS - UNSATISFACTORY Required Program Compliance: Construction site runoff — site planning &structural and non-structural Controls: • Provide Code Regulations related to erosion and sediment controls. Construction site runoff — inspection and enforcement: • Enforcement frequency as -needed based on demonstrated lack of prevention control. • Maintain internal log of inspections performed. • Provide proper training of personnel in sediment and erosion control. Construction Site runoff — site operator training: • Implement "Red Stamp" program. • Develop procedures to notify building permit applicants of NPDES regulations for construction site runoff. Include summary of procedures in annual reports. • Implement procedures to notify building permit applicants of NPDES regulations for construction site runoff. Actions Taken Toward Compliance for Year 5: Construction site runoff — site planning & structural and non-structural Controls: • Code Regulations and Engineering Standard were authorized and implemented in Year 2; however, a copy was not included in the Year 5 report. Attached is a full copy of all regulation and standards. (Exhibit # 1) • A "stop work" order is the primary enforcement tool for compliance. Monetary penalties are enforced for specific code violations. Construction site runoff — inspection and enforcement: • Inspection and enforcement was conducted by Public Works Line and Grade and Code Enforcement staff during routine set back inspections and in response to identified problem construction sites and complaints. • Internal log of "Violation of Permit Notices" and "Dewatering into Right of Way" permits were performed by each inspector. Seven (7) Notices and 7 permits were issued in Year 5. Samples of each are attached for your review. (Exhibit # 2) • Five DEP Qualified Erosion and Sediment control inspectors have been trained. Certificates attached. (Exhibit # 3) • Two Engineers have received DEP Certified training as official trainers. Construction Site runoff — site operator training: • Implemented "Red Stamp" program. Sample "red stamp" attached. (Exhibit # 4) • Procedures have been developed to notify building permit applicants of NPDES regulations for construction site runoff. • Implemented procedures to notify building permit applicants of NPDES regulations for construction site runoff. • Implemented erosion control methods on all construction projects. Attached is a copy of Section 400-6 of the City's Standard Contract Documents and Specifications. (Exhibit # 5) 03- '7 5'7 4 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) CONSTRUCTION SITE CONTROLS — UNSATISFACTORY (Continued) Proposed Compliance Improvements Beginning Year 7: The City Code Regulations, Engineering Standards and notification stamps are all in place. The procedure to notify all contractors has been established. The following improvements will enhance notification, inspection and enforcement of erosion and sediment control of construction site runoff: • All appropriate Building and Zoning Inspectors, Public Works Line and Grade Inspectors, Capital Improvements Construction Inspectors, and appropriate Code Enforcement Inspectors assigned to the City's NET Service Center will be trained and qualified, in accordance with DEP regulations, in erosion and sediment control inspection and enforcement. Training will be accomplished within 1 year. • Attach erosion and sediment control plan details and bulletin requirements to each and every set of site construction plans. • Include erosion and sediment control requirements in Division 2, Special Provisions, of the City of Miami Construction Specification Book and include details in Division 5, Engineering Standards on all City of Miami Construction projects. • Notice of Intent — NOI for 1 acre and more will be required after March 2002 by plans reviewers and construction inspectors. • Appropriate inspectors will maintain a log, by completion of inspection report, or erosion and sediment control site inspections. (Exhibit # 6) • Inspections will be conducted at City Construction projects during each site visit inspections. • Inspection of building sites will be conducted at time of line and grade inspection, as needed during routine building inspections and in response to complaints. • All inspections and enforcement action will be documented in the annual reports. 03- '7 5'7 -1 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) MUNICIPAL WASTE FACILITIES - UNSATISFACTORY Required Program Compliance: Municipal Waste Facilities: • Provide maintenance records for exfiltration system annually. Actions Taken Toward Compliance for Year 5: Municipal Waste Facilities: • The exfiltration drainage system and the pollution control structures protecting the exfiltration trench are services regularly by IPC/Magnum Environmental Services. IPC/Magnum performed inspections and cleaning of the pollutant control structures as shown on the attached maintenance record for this facility. (Exhibit # 7) Based on their inspection report, the pollution control structures functioned properly by protecting the exfiltration trench and no maintenance of the trench itself was required during the fifth year of the permit. This service fully complied with the requirements of the City's NPDES permit. • In addition, the City's General Services Administration properly maintained the City's fleet by collecting and disposing / recycling the following items further protecting the ground and surface waters: • 1,315 gal. Used coolant. • 3,340 gal. Oily water. • 3,550 gal. Sludge. • 2,900 lbs. Used oil filter. Proposed Compliance Improvements Beginning Year 7: • A more detailed report and inspection records from the City's maintenance contractor will be included in the City's annual reports. • A City NPDES inspector will verify the contractors maintenance report monthly. 03— 757 MS4 STORMWATER INSPECTION REPORT - YEAR 5 (SUMMARY) ILLICIT DISCHARGE CONTROLS - MARGINAL Required Program Compliance: • Illicit discharges and improper disposal - inspections, ordinances and enforcement measures: • Enforce City Ordinance 6145 and County Code section 24-11(3) controlling illegal discharges to surface waters and storm sewers. • Illicit discharges and improper disposal - Field screening. • Conduct field screening of MS4 for illicit discharges and improper disposal and maintain a log record. • Collect inventory information of outfalls, including updates to MS4. • 411icit discharges and improper disposal - Investigations of Suspected illicit and/or improper disposal: • Implement investigative procedures to identify, report, and terminate sources of illicit connections. • Provide training of appropriate staff in identifying and reporting illicit discharges and illicit connections. • Illicit discharges and improper disposal - Spill prevention and response: • Provide training of appropriate personnel in spill prevention and response and in techniques to mitigate pollutant discharges from spills to the MS4 and surface waters. • Illicit discharges and improper disposal - Public notification: • Implement public awareness and reporting annually. • Maintain citizen complaint log for illicit discharges annually. • Illicit discharges and improper disposal - Oil, toxics and household hazardous waste control: • Update City/County negotiations on additional oil & haz. waste collection site. • Implement outreach program. • Actively promote and support a voluntary stenciling program. • Illicit discharges and improper disposal - limitation of sanitary sewer seepage: • Implement program to limit sanitary sewer seepage to MS4. • Advise appropriate utility owner of any wastewater contamination during field screening or routine inspections. 03- '75'7 7 IVIS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) ILLICIT DISCHARGE CONTROLS — MARGINAL (Continued) Actions Taken Toward Compliance for Year 5: • Illicit discharges and improper disposal — inspections, ordinances and enforcement measures: • All City inspectors are authorized to enforce City and County Code Regulations. Illicit discharges and improper disposal — Field screening annually: • An inventory and field screening of all 262 outfalls was completed in Years 2 and 4 by Consulting Engineering and Science (CES). From this information, 9 sites were identified for follow-up investigations; however, no dry weather flow was detected during subsequent visits. Collection and analysis will resume once dry weather flow resumes. Illicit discharges and improper disposal — Investigations of Suspected illicit and/or improper disposal: • No complaints of violations were received in Year 5 from citizens or City inspectors that prompted an investigation and formal report. As a follow-up verification, 22 spot investigations of industrial sites were conducted at the close of Year 5 that did not reveal violations. Sample attached. (Exhibit # 8) • Initial training of staff to identify illicit discharges was informal. Formal training is currently underway via videotape and power point lessons. Illicit discharges and improper disposal — Spill prevention and response: • Fire and Rescue Department Haz-Mat team conducts monthly training and multi agency drills. Complete analysis in fifth year report attached. (Exhibit # 9) Illicit discharges and improper disposal — Public notification: • Complete analysis in fifth year report. Program includes broadcasting Hotline numbers on City Cable Channel 9. • Complaints are logged on the City's Complaint Tracking System database. Illicit discharges and improper disposal — Oil, toxics & household hazardous waste control: • The City continues to use exiting County collection sites for residential disposal needs. • Outreach program for oil and hazardous Waste Control distributed to the public includes those materials shown on the enclosed attachment. (Exhibit # 10) • Stenciling of drainage inlets was completed in the critical Wagner Creek drainage basin area. Illicit discharges and improper disposal — limitation of sanitary sewer seepage: • City Code prohibits discharge to sanitary sewers from any sources other than wastewater. • Advise appropriate utility owner of any wastewater contamination during field screening or routine inspections. • City Code and County Code prohibits septic tank permits to be issued where sanitary sewer service is available. • Coordinate with County on discovery of illegal connections between sanitary sewer system and storm water sewer system. • Complete d a $129,500 project to disconnect several sanitary/ storm sewer cross connections discovered by smoke testing. • Continue cooperation with Miami -Dade Water and Sewer Department and Miami - Dade Department of Environmental Resources Management to control sanitary sewer seepage into the drainage systems. Permits and information gathering was expedited for sanitary sewer upgrading project. 