HomeMy WebLinkAboutR-03-0541J-03-274
03/19/03
RESOLUTION NO. 03— 541
A RESOLUTION OF THE MIAMI CITY COMMISSION,
WITH ATTACHMENT(S), BY A FOUR-FIFTHS (4/5 THS)
AFFIRMATIVE VOTE, RATIFYING, APPROVING AND
CONFIRMING THE CITY MANAGER'S FINDINGS OF AN
EMERGENCY(S), WAIVING THE REQUIREMENTS FOR
COMPETITIVE SEALED BIDDING PROCEDURES AS
DESCRIBED ON THE EXHIBIT(S) ATTACHED AND
INCORPORATED; ALLOCATING FUNDS FROM THE
BUDGETS OF VARIOUS USER DEPARTMENT ACCOUNTS.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. By a four-fifths (4/5th,) affirmative vote,
the City Manager's findings of an emergency(s), waiving the
requirements for competitive sealed bidding procedures as
described on the exhibit(s) attached are ratified, approved and
confirmed, with funds allocated from the budgets of various user
department accounts.
7
CITY COMM MON
1IEETITNFC OF
K�` 7 2 ?n
hu& ution No.
03- 541
Section 2. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.!'
PASSED AND ADOPTED this 22nd day of May , 2003.
MANUEL A. DIAZ, MAYOR
In accordance with Miami Code Sec. 2-36, since the Mayor did not indicate approval of
this legislation by signing in the designated place provided, said legi-l<ation now
becomes effective with the elansc of ten (10) days from the date of corn. nission action
regarding same, withoUt the Mayor exercising a vote.
Pr' ilia A. Thompson, City Cerk
ATTEST:
PRISCILLA A. THOMPSON
CITY CLERK
APPROVES,..710 M AND CORRECTNESS:
:NDRO `r1L
ATTORNEY
W7083:tr:MJC
�i If the Mayor does not sign this Resolution, it shall become
effective at the end of ten calendar days from the date it was
passed and adopted. If the Mayor vetoes this Resolution, it shall
become effective immediately upon override of the veto by the
City Commission.
Page 2 of 2 03- 541
CITY OF MIAMI. FLORIDA 4 ,�
y'1 01-02-036 Yom,
INTER -OFFICE MEMORANDUM C O
Carlos A. Gimenez DATE
June 25, 2001
City Manager SUBJECT
Emergency Finding
NW 17 Avenue
FROt: REFERENCES Parking Lot
John H. Jacks , Director
Public Works Department ENCLOSURES:
At the July 20, 2000 meeting, the City Commission adopted' Motion M-00-624 directing
the Administration to proceed with the design and construction of a parking lot on City -
owned lot located at 5500 NW 17 Avenue. Site soil testing, survey and the design of the
parking lot have been completed .by Public Works Department.
A commitment was made at past Commission meetings indicating that the Parking Lot
Project be done on a fast-track basis and to proceed with the construction. In order to
fulfill the expedited completion schedule, formal bidding of the construction must be
waived; informal bids taken, and the project awarded to the lowest responsible bidder and
proceed with the construction. Public Works estimates the cost of the construction,
administration and testing charges not to exceed $80,000.
Funds to cover the cost of the project are available from CDBG 2001 Funds.
If this meets with your appaal, *fig indicate by your signature below.
APPROVE&Date v2� 0/
APPROVED
FKR/JHJ/mm
. Warren, Director
Commu
Linda M. Haskins, Director
Management & Budget
CadedW,GmenAz
City Manager
Date f
Date 400101
c: Gwendolyn C. Warren, Director, Community Development
Jorge Avirio, Assistant Director, Public Works Department
J -03-274 Juan Ordonez, Chief Structural Engineer, Public Works Department
W 7 0 8 3 inning-NWITAveParkingLoc
03- 541
J
C.7^-
CITY OF MIAMI. FLORIDA
INTEROFFICE MEMORANDUM
� Carlos A.
Gimenez --_ June 11812001 _ • i 7 �,�E
City Manager
= Manuel ARime Community Center
EMERGENCY FINDINGS
400V_= Kis Supplemental Work
ohn H. Jac n, Director _
Public Works Department
On January 5, 2001 an emergency was established to seal coat, construct curbing, striping and
additional signage for the Manuel Artime Community Center parking lot (attached memo). The
work was informally bid and awarded io F & L Construction, Inc. for 536,018.00. After starting
the work additional base cracking, failures and deficiencies were found in the parking. lot and
walkway areas. The hazardous and maintenance items need repairing to make the area safe for
pedestrians and vehicular movement on the property. The additional work will repair trench
settlement from prior electrical work and complete the re -surfacing of the parking lot.
