HomeMy WebLinkAboutR-03-0538J-03-271
03/19/03
RESOLUTION NO. 0 3 5 3 8
A RESOLUTION OF THE MIAMI CITY COMMISSION,
WITH ATTACHMENT(S), BY A FOUR-FIFTHS (4/5 T11)
AFFIRMATIVE VOTE, RATIFYING, APPROVING AND
CONFIRMING THE CITY MANAGER'S FINDINGS OF AN
EMERGENCY(S), WAIVING THE REQUIREMENTS FOR
COMPETITIVE SEALED BIDDING PROCEDURES AS
DESCRIBED ON THE EXHIBITS) ATTACHED AND
INCORPORATED; ALLOCATING FUNDS FROM THE
BUDGETS OF VARIOUS USER DEPARTMENT ACCOUNTS.
BE IT RESOLVED BY THE COMMISSION OF THE CITY OF MIAMI,
FLORIDA:
Section 1. By a four-fifths (4/5tns) affirmative vote,
the City Manager's findings of an emergency(s), waiving the
requirements for competitive sealed bidding procedures as
described on the exhibit(s) attached are ratified, approved and
confirmed, with funds allocated from the budgets of various user
department accounts.
CITY COMMISSION
MEETING OF
MAY 2 2
Resolution No.
03- 538
Section 2. This Resolution shall become effective
immediately upon its adoption and signature of the Mayor.!'
PASSED AND ADOPTED this 22nd day of May , 2003.
MANUEL A. DIAZ, MAYOR
In accordance with Miamil Code Sec. 2-36, since the Mayor did not indi„ ote approval of
this legislation by si ning in, the de si mated place provided, s�illd now
becomes effective with the elapse of ten (1g) days from the date of cornmi sion .action
regarding same, without the Mayor exercising a vote.
ATTEST: Priobilla A. Thompson, City Cerk
PRISCILLA A. THOMPSON
CITY CLERK
oe
APPRO T044ORM AND CORRECTNESS:
RLEJANDRO VILARELLO
CITY ATTORNEY
W7080:tr:MJC
�i If the Mayor does not sign this Resolution, it shall become
effective at the end of ten calendar days from the date it was
passed and adopted. If the Mayor vetoes this Resolution, it shall
become effective immediately upon override of the veto by the
City Commission.
Page 2 of 2
03—
3_ 538
A
T ; Carlos A. Gimenez
City Manager
r=_
John H. Jackson, Director
Public Works Department
The Dinner Key Boatyard Marine' Docks project consists of the construction of new
marina docks, new seawall, upland improvements and related environmental mitigation.
The project was originally awarded to Cone Constructors, Inc. in October 1997 and work
was well underway when Cone Constructors defaulted in July 1999. The work stopped
and in October 1999, the new docks suffered damage from Hurricane Irene and from
vandalism. In April 2001, the City entered into a contract with Bunnell Foundation, Inc.
to make the necessary repairs and to complete the project, including the related
environmental mitigation.
When the Building Department re -inspected the facility, it was discovered that electrical
equipment on the docks suffered unforeseen salt water damage and they required
replacement of -the electrical transformers that had been under sea water, re -certification
of the other electrical equipment exposed to storm damage and other repairs for City
Code compliance. The replacement of transformers and the above storm damage repairs
were not part of the original scope of work in the Bunnell Foundation contract, and this
Emergency Finding is to authorize an increase in the construction contract to expedite the
completion of the project. The total amount of the increase in contract is $119,700.00
and the additional work includes $89,288 for replacement transformers and re-
certification of electrical equipment; $14,000 to upgrade the fire alarm poles and wiring;
$10,285.00 for stainless steel supports and $6,127.00 to replace damaged electrical
conduits and wiring.
There has been substantial work completed at the site but the abovementioned
transformers must be ordered, delivered and installed, which is extra work not
anticipated. Therefore, based on the work completed and the performance bond on the
job, we request that the remaining 50% compensation to Bunnell Foundation from the
original contract and pursuant to the current contract provision in the amount of $50,688
be released at this time.