03- '75'7 0 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) ILLICIT DISCHARGE CONTROLS — MARGINAL (Continued) Proposed Additional Compliance Beginning Year 7: • Continued dry weather sampling and testing of high priority outfalls identified during initial dry weather screening. • Coordinate consultants' work with City NPDES field inspectors. • Continue formal training and certification of appropriate City inspectors for illicit discharge identification and enforcement utilizing videotape and power point presentations and video lessons. • Implement a routine schedule of illicit detection investigations by four NPDES City inspectors assigned to the quadrants of the City. • Enter into consultant agreement for sampling and testing of identified illicit discharge locations. • All investigations, sampling, testing and eventual enforcement will be logged and summarized in annual report. • Within the next year, the City will enter into a formal agreement with Miami -Dade County for the disposal of oil and hazardous household waste. • Stenciling program will continue to the next highest ranking critical drainage basin. • Continue cooperation with Miami- Dade County in identifying and disconnecting illegal connections to the sanitary sewer system. 03— '75% E MS4 STORMINATER INSPECTION REPORT — YEAR 5 (SUMMARY) HIGH RISK AND INDUSTRIAL FACILITY CONTROLS - UNSATISFACTORY Required Program compliance: Industrial and high risk runoff — identification of priorities and procedures for inspections: • Develop inventory of existing high risk facilities discharging to MS4 frequency annually. • Prioritized identified high risk facilities. • Develop procedures for inspection of identified high risk facilities and include summary of procedures and inspection schedule frequency annually. • Begin inspections of high risk facilities and log results. • Maintain list of industrial sources discharging to MS4 and update annually. Industrial and high risk runoff — Monitoring: • Provide description of Monitoring program for the high risk facilities discharging into MS4. • Implement Monitoring Program. Actions Taken Toward Compliance for Year 5: Industrial and high risk runoff — identification of priorities and procedures for inspections: • A complete inventory of high risk/ industrial facilities in the City was completed in Year 1 of the NPDES permit. Attached is a comprehensive list. (Exhibit # 11) • Based on the dry weather screening results completed in Year 4, the most critical industrial sites were identified. The top 9 critical sites are identified on the attached list. (Exhibit # 12) • Training of staff for high risk / industrial facility inspection has been informal. Subsequent to Year 5, formal training is being conducted. The illicit detection program and the high risk/ industrial facilities control program are linked and investigative procedures are complementary to both. A procedure to jointly inspect high risk/ industrial sites, in accordance with DERM inspection criteria, was developed based on dry weather screening results and complaints. This procedure is described in detail in Year 1 of the City's annual report and was implemented during subsequent reporting years. As reported in the illicit section, dry weather flow was not detected at the critical site locations and no complaints were received by the Public Works Department. As a result, no formal inspection reports were completed in Year 5. Follow up verification of 22 industrial sites was conducted at the close of Year 5, and no violations were identified. Sample of one inspection report is enclosed. (Exhibit # 8) • The list of industrial sites with overflow discharge to the MS4 remains unchanged. Attached is a copy of the list. (Exhibit # 13) Industrial and high risk runoff — Monitoring: • No formal monitoring was conducted in Year 5. 03- 757 10 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) HIGH RISK AND INDUSTRIAL FACILITY CONTROLS — UNSATISFACTORY (Continued) Proposed Compliance Improvements Beginning Year 7: • Appropriate staff will be formally trained in high risk and industrial facility including four (4) technicians positions exclusively assigned to NPDES inspections in the City's quadrants within the next year. • Each industrial site located within a discharge basin will be inspected annually. Follow-up investigation as required. • Each industrial site with an overflow discharge will be investigated semi-annually with follow- up inspections if violations are identified. • The City will retain an environmental consultant to develop a program for the monitoring of the critical industrial sites identified on the attached list (Exhibit # 12) within year 7. If necessary, the consultant will include in the program testing in accordance with Part 11.8.b on page 22 of the City's NPDES permit. • The City and consultant will implement the monitoring program develop by the consultant within Year 7 and subsequent years. ;-- 7 5 7 11 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) PEST, HERB, AND FERTILIZER APPLICATION - SATISFACTORY Required Program Compliance: Pesticide, Herbicide, Fertilizer: • Evidence of certification and licensing. • Implement program for reduction, proper application, mixing and storage. • Attendance of vendor sponsored seminars. • Maintenance of safety data sheets for materials and storage. • Develop outreach program for reduction of fertilizers as needed. • Implement public outreach education program frequency by -annually. Actions Taken Toward Compliance for Year 5: • Two (2) Register Pesticide Applicators in the Parks Department. Certificates are included in the fifth year report. • One (1) Register Pesticide Applicator in Melreese Golf Course. Certificates are included in the fifth year report. • Applied pesticides, herbicides, and fertilizers complying with MEP discharge. Data sheets are included in the fifth year report. • Registered user attends monthly vendor sponsored meetings. - • Continue reliance on slow release fertilizers, pesticides and herbicides. • Educational videos utilizing City Cable Channel 9. Proposed Compliance Improvements Beginning Year 7: • Continue with the Stenciling "do not pollute" program. • Update Public information brochures to refer City of Miami web and contact numbers. • Maintain Current Certification and Licensing. MONITORING RECORDS SATISFACTORY Required program compliance: Monitor and record all 262+ outfalls every two years — CONSULTANT Implement a GIS record of the storm sewer system with all the existing and proposed structures. Actions Taken Toward Compliance for Year 5: • Recording and screening of all 262 outfalls ahs been completed. • Priority outfalls for additional sampling and testing have been identified. Proposed Compliance Improvements Beginning Year 7: Enter into consultant agreement to continue dry weathering screening of outfalls and sampling and testing of high priority sites. Implement a GIS record of the storm sewer system with all existing structures and systems. 12 03- '757 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) ROADWAYS - SATISFACTORY Required Program Compliance: Roadway Maintenance: • Structural control maintenance. • Litter control program description: 1. enforcement 2. solid waste pickups 3. street sweeping 4. pressure cleaning 5. litter container service 6. blower service 7. vactor truck 8. education • Street sweeping program frequency annually. • Reevaluate routs for street sweeping and load reduction. • Implement road repair practices frequency as -needed. • Implement program to reduce pollutants in storm water runoff from municipal facilities frequency as needed. Actions Taken Toward Compliance for Year 5: Roadway Maintenance: Litter control program: • Structural Control Program addressed under "Structural Controls" topic (page 3) • Solid Waste purchased 800 litter containers. • Enforcement of 8,211 inspections, 3,154 Warning notices, 850 sanitation code enforcement civil violations. • Solid Waste pickups: frequency twice per week household garbage collection and once a week collection of large trash/bulky waste, collection of recyclable materials: 178,853 tons of debris. • Street sweeping: seven nights per week along arterial roads and main commercial corridors including weekly sweeping of produce area at Upper Wagner Creek: 30 miles/day with 7 sweepers: 2,000 tons a year. • Purchased 2 pressure cleaning machines. • 1,300 litter containers emptied seven nights per week. • Blower service for cleaning streets and sidewalks citywide. • Vactor truck cleaning addressed under "Structural Controls" topic (page 3) • Citywide education by distributing flyers, brochures, broadcasts public service at Channel 9. • Street sweeping program implemented. • Street sweeping routes prioritized as reported above. • Implement road repair practices frequency as -needed. • Implemented program to reduce pollutants in storm water runoff from municipal facilities: 1,315 gal. used coolant and 3,340 gal. of oily water disposed properly. 