HomeMy WebLinkAboutR-03-0623J-04-480
05/22/03
RESOLUTION NO. 0 J — 6 1 el
A RESOLUTION OF THE MIAMI CITY COMMISSION,
WITH ATTACHMENT(S), ACCEPTING THE BID OF
MORLIC ENGINEERING, CORP., FOR THE PROJECT
ENTITLED "'ALLAPATTAH STREET REBUILDING AND
STORM SEWER, B-4626 AND B-5653," IN THE
AMOUNT OF $222,077; ALLOCATING FUNDS FROM
CAPITAL IMPROVEMENTS PROJECT NOS. 341200, IN
THE AMOUNT OF $117,065, 341321, IN THE AMOUNT
OF $44,923.55 AND, 352214, IN THE AMOUNT OF
$93,400, IN A TOTAL AMOUNT OF $222,077 FOR
THE CONTRACT COST, PLUS $33,311.55 FOR
EXPENSES INCURR�D BY THE CITY, FOR TOTAL
ESTIMATED PROJECT CONSTRUCTION COSTS OF
$255,388.55 AS SET FORTH ON THE DEPARTMENT OF
CAPITAL IMPROVEMENTS PROJECT FACT SHEET,
ATTACHED AND INCORPORATED; AUTHORIZING THE
CITY MANAGER TO EXECUTE THE NECESSARY
DOCUMENTS, IN A FORM ACCEPTABLE TO THE CITY
ATTORNEY, FOR SAID PURPOSE.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. The bid of MORLIC Engineering, Corp. for the
project entitled "ALLAPATTAH STREET REBUILDING AND STORM SEWER,
B-4626 & B-5653" is accepted, in the proposed project amount of
$222,077, for total contract costs plus $33,311.55 for estimated
expenses incurred by the City, for total estimated construction
. . . .........
F. .
7 T1
6 ey�?.7P
M c �
MAY 2 2 SO
Resolution No.
0:1— %2.1
costs of $255,388.55, as set forth on the Department of Capital
Improvements Project Fact Sheet, attached and incorporated, with
funds allocated from Capital Improvement Project Nos. 341200, in
the amount of $117,065, 341321, in the amount of $44,923.55, and
352214, in the amount of $93,400.
Section 2. The City Manager is authorized!' to execute
the necessary documents, in a form acceptable to the City
Attorney, for said purpose.
Section 3. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.'
1� The herein authorization is further subject to compliance with
all requirements that may be imposed by the City Attorney,
including but not limited to those prescribed by applicable
provisions of the City Charter and Code.
�� If the Mayor does not sign this Resolution, it shall become
effective at the end of ten calendar days from the date it was
passed and adopted. If the Mayor vetoes this Resolution, it
shall become effective immediately upon override of the veto by
the City Commission.
Page 2 of 3
PASSED AND ADOPTED this 22nd .day of May , 2003.
ATTEST:
4-7
PRISCILLA A. T OMP ON
CITY CLERK
APPROVE-'fORM-,"'5'CORRECTNESS:
�rJANDRO VILARELLO
TY ATTORNEY
W7264:tr:AS
Page 3 of 3
��alw aa -al -x
MANUEL A. DIAZ,
iJ3- 61943
'i OF City of Miami
De, tment of Capital Improvemer,
PROJECT FACT SHEET
0
CO,FV
Date: May 21, 2003
Emergency: j
Project Name: ALLAPATTAH STREET REBUILDING AND STORM SEWER
Project Location:
Allapattah Neighborhood
Commissioner District: 1
Project Number:
B-4626&5653
Initiating Dept.: Public Works
Project Manager/Ext. No.:
Cesar Gonzalez / 416-1219
Project Budget:
Homeland Defense
Account Number:
341200 Amount: $117,065.00
Federal (C.D.B.G.)
Account Number:
341321 Amount: $44,923.00
S.N.P.B.
Account Number:
352214 Amount: $93,400.00
Other: C.I.P. No.
Account Number:
Amount:
The Project is located at N.W. 15 Street between N.W. 13 Court & N.W. 14 Avenue and N.W. 13 Court between
w N.W. 15 Street & N.W. 16 Street.
a.