J -03-271
W7080
03- 538
EMERGENCY FINDING:"`
Increase in Contract for Dinner
=�Rt3
Key Boatyard Marina Docks
Project, B -1088B
The Dinner Key Boatyard Marine' Docks project consists of the construction of new
marina docks, new seawall, upland improvements and related environmental mitigation.
The project was originally awarded to Cone Constructors, Inc. in October 1997 and work
was well underway when Cone Constructors defaulted in July 1999. The work stopped
and in October 1999, the new docks suffered damage from Hurricane Irene and from
vandalism. In April 2001, the City entered into a contract with Bunnell Foundation, Inc.
to make the necessary repairs and to complete the project, including the related
environmental mitigation.
When the Building Department re -inspected the facility, it was discovered that electrical
equipment on the docks suffered unforeseen salt water damage and they required
replacement of -the electrical transformers that had been under sea water, re -certification
of the other electrical equipment exposed to storm damage and other repairs for City
Code compliance. The replacement of transformers and the above storm damage repairs
were not part of the original scope of work in the Bunnell Foundation contract, and this
Emergency Finding is to authorize an increase in the construction contract to expedite the
completion of the project. The total amount of the increase in contract is $119,700.00
and the additional work includes $89,288 for replacement transformers and re-
certification of electrical equipment; $14,000 to upgrade the fire alarm poles and wiring;
$10,285.00 for stainless steel supports and $6,127.00 to replace damaged electrical
conduits and wiring.
There has been substantial work completed at the site but the abovementioned
transformers must be ordered, delivered and installed, which is extra work not
anticipated. Therefore, based on the work completed and the performance bond on the
job, we request that the remaining 50% compensation to Bunnell Foundation from the
original contract and pursuant to the current contract provision in the amount of $50,688
be released at this time.
J -03-271
W7080
03- 538
f
Carlos A. Gimenez r_f
EMERGENCY FINDING: Contract with Bunnell Foundation, Inc.
H-1088
Y
April 18, 2001
Page two
. 4.�
The Surety claims that the invoice of Bunnell Foundation, in the sum of $101;375 and the
payment to the subcontractors of CCI, in the sum of 547,805.03 are barred by their failure to
submit timely claims. Accordingly, the City may not be able to recover these amounts from the
Surety. However, the new contractor and the subcontractors require payment of their
outstanding invoices in order to return to the site to complete the Project.
Public Works will endeavor via the Law Department to get an acceptable tender agreement with
the City and the Surety for the payment of all costs to complete the project. This request is for
your approval to enter into a contract on an EMERGENCY BASIS with Bunnell Foundation,
Inc. in the amount of $337,051.60 to complete the project work. Funds for this contract are
available in unallocated fund balances from General Fund contributions to CIP and public
service taxes. These funds are being proposed for appropriation in the FY2001 Mid -Year
Ordinance.
This finding of an emergency will be placed on the next available Commission agenda for
ratification and approval by the City Commission.
Linda M. Haskins, Director
Management and Budget
DATE: O!
APPROVED: DATE: /Y/81/�v
t, Carlos A. Gimenez
City Manager
FKR/JHJ/rj f
c: Olga Ramirez-Seijas, Assistant City Attorney
Allan Poms, Chief Architect, Public Works Department
Genady Beylin, Engineer I, Public Works Department
C:\My DocumentsUHJ-BUNNELL.doc 03,— 538
4:7
Carlos A. Gimenez
City Manager
'Z. -i- 't *�
John H. Jacks, Director
Public Works Department
-• _= - P-GRi'JA
INTER -OFFICE MEMORANDUM
April 18, 2001 = -=
- = EMERGENCY FINDING:
Contract with Bunnell
Foundation, Inc.
=- Dinner Key Boat Yard Marina
Docks Project, H-1088
On October 16, 1997, the City of Miami entered into a contract with Cone Constructors, Inc.
(CCI) for the Dinner Key Boat Yard Marina Docks project, H-1088, for the contract sum of
$2,301,500. Cone Constructors, Inc. completed approximately 95% of the work but
subsequently defaulted under the contract and abandoned the project. The City found CCI in
default under the contract and notified the Surety under the Payment and Performance Bond, The
American Home Assurance Company. Since 1999, the City has been. negotiating without
success with the Surety for the completion of the project.