03- '75'7 13 MS4 STORMWATER INSPECTION REPORT — YEAR 5 (SUMMARY) ROADWAYS —SATISFACTORY (Continued) Proposed Compliance Improvements Beginning Year 7: • Continue to implement SWMP, and the standard road repair practices to reduce pollutants. • Training and educating of additional inspectors/ engineers and personnel (BMP and Erosion Control) • Daily Spill kits on all trucks and coordination with the Haz-Mat team (Fire - Rescue). • Daily Litter Control Enforcement (Container Service). • Weekly Solid Waste Pick—up Program. • Annual Street Sweeping for NPDES routing — CONTRACT specifically for NPDES program. • Annual Pressure Cleaning Program — CONTRACT specifically for NPDES program. �3- '75'7 14 EXHIBIT # 1 DEPARTMENT OF PUBLIC WORKS BULLETIN BULLETIN NO. 25 Subject: DISCHARGE OF EXCAVATION WASTE WATER, EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES Issue Date: March 31, 1998 (Rev.) Approved: James J. Kay, P.E., D ector The Code of the City of Miami contains the following provisions: Sec. 49-4. "It shall be illegal to discharge wastewater, stormwater or groundwater from a construction excavation into a city storm sewer until the rules, regulation and requirements of the Department of Public Works governing such discharge have been fulfilled and a permit has been obtained from such department allowing same." Sec. 49-5. "It shall be illegal to dump or discharge the contents of septic tanks into city sanitary or storm sewers by any manner or means whatsoever." Upon conviction, violators of these provisions shall be fined and / or imprisoned. Each day the violation continues shall constitute a separate offense. Pursuant to Sec. 49-4 and the City's National Pollutant Discharge Elimination System (NPDES) Permit FLS000002, the Department of Public Works has established the Rules, Regulations and Requirements relating to discharges originating from construction activities and construction sites including but not limited to: discharge of construction excavation water to the public right-of- way, sediment runoff and erosion. Copies are on file in the Department and are available for all concerned. It shall be the duty of City of Miami inspectors to enforce City Code Sections 494, 49-5, in addition to complying with the requirements of the City NPDES permit and the above mentioned Rules. Where violation is observed, the inspector shall in proper form and manner enforce the violation and pursue the matter in the courts where necessary. 03- 757 15 Page 1 of 4 EXHIBIT # 1 Rules, Regulations and Requirements of the Department of Public Works The City of Miami, Florida relating to DISCHARGES ORIGINATING FROM CONSTRUCTION SITES OR RESULTING FROM CONSTRUCTION ACTIVITIES The Code of the City of Miami contains the following restrictions regarding the Discharge of Construction Excavation Waste Water. Sec. 49-4. "It shall be illegal to discharge wastewater, stornwater or groundwater from a construction excavation into a city storm sewer until the rules, regulation and requirements of the Department of Public Works governing such discharge have been fulfilled and a permit has been obtained from such department allowing same." II. The Rules, Regulations and Requirements of the Department of Public Works in this matter are as follows: A. The discharge of wastewater from a construction excavation into a City storm sewer is prohibited unless a permit authorizing the discharge is obtained from the Department of Public Works. 1. All contractors are required to obtain approval from the Department of Public Works as to their proposed method, manner and location for the disposal of waste water from any excavation, prior to their application for permit, for such de -watering from the Building Department. 2. The following procedures shall be followed for wastewater discharges from construction excavations: a) All necessary pumping shall be performed in a workmanlike manner. b) All necessary labor, equipment and appurtenances for final disposition of the wastewater shall be provided at no expense to the City of Miami. 03- 757 16 Page 2 of 4 EXHIBIT # 1 c) Waste water shall be disposed of in such manner as not be iniurious to the public health and welfare, or to public or private propem . or the surface of streets. d) The discharge of waste water shall not limit the full use of public streets or private driveways except as approved in writing by the Department of Public Works. e) The contractor shall be fully responsible for the settlement of or damage to any street or adjacent property due to pumping or other operations necessary to dispose of waste water. f) All gutters, drains, culverts and the like shall be kept clean and open at all times for normal surface drainage, unless certain damming or . ponding is approved in writing by the Department of Public Works. g) No flow of water may be directed across or over a sidewalk or pavement except through pipe, troughs or flumes approved in writing by the Department of Public Works. Placement and removal of such pipes, troughs or flumes shall be done at no expense to the City. h) The used of sanitary sewers, french drains, covered ditches, and/or rock drains for the disposal of waste water is expressly prohibited. i) Where conditions warrant, the Department of Public Works may approve the pumping of waste water into a storm sewer, but prior approval shall be obtained in writing and the waste water shall be filtered (or settled) in a manner approved by the Department. Discharge of waste water under these conditions shall be stopped immediately if the filtering device becomes silted, clogged, ineffective or inoperative for any reason. When the unsatisfactory condition has been corrected, pumping may be resumed. j) If it is the opinion of the Department of Public Works that excessive solids or fines have been discharged into a storm sewer, the Contractor shall, upon written order, clean the storm sewer in a manner satisfactory to the Department. B. Direct or indirect runoff and / or erosion from any site of construction to the public right-of-way shall be deemed a nuisance and a violation of the City of Miami National Pollutant Discharge Elimination. System Permit (NPDES), to be ceased immediately. Non compliance is subject to enforcement action and / or withholding of Certificate of Occupancy, and in the case of a City contract, withholding of payment. 03- '757 17 Page 3 of 4 EXHIBIT # 1 1. Acceptable best management practices and / or structural and non structural controls shall be implemented for erosion and sediment control during construction activities. These controls consist of: but are not limited to: temporary grassing, temporary sodding, temporary mulching. sandbagging. Slope drains, sediment basins, sediment checks. berms. baled hav or straw. floating turbidity barrier, staked turbidity barrier, and silt fence. 2. Design details are available in the City of Miami Engineering Standards for Design and Construction on file in the Public Works Department. Alternative methods of control must be approved by the Director of Public Works. or his designee. III. On-site inspection and approval of construction sites shall be enforced by the City of Miami Building Department, Inspection Services Division. IV. Inspection and approval of public right-of-way adjacent to the construction site shall be enforced by the City of Miami Department of Public Works, Construction Division.. THE FOREGOING RULES, REGULATIONS AND REQUIREMENTS ARE HEREBY ESTABLISHED, PUBLISHED AND ORDERED, EFFECTIVE MARCH 31, 1998 03- 757 18 Page 4 of 4 EXHIBIT # 1 DEPARTMENT OF PUBLIC WORKS BULLETIN BULLETIN NO. ? 6 Subject: DISCHARGE OF STORMWATER TO PUBLIC SEWERS FROM PRIVATE PROPERTY Issue Date:1i APR�L a�1999 (Rev.) Approved: James J. Kay, P.E., IArector 1. The South Florida Building Code (SFBC) Section 4611.1 (Disposition of Rainwater) provides for alternate methods of rainwater disposal including direct and indirect disposal to Public Storm Sewers. 2. Pursuant to Section 4611.1 of the South Florida Building Code and the City's National Pollutant Discharge Elimination System (NPDES) Permit FLS000002, the Department of Public Works has established the following Rules, Regulations and Requirements: . A. Direct and/or indirect flow of rainwater from private property to public storm sewers will not be approved by the Department of Public Works for any new development of private property. B. Existing direct and/or indirect flow of rainwater from existing private structures or developments to public storm sewers shall be terminated and an approved on-site disposal system provided when the property has a demonstrably rational and substantial impact on the public right-of-way or violates the City's NPDES permit requirements. 