Loading...
HomeMy WebLinkAboutR-03-0581J-03-314 03/19/03 RESOLUTION NO.03— 581 A RESOLUTION OF THE MIAMI CITY COMMISSION, WITH ATTACHMENT(S), BY A FOUR-FIFTHS (4/5 T11) AFFIRMATIVE VOTE, RATIFYING, APPROVING AND CONFIRMING THE CITY MANAGER'S FINDINGS OF AN EMERGENCY(S), WAIVING THE REQUIREMENTS FOR COMPETITIVE SEALED BIDDING PROCEDURES AS DESCRIBED ON THE EXHIBITS) ATTACHED AND INCORPORATED; ALLOCATING FUNDS FROM THE BUDGETS OF VARIOUS USER DEPARTMENT ACCOUNTS. BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI, FLORIDA: Section 1. By a four-fifths (4/5th,) affirmative vote, the City Manager's findings of an emergency (s), waiving the requirements for competitive sealed bidding procedures as described on the exhibit(s) attached are ratified, approved and confirmed, with funds allocated from the budgets of various user department accounts. '� ., : ,; C (y�m f `Wai% vt i CITY COMMISSION MEETING OF MAY 2 2 2P03 Resolution No. 03-- 581 Section 2. This Resolution shall become effective immediately upon its adoption and signature of the Mayor.!' PASSED AND ADOPTED this 22nd day of May , 2003. MANUEL A. DIAZ, MAYOR In accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of tt% iFl legislation by signing in the designated place provided, said !eq- isiat°stn nuAl becomes effective with tf c, (.lapse of ton (10) days from the date of c ..„ oC s action regarding same, without the Mayor exercising a vote. ATTEST: Pr' cilla A. Thompson, City Cerk PRISCILLA A. THOMPSON CITY CLERK APPROVE NDRO VILARELLO ATTORNEY 7123:tr:MJC AND CORRECTNESS: �i If the Mayor does not sign this Resolution, it shall become effective at the end of ten calendar days from the date it was passed and adopted. If the Mayor vetoes this Resolution, it shall become effective immediately upon override of the veto by the City Commission. Page 2 of 2 03— 581 Carlos A. Gimenez TO: City Manager VW CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM Dennis R. Wheeler, Director Neighborhood Enhancement Team (NED DATE: October 23, 2002 may_ 02-03-020 FILE: StMMCT : Billboard/Signage locations in the City of Miami REFEs: Ems: On May 2002, you authorized the immediate surveying and mapping of approximately 50 billboards and signage along the corridors of State Roads 112, 195, 395 and I-95 at a cost of $ 44,250. At this time we are requesting your approval for the surveying of the additional 400 billboards that at a per unit cost of $345 will extend the total cost another $138,000 to a total of $182,250. It is respectfully requested to fund this project on an EMERGENCY BASIS. This finding of Emergency will be placed on the next available Commission agenda for ratification and approval by the City Commission. If this proposal meets with your approval, please indicate by your signature below. APPROVED- Date: Budget Department APPR ate: ` ez City Manager t a� TKFJDRW/jar J -03-314 W7123 03", 581 W CSN OF MIAMI, FLORIDA W INTER -OFFICE MEMORANDUM ', .9, 1 i I., r gAtaGERS OFFICE Carlos A. Gunenez Novemb% Px TC: City Manama DATE FILE r FRLV.1 . Dennis P, , DiTeCtiOr Neighborhood IR-l"Wernent Team SUIL ECT : Coral Way Net Service Center Roof Repain and AJC Replacement EMERGENCY FINDINGS REFERENCES: 01-02-1n7 iiiiin This memorandum is to request yoyr autbwrriation for emergency repairs and replacement of the existing roofs and the of the air conditioning system at the CORAL WAY NET OFFICE, located at 1300 SW le Avenue. Public Works Department Staff Inspected the roof of the Coral Way Net Office Building on July 2001 and found significant leaks destroying the inside of the building and inhibiting the staff from working. At that time it was estimated that the cost would not exceed S 34,000.00 and an anthonzadon was requested and obtained from you to fiord this prOject. The bid response obtained was minimal and certainly exceeded the available budget. Therefore, we are requesting an increase to S 40,000.00 which is the new estimate given by Public Works. In addition, on November 56, 2001 the air conditioning broke and the'GSA A/C technician indicated that the system couldn't be repair at a reasonable cost They estimated that the cost of replacing the air conditioning unit to a bigger capacity, the installation of new conduits and to move the A/C unit from the roof were presently is installed to a ground housing would cost approximately S 20,000. Funding of these projects will be made through CIP account # 311061.259401.6.830 Improvements Other Than Buildings. Subject to your approval Public Works and GSA will manage these projects to completion. This finding of EMERGENCY will be placed on the next available Commission agenda for ratification and approval by the City Commission. If this meets your approval, please indicate by signing below. APPROVEDATZ61 ',—All City Manager LQ(WfiJar J -03-313 W7122 +03— 581