The contract with F & L Construction will be increased by $20,000.00 to complete the additional
work. CDBG 2001 finds are available in CIP Account #322060 to cover the cost of the work.
The Public Works Department and the Department of Public Facilities regommend that the work
be done.
This finding of emergency will be placed on the next available Commission agenda for
ratification and approval by the City Commission.
If this meets with your approval, please indicate by signing below.
c�—
E
FKR/JHJ/rjf
-03-273
)ATE V / v/
'l.uy Nuumrra
W 7 0 8 2 =hristina Abrams, Director, Public Facilities
Ubert Dominguez, Assistant Director, Public Works Department
_ilia Varas, Manuel Artime Community Center
JHJ-MACC EMERGENCY -SUPPLEMENTAL
DATE*14
•
03- 541
.._ . .idrs'Gr�:CE ;u,uht
Carlos A. Gimenez
City Manager :: .. i ::; , •..
Terry Buice, Acting Director
Conference, Conventions and Public Facilities
January 5, 2001
Manuel Artime Community Center
Renovations -Emergency
This memorandum serves to request your authorization for the emergency resurfacing and repair
of the Manuel Artime Parking Lot that serves the theater building, the office building and the
Ernesto Lecuona Park. There is also a need to relocate and add handicapped parking spaces for
both buildings to comply with ADA requurements.
An Emergency Finding memorandum was previously issued which included this project (see
attached) showing the need to spend CDBG Funds prior to September 1,2000. The first phase of
the project that deals with the preparation of blueprints, scope of work and specifications was done
by Metric Engineering, who will serve as the project manager. The second phase of the project,
the repair and resurfacing for the parking lot, was informally bid and awarded to F&L
Construction, Inc. for 536,018.00. Due to the fact that the processing of paperwork was caught in
the middle of the dateline, the prior Emergency Finding memorandum•does not comply in part for
what it was issued (dateline), lea, ing in limbo the second phase of the project. Funds from CDBG
are still available and will be used to complete the second phase of the project.
The need for the repairs and resurfacing of the parking lot is imperative for the safety and well
being of our tenants and clients and their private property. In the past we have had numerous
problems with broken curbs and parking stoppers, exposing bare metal bars and causing damage
to cars. Also, a suit has been initiated by a client who fell.
If this meets with your approval, please indicate by signing below.
Approved: Not Approved:
o Im Carlos A. Gimenez
City Manager City Manager
e
'VW.;
r
FYJt/TB/11 v
c: John H. Jackson, Public Works
Liiia L. Varas, Manuel Artime Community Center
03- 541
Jt J F twM'%It!'i�%G t•tC� 'J: Uht
Carlos A. Gimencz
City Manager
Terry Buice, Acting Director
Conference. Conventions and Public Facilities
January 5, 2001
Manuel Artime Conununity Center
Renovations -Emergency
This memorandum serves to request your authorization for the emergency resurfacing and repair
of the Manuel Artime Parking Lot that serves the theater building. the office building and the
Ernesto Lecuona Park. There is also a need to relocate and add handicapped parking spaces for
both buildings to comply with ADA requirements.
An Emergency Finding memorandum was previously issued which included this project (see
attached) showing the need to spend CDBG Funds prior to September 1:-2000. The first phase of
the project that deals with the preparation of blueprints, scope of work and specifications was done
by Metric Engineering, who will serve as the project manager. The second phase of the project,
the repair and resurfacing for the parking lot, was informally bid and awarded to F&L
Construction, Inc. for 536,018.00. Due to the fact that the processing of paperwork was caught in
the middle of the dateline. the prior Emergency Finding memorandum.does not comply in part for
what it was issued (dateline), lea%ing in limbo the second phase of the project. Funds from CDBG
are still available and will be used to complete the second phase of the project.
The need for the repairs and resurfacing of the parking lot is imperative for the safety and well
being of our tenants and clients and their private property. In the past we have had numerous
problems with broken curbs and parking stoppers, exposing bare metal bars and causing damage
to cars. Also, a suit has been initiated by a client who fell.
If this meets with your approval, please indicate by signing below.
- Approved: Not Approved:
° rm i. Carlos A. Gimenez
City Manage City Manager
51!141"
FXJUTBAJV
c: John H. Jackson, Public Works
Lilia L. Varas, Manuel Artime Community Center
03- 541