1. On-site drainage systems shall be approved and inspected by the City of Miami Building Department, Plumbing Division, Miami -Dade Department of Environmental Resources Management (DERM) and the Florida Department of Environmental Protection (FDEP). 2. Abandonment or removal of existing private systems within the public right-of-way shall be approved and inspected by the Public Works Department. 03- "75'7 19 EXHIBIT # 1 k 0 3 — 75"7 V-F%wolON AND SEDIMENT CONTROL FOR CONSTRUCTION SITES 03— 7578m i ff4 DR: HLB DEPARTMENT OF PUBLIC WORKS cK = L.J.H. uo SCALE CITY OF M I fio FLOR I OR MIsc. 4-98 1 35-89-6 �R NI .Y Q W 1 1 1 1 1 ^ Y 1 I � � W W Y Y ~ ^ N! •Q/ i ,a 0 3 — 75"7 V-F%wolON AND SEDIMENT CONTROL FOR CONSTRUCTION SITES 03— 7578m i ff4 DR: HLB DEPARTMENT OF PUBLIC WORKS cK = L.J.H. uo SCALE CITY OF M I fio FLOR I OR MIsc. 4-98 1 35-89-6 EXHIBIT # 1 II• T SD' On Centers f TTp. I As Requires N •I i li• I• A aVf Fora Wlln 2 T r Z. e' PLAN Poem Per Bae. Ovtrpp Etas Fill Sloim ELEVATION TO BE USED AT SELECTED SITES WHERE THE NATURAL GROUND SLOPES TOWARD THE TOE Or SLOPE "rye A Or B face Note: Was to of swtr of the eircllon of me Etpineer. @19WL,mass Soil Pfpactd Br srmv Aro LLprry CeeasUea A4*'0 Uosrrtotr face Of Blas. BALES BACKED BY FENCE Amfor a" WHA 2 - Zi Z+ e- SwerM Sfdat Per pmt. 4mk—� O -- _ Dint(El --- DitchCur. L Gutter CUrO i Gurfer PARTIAL INLET COMPLETED INLET DITCH BOTTOM INLET PROTECTION AROUND INLETS OR SIMILAR STRUCTURES FLor Bald To But? , — AltYn. Bare: Wtrn z -rz r r Sides Per Bale. PLAN Loose Son Pteced BT Sl" Atd UpVtt 6'wn. Caoxree AArp The Uortrsae Edge Of Bales. Fru S+ow ELEVATAV TO BE USED AT SELECTED SfTES WHERE THE NATURAL GROUND SLOPES AWAr FROM THE TOE OF SLOPE BARRIERS FOR FILL SLOPES INFORMATION ADAPTED FROM THE FLORIDA DEPARTMENT OF TRANSPORTATION'S STATE DRA/NAGE MANUAL. EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES 03— 7 5 9M2ff4 DR: Nie DEPARTMENT OF PUBLIC WORKS uo SCALE CITY OF M IFA , FLORIDA M I sC . CK: L.J.H. 4-98 35-89-6 EXHIBIT # 1 57 7 Acrjz Saacirps sawn in tniS enact ate emed en FLOW RATES ( CFS ) peneroritee Dorroirions and sraia ee adjusted very Lip+t < 5 msed on oetwi$at pertorwcrct a nrorw1k Py > 5 < q connurorions. ttooerott > � < �5 Mea.y > t5 < 25 very heavy > 25 < 40 LEGEND F*w SOILS Sols t i Calesiya won Conesive Firm LOOM Cine $ono \\ Cby Sonar Course Sona _ - - \ CbYs Cro.els - \\ I NOraDOr's Soncy Loan \ ♦ \ c ♦ I $:I1 LOom {1 4 \ 4 ♦ I i O ♦ y � r I c_ I yo7. esi on '>o ; t►f i - 'CO' `fie ` C Oa/`e ars 0j; . 2 I ----- CO -- si "s 1 Co.uider use Of I refneorwy Sad ! r i i ' 1 I I -- I 50 170 150 200 250 300 350 400 Spxinq fin Feel CHART I RECOMMENDED SPACING FOR TYPE I AND TYPE II HAY BALE BARRIERS. AND TYPE III SILT FENCES INFORMATION ADAPTED FROM THE FLORIDA DEPARTMENT OF TRANSPORTATVON'S STATE DRAINAGE MANUAL.. EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES A _ 4 O 9W PDR:B DEPARTMENT OF PUBLIC WORKS CITY OF Mf �(}� FLOR I DA M I Sc. 4-98 35 -89-6 uo scup 57 EXHIBIT # 1 i ,- Sae Sod sada. Soil P%cd Shwd Ard Lpowl PLAN coolowrod AAarp ucrrrsa. Edge Of awes. ArCrdr ares with 1 Z s 7 s r shwas Per Bae. RCN Past r min. Remwea>,r w ELEVATION Soaclr¢ Bowe Carriers for ON dlld - Vold be sowed In aygreac* -Ith Chard. BARRIER FOR PAVED DI TCH PLAN LOOS* Sell Plocd Br Srwel Aro L14Wtf Caoxi4v Abe rhe urstrom Eope Of ares. Ron Post Ili" rAt A. Rea wwwad ./ S'Trp, rmin. Rmn.wwd Anybr (aver gores with 1 •7a 2'y rStota Per Bog. Armor top gad To (Ower ares with 2 -2's 1'r rStma Per ave. Arcnor Bad with 2 Z s 2's *"SIOta Per gore ELEVATION ELEVATION AaWkotlon Ord Spocrrq The Sts of Typwt l ♦ II Cae earners maid be Ihelted to tty nadlllaw Ountrw In CnortL TYPE Z TYPE I BARRIER FOR UNPAVED DITCHES INFORMATION ADAPTED FROM THE FL.ORVA DEPARTMENT OF TRANSPORTATIONS STATE DRAINAGE MANIAAL. EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES 0 3 — 7 5 SM8ff4 DR: HLB DEPARTMENT OF PUBLIC WORKS M I sC . W G . J . H .WscAl � CITY OF MIN, FLORIDA 4-918 35-89-6 women Filler FOOrk M AOeews Of Et/tals/lwf Great tAwmx.Irz rr). Seery Edea Ey ElwralW/q Ard E+I*V Order ays ad awd. FoOrlc SrddYee/ The RsprlfsaWS Of sord Boos Stclhon ws Of rho Sfado/d SCtlfkothont. Cost Of Fork To Be 5' min, InAdd M The COW"Cl OMt Prlc* For Bad mw Or Strow. TY. _ cave Son PPwd By SftrW Ard LlpMlr Co,r4 fsd Mang rhe Opslreow Eope Of Baa. PLAN PLAN LOOS* Sell Plocd Br Srwel Aro L14Wtf Caoxi4v Abe rhe urstrom Eope Of ares. Ron Post Ili" rAt A. Rea wwwad ./ S'Trp, rmin. Rmn.wwd Anybr (aver gores with 1 •7a 2'y rStota Per Bog. Armor top gad To (Ower ares with 2 -2's 1'r rStma Per ave. Arcnor Bad with 2 Z s 2's *"SIOta Per gore ELEVATION ELEVATION AaWkotlon Ord Spocrrq The Sts of Typwt l ♦ II Cae earners maid be Ihelted to tty nadlllaw Ountrw In CnortL TYPE Z TYPE I BARRIER FOR UNPAVED DITCHES INFORMATION ADAPTED FROM THE FL.ORVA DEPARTMENT OF TRANSPORTATIONS STATE DRAINAGE MANIAAL. EROSION AND SEDIMENT CONTROL FOR CONSTRUCTION SITES 0 3 — 7 5 SM8ff4 DR: HLB DEPARTMENT OF PUBLIC WORKS M I sC . W G . J . H .WscAl � CITY OF MIN, FLORIDA 4-918 35-89-6 EXHIBIT # 2 Tifia of 4Kiami JOHN H. )ACKSON, P.E. Director February 5, 2001 Mr. Jorge Godoy Metro Equipment Service. Inc. 9450 Sunset Drive. Suite 210 Miami, FL 33173 Dear Mr. Godoy: RE: VIOLATION OF PERMIT NOTICE CARLOS A. GI\!E\E Crn Manage - This letter serves as a formal issuance of "Violation of Permit Notice" for the event that took place on Saturday, February 3, 2001 at SW 2nd Avenue and 6 Street. The following violations were identified and discussed with your representative at the subject location. 1. Dewatering with no permit from the City of Miami 2. Dewatering with no permit from D.E.R.-M. 3. Dewatering with no sedimentation tank on the site. Please be advised that you must clean the two catch basins before you 'will be allowed to work again. Anv further violations will result in the rescinding of the excavation permit for a period of fifteen (15) calendar days. Should you have any questions or would like to discuss this matter, please contact me at 305- 416-1200. Sincerely, Albert A. Dominguez, P.E. Assistant Director AAD/dg cc: John H. Jackson, P.E. Amilcar Choquehuanca, Utility Coordinator Patrick Seguin, Inspector Guillermo V. Alonso, Inspection 03- '7 5'7 24 SOH` H. JACKSON. P.E. Otrector May 3, 2001 Gregory Electric c/o Chris Helton 2760 NW 55th Court Ft. Lauderdale, FL 33309 EXHIBIT # 2 T-fij of �Ctttmi Y OF y uurr nuu DEWATERING PERMIT RE: CITY OF MIAMI PUBLIC WORKS DEPARTMENT PERMIT N0. 910800 Dear Mr. Helton: CARLOS A. GL�ti�E� ON Manapll The City of Miami Department of Public Works hereby grants approval to discharge (flush water mains) into the City storm system catch basins at the following locations: 1. NW Is" Street and NW North River Drive 2. NW 2"d Street and NW North River Drive 3. NW 3'd Street and NW North River Drive 4. NW 4th Street and NW North River Drive This permit is valid from May 4, 2001 through June 14, 2001. The contractor shall comply with the following conditions: 1. The flow of water being discharged into the storm sewer must be regulated so that the system is never overloaded, flooding the street or creating a traffic hazard. To accomplish this, the rate of discharge must be reduced or stopped during rainstorms, or if trouble develops within the systems. 2. No, silt or other debris can be discharge into the storm sewer system. A proper filter system must be used, such as an approved filter box. No indigenous materials adjacent to the inlets shall be allowed to wash into the system. If by accident or other means the storm sewer system, upon completion of your pumping, is noted to have excessive silt, sand or other debris caused by your operation, you will be required to clean all lines to our satisfaction. 3. The public shall be properly protected from the dewatering apparatus. Street crossing shall positioned in manner to limit the disruption of traffic. ;- 757 25 EXHIBIT # 2 Page 2 4. All necessary precautions must be taken to prevent the generation of loud, unnecessary noise in conjunction with this dewatering operation. 5. You must obtain a Class II permit from Dade County Department of Environmental Resources Management (DERM) for water being discharged into the Miami River of Biscayne Bay through a storm sewer outfall. This permit is conditioned on your obtaining a DERM permit; which is required. 6. The Construction Division (Patrick Seguin) of the Department of Public Works must be notified at least 24 hours in advance of discharging water into the storm sewer system so that your operation may be inspected. Should you have any questions concerning this matter, please do not hesitate to call my office at 416-1218. Sincerely, Albert A. Dominguez, P.E Assistant Director AAD/dg cc: Mr. Bili Gallo, Dade County, D.E.R.M. Patrick Seguin 26 03- '75'7 EXHIBIT # 2 Page 2 4. All necessary precautions must be taken to prevent the generation of loud, unnecessary noise in conjunction with this dewatering operation. 5. You must obtain a Class II permit from Dade County Department of Environmental Resources Management (DERM) for water being discharged into the Miami River of Biscayne Bay through a storm sewer outfall. This permit is conditioned on your obtaining a DERM permit; which is required. 6. The Construction Division (Patrick Seguin) of the Department of Public Works must be notified at least 24 hours in advance of discharging water into the storm sewer system so that your operation may be inspected. Should you have any questions concerning this matter, please do not hesitate to call my office at 416-1218. Sincerely, Albert A. Dominguez, P.E Assistant Director AAD/dg cc: Mr. Bill Gallo, Dade County, D.E.R.M. Patrick Seguin 26 QUALIFIED WATER MANAGEME STORM INSPECTOR NT FLOW. 'A The undersigned hereby acknowledge that Elyrosa Estevez has successfully met all requirements necessary to be fully certified through the Florida Department of Environmental Protection Stormwater, Erosion, and Sedimentation Control Inspector Training Program otu� July 12, 2002 C-- rl.j Marleina Overton Inspector # 3027Greg Knecht I IA LM I?Ilgz ,.\�,. :(p,.. C \�..- `.,/'r-'�: .,•,�,•:�::/i.'.�ja.: ��:• '11`.•r:'//•<�ii +�C�'./P,.. ,,aq��ii.�. _ "._ .,/ ,..iii^ ''�-,"%•��/I "sii:% ��:�\VY.-:'y'/21✓/., -.;�• \�:•.�'%: "dii" _.,,q.„-�T.,q .•, •,.rl: t: 1 .•. •, .T_ ,•, r,,., .►, .v . ;/r1�+•1 >;�-1;.� •, .►, __,.r :,', •,�i.1.��.. ` ,: ,t.+, •ir�ty., 1 ('111 't�;l'.. ��f .t tS�, �.�it !f�',�� f= `.,.r��;-i-_c '- a== / - - •.r'. •:.ii%,• 1::.'%"_=' ` :iJ o1bti � � .r3L'. tG:.- � :7 A 31v It="" � rim * !r`=. - �� •.4c!, �;-:'" .�t✓,•, 1;:� �:�� r91c �:=� .'1= 7 QUALIFIED MW�.I�•y,. it . MANAGE OR 1�+ INSPECTOR ST �WOT (TIO The undersigned hereby Ili. ,�} .,�;, • `'. `�! �i' , If///.ir:: Y•••• acknowledge ._ Simon Shmuekler l roll.....•.. `:` rtt}1i i; i■+ 1111/II/I/I: i. has successfully met •ll the requirements necessary / be fully certified through the Florida Department of Environmental Protection Ston-nwater, Erosion, and Sedimentation Control Inspector Training Program mill\:: chi October 9, 2000 Inspector # 326 Greg Knecht Daniel R. DeWiest u a 11.1.11 •n•' ”' ♦ v ♦ • .r �::,4 - is ki";`;;�YLZi'� t1 1 i. 4 Lf'� tr 1 t 1 9r \�: ��:1 SPL �`: i/IJ// 1\\'�\�i/i/ J/ 1\'l: '\\� i�i''� 104\�ti :ri.JJJ 54 � 1\pJ -'l- ///.VVY��"\111,: �.`, �., t\\\♦, `;t `:�..f� ,tiljl111, �. r j,/fIIIIl144:::Z� lllltll \` rj i,fllllll4��\♦ r/%:•//f11111114.A\+ .�4:;/i/lllllt\,t��Q ���%i'/J/I %,'nntrl.i :�:r`L1:i7„v tllutl,V:�.�l,,',r�!:✓faut)!,..i ;�: �;�vIitJlit1.l�`\ :1 11111, ,ttt1%\ .y: G;lti,ll� tl .,.fin rr.3 /It t)1 .'�ti ./r/ /i%I 14 ;�;;'JI\��:o\•.a�; s''r ��• ` .r .✓i ) � r 2 , ♦,� Y ) , ♦ti� AI) � �� %,r �rGS•vr �IJ� � 1. ♦ �/ �r � Qt• \�•�\���'•p 1.' ...,, ..\., � /,;�� ,1.. .��i�•.�v�. ././'• ..Ir ti; .•..�/. 5 ��n' ,•nr~•.:, •\♦ ///. Q,/In .•l,l ..\♦ , //r51';'ll'� '11, \\\, i///5/'•'il ., �ii'7 `. I/ �� � II���J �,�::ti: ,lirl�i .'% �r� hh�• 'I ',N "1 ./, i �h 1 I' //. ��' 'II'q h •�\\r 1 r /•Irl pltln h •.�\ 1 /%.• 1' J'14 1�„�I\\ 'r I /, d lu•i,' �'` •'\ Ilddlq FI \, •/ .•�. „1, tll. •.�, lu, ,, rll ,, ,r 1.. ..0 .1 r !rl” �',, �,, ,1�.\, r ri ,1�..,.l,,l,l�•:..;.. , //.•,• / '; �f •fin' e5 n''• \ / / � .l''. �Ii ..ii.;' '4`0' li ♦//, ll''• 'irl Ili`:•:. n i/: l ,1, •\ I� /�! % 1 ! '''•.1\ \\'.`�r :� /' •\♦ 'P ..\ J 'i�ilf `•\� / I• .\ ;n '�il' / 'r'�'11 l .\ / 1 dl1. ,\ ,i ., \ 'I I' ”; �5� t'`` . 'I. cl,l,,,, 1'"\ 1 / •Ilia ,1 1 i.l��� I 'ii; :I; 1 !'d �' I, i.fl.l'•a' 'r t l .f � t 7 �n, 1``� 1 r• ,n„ �, 1' J/"r 'U'\\ /��'tl '1��� I I .1+\ t Ii, t% ;i7^ `r 11•. I •ii` l%''1 h, I 1 IiP 11 1 I{ dl h �I' I 1 i' 11 II ,p h 1 !%� 'll.., li' 1 .1 . It •'I •i� .II' >r�, i� III '1 r 'll l %,r . rll /' 1 \. II // "1"1'"n", , •I // lS� (I iirr�r 1 •'i�� �'i�i �' Ic' ^r l li 'a 'I' tl 1tt' 'I 1'1 .h. h • P•• lll t. ' m' n' I ;l'i'. l" �,ti'u:: ::;t, L' •; r ",pl"iiu ,tmii',1:; ,ill;•, t •.tti.t, n ; • r' !r•!`ttI rijlt,l P 1!. t.r,r t :1'l :i iii;/tr Ittii(lu 'il;fiii,'rul I lii�,l( . (!!1 !ir/plh I�nl:'n:,. ', 1 �'•+' ;ii; �;; i; irr%i ii Jtt ..t%it. 1i.n1 ,r11 1. ►.f',b 1, WI'I!� �,r , ,,."un��.�� :.'.In u�:a — — 1; I!igNi --- �!!!illfr - — '17/k/!kf�n i u.. '..•, w�u• W- i7RS II �« j\Uil t�1��; PIS 4n" sfI)trii 1� 4 � INSPECTO .'It tnt 1,,,1\• t llfl y • ; �'L �I aw �I�2 / l l 11.11 tt•� �/'l �1111�11 11.111 _�`.• ..1♦\l ._ _ .� � .� 11//// /fflftt f aw / l l 11.11 �1111�11 11.111 _�`.• iII& �AA A1IAAAAf1 �'11��fI Y✓1AT AI� T�A YA/Y111YAYY1 lf1•\�(1 Y1AAAn[1AM/ �A NA t11��11 11 ry certmea inrougn the rionaa uepa=ent of rnvironmentat rrotectionIN w him June 27. 2000 Insncctor # 327 110 Ih" Jc�]i�G'�i=r• CJ.LfL�- �1 - _�k��f� i�d'� i-��,`.=-ZY{1,,k�•�1l ��'-� .^.�\. I xrfri.�ql{. _=':. r�.a` ti:`'�i�.N}�j�lf,L}*�, Ay\,A(l _ _., ^�: /''A�:^G`_%_.S:a�:•/{" ;:/�{: tii�i �AVyfIY.A fi;'J f„ffff! ;II OW 'Mlf CA The undersigned hereby acknowledge that i A Mm I Y -C .2 EXHIBIT # 4 "RED STAMP" • - � - �.. __ - - - TSI 1^T�`���� City of prod!;'D;: le a e;;cave.'irOn in o a city s rlit_,y or s'.Drlil of FL'Jiic ti�rOr'S. The rules, re-ilati~a and rcrqulrem�,..; -:':'.� t +.o the dischaTye of coutra::i^.n water are on file in the Department oll i bi;c Works and copies are avai!0:5le for a11 V,.nse concarned. 03- r75'7 32 EXHIBIT # 4 Additional "RED STAMP" Implementation for Year 7+ The methods of construction shown on this plan shall comply with the following permit: City of Miami MS4 -- FLS000002 (Municipal Separate Storm Sewer System Permit) as required under the following program: N.P.D.E.S. (National Pollutant Discharge Elimination System) www.dep.state.fl.us/wateristormwaterinpdes/ Please call Public Works at (305) 416-1200 for additional information. 33 D:Wy Documents\EXHIBIT.doc EXHIBIT # 5 M=THccS 400-4.1 Fencing Around Excavations: If approved o Engineer, the Contractor at the close of the workday, on holidays a-�: r weekends may provide a fence around the perimeter of open excavaticns b in lieu of refilling the excavation. The fence material ani installation method shall be as approved by the Engineer. N: additional payment will be allowed for fencing. 400-5 Tunneling: No tunneling, other than that shown on the Plans, will be allowed, except by written permission of the Engineer, with his approval of the cross-section, lining, refilling, etc., of the tunnel. 400-6 Discharge of Construction Excavation Waste Water 400-6.1 Permit: A permit shall be obtained from the Engineer, approving the proposed methods, manner and location for the disposal of waste water from any excavation prior to any dewatering operation. Permit fees will be waived. 400-6.2 Manner of Pumping: All necessary pumping shall be performed in a workmanlike manner. 400-6.3 Provision of Labor and Equipment: All necessary labor, equipment and appurtenances for final disposition of the waste water shall be provided by the Contractor. 400-6.4 Hazard to Health and Property: Waste water shall be disposed of in such manner as shall not be injurious to putlic health and welfare or to public or private property or the surface of streets. 400-6.5 Restriction of Access: The discharge of waste water shall not restrict the full use of public streets or public or private driveways, except as approved by the engineer in writing. 400-6.6 Damage to Public and Private Property: The Contractor shall be fully responsible for the settlement of/or damage to any street or adjacent property due to pumping or other operations necessary to dispose of waste water. Ei 400-6.7 Maintenance of Surface Drainage Facilities: All gutters, drains, culverts and similar facilities shall be kept clean and open at all times for normal surface drainage, except under special circumstances when damming or ponding is approved in advance, by the Engineer in writing. 400-6.8 Discharge of Water Across Sidewalk and Pavement: No flow of water may be directed across or over a sidewalk or pavement except through pipe, troughs or flumes approved by the engineer in writing. Installations and removal of such pipes troughs or flumes shall be done at no expense to the City. 34 03— 757 EXHIBIT # 5 METHODS 400-6.9 Use of Sanitary Sewers and Local Drains Prohibited: The use of sanitary sewers, french drains, covered ditches, and/or rock drains for the disposal of waste water is expressly prohibited. 400-6.10 Use of Storm Sewers: Where conditions warrant, the Engineer may approve the pumping of waste water into a storm sewer, but prior approval shall be obtained in writing and the waste water shall be filtered or settled in a manner approved by the Engineer. Discharge of waste water under these conditions shall be stopped immediately if the filtering device becomes silted, clogged, ineffective or inoperative for any reason. When the unsatisfactory condition has been corrected, pumping may be resumed. 400-6.11 Cleaning Storm Sewer: If, in the opinion of the Engineer, excessive solid or fine materials have been discharged into a storm sewer, the Contractor shall be required to clean the storm sewer. 400-7 Street Drainage: All gutters, drains, culverts and drainage. No damming or ponding of water -in gutters and other waterways will be permitted, except to a very limited extent where the Engineer shall consider the same necessary. 400-8 Sanitary Sewer Crossing of Water Mains: In cases where water mains cross the proposed sewer with less than 18 inches clearance, the sewer pipe shall be encased in concrete. This concrete encasement shall be a minimum thickness of six inches around the pipe, and shall extend no less than ten feet on each side of the water main. Where it is impractical to encase the pipe with concrete, cast iron water pipe shall be used, extending at least ten feet on each side of the water main, and concrete encasement will not be required except at the transition joints. 