In October 1999, Hurricane Irene hit South Florida and the property upon which the project is
being developed sustained damages estimated at $97,312. Additionally, resulting from CCI's
abandonment of the project, there has been vandalism to the property estimated at $25,280. The
Surety, while continuing to negotiate, is not willing to enter into an agreement acceptable to the
City and to pay a new- contractor to complete the project work. The City needs to complete the
project work prior to July 2001 to satisfy its obligation to the lessee of the property. It is
imperative that the work be started immediately in order to meet the July 2001 date.
Bunnell Foundation, Inc. is familiar with the project, having been the major marine subcontractor
to CCI, and has submitted a proposal for the completion of the project. Based on the proposal
and subsequent negotiations, it is estimated that the total cost to complete the. project is
$386,302.90 which represents (i) $114,530 compensation to the new contractor to complete the
work; (ii) $97,312 for hurricane repairs;(iii) $25,280 for vandalism repairs, (iv) $101,375.87 to
pay an outstanding invoice of Bunnell Foundation, Inc., which includes $53,324 in change orders
approved by the Public Works, and (v) $47,805.03 to pay outstanding .invoices of various
subcontractors of CCI. The City has undisbursed funds in the amount of 5119,251�esulting
in an amount needed of $267,051.60. The City will also need $70,000 for contingency in the
contract with the new contractor, for a total amount of 5337,051.60.
C:1My DocumentsUHJ-BUNNELL.doc
03- 538
Carlos A. Gimenez
EMERGENCY FINDINGS
B -1088B
October 3, 2001
Page two
The funds for the increase in contract amount of $119,700.00 are available in CIP
326005. Ratification of this Finding of Emergency will be placed on the next available
Commission agenda for ratification and approval by the City Commission.
F WHU/rjf
Approved: Date: s 't
-q-eLinda M. Haskins, Director
Dept. of Management & Budget
'Annro-ve,4- Date: 19>14-1�e
;.'ro �"QL
City Manager
c: Albert Dominguez, Assistant Director, Public Works Department
Allan Poms, Chief Architect, Public Works Department
03- 538
TD Carlos A. Gimenez
City Manager
John H2,a , Director
Public Works Department
CiTY OF MIAMI. FLORIDA
INTER -OFFICE MEMORANDUM
00-01-715
DATE March 6, 2001 RLE:
SUSJECT EMERGENCY FiNDING
GSA Building Roof Replacement
(Second Bidding) B-6364
REFEaENCE,
E%CL--911AE5
The GSA Heavy Equipment and Office Building has been in need of a new roof for
several years. This fac * is essential for the City's operations particularly in emergency
situations. The Department of Public Works prepared roof replacement plans and
received bids in October 2000. The bids were substantially over the budget
Public Works then revised and improved the roof specifications and formally n: -bid the
project at a time when roof work was morecompetitive. As a result of the 'Second
Bidding' on February 13, 2001 a low bid in the amount of $232,200 was received.
This proposal from the Morton Roofing Company is approximately 20% under the
budget
Public Works has drafted the award of contract legislation for the* next available
Commission meeting in April. However. both GSA and Public Works recommend that
the roof replacement work begin immediately because there are only a couple of months
remaining before the rainy season begins.
The GSA Building has an existing roof structure that is extremely vulnerable to roof leaks
during the period between the removal of the old roof membrane and the installation of
the new roof. There cord be serious damage to the offices and to the equipment in the
building because the roof structure will be exposed for a 2 -day period between removal
and 'dry -in'. It is essential that the roof replacement work be done during the 'dry
season'
Upon your approval, the Public Works Department will have the low bidder roofing
contractor, Morton Roofing Co., start as soon as possible so that the work can be
_ substantially complete before the start of the rainy season. Funding for this project is
allocated under CIP Project No. 311706. �^
J -03-270 r -;c
W 7 0 7 9 APPROVED
FMAIPhnm
EMERGENCYffWno.GSA Roofing
wLirxda M. Haskft. Director
Budget DepartmW
City Manager
03- 538