O
U
N The Project consists of the removal of some of the existing drainage system and piping and the reconstruction
v of the system using various inlets and exfiltration trench. Them the removal of the existing pavement, sidewalk,
LU subgrade and limerock base and the reconstruction of the roadway according to the proposed grading plan
00 and typical roadway sections.
CL
LU
U)
Q
(L
2
O
U
H
U)
Z
O
U
Milian, Swain & Associates, Inc.
2025 S.W. 32 Ave, Suite 110
P-• Miami, Florida 33145
m: Alberto Herrera
1Ai°t, (305)441-0123
Hiohwav I
Contractor: MORLIC Engineering Corp.
Address: 7571 N.W. 7 Street
City, State, Zip: Miami, Florida 33126
Contact Person: J. Orlando Mora
Telephone/E-mail:
(305)267-1907
Class: P
(J = Joint P = Prime S = Sub)
Minority Status: H
(B = Black F = Female H = Hispanic N = None)
Established: 7 years
License Number: E1322
Sub -Contractors:
H & J Asphalt
Barreiro Concrete
PROJECT COSTS
I;E) ;• Estimab
000-00 (A)
N/A (A)
N/A :,(A)
rvices: N/A, (A)
iration: $2,520.00 (A)
Total• $38,520.00
Construction Contract Amount: $222,077.00 (BID)
CIP Construction Administration: $33,311.55 (E)
Misc. Construction Costs: N/A (E)
Construction Phase Total $255,388.55
6.13
CrJ
C` i
cW
TABULATION OF BIDS FORroe
t --I
ALLAPATTAH
STREET REBUILDING AND
STORM SEWER - FORMAL
B-4626 a B-5653'
FORMAL
Received by the City Clerk, City of Kari, Florida at IIAO ax on
May 15, 2003.
Bidder MIC ENGINEERING CORP.
Address 7571 N.V. 7 STREET
MIAMI, FL 33126
lacated 1. the aty or x1ow NO
Ik"wed L bm*W a hr City Co* -L r*Vo Ord YES
Bid Bond Amit B.H. 5%
Irreanarlties
REPOR BROTHERS, INC. APAC GROLF, INC.
1999 N.E. 150 ST 1103 5190 N.V. 167 ST 1 201
MINN, FL 33126 MIAMI, FL 33014
NO NO
YES YES
B.B. 5% B.B. 57
C
METRO EXPRESS, INC.
3594 S.V. 143 CT
MIAMI, FL 33175
NO
YES
B.B. 5%
HORIZON CONTRACTORS, INC. TLMC ENTERPRICES, INC.
8175 V. 32 AVE STE /1 3800 N.V. 22 AVE 1100
MIAMI, FL 33018 MIAMI, FL 33142
NO NO
YES YES
B.B. 5% B.B. 5%
C
RRALTA REBIlLL SER16, I NC
4941 S.V. 74 CT
MIAMI, FL 33155
NO
YES
B.B. 5%
---city o'ned YES, H
YES, B YES, B
YES, H
YES, H YES, F
YES, H
TOTAL BID: THE TOTAL OF
ITEMS 1 THROUGH 23 BASED ON
SEVENTY FIVE (75) CALENDAR DAYS
COMPLETION TIME, THE SUM OF $222,077.00
$237,342.00 $242,595.00
$279,430.00
;280,330.00 $293,392.00
$293,630.00
IRREGULARITIES LEGEND
A — No Power -of -Attorney
B — No Affidavit as to Copitat L Surptus of Bcpm* Company
C — Corrected Extensions
D—Proposat unsigned or improperly S"d or No Corporate Seat
E — Incomplete Extensions ("sing Primary Office Location Form)
THE DEPARTMENT OF C.I.P.
HAS DETERMINED THAT THE LOWEST
F —Non-responswe bid 0"" copy of certificate of competeney)
RESPONSIBLE AND RESPONSIVE BIDDER
IS MORLIC ENGINEERING CORP.
G — Improper Bid Bond
IN THE REVISED AMOUNT
OF 5 222,077.00 FOR THE TOTAL BID.
H — corrected Bid
I — No First source ►.ri„o Compliance statement
'
N J — No Minority compilance Statement
./ --
JOB NO.
K—No BugBid Proposal
IM Prep..
� Ir Br M. LOPEZ check By, C. C,ONZALEI
5 /p 3
/�
PAGE:
I OF 1 B-4626 8 B-565
FORMAL
CrJ
C` i
cW