400-9 Adjustment of Manholes, Castings and Monuments: As a part of street construction, sanitary and storm sewer catch basin and manhole castings shall be adjusted to the new surface elevation by the Contractor. All other utility castings shall be adjusted to the new surface elevati.,n by their respective owners. The Contractor is advised that although a street may have a 1imerock base, it is possible, because of pavement replacement incidental to street cuts, that castings may be found imbedded in concrete. Where existing manholes and meter box castings come in the sidewalk slab, the top surface of their castings shall be set even with the sidewalk surface by the Contractor with rectangular castings squared to the face of the sidewalk. 03-- 757 35 EXHIBIT # 6 / SEDIMENT CONTROL INSPECTION FORM INSPECTION DATE: INSPECTOR: LOCATION ADDRESS: TYPE OF CONSTRUCTION: (PLEASE CHECK) BBuilding Manne Storm sewer = Otne- San. sewer =Water main Highway INSPECTION CHECKLIS Y/N "PERMIT =EROSION / SEDIMENT CONTROLS IN PLACE PERMIT NO. (CHECK CONTROLS): EROSION BEING CONTROLLED ? IS SEDIMENT BEING CONTROLLED? ANY ADJACENT WATERWAYS? IS THE POTENTIAL FOR TURBIDITY IN ADJACENT WATERWAYS MINIMIZED? ANSWERING THE PREVIOUS CHECKLIST ITEMS, IS FACILITY IN COMPLIANCE? COMMENTS FOR NON-COMPLIANCE: QFOLLOWUP INSPECTION REQUIRED? CEASE CONSTRUCTION ACTIVITY VERBAL WARNING WRITTEN NOTICE OF VIOLATION TICKET TICKET NO. ON DATE: COMPLIANCE: Y / N COMMENTS: 5'7 EROINSP.XLS grassing berms sodding hay bales mulching turb.barner sandbagging sift fence slope drains sed. basins other- .(SPECIFY) EROSION BEING CONTROLLED ? IS SEDIMENT BEING CONTROLLED? ANY ADJACENT WATERWAYS? IS THE POTENTIAL FOR TURBIDITY IN ADJACENT WATERWAYS MINIMIZED? ANSWERING THE PREVIOUS CHECKLIST ITEMS, IS FACILITY IN COMPLIANCE? COMMENTS FOR NON-COMPLIANCE: QFOLLOWUP INSPECTION REQUIRED? CEASE CONSTRUCTION ACTIVITY VERBAL WARNING WRITTEN NOTICE OF VIOLATION TICKET TICKET NO. ON DATE: COMPLIANCE: Y / N COMMENTS: 5'7 EROINSP.XLS ATERIALS: PETROLEUM OIL - USED ANTIFREEZE ABSORBWT G� d. OIL FILTERS e. OTHER (SPECIFY) M X cu --I WasteDisposalRccordForrn.xls CONTAINERS NO. QUANTITY CONTAINERS TYPE VOLUME GALLONS COMMENTS DISPOSALWASTE DATE CONTRACTOR 'MATERIAL MANIFEST NO 10/11/2001 Magnum a 108517 n/a TT 200 G 10/11/2001 Magnum a 108517 n/a TT 295 G Oily Water 11/16/2001 Magnum a 111041 n/a TT 480 G Above ground tank @ MP 11/16/2001 Magnum a n/a TT 185 G 11/28/2001 Magnum b 110764 n/a Drum 220 G 12/7/2001 Magnum a 113653 n1a TT 55 G 1/8/2002 Magnum a 114583 n/a TT 470 G 1/11/2002 Magnum b 116183 n/a TT 220 G 1/15/2002 Magnum d 116362 n/a TT 2 DM 2 drums oil fillers 2/26/2002 Magnum a 117952 n/a TT 465 G LF above grounds 2/26/2002 Magnum a 119637 n/a TT 425 FI above grounds ATERIALS: PETROLEUM OIL - USED ANTIFREEZE ABSORBWT G� d. OIL FILTERS e. OTHER (SPECIFY) M X cu --I WasteDisposalRccordForrn.xls CITY JF MIAMI STORM SEWER INSPECTIC ?ORM DATE: I --.- EXHIBIT # 8 Farihn Name:� fat ✓ , 6-.-, t'S NPDES Permit No. Address: Address: 1/ est N �' `_�ti�f ,'Yl�,:,,��. , �I 7.3)(%-Z Parent Co. Phone No.: Address: Contact Name:— L- o-t�; ; A Phone No.: Primary SIC Code: Sec. SIC Code: STORM WATER MANAGEMENT SYSTEM S\V Discharged from site? ✓Yes 2 DHo\ No SW Controls in place? ✓ Yes No Types of controls Ponds on Site) Yes ✓ No Ponds Dry? Yes No Methods of discharge 1'i,n - a, Erosion or sediment problems? Yes ✓ No Problem Pond slopes sodded. seeded. mulched? Yes No Blockage of pipes. ditches. etc? Yes No Routine maintenance performed FACILITY INFORMATION - ProducVservice . •n-, .e—+ 5 Description of waste managem nt/ Disposal practices: Ra,A- mtl's handlings Storage practices: Load ingslinloading: Outdoor storaze of „c ( (_.Q Raw mtlsiproducts: Outdoor processy �, Activities: Dust/ particulate: Housekeeping/spill: (,q Clean-up practices: City sewer? -Yes Floor drains? Yes _ Potential illicit discharges? Potential Problems SW? No Septic tank? Yes No !/' No Routing V P Potential Contamination Grd wtr? ✓ Yes No Surf. wtr? COMMENTS/ DRAWINGS C�l P 38 Yes ✓ No Tropical Pallets. Inc. 154 5 — 1691 NV 23 Street Miami. FL. 33142 EXHIBIT # 8 Allowed Full Access to site .)-I - - at 12:29 pm Drain at East side Drain at West side Drain at North Side ----------- 7. RIGOBERTO LESTEIRA JR. Tropical Pallets, Inc. 1691 N W 23rd Street _ 6845 NAV 73rd Court Miamf =londa 33142 -Barr,. Florida 33166 ^one 3051634-0346 Phone. 1305)884-4828 39 93- 757 EXHIBIT # 9 FIFTH .L*I\'L'AL REPORT PER.\1;T \0 c;,Stkha\: CITY OF \11,01 Section 4.9 - Narrative Report For Spill Response 4.9.1 Objective Of Spill Response The City of Miami shall implement procedures to prevent, contain, and respond to spills that may discharge into the Municipal Separate Storm Sewer System (MS4). The Cin -'s compliance with this objective is done through its Spill Prevention and Response Program as discussed in the following sections. 4.9.2 Spill Response Activities Completed And Those In Progress During the fifth permitting year, the following accomplishments have been achieved and are ongoing as part of this program: • The Haz-Mat Team, a division of the City of Miami Fire -Rescue Department. continues to keep an extensive spill prevention and response program in place as required by the City's NPDES permit. • The Haz Mat Team receiv,.s monthly training drills as well as a minimum of one joint multi agency drill with the other Haz-Mat Teams in Dade and Broward Counties. • The Haz-Mat Team is part of the Local Emergency Planning Council, and works closely with the other two Hazardous materials teams in Miami -Dade County, as well as with the Hazardous materials Teams in Broward county. • The Hazardous Materials team is part of a federal Metropolitan Medical Strike Team, whose purpose is to send a consolidated Hazardous Materials Team to any terrorist, or suspected terrorist event within Miami -Dade, Monroe, and Broward County, and as far north as Palm Beach County should the need arise. Several full scale drills have been conducted with this mission in mind. These drills were conducted with the cooperation and participation of all public Safety disciplines, including the FBI, and other federal agencies. • A Special Operations Officer has been created to better coordinate the' efforts of the Hazardous materials team on all three shifts. This is a S day a week position that has improved tum around time with broken equipment, and better coordination ongoing training. • Presently an effort is underway to coordinate training classes from Miami -Dade County and Hialeah, with members of all three teams attending so better efficiency and familiarization of each others abilities and resources will be realized. • With a new administration and a better understanding of Haz-Mat needs, equipment is being ordered in a timely fashion. 03— '757 40 FIFTH A�NTEXHIBIT # 9UAL REPORT PER.'-117T \0 FLSCookx_ MY OF MIAM. 4.9.3 General Discussion Of Spill Response As documented in the City's previous annual reports, the City of Miami's Hazardous Materials Response Team is responsible for mitigation and prevention of hazardous materials spills and releases and 'as implemented procedures to accomplish the above with an ongoing monthly training program and multi -agency drills. The City of Miami's Hazardous Materials Team is located at Station 1. at 144 NE 5 Street. The Team includes multiple units including a Haz-Mat EMS contingent able to handle medical emergencies as related to Haz-Mat Incidents. Their primary responsibilities are the mitigation of Haz- Mat incidents. The team staffs the following units: an aerial ladder device, a foam pumper, several types of protective suits ranging from Level A to Level D and a dedicated Haz-Mat unit. There is a 5 day week, Special Operations Officer dedicated to the coordination of the Hazardous Materials Team, and Miami Fire Rescue's Dive Rescue Team, and a recently formed technical Rescue Team. This new team works hand in hand with the city's Haz Mat, and Dive Rescue Teams. They specialize in confined space rescues, trench rescues and high angle or elevated rescues. There are 49 firefighters and officers assigned to the Haz-Mat team, and all are at least trained to the technician level. The team is commanded by a District Chief who is also a Haz-Mat Technician. Training includes operations that involve damming, diking and the prevention of spread of product using special equipment which includes pigs, booms and absorption type pads. Furthermore, the team is also trained in utilizing atmospheric monitoring devices to determine levels of toxic gases, arxi ventilation techniques to make the -incident safe. Recently through a federal grant, a portable gas chromatic mass spectrometer, has been procured and is available to all the Haz Mat teams in Miami -Dade county. This additional resource, plus trained technicians, will enable a much faster identification of unknown products, and thus a faster mitigation of hazardous materials emergencies. Needless to say, safer procedures can be implemented as well. The Haz-Mat Team responded to approximately 1000 incidents in 2001, which included fuel spills, leaking cylinders, gas leaks, explosion type incidents, several confined space rescues and incidents involving boats and aircraft. The additional 500 to 600 calls were due to the hysteria after the terrorist events of September 11, and the months that followed.. Most of these were called in by hysterical citizens, who because of the hype by the media perceived any white powder, up to and including confectioners sugar on a yes, doughnut, as Anthrax. The fire department responded to about. 2700 calls to suspicious powder, and not one of the specimens analyzed came up positive. Many times the Haz Mat team is dispatched to a perceived hazardous material because of the mere fact the product is unknown at the time. Many times even though this might be a benign substance, full alert procedures are implemented until the identity of the product is known, and made safe. Most recently extensive training is being provided to keep the team abreast of the problems in terrorist type incidents, including NBC type weapons The Hazardous Materials Team received extensive training in chemical antidotes, and recognition of these types of events This is an ongoing project, with refresher training every two years at a minimum. 41 03- 757 EXHIBIT # 10 Pamphlets and Brochures EPA Collecting Used Oil For Recycling - Tips for consumers... (EPA 530-F-94-008) Recycle -You can make a ton of difference (EPA 530-F92-003) Protecting Our Nation's Waters Through Watei Quality Based Controls (EPA 823-F-93-011) Protecting Our Nation's Waters from Industrial Discharges (EPA -821-F-93-002) Working to Ensure Abundant, Safe, and Clean Water Resources (EPA -900-F-92-001) Household Hazardous Waste - Steps to Safe Management (EPA -530-F-92-031) Manazins Used Oil - Advice for small businesses (EPA -530=F-96-004) Recycling Grass Clippings (EPA -530-F-92-012) Yard Waste Composting (EPA -530 -SW -91-009) Manejando Aceite Usado - Consejos para empresas pequenas (EPA -530 -F -96-004S) Recoleccion de Aceite Usado para Reciclaje o Reutilizacion - Consejos pats consumidores (EPA 530 -F -94-008S) Desechos Domesticos Peligrosos - Pasos para un manejo seguro (EPA 530 -F -92-031S) When it Rains. It Drains (EPA 832-F-93-002) Miami Dade County Home Chemical Collection Program Environmental Impact - Newsletter South Florida Water Management District Retrofit - Complete Guide to Home Water Conservation Xeriscape - Siembra Bien Xeriscape - Plant it Smart Xeriscape - Plant Guide II Water is Life... Save it El Agua es Vida... Ahorrela! 50 Ways to Turn it Off - How you can help save Florida's precious water supply City of Miami The City of Miami Yard Trash Management Facility City of Miami Department of Solid Waste - Residential Services Update Brochure (in Spanish, English & Creole) City of Miami Recycling Awareness Program (in English, Spanish & Creole) 42 03- 757 Industrial Facilities Inspected for Year 6 Zip Codes NPDES High SIC Basin Outfalls NPDES Permit Risk inspection Company Name Facility Address Code Standard Extended Name Map # DERM IW # Folio Number Permit YIN No. YIN Date Comments Out of business Mears Destination Services 1515 NW 21 St. 4142 33142 7412 WC04 117 IW500996-97 3126-021-0390 A.0.97-068 NIA N N 3/14/02 No foreseen impact to sewer. 3/15102 No foreseen Impact to sewer. Garland Corp. 1500 NW 23 St. 2033 33142 9998 WC031 117 None 3126-041-0010 117 None 3126-044-0160 A.0.98-006 N/A N/A N 3/15/02 No foreseen im act to sewer. Tropical Pallets, Inc. 1691 NW 23 St. 2448 33142 7625 WC03 WC04 117 IW507662-96 3126-021-0420 N 3114/02 No foreseen Impact to sewer. National Auto BodyWorks 1500 NW 21 St. 33142 WC05 117 None 3126-045-0070 N 3/15/02 Parkin lot drains, no foreseen Impact to sewer. Matslm Intemational 1625 NW 20 St. 33142 WC04 117 None 3126-048-0100 N 3/15/02 Parkin lot drains, no foreseen Impact to sewer. Te Kingston -Miami Trading1465 NW 21 Ter. 33142 WC03 117 None 3126-044-0151 N 3115!02 Warehouse use on , no roreseen Impact to sewer. Tropical Pallets, Int. 1545 NW 23 33142 1. Facilities are listed for each SIC code. demand Ph: biochemical oxygen demand (bod); total suspended solids (ISS); total phosphorus (IT); off 6 grease (olg); chemical oxygen (COD); total k(eldahi notrogen (IKN); nitrate plus nitrite nitrogen (NNN); other (specIly).A16 Faciliks Indicate business name change. & Shga Flow Runoff (SF). TO outfall storm sewer (Map No.). Onsite (0). Sanitary Sewer (SS) ' Require further Investigation based on available monitoring or screening data. Outfalls with potential sanitary sewer contamination EXHIBIT # 12 Outfall Basin Date Sampled Identification No. Map No. 54-41-22-SW10B 45-334 BB18 5/4/00 54-41 -01 -NW1 5C 36-274 MR22 5/4/00 53-42-30-NW081 21-376 BB60 5/11/00 53-41-32-SE01 D 27-185 CC07 5/19/00 53-42-30-SWO21 21-108 BB61 5/10/00 53-41-33-SW05C 26-358 CC14 5/19/00 53-42-19-SE021 15-84 BB42 4/3/00 53-42-19-NE081 15-83 BB42 5/17/00 53-42-30-NW051 21-106 BB61 5/10/00 Note: The outfalls were found to have sanitary sewage odors during year 3 City Dry Weather Screening. 44 03- 757 M X 00 CA) Facilities Connected to Cl Storm Sewers Zip Codes SIC Company Name Facility Address Code standard NPDES Basin NPDES Permit Extended Name Outfalls Map # DERM IW # Follo Number Permit Y/N No. High Risk Inspection YIN Date Comments GA. Records Manutacturina 2337 NW 8 Ave. 2821 33142 7434 WC01 136,116,173,176 3/13/02 Closed, no access, need to reinspect. Aled Ptatlry.Inc. 2120 NW 10 Ave 3585 33142 WC01 136,116,173,176 3/13/02 Out of business. Modem Elevator Co. 2435 NW 7 Ct. 2591 331271 4209 WC01 136,116,173,176 3/13/02 Closed, no access, need to reinspect. Apollo Press MlamI Corp. 2302 NW 7 PI. 2759 331271 WC01 136,116,173,176 3113102 Closed, no access, need to reinspect. General Enve MV. Co. 2340 NW 7 Pl. 2677 331271 WC01 136,116,173,176 3/13/02 Onsite drains. Ammicon National Lwmrsphers 2444 NW 7 PI. 2752 331271 WC01 136,116,173,176 IW5-00920-97 3/13/02 Closed, no access, need to reinspect. MamdChoose Co. Inc. 1066 NW 21 St. 2022 331271 WCO1 136,116,173,176 3120102 Run-off from parking lot. MJa Really 831 NW 21 St. 2321 33127 WC01 136,116,173,176 3/20/02 Clothing store. Vorys Cash a Carry 1128 NW 22 St. 2515 33127 4528 WC01 136,116,173,176 3/20/02 No unforeseen Impact on sewer. C" Daky Products Inc. 743 NW 23 St. 2022 33127 4242 WC01 136,116,173,176 3120102 No comments. H. M Inc. 930 NW 23 St. 2331 33127 4245 WC01 136,116,173,176 3/20/02 Under construction R a R Dalry 732 NW 24 St. 4225 33127 4262 WC01 136,116,173,176 3/22/02 Not open. MakW Sign Co. s Body Shop Inc. 750 NW 24 St 3993 33127 WC01 136,116,173.176 3120102 New business. Ptaffco Inc. 759 NW 24 St 2759 331271 WC01 136,116,173,1761W5-00158-97 3120102 Drains on site. ShA" Pah 760 NW 24 Sl 2782 331271 4261 WC01 136,116,173,176 3/20/02 New business. 1700 NW 22 St. 33127 3/15/02 Drains on site. 728 NW 24 St. 33127 3/20102 No drains on site. 1. Facilities are listed for each SIC code. ® oil & grease (o/g); chemical oxygen demand (COD); Ph: biochemical oxygen demand (bod); total suspended solids (ISS); total phosphorus (IT); total k)eldahl notrogen (IKN); nitrate plus nitrite nitrogen (NNN); other (speciy).A16 Facilities indicate business name change. & Sheet Flow Runoff (SF). TO outfall storm sewer (Map No.). Onsite (0). Sanitary Sewer (SS) • Require further investigation based on available monitoring or screening data. M X 00 CA) Exhibit II In -Kind Penalties Once the settlement amount has been established, it may be appropriate to consider an in-kind penalty project by the violator as a way of reducing the total cash amount owed the Department. The in-kind penalty project is not designed to give the violator credit for the cost of corrective actions that he would be required to undertake anyway, but only to offset all or some portion of the cash settlement in a mutually satisfactory manner. So long as the financial impact upon the violator is equivalent to that established pursuant to these settlement guidelines, the Department may consider alternative ways that the violator may pay the penalty. In-kind penalties should only be considered in the following circumstances: a) If the responsible party is a government entity, such as a federal agency, state agency, county, city, university, or school board, b) If the responsible party is a private party proposing an environmental restoration or enhancement project, or C) If the responsible party is a private party proposing an in-kind project that does not involve environmental restoration or enhancement for a calculated penalty of $10,000 or more. In-kind penalties are limited to the following specific options: a. Material and/or Labor Support for Environmental Enhancement or Restoration Projects. Preference should be given to proposals that involve participation in existing or proposed government sponsored environmental enhancement or restoration projects such as SWIM projects. The responsible party shall be required to place appropriate signs at the project site during the implementation of the project indicating that the responsible party's involvement with the project is the result of a Department enforcement action. Once the project has been completed as required by the Consent Order, the sign may be taken down. However, the responsible party should not be allowed to post a sign at the site after the project has been completed indicating that the reason for the project being completed was anything other than a DEP enforcement action. For all environmental enhancement or restoration projects conducted on private property, the responsible party must provide a conservation easement to the Department for the land on which the restoration project took place. For an environmental enhancement or restoration project on public land, the responsible party may need to provide a conservation easement to the Department for private land adjoining the environmental enhancement or restoration project if it is required to protect the completed restoration project. b. Environmental Information/Education Projects. Any information or education project proposed must demonstrate how the information or education project will directly enhance the Department's pollution control activities. An example of an acceptable information or education project is one that involves training, workshops, brochures, PSAs, or handbooks on what small quantity generators of hazardous waste need to do to comply with RCRA. The information or education projects must not include recognition of the development of the projects by the responsible parties. C. Capital or Facility Improvements. Any capital or facility improvement project proposed must demonstrate how the capital or facility improvement project will directly enhance the Department's pollution control activities. An example of an acceptable capital or facility improvement project is one that involves the construction of a sewer line to hook up a failing package plant, owned and operated by an insolvent third party, to a regional sewage treatment plant. An example of an unacceptable capital or facility improvement project is one that involves the planting of upland trees and shrubs. 03- '7 5 '7 d. Property. A responsible party may propose to donate environmentally sensitive land to the Department as an in-kind penalty. Any proposals concerning the donation of land to the Department as an in-kind penalty must receive prior approval from the Department's Division of State Lands. The DEP may require proposals concerning the donation of land to another government entity or non-profit organization to include a conservation easement involving the donated property. If an in-kind penalty is used in lieu of a cash penalty, the value of the in-kind penalty should be 1 and 1/2 times the amount of the penalty if paid in cash. Department staff should not be involved in choosing vendors or agents used by the responsible party in implementing an in-kind project. No in-kind penalty project should include the purchase or lease of any equipment for the Department. 03- 7 �'7 CITY OF MIAMI, FLORIDA A=7 INTER -OFFICE MEMORANDUM TO: The Honorable and Memb DATE: JUL - 8 2003 FILE: of City Co mission SUBJECT: Resolution Authorizing the City Manager to U Execute a Consent Order �. � FROM: REFERENCES: Jo Aqnola Chief dministrator/ City Manager ENCLOSURES: Resolution RECOMMENDATION: It is respectfully recommended that the City Commission adopt the attached resolution authorizing the City Manager to Execute a Consent Order, in substantially the attached form, between the City of Miami and The Florida Department of Environmental Protection. BACK GROUND: The City of Miami is the owner and the agency responsible for the operation of a Municipal Separate Stone Sewer System (MS4) that serves the lands located within the City's jurisdiction and the City operates its MS4 under a National Pollutant Discharge Elimination System (NPDES) permit that is administered by the Florida Department of Environmental Protection (FDEP). During the fourth and fifth year annum reviews, the FDEP found the City's NPDES permit to be in non-compliance and determined that the City was in violation with the terms and conditions of the NPDES permit. On November 21, 2002, the City of Miami submitted a 2003 NPDES Compliance Strategy to FDEP and after carefully reviewing the City's Strategy, the FDEP has prepare a Consent Order for the City of Miami to accept and enforce. Please refer to the attached Consent Order, File No. OGC No. 03-0166, in the matter of FDEP vs City of Miami received June 2, 2003. FISCAL IMPACT: NONE/ BUDGETED ITEM <00 ,1619103 JA/AAD/LJ H/ee 03- 75'7 Jeb Bush Governor May 30, 2003 Department of Environmental Protection Twin Towers Office Building 2600 Blair Stone Road Tallahassee, Florida 32399-2400 David B. Struhs Secretary The Honorable Manuel A. Diaz Mayor, City of Miami 3500 Pan American Drive C-5 N Miami, Florida 33133 rz c= C Mr. Alejandro Vilarello, City Attorney C-) City of Miami City Attorney's Office 444 S.W. 2nd Avenue, Suite 945 WC) 3 � C Miami, Florida 33133 y c r a Certified Mail No.: 'tcx=>1 \AC� Z�-C1 -Ic5E��,} \L'to0 o Yu o O r— Re: NPDES Stormwater MS4 Permit No.: FLS000002 OGC Case No.: 03-0166 Dear Gentlemen: The purpose of this letter is to transmit the proposed Consent Order, OGC No. 03-0166, in the matter of DEP vs City of Miami. Please review the document, sign and return it by July 4, 2003. An executed copy of the Consent Order will subsequently be forwarded to you for your records. Your continued cooperation in resolving this matter is appreciated. If you have any further questions, please contact Geoff Rabinowitz at (850) 245-7521. Enclosure: Consent Order Sincerely, Eric H. Livingston Chief, Bureau of Watershed Management "More Protection, Less Process" Printed on recycled paper. 03- 757 cc: Mimi Drew, Director, Division of Water Resource Management Eric Livingston, Chief, Bureau of Watershed Management Michael Bateman, P.E. NPDES Stormwater Administrator Geoffrey Rabinowitz, Compliance & Enforcement Manager Rachel Siebert, NPDES Stormwater Attorney Albert Dominguez, Director, Public Works, City of Miami Erica Wright, Esq. City of Miami File 03— 75"5 JUL 13 2000 5:13PM Po]ig�Comraittee: Governor of State of Florida Mr. Jeb Bush Designee: Dr. Pamella Dana Chair of Miami -Dade Delegation Representative Rene Garcia Designee: Ms. Debra Owens Chair of Governing Board of South Florida Water Management District Mr, Nicolas J. Gutierrez. Jr. Designee: Ms. beta Bague Miami -Dade State Attorney Ms. Katherine Fernandez -Rundle Designee: Mr. Gary Winston Mayor of Miaml-Dade County Mayor Alex Penelas Designee: Mr- Henry F. 3ori Mayor of Miami Mayor Manuel A. Diaz Desigeee: Mr, Otto Boudet-Murtas City of Miami Commissioner Commissioner Joe Sanchez Designee: Mr. Steve Wright Miami -Dade County Commissioner Commissioner Bruno Barrsim Designee: Mr. Alfredo Gonzalez Chair or Miami River Marine Group Charles "Bud" Morton Designee: Mr. Richard Huanell Cbair or Marine Council Mr. Michael Karcher Designer. Mr. Phil EvcAngham Executive Director of Downtown Development Authority Mr. Dana A. Nottingham Designee: Mr. Adam Lukin Chair of Greater Miami Chamber of Commerce Mr. William O. Cullom Designee; Ms. Megan Kelly Neighborhood Representative Appointed by City of Miami Commission Dr. Ernest Martin Designee: Mr, Michael Cox Neighborhood Representative Appointed by Nliami-Dade Commi-qsion Ms. Sallye Jude Designee: Ms. Jane Caporelli Representative from Environmental or Civic Organization Appointed by the Governor Ms. Janet McAliley Designee: Ms. Theo Long Member at Large Appointed by the Governor Mr. Robert Parks Member at Large Appointed by Miami -Dade Commission Ms. Sun Babun Designee: Mr. Tom Parker Member at Large Appointed by City of Miami Commission Mr. Cleve Jones, Jr. Designee: Captain Beau Payne Managing Director Captain David Miller MIAMI RIVER UUMM1551ut7 JuJ J-1 i • -- miami River Comm do Rosenstiel,; 4600 Rickenbacker Miami, Florida Office: (305);36; Fax: (305) 361• email: mrc@rsmas.i Honorable Chairman Johnny L. Winton City Hall 3500 Pan American Drive Miami, FL 33133 Re: Recommendation for Approval of July 17, 2003 City Commission Agenda Items CA -8 & CA -9 Dear Chairman Winton: This letter serves as the Miami River Commission's (MRC) "official! statement" to all City Commissioners, requested in City Resolution 00- 320, regarding July 17, 2003 City Commission agenda items CA -8 & ;. CA -9, which impact the Miami River corridor, The MRC respectfully recommends the City Commission authorize the Manager to engage consultants for dredging Wagner Creek Phase III and the Lawrence Waterway. Dredging the Miami River and its tributaries are "Implementation Steps" of The.Viami River Corridor" Urban Infill Plan, our award winning strategic plan to revitalize the Miami River. The MRC commends the City for.implernenting these two projects that, will improve the environment of the Miami River watershed. Respectfully, 944* 0.00 Robert L. Parks, Esq. Chair, Miami River Commission Cc. Honorable Mayor Manuel A. Diaz City Administrator Joe Arriola City Clerk Priscilla Thompson City Attorney Alex Vilarello Sub€matted Tato —co—, id in connE Priscilla A.-' iDJ-" JUL 13 2000 5:13PM MIAMI RIVER COMMISSION J U t), J b 1 14 1 b z) FROM: AM, Brett Bibeau, Assistant Director Manager, Clerk and Attorney MIAMI RIVER 1 DATE: 1 14 City of Miami JULY 15, 2003 COMMISSION F TOTAL NO. OP PAGES INCLUDING COVER: 2 C/O ROSENSTIEL SCHOOL OF MARINE & ATMOSPHERIC SCIENCE 5410, 4161801, 4600 RICKENBACKER CAUSEWAY L:85V61230,2505399,� 8 610 MIAMI, FL 33149-1098 PHONE MUDER: SENDER'S REFERENCE NUM1ML- _4 TEL: (305)361 -4850 FAX:(305)361 -475 5 W W W. M I A M I R I V E R C 0 M M I S S 10 N. 0 R G RE: YOUR REFERENCE NUMBER: FACSIMILE TRANSMITTAL SHEET for Approval of 7/17/03 City TO: FROM: Honorable City Commission, Mayor, Brett Bibeau, Assistant Director Manager, Clerk and Attorney COMPANY: DATE: City of Miami JULY 15, 2003 F TOTAL NO. OP PAGES INCLUDING COVER: 2 v8"5 C01, 250 5456,2505386,63-113-334, 5410, 4161801, L:85V61230,2505399,� 8 610 PHONE MUDER: SENDER'S REFERENCE NUM1ML- _4 RE: YOUR REFERENCE NUMBER: Enclosed MRC Recommendation for Approval of 7/17/03 City Commission Agenda Items CA -8 uy 4-- -4* Subrnitt-ed 1,r10 the public o, r d i f I c o n n e ct i rj r i 1h, item j�o,79' �-JGP Priscilla A. Thum sols' Ci+y Clerk